HomeMy WebLinkAbout2214C CCO 25.pdf COUNTY OFFRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE | CHANGE ORDER NO. 25 AK8ER|CAN AVENUE TD MISSION STREET APF<|L24. 2O24 CONTRACT NO. 22'14-C PAGE 1OF5 TO: YARBS GRADING AND PAVING, INC.: Make the following changes to the | and specifications ordo work not|n the plans and specifications for this contract. Because of the ohonge(s). will be added to the contract timeline. PART 1: INSTALL BATTERY-OPERATED TIMERS FOR SPRINKLER VALVES IN THE CENTER MEDIAN(SELMA REGION) 'EXTRA WORK This extra work was requested bv the engineer. In accordance with Section 4-1.05, "Changes and Extra Work,"of the Standard Specifications, install m total of 33 battery-operated timers on the irrigation valves throughout the landscaped median in the Selma region. Perform all work in accordance with the manufacturer's recommendations. Upon obtaining permanent power connection from the PG&E, remove these battery-operated controllers and oonneottheirhBationove|veotothepemnanentuonUoUero.Thonemnovedbattery-mparmbsdcontnoUema are to be handed over to the engineer. Compensation for this work will be made at an agreed lumpsum price of$8,085.00 according to Section 9-1.03, "Payment Scope,"of the Special Provisions. This amount includes compensation for all labor, equipnnent, materials, traffic controls, incidentals, marhupo, and profit for the above referenced work, no additional compensation will be made. This amount will be paid es extra work. This extra work did not impact the critical path for the project,tharefona. gnantinQaddiUono|contnscttimexvao not warranted. TOTAL COST PART 1: A$0,085'00 INCREASE TOTAL TIME EXTENSION PART 1: ZERO(0) -WORKING DAYS PART II: INSTALL ADDITIONAL IRRIGATION LINES FOR THE MEDIAN LANDSCAPE XNTHE SELAOA REGION_EXTRA WORK This change was requested bv the contractor. |n accordance with Section 4-1.O5. "Changes and Extra VVork'"ofthe Standard Specifications, install eppnoninnaba|v 320 linear feet of 1 %—inch Schedule 40 PVC piping in the landscape median in the Selma region to overcome the lower water pressure issue. This work consists of installing above- ground, two separate lines from Controller A to Valve A5 and Valve A7, and two separate lines from Controller D to Valve D5 and Valve D6; running and testing sprinklers to assure adequate water spray and proper function; and then burying these lines at their final locations. Perform all work in accordance with Section 20-2, "Irrigation," of the Standard Specifications and/or the ProjectGpmcifioetiona. Compensation for this work will be made as extra work at force account according to Section 9-1.03, "Payment Scopa."mfthe Special Provisions. Total compensation for this work resulted in $8,149.51, this amount will be paid as extra work. --Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,/r --Auditor Controller this proposal is approved,matwewmnmvmeane«ummpnt,mm/sxm|mate,/am'pxcpvto,mavmmenw/aeow --Business Office noted above,and perform all services necessary for the work above specified,and will accept as full payment __Board mSupervisors therefore the prices shown above. _om*.monooement REJArch msm" If the Contractor does not sign acceptance of this order,his attention Is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein ,p,cmou. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 25 AMERICAN AVENUE TO MISSION STREET APRIL 24, 2024 CONTRACT NO. 22-14-C PAGE 2 OF 5 This extra work did not impact the critical path for the project, therefore, granting additional contract time was not warranted. TOTAL COST PART II: A$8,149.51 INCREASE TOTAL TIME EXTENSION PART II: ZERO (0) -WORKING DAYS PART III: INSTALL HANDRAILING AT THE SOUTHEAST CORNER OF NORTH STREET AND WHITSON STREET INTERSECTION—EXTRA WORK This extra work was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications,fabricate and install approximately 25 linear feet of handrailing at the ramp at the southeast corner of North Street and Whitson Street, as shown on the attached revised Plans Sheets 51 B and 70C. Perform all work in accordance with Section 83-2, "Metal Railing and Barriers,"of the Standard Specifications. Yarb's crew members fabricated and installed the handrail per the revised plans at ADA ramp at the SE corner of North and Whitson. Compensation for this work will be made as extra work at force account