23-04-C Executed Contract.pdf
SPECIFICATIONS FOWLER AVE & OLIVE AVE INTERSECTION IMPROVEMENTS FEDERAL PROJECT NUMBER: CML-5942(293) BUDGET / ACCOUNT: 4510 / 7370 4� co �5 Department o Public Works and Planning O� �O p f g FR IS CONTRACT NUMBER 23-04-C coU� Countyof FresnoC O is56 O DEPARTMENT OF PUBLIC WORKS AND PLANNING STEVEN E. WHITE, DIRECTOR 10 FRESH February 2, 2024 Contract No. 23-04-C ADDENDUM NO. 1 to FOWLER AVE AND OLIVE AVE INTERSECTION IMPROVEMENTS, revising the Bidding and Contract Documents and Plans as follows: NOTICE TO BIDDERS DELETE: The work to be done consists, in general, of installing a new traffic signal, reconstructing the pavement, and widening the intersection of Fowler Avenue and Olive Avenue. The work will also include signing, striping, and pavement marking. Existing water and sewer facilities will need to be relocated and/or adjusted to grade. Two new drain inlets with storm drain pipe are included as part of the work. The contractor is responsible for coordination with utility companies, the City of Fresno, and the Fresno Municipal Flood Control District. REPLACE with: The work to be done consists, in general, of installing a new traffic signal, reconstructing the pavement, and widening the intersection of Fowler Avenue and Olive Avenue. The work will also include signing, striping, and pavement marking. Two new drain inlets with storm drain pipe are included as part of the work. The contractor is responsible for coordination with utility companies, the City of Fresno, and the Fresno Municipal Flood Control District. DELETE: The Federal minimum wage rates for this project as predetermined by the United States Secretary of Labor are set forth in General Decision Number CA20240018, Dated 1/05/2024, which is incorporated in these special provisions by this reference as if fully set forth herein and which can be viewed at https://SAM.gov, under CA20240018. Said Federal wage rates, as well as project plans, special provisions, and bid forms, may also be examined at the County of Fresno office described in the preceding paragraph. Addenda to modify the reference to Federal minimum wage rates to reflect revisions thereto, if necessary, will be issued to planholders of record. REPLACE with: The Federal minimum wage rates for this project as predetermined by the United States Secretary of Labor are set forth in General Decision Number CA20240018, Dated 1/26/2024, which is incorporated in these special provisions by this reference as if fully set forth herein and which can be viewed at https://SAM.gov, under CA20240018. Said Federal wage rates, as well as project plans, special provisions, and bid forms, may also be examined at the County of Fresno office described in the preceding Addendum No. 1 FOWLER AVE AND OLIVE AVE INTERSECTION IMPROVEMENTS Contract No. 23-04-C Page 1 of 3 paragraph. Addenda to modify the reference to Federal minimum wage rates to reflect revisions thereto, if necessary, will be issued to planholders of record. SPECIAL PROVISIONS 15-1.05 Utility Relocation DELETE: Utility relocation as shown on the plans "by others" will be performed by the appropriate agency and coordinated by the County. Ensure the project site is prepared as necessary and ready for work on the day(s) scheduled for such work. Inform the Engineer ten (10) working days in advance of completion of site preparation for relocation so the County can schedule work properly. Any traffic control measures needed for the utility relocation shall be responsibility of the Contractor and shall be included in the traffic control system bid item. The cost or coordinating the relocation with the Engineer and the Utility Company shall be included in the various items of the work and no further compensation shall be paid therefor. REPLACE with: Utility relocation as shown on the plans "by others" will be performed by the appropriate agency and coordinated by the County. Ensure the project site is prepared as necessary and ready for work on the day(s) scheduled for such work. Inform the Engineer ten (10) working days in advance of completion of site preparation for relocation so the County can schedule work properly. Any traffic control measures needed for the utility relocation shall be responsibility of the Contractor and shall be included in the traffic control system bid item. The cost of coordinating the relocation with the Engineer and the Utility Company, including but not limited to AT&T, the City of Fresno, and Comcast, shall be included in the various items of the work and no further compensation shall be paid therefor. DELETE: Section DIVISION VIII MISCELLANEOUS CONSTRUCTION, 77 LOCAL INFRASTRUCTURE in its entirety. BID BOOK DELETE: Proposal 2 REPLACE with attached Proposal 2A PLANS DELETE: PLAN SHEET 2, 10, 11, 12, 13, 25 REPLACE with: PLAN SHEET 2A, 10A, 11A, 12A, 13A, 25A END OF ADDENDUM NO. 1 Addendum No. 1 FOWLER AVE AND OLIVE AVE INTERSECTION IMPROVEMENTS Contract No. 23-04-C Page 2 of 3 -------------------------------------------------------------------------------------------------------------------- Please attach this Addendum to the inside cover of the Specifications booklet. If you have given the Bidding and Contract Documents to someone else, please forward this Addendum. nFNS S/pal P�\ yF� Date Signed co No. C76724 r Exp.12/31/24 �TF F(VIL CAUF���� Supervising Engineer: - Sebastian Artal, PE C76724 FRESNO COUNTY Department of Public Works and Planning m/a 2220 Tulare Street, Suite 720 Fresno, CA 93721-2106 Addendum No. 1 FOWLER AVE AND OLIVE AVE INTERSECTION IMPROVEMENTS Contract No. 23-04-C Page 2 of 2 Fresno County Department of Public Works and Planning Bid Item List - Proposal 2A Contract# 23-04-C Contract Name Fowler Ave & Olive Ave Intersection Improvements Location Fowler Avenue and Olive Avenue Bid Items Item ID Quantity Unit Unit Price Total Description 1 80000 $ $1 $80,000 Supplemental Work(Payment Adjustment for Price Index Fluctuations) 2 2 EA $ $ Construction Project Information Sign 3 1 LS $ $ Traffic Control System 4 6 EA $ $ Portable Changeable Message Sign 5 1 LS $ $ Job Site Management 6 1 LS $ Fs Prepare& Implement Storm Water Pollution Prevention Plan 7 1000 $ $1 $1,000 State Water Resources Control Board Notice of Intent Filing Fee 8 1 LS $ $ Storm Water Annual Report 9 1 LS Is $ Dust Control Plan Bid Item List 2/2/2024 23-04-C Page 1 of 6 10 2 EA $ $ Salvage Drain Inlet to FMFCD 11 1 LS Is Fs Remove& Dispose Light Fixtures 12 1 LS $ Fs Remove& Dispose Storage Sheds 13 4 EA Is Fs Remove& Dispose Sign Structure 14 43 LF Is $ Remove& Dispose Concrete Pipe 15 168 LF $ $ Remove& Dispose Wood Fence 16 744 LF $ $ Remove And Dispose Hog Wire Fence 17 1015 LF Is $ Remove& Dispose Barbed Wire Fence 18 1 LS $ $ Remove& Dispose Of Underground Septic System 19 1 LS $ $ Clearing and Grubbing 20 15 EA Is $ Tree Removal 21 9539 CY Is $ Roadway Excavation - Final Pay Item 22 2693 CY Is $ Roadway Ditch Excavation - Final Pay Item Bid Item List 2/2/2024 23-04-C Page 2 of 6 23 50 CY $ $ Berm Construction - Final Pay Item 24 11 CY $ $ 3-Sack Concrete Slurry Backfill 25 1 LS $ $ Finishing Roadway 26 4250 CY $ $ Class 2 Aggregate Base- Final Pay Item 27 121 TON Is $ Hot Mix Asphalt(Type A 1/2" Grading) 28 6800 TON $ $ Hot Mix Asphalt(Type A 3/4" Grading) 29 214 CY $ $ Shoulder Backing 30 1670 LF $ $ Place Hot Mix Asphalt Dike (Type E) 31 262 LF $ $ Place Hot Mix Asphalt Dike (Type F) 32 800 SY Is F$ — Place Type A 1/2" Grading HMA(Miscellaneous Area) 33 8 TON Is Fs Tack Coat 34 590 SY $ Fs Cold Plane Asphalt Concrete Pavement 35 2 EA Is Fs Install FMFCD Type"E" Drainage Inlet Bid Item List 2/2/2024 23-04-C Page 3 of 6 36 1 LS $ $ Miscellaneous Operations (Splice Exist SD, Cut Out Manhole, etc) 37 140 LF $ $ 24-Inch Reinforced Concrete Pipe (Class III, Rubber Gasket Joint) 38 88 CY Is Fs Small-Rock Slope Protection 39 7200 SF $ $ Weed Barrier Fabric 40 20 LF $ $ Minor Concrete (Curb and Gutter) 41 23 SY $ $ Minor Concrete (Electrical Pad) 42 2 EA $ $ Install Manhole (Type A, Case 1) 43 3 EA $ $ Adjust Storm Drain Manhole Lids to Grade 44 1 EA $ $ Survey Monument(Type D) 45 9 EA $ $ Remove& Dispose Roadside Sign 46 1 EA $ Fs Relocate Roadside Sign -One Post 47 23 EA $ Fs Roadside Sign -One Post 48 190 LF $ $ Paint HMA Dike (White) Bid Item List 2/2/2024 23-04-C Page 4 of 6 49 1600 LF $ $ Thermoplastic Traffic Stripe (Detail 22) 50 2750 LF Is $ Thermoplastic Traffic Stripe (Detail 29) 51 290 LF $ $ Thermoplastic Traffic Stripe (Detail 32) 52 1050 LF $ $ Thermoplastic Traffic Stripe (Detail 38) 53 6535 LF Is $ Thermoplastic Traffic Stripe (Detail 39) 54 46 EA $ $ Type G One Way Clear Retroflective Marker 55 385 LF Is $ Type D Two Way Yellow Retroflective Marker 56 180 LF $ Fs Thermoplastic Pavement Markings (Limit Line) 57 150 SF Is Fs Thermoplastic Pavement Markings (Left Turn Arrow Type IV) 58 120 SF Is Fs Thermoplastic Pavement Markings (Right Turn Arrow Type IV) 59 84 SF Is Fs Thermoplastic Pavement Markings (Bike Lane Symbol with Person and Bike Lane Arrow) 60 252 SF $ $ Thermoplastic Pavement Marking Words (Signal Ahead) 61 32 EA Is Fs Inductive Loop Detector Bid Item List 2/2/2024 23-04-C Page 5 of 6 62 1 LS $ $ Traffic Signal & Lighting System 63 1 LS Is Fs Mobilization Bid Items Total: $ Bid Item List 2/2/2024 23-04-C Page 6 of 6 TABLE OF CONTENTS COVER SHEET BOARD ADOPTION AND ACKNOWLEDGMENT Engineer's Signature Consultant's Signature NOTICE TO BIDDERS SPECIAL PROVISIONS FEDERAL REQUIREMENTS Federal Requirements for Federal Aid Construction Projects Federal Forms PROJECT DETAILS / DRAWINGS Project Drawings/Details Location Map City of Fresno Standard Specifications and Drawings Construction Funding Sign PG&E Rule 16 FMFCD Standard Specifications County of Fresno Dummy Permit Self-Dealing Transactions Disclosure Form Revised Standard Specifications Dated 09-02-16 BID BOOK Bidder's Declaration Bid Form Abbreviations Used Bid Security and Signature Noncollusion Declaration Public Contract Code Subcontractor List Certifications DBE Forms Bidder's List of Subcontractors Opt-Out of Asphalt Concrete Price Fluctuations Form Guaranty General Requirements for In-Use Off-Road Diesel-Fueled Fleets AGREEMENT Agreement Exhibit A— Required Federal Aid Contract Language (Exhibit 12-G and Form 1273) Exhibit B — Minimum Federal Wage Rates Determination Contract Number 23-04-C PROJECT: FOWLER AVE & OLIVE AVE INTERSECTION IMPROVEMENTS CONTRACT NUMBER: 23-04-C Nathan Magsig, Chairman 5th District Ernest Buddy Mendes, Vice Chairman 4th District Brian Pacheco 1st District Steve Brandau 2nd District Sal Quintero 3rd District Paul Nerland, County Administrative Officer Steven E. White, yWond Department of Puanning OFNSS/ Date Signed: 7 � Zoz4 \P T F CONo. C76724 Exp.12/31/24 �TF OFfIL Supervising Engineer: Sebastian Artal, PE 76724 FRESNO COUNTY Department of Public Works and Planning m/a 2220 Tulare Street, Suite 720 Fresno, CA 93721-2106 BOARD OF SUPERVISORS COUNTY OF FRESNO STATE OF CALIFORNIA NOTICE TO BIDDERS Sealed proposals will be received at: https://www.bidexpress.com/businesses/36473/home and at the Fresno County Department of Public Works and Planning (Department), Office of the Design Engineer, Seventh Floor, Fresno County Plaza Building, 2220 Tulare Street, Fresno, CA 93721 until 2:00 P.M., (1400 hours and 00 seconds) Thursday, February 8, 2024 If you have any questions about bid submission, please contact us at DesignServices(a-)fresnocountyca.gov or calling (559) 353-4919 or (559) 600-4543. Promptly following the closing of the bidding all timely submitted bids will be publicly opened and viewable via a livestream (the link for which will be posted at https://www.fresnocountVca.gov) for construction in accordance with the project specifications therefor, to which special reference is made as follows: FOWLER AVE & OLIVE AVE INTERSECTION IMPROVEMENTS FEDERAL PROJECT NUMBER: CML-5942(293) CONTRACT NUMBER 23-04-C The work to be done consists, in general, of installing a new traffic signal, reconstructing the pavement, and widening the intersection of Fowler Avenue and Olive Avenue. The work will also include signing, striping, and pavement marking. Existing water and sewer facilities will need to be relocated and/or adjusted to grade. Two new drain inlets with storm drain pipe are included as part of the work. Contractor is responsible for coordination with utility companies, the City of Fresno, and the Fresno Municipal Flood Control District. The County of Fresno affirms that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation. Bidders are advised that, as required by federal law, Disadvantaged Business Enterprise (DBE) requirements are included in Section 2, "Bidding," under subsection 2-1.12 "Disadvantaged Business Enterprises". The DBE Contract Goal is 22 percent. This project is subject to the "Buy America" provisions of the Surface Transportation Assistance Act Of 1982 as amended by the Intermodal Surface Transportation Efficiency Act Of 1991. This project is subject to the Cargo Preference Act and implementing regulations (46 CFR Part 381) to the Federal Highway Program. This project is subject to the contracting requirements and implementing regulations as amended in Title 13, Section 2449 General Requirements for In-Use Off-Road Diesel-Fueled Fleets, of the California Code of Regulations (13 CCR § 2449(i)). Bidders and their listed subcontractors must submit valid Certificates of Reported Compliance (CRCs) issued by the California Air Resources Control Board and any supporting documentation within five (5) calendar days of bid opening. Failure to submit the required CRCs may render a bid non- responsive. Bidders may fill out a Request to be Added to Planholders list: https://www.fresnocountyca.gov/Departments/Public-Works-and-Planning/Construction-Bidding- Opportunities/Request-to-Be-Added-to-the-Planholders-List-Form Requesters will then be listed as a planholder for the project on the website and receive notifications and addenda issued for the project. Prospective bidders may also select the project on https://www.bidexpress.com/businesses/36473/home. Those that demonstrate interest in the project will be added to the planholders list, and receive notifications and addenda issued for the project. Planholder and exchange/publication names may be obtained from the Fresno County website at https://www.fresnocountyca.gov. Electronic copies, in ".pdf" file format, of the official project specifications, bid books and proposal sheets, and such additional supplemental project information as may be provided, are available to view, download, and print at https://www.fresnocountVca.gov/planholders. If a bidder is unable to submit a bid via Bid Express, Bid Books, which contain bid proposal sheets necessary to submit a bid, may be obtained within the Specifications documents posted on the Fresno County website. Electronic bids shall be submitted via the Bid Express website. Hardcopy bids shall be submitted in a sealed envelope addressed to the Department and labeled with the name of the bidder, the name of the project and the statement "Do Not Open Until The Time Of Bid Opening." Bid security in the amount of ten (10) percent of the amount of the bid, and in the form of a bid bond issued by an admitted surety insurer licensed by the California Department of Insurance, cash, cashier's check or certified check shall accompany the bid. You must either attach an electronic bid bond or provide an original bid bond (or other form of bid security authorized by Public Contract Code Section 20129(a)), prior to the bid opening. Bid security shall be made in favor of the County of Fresno. Hardcopy bid bonds shall be submitted in a sealed envelope addressed to the Department and labeled with the name of the bidder, the name of the project, contract number, and the statement "Do Not Open Until The Time Of Bid Opening — BID BOND". A Summary of Bids and a list of subcontractors for the apparent low bidder will be posted at the above listed website, generally within 24 hours of the Bid Opening. All questions regarding this project shall be in writing and shall be received by the Department of Public Works and Planning, Design Division, no later than 2.00 P.M. on the seventh (7th) calendar day before bid opening. Any questions received after this deadline will not receive a response unless the Department of Public Works and Planning elects to issue an addendum to revise the bid opening date. In the event that the bid opening date is revised, the deadline for questions will be extended to no later than 2:00 P.M. on the seventh (7th) calendar day before the revised bid opening date. Questions shall be submitted on the "Request for Clarification Form" provided on our website: Contract Number 23-04-C Notice to Bidders - 2 http://www.fresnocountyca.gov/Departments/Public-Works-and-Planning/Construction-Bidding- Opportu nities/23-04-C-Fowler-Ave-and-Olive-Ave-I ntersection-Improvements/Request-for- Clarification-Form Any changes to, or clarification of, the project plans and specifications shall be in the form of a written addendum issued to planholders of record. Questions that prompt a change or clarification shall be included in the addendum with the subsequent answer. Any oral explanation or interpretations given to this project are not binding. No contract will be awarded to a contractor who has not been licensed in accordance with the provisions of the Contractors State License Law, California Business and Professions Code, Division 3, Chapter 9, as amended, or whose bid is not on the proposal form included in the contract document. A valid California Contractor's License, Class A (General Engineering) or Class C-12 (Earthwork and Paving Contractors), is required for this project. Pursuant to Section 1773 of the Labor Code, the general prevailing wage rates in the county, or counties, in which the work is to be done have been determined by the Director of the California Department of Industrial Relations. These wages are set forth in the General Prevailing Wage Rates for this project, available at County of Fresno, Department of Public Works and Planning, 2220 Tulare Street, Sixth Floor, Fresno CA 93721-2104 and available from the California Department of Industrial Relations' Internet web site at http://www.dir.ca.gov/DLSR/PWD. Future effective general prevailing wage rates, which have been predetermined and are on file with the California Department of Industrial Relations are referenced but not printed in the general prevailing wage rates. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. This contract is subject to state contract nondiscrimination and compliance requirements pursuant to Government Code, Section 12990. The Federal minimum wage rates for this project as predetermined by the United States Secretary of Labor are set forth in General Decision Number CA20240018, Dated 1105/2024, which is incorporated in these special provisions by this reference as if fully set forth herein and which can be viewed at https://SAM.gov, under CA20240018. Said Federal wage rates, as well as project plans, special provisions, and bid forms, may also be examined at the County of Fresno office described in the preceding paragraph. Addenda to modify the reference to Federal minimum wage rates to reflect revisions thereto, if necessary, will be issued to planholders of record. Attention is directed to the provisions in the "Federal Requirements" section of these specifications. If there is a difference between the minimum wage rates predetermined by the Secretary of Labor and the general prevailing wage rates determined by the Director of the California Department of Industrial Relations for similar classifications of labor, the Contractor and subcontractors shall pay not less than the higher wage rate. The Department will not accept lower State wage rates not specifically included in the Federal minimum wage determinations. This includes "helper" (or other Contract Number 23-04-C Notice to Bidders - 3 classifications based on hours of experience)or any other classification not appearing in the Federal wage determinations. Where Federal wage determinations do not contain the State wage rate determination otherwise available for use by the Contractor and subcontractors, the Contractor and subcontractors shall pay not less than the Federal minimum wage rate, which most closely approximates the duties of the employees in question. This project requires 0 trainees. The U.S. Department of Transportation (DOT) provides a toll-free "hotline" service to report bid rigging activities. Bid rigging activities can be reported Mondays through Fridays, between 8:00 a.m. and 5:00 p.m., Eastern Time, Telephone No. 1-800-424-9071. Anyone with knowledge of possible bid rigging, bidder collusion, or other fraudulent activities should use the "hotline" to report these activities. The "hotline" is part of the DOT's continuing effort to identify and investigate highway construction contract fraud and abuse and is operated under the direction of the DOT Inspector General. All information will be treated confidentially and caller anonymity will be respected. Bids are required for the entire work described herein. Bids will be compared on the basis of the cumulative sum of the bid amounts listed for the individual line items. The successful bidder shall furnish a faithful performance bond in the amount of 100 percent of the contract amount and a payment bond in the amount of 100 percent of the contract amount. Each bond specified in this Notice (bid bond, faithful performance bond and payment bond) shall meet the requirements of all applicable statutes, including but not limited to those specified in Public Contract Code section 20129 and Civil Code section 3248. Each bond specified in this Notice shall be issued by a surety company designated as an admitted surety insurer in good standing with and authorized to transact business in this state by the California Department of Insurance, and acceptable to the County of Fresno. Bidders are cautioned that representations made by surety companies will be verified with the California Department of Insurance. Additionally, the County of Fresno, in its discretion, when determining the sufficiency of a proposed surety company, may require the surety company to provide additional information supported by documentation. The County generally requires such information and documentation whenever the proposed surety company has either a Best's Key Rating Guide of less than A and a financial size designation of less than VIII. Provided, however, that the County expressly reserves its right to require all information and documentation to which the County is legally entitled from any proposed surety company. Pursuant to Public Contract Code Section 22300, substitution of securities for any moneys withheld by the County of Fresno to ensure performance under the contract shall be permitted. The Board of Supervisors reserves the right to reject any or all bids. Board of Supervisors, County of Fresno Paul Nerland, County Administrative Officer Bernice E. Seidel, Clerk of the Board Issue Date: January 9, 2024 Contract Number 23-04-C Notice to Bidders -4 Special Provisions Contract Number 23-04-C DIVISION I GENERAL PROVISIONS 1 GENERAL 1-1.01 GENERAL Add to the beginning of Section 1: The work is done in accordance with the 2015 Standard Specifications, 2015 Standard Plans and the following special provisions. Where these special provisions indicate to replace, add to, delete, delete from, or otherwise modify a "section," or a portion thereof, the section or portion thereof to which such modification is to be applied is the section or portion thereof with the corresponding numbering in the 2015 Standard Specifications. Except to the extent that they may conflict with these special provisions, revised standard specifications apply if included in the project details section of the book entitled "Specifications." Revised standard plans apply if listed on the "List of Revised Standard Plans," if any, in these special provisions; or if shown or referenced on the project plans or in the project details section of the book entitled "Specifications." In case of conflict between the Standard Specifications and these special provisions, the special provisions shall take precedence over and be used in lieu of such conflicting portions. In case of conflict between applicable revised standard specifications and these special provisions, the special provisions shall take precedence over and be used in lieu of such conflicting portions. Add to the end of section 1-1.01: Bid Items and Applicable Sections Item Item description Applicable code section SUPPLEMENTAL WORK(PAYMENT ADJUSTMENT FOR PROCE 9 INDEX FLUCTUATIONS CONSTRUCTION PROJECT INFORMATION SIGN 12 TRAFFIC CONTROL SYSTEM 12 PORTABLE CHANGEABLE MESSAGE SIGNS 12 JOB SITE MANAGEMENT 13 PREPARE & IMPLEMENT STORM WATER POLLUTION PREVENTION 13 PLAN STATE WATER RESOURCES CONTROL BOARD — NOTICE OF 13 INTENT FILING FEE STORM WATER ANNUAL REPORT 13 DUST CONTROL PLAN 14 SALVAGE DRAIN INLET TO FMFCD 15 REMOVE & DISPOSE LIGHT FIXTURES 15 REMOVE & DISPOSE STORAGE SHED 15 REMOVE & DISPOSE SIGN STRUCTURE 15 REMOVE & DISPOSE CONCRETE PIPE 15 REMOVE & DISPOSE WOOD FENCE 15 REMOVE & DISPOSE HOG WIRE FENCE 15 REMOVE & DISPOSE BARBED WIRE FENCE 15 REMOVE AND DISPOSE OF UNDERGROUND SEPTIC SYSTEM CLEARING AND GRUBBING 17 TREE REMOVAL 17 REMOVE & DISPOSE BOLLARDS 15 ROADWAY EXCAVATION 19 ROADWAY DITCH EXCAVATION 19 BERM CONSTRUCTION 19 SHOULDER BACKING 19 3-SACK CONCRETE SLURRY BACKFILL FINISHING ROADWAY 22 CLASS II AGGREGATE BASE 26 HOT MIX ASPHALT TYPE A, 'h" GRADING 39 HOT MIX ASPHALT TYPE A, %" GRADING 39 SHOULDER BACKING 19 PLACE HOT MIX ASPHALT DIKE TYPE E 39 PLACE HOT MIX ASPHALT MISCELLANEOUS AREA 39 TACK COAT 39 COLD PLANE ASPHALT CONCRETE PAVEMENT 39 INSTALL FMFCD DRAINAGE INLET TYPE E 70 MISCELLANEOUS OPERATIONS (SPLICE EXISTING STORM DRAIN, 70 CUT OUT MANHOLE, ETC 24" REINFORCED CONCRETE PIPE (CLASS III RUBBER GASKET 65 JOINT SMALL-ROCK SLOPE PROTECTION 72 WEED BARRIER FABRIC 72 MINOR CONCRETE CURB &GUTTER 73 MINOR CONCRETE ELECTRICAL PAD 73 INSTALL MANHOLE TYPE A, CLASS I 70 RELOCATE ARV ASSEMBLY 77 RELOCATE BLOW-OFF ASSEMBLY 77 RELOCATE TYPE I TEST STATION INCLUDE TEST WIRES 77 ADJUST WATER VALVE LIDS TO GRADE 77 ADJUST SEWER MANHOLE LID TO GRADE 77 ADJUST STORM DRAIN MANHOLE LIDS TO GRADE 70 SURVEY MONUMENT TYPED 78 REMOVE & DISPOSE ROADSIDE SIGN 82 RELOCATE ROADSIDE SIGN -ONE POST 82 ROADSIDE SIGN -ONE POST 82 PAINT HMA DIKE (WHITE) 84 THERMOPLASTIC TRAFFIC STRIPING (DETAIL 22) 84 THERMOPLASTIC TRAFFIC STRIPING (DETAIL 29) 84 THERMOPLASTIC TRAFFIC STRIPING (DETAIL 32) 84 THERMOPLASTIC TRAFFIC STRIPING (DETAIL 38) 84 THERMOPLASTIC TRAFFIC STRIPING (DETAIL 39) 84 THERMOPLASTIC PAVEMENT MARKINGS LIMIT LINE) 84 THERMOPLASTIC PAVEMENT MARKINGS (LEFT TURN ARROW TYPE IV) 84 THERMOPLASTIC PAVEMENT MARKINGS (RIGHT TURN ARROW TYPE IV) 84 THERMOPLASTIC PAVEMENT MARKINGS (BIKE LANE SYMBOL 84 WITH PERSON & BIKE LANE ARROW) THERMOPLASTIC PAVEMENT MARKING WORDS (SIGNAL AHEAD) 84 INSTALL BOLLARD 77 INDUCTIVE LOOP DETECTOR 86 TRAFFIC SIGNAL & LIGHTING SYSTEM 86 MOBILIZATION 9 Add to the 1st table of section 1-1.06: APCD air pollution control district AQMD air quality management district CISS cast-in-steel shell CSL crosshole sonic logging GGL gamma-gamma logging METS Caltrans Material Engineering and Testing Services Add to section 1-1.06: Abbreviations in the Bid Item List are also used in Proposal Sheet 2. Replace the headings and paragraphs of Section 1-1.07 with: 1-1.07 DEFINITIONS 1-1.07A General Interpret terms as defined in the Contract documents. 