Loading...
HomeMy WebLinkAbout2313C CCO 01.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER CSA 30 & 32 WELL SITE IMPROVEMENTS AND CHANGE ORDER NO. 1 MANGANESE TREATMENT JULY 15, 2024 COUNTY SERVICE AREAS 30 & 32 EL PORVENIR & CANTUA CREEK PAGE 1 OF 1 COUNTY OF FRESNO WESTSIDE GROUNDWATER PROJECT STATE WATER RESOURCES CONTROL BOARD— PROJECT NUMBER: 1000359-005C CONTRACT NO. 23-13-C TO: SYBLON REID CONTRACTORS: Make the following changes to the plans and specifications or do work not in the plans and specifications for this contract. Because of the change(s), 203 -WORKING DAYS will be added to the contract time for the First Order of Work. The revised completion date is May 2, 2025. GRANT A TIME EXTENSION: This time extension was requested by the contractor. Grant a time extension of 203-working days to the "First Order of Work" due to the additional time required for the submittals process, vendor acceptance of equipment/material orders, verification of delivery dates and acknowledgment that equipment/materials are in conformance with the contract requirements, particularly for the long-lead items. This time extension is being granted according to Section 8-1.07B, "Time Adjustments," of the Special Provisions. NET COST THIS CHANGE ORDER: $0.00 (NO COST) NET TIME EXTENSION THIS CHANGE ORDER: 203 -WORKING DAYS (FIRST ORDER OR WORK) JASON AHUMADA, Resident Engineer APPROVAL RECOMMENDED: SYBLON REID CONTRACTORS �" V 5 �a�_ Contractor MANDEEP S. SEKHON, PE Construction Engineer ChM Ross By Chad Ross(Ad 17.2024 08:32 PDT) APPROVED BY: /� } Digitally signed by Steve Whit Steve V V hI le D tee2024.07.17 Title Project Engineer 12:4420.07'00, STEVEN E. WHITE, Director Jul 17 2024 Public Works and Planning Accepted Date: , Date: Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business Office noted above, and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. _Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified.