HomeMy WebLinkAboutT80339 CCO 006.pdf CID y County of Fresno n Department of Public Works and Planning Development Services&Capital Projects Division FRES� Steven E.White,Director PROJECT MANAGEMENT CONSTRUCTION CHANGE ORDER REQUEST This Document is for Fresno County Internal Use Only Project: Sheriff Substation Bid Package 2 Contract No.: 21-S-01 Date: 06/27/2024 Contractor: BMY Construction Group,Inc. Architect: Roger Davidson Change Order No.: CCO#6 Construction Contract Dollar Amount(as awarded on 5/17/2022) $2,465,000.00 Director's Change Order Limit: $135,750.00 Change Order Allowance $246,500.00 Contract Time(Calendar Days): 60 Construction Start Date(NTP Issued 11/13/23): 11/13/23 Original Construction Completion Date: 1/12/24 Change Order Scope of Work: PCO#18 Contra Costa Electric Labor Escalation PCO#19 Contra Costa Electric Time&Material Attachment(s): Contractors PCO,Change Order Summary Net Change Order Dollar Amount: $27,240.25 Net Calendar Days: 11 Total Change Order Dollar Amount To Date $232,277.81 Adjusted Contract Dollar Amount: $2,697,277.81 Director's Change Order Limit Balance: Change Order Allowance Balance: $14,222.19 Total Adjusted Calendar Days To Date: 99 Adjusted Construction Completion Date: 04I20124 Reviewed: Roger Davidson - 2024.07.08 13:41:57-07'00' Supervising Architect Reviewed: Keith M.Eckert II Keith Eckert 7.10.24 Senior Engineering Technician-Project Manager Reviewed: Mandee Sekhon Mandee S.Sekhon Digitally signed by ManCeep S.SekhOn p p Dale 2024 07 12 09.41 18-OrW' Construction Division Engineer-Construction Manager Reviewed: William M.Kettler William M. Kettler DigiWIly slgn,d by William M Kelder Date:2024.07.12 14'.39:47-07W Deputy Director of Planning Reviewed: Bernard Jimenez Bernard Jimenez Oigi[ally signed by Bernard JimenezDate 2024.07.1216:16:14-02'00' Planning&Resource Management Officer Approved: Steven E. White Steve White DaiWly ig24 07d,by St—hit, Director of Public Works and Planning Approved: Nathan Magsig Board of Supervisors,Chairman Kay Vang Digitally signed by Kay Vang Acknowledged: Kay Vang Date:2024.07.31 14:13:15-07'00' Principal Accountant Scan and forward Director Approved Copy to; PWP Business Office Kay Vang co 19 t County of Fresno O is O Department of Public Works and Planning FREC3 Development Services&Capital Projects Division Steven E.White,Director COUNTY CHANGE ORDER REQUEST Project: Sheriff Substation Bid Package 2 Contract No.: 21-S-01 Date: 06/27/2024 Contractor: BMY Construction Group,Inc. 2485 East Olive Avenue Fresno,CA 93727 (559)243 4200 Change Order No.: CCO#6 Construction Contract Dollar Amount(as awarded on 5/17/2022) $2,465,000.00 Original Construction Completion Date: 01112/24 CCO#6 is hereby approved by the County. Scope of Work: PCO#18 Contra Costa Electric Labor Escalation PCO#19 Contra Costa Electric Time&Material Attachment(s): Contractors PCO,Change Order Summary Net Change Order Dollar Amount: $27,240.25 Net Calendar Days: 11 Adjusted Contract Dollar Amount: $2,697,277.81 Total Change Order Dollar Amount To Date: $232,277.81 Total Adjusted Calendar Days To Date: 99 Adjusted Construction Completion Date: 04I20/24 Keith M.Eckert ll Keith M. Eckert Project Manager Date: 711124 By signing acceptance of this Change Order,the Contractor shall agree to the following: 1.Provide all equipment,material,labor and services required to complete the Scope of Work specified in this Change Order. 