1-1.07B Glossary abandon: Render unserviceable in place. acts of God: Acts of God as defined in Pub Cont Code § 7105. activity: Task, event, or other project element on a schedule that contributes to completing the project. An activity has a description, start date, finish date, duration, and one or more logic ties. adjust: Raise or lower a facility to match a new grade line. aerially deposited lead: Lead primarily from vehicle emissions deposited within unpaved areas or formerly unpaved areas. Authorized Facility Audit List: Caltrans-developed list of facilities. For the Authorized Facility Audit List, go the METS website. authorized laboratory: Independent testing laboratory (1) not employed or compensated by any subcontractor or subcontractor's affiliate providing other services for the Contract and (2) authorized by the Department. Authorized Material List: Caltrans-developed list of authorized materials. For the Authorized Material List go to the METS website. Authorized Material Source List: Caltrans-developed list of authorized source materials. For the Authorized Material Source List go to the METS website. base: Layer of specified material of planned thickness placed immediately below the pavement or surfacing. basement material: Material in an excavation or embankment under the lowest layer to be placed. bid item: Work unit for which the Bidder provides a price. Bid Item List: List of bid items, units of measure, and the associated quantities. The verified Bid Item List is the Bid Item List with verified prices. The Contract Proposal (Proposal 2)of Low Bidder at the Department's website is the verified Bid Item List. After contract award, interpret a reference to the Bid Item List as a reference to the verified Bid Item List. borrow: Fill acquired from an excavation source outside the described cut area. 1. local borrow: Material obtained by widening cuts or excavating from sources outside the planned or authorized cross section on the job site. The location of the local borrow is described or designated by the Engineer. 2. imported borrow: Borrow that is not local borrow. bridge: Structure that: 1. Has a bridge number 2. Carries a (1) utility, (2) railroad, or(3)vehicle, pedestrian, or other traffic over, under, or around obstructions or waterways building-construction contract: Contract that has Building Construction on the cover of the Notice to Bidders and Special Provisions. California Test: Caltrans-developed test for determining work quality. For California Tests, go to the METS website. Caltrans: State of California Department of Transportation certificate of compliance: Certificate stating the material complies with the Contract. Certified Industrial Hygienist: Industrial hygienist certified in comprehensive practice by the American Board of Industrial Hygiene. change order work: Work described in a Change Order, including extra work and work described in the Contract as change order work. closure: Closure of a traffic lane or lanes, including shoulder, ramp, or connector lanes, within a single traffic control system. commercial quality: Quality meeting the best general practices. commercial source: Established business operating as a material source for the general public. Contract: Written and executed contract between the Department and the Contractor. Contract acceptance: Director's written acceptance of a completed Contract. Contract time: Number of original working days as adjusted by any time adjustment. Contractor: Person or business or its legal representative entering into a Contract with the Department for performance of the work. controlling activity: Construction activity that will extend the scheduled completion date if delayed. County: The County of Fresno critical path: Longest continuous chain of activities for the project that has the least amount of total float of all chains. In general, a delay on the critical path extends the scheduled completion date. critical path method: Network-based planning technique using activity durations and relationships between activities to calculate a schedule for the entire project. culvert: Structure other than a bridge that provides an opening under a roadway. data date: Day after the date through which a schedule is current. Everything occurring earlier than the data date is as-built and everything on or after the data date is planned. day: 24 consecutive hours running from midnight to midnight; calendar day. 1. business day: Day on the calendar except a Saturday and a holiday. 2. working day: Time measure unit for work progress. A working day is any 24-consecutive-hour period except: 2.1. Saturday and a holiday. 2.2. Day during which you cannot perform work on the controlling activity for at least 50 percent of the scheduled work shift with at least 50 percent of the scheduled labor and equipment due to any of the following: 2.2.1. Adverse weather-related conditions. 2.2.2. Traffic maintenance under the Contract. 2.2.3. Suspension of a controlling activity that you and the Engineer agree benefits both parties. 2.2.4. Unanticipated event not caused by either party, such as: 2.2.4.1. Act of God 2.2.4.2. Act of a public enemy. 2.2.4.3. Epidemic. 2.2.4.4. Fire. 2.2.4.5. Flood. 2.2.4.6. Governor-declared state of emergency. 2.2.4.7. Landslide. 2.2.4.8. Quarantine restriction. 2.2.5. Issue involving a third party, including: 2.2.5.1. Industry or area-wide labor strike. 2.2.5.2. Material shortage. 2.2.5.3. Freight embargo. 2.2.5.4. Jurisdictional requirement of a law enforcement agency. 2.2.5.5. Workforce labor dispute of a utility or nonhighway facility owner resulting in a nonhighway facility rearrangement not described and not solely for the Contractor's convenience. Rearrangement of a nonhighway facility includes installation, relocation, alteration, or removal of the facility. 2.3. Day during a concurrent delay. 3. original working days: 3.1. Working days to complete the work shown on the Notice to Bidders for a non-cost-plus-time- based bid 3.2. Working days bid to complete the work for a cost-plus-time-based bid Where working days is specified without the modifier original in the context of the number of working days to complete the work, interpret the number as the number of original working days as adjusted by any time adjustment. deduction: Money permanently taken from a progress payment or the final payment. Deductions are cumulative and are not retentions under Pub Cont Code § 7107. delay: Event that extends the completion of an activity. 1. excusable delay: Delay caused by the Department and not reasonably foreseeable when the work began, such as: 1.1. Change in the work 1.2. Department action that is not part of the Contract 1.3. Presence of an underground utility main not described in the Contract or in a location substantially different from that specified 1.4. Described facility rearrangement not rearranged as described, by the utility owner by the date specified, unless the rearrangement is solely for the Contractor's convenience 1.5. Department's failure to obtain timely access to the right-of-way 1.6. Department's failure to review a submittal or provide notification in the time specified 2. critical delay: Excusable delay that extends the scheduled completion date 3. concurrent delay: Occurrence of at least 2 of the following events in the same period of time, either partially or entirely: 3.1. Critical delay 3.2. Delay to a controlling activity caused by you 3.3. Non—working day Department: The Fresno County Board of Supervisors and its authorized representatives. District Office: County of Fresno Department of Public Works and Planning detour: Temporary route for traffic around a closed road part. A passageway through a job site is not a detour. Director: Department's Chairman disadvantaged business enterprise: Disadvantaged business enterprise as defined in 49 CFR 26.5. dispose of: Remove from the job site. divided highway: Highway with separated traveled ways for traffic, generally in opposite directions. Engineer: The County's Director of Public Works and Planning, acting through their authorized designees. early completion time: Difference in time between an early scheduled completion date and the work completion date. environmentally sensitive area: Area within or near construction limits where access is prohibited or limited to protect environmental resources. estimated cost: Estimated cost of the project as shown on the Notice to Bidders. extra work: Any work, desired or performed, but not included in the original Contract. federal-aid contract: Contract that has a federal-aid project number on the cover of the Specifications. final pay item: Bid item whose quantity shown on the Bid Item List is the quantity paid. finished grade: Final surface of the completed facility. If the work under the Contract includes stage construction, the relation between the finished grade and the work under the Contract is shown. fixed cost: Labor, material, or equipment cost directly incurred by the Contractor as a result of performing or supplying a particular bid item that remains constant regardless of the item's quantity. float: Difference between the earliest and latest allowable start or finish times for an activity. 1. Department-owned float: Time saved on the critical path by actions of the Department. It is the last activity shown on the schedule before the scheduled completion date. force account work: Work ordered on a construction project without an existing agreement on its cost, and performed with the understanding that the contractor will bill the owner according to the cost of labor, materials, and equipment, plus a certain percentage for overhead and profit. grading plane: Basement material surface on which the lowest layer of subbase, base, pavement, surfacing, or other specified layer is placed. highway: Whole right-of-way or area reserved for use in constructing the roadway and its appurtenances. holiday: Holiday shown in the following table: Holidays Holida Date observed Every Sunday Every Sunda New Year's Day January 1st Birthday of Martin Luther King, Jr. 3rd Monday in January Presidents' Day 3rd Monday in February Cesar Chavez Day March 31 st Memorial Day Last Monday in May Independence Day July 41n Labor Day 1st Monday in September Veterans Day November 111n Thanksgiving Day 4th Thursday in November Day after Thanksgiving Day Day after Thanksgiving Da Christmas Day December 251" If January 1st, March 31st, July 4th, November 11th, or December 25th fall on a Sunday, the Monday following is a holiday. If January 1st, March 31st, July 4th, November 11th, or December 25th fall on a Saturday, the preceding Friday is a holiday. hours of darkness: Hours of darkness as defined in Veh Code § 280. idle equipment: Equipment: 1. On the job site at the start of a delay 2. Idled because of the delay 3. Not operated during the delay informal-bid contract: Contract that has Informal Bid Authorized by Pub Cont Code§ 10122 on the cover of the Notice to Bidders and Special Provisions. job site: Area within the defined boundaries of a project. Labor Surcharge and Equipment Rental Rates: Caltrans publication that lists labor surcharge and equipment rental rates. landscaping: Practice of a landscaping contractor under 16 CA Code of Regs § 832.27. material: Any product or substance specified for use in the construction of a project. material shortage: 1. Shortage of raw or produced material that is area-wide and caused by an unusual market condition except if any of the following occurs: 1.1. Shortage relates to a produced, nonstandard material 1.2. Supplier's and the Contractor's priority for filling an order differs 1.3. Event outside the United States for a material produced outside the United States 2. Unavailability of water that delays a controlling activity material source facility audit: Self-audit and a Caltrans audit evaluating a facility's capability to consistently produce materials that comply with Caltrans standards. median: Portion of a divided highway separating the traveled ways including inside shoulders. milestone: Event activity that has zero duration and is typically used to represent the start or end of a certain stage of the project. mobilization: Preparatory work that must be performed or costs incurred before starting work on the various items on the job site (Pub Cont Code § 10104). modify: Add to or subtract from an appurtenant part. narrative report: Document submitted with each schedule that discusses topics related to project progress and scheduling. near critical path: Chain of activities with total float exceeding that of the critical path but having not more than 10 working days of total float. obliterate: Place an earth cover over or root, plow, pulverize, or scarify. Office engineer: The Director of Public Works and Planning for the County of Fresno pavement: Uppermost layer of material placed on a traveled way or shoulder. plans: Standard plans, revised standard plans, and project plans. 1. standard plans: Drawings standard to Department construction projects. These plans are in a book titled Standard Plans. 2. revised standard plans: New or revised standard plans. These plans are listed in the List of Revised Standard Plans in a book titled Specifications. 3. project plans: Drawings specific to the project, including authorized shop drawings. These plans also include a section titled Project Details of a book titled Specifications. plant establishment period: Number of days shown on the Notice to Bidders for plant establishment. quality characteristic: Characteristic of a material that is measured to determine conformance with a given requirement. quality control plan: Contractor's plan to ensure QC. reconstruct: Remove and disassemble and construct again at an existing or new location. relocate: Remove and install or place in a new location. remove: Remove and dispose of. reset: Remove and install or place laterally at the same station location. roadbed: Roadway portion extending from the curb line to curb line or the shoulder line to shoulder line. A divided highway has 2 roadbeds. roadside: Area between the outside shoulder edge and the right-of-way limits. roadway: Portion of the highway within the outside lines of curbs, sidewalks, slopes, ditches, channels, or waterways. A roadway includes the structures and features necessary for safety, protection of facilities, and drainage. salvage: Remove, clean, and haul to a specified location. schedule: 1. baseline schedule: Initial schedule showing the original work plan starting on the date of Contract approval. This schedule shows no completed work to date and no negative float or negative lag to any activity. 2. revised schedule: Schedule that incorporates a proposed or past change to logic or activity durations. 3. updated schedule: Current schedule developed from the accepted baseline and any subsequent accepted updated or revised schedules through regular monthly review to incorporate actual past progress. scheduled completion date: Planned work completion date shown on the current schedule. shoulder: Roadway portion contiguous with the traveled way for accommodation of a stopped vehicle, emergency use, and lateral support of base and surface courses. small tool: Tool or piece of equipment not listed in Labor Surcharge and Equipment Rental Rates that has a replacement value of$500 or less. specifications: Standard specifications, revised standard specifications, and special provisions. 1. standard specifications: Specifications standard to Department construction projects. These specifications are in a book titled Standard Specifications. 2. revised standard specifications: New or revised standard specifications. These specifications are in a section titled Revised Standard Specifications of a book titled Specifications. 3. special provisions: Specifications specific to the project. These specifications are in a section titled Special Provisions of a book titled Specifications. State: State of California, including its agencies, departments or divisions whose conduct or action is related to the work. Structure Design: Offices of Structure Design of the Department of Transportation. subbase: Layer of material between a base and the basement material. subgrade: Roadbed portion on which pavement, surfacing, base, subbase, or a layer of any other material is placed. submittal: 1. action submittal: Written and graphic information and samples that require the Department's response. 2. informational submittal: Written information that does not require the Department's response. substantial defects: Defects plainly seen as damaged, displaced, or missing parts or improper functioning of materials, parts, equipment, or systems. substructure: Bridge parts below the bridge seats, pier tops, and haunches for rigid-framed bridges or spring lines for arched bridges; includes abutment backwalls, abutment parapets, and wingwalls. superstructure: Bridge parts except the substructure. supplemental project information: Information relevant to the project, specified as supplemental project information, and made available to bidders. surfacing: Uppermost layer of material placed on a traveled way or shoulders; pavement. time impact analysis: Analysis using a CPM schedule developed specifically to demonstrate the effect a proposed or past change or delay has on the current scheduled completion date. time-scaled network diagram: Graphic depiction of a CPM schedule comprised of activity bars with relationships for each activity represented by arrows. The tail of each arrow connects to the activity bar for the predecessor and points to the successor. total bid: Sum of the item totals as verified by the Department; original Contract price. total float: Amount of time that an activity or chain of activities can be delayed before extending the scheduled completion date. traffic: Pedestrians, bicyclists, ridden or herded animals, vehicles, streetcars, and other conveyances either singularly or together while using any highway for purposes of travel. traffic lane: Portion of traveled way used for the movement of a single line of vehicles. traveled way: Portion of the roadway for the movement of vehicles, exclusive of the shoulders, berms, sidewalks, and parking lanes. tunnel: Tunnel as defined in 8 CA Code of Regs § 8405 et seq. unauthorized work: Work performed beyond the lines and grades described in the Contract or established by the Engineer or extra work performed without Department authorization. unsuitable material: Material encountered below the natural ground surface in embankment areas or below the grading plane in excavation areas that the Engineer determines to be in any of the following conditions: 1. Of such unstable nature that it cannot be compacted to the specified density using ordinary methods at optimum moisture content. 2. Too wet to be properly compacted and cannot be dried before incorporating it into the work. Excessive moisture alone is not sufficient cause for determining that the material is unsuitable. 3. Inappropriate for the planned use. withhold: Money temporarily or permanently taken from a progress payment. work: Resources and activities required for Contract acceptance, including labor, materials, equipment, and the created product. work plan: Detailed formulation of a program of action. work zone: Area of a highway with construction, maintenance, or utility work activities. 1-1.08 DISTRICTS Replace the first sentence in Section 1.08 with the following: Caltrans' district composition and office addresses are as shown in the following table: Add to the end of Section 1-1.09 This project is not in a freeze-thaw area. Replace the headings and paragraphs of Section 1-1.10 with: 1-1.10 PAVEMENT CLIMATE REGIONS To help account for the effects of various climatic conditions on pavement performance, the State has been divided into 9 climate regions. The project's pavement climate region is Inland Valley. Replace the headings and paragraphs of Section 1-1.11 with: 1-1.11 WEBSITES,ADDRESSES, AND TELEPHONE NUMBERS Websites, Addresses, and Telephone Numbers Reference or agency or department unit Website Address Telephone no. Authorized https://dot.ca.gov/program Material Lists s/engineering= Authorized services/authorized- Material Source materials-lists Lists CA Unified Certification https:Hdot.ca.gov/program Program's list of s/civil-rights/dbe-search certified DBEs California https:Hdot.ca.gov/program MUTCD s/safety- -- -- ro rams/camutcd Data Materials Engineering and Testing Interchange for Services Department of Materials https://dime.dot.ca.gov/ Transportation (916) 227-5238 Engineering 5900 Folsom Blvd Sacramento CA 95819-4612 https://www.fresnocountVc 2220 Tulare Street Department a.gov/Departments/Public- Design Division —Seventh Floor (559)600-9908 Works-and-Plan nin Fresno, CA 93721 Department of Conservation, http://www.conservation.c Office of Mine a.gov/dmr/ Reclamation Department of General Office of Small Business and DVBE Services, Office https://www.dgs.ca.gov/O Services Department of General (800) 559-5529 of Small BAS Services 707 3rd St West (916) 375-4940 Business and Sacramento CA 95605- 2811 DVBE Services Department of 455 Golden Gate Ave Industrial http://www.dir.ca.gov San Francisco CA 94102 -- Relations Design Tel: (559) 353- Services- https://www.fresnocountyc 4919 Contract a.gov/Departments/Public- 2220 Tulare Street Fax:(559)455- Administration, Works-and- Design Division —Seventh Floor 4609 Email: Planholders, Planning/Construction- Fresno, CA 93721 Des ign Services(a)- Bid Results Bidding-Opportunities fresnocountyca.g ov Division of Major Construction Payment and Accounting, Information Unit Office of https:Hdot.ca.gov/program Office of External Accounts Payable External s/accounting Division of Accounting (916)227-9013 Accounts Department of Transportation Payable P.O. Box 168043 Sacramento, CA 95816-8043 Division of http://www.dot.ca.gov/hq/c Construction onstruc/ Geotechnical Services Geotechnical https://dot.ca.gov/program Department of Transportation (916)227-7000 Services s/engineering-services 5900 Folsom Blvd Sacramento, CA 95819-4612 Materials Engineering and Testing https:Hdot.ca.gov/program Services METS Department of Transportation (916)227-7000 s/engineering-services 5900 Folsom Blvd Sacramento, CA 95819-4612 https:Hdot.ca.gov/program MPQP s/construction/material- -- -- lant- ualit - ro ram Director of Public Works & Planning Office Engineer __ Fresno County cn (559)600-4078 2220 Tulare St, 8 Floor Fresno, CA 93721 Replace the headings and paragraphs of Section 1-1.12 with the following: 1-1.12 MISCELLANY Make checks and bonds payable to the Fresno County Director of Department of Public Works and Planning. 