according to Section 9-1.03, "Payment Scope,"of the Special Provisions.Total compensation for this work resulted in $4,507.29, this amount will be paid as extra work. This extra work did not impact the critical path for the project,therefore, granting additional contract time was not warranted. TOTAL COST PART III: A $4,607.29 INCREASE TOTAL TIME EXTENSION PART III: ZERO (0) -WORKING DAYS PART IV: INSTALL BRICK PATTERN IN THE CONCRETE WALKWAY AT THE NORTHWEST CORNER OF FRONT STREET AND NORTH STREET(SELMA REGION) -EXTRA WORK This extra work was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, install approximately 21-inch wide and 79-feet long brick pattern in the concrete sidewalk at the northwest corner of Front Street and North Street as shown on the attached Plan Sheet 67B. Perform all work according to Section 73, "Concrete Curbs and Sidewalks," of the Standard Specifications. Compensation for this work will be made at an agreed lumpsum price of$6,444.05, according to Section 9-1.03, "Payment Scope,"of the Special Provisions. This amount includes compensation for all labor, equipment, materials, traffic controls, incidentals, markups, and profit for the above referenced work, no additional compensation will be made. This amount will be paid as extra work. This extra work did not impact the critical path for the project,therefore, granting additional contract time was not warranted. _Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,if —Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be _Business Office Board of Supervisors noted above,and perform all services necessary for the work above specified,and will accept as full payment _ _Const.Management therefore the prices shown above. _RE/Arch. _Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 25 AMERICAN AVENUE TO MISSION STREET APRIL 24, 2024 CONTRACT NO. 22-14-C PAGE 3 OF 5 TOTAL COST PART IV: A$6,444.05 INCREASE NET TIME EXTENSION PART IV: ZERO(0) -WORKING DAYS PART V: ADJUST FIRE HYDRANT AT STA. 79+65(LT)TO MATCH NEW CURB RAMP AND SIDEWALK GRADES(KINGSBURG REGION)—EXTRA WORK This extra work was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work,"of the Standard Specifications, adjust fire hydrant to match the sidewalk at curb ramp grades at sta. 79+65(LT) in the Kingsburg region as extra work. Perform all work according to Section 15, "Existing Facilities,"of the Standard Specifications. Compensation for this work will be made at force account according to Section 9-1.03, "Payment Scope,"of the Special Provisions. Total compensation for this work resulted in $2,160.64, this amount will be paid as extra work. This extra work did not impact the critical path for the project,therefore, granting additional contract time was not warranted. TOTAL COST PART V: A$2,160.64 INCREASE NET TIME EXTENSION PART V: ZERO(0) -WORKING DAYS PART VI: REMOVE A TREE AND GRIND STUMP IN CONFLICT WITH THE PROPOSED CURB AND GUTTER AT STA. 355+60(LT) IN SELMA REGION—EXTRA WORK This extra work was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work,"of the Standard Specifications, remove an existing tree and grind stump in conflict with the proposed curb and gutter at sta. 355+50(LT)in the Selma Region. Dispose of tree and stump outside of the road right-of-way. Perform all work in accordance with Section 17-2, "Clearing and Grubbing,"of the Standard Specifications and/or Project Specifications. Compensation for this work will be made as extra work at force account according to Section 9-1.03, "Payment Scope,"of the Special Provisions.Total compensation for this work resulted in $13,422.77, this amount will be paid as extra work. This extra work did not impact the critical path for the project,therefore, granting additional contract time was not warranted. TOTAL COST PART VI: A $13,422.77 INCREASE TOTAL TIME EXTENSION PART VI: ZERO (0) -WORKING DAYS _Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,if _Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be _Business Office noted above,and perform all services necessary for the work above specified,and will accept as full payment _Board of Supervisors therefore the prices shown above. _Const.Management _RE/Arch. _Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 25 AMERICAN AVENUE TO MISSION STREET APRIL 24, 2024 CONTRACT NO. 22-144-C PAGE 4 OF 5 PART VII: INSTALL