2.The revised adjusted Contract dollar amount and time extension shown in this Change Order as payment in full. In the event the Contractor does not sign acceptance of this Change Order,Provisions under the Agreement 16-S-05,Article VI shall apply. Accepted By: BMY Construction Group,Inc. Evan Stockbridge Authorized Signature Date: 7/8/24 When completed by the Contractor, please scan and return Hard Copies and Color PDF copy to: Linda Guerra,Staff Analyst Fresno County Department of Public Works and Planning,Development Services&Capital Projects Division 2220 Tulare Street,Eighth Floor Fresno,CA. 93721 CHANGE ORDER SUMMARY Project: Sheriff Substation Bid Packaqe 2 Executed Order 1'�pp�%Fdd Credit Adj. Days Description 1 12/19/2023 $73,759.38 $0.00 32 Includes PCO#4,5 2 01/29/2024 $13,144.95 $0.00 10 Includes PCO#7 3 02/26/2024 $17,246.41 $0.00 3 Includes PCO#2,9 4 04/08/2024 $97,206.02 $0.00 40 Includes PCO#12.1,13,17 5 05/16/2024 $3,680.80 $0.00 3 Includes PCO#10.1 6 06/27/2024 $27,240.25 $0.00 11 Includes PCO#18, 19 7 8 9 10 Totals $232,277.81 $0.00 99 ChangeProposed Executed Add Credit Rejected Pending Adj. D Description Orders CO# 1 Not Used 2 3 $15,269.48 0 Material&Labor Increase due to late start of project 3 $2,266.26 5 Room#SS113 clean and seal concrete 4 1 $10,551.27 7 D One Drywall Addendum 4(Extra Studs) 5 1 $63,208.11 25 Client request,see RFI#15 6 $56,930.36 7 American Inc.Added roof drains 7 2 $13,144.95 10 Generator Pad Relocation 8 $1,105.31 0 Glass&glazing material increase 9 3 $1,976.93 3 Missing Power R.1 10 $5,809.79 3 Power to mezzanine HVAC units 10.1 5 $3,680.80 3 Power to mezzanine HVAC units 11 $2,432.59 0 Remove drywell and add 2"condensate piping 11.1 $1,956.15 0 Remove drywell and add 2"condensate piping 12 $103,191.00 0 EPC 12.1 4 $61,380.00 36 EPC 13 4 $35,616.02 4 Nation-Added roof draings ASI 11-29-2023-01 14 $28,126.78 5 American Inc.Change of scope 15 $26,640.86 5 Equipment Yard-Added baserock 16 Not Used 17 4 $210.00 0 Reinstall Mail Box T&M 18 6 $13,768.17 0 Contra Costa Electric-Labor Escalation 19 6 $13,472.08 11 Contra Costa Electric-T&M Totals $232,277.81 $0.00 $165,931.15 $62,527.95 PCO #018 CONSTRUCTION GROUPINCORPORATED BMY Construction Group, Inc. Project: 22009-Fresno County Sheriff Substation Bid Package Contract 5485 East Olive Avenue #21-S-01 Fresno,California 93727-2541 1129 N Armstrong Ave Phone:(559)243-4200 Fresno,California 93727 Fax:null Prime Contract Potential Change Order #018: CE #024 - Contra Costa Electric - Labor Escalation TO: The County of Fresno,Department of Public FROM: BMY Construction Group,Inc. Works and Planning 