2 BIDDING Replace the headings and paragraphs of Section 2 with the following: 2-1.01 GENERAL Section 2 includes specifications related to bid eligibility and the bidding process. 2-1.02 BID INELIGIBILITY A firm that has provided architectural or engineering services to the Department for this contract before bid submittal for this contract is prohibited from any of the following: 1. Submitting a bid 2. Subcontracting for a part of the work 3. Supplying materials 2-1.03 CONTRACTOR REGISTRATION No contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. 2-1.04-2-1.05 RESERVED 2-1.06 BID DOCUMENTS 2-1.06A General The Bid book includes bid forms and certifications and may be requested from Design Services and are available online at http://www.BidExpress.com. The Specifications includes the Notice to Bidders, revised standard specifications, project details, and special provisions. The Specifications, project plans, and any addenda to these documents may be accessed at Design Services. The Standard Specifications and Standard Plans may be purchased at the Publication Distribution Unit or accessed online at https://www.fresnocountyca.gov/files/sharedassets/county/vision-files/files/58025- 2015-standard-specifications.pdf. 2-1.06B Supplemental Project Information The Department makes the following supplemental project information available: Supplemental Project Information Where Available Description Included in Project Details City of Fresno Standard Specifications and Drawings • Construction Funding Sign • PG&E Rule 16 • FMFCD Standard Specifications • County of Fresno dummy permit Available on Design Services webpage Planholders List, Project Cross Sections If as-built drawings are available they may not show existing dimensions and conditions. Where new construction dimensions are dependent on existing bridge dimensions, verify the field dimensions and adjust the dimensions of the work to fit the existing conditions. 2-1.06C-2-1.06D Reserved 2-1.07 JOB SITE AND DOCUMENT EXAMINATION Examine the job site and bid documents. Notify the Department of apparent errors and patent ambiguities in the plans, specifications, and Bid Item List. Failure to do so may result in rejection of a bid or rescission of an award. Bid submission is your acknowledgment that you have examined the job site and bid documents and are satisfied with: 1. General and local conditions to be encountered 2. Character, quality, and scope of work to be performed 3. Quantities of materials to be furnished 4. Character, quality, and quantity of surface and subsurface materials or obstacles 5. Requirements of the contract 2-1.08 RESERVED 2-1.09 BID ITEM LIST Submit a bid based on the bid item quantities the Department shows on Bid Item List. 2-1.10 SUBCONTRACTOR LIST On the Subcontractor List form, list each subcontractor to perform work in an amount in excess of 1/2 of 1 percent of the total bid or$10,000, whichever is greater(Pub Cont Code §4100 et seq.). For each subcontractor listed, the Subcontractor List form must show: 1. Business name and the location of its place of business. 2. California contractor license number for a non-federal-aid contract. 3. Public works contractor registration number. 4. Portion of work it will perform. Show the portion of the work by: 4.1. Bid item numbers for the subcontracted work 4.2. Percentage of the subcontracted work for each bid item listed 4.3. Description of the subcontracted work if the percentage of the bid item listed is less than 100 percent 2-1.11 RESERVED 2-1.12 DISADVANTAGED BUSINESS ENTERPRISES 2-1.12A General Section 2-1.12 applies to a federal-aid contract. Under 49 CFR 26.13(b): The contractor, sub recipient or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR part 26 in the award and administration of DOT-assisted contracts. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as the recipient deems appropriate, which may include, but is not limited to: (1) Withholding monthly progress payments; (2) Assessing sanctions; (3) Liquidated damages; and/or (4) Disqualifying the contractor from future bidding as non-responsible. Include this assurance in each subcontract you sign with a subcontractor. 2-1.12B Disadvantaged Business Enterprise Goal 2-1.12B(1) General Section 2-1.12B applies if a DBE goal is shown on the Notice to Bidders. The Department shows a goal for DBEs to comply with the DBE program objectives provided in 49 CFR 26.1. Make work available to DBEs and select work parts consistent with the available DBEs, including subcontractors, suppliers, service providers, and truckers. Meet the DBE goal shown on the Notice to Bidders or demonstrate that you made adequate good faith efforts to meet this goal. You are responsible to verify at bid opening the DBE firm is certified as a DBE by the California Unified Certification Program and possess the work codes applicable to the type of work the firm will perform on the Contract. Determine that selected DBEs perform a commercially useful function for the type of work the DBE will perform on the Contract as provided in 49 CFR 26.55(c)(1)—(4). Under 49 CFR 26.55(c)(1)—(4), the DBE must be responsible for the execution of a distinct element of work and must carry out its responsibility by actually performing, managing, and supervising the work. All DBE participation will count toward Caltrans' federally mandated statewide overall DBE goal. Credit for materials or supplies you purchase from DBEs will be evaluated on a contract-by-contract basis and counts toward the goal in the following manner: 1. 100 percent if the materials or supplies are obtained from a DBE manufacturer. 2. 60 percent if the materials or supplies are obtained from a DBE regular dealer. 3. Only fees, commissions, and charges for assistance in the procurement and delivery of materials or supplies if they are obtained from a DBE that is neither a manufacturer nor a regular dealer. 49 CFR 26.55 defines manufacturer and regular dealer. You receive credit toward the goal if you employ a DBE trucking company that is performing a commercially useful function. The Department uses the following factors in determining whether a DBE trucking company is performing a commercially useful function: • The DBE must be responsible for the management and supervision of the entire trucking operation for which it is responsible on a particular contract, and there cannot be a contrived arrangement for the purpose of meeting DBE goals. • The DBE must itself own and operate at least one fully licensed, insured, and operational truck used on the contract. • The DBE receives credit for the total value of the transportation services it provides on the Contract using trucks it owns, insures, and operates using drivers it employs. • The DBE may lease trucks from another DBE firm, including an owner-operator who is certified as a DBE. The DBE who leases trucks from another DBE receives credit for the total value of the transportation services the lessee DBE provides on the Contract. • The DBE may lease trucks without drivers from a non-DBE truck leasing company. If the DBE leases trucks from a non-DBE truck leasing company and uses its own employees as drivers, it is entitled to credit for the total value of these hauling services. • A lease must indicate that the DBE has exclusive use of and control over the truck. This does not preclude the leased truck from working for others during the term of the lease with the consent of the DBE, so long as the lease gives the DBE absolute priority for use of the leased truck. Leased trucks must display the name and identification number of the DBE. [49 CFR 26.55(d)] 2-1.12B(2) DBE Commitment Submittal Submit DBE information under section 2-1.33. Submit a copy of the quote from each DBE shown on the DBE Commitment form that describes the type and dollar amount of work shown on the form. If a DBE is participating as a joint venture partner, submit a copy of the joint venture agreement. 2-1.12B(3) DBE Good Faith Efforts Submittal You can meet the DBE requirements by either documenting commitments to DBEs to meet the Contract goal or by documenting adequate good faith efforts to meet the Contract goal. An adequate good faith effort means that the bidder must show that it took all necessary and reasonable steps to achieve a DBE goal that, by their scope, intensity, and appropriateness to the objective, could reasonably be expected to meet the DBE goal. If you have not met the DBE goal, complete and submit the DBE Good Faith Efforts Documentation form under section 2-1.33 showing that you made adequate good faith efforts to meet the goal. Only good faith efforts directed toward obtaining participation by DBEs are considered. Submit good faith efforts documentation within the specified time to protect your eligibility for award of the contract in the event the Department finds that the DBE goal has not been met. Refer to 49 CFR 26 app A for guidance regarding evaluation of good faith efforts to meet the DBE goal. The Department considers DBE commitments of other bidders in determining whether the low bidder made good faith efforts to meet the DBE goal. 2-1.13-2-1.30 RESERVED Replace section 2-1.31 with: 2-1.31 RESERVED 2-1.31 OPT OUT OF PAYMENT ADJUSTMENTS FOR PRICE INDEX FLUCTUATIONS You may opt out of the payment adjustments for price index fluctuations specified in section 9-1.07. To opt out, submit a completed Opt Out of Payment Adjustments for Price Index Fluctuations form under section 2-1.33. 2-1.32 RESERVED 2-1.33 BID DOCUMENT COMPLETION AND SUBMITTAL 2-1.33A General Complete forms in the Bid book. Submit an electronic bid online at http://www.BidExpress.com (Section 2-1.33D) or submit a hardcopy bid: 1. Under sealed cover 2. Marked as a bid 3. Identifying the contract number and the bid opening date Certain bid forms must be submitted with the bid and properly executed. Certain other forms and information must be submitted either with the bid or within the prescribed period after bid opening as specified elsewhere in these special provisions. Failure to submit the forms and information as specified results in a nonresponsive bid. If an agent other than the authorized corporation officer or a partnership member signs the bid, file a Power of Attorney with the Department either before opening bids or with the bid. Otherwise, the bid may be nonresponsive. 2-1.33B Bid Item List and Bid Comparison Submit a bid based on the bid item quantities the Department shows on Proposal 2. Bids will be evaluated and the low bidder determined as indicated in the Notice to Bidders. Do not submit an unbalanced bid. An unbalanced is a bid is one in which one or more bid items is/are considered by the Department to have been bid at an amount that is unreasonably high or unreasonably low. A bid may be considered to be non-responsive and may be rejected if it is considered by the Department to be unbalanced. 2-1.33C Bid Document Completion Proposal items are identified by title and by the word "Proposal"followed by the number assigned to the proposal item in question. Proposal items are included in the Bid Book. 2-1.33C(1) Proposal 1 - Proposal to the Board of Supervisors of Fresno County 2-1.33C(2) Proposal 2 - Bid Item List One or more sheet(s)or list(s) upon which the bidder completes the bid. Fill out completely including a unit price and total for each unit price-based item and a total for each lump sum item. Do not make any additions such as "plus tax", "plus freight", or conditions such as "less 2% if paid by 15th". Use ink or typewriter for paper bids. 2-1.33C(3) Proposal 3 - Evaluation of Bid Proposal Sheet Describes how inconsistences and irregularities are evaluated and corrected when Design Services reviews the Bid Sheet. 2-1.33C(4) Proposal 4- Bid Security and Signature Submit one of the following forms of bidder's security equal to at least 10 percent of the bid: • Cash • Cashier's check • Certified check • Signed bidder's bond by an admitted surety insurer Indicate type of bid security provided. • Cash—Acceptable but not recommended. Cash is deposited in a clearing account and is returned to bidders by County warrant. This process may take several weeks. • Cashier's or Certified Checks. This type of security is held until the bid is no longer under consideration. If submitted by a potential awardee, they will be returned when the contract is fully executed by the bidder and bonds and insurance have been approved. • Bid Bonds - Must be signed by the bidder and by the attorney-in-fact for the bonding company. Provide notarized signature of attorney-in-fact accompanied by bonding company's affidavit authorizing attorney-in-fact to execute bonds. An unsigned bid bond will be cause for rejection. Bonding companies may provide their own bid bond forms. The Bid Security and Signature sections must be completed by the bidder and submitted with their bid. Provide contractor's license information. State business name and if business is a: • Corporation - list officers • Partnership- list partners • Joint Venture- list members; if members are corporations or partnerships, list their officers or partners. • Individual - list Owner's name and firm name style Signature of Bidder-the following lists types of companies and corresponding authorized signers. • Corporation - by an officer • Partnership- by a partner • Joint Venture- by a member • Individual - by the Owner If signature is by a Branch Manager, Estimator, Agent, etc., the bid must be accompanied by a power of attorney authorizing the individual to sign the bid in question or to sign bids more generally, otherwise the bid may be rejected. Business Address - Firm's Street Address Mailing Address - P.O. Box or Street Address Complete, sign, and return with bid. 2-1.33C(5) Proposal 5 - Noncollusion Declaration Must be completed, signed, and returned with bid. 2-1.33C(6) Proposal 6 - Public Contract Code Section 10285.1 Statement Select"has"or"has not" in accordance with instructions on form, return with completed for with bid. Note that signing the bid constitutes signing this statement. 2-1.33C(7) Proposal 7 - Public Contract Code Section 10162 Questionnaire And Public Contract Code 10232 Statement Select: "yes" or"no" accordance with instructions on form, include explanation if"yes" is selected. Return completed form with bid. Note that signing the bid constitutes signing this questionnaire and statement. 2-1.33C(8) Proposal 8 -Subcontractors Sheet(s) upon which bidders list subcontractors. List each subcontractor to perform work in an amount in excess of 1/2 of 1 percent of the total bid or$10,000, whichever is greater(Pub Cont Code §4100 et seq.). The Subcontractor List submitted with the bid must show the name, location of business, work portions to be performed, and the contractor's license number for each subcontractor listed. • Use subcontractor's business name style as registered with the License Board. • Specify the city in which the subcontractor's business is located and the state if other than California. • Description of the work to be performed by the subcontractor. Indicate with bid item numbers from the bid sheet and/or work descriptions similar to those on bid sheet. • List license number and Department of Industrial Relations registration number for each subcontractor. Upon request from Design Services, provide the following additional information within 24 hours of bid opening if not included on the Subcontractor List submitted with the bid: • Complete physical address for each subcontractor listed. • Percentage of the total bid or dollar amount associated with each subcontractor listed. 2-1.33C(9) Proposal 9 - Certification With Regard To The Performance Of Previous Contracts Or Subcontracts Subject To The Equal Opportunity Clause And The Filing Of Required Reports For a Federal-aid contract, complete, sign, and return with bid. Certification of proposed subcontractors is the responsibility of the Bidder and must be provided to the County upon request. 2-1.33C(10) Proposal 10 - Title 49, Code Of Federal Regulations, Part 29 Debarment And Suspension Certification For a Federal-aid contract, complete, sign, and return with bid. Certification of proposed subcontractors is the responsibility of the Bidder and must be provided to the County upon request. 2-1.33C(11) Proposal 11 -Nonlobbying Certification For Federal-Aid Contracts For a Federal-aid contract, complete, sign, and return with bid. 2-1.33C(12) Proposal 12(a)through Proposal 12(b) -Disclosure Of Lobbying Activities For a Federal-aid contract, complete, sign, and return with bid. 2-1.33C (13) Proposal 13(a)through Proposal 13(b) -Exhibit 15-G Local Agency Bidder DBE Commitment(Construction Contracts) For a Federal-aid contract, bidders must complete and submit so that it is received by Design Services, no later than 4:00 PM on the fifth calendar day after the bid opening if not submitted with the bid. 2-1.33C(14) Proposal 14(a)through proposal 14(c) -Exhibit 15-H DBE Information— Good Faith Efforts For a Federal-aid contract, if you have not met the DBE goal, bidders must complete and submit so that it is received by Design Services no later than 4:00 PM on the fifth calendar day after the bid opening if not submitted with the bid. 2-1.33C(15) Proposal 15(a)through Proposal 15(b) —Exhibit 12-B Bidder's List of Subcontractor (DBE and Non-DBE) For a Federal-aid contract, bidders must submit so that it is received by Design Services, no later than 4:00 PM on the fifth (5th) calendar day after the bid opening if not submitted with the bid. Fill out as completely as possible. 2-1.33C(16) Proposal 16 - Opt out of payment adjustments for price index fluctuations You may opt out of the payment adjustments for price index fluctuations specified in section 9-1.07. To opt out, submit a completed Opt Out of Payment Adjustments for Price Index Fluctuations form with your bid. 2-1.33C(17) Proposal 17 - Guaranty Does not need to be signed with the bid. Part of the contract which must be signed by the contractor when contract is executed. 2-1.33C(18) Proposal 18 -Title 13, California Code of Regulations § 2449(i) General Requirements for In-Use Off-Road Diesel-Fueled Fleets Contractors, if applicable, must submit valid Certificates of Reported Compliance with their bid. Subcontractor certificates will be due no later than 4:00 PM on the fifth (51") calendar day after the bid opening if not submitted with the bid. 2-1.33D Electronic Bid Document Completion Electronic versions of the bid book documents are available online at http://www.BidExpress.com, and may be submitted through that website. You must either attach an electronic bid bond or provide an original bid bond (or other form of bid security authorized by Public Contract Code Section 20129(a)), prior to the bid opening. Bidders submitting online may use one of the accepted electronic sureties (Tinubu or Surety 2000)to submit their bid bond; or may submit cash, cashier's check, certified check, or a bidder bond to Design Services at 2220 Tulare St., Seventh Floor, Fresno, CA 93721. Those submitting bid bonds directly to Design Services must submit their bid bond: 1. Under sealed cover 2. Marked as a bid-bond 3. Identifying the contract number and the bid opening date on the cover 2-1.34 BIDDER'S SECURITY Submit one of the following forms of bidder's security equal to at least 10 percent of the bid: 1. Cash 2. Cashier's check 3. Certified check 4. Signed bidder's bond by an admitted surety insurer Submit cash, cashier's check, certified check, or bidder's bond with your bid. 2-1.35-2-1.39 RESERVED 2-1.40 BID WITHDRAWAL 1. An authorized agent may withdraw a bid before the bid opening date and time by submitting a written bid withdrawal request at the location where the bid was submitted. Withdrawing a bid does not prevent you from submitting a new bid. An authorized agent is an individual authorized to submit a bid. 2. After the bid opening time, you cannot withdraw a bid. 2-1.41-2-1.42 RESERVED 2-1.43 BID OPENING The Department publicly opens and reads bids at the time and place shown on the Notice to Bidders. 2-1.44-2-1.45 RESERVED 2-1.46 DEPARTMENT'S DECISION ON BID The Department's decision on the bid amount is final. The Department may reject: 1. All bids 2. A nonresponsive bid 2-1.47 BID RELIEF The Department may grant bid relief under Pub Cont Code § 5100 et seq. Submit any request for bid relief to Design Services. 2-1.48 RESERVED 2-1.49 SUBMITTAL FAILURE HISTORY The Department considers a bidder's past failure to submit documents required after bid opening in determining a bidder's responsibility. 2-1.50 BID RIGGING Section 2-1.50 applies to a federal-aid contract. The US Department of Transportation (DOT) provides a toll-free hotline to report bid rigging activities. Use the hotline to report bid rigging, bidder collusion, and other fraudulent activities. The hotline number is (800)424-9071. The service is available 24 hours 7 days a week and is confidential and anonymous.. The hotline is part of the DOT's effort to identify and investigate highway construction contract fraud and abuse and is operated under the direction of the DOT Inspector General. 2-1.51 DISCLOSURE OF SELF-DEALING TRANSACTIONS This provision is only applicable if the contractor is operating as a corporation (a for-profit or non-profit corporation)or if during the term of this agreement, the contractor changes its status to operate as a corporation. Members of the contractor's Board of Directors shall disclose any self-dealing transactions that they are a party to while contractor is providing goods or performing services under this agreement. A self-dealing transaction shall mean a transaction to which the contractor is a party and in which one or more of its directors has a material financial interest. Members of the Board of Directors shall disclose any self- dealing transactions that they are a party to by completing and signing a Self-Dealing Transaction Disclosure Form which is included in Project Details of these special provisions. In the event that the Contractor(to whom the project is awarded) is operating as a corporation or incorporates during the course of the construction contract, and any member of its board of directors is engaged or intends to become engaged in self-dealing transaction(s), each member of its board of directors who is engaged or intends to become engaged in a self-dealing transaction or transactions must complete and submit to the County a completed Self-Dealing Transaction Disclosure Form (in Project Details)for each such transaction prior to engaging therein or immediately thereafter. 3 CONTRACT AWARD AND EXECUTION Replace the headings and paragraphs of Section 3 with: 3-1.01 GENERAL Section 3 includes specifications related to contract award and execution. 