A CHAIN-LINK FENCE ENCLOSURE AROUND THE STORM DRAIN OUTLET IN PONDING BASIN IN KINGSBURG REGION—EXTRA WORK This extra work was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, install an 8-feet x 8-feet x 4-feet chain link fence(Type CL-6) enclosure around the newly installed storm drain in the ponding basin in the Kingsburg region. Perform all work in accordance with Section 80, "Fences," of the Standard Specifications and/or Project Specifications. Compensation for this work will be made at an agreed lump sum price of$4,900, according to Section 9-1.03, "Payment Scope,"of the Special Provisions. This amount includes compensation for all labor, equipment, materials, traffic controls, incidentals, markups, and profit for the above referenced work, no additional compensation will be made.This amount will be paid as extra work. This extra work did not impact the critical path for the project, therefore, granting additional contract time was not warranted. TOTAL COST PART VII: A $4,900.00 INCREASE TOTAL TIME EXTENSION PART VII: ZERO (0) -WORKING DAYS PART Vill: ADJUST COMPENSATION FOR THE ADDITIONAL LABOR TO CONSTRUCT CONCRETE CURB AND GUTTER NEAR STA. 355+00(LT) IN SELMA REGION—EXTRA WORK This compensation adjustment was requested by the contractor. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, adjust compensation for the additional labor to construct approximately 33 linear feet of concrete curb and gutter at sta. 355+00, (LT), in the Selma region. This compensation adjustment will be made as extra work at force account, according to Section 9-1,03, "Payment Scope,"of the Special Provisions.Total compensation for this work resulted in $1,149.85, this amount will be paid as extra work. This extra work did not impact the critical path for the project, therefore, granting additional contract time was not warranted. TOTAL COST PART Vlll: $1,149.86 INCREASE TOTAL TIME EXTENSION PART Vlll: ZERO (0) -WORKING DAYS _Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,if _Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be _Business Office Board Of Supervisors noted above,and perform all services necessary for the work above specified,and will accept as full payment _ _Const.Management therefore the prices shown above. _RE/Arch. _Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 25 AMERICAN AVENUE TO MISSION STREET APRIL 24, 2024 CONTRACT NO. 22-14-C PAGE 5 OF 5 NET COST THIS CHANGE ORDER: A$48,819.11 INCREASE NET TIME EXTENSION THIS CHANGE ORDER: ZERO (0) -WORKING DAYS a—za4 tARue Goossen(Apr 24.2024 14:55 PDT) LaRue Goossen, Resident Engineer APPROVAL RECOMMENDED: YARBS GRADING AND PAVING, INC. 1�'45.�d�— Contractor Mandeep S. Sekhon, PE Construction Engineer TM XvIbl-owh By TrooyY�ugh(Apr 25.202 O:48PDT) APPROVED BY: Digitally signed by Steve White Steve White President Date:2024.04.29 15:55:44 Title -07'00' Steven E. White, Director Accepted Date: Apr 25 2024 Public Works and Planning � Date: Nathan Magsig, Chairman Board of Supervisors Date: Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,if _Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be _Business Office noted above,and perform all services necessary for the work above specified,and will accept as full payment _Board of Supervisors therefore the prices shown above. _Const.Managementnagement RE/Arch. _Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. III N VETAOLE -M TAULL CURVETAALE RIRVI:TARLE [uRl£/ R.rpUS LYIIa laKYM In. )Z39'IS' T69'10 2W I3v00.2S 5'136 JO' I J005" IIO M' 9P 000 'IOOT IS]J' DETAIL"A" DETAIL"B Ij b \ v]nw L clY tw[ ILI ��-. 1� t•'SGS.(>_-M.l 9 — _— r bu-.fflW_HdL J(A� 1 I . 4�-fSLHK_.ate '� W+t�La�.l,^�'rlr �'— DETAI ID ram, ore .,S v,r°m•, w ft_ra_ w•� n DETAIL IrCn - "`�'°�- m.•! WHITSON ST w - I --`—" osa-alse,v.J9.r.� suit r•=m" '4= x.rvti4, N o.w,r w le, An I � Sa9Ys'".e2tttt��-- \ ' �� �� _P_R N,'•wae A,d1C �'\I.\ I �u -. �: Sxa_at aM.L13rt Iris a� m_ S aet�I � !.>• rsai. 5".we J . asrAo n"S. x:9 n.mn I vs qn,# r ! Stl:L�.M R.lw / I 1 .� \ a. 129L,JtN�vt / b•` DETAIL'A" Scvr DETAIL"D" x� m DETAIL'B" DETAIL"C" nmsr _.AlYL CYL eI HM�td%p SLss£ -I � ssa nz u RECORD DRAWING PROJECT-PRASEI y ip \ DEP,IRT.11A-, ;.SA'O 1TOI'1'UBIJClf'OI .IPII.V.VI.1'Cr coLDENsuTE coRwooR-ECONOMICDEVELDPMENT l� CONSTRUCTION DETAILS x xRu ANDINERASTRVCNRE IMPRWEMENTS �- ,/urlulo ao xo.[u r ' 2 i