5485 E.Olive Ave 2220 Tulare Street,8th Floor Fresno,California 93727 Fresno,California 93721 PCO NUMBER/REVISION: 018/0 CONTRACT: 22009-Fresno County Sheriff Substation Bid Package Contract#21-S-01 Prime Contract REQUEST RECEIVED FROM: CREATED BY: Nick Hostetler(BMY Construction Group,Inc.) STATUS: Pending-In Review CREATED DATE: 5/23/2024 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: ACCOUNTING METHOD: Amount Based THE REFERENCED PCO 30 WILL EXPIRE AFTER: SCHEDULE IMPACT: PAID IN FULL: No EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: $13,768.17 POTENTIAL CHANGE ORDER TITLE:CE#024-Contra Costa Electric-Labor Escalation CHANGE REASON:Correction POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE#024-Contra Costa Electric-Labor Escalation ATTACHMENTS: 73111 -CO#01 Proposal.pdf # Budget Code Description Amount 1 26-OOOO.PO Electrical.Purchase Order Labor Escalation $13,768.17 Subtotal: $13,768.17 Overhead(Subcontractor): $0.00 Subcontractor Total: $13,768.17 Overhead(BMY): $0.00 Grand Total: $13,768.17 BMY Construction Group, Inc. Page 1 of 2 Printed On: 5/23/2024 08:55 AM PCO #018 CONSTRUCTION GROUPINCORPORATED Keith Eckert(The County of Fresno, The County of Fresno,Department of BMY Construction Group,Inc. Department of Public Works and Public Works and Planning Planning) 2220 Tulare Street,8th Floor 2220 Tulare Street,8th Floor 5485 E.Olive Ave Fresno,California 93721 Fresno,California 93721 Fresno,California 93727 P—,.ArchitectSign Here Pro—ArchitectSlg-dDate ProcoreOwnerSig,Here Pro co reOwnerSlgnedDate ProcoreGeneralC,—,torSig,Here P,coreGeneralContractorSignedDate SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE BMY Construction Group, Inc. Page 2 of 2 Printed On:5/23/2024 08:55 AM Contra Costa Electric,Inc. Contra Costa Electric 4690 E.Carmen Ave An EMCOR Company Fresno CA 937 Ph:559-252-1114 www.ccelectric.com November 9, 2023 BMY Construction Group Inc. 5485 E. Olive Ave. Fresno, CA 93727 Attention: Nick Hostetler Subject: Fresno Sherriff s Substation Bid Package 2—Labor Escalation. Please consider our Lump Sum Quotation for the above referenced project. Our quotation is in accordance with the new schedule provided showing a new start date of Nov. 131h, 2023 and new completion date of January 1 lth, 2024. This has increased our cost to complete the project due to labor escalation. Change Order#1 —Labor Escalation thru Jan. 1 lth, 2024. The scope of work included in our proposal as follows: Labor Cost Increase of$13,768.17. A. In general, our quotation will include the following: • Hourly rate increase of$5.04/hr. X 2,731.78 estimated hours at the time of bid. B. The following items are not included: 1. Concrete Scanning and Coring (by others). 2. Cutting, Patching, Blocking and Framing. 3. All Painting. 4. Accelerated work schedule. 