3-1.02 CONSIDERATION OF BIDS 3-1.02A General Bids will be compared on the basis listed in the Notice to Bidders. 3-1.02B Tied Bids The Department breaks a tied bid with a coin toss: 3-1.03 CONTRACTOR REGISTRATION No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. 3-1.04 CONTRACT AWARD 3-1.04A BID PROTEST PROCEDURES Any bid protest must be submitted in writing and delivered by the Bidder by either of the following means: (1)via e-mail to Des ignServices(LDfresnocountyca.gov; or(2)via certified mail, return receipt requested to the following address: Design Division, Department of Public Works and Planning, 2220 Tulare Street, Sixth Floor, Fresno, CA 93721. The bid protest must be received no later than 5:00 p.m. of the seventh (7th) calendar day following the bid opening for any issues found within the bid itself, or 5:00 p.m. of the third (3rd) calendar day following the deadline for submittal of the specific bid document(s) placed at issue by the protest. Any Bidder filing a protest is encouraged to submit the bid protest via e-mail, because the deadline is based on the Department's receipt of the bid protest. A bid protest accordingly may be rejected as untimely if it is not received by the deadline, regardless of the date on which it was postmarked. The Bidder's compliance with the following additional procedures also is mandatory: a. The initial protest document shall contain a complete statement of the grounds for the protest, including a detailed statement of the factual basis and any supporting legal authority. b. The protest shall identify and address the specific portion of the document(s)forming the basis for the protest. c. The protest shall include the name, address and telephone number of the person representing the protesting party. d. The Department will provide a copy of the initial protest document and any attached documentation to all other Bidders or proposers who appear to have a reasonable prospect of receiving an award depending upon the outcome of the protest. e. The Board of Supervisors will issue a decision on the protest. If the Board of Supervisors determines that a protest is frivolous, the party originating the protest may be determined to be irresponsible and that party may be determined to be ineligible for future contract awards. f. The procedure and time limits set forth herein are mandatory and are the Bidder's sole and exclusive remedy in the event of a bid protest. Failure by the Bidder to comply with these procedures shall constitute a waiver of any right to further pursue the bid protest, including the subsequent filing of a Government Code Claim or legal proceedings. 3-1.04B AWARD PERIOD If the Department awards the contract, the award is made to the lowest responsible bidder within 54 calendar days after bid opening. The Department may extend the specified award period if the Bidder agrees. You may request to extend the award period by faxing a request to Design Services before 4:00 p.m. on or before the last day of the award period. If you do not make this request, after the specified award period: 1. Your bid becomes invalid 2. You are not eligible for the award of the contract 3-1.05 CONTRACT BONDS (PUB CONT CODE §§ 10221 AND 10222) The successful bidder must furnish 2 bonds conforming to the requirements in the Agreement of these special provisions. 3-1.06 CONTRACTOR LICENSE For a federal-aid contract, the Contractor must be properly licensed as a contractor from contract award through Contract acceptance (Pub Cont Code § 10164). For a non-federal-aid contract: 1. Contractor must be properly licensed as a contractor from bid opening through Contract acceptance (Bus & Prof Code § 7028.15) 2. Joint venture bidders must obtain a joint venture license before contract award (Bus & Prof Code § 7029.1) 3-1.07 INSURANCE POLICIES The successful bidder must submit copies of its insurance policies conforming to the requirements in the Agreement of these special provisions. 3-1.08—3-1.10 RESERVED 3-1.11 PAYEE DATA RECORD Complete and deliver to the Engineer a Payee Data Record form when requested by the Engineer. 3-1.12 RESERVED 3-1.13 FORM FHWA-1273 For a federal-aid contract, form FHWA-1273 is included with the Contract form in the documents sent to the successful bidder for execution. Comply with its provisions. Interpret the training and promotion section as specified in section 7-1.11A. 3-1.14-3-1.17 RESERVED 3-1.18 CONTRACT EXECUTION The successful bidder must sign the Agreement. Deliver to Design Services: 1. Signed Agreement including the attached form FHWA-1273 2. Contract bonds 3. Documents identified in section 3-1.07 4. For a federal-aid contract, Local Agency Bidder-DBE Information form Design Services must receive these documents before the 10th business day after the bidder receives the contract. The bidder's security may be forfeited for failure to execute the contract within the time specified (Pub Cont Code §§ 10181, 10182, and 10183). 3-1.19 BIDDERS' SECURITIES The Department keeps the securities of the 1st, 2nd, and 3rd low bidders until the contract has been executed. The other bidders' securities, other than bidders' bonds, are returned upon determination of the 1st, 2nd, and 3rd low bidders, and their bidders' bonds are of no further effect(Pub Cont Code § 10184). 4 SCOPE OF WORK Replace Section 4-1.02 with: 4-1.02 INTENT The Contract intent is to provide for work completion using the best general practices. Nothing in the specifications, special provisions, Standard Specifications, or in any other Contract document voids the Contractor's public safety responsibilities. Replace the paragraphs of Section 4-1.07C with the following: 4-1.07C Reserved Replace Section 4-1.13 with: 4-1.13 CLEANUP Before final inspection, leave the job site neat and presentable and dispose of: 1. Rubbish 2. Excess materials 3. Falsework 4. Temporary structures 5. Equipment Remove warning, regulatory, and guide signs when directed by the Engineer. 5 CONTROL OF WORK Delete the 9t" Paragraph of Section 5-1.01 Add the following before the last sentence in Section 5-1.02 Caltrans Standard Plans, City of Fresno Standard Drawings, and any other other-agency Standard Drawings included in the "Project Details" section of the book entitled "specifications" have the same ranking as Standard Plans." All other drawings in the "Project Details" section of the book entitled "specifications" have the same ranking as Project Plans. Tables and other documents in the "Project Details" section of the book entitled "specifications" have the same ranking as Special Provisions. If a portion of a document in the Project Details section conflicts with the Special Provisions, the Special Provisions shall prevail. Replace the headings and paragraphs of section 5-1.09 with: 5-1.09 RESERVED Replace Section 5-1.12 with: 5-1.12 ASSIGNMENT No third-party agreement relieves you or your surety of the responsibility to complete the work. Do not sell, transfer, or otherwise dispose of any Contract part without prior written consent from the Department. If you assign the right to receive Contract payments, the Engineer accepts the assignment upon the Engineer's receipt of a notice. Assigned payments remain subject to deductions and withholds described in the Contract. The Department may use withheld payments for work completion whether payments are assigned or not. A pending or disapproved request for assignment does not relieve you of the responsibility to commence and pursue work timely and in strict accordance with contract documents. Replace the headings and paragraphs of section 5-1.13C with: 5-1.13C RESERVED Replace the headings and paragraphs of section 5-1.13D with: 5-1.13D RESERVED Add the following paragraph to the end of section 5-1.16 with: Submit Daily Log records to the Engineer weekly for the entire course of work unless the Engineer requests another interval. Replace the paragraphs of section 5-1.20B(4)with: 5-1.20B(4) Contractor—Property Owner Agreement Before procuring material from or disposing or stockpiling of material on non-highway property: 1. Provide proof that the property where materials are to be stockpiled or equipment parked/stored is appropriately zoned and/or permitted for the use proposed by the Contractor. 2. Obtain written authorization from each and every owner of the property where materials are to be stockpiled or equipment parked/stored. 3. Provide proof that the signor(s)of the authorization are the owners of the property. 4. Provide an executed release from the property owner(s) absolving the Department from any and all responsibility in connection with the stockpiling of materials or parking/storage of equipment on said property. 5. Obtain written permission from the Engineer to stockpile materials or park/store equipment at the location designated in said authorization. Before Contract acceptance, submit a document signed by the owner of the material source or disposal site stating that the Contractor has complied with the Contractor-owner agreement. Failure by the Contractor to provide written authorization shall result in the withholding of all funds due to the Contractor until said authorization is received by the County. Replace the paragraph of section 5-1.20C with: 5-1.20C Railroad Relations If the Contract includes an agreement with a railroad company, the Department makes the provisions of the agreement available in Project Details in the document titled "Railroad Relations and Insurance Requirements." Comply with the requirements in the document. Replace the paragraphs of section 5-1.23A with: 5-1.23A General Section 5-1.23 includes specifications for action and informational submittals. Any submittal not specified as an informational submittal is an action submittal. Submit action and informational submittals to the Engineer. Unless otherwise specified in these Specifications, submittals shall be provided via email in .pdf format. Each submittal must have a cover sheet that must include: 1. Contract number 2. Project Name 3. Date 4. Submittals (and resubmittals if applicable) must be numbered sequentially 5. Structure number if applicable 6. Contractor 7. Person responsible for submitting the submittal 8. Signature of Contractor's representative sending submittal 9. Section number and/or item submittal is referencing 10. Pages of submittal, excluding cover sheet The Department rejects a submittal if it has any error or omission. If the last day for submitting a document falls on a Saturday or holiday, it may be submitted on the next business day with the same effect as if it had been submitted on the day specified. Documents must be submitted in the English language. Convert documents to US customary units. Replace Section 5-1.26 with: 5-1.26 CONSTRUCTION SURVEYS The Engineer places stakes and/or marks as the Engineer determines to be necessary to establish the lines and grades required for the work. Submit your request for Engineer-furnished stakes: 1 Once staking area is ready for stakes 2. On a Request for Construction Stakes form After your submittal, the Engineer starts staking within 2 working days. Preserve stakes and marks placed by the Engineer. If the stakes or marks are destroyed, the Engineer replaces them at the Engineer's earliest convenience and deducts the cost. Replace Section 5-1.27E with: 5-1.27E CHANGE ORDER BILLS Maintain separate records for change order work costs. 5-1.32 AREAS FOR USE Occupy the highway only for purposes necessary to perform the work. Defend, indemnify, and hold the Department harmless to the same extent as under section 7-1.05. The Department does not allow temporary residences within the highway. 6 CONTROL OF MATERIALS Replace section 6-1.05 with: 6-1.05 SPECIFIC BRAND OR TRADE NAME AND SUBSTITUTION Unless substitution is expressly precluded in the special provisions, a reference to a specific brand or trade name establishes a quality standard and is not intended to limit competition. Unless the Department has made a public interest finding expressly authorizing sole source procurement of a particular item, you may use a product that is equal to or better than the specified brand or trade name if authorized. Submit a substitution request with a time period that: 1. Follows Contract award 2. Allows 30 days for review 3. Causes no delay Include substantiating data with the substitution request that proves that substitution: 1. Causes no delay 2. Is of equal or better quality and suitability If the special provisions disallow substitution of a particular item, provide the specified item and do not propose substitution. 7 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC Add to Section 7-1.02C: In conformance with Title 13 § 2449(i), between March 1 and June 1 of each year, new valid Certificates of Reported Compliance for the current compliance year, as defined in section 2449(n) for the Contractor and all applicable subcontractors must be submitted. Submit new valid Certificates of Reported Compliance to the Engineer at least one week prior to the expiration date of the current certificate. Replace the 2nd Paragraph of Section 7-1.02K(2) with: The general prevailing wage rates and any applicable changes to these wage rates are available: 1. From Design Services 2. From the Department of Industrial Relations'Web site Replace section 7-1.02K(3)with: 04-22-16 Keep accurate payroll records. Submit a copy of your certified payroll records, weekly, including those of subcontractors. Include: 1. Each employee's: 1.1. Full name 1.2. Address 1.3. Social security number 1.4. Work classification 1.5. Straight time and overtime hours worked each day and week 1.6. Actual wages paid for each day to each: 1.6.1. Journeyman 1.6.2. Apprentice 1.6.3. Worker 1.6.4. Other employee you employ for the work 1.7. Pay rate 1.8. Itemized deductions made 1.9. Check number issued 2. Apprentices and the apprentice-to-journeyman ratio Each certified payroll record must include a Statement of Compliance form signed under penalty of perjury that declares: 1. Information contained in the payroll record is true, correct, and complete 2. Employer has complied with the requirements of sections 1771, 1811, and 1815 for any work performed by his or her employees on the public works project 3. Wage rates paid are at least those required by the Contract Submitted certified payrolls for hauling and delivering ready-mixed concrete must be accompanied by a written time record. The time record must include: 1. Truck driver's full name and address 2. Name and address of the factory or batching plant 3. Time the concrete was loaded at the factory or batching plant 4. Time the truck returned to the factory or batching plant 5. Truck driver's signature certifying under penalty of perjury that the information contained in this written time record is true and correct Make certified payroll records available for inspection at all reasonable hours at your main office on the following basis: 1. Upon the employee's request or upon request of the employee's authorized representative, make available for inspection a certified copy of the employee's payroll record. 2. Refer the public's requests for certified payroll records to the Department. Upon the public's request, the Department makes available for inspection or furnishes copies of your certified payroll records. Do not give the public access to the records at your main office. Make all payroll records available for inspection and copying or furnish a copy upon request of a representative of the: 1. Department 2. Division of Labor Standards Enforcement of the Department of Industrial Relations 3. Division of Apprenticeship Standards of the Department of Industrial Relations Furnish the Department the location of the records. Include the street address, city, and county. Furnish the Department a notification of a location and address change within 5 business days of the change. Comply with a request for the records within 10 days after you receive a written request. If you do not comply within this period, the Department withholds from progress payments a $100 penalty for each day or part of a day for each worker until you comply. You are not assessed this penalty for a subcontractor's failure to comply with Labor Code § 1776. The Department withholds from progress payments for delinquent or inadequate records (Labor Code § 1771.5). If you have not submitted an adequate record by the month's 15th day for the period ending on or before the 1 st of that month, the Department withholds up to 10 percent of the monthly progress estimate, exclusive of mobilization. The Department does not withhold more than $10,000 or less than $1,000. Replace Section 7-1.02M(2) with: 7-1.02M(2) Fire Prevention Cooperate with local fire prevention authorities in eliminating hazardous fire conditions. Obtain the phone numbers of the nearest fire suppression agency, California Department of Forestry and Fire Protection (Cal Fire) unit headquarters, United States Forest Service (USFS) ranger district office, and U.S. Department of Interior(USDI) BLM field office. Submit these phone numbers to the Engineer before the start of job site activities. Immediately report to the nearest fire suppression agency fires occurring within the project limits. Prevent project personnel from setting open fires that are not part of the work. Prevent the escape of and extinguish fires caused directly or indirectly by job site activities Except for motor trucks, truck tractors, buses, and passenger vehicles, equip all hydrocarbon-fueled engines, both stationary and mobile including motorcycles, with spark arresters that meet USFS standards as specified in the Forest Service Spark Arrester Guide. Maintain the spark arresters in good operating condition. Spark arresters are not required by Cal Fire, the BLM, or the USFS on equipment powered by properly maintained exhaust-driven turbo-charged engines or equipped with scrubbers with properly maintained water levels. The Forest Service Spark Arrester Guide is available at the district offices. Each toilet must have a metal ashtray at least 6 inches in diameter by 8 inches deep half-filled with sand and within easy reach of anyone using the facility. Locate flammable materials at least 50 feet away from equipment service, parking, and gas and oil storage areas. Each small mobile or stationary engine site must be cleared of flammable material for a radius of at least 15 feet from the engine. Each area to be cleared and grubbed must be cleared and kept clear of flammable material such as dry grass, weeds, brush, downed trees, oily rags and waste, paper, cartons, and plastic waste. Before clearing and grubbing, clear a fire break at the outer limits of the areas to be cleared and grubbed. Other fire breaks may be ordered and are change order work. Furnish the following fire tools: 1. 1 shovel and 1 fully charged fire extinguisher UL rated at 4 B:C or more on each truck, personnel vehicle, tractor, grader, or other heavy equipment. The Engineer may suspend work wholly or in part due to hazardous fire conditions. The days during this suspension are non—working days. If field and weather conditions become such that the determination of the fire danger rating is suspended, section 7-1.02M(2)will not be enforced for the period of the suspension of the determination of the fire danger rating. The Engineer will notify you of the dates of the suspension and resumption of the determination of the fire danger rating. Add between the 9th and 10th paragraphs of section 7-1.03: 07-15-16 If a height differential of more than 0.04 foot is created by construction activities at a joint transverse to the direction of traffic on the traveled way or a shoulder subject to public traffic, construct a temporary taper at the joint with a slope complying with the requirements shown in the following table: Temporary Tapers Height differential Slope horizontal:vertical foot Taper use of 14 days or less Taper use of more than 14 da s Greater than 0.08 100:1 or flatter 200:1 or flatter 0.04-0.08 70:1 or flatter 70:1 or flatter For a taper on existing asphalt concrete or concrete pavement, construct the taper with minor HMA under section 39-2.07. Grind existing surfaces to accommodate a minimum taper thickness of 0.10 foot under either of the following conditions: 1. HMA material such as rubberized HMA, polymer-modified bonded wearing course, or open-graded friction course is unsuitable for raking to a maximum 0.02 foot thickness at the edge 2. Taper will be in place for more than 14 days For a taper on a bridge deck or approach slab, construct the taper with polyester concrete under section 60-3.04B. The completed surface of the taper must be uniform and must not vary more than 0.02 foot from the lower edge of a 12-foot straightedge when placed on its surface parallel and perpendicular to traffic. If authorized, you may use alternative materials or methods to construct the required taper. Replace the headings and paragraphs of Section 7-1.04 with: 7-1.04 PUBLIC SAFETY 7-1.04A GENERAL You are responsible to provide for public safety. Do not construct a temporary facility that interferes with the safe passage of traffic. Control dust resulting from the work, inside and outside the right-of-way. Move workers, equipment, and materials without endangering traffic. Whenever your activities create a condition hazardous to the public, furnish, erect and maintain those fences, temporary railing, barricades, lights, signs, and other devices and take any other necessary protective measures to prevent damage or injury to the public. Any fences, temporary railing, barricades, lights, signs, or other devices furnished, erected and maintained by you are in addition to those for which payment is provided elsewhere in the specifications. Provide flaggers whenever necessary to ensure that the public is given safe guidance through the work zone. At locations where traffic is being routed through construction under one-way controls, move your equipment in compliance with the one-way controls unless otherwise ordered. Use of signs, lights, flags, or other protective devices must comply with the California MUTCD and any directions of the Engineer. Signs, lights, flags or other protective devices must not obscure the visibility of, nor conflict in intent, meaning, and function of either existing signs, lights and traffic control devices, or any construction area signs. Keep existing traffic signals and highway lighting in operation. Other forces within the Department will perform routine maintenance of these facilities during the work. Cover signs that direct traffic to a closed area. Install temporary illumination in a manner which the illumination and the illumination equipment does not interfere with public safety. The installation of general roadway illumination does not relieve you from furnishing and maintaining any protective devices. Equipment must enter and leave the highway via existing ramps and crossovers and must move in the direction of traffic. All movements of workmen and construction equipment on or across lanes open to traffic must be performed in a manner that do not endanger the public. Your vehicles or other mobile equipment leaving an open traffic lane to enter the construction area must slow down gradually in advance of the location of the turnoff to give the traffic following an opportunity to slow down. When leaving a work area and entering a roadway carrying traffic, your vehicles and equipment must yield to traffic. Immediately remove hauling spillage from a roadway lane or shoulder open to traffic. When hauling on roadways, trim loads and remove material from shelf areas to minimize spillage. Notify the Engineer not less than 5 days before the anticipated start of an activity that will change the vertical or horizontal clearance available to traffic, including shoulders. If vertical clearance is temporarily reduced to 15.5 feet or less, place low clearance warning signs in compliance with the California MUTCD and any directions of the Engineer. Signs must comply with the dimensions, color, and legend requirements of the California MUTCD and section 12-3.06 except that the signs must have black letters and numbers on an orange retroreflective background. W12-2P signs must be illuminated so that the signs are clearly visible. Pave or provide full width continuous and cleared wood walks for pedestrian openings through falsework. Protect pedestrians from