HomeMy WebLinkAbout2324SW CCO 02.pdf COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
AMERICAN AVENUE DISPOSAL SITE CHANGE ORDER NO. 2
PHASE III - MODULES 9 & 10 JULY 12, 2024
EXCAVATION AND LINER CONSTRUCTION PAGE 1 OF 2
18950 W AMERICAN AVENUE, KERMAN, CA 93630
CONTRACT NO. 23-24-SW
TO: YARBS GRADING AND PAVING, INC:
Make the following changes to the plans and specifications or do work not in the plans and specifications for
this contract. Because of the change(s), SEVEN (7) -WORKING DAYS will be added to the contract time.
PART I: REPAIR AN EXISTING ELECTRICAL CONDUIT—EXTRA WORK
This change was requested by the engineer.
In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, repair
existing 3-inch vacant damaged conduit between Modules 9 and 10. This conduit will be utilized for the
electrical components for Modules 9 and 10 as per project plans. This work consists of videotaping to
locate the blocked/damaged portion; excavating and replacing the damaged section; replacing the
existing pull rope; and backfill and compacting the excavated area. Perform all work in accordance with
the applicable sections of the Special Provisions and/or Standard Specifications. Compensation for this
work will be made at an agreed lumpsum price of$9,422.17 according to Section 9-1.03, "Payment
Scope," of the Special Provisions. This agreed price includes compensation of all materials, labor,
equipment, traffic control, overhead costs, markups, profits, and incidentals for performing the work. This
amount will be paid through Bid Item No. 1, Supplemental Work Allowance, with no net increase to the
contract.
This extra work did not impact the critical path for the project, therefore, granting additional contract time was
not warranted.
TOTAL COST PART I: $0.00 (PAID IN BID ITEM NO. 1)
TOTAL TIME EXTENSION PART I: ZERO (0) -WORKING DAYS
PART I: INCREASE ITEMS AT UNIT PRICES
This payment adjustment was proposed by the engineer.
Item quantities in the Bid Book and subsequent change orders are estimates only. This part adjusts item
quantities to the actual quantities used.
Increased Items:
Item Total Total
No. Description Unit Quantity Price Amount (%) (0/6)
10 Unsuitable Material SY 23,000.00 $7.00 $161,00.00 134.34 134.34
Contractor We,the above signed contractor, have considered the change proposed and hereby agree,if this proposal is
_Auditor Controller approved,that we will provide all equipment,furnish all materials,except as may otherwise be noted above,
_Business Office and perform all services necessary for the work above specified,and will accept as full payment therefore the
_Board of Supervisors prices shown above.
_Const.Management
RE/Arch.
Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
AMERICAN AVENUE DISPOSAL SITE CHANGE ORDER NO. 2
PHASE III - MODULES 9 & 10 JULY 12, 2024
EXCAVATION AND LINER CONSTRUCTION PAGE 2 OF 2
18950 W AMERICAN AVENUE, KERMAN, CA 93630
CONTRACT NO. 23-24-SW
TOTAL INCREASE: $161,000.00
Seven (7) working days were added to the allotted contract time for this change.
TOTAL COST PART II: $161,000.00 INCREASE
TOTAL TIME EXTENSION PART II: SEVEN (7) -WORKING DAYS
NET COST THIS CHANGE ORDER: A $161,000.00 INCREASE
NET TIME EXTENSION THIS CHANGE ORDER: SEVEN (7) -WORKING DAYS
Oleg Savelyev, Resident Engineer
APPROVAL RECOMMENDED:
YARBS GRADING & PAVING. INC. 04 "- '--
Contractor Mandeep S. Sekhon, PE
Construction Engineer
By Troy Yar rough(Jul16,2024 9:50PDT) APPROVED BY:
Digitally signed by Steve
Whit
President Steve Whlt}eD tee2024.07.23
Title 09:10:04-07'00'
Steven E. White, Director
Accepted Date:
Jul 1622024 Public Works and Planning
Date:
_Contractor We,the above signed contractor, have considered the change proposed and hereby agree, if this proposal is
Auditor Controller approved,that we will provide all equipment,furnish all materials,except as may otherwise be noted above,
Business office and perform all services necessary for the work above specified,and will accept as full payment therefore the
Board of Supervisors prices shown above.
_Const.Management
RE/Arch.
Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.