5. Anything not specifically included is explicitly excluded. Contra Costa Electric appreciates your consideration and we look forward to working with you on this project. If you have any questions or require additional information, please do not hesitate to call me at: 559-252-1114. Ext. 703 orjfowler@emcor.net Sincerely, 9-& r-t-� Contra Costa Electric,Inc. Contra Costa Electric 4690 E.Carmen Ave An EMCOR Company Fresno CA 937 Ph:559-252-1114 www.ccelectric.com Project Manager Contra Costa Electric,Inc. An EMCOR Company 1 =10FAM PCO #019 CONSTRUCTION GROUP INCORPORATED BMY Construction Group, Inc. Project:22009-Fresno County Sheriff Substation Bid Package Contract 5485 East Olive Avenue #21-S-01 Fresno, California 93727-2541 1129 N Armstrong Ave Phone: (559)243-4200 Fresno, California 93727 Fax: null Prime Contract Potential Change Order #019: CE #025 - Contra Costa Electric - T&M TO: The County of Fresno, Department ofPublic FROM: BMY Construction Group, Inc. Works and Planning 5485 E.Olive Ave 2220 Tulare Street,8th Floor Fresno, California 93727 Fresno, California 93721 PCO NUMBER/REVISION: 019/0 CONTRACT: 22009-Fresno County SheriffSubstation Bid Package Contract#21-S-01 Prime Contract REQUEST RECEIVED FROM: CREATED BY: Nick Hostetler(BMY Construction Group,Inc.) STATUS: Pending-In Review CREATED DATE: 5/23/2024 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: ACCOUNTING METHOD: Amount Based THE REFERENCED PCO 30 WILL EXPIRE AFTER: SCHEDULE IMPACT: 11 days PAID IN FULL: No EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: $13,472.08 POTENTIAL CHANGE ORDER TITLE: CE#025-Contra Costa Electric-T&M CHANGE REASON:Correction POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE#025-Contra Costa Electric-T&M The scope of work included in our proposal is for the Electrical changes only and is tendered with qualifications except those listed in the drawings indicated above and inclusions listed below:All work is subject to materials submittal approval and time constraints of approved materials and vendors. Proposal is valid for 30 days. ATTACHMENTS: 73111 -CO#07 Proposal.pdf # Budget Code Description Amount 1 26-OOOO.PO Electrical.Purchase Order Time and Material Work $10,702.12 Subtotal: $10,702.12 Overhead(Subcontractor): $1,888.60 Subcontractor Total: $12,590.72 Overhead(BMY): $881.36 Grand Total: $13,472.08 BMY Construction Group, Inc. Page 1 of 2 Printed On:5/23/2024 09:07 AM I =1 OAF N PCO #019 CONSTRUCTION GROUP INCORPORATED Keith Eckert(The County of Fresno, The County of Fresno, Department of BMY Construction Group,Inc. Department of Public Works and Public Works and Planning Planning) 2220 Tulare Street,8th Floor 2220 Tulare Street,8th Floor 5485 E.Olive Ave Fresno,California 93721 Fresno,California 93721 Fresno,California 93727 ProcoreHrchitect Sign Here Procor,ArchitectS,gnedD- Procor 0—rSign Here Proco 0—,rSignedDate ProcoreG--1ContraclorSignHere ProcoreGeneralContractorSigned Date SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE BMY Construction Group, Inc. Page 2 of 2 Printed On:5/23/2024 09:07 AM Contra Costa Electric Contra Costa Electric,Inc. 4690 E Carmen Ave An EMCOR Company Fresno,CA 93703 Ph:559.252.1114 Fax:559.452.1013 May 22nd, 2024 Attn: Derek Brawley Subject: Fresno Sherriffs Substation Bid Package 2 -Time and Material Work CCE CO#7 We are pleased to offer for your consideration our Lump Sum Quotation for the above referenced project. The scope of work included in our proposal is for the Electrical changes only and is tendered with qualifications except those listed in the drawings indicated above and inclusions listed below:All work is subject to materials submittal approval and time constraints of approved materials and vendors.Proposal is valid for 30 days. Lump Sum $12,590.72 A. In general, our quotation will include the following: • Time and Materials per direction of the County and BMY. See attached backup documents. B. We have excluded the following items from our scope of work: • Providing performance and payment bond. • Anything not specifically included is explicitly excluded. We recognize that you have a choice when it comes to selecting contractors to work on your projects and we thank you for giving Contra Costa Electric, Inc.the opportunity of bidding on your work. If we can be of service to you on this or future projects,please feel free to contact me at(559) 252-1114 or jfowler0emcor.net Sincerely, �6� 74Gf&T Fresno Office Contra Costa Electric,Inc. An EMCOR Company ,p d..._..'"'Rs www.ccelectric.com Page 1 of 1 D R#10000011625 Invoice Breakdown Quall UNITS I Description of Labor Rate Total Cost 8.5 HRS 5/2/24 Power for Onyx Panels $117.60 $ 999.60 13 HRS 5/3/24 Power for Onyx Panels $117.60 $ 1,528.80 12 HRS 5/6/24 Install Remote Panels for Generator and ATS $117.60 $ 1,411.20 9 HRS 5/7/24 Trace Conduit Pathways $117.60 $ 1,058.40 4 HRS 5/7/24 Additional Control Power for AHU's $117.60 $ 470.40 16 HRS 5/8/24 Tracing Pathway to Generator,Pull wire $117.60 $ 1,881.60 10 HRS 5/9/24 Install Conduit for Generator Remote Display $117.60 $ 1,176.00 9 HRS 5/13/24 Install Remote Generator Panels and Wire $117.60 $ 1,058.40 See attached T&M Daily Reports Total Labor Cost $ 9,584.40 Quantity I UNITS Description of Material Rate Total Cost 1000 Ft. Belden#B9841 24-1P Stranded,Sheilded Cable $ 1.97659 $ 1,976.59 30 Ft. 3/4" EMT Conduit $ 0.92 $ 27.60 120 Ft. 1"EMT Conduit $ 1.72 $ 206.40 680 Ft. #12 THHN $ 0.15436 $ 104.96 960 Ft. #14 THHN $ 0.097749 $ 93.84 Material Subtotal $ 2,409.39 Tax 0.08500 $ 204.80 Mark-up 15% $ 392.13 Total Material Cost $ 3,006.32 Quantity UNITS Description of Equipment, Rentals, & Other Costs Rate Total Cost Equipment, Rentals, & Other Costs Subtotal $ - Tax 0.08500 $ - Mark-up 15% $ - Total Equipment, Rentals & Other Costs: $ - OVERALL TOTAL FOR WORK PERFORMED $ 12,590.72 Page 1 c Contra Costa Electric An EMCOR Company CA. LICENSE#139885 4690 E.CARMEN AVENUE,FRESNO,CA 93703 (559)252-1114•FAX(559)252-1177 CUSTOMER: y--o PAGE No. [ LOCATION: *WORK ORDER* JOB No. -7 _ S DATE: SJ -2- /�E CONTRACT / P.O. No: JOB STATUS: OP /COMPLETE DESCRIPTION OF WORK: g -S.'T��! � �- V-4FLOC� A li—m— QUAN. MATERIAL USED P.O.