falling objects and concrete-curing water. Extend overhead protection for pedestrians at least 4 feet beyond the edge of the bridge deck. Illuminate all pedestrian openings through falsework. Temporary pedestrian facilities must comply with the California MUTCD, Part 6, Chapter 6D, "Pedestrian and Worker Safety." Do not store vehicles, material, or equipment in a way that: 1. Creates a hazard to the public 2. Obstructs traffic control devices Do not install or place temporary facilities used to perform the work which interfere with the free and safe passage of traffic. Temporary facilities that could be a hazard to public safety if improperly designed must comply with design requirements described in the Contract for those facilities or, if none are described, with standard design criteria or codes appropriate for the facility involved. Submit shop drawings and design calculations for the temporary facilities and show the standard design criteria or codes used. Shop drawings and supplemental calculations must be sealed and signed by an engineer who is registered as a civil engineer in the State. If you appear to be neglectful or negligent in furnishing warning devices and taking protective measures, the Engineer may direct your attention to the existence of a hazard. You must furnish and install the necessary warning devices. If the Engineer points out the inadequacy of warning devices and protective measures, that action on the part of the Engineer does not relieve you from your responsibility for public safety or abrogate your obligation to furnish and pay for these devices and measures. Install Type K temporary railing or other authorized protective systems under any of the following conditions: 1. Excavations: Where the near edge of the excavation is within 15 feet from the edge of an open traffic lane 2. Temporarily unprotected permanent obstacles: When the work includes the installation of a fixed obstacle together with a protective system, such as a sign structure together with protective railing, and you elect to install the obstacle before installing the protective system; or you, for your convenience and as authorized, remove a portion of an existing protective railing at an obstacle and do not replace such railing completely the same day 3. Storage areas: When material or equipment is stored within 15 feet of the edge of an open traffic lane and the storage is not otherwise prohibited by the Contract 4. Height differentials: When construction operations create a height differential greater than 0.15 feet within 15 feet of the edge of traffic lane Installation of Type K temporary railing is not required if an excavation within 15 feet from the edge of an open traffic lane is protected by any of the following: 1. Steel plate or concrete covers of adequate thickness to prevent accidental entry by traffic or the public 2. Side slope where the downhill slope is 4:1 (horizontal: vertical)or less unless a naturally occurring condition 3. Barrier or railing Offset the approach end of Type K temporary railing a minimum of 15 feet from the edge of an open traffic lane. Install the temporary railing on a skew toward the edge of the traffic lane of not more than 1 foot transversely to 10 feet longitudinally with respect to the edge of the traffic lane. If the 15-foot minimum offset cannot be achieved, the temporary railing must be installed on the 10 to 1 skew to obtain the maximum available offset between the approach end of the railing and the edge of the traffic lane, and an array of temporary crash cushion modules must be installed at the approach end of the temporary railing. Secure Type K temporary railing in place before starting work for which the temporary railing is required. Where 2 or more lanes in the same direction are adjacent to the area where the work is being performed, including shoulders, the adjacent lane must be closed under any of the following conditions: 1. Work is off the traveled way but within 6 feet of the edge of the traveled way, and the approach speed is greater than 45 miles per hour 2. Work is off the traveled way but within 3 feet of the edge of the traveled way, and the approach speed is less than 45 miles per hour Closure of the adjacent traffic lane is not required when performing any of the following: 1. Working behind a barrier 2. Paving, grinding, or grooving 3. Installing, maintaining, or removing traffic control devices except Type K temporary railing Do not reduce an open traffic lane width to less than 10 feet. When traffic cones or delineators are used for temporary edge delineation, the side of the base of the cones or delineators nearest to traffic is considered the edge of the traveled way. If a traffic lane is closed with channelizers for excavation work, move the devices to the adjacent edge of the traveled way when not excavating. Space the devices as specified for the lane closure. Do not move or temporarily suspend anything over a traffic lane open to the public unless the public is protected. 7-1.04B WORK ZONE SAFETY AND MOBILITY 7-1.04B(1) POLICY In order to ensure safe and efficient flow of traffic through work zones, the County of Fresno, via its General Plan, Transportation and Circulation Element, Policy TRA-1, has adopted the use of AASHTO Standards as supplemented by Caltrans and County Department of Public Works and Planning Standards. 7-1.04B(2)TRAFFIC MANAGEMENT PLAN Perform traffic management shall be in accordance with Section 12, "TEMPORARY TRAFFIC CONTROL,"of these special provisions. 7-1.04B(3)TEMPORARY TRAFFIC CONTROL PLAN Prepare traffic control plan(s) in accordance with Section 12, "TEMPORARY TRAFFIC CONTROL," of these special provisions. 7-1.04B(4)PUBLIC INFORMATION Provide notice to public agencies and others to the extent required, if any, elsewhere in these special provisions. The Engineer provides other noticing not identified to be performed by the Contractor. Replace the headings and paragraphs of Section 7-1.06 with: 7-1.06 INSURANCE 7-1.06A General Nothing in the Contract is intended to establish a standard of care owed to any member of the public or to extend to the public the status of a third-party beneficiary for any of these insurance specifications. 7-1.06B Casualty Insurance Obtain and maintain insurance on all of your operations with companies acceptable to the Department as follows: 1. Keep all insurance in full force and effect from the start of the work through Contract acceptance. 2. All insurance must be with an insurance company with a rating from A.M. Best Financial Strength Rating of A or better and a Financial Size Category of VIII or better. 3. Maintain completed operations coverage with a carrier acceptable to the State through the expiration of the patent deficiency in construction statute of repose set forth in Civ Pro Code § 337.1. 7-1.06C Workers' Compensation and Employer's Liability Insurance Under Labor Code § 1860, secure the payment of worker's compensation under Labor Code § 3700. Submit to the Department the following certification before performing the work (Labor Code § 1861): 1 am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for workers' compensation or to undertake self-insurance in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of this contract. Contract signing constitutes certification submittal. Provide Employer's Liability Insurance in amounts not less than: 1. $1,000,000 for each accident for bodily injury by accident 2. $1,000,000 policy limit for bodily injury by disease 3. $1,000,000 for each employee for bodily injury by disease If there is an exposure of injury to your employees under the U.S. Longshoremen's and Harbor Workers' Compensation Act, the Jones Act, or under laws, regulations, or statutes applicable to maritime employees, coverage must be included for such injuries or claims. 7-1.06D Liability Insurance 7-1.06D(1) General Carry General Liability and Umbrella or Excess Liability Insurance covering all operations by or on behalf of you providing insurance for bodily injury liability and property damage liability for the following limits and including coverage for: 1. Premises, operations and mobile equipment 2. Products and completed operations 3. Broad form property damage (including completed operations) 4. Explosion, collapse, and underground hazards 5. Personal injury 6. Contractual liability 7-1.06D(2) Liability Limits/Additional Insureds Refer to the Agreement of these special provisions Additional insured coverage must be provided by a policy provision or by an endorsement providing coverage at least as broad as Additional Insured(Form B) endorsement form CG 2010, as published by the Insurance Services Office (ISO), or other form designated by the Department. 7-1.061)(3) Contractor's Insurance Policy is Primary The policy must stipulate that the insurance afforded the additional insureds applies as primary insurance. Any other insurance or self-insurance maintained by the State is excess only and must not be called upon to contribute with this insurance. 7-1.06E Automobile Liability Insurance Comply with requirements in the Agreement of these special provisions 7-1.06F Policy Forms, Endorsements, and Certificates Provide your General Liability Insurance under Commercial General Liability policy form no. CG0001 as published by the Insurance Services Office (ISO) or under a policy form at least as broad as policy form no. CG0001. 7-1.06G NOT USED 7-1.06H Enforcement The Department may assure your compliance with your insurance obligations. Ten days before an insurance policy lapses or is canceled during the Contract period you must submit to the Department evidence of renewal or replacement of the policy. If you fail to maintain any required insurance coverage, the Department may maintain this coverage and withhold or charge the expense to you or terminate your control of the work. You are not relieved of your duties and responsibilities to indemnify, defend, and hold harmless the State, its officers, agents, and employees by the Department's acceptance of insurance policies and certificates. Minimum insurance coverage amounts do not relieve you for liability in excess of such coverage, nor do they preclude the State from taking other actions available to it, including the withholding of funds under this Contract. 7-1.061 Self-Insurance Comply with the Agreement of these special provisions Replace the headings and paragraphs of Section 7-1.07 with: 7-1.07 LEGAL ACTIONS AGAINST THE DEPARTMENT 7-1.07A General If legal action is brought against the Department over compliance with a State or federal law, rule, or regulation applicable to highway work, then: 1. If the Department in complying with a court order prohibits you from performing work, the resulting delay is a suspension related to your performance, unless the Department terminates the Contract. 2. If a court order other than an order to show cause or the final judgment in the action prohibits the Department from requiring you to perform work, the Department may delete the prohibited work or terminate the Contract. 7-1.0713 Seal Coat Claims This section applies to seal coat projects. Pay for claims for personal property damage caused by screening and bituminous binder. Seal coat claims are limited to: 1. 10 percent of the total bid 2. Damage occurring between the 1 st day of screening spreading and 4 days after the last day of screening spreading for each seal coat location Within 30 days of the last screening spreading, do the following: 1. Process and resolve all claims reported or submitted to you by the public as follows: 1.1. Within 3 business days of receipt of a claim, submit to the Department a copy of the claim, a written analysis of the claim, and a statement indicating whether or not you will pay the claim. If you reject a claim, provide the reasons for rejection in writing. 1.2. If the claimant becomes dissatisfied with your handling of the claim, immediately refer the claimant to the local district claims office for assistance in resolving the claim. 2. Submit to the Department evidence of your paid claims. All claims presented to the Department, any district claims office, or the State Board of Control (Govt Code § 900 et seq.) are processed and resolved by the Department as follows: 1. The claims are processed as formal government claims subject to all laws and policies and are resolved as the Department determines including referring the claim to you for handling. 2. If the Department or the State Board of Control approves settlement of a claim or is ordered to pay pursuant to a court order, the claim is paid from funds withheld from you. 3. Within 3 business days of the Department's determination that you are responsible for resolving the claim, the Department sends a copy of the claim to you for resolution or notifies you of the Department's decision to resolve the claim. The Department withholds an amount not to exceed 5 percent of the total bid to resolve all claims. The amount is held no longer than 60 days following the last spreading of screenings so that the Department has ample time to resolve any pending claims. After 60 days, any remaining amount withheld is returned to you. If no withheld funds remain or have been returned, the Department may pay any claims and seek reimbursement from you through an offset or any other legal means. Any reimbursement or offset to be recovered from you, including all other paid claims, is limited to 10 percent of the total bid. Section 7-1.07B does not limit your obligation to defend and indemnify the Department. 7-1.07C Claims This section applies to non-seal coat projects which involve asphalt concrete paving. Pay for claims for personal property damage caused by your work. Claims are limited to: 1. 10 percent of the total bid Within 30 days of the last working day placement of hot mix asphalt, do the following: 1. Process and resolve all claims reported or submitted to you by the public as follows: 1.1. Within 3 business days of receipt of a claim, submit to the Department a copy of the claim, a written analysis of the claim, and a statement indicating whether or not you will pay the claim. If you reject a claim, provide the reasons for rejection in writing. 1.2. If the claimant becomes dissatisfied with your handling of the claim, immediately refer the claimant to the local district claims office for assistance in resolving the claim. 2. Submit to the Department evidence of your paid claims. All claims presented to the Department, (Govt Code § 900 et seq.) are processed and resolved by the Department as follows: 1. The claims are processed as formal government claims subject to all laws and policies and are resolved as the Department determines including referring the claim to you for handling. 2. If the Department approves settlement of a claim or is ordered to pay pursuant to a court order, the claim is paid from funds withheld from you. 3. Within 3 business days of the Department's determination that you are responsible for resolving the claim, the Department sends a copy of the claim to you for resolution or notifies you of the Department's decision to resolve the claim. The Department withholds an amount not to exceed 5 percent of the total bid to resolve all claims. The amount is held no longer than 60 days following the last working day so that the Department has ample time to resolve any pending claims. After 60 days, any remaining amount withheld is returned to you. If no withheld funds remain or have been returned, the Department may pay any claims and seek reimbursement from you through an offset or any other legal means. Any reimbursement or offset to be recovered from you, including all other paid claims, is limited to 10 percent of the total bid. Section 7-1.07C does not limit your obligation to defend and indemnify the Department. Add between the 1st and 2nd paragraphs of section 7-1.11A: Comply with 46 CFR 381.7(a)—(b). 8 PROSECUTION AND PROGRESS Replace the headings and paragraphs in Section 8 with: 8-1.01 GENERAL Section 8 includes specifications related to prosecuting the Contract and work progress. 8-1.01A Work Hours Perform all work on working days during daytime. You may request approval to work on a holiday or on a non-working day. If, pursuant to such request, the Engineer authorizes you to work on a holiday or on a non-working day, you pay the actual cost incurred by the Department to perform all inspection, surveying, testing, and all other project-related work by the Department on such holiday or non-working day. Such payment will be deducted from monies due or which may become due to the Contractor. Plan work so that all construction operations performed each day, including cleanup of the project site, establishment of appropriate traffic control and any other work necessary for the safety of the public shall be completed within the daytime hours. Do not perform work during nighttime unless approved by the Engineer Request approval to work during nighttime in writing and include the appropriate traffic control plan(s)and work plan(s)which clearly identify all provisions for illuminating all portions of the work site, including any flagging operations. If you work fail to complete work during the daytime hours, the Engineer may stop all work upon the onset of nighttime and order you to perform any and all work the Engineer deems necessary to ensure the safety of the public during the nighttime hours. You are not entitled to any additional compensation or extension of the contract time as a result of the Engineer stopping the work due to the onset of nighttime. 8-1.02 SCHEDULE 8-1.02A General Upon completion of all work, the Department returns the withholds associated with section 8-1.02 and makes a payment adjustment for work not performed in the same manner as work-character changes. 8-1.02113 Level 1 Critical Path Method Schedule 8-1.02113(1) General No pay item is provided for Level 1 Critical Path Project Schedule. Payment is considered to be included in the various items of work. Before or at the preconstruction conference, submit a CPM baseline schedule. For each schedule, submit: 1. Plotted original, time-scaled network diagram on a sheet at least 8-1/2 by 11 inches with a title block and timeline 2. Read-only compact disc or other Engineer-authorized data-storage device containing the schedule data if software is used to make the schedule. Label the device with: 2.1. Contract number 2.2. CPM schedule number and date produced 2.3. File name 8-1.02B(2) Schedule Format On each schedule, show: 1. Planned and actual start and completion dates of each work activity, including applicable: 1.1. Submittal development 1.2. Submittal review and acceptance 1.3. Material procurement 1.4. Contract milestones and constraints 1.5. Equipment and plant setup 1.6. Interfaces with outside entities 1.7. Erection and removal of falsework and shoring 1.8. Test periods 1.9. Major traffic stage change 1.10. Final cleanup 2. Order that you propose to prosecute the work 3. Logical links between the time-scaled work activities 4. All controlling activities 5. Legible description of each activity 6. At least 1 predecessor and 1 successor to each activity except for project start and project end milestones 7. Duration of at least 1 working day for each activity 8. Start milestone date as the Contract approval date 8-1.02B(3) Updated Schedule Submit a monthly updated schedule that includes the status of work completed to date and the work yet to be performed as planned. You may include changes to updated schedules that do not alter a critical path or extend the scheduled completion date compared to the current schedule. Changes may include: 1. Adding or deleting activities 2. Changing activity constraints 3. Changing durations 4. Changing logic If any proposed change in planned work would alter the critical path or extend the scheduled completion date, submit a revised schedule within 15 days of the proposed change. 8-1.02C-8-1.02F Reserved 8-1.03 PRECONSTRUCTION CONFERENCE Attend a preconstruction conference with key personnel, including your assigned representative, at a time and location determined by the Engineer. Submit documents as required before the preconstruction conference. Be prepared to discuss the topics and documents shown in the following table: Topic Document Potential claim and dispute Potential claim forms resolution Contractor's representation Assignment of Contractor's representative DBE Final utilization reports Equipment Equipment list Labor compliance and equal Job site posters and benefit and payroll reports employment opportunity Material inspection Notice of Materials to be Used form Materials on hand Request for Payment for Materials on Hand form Measurements Partnering -- Quality control QC plans Safety Injury and Illness Prevention Program and job site posters Schedule Baseline schedule and Weekly Statement of Working Days form Subcontracting Subcontracting Request form Surveying Surve Request form Traffic control Traffic contingency plan and traffic control plans Utility work Weight limitations -- Water pollution control SWPPP or WPCP Work restrictions PLACs Action submittals -- 8-1.04 START OF JOB SITE ACTIVITIES 8-1.04A General Provide signed contracts, bonds, and evidence of insurance timely as required. This section, 8-1.04, "Start of Job Activities," does not modify remedies available to the Department should you fail to provide signed contracts bonds and insurance timely. Submit a notice 72 hours before starting job site activities. If the project has more than 1 location of work, submit a separate notice for each location. You may start job site activities before receiving notice of Contract approval if you: 1. Deliver the signed Contract, bonds, and evidence of insurance to the Department 2. Submit 72-hour notice 3. Are authorized by the Department to start 4. Perform work at your own risk 5. Perform work under the Contract If the Contract is approved, work already performed that complies with the Contract is authorized. If the Contract is not approved, leave the job site in a neat condition. If a facility has been changed, restore it to its former condition or an equivalent condition. The Department does not pay for the restoration. 8-1.04B Reserved Replace Section 8-1.04B with: 8-1.04B Reserved Replace "Reserved" of Section 8-1.04C with: 8-1.04C Long Lead Time Equipment Start Section 8-1.04B, Standard Start, does not apply to this project This project includes two, non-concurrent phases. The first order of work (submittals) involves potholing, submittals and equipment procurement. The second order of work involves physical construction upon the project site. 8-1.04C(1) First Order of Work, Submittals Be prepared to begin the first order of work no later than the 20th business day after award of the Contract by the Department. The Engineer may issue a notice to proceed with the first order of work as soon as the Contracts, including bonds and insurance certificates, have been approved. Start the first order of work on the day shown in the notice to proceed, unless an early start has been approved. Potholing at the project site shall be completed within the first ten working days of the first order of work. No submittals will receive final approval until field verification of the final pole location has been approved by the Engineer. Compensation for potholing shall be considered to be included in the various items of work. The Engineer may issue a notice of commencement of contract time for the first order of work if you fail to provide Contracts, including bonds and insurance certificates or other required documents timely. The Engineer shall have a maximum of ten (10)working days in which to review and approve or reject each submittal from the Contractor. In the event that the Engineer rejects any of the Contractor's initial submittals, the Engineer shall have a maximum of ten (10)working days in which to review and approve or reject each re-submittal from the Contractor. The ten (10)working day time period for the Engineer's review shall commence on the day upon which the Engineer receives the submittal or re-submittal in question. In the event that the Engineer's review of a submittal or re-submittal requires in excess of ten (10) working days, the Engineer shall extend the number of working days allowed for the completion of the first order of work by one working day for each working day of delay in the Engineer's completion of the review. The first order of work is complete when you: • have completed potholing at the project site • have completed a staging plan clearly depicting all phases of the work and intended traffic control plan at each phase • have submitted a detour plan (if contractor plans to close the intersection for the time allotted in these special provisions) • have approved traffic control encroachment permit from City of Fresno and Caltrans. • have completed, submitted and obtained approval of a Dust Control Plan from the San Joaquin Valley Air Pollution Control District • have submitted the approved SWPPP in SMARTS and paid for the permit • have received approval for all submittals required for the project. • have furnished a statement from the vendors that the orders for required equipment and materials has been received and accepted by said vendor • have furnished a statement from vendors which indicates that the anticipated delivery date for the equipment and materials ordered is in conformance with contract requirements. • Receive a written statement that the first order of work is complete. Complete the first order of work before the expiration of THIRTY(30)WORKING DAYS from the date shown in said Notice to Proceed, or in the Notice of Commencement of Contract Time, whichever was issued first. Pay to the County of Fresno the sum of TWO THOUSAND ($2,000.00) per day for each and every calendar day's delay in finishing the first order of work in excess of the number of working days prescribed above. 