# PRICE PER AMOUNT 10 6 3 3 � 44 l K� s 2It2. L EQUIPMENT SUB TOTAL: $ DATE QUAN. TYPE/SIZE HRS RATE AMOUNT S.TAX: % $ MK-UP: % $ FREIGHT: $ TOTAL MAT: $_ LABOR EQUIPMENT: $ DATE CLASS EMPLOYEE ST, T 1/2 HRS BLNG AMOUNT OR DT RATE DELV. & P/U: $ 2. WPM MK-UP: % $ S.TAX: % $ TOTAL EQIP: $ TOTAL ST. TIME: $ TOTAL TIME & 1/2: 5 TOTAL DBLE TIME $ TOTAL LABOR: $ QUANTITY OF OVERTIME MEALS /Z'-�t MEALS: $ CUSTOMERS REP. DATE: 6 /��`1- W.O. TOTAL $ F Contra Costa Electric An EMCOR Company CA. LICENSE#139885 4690 E.CARMEN AVENUE,FRESNO,CA 93703 (559)252-1114•FAX(559)252-1177 CUSTOMER: o� C PAGE No. [ ] y LOCATION: 5�ct, 514R1o�J *WORK ORDER* JOB No. 3 11t DATE: _ / a-/ -2_4 2y CONTRACT / P.O. No: JOB STATUS: EN COMPLETE DESCRIPT ON OF WORK: t LoG�� � - Eon-- wad- rZM 1"t 17-120%A- QUAN. MATERIAL USED P.O.# PRICE PER AMOUNT 0.7 T'+4+4 t 3 1,4 11 m-- 3 Im It F-%\A-C G o I-P aAe-55 4 tsaJ D"PL��►-3 2 3L4T l�ti1t� a S I EQUIPMENT SUB TOTAL: $ DATE QUAN. TYPE/SIZE HRS RATE AMOUNT S.TAX: % $ MK-UP: _ % $ FREIGHT: $ I TOTAL MAT: $ LABOR EQUIPMENT: S DATE CLASS EMPLOYEE ST, T 1/2 HRS BLNG AMOUNT OR DT RATE DELV. & P/U: S 5 3 cM �. Twos s� MK-UP: % $ S.TAX: % S TOTAL EQIP: $ TOTAL ST. TIME: S TOTAL TIME & 1/2: $— TOTAL DBLE TIME $ TOTAL 1 LABOR: $ QUANTITY OF OVERTIME MEALS MEALS: $ CUSTOMERS REP. ��- DATE: /��W.O. TOTAL $ Contra Costa Electric An EMCOR Company CA. LICENSE#139885 4690 E.CARMEN AVENUE,FRESNO,CA 93703 (559)252-1114•FAX(559)252-1177 CUSTOMER: �O �� '''� PAGE No. [ ] LOCATION: SI Oz44'�g a.-, *WORK ORDER* JOB No. -7 3 I DATE: �_.��_�_A,24( CONTRACT / P.O. No: JOB STATUS: OPEN/COMPLETE DESCRIPTION OF WORK: -T7091 yjr�L-n►J QUAN. MATERIAL USED P.O.# PRICE PER AMOUNT l0 k"- i 4 S pawl-- NHS I itX it T'S r r, M'I EQUIPMENT SUB TOTAL: $ DATE QUAN. TYPE/SIZE HRS RATE AMOUNT S.TAX:_% $ MK-UP: % $ FREIGHT: $ TOTAL MAT: $ LABOR EQUIPMENT: $ DATE CLASS EMPLOYEE ST, T 1/2 HRS BLNG AMOUNT OR DT RATE DELV. & P/U: $ rl b 2H F_I=b%1 ei" S7 MK-UP: % $ u7 E5 j S.TAX: % $ _ TOTAL EQIP: $ TOTAL ST. TIME: $ TOTAL TIME & 1/2: $ TOTAL DBLE TIME $ TOTAL LABOR: $ QUANTITY OF OVERTIME ME /p-Z MEALS: $ CUSTOMERS REP. ^� _ Z DATE: W.O. TOTAL $ 9 Contra Costa Electric An EMCOR Company CA. LICENSE#139885 4690 E.CARMEN AVENUE,FRESNO,CA 93703 (559)252-1114•FAX(559)252.1177 CUSTOMER: I 1 I�� `c�U `if PAGE No. [ ) LOCATION: `_�i z sa-�ti S,-AA �'s�:�Cr� "WORK ORDER- JOB No. DATE: CONTRACT / P.O. No: JOB STATU$: � P[= COMPLETE DESCRIPTION OF WORK: `�1'ZACtL�N>� �[)�Ov�� �CYL- 'f�.At3L �7�cy — i7!-� �3L� Yu cA►b- — i L QUAN. MATERIAL USED P.O.# PRICE PER AMOUNT EQUIPMENT SUB TOTAL: $ DATE QUAN. TYPE/SIZE HRS RATE AMOUNT S.TAX: % S MK-UP: % S FREIGHT: S -- — -- I TOTAL MAT: $ LABOR EQUIPMENT: $ DATE CLASS EMPLOYEE ST, T 1/2 HRS BLNG AMOUNT OR DT RATE DELV. & P/U: S MK-UP: % S S` S.TAX:_% $ TOTAL EQIP: $ TOTAL ST. TIME: $ TOTAL TIME & 1/2: $ _ TOTAL DBLE TIME $ TOTAL LABOR: $ QUANTITY OF OVERTIME,MEA �, MEALS: S CUSTOMERS REP.