8-1.04C(2) Second Order of Work The Engineer, in their sole discretion, may issue the Notice to Proceed —Second Order of Work immediately upon delivery to the Contractor of the materials and equipment necessary to construct the project and after PG&E has relocated existing electrical poles. Alternatively, the Engineer may defer issuance of the Notice to Proceed —Second Order of Work to the extent the Engineer, in their sole discretion, deems appropriate. Begin work at the site on the date shown on the Notice to Proceed —Second Order of Work. Do not begin site work prior to the date shown on the Notice to Proceed —Second Order of Work. The date shown on the Notice to Proceed —Second Order of Work will be the first working day charged against the allotted number of working days for the second order of work. Complete the second order of work before the expiration of SIXTY(60) WORKING DAYS from the date shown in said Notice to Proceed —Second Order of Work. Complete all work, including corrective work and punch list work, prior to the expiration of the allotted working days. Working days continue to accrue until corrective work and punch list work is completed and accepted. Pay to the County of Fresno the sum of THREE THOUSAND FIVE HUNDRED ($3,500.00) per day for each and every calendar day's delay in finishing the second order of work, including corrective work and punch list work, in excess of the number of working days prescribed above. Such payment is in addition to payment, if any, for failure to complete the first order of work as specified. 8-1.05 TIME Contract time starts on the day specified in the notice to proceed or in the notice of commencement of contract time as described in section 8-1.04 or on the day you start job site activities, whichever occurs first. Complete the work within the Contract time. Meet each specified interim work completion date. The Engineer issues a Weekly Statement of Working Days by the end of the following week. The Weekly Statement of Working Days shows: 1. Working days and non—working days during the reporting week 2. Time adjustments 3. Work completion date computations, including working days remaining 4. Controlling activities 8-1.06 SUSPENSIONS The Engineer may suspend work wholly or in part due to conditions unsuitable for work progress. Provide for public safety and a smooth and unobstructed passageway through the work zone during the suspension as specified in sections 7-1.03 and 7-1.04. Providing the passageway is force account work. The Department makes a time adjustment for the suspension due to a critical delay. The Engineer may suspend work wholly or in part due to your failure to (1)fulfill the Engineer's orders, (2) fulfill a Contract part, or(3) perform weather-dependent work when conditions are favorable so that weather-related unsuitable conditions are avoided or do not occur. The Department may provide for a smooth and unobstructed passageway through the work during the suspension and deduct the cost from payments. The Department does not make a time adjustment for the suspension. Upon the Engineer's order of suspension, suspend work immediately. Resume work when ordered. 8-1.07 DELAYS 8-1.07A General To request a delay-related time or payment adjustment, submit an RFI. 8-1.0713 Time Adjustments The Department may make a time adjustment for a critical delay. The Engineer uses information from the schedule to evaluate requests for time adjustments. To request an adjustment, submit a revised schedule showing the delay's effect on the controlling activity. If the delay has: 1. Occurred, submit records of the dates and what work was performed during the delayed activity 2. Not occurred, submit the expected dates or duration of the delayed activity Update the schedule to the last working day before the start of the delay if ordered. 8-1.07C Payment Adjustments The Department may make a payment adjustment for an excusable delay that affects your costs. Only losses for idle equipment, idle workers, and moving or transporting equipment are eligible for delay- related payment adjustments. The Engineer determines payment for idle time of equipment in the same manner as determinations are made for equipment used in the performance of force account work under section 9-1.04 with the following exceptions: 1. Delay factor in the Labor Surcharge and Equipment Rental Rates applies to each equipment rental rate. 2. Daily number of payable hours equals the normal working hours during the delay, not to exceed 8 hours per day. 3. Delay days exclude non—working days. 4. Markups are not added. The Engineer determines payment adjustment for the idle workers under section 9-1.04B, but does not add markups. The Engineer includes costs due to necessary extra moving or transporting of equipment. The Department does not make a payment adjustment for overhead incurred during non—working days of additional construction seasons experienced because of delay. 8-1.08-8-1.09 RESERVED 8-1.10 LIQUIDATED DAMAGES 8-1.10A General The Department specifies liquidated damages (Pub Cont Code § 10226). Liquidated damages, if any, accrue starting on the 1 st day after the expiration of the working days through the day of Contract acceptance except as specified in sections 8-1.10B and 8-1.10C. The Department withholds liquidated damages before the accrual date if the anticipated liquidated damages may exceed the value of the remaining work. Liquidated damages are specified in section 8-1.04. 8-1.10B Failure to Complete Work Parts within Specified Times The Department may deduct specified damages from payments for each day needed to complete a work part in excess of the time specified for completing the work part. Damages for untimely completion of work parts may not be equal to the daily amount specified as liquidated damages for the project as a whole, but the Department does not simultaneously assess damages for untimely completion of work parts and for the whole work. Damages accrue starting the 1st day after a work part exceeds the specified time through the day the specified work part is complete. 8-1.10C Failure to Complete Work Parts by Specified Dates The Department may deduct specified damages from payments for each day needed to complete a work part in excess of the specified completion date for the work part. Damages for untimely completion of a work part may not be equal to the daily amount specified as liquidated damages for the project as a whole, but the Department does not simultaneously assess damages for untimely completion of a work part and the whole work. Damages accrue starting the 1st day after an unmet completion date through the day the work part is complete. 8-1.10D RESERVED 8-1.11-8-1.12 RESERVED 8-1.13 CONTRACTOR'S CONTROL TERMINATION The Department may terminate your control of the work for failure to do any of the following (Pub Cont Code § 10253): 1. Supply an adequate workforce 2. Supply material as described 3. Pay subcontractors (Pub Cont Code §10262) 4. Prosecute the work as described in the Contract The Department may also terminate your control for failure to maintain insurance coverage. For a federal-aid project, the Department may terminate your control of the work for failure to include "Required Contract Provisions, Federal-Aid Construction Contracts" in subcontracts. The Department gives notice to you and your surety at least 5 business days before terminating control. The notice describes the failures and the time allowed to remedy the failures. If failures are not remedied within the time provided, the Department takes control of the work. The Department may complete the work if the Department terminates the Contractor's control or you abandon the project(Pub Cont Code § 10255). The Department determines the unpaid balance under Pub Cont Code § 10258 and the Contract. At any time before final payment of all claims, the Department may convert a Contractor's control termination to a Contract termination. 8-1.14 CONTRACT TERMINATION 8-1.14A General The Director may terminate the Contract if it serves the State's best interest. The Department issues you a written notice, implements the termination, and pays you. 8-1.1413 Relief from Responsibility for Work Upon receiving a termination notice: 1. Stop work 2. Notify subcontractors and suppliers of the Contract termination and stop Contract-related work 3. Perform the Engineer-ordered work to secure the job site for termination 4. Remove equipment 5. Subject to the Engineer's authorization, settle termination-related claims and liabilities involving subcontractors and suppliers; assign to the Department the rights, titles, or interests held by you with respect to these parties 8-1.14C Responsibility for Materials Upon receiving a termination notice, protect unused material until: 1. You submit an inventory of materials already produced, purchased, or ordered but not yet used; include the location of the material. 2. The Engineer identifies materials that will be retained by the Department. Submit bills of sales or other records of material title. 3. The Engineer confirms that unused materials paid by progress payment and materials furnished by the State have been delivered and stored as ordered. 4. The titles are transferred for materials purchased by the Department. Dispose of materials that will not be retained by the Department. 8-1.14D Contract Acceptance after Termination The Engineer recommends Contract acceptance after determining the completion of: 1. Work ordered to be completed before termination 2. Other work ordered to secure the project before termination 3. Material delivery and title transfer The Department pays you under section 9-1.17. 8-1.14E Payment Adjustment for Termination If the Department issues a termination notice, the Engineer determines the payment for termination based on the following: 1. Direct cost for the work: 1.1. Including: 1.1.1. Mobilization. 1.1.2. Demobilization. 1.1.3. Securing the job site for termination. 1.1.4. Losses from the sale of materials. 1.2. Not including: 1.2.1. Cost of materials you keep. 1.2.2. Profit realized from the sale of materials. 1.2.3. Cost of material damaged by: 1.2.3.1. Act of God. 1.2.3.2. Act of a public enemy. 1.2.3.3. Fire. 1.2.3.4. Flood. 1.2.3.5. Governor-declared state of emergency. 1.2.3.6. Landslide. 1.2.3.7. Tsunami. 1.2.4. Other credits. 2. Cost of remedial work, as estimated by the Engineer, is not reimbursed. 3. Allowance for profit not to exceed 4 percent of the cost of the work. Prove a likelihood of having made a profit had the Contract not been terminated. 4. Material handling costs for material returned to the vendor or disposed of as ordered. 5. Costs in determining the payment adjustment due to the termination, excluding attorney fees and litigation costs. Termination of the Contract does not relieve the surety of its obligation for any just claims arising out of the work performed. 8-1.15-8-1.16 RESERVED 9 PAYMENT Add the following Section 9-1.01A 9-1.01A COMPENSATION The bid items shown in the bid proposal sheet represent full compensation for performing all work. Full compensation for any work for which there is no bid item shall be considered to be included in the various items of work. Replace the headings and paragraphs of Section 9-1.03 with: 9-1.03 PAYMENT SCOPE The Department pays you for furnishing the resources and activities required to complete the work. The Department's payment is full compensation for furnishing the resources and activities, including: 1. Risk, loss, damage repair, or cost of whatever character arising from or relating to the work and performance of the work 2. PLACs and taxes 3. Any royalties and costs arising from patents, trademarks, and copyrights involved in the work The Department does not pay for your loss, damage, repair, or extra costs of whatever character arising from or relating to the work that is a direct or indirect result of your choice of construction methods, materials, equipment, or manpower, unless specifically mandated by the Contract. Payment is: 1. Full compensation for all work involved in each bid item shown on the Bid Item List by the unit of measure shown for that bid item 2. For the price bid for each bid item shown on the Bid Item List or as changed by change order with a specified price adjustment Full compensation for work specified in divisions I, II, and X is included in the payment for the bid items unless: 1. Bid item for the work is shown on the Bid Item List 2. Work is specified as change order work Work paid for under one bid item is not paid for under any other bid item. Payment for a bid item includes payment for work in sections referenced by the section set forth by that bid item. Notwithstanding anything to the contrary in these special provisions, full compensation for performing all work as shown, as specified, and as directed by the Engineer is considered to be included in the various bid items, and no additional payment will be made, except pursuant to a contract change order to perform work not shown and/or specified. If one or more bid item(s) is/are not included, perform the work as shown and as specified and payment therefor is considered to be included in the various items of work. If an alternative is described in the Contract, the Department pays based on the bid items for the details and specifications not described as an alternative unless the bid item is described as an alternative, in which case, the Department pays based on the details and specifications for that alternative. The Department pays for change order work based on one or a combination of the following: 1. Bid item prices 2. Force account 3. Agreed price 4. Specialist billing If the Engineer chooses to pay for change order work based on an agreed price, but you and the Engineer cannot agree on the price, the Department pays by force account. If a portion of extra work is covered by bid items, the Department pays for this work as changed quantities in those items. The Department pays for the remaining portion of the extra work by force account or agreed price. If the amount of a deduction or withhold exceeds final payment, the Department invoices you for the difference, to be paid upon receipt. Pay your subcontractors within 10 days of receipt of each progress payment under Pub Cont Code §§ 10262 and 10262.5. 9-1.07 PAYMENT ADJUSTMENTS FOR PRICE INDEX FLUCTUATIONS Replace Section 9-1.07A with: 9-1.07A General Section 9-1.07 applies to asphalt contained in materials for pavement structures and pavement surface treatments such as HMA, tack coat, asphaltic emulsions, bituminous seals, asphalt binders, and modified asphalt binders placed in the work. Section 9-1.07 does not apply if you opted out of payment adjustments for price index fluctuations at the time of bid. The Engineer adjusts payment whenever the California statewide crude oil price index for the month the material is placed is more than 5 percent higher or lower than the price index at the time of bid. The California Department of Transportation determines the California statewide crude oil price index each month on or about the 1 st business day of the month using the average of the posted prices in effect for the previous month as posted by Chevron, ExxonMobil, and ConocoPhillips for the Buena Vista and Midway Sunset fields. If a company discontinues posting its prices for a field, the Department determines the index from the remaining posted prices. The Department may include additional fields to determine the index. For the California statewide crude oil price index, go to the California Department of Transportation Division of Construction Web site. If the adjustment is a decrease in payment, the Department deducts the amount from the monthly progress payment. The Department makes payment adjustments due to price index fluctuations for changed quantities under section 9-1.06. If you do not complete the work within the Contract time, payment adjustments during the overrun period are determined using the California statewide crude oil price index in effect for the month in which the overrun period began. If the price index at the time of placement increases: 1. 50 percent or more over the price index at bid opening, notify the Engineer. 2. 100 percent or more over the price index at bid opening, do not furnish material containing asphalt until the Engineer authorizes you to proceed with that work. The Department may decrease bid item quantities, eliminate bid items, or terminate the Contract. Before placing material containing asphalt, submit the current sales and use tax rate in effect in the tax jurisdiction where the material is to be placed. Submit a public weighmaster's certificate for HMA, tack coat, asphaltic emulsions, and modified asphalt binders, including those materials not paid for by weight. For slurry seals, submit a separate public weighmaster's certificate for the asphaltic emulsion. Add to Section 9-1.16C: Traffic signal material is eligible for material on hand. Any piece of material that Contractor seeks material on hand reimbursement shall be stored in a safe location as per manufacturer specifications. Contractor shall grant access to the Engineer for review and approval of the material prior to approval of payment. Replace Section 9-1.16F with: 9-1.16F Retentions The Department, once in each month, shall cause an estimate in writing to be made by the Engineer. The estimate shall include the total amount of work done and acceptable materials furnished, provided the acceptable materials are listed as eligible for partial payment as materials in the special provisions and are furnished and delivered by the Contractor on the ground and not used or are furnished and stored for use on the contract, if the storage is within the State of California and the Contractor furnishes evidence satisfactory to the Engineer that the materials are stored subject to or under the control of the Department, to the time of the estimate, and the value thereof. The estimate shall also include any amounts payable for mobilization. Daily extra work reports furnished by the Contractor less than 5 calendar days, not including Saturdays, Sundays and legal holidays, before the preparation of the monthly progress estimate shall not be eligible for payment until the following month's estimate. The amount of any material to be considered in making an estimate will in no case exceed the amount thereof which has been reported by the Contractor to the Engineer on State-furnished forms properly filled out and executed, including accompanying documentation as therein required, less the amount of the material incorporated in the work to the time of the estimate. Only materials to be incorporated in the work will be considered. The estimated value of the material established by the Engineer will in no case exceed the contract price for the item of work for which the material is furnished. The Department shall retain 5 percent of the estimated value of the work done and 5 percent of the value of materials so estimated to have been furnished and delivered and unused or furnished and stored as aforesaid as part security for the fulfillment of the contract by the Contractor. The Department will not hold retention for mobilization or demobilization. The Department shall pay monthly to the Contractor, while carrying on the work, the balance not retained, as aforesaid, after deducting therefrom all previous payments and all sums to be kept or retained under the provisions of the contract. No monthly estimate or payment shall be required to be made when, in the judgment of the Engineer, the work is not proceeding in accordance with the provisions of the contract. No monthly estimate or payment shall be construed to be an acceptance of any defective work or improper materials. Attention is directed to the prohibitions and penalties pertaining to unlicensed contractors as provided in Business and Professions Code Sections 7028.15(a) and 7031. No partial payment will be made for any materials on hand which are furnished but not incorporated in the work. Add the following Section 9-1.23: 9-1.23 RESOLUTION OF CONTRACT CLAIMS Public works contract claims of three hundred seventy-five thousand dollars ($375,000)or less which arise between a Contractor and a local public agency shall be resolved in accordance with the provisions of California Public Contract Code Sections 20104-20104.6, inclusive. In addition, California Public Contract Code Section 9204 requires that the procedure established therein shall apply to all claims (as therein defined)filed by a contractor in connection with a public works project. Accordingly, this contract expressly incorporates all of the terms and conditions of those statutory provisions, which are as follows: California Public Contract Code Section 9204 (a) The Legislature finds and declares that it is in the best interests of the state and its citizens to ensure that all construction business performed on a public works project in the state that is complete and not in dispute is paid in full and in a timely manner. (b) Notwithstanding any other law, including, but not limited to, Article 7.1 (commencing with Section 10240)of Chapter 1 of Part 2, Chapter 10 (commencing with Section 19100)of Part 2, and Article 1.5 (commencing with Section 20104)of Chapter 1 of Part 3, this section shall apply to any claim by a contractor in connection with a public works project. (c) For purposes of this section: (1) "Claim" means a separate demand by a contractor sent by registered mail or certified mail with return receipt requested, for one or more of the following: (A)A time extension, including, without limitation, for relief from damages or penalties for delay assessed by a public entity under a contract for a public works project. (B) Payment by the public entity of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public works project and payment for which is not otherwise expressly provided or to which the claimant is not otherwise entitled. (C) Payment of an amount that is disputed by the public entity. (2) "Contractor" means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000)of Division 3 of the Business and Professions Code who has entered into a direct contract with a public entity for a public works project. (3)(A) "Public entity" means, without limitation, except as provided in subparagraph (B), a state agency, department, office, division, bureau, board, or commission, the California State University, the University of California, a city, including a charter city, county, including a charter county, city and county, including a charter city and county, district, special district, public authority, political subdivision, public corporation, or nonprofit transit corporation wholly owned by a public agency and formed to carry out the purposes of the public agency. (B) "Public entity" shall not include the following: (i)The Department of Water Resources as to any project under the jurisdiction of that department. (ii)The Department of Transportation as to any project under the jurisdiction of that department. (iii)The Department of Parks and Recreation as to any project under the jurisdiction of that department. (iv)The Department of Corrections and Rehabilitation with respect to any project under its jurisdiction pursuant to Chapter 11 (commencing with Section 7000) of Title 7 of Part 3 of the Penal Code. (v)The Military Department as to any project under the jurisdiction of that department. (vi)The Department of General Services as to all other projects. (vii)The High-Speed Rail Authority. (4) "Public works project" means the erection, construction, alteration, repair, or improvement of any public structure, building, road, or other public improvement of any kind. (5) "Subcontractor" means any type of contractor within the meaning of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code who either is in direct contract with a contractor or is a lower tier subcontractor. (d) (1) (A) Upon receipt of a claim pursuant to this section, the public entity to which the claim applies shall conduct a reasonable review of the claim and, within a period not to exceed 45 days, shall provide the claimant a written statement identifying what portion of the claim is disputed and what portion is undisputed. Upon receipt of a claim, a public entity and a contractor may, by mutual agreement, extend the time period provided in this subdivision. (B) The claimant shall furnish reasonable documentation to support the claim. (C) If the public entity needs approval from its governing body to provide the claimant a written statement identifying the disputed portion and the undisputed portion of the claim, and the governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a claim sent by registered mail or certified mail, return receipt requested, the public entity shall have up to three days following the next duly publicly noticed meeting of the governing body after the 45-day period, or extension, expires to provide the claimant a written statement identifying the disputed portion and the undisputed portion. (D)Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. If the public entity fails to issue a written statement, paragraph (3) shall apply. (2) (A) If the claimant disputes the public entity's written response, or if the public entity fails to respond to a claim issued pursuant to this section within the time prescribed, the claimant may demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the public entity shall schedule a meet and confer conference within 30 days for settlement of the dispute. (B)Within 10 business days following the conclusion of the meet and confer conference, if the claim or any portion of the claim remains in dispute, the public entity shall provide the claimant a written statement identifying the portion of the claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the claim shall be processed and made within 60 days after the public entity issues its written statement. Any disputed portion of the claim, as identified by the contractor in writing, shall be submitted to nonbinding mediation, with the public entity and the claimant sharing the associated costs equally. The public entity and claimant shall mutually agree to a mediator within 10 business days after the disputed portion of the claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. If mediation is unsuccessful, the parts of the claim remaining in dispute shall be subject to applicable procedures outside this section. (C) For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section. (D) Unless otherwise agreed to by the public entity and the contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced. (E) This section does not preclude a public entity from requiring arbitration of disputes under private arbitration or the Public Works Contract Arbitration Program, if mediation under this section does not resolve the parties' dispute. (3) Failure by the public entity to respond to a claim from a contractor within the time periods described in this subdivision or to otherwise meet the time requirements of this section shall result in the claim being deemed rejected in its entirety. A claim that is denied by reason of the public entity's failure to have responded to a claim, or its failure to otherwise meet the time requirements of this section, shall not constitute an adverse finding with regard to the merits of the claim or the responsibility or qualifications of the claimant. (4)Amounts not paid in a timely manner as required by this section shall bear interest at 7 percent per annum. (5) If a subcontractor or a lower tier subcontractor lacks legal standing to assert a claim against a public entity because privity of contract does not exist, the contractor may present to the public entity a claim on behalf of a subcontractor or lower tier subcontractor. A subcontractor may request in writing, either on his or her own behalf or on behalf of a lower tier subcontractor, that the contractor present a claim for work which was performed by the subcontractor or by a lower tier subcontractor on behalf of the subcontractor. The subcontractor requesting that the claim be presented to the public entity shall furnish reasonable documentation to support the claim. Within 45 days of receipt of this written request, the contractor shall notify the subcontractor in writing as to whether the contractor presented the claim to the public entity and, if the original contractor did not present the claim, provide the subcontractor with a statement of the reasons for not having done so. (e) The text of this section or a summary of it shall be set forth in the plans or specifications for any public works project that may give rise to a claim under this section. (f) A waiver of the rights granted by this section is void and contrary to public policy, provided, however, that (1) upon receipt of a claim, the parties may mutually agree to waive, in writing, mediation and proceed directly to the commencement of a civil action or binding arbitration, as applicable; and (2) a public entity may prescribe reasonable change order, claim, and dispute resolution procedures and requirements in addition to the provisions of this section, so long as the contractual provisions do not conflict with or otherwise impair the timeframes and procedures set forth in this section. (g) This section applies to contracts entered into on or after January 1, 2017. (h) Nothing in this section shall impose liability upon a public entity that makes loans or grants available through a competitive application process, for the failure of an awardee to meet its contractual obligations. (i) This section shall remain in effect only until January 1, 2020, and as of that date is repealed, unless a later enacted statute, that is enacted before January 1, 2020, deletes or extends that date. California Public Contract Code Sections 20104—20104.6 Section 20104 (a)(1) This article applies to all public works claims of three hundred seventy-five thousand dollars ($375,000) or less which arise between a contractor and a local agency. (2) This article shall not apply to any claims resulting from a contract between a contractor and a public agency when the public agency has elected to resolve any disputes pursuant to Article 7.1 (commencing with Section 10240)of Chapter 1 of Part 2. (b)(1) "Public work" means "public works contract" as defined in Section 1101 but does not include any work or improvement contracted for by the state or the Regents of the University of California. (2) "Claim" means a separate demand by the contractor for(A) a time extension, (B) payment of money or damages arising from work done by, or on behalf of, the contractor pursuant to the contract for a public work and payment of which is not otherwise expressly provided for or the claimant is not otherwise entitled to, or(C) an amount the payment of which is disputed by the local agency. (c) The provisions of this article or a summary thereof shall be set forth in the plans or specifications for any work which may give rise to a claim under this article. (d) This article applies only to contracts entered into on or after January 1, 1991. Section 20104.2 For any claim subject to this article, the following requirements apply: (a) The claim shall be in writing and include the documents necessary to substantiate the claim. Claims must be filed on or before the date of final payment. Nothing in this subdivision is intended to extend the time limit or supersede notice requirements otherwise provided by contract for the filing of claims. (b) (1) For claims of less than fifty thousand dollars ($50,000), the local agency shall respond in writing to any written claim within 45 days of receipt of the claim, or may request, in writing, within 30 days of receipt of the claim, any additional documentation supporting the claim or relating to defenses to the claim the local agency may have against the claimant. (2) If additional information is thereafter required, it shall be requested and provided pursuant to this subdivision, upon mutual agreement of the local agency and the claimant. (3) The local agency's written response to the claim, as further documented, shall be submitted to the claimant within 15 days after receipt of the further documentation or within a period of time no greater than that taken by the claimant in producing the additional information, whichever is greater. (c) (1) For claims of over fifty thousand dollars ($50,000) and less than or equal to three hundred seventy-five thousand dollars ($375,000), the local agency shall respond in writing to all written claims within 60 days of receipt of the claim, or may request, in writing, within 30 days of receipt of the claim, any additional documentation supporting the claim or relating to defenses to the claim the local agency may have against the claimant. (2) If additional information is thereafter required, it shall be requested and provided pursuant to this subdivision, upon mutual agreement of the local agency and the claimant. (3) The local agency's written response to the claim, as further documented, shall be submitted to the claimant within 30 days after receipt of the further documentation, or within a period of time no greater than that taken by the claimant in producing the additional information or requested documentation, whichever is greater. (d) If the claimant disputes the local agency's written response, or the local agency fails to respond within the time prescribed, the claimant may so notify the local agency, in writing, either within 15 days of receipt of the local agency's response or within 15 days of the local agency's failure to respond within the time prescribed, respectively, and demand an informal conference to meet and confer for settlement of the issues in dispute. Upon a demand, the local agency shall schedule a meet and confer conference within 30 days for settlement of the dispute. (e) Following the meet and confer conference, if the claim or any portion remains in dispute, the claimant may file a claim as provided in Chapter 1 (commencing with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code. For purposes of those provisions, the running of the period of time within which a claim must be filed shall be tolled from the time the claimant submits his or her written claim pursuant to subdivision (a) until the time that claim is denied as a result of the meet and confer process, including any period of time utilized by the meet and confer process. (f) This article does not apply to tort claims and nothing in this article is intended nor shall be construed to change the time periods for filing tort claims or actions specified by Chapter 1 (commencing with Section 900) and Chapter 2 (commencing with Section 910)of Part 3 of Division 3.6 of Title 1 of the Government Code. Section 20104.4 The following procedures are established for all civil actions filed to resolve claims subject to this article: (a) Within 60 days, but no earlier than 30 days, following the filing or responsive pleadings, the court shall submit the matter to nonbinding mediation unless waived by mutual stipulation of both parties. The mediation process shall provide for the selection within 15 days by both parties of a disinterested third person as mediator, shall be commenced within 30 days of the submittal, and shall be concluded within 15 days from the commencement of the mediation unless a time requirement is extended upon a good cause showing to the court or by stipulation of both parties. If the parties fail to select a mediator within the 15-day period, any party may petition the court to appoint the mediator. (b) (1) If the matter remains in dispute, the case shall be submitted to judicial arbitration pursuant to Chapter 2.5 (commencing with Section 1141.10)of Title 3 of Part 3 of the Code of Civil Procedure, notwithstanding Section 1141.11 of that code. The Civil Discovery Act(Title 4 (commencing with Section 2016.010) of Part 4 of the Code of Civil Procedure)shall apply to any proceeding brought under this subdivision consistent with the rules pertaining to judicial arbitration. (2) Notwithstanding any other provision of law, upon stipulation of the parties, arbitrators appointed for purposes of this article shall be experienced in construction law, and, upon stipulation of the parties, mediators and arbitrators shall be paid necessary and reasonable hourly rates of pay not to exceed their customary rate, and such fees and expenses shall be paid equally by the parties, except in the case of arbitration where the arbitrator, for good cause, determines a different division. In no event shall these fees or expenses be paid by state or county funds. (3) In addition to Chapter 2.5 (commencing with Section 1141.10)of Title 3 of Part 3 of the Code of Civil Procedure, any party who after receiving an arbitration award requests a trial de novo but does not obtain a more favorable judgment shall, in addition to payment of costs and fees under that chapter, pay the attorney's fees of the other party arising out of the trial de novo. (c) The court may, upon request by any party, order any witnesses to participate in the mediation or arbitration process. Section 20104.6 (a) No local agency shall fail to pay money as to any portion of a claim which is undisputed except as otherwise provided in the contract. (b) In any suit filed under Section 20104.4, the local agency shall pay interest at the legal rate on any arbitration award or judgment. The interest shall begin to accrue on the date the suit is filed in a court of law. Add the following Section 9-1.24: 9-1.24 SUPPLEMENTAL WORK(PAYMENT ADJUSTMENTS FOR PRICE INDEX FLUCTUATIONS) This item is provided solely to provide funds necessary for adjustments to the prices of those oil- containing materials expressly specified as eligible for such adjustments in "Payment Adjustments for Price Index Fluctuations," elsewhere in these special provisions. The amount included for this item is an estimate only, and is a predetermined amount included in the bid proposal sheet(s)for the project. This item, "Supplemental Work (Payment Adjustments for Price Index Fluctuations" is purely administrative in nature, is not intended to limit such payment adjustments to the number provided in the bid proposal sheet(s), nor is it intended to modify or supplement the provisions in "Payment Adjustments for Price Index Fluctuations," in any manner whatsoever. Any and all such adjustments shall be made in strict conformance with the requirements in said section. The provisions in Section 9-1.06, "Changed Quantity Pay Adjustments" of the Standard Specifications shall not apply to the item "Supplemental Work (Payment Adjustments for Price Index Fluctuations)." DIVISION II GENERAL CONSTRUCTION 10 GENERAL Add to the end of the RSS for section 10-1.02B: Install loop detectors as indicated in Section 86 of these Special Provisions Add to the end of section 10-1.02C(2): Protect any irrigation component to be relocated before performing any other construction activity in the area. Replace Reserved in section 10-1.02C(3)with: Transplant any plant to be transplanted before performing any other construction activity in the area. Add to the beginning of section 10-1.02E: Construct the new pavement structure adjacent to the existing traveled way by successively excavating, preparing subgrade, placing base materials, and paving. Perform these activities concurrently after you start paving. If a difference in excess of 0.15 foot exists between the elevation of the existing pavement and the elevation of an excavation within 8 feet of the traveled way at the end of each working day, place and compact material against the vertical cut adjacent to the traveled way. During the excavation, you may use native material for this purpose except you must use structural material once you start placing the structural section. Place the material to the top of the existing pavement and taper at a slope of 4:1 (horizontal:vertical) or flatter to the bottom of the excavation. Do not use treated base for the taper. 12 TEMPORARY TRAFFIC CONTROL Add to section 12-1.01: Refer to Section 8-1.04D Order of Work for Phasing of the project to properly coordinate temporary traffic control measures during construction of this project. The project requires obtaining Temporary traffic control encroachment permit from Caltrans Right-of-Way and City of Fresno. The permit application fees for the traffic control shall be paid by the Contractor. Contractor shall obtain final fees from Caltrans and City of Fresno before submitting the bid. Contractor shall be responsible for coordinating the permit process, pay for required fees and obtain the permit. The cost of the coordination and fees shall be included in the various items of work. Caltrans may require the County contractor to place a PMS sign(s)on State Route 180 before the Fowler Avenue off-ramp for at least 7 days in advance. The contractor can download the Standard Encroachment Permit Application form TR-0100 at the link below: https:Hdot.ca.gov/programs/traffic-operations/ep/applications The contractor must submit the electronic copy of the permit application to Caltrans District 6 mailbox below: District6 Encroach ment Permits(o)dot.ca.gov The project requires obtaining Temporary traffic control encroachment permit from City of Fresno. Requirements and policies for obtaining the permit can be found in the following website: https://www.fresno.gov/publicworks/traffic-engineerinq/#traffic-permits-&-plan-checks Contractor is required to submit a detour plan in conformance with Standard Specifications, these Special provisions and CAMUTCD. A schematic detour routes plan is incorporated as part of the plans for general requirements and to depict detour routes. Replace section 12-1.04 with: 12-1.04 FLAGGING COSTS You pay the cost of furnishing all flaggers, including transporting flaggers and furnishing stands and towers for flaggers to provide for the passage of traffic through the work as specified in sections 7-1.03 and 7-1.04. Replace section 12-2 with: 12-2 CONSTRUCTION PROJECT FUNDING SIGNS 12-2.01 GENERAL Details for construction project funding signs are in Project Details. Keep construction project funding signs clean and in good repair at all times. 12-2.02 MATERIALS Provide Construction project funding signs, posts, and mounting hardware. Construction project funding signs must be wood post signs complying with section 82-3. Sign panels for construction project funding signs must be framed, single sheet aluminum panels complying with section 82-2. The background on construction project funding signs must be Type II retroreflective sheeting on the Authorized Material List for signing and delineation materials. The legend must be retroreflective, except for nonreflective black letters and numerals. The colors blue and orange must comply with PR Color no. 3 and no. 6, respectively, as specified in the Federal Highway Administration's Color Tolerance Chart. The size of the legend on construction project funding signs must be as described. Do not add any additional information unless authorized. FEDERAL HIGHWAY TRUST FUNDS SENATE BILL- 1 12-2.03 CONSTRUCTION Provide and Install a total of 2 construction project funding signs at the locations designated by the Engineer before starting major work activities visible to highway users. Upon completion and acceptance of the work, the signs shall be removed and become the property of the Contractor. 12-2.04 PAYMENT The Department pays you for Construction Funding Signs as follows: 1. 75 percent of the item upon installation of each sign 2. 100 percent of the item upon removal of each sign Replace Section 12-3.01 C With: 12-3.01 C Construction If channelizing devices are used on the project, perform all layout work necessary to place channelizing devices: 1. On the proper alignment 2. Uniformly at the location and spacing described 3. Straight on a tangent alignment 4. On a true arc in a curved alignment If temporary traffic control devices are damaged, displaced, or stop operating or functioning as described from any cause during the progress of the work, immediately repair, repaint, or replace the components and restore them to their original locations and positions. If ordered, furnish and place additional temporary traffic control devices. This work is not change order work if: 1. Required to conform with your traffic control plan 2. Required to conform with the MUTCD 3. Necessary for public safety or convenience as determined by the Engineer 4. Required to perform staged construction shown on the plans Replace Section 12-3.03C With: 12-3.03C Construction If plastic traffic drums are used on project, use 1 type of plastic traffic drum on the project. Use the same type and brand of retroreflective sheeting for all plastic traffic drums used on the project. Do not use sandbags or comparable ballast. Moving plastic traffic drums from location to location if ordered after initial placement is not change order work if: 1. Required to conform with your traffic control plan 2. Required to conform with the MUTCD 3. Necessary for public safety or convenience as determined by the Engineer 4. Required to perform staged construction shown on the plans Replace Section 12-3.10C With: 12-3.10C Construction If barricades are used on the project, place each barricade such that the stripes slope downward in the direction road users are to pass. Place each sand-filled bag near the ground level on the lower parts of the frame or stays to serve as ballast for the barricades. Do not place ballast on top of barricades or over any retroreflective barricade rail face that is facing traffic. Do not remove barricades that are shown to be left in place at the time of work completion. Moving a barricade from location to location is change order work if ordered after initial placement of the barricade unless. 1. Required to conform with your traffic control plan 2. Required to conform with the MUTCD 3. Necessary for public safety or convenience as determined by the Engineer 4. Required to perform staged construction shown on the plans Replace Section 12-3.20C(1) With: 12-3.20C1 General If type K temporary rail is used on the project, before placing Type K temporary railing on the job site, paint the exposed surfaces of the railing with white paint complying with the specifications for acrylic emulsion paint for exterior masonry. Place Type K temporary railing on a firm, stable foundation. Grade the foundation to provide a uniform bearing surface throughout the entire length of the railing. Structure excavation and backfill must comply with section 19-3 except compaction of earth fill placed behind Type K temporary railing in a curved layout is not required. Place and maintain the abutting ends of PC concrete units in alignment without substantial offset from each other. The drilling of holes and bonding of threaded rods or dowels must comply with the specifications for drilling and bonding dowels in section 51-1. Install a reflector on the top or face of the rail of each rail unit placed within 10 feet of a traffic lane. Apply adhesive for mounting the reflector under the reflector manufacturer's instructions. Install a Type P marker panel at each end of railing placed adjacent to a 2-lane, two-way highway and at the end facing traffic for railing installed adjacent to a one-way roadbed. If the railing is placed on a skew, install the marker at the end of the skew nearest the traveled way. Type P marker panels must comply with section 82 except you must furnish the marker panels. After removing Type K temporary railing: 1. Restore the area to its previous condition or construct it to its planned condition if temporary excavation or embankment was used to accommodate the railing. 