— DATE: ,5- i W.O. TOTAL ISF Contra Costa Electric 7-7 An EMCOR Company CA. LICENSE#139885 4690 E.CARMEN AVENUE,FRESNO,CA 93703 (559)252-1114•FAX(559)252-1177 CUSTOMER: Rr -;j0 u�:: PAGE No. [ ] LOCATION: *WORK ORDER* JOB No. `7 2>1 i I S►.1��U'L►F S �SIo+-� DATE: —SJZ/ 2-14 CONTRACT / P.O. No: JOB STATUS: OPEN/CC9iPLE�'E DESCRIPTION OF WORK: DDCTI C -T12z�L— t'vv .�,1JT L�FYt ( L) Y2-WI,,— EV'v112 QUAN. MATERIAL USED P.O.# PRICE PER AMOUNT EQUIPMENT SUB TOTAL: $ DATE QUAN. TYPE/SIZE HRS RATE AMOUNT S.TAX: _ % $ MK-UP: % $ FREIGHT: $ TOTAL MAT: $ LABOR EQUIPMENT: 5 DATE CLASS EMPLOYEE ST, T 1/2 HRS BLNG AMOUNT OR DT RATE DELV. & P/U: S -T MK-UP: % S w � 2 S.TAX: % S TOTAL EQIP: S TOTAL ST. TIME: S TOTAL TIME & 1/2: $ TOTAL DBLE TIME $ TOTAL LABOR: $ QUANTITY OF OVERTIME MEALS- _ MEALS: $ CUSTOMERS REP. ��� _ DATE:��� 7 W.O. TOTAL$ Contra Costa Electric 7-7 An EMCOR Company CA. LICENSE#139885 4690 E.CARMEN AVENUE,FRESNO,CA 93703 (559)252-1114•FAX(559)252-1177 CUSTOMER: 00�'T PAGE No. [ LOCATION: <i ��'-� sce n7A'nclp *WORK ORDER" JOB No. DATE: ) CONTRACT / P.O. No: _ JOB STATUS: E COMPLETE DESCRIPTION OF WORK: (2ctvL D► i!�___l�tC_ +r••� ( r� C ;U2,�c /1 �JLLr t.�JirL{� v/lawt LfL �. i� 1 l• Y'A'11n Z QUAN. MATERIAL USED P.O.# PRICE PER AMOUNT 6 CE.o� l ZA 2k ,� ►� IA i. 61 2 Z" G M.-, EQUIPMENT SUB TOTAL: $ DATE QUAN. TYPE/SIZE HRS RATE AMOUNT S.TAX:_% $ MK-UP: % $ jFREIGHT: $ TOTAL MAT: $ LABOR EQUIPMENT: $ DATE CLASS EMPLOYEE ST, T 1/2 HRS BLNG AMOUNT OR DT RATE DELV. & P/U: $ G l=►'► S i S_r MK-UP: % $ Zi?( S S.TAX: % $ TOTAL EQIP: $ TOTAL ST. TIME: $ TOTAL TIME & 1/2: $ TOTAL DBLE TIME $ TOTAL LABOR: $ QUANTITY OF OVERTIME MEALS MEALS: CUSTOMERS RE I g--jZ' W.O. TOTAL$ Contra Costa Electric 9 An EMCOR Company CA. LICENSE#139885 4690 E.CARMEN AVENUE,FRESNO,CA 93703 (559)252-1114•FAX(559)252-1177 CUSTOMER: y l5--J :)L4-L'L'` PAGE No. [ LOCATION: "WORK ORDER" JOB No. DATE: CONTRACT / P.O. No: JOB STATUS: q2EEW COMPLETE DESCRIPTION OF WORK: QUAN. MATERIAL USED P.O.# PRICE PER AMOUNT ZG� art u nt - u 1 1 EQUIPMENT SUB TOTAL: $ DATE QUAN. TYPE/SIZE HRS RATE AMOUNT S.TAX: % $ MK-UP: % $ FREIGHT: $ TOTAL MAT: $ LABOR EQUIPMENT: $ DATE CLASS EMPLOYEE ST, T 1/2 HRS BLNG AMOUNT OR DT RATE DELV. & P/U: $ MK-UP: % $ W ST S.TAX: % $ TOTAL EQIP: $ TOTAL ST. TIME: $ TOTAL TIME & 1/2: $ TOTAL DBLE TIME $ TOTAL LABOR: $ QUANTITY OF OVERTIME MEALS S' MEALS: $ CUSTOMERS REP 3 �7 _ DATE: J J—J-2_yW.O. TOTAL$ Contra Costa Electric An EMCOR Company CA. LICENSE#139885 4690 E.CARMEN AVENUE,FRESNO,CA 93703 (559)252-1114•FAX(559)252-1177 CUSTOMER: y I vrzi�5-6 PAGE No. [ LOCATION: lujw-rliti,-'.3 'WORK ORDER" JOB No. DATE: / 2-4 CONTRACT / P.O. No: JOB STATUS: Off/COMPLETE DESCRIPTION OF WORK: -Q ,rz4 - , 4 L.i QUAN. MATERIAL USED P.O.# PRICE PER AMOUNT Li L EQUIPMENT SUB TOTAL: S DATE QUAN. TYPE/SIZE HRS RATE AMOUNT S.TAX:_% $ MK-UP: % $ FREIGHT: $ TOTAL MAT: $ LABOR EQUIPMENT: $ DATE CLASS EMPLOYEE ST, T 1/2 HRS BLNG AMOUNT OR DT RATE DELV. & P/U: $ � � l� FM. . Si'vr✓-.f� 5 i �l v S MK-UP: % $ . S.TAX: % $ TOTAL EQIP: $ TOTAL ST. TIME: $ TOTAL TIME & 1/2: $ TOTAL DBLE TIME $ TOTAL LABOR: $_ QUANTITY OF OVERTIME MEA MEALS: S CUSTOMERS REP. / S`2� _ DATE:---J / W.O. TOTAL $