2. Remove all threaded rods or dowels to a depth of at least 1 inch below the surface of the concrete. Fill the resulting holes with mortar under section 51-1 except cure the mortar by the water method or by the curing compound method using curing compound no. 6. If the Engineer orders a lateral move of Type K temporary railing and repositioning is not shown, the lateral move is change order work unless: 1. Required to conform with your traffic control plan 2. Required to conform with the MUTCD 3. Necessary for public safety or convenience as determined by the Engineer 4. Required to perform staged construction shown on the plans Replace Section 12-3.22C With: 12-3.22C Construction If crash cushion modules are used on the project, use the same type of crash cushion module for a single grouping or array. Temporary crash cushion arrays must not encroach on the traveled way. Secure the sand-filled modules in place before starting an activity requiring a temporary crash cushion. Maintain sand-filled temporary crash cushions in place at each location, including times when work is not actively in progress. You may remove the crash cushions during the work shift for access to the work if the exposed fixed obstacle is 15 feet or more from the nearest lane carrying traffic. Reset the crash cushion before the end of the work shift. Immediately repair sand-filled temporary crash cushion modules damaged due to your activities. Remove and replace any module damaged beyond repair. Repair and replacement of temporary crash cushion modules damaged by traffic are change order work. You may place sand-filled temporary crash cushion modules on movable pallets or frames complying with the dimensions shown. The pallets or frames must provide a full-bearing base beneath the modules. Do not move the modules and supporting pallets or frames by sliding or skidding along the pavement or bridge deck. Attach a Type R or Type P marker panel to the front of the temporary crash cushion if the closest point of the crash cushion array is within 12 feet of the traveled way. Firmly fasten the marker panel to the crash cushion with commercial quality hardware or by other authorized methods. Attach the Type R marker panel such that the top of the panel is 1 inch below the module lid. Attach the Type P marker panel such that the bottom of the panel rests upon the pallet or roadway surface if pallets are not used. A lateral move of a temporary crash cushion module is change order work if ordered and the repositioning is not shown, unless required for staged construction. Remove sand-filled temporary crash cushion modules, including sand, pallets or frames, and marker panels, at Contract acceptance. Do not install sand-filled temporary crash cushion modules in the permanent work. Replace section 12-3.31 C with: 12-3.31 C Construction If portable flashing beacons are used on the project, remove portable flashing beacons from the traveled way at the end of each night's work. You may store the flashing beacon at selected central locations within the highway where designated by the Engineer. Moving portable flashing beacons from location to location if ordered after initial placement is change order work unless: 1. Required to conform with your traffic control plan 2. Required to conform with the MUTCD 3. Necessary for public safety or convenience as determined by the Engineer 4. Required to perform staged construction shown on the plans Add to section 12-3.32A: The project requires one Portable Changeable Message Sign on HWY 180 and on City of Fresno jurisdiction for certain duration of the project. Start displaying the message ("ROADWORK START MONTH/DAY/YEAR" "EXPECT DELAYS')on the portable changeable message boards 7 days prior to the start of construction. Start displaying the message on the portable changeable message sign 10 minutes before closing a lane. Place the portable changeable message sign in advance of the 1st warning sign for each: 1. Stationary lane closure 2. Connector closure 3. Speed reduction zone Replace section 12-3.32D with: 12-3.32D Payment Full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all work involved in the provisions of this section, including, but not limited to, coordination with the County Engineer, City of Fresno Traffic Division, Caltrans office of encroachment permit as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer shall be considered as included in prices paid for; "Portable Changeable Message Sign", per each portable changeable message sign installed for the duration of the project. Replace Section 12-3.35B(6)with: 12-3.35B(6) User Interface If the project includes an AWIS, the system must have a user interface to control the AWIS PCMS communications. The interface must be (1)software compatible with a Windows environment or(2) a web service accessed by a web browser. Provide any software on a CD or other Engineer-authorized data-storage device. The user interface must, at a minimum, provide the user with a list of AWIS PCMSs in the field, location information for each AWIS PCMS, and a real-time on-board display of the message in the field. Control options must, at a minimum, provide the user the ability to change the on-board messages and flash rate. Replace the headings and paragraphs of Section 12-4 with: 12-4 MAINTAINING TRAFFIC 12-4.01 GENERAL 12-4.01A General Section 12-4.01 includes general specifications for maintaining traffic through construction work zones. If local authorities regulate traffic, notify them at least 5 business days before the start of job site activities. Cooperate with the local authorities to handle traffic through the work zone and to make arrangements to keep the work zone clear of parked vehicles. 12-4.01 B Materials Not Used 12-4.01C CONSTRUCTION Furnishing and operating pilot cars is not change order work. 12-4.01 D Payment Not Used 12-4.02 TRAFFIC CONTROL SYSTEMS 12-4.02A General 12-4.02A(1) Summary Section 12-4.02 includes specifications for providing a traffic control system to close traffic lanes, shoulders, and roadways. A traffic control system for a closure includes the temporary traffic control devices described as part of the traffic control system. Temporary traffic control devices must comply with section 12-3. 12-4.02A(2) Definitions designated holidays: Designated holidays are shown as "holidays" in Section 1-1.07B. 12-4.02A(3) Submittals 12-4.02A(3)(a) General The Contractor shall prepare and submit to the County Construction Engineer for approval, a traffic control system plan indicating the means and methods he will employ to institute and maintain traffic control for all phases of the work within the project. The traffic control system plan shall be submitted to the County Construction Engineer as early as possible, preferably five (5) working days prior to pre- construction meeting. The Engineer will require five (5)working days to review the initial submittal of the traffic control system plan and an additional five (5)working days for each successive review. No work at the project site whatsoever, including preparatory work such as the installation of construction project funding signs, shall commence until the traffic control system plan has been approved in writing by the Engineer. In the event that the traffic control system plan is not submitted timely, the Engineer may issue a notice of commencement of contract time prior to approval of the traffic control system plan, and working days will begin to accrue against the allotted contract time. Late submittal of the traffic control plan or revisions thereafter required, due to the inadequacy of the plan, shall not be accepted as justification for the delay in the start of the working days for the project. It shall be the Contractor's responsibility to provide, install, maintain, and remove any and all detour signage and traffic control devices and to obtain all permits, including permits from Caltrans, as may be necessary to establish detours as part of the contractor's traffic control plan. Traffic will not be allowed to be limited to one direction when construction activities are not actively in progress. Providing, installing, maintaining, and removing all traffic control, including portable changeable message signs if required, obtaining and complying with all permits, and providing all traffic control operations shall be the responsibility of the contractor, and no additional compensation will be allowed therefor. 12-4.02A(3)(b) Closure Schedules One-way traffic shall be controlled through the project in accordance with the California Manual MUTCD and Caltrans Standard Plans T-11 and T-13 entitled "Traffic Control System for Lane Closure on Multilane Conventional Highways" and "Traffic Control System for Lane Closure on Two Lane Conventional Highways," and these special provisions. Night closure will not be permitted. When traffic is under one way control on unpaved areas, the cones shown along the centerline on the plan need not be placed. Every Monday by noon, submit a closure schedule request for planned closures for the next week. The next week is defined as Sunday at noon through the following Sunday at noon. Submit a closure schedule request 5 days before the anticipated start of any job site activity that reduces: 1. Horizontal clearances of traveled ways, including shoulders, to 2 lanes or fewer due to activities such as temporary barrier placement and paving 2. Vertical clearances of traveled ways, including shoulders, due to activities such as pavement overlays, overhead sign installation, or falsework girder erection Submit closure schedule changes, including additional closures, by noon at least 3 business days before a planned closure. Cancel closure requests at least 48 hours before the start time of the closure. The Department notifies you of unauthorized closures or closures that require coordination with other parties as a condition for authorization. 12-4.02A(3)(c) Contingency Plans for Closures Submit a contingency plan for an activity that could affect a closure if a contingency plan is specified in the special provisions or if a contingency plan is requested. If a contingency plan is requested, submit the contingency plan within 1 business day of the request. The contingency plan must identify the activities, equipment, processes, and materials that may cause a delay in the opening of a closure to traffic. The plan must include: 1. List of additional or alternate equipment, materials, or workers necessary to ensure continuing activities and on-time opening of closures if a problem occurs. If the additional or alternate equipment, materials, or workers are not on the job site, specify their location, the method for mobilizing these items, and the required time to complete mobilization. 2. General time-scaled logic diagram displaying the major activities and sequence of the planned activities. For each activity, identify the critical event that will activate the contingency plan. Submit revisions to a contingency plan at least 3 business days before starting the activity requiring the contingency plan. Allow 2 business days for review. 12-4.02A(4) Quality Assurance Reserved 12-4.0213 Materials Not Used 12-4.02C Construction 12-4.02C(1) General Traffic will be controlled by flagmen by eyesight, radio (walkie talkie)or baton. In the event these methods do not work satisfactorily, as determined by the Engineer, a pilot car will be required. The Engineer may require a pilot car to be used during earthwork operations in preparation of the grading plane or other operations when the Contractor's operations cover an area beyond the line of sight, or beyond the range of radios or when the baton method does not function satisfactorily. Full compensation for furnishing and operating the pilot car, (including driver, radios, and any other equipment and labor required) shall be considered as included in the contract lump sum price paid for traffic control system and no further payment will be made therefor. Work that interferes with traffic is limited to the hours when closures are allowed. You may use a pilot car to control traffic. If a pilot car is used for traffic control, the cones shown along the centerline need not be placed. The pilot car must have radio contact with personnel in the work area. Operate the pilot car through the traffic control zone at a speed not greater than 25 miles per hour. Use a pilot car to control traffic. The cones shown along the centerline need not be placed. The pilot car must have radio contact with personnel in the work area. Operate the pilot car through the traffic control zone at a speed not greater than 25 miles per hour. 12-4.02C(3) Closure Requirements and Charts 12-4.02C(3)(a) General Where 2 or more lanes in the same direction, including the shoulders, are adjacent to the area where the work is being performed, close the adjacent lane under any of the following conditions: 1. Work is off the traveled way but within 6 feet of the edge of the traveled way, and the approach speed is greater than 45 mph 2. Work is off the traveled way but within 3 feet of the edge of the traveled way, and the approach speed is less than 45 mph Closure of the adjacent traffic lane is not required during any of the following activities: 1. Work behind a barrier 2. Paving, grinding, or grooving 3. Installation, maintenance, or removal of traffic control devices except for temporary railing 12-4.02C(3)(b) - 12-4.02C(3)(n) Reserved 12-4.02C(3)(o) Closure of Conventional County Roads The type and location of signs, lights, flags, flagmen, and other traffic control and safety devices shall be in accordance with the current edition of the California Manual on Uniform Traffic Control Devices (MUTCD) issued by the State of California, Department of Transportation (Caltrans). Public traffic shall be permitted to pass through construction at all times unless otherwise specified herein. Provide access to properties abutting the project site at all times. Only in certain circumstances and when allowed by the Engineer, traffic may be routed through the work under one-way control. Under one-way reversing traffic control operations, public traffic may be stopped in one direction for periods not to exceed 10 minutes. Lane closure is defined as the closure of a traffic lane or lanes within a single traffic control system. A minimum of one paved traffic lane, not less than 11 feet wide, shall be open for use by public traffic in each direction of travel at all times. The full width of the traveled way shall be open for use by public traffic when construction operations are not actively in progress. The Contractor's attention is directed to private driveways and access roads. The driveways and access roads shall remain accessible at all times. The Contractor may close the intersection to public traffic for a maximum period of 15 working days. The Contractor shall notify the Engineer five (5) working days prior to the date on which he intends to close the road. The Contractor shall be required, however,to provide access to property abutting the project along the line of work at all times where such access now exists. It is agreed by the parties to the contract that should any roads remain closed for more than the number of working days specified, damage will be sustained by the County of Fresno, and that it is and will be impracticable and extremely difficult to ascertain and determine the actual damage which the County will sustain in the event of and by reason of such delay and it is,therefore, agreed that the Contractor will pay to the County of Fresno, the sum set forth in the following paragraph per day for each and every calendar day's delay in opening any of the roads to traffic in excess of the number of days prescribed and the Contractor agrees to pay said liquidated damages wherein provided for, and further agrees that Fresno County may deduct the amount thereof from any monies due or that may become due the Contractor under the contract. Liquidated damages of One Thousand dollars($1,000) per day shall be paid to the County of Fresno by the Contractor for each calendar day's delay in opening the roads beyond the time limits specified herein, which damages are in addition to the liquidated damages for not completing the entire work as specified in Section 4 of these special provisions. Personal vehicles of the Contractor's employees shall not be parked on the traveled way or shoulders including sections closed to public traffic. Personal vehicles of the Contractor's employees shall not be parked within the right of way except between 6:00 a.m. and 5:00 p.m. When work vehicles or equipment are parked on the shoulder within 6 feet of a traffic lane, the shoulder area shall be closed as shown on standard plan T-10. The Contractor's equipment and materials shall not remain in a lane except when such lane is closed to traffic and the lane is being used for contract operations. 12-4.02C(3)(o)-12-4.02C(3)(s) Reserved 12-4.02C(4)-12.4.02C(6) Reserved 12-4.02C(7) Traffic Control System Requirements 12-4.02C(7)(a) General Control traffic using stationary closures. If components of the traffic control system are displaced or cease to operate or function as specified, immediately repair them to their original condition or replace them and place them back in their original locations. Vehicles equipped with attenuators must comply with section 12-3.23. Each vehicle used to place, maintain, and remove components of a traffic control system on a multilane highway must have a Type II flashing arrow sign that must operate whenever the vehicle is used for placing, maintaining, or removing thed components. For a stationary closure, vehicles with a Type II flashing arrow sign not involved in placing, maintaining, or removing the components must display only the caution display mode. If a flashing arrow sign is required for a closure, activate the sign before the closure is in place. 12-4.02C(7)(b) Stationary Closures Except for channelizing devices placed along open trenches or excavations adjacent to the traveled way, remove the components of the traffic control system for a stationary closure from the traveled way and shoulders at the end of each work period. You may store the components at authorized locations within the limits of the highway. If a traffic lane is closed with channelizing devices for excavation work, move the devices to the adjacent edge of the traveled way when not excavating. Space the devices as shown for the lane closure. 12-4.02C(7)(c) Moving Closures For a moving closure, use a PCMS that complies with section 12-3.32 except the sign must be truck mounted. The full operational height to the bottom of the sign may be less than 7 feet above the ground but must be as high as practicable. If you use a flashing arrow sign in a moving closure, the sign must be truck mounted. Operate the flashing arrow sign in the caution display mode if it is being used on a 2-lane, two-way highway. 12-4.02C(8) Traffic Control System Signs 12-4.02C(8)(a) General Traffic control system signs must comply with section 12-3.11. 12-4.02C(8)(b) Connector and Ramp Closure Signs Inform motorists of a temporary closing of a (1) connector or a (2)freeway or expressway entrance or exit ramp using: 1. SC6-3(CA) (Ramp Closed) sign for closures of 1 day or less 2. SC6-4(CA) (Ramp Closed) sign for closures of more than 1 day SC6-3(CA)and SC6-4(CA) signs must be stationary mounted at the locations shown and must remain in place and visible to motorists during the connector or ramp closure. Notify the Engineer at least 2 business days before installing the sign and install the sign from 7 to 15 days before the closure. 12-4.02C(10)-12-4.02C(11) Reserved 12-4.02C(12) Failure to Provide Traffic Control. If the Contractor does not provide the traffic control and it becomes necessary for the Engineer to notify the Contractor of his duties according to the Standard Specifications and these special provisions, the Contractor shall pay$200 per 15-minute period or portion thereof to the County for all the time required to acquire the traffic control, including pilot car. Such payment shall commence at the time notice of the improper traffic control condition is given to the Contractor or his authorized representative by the Engineer and shall terminate when the condition is corrected. Such payment will be deducted from the Contractor's payment. In addition thereto, when it is necessary for the Engineer to perform the work, the Contractor shall pay the actual cost for the performance thereof. Such amount will be deducted from the Contractor's payment. This will be in addition to any penalties imposed in these special provisions. The provisions in this section will not relieve the Contractor from his responsibility to provide such additional devices or take such measures as may be necessary to comply with the provisions in Section 7-1.04, "Public Safety," of the Standard Specifications. 12-4.02D Payment The Department pays for change order work for a traffic control system by force account for increased traffic control and uses a force account analysis for decreased traffic control. Traffic control system for lane closure is paid for as traffic control system. Flagging costs are paid for as specified in section 12-1.04. The requirements in section 4-1.05 for payment adjustment do not apply to traffic control system. Adjustments in compensation for traffic control system will be made for an increase or decrease in traffic control work if ordered and will be made on the basis of the cost of the necessary increased or decreased traffic control. The adjustment will be made on a force account basis for increased work and estimated on the same basis in the case of decreased work. A traffic control system required by change order work is paid for as a part of the change order work. 12-4.03 FALSEWORK OPENINGS Reserved 12-4.04 PEDESTRIAN FACILITIES 12-4.04A General Section 12-4.04 includes specifications for providing temporary pedestrian facilities. Temporary pedestrian facilities must comply with section 16-2.02. 12-4.0413 Materials Not Used 12-4.04C Construction If pedestrian traffic is allowed to pass through work areas, provide a temporary pedestrian facility through the construction areas within the highway. Include a protective overhead covering as necessary to ensure protection from falling objects and drippings from overhead structures. If an activity requires a closure of a walkway, provide another walkway nearby, off of the traveled way. Where pedestrian openings through falsework are required, provide a temporary pedestrian facility with a protective overhead covering during all bridge construction activities. 12-4.04D Payment Not Used 12-4.06-12-4.10 RESERVED Replace the headings and paragraphs of Section 12-5 with: 12-5 TEMPORARY PAVEMENT AND BARRIERS 12-5.01 GENERAL Contractor is responsible for identifying a phasing plan that will maintain the intersection and lanes open per Section 12-4.02C(3)(o). If the phasing plan identified by Contractor involves placement of temporary pavement and temporary barriers to meet CA MUTCD, the cost of these temporary measures shall be included in The Traffic Control System bid item. Contractor is responsible for preparing and submitting for acceptance of the Engineer a phasing plan, clearly identifying the temporary measures included in each of the phase. Contractor is responsible for maintaining the temporary pavement in proper driving conditions. 12-5.02 MATERIALS HMA: HMA to be place on the temporary median transition shall meet Section 39 of the Special Provisions and Standard Specifications Barrier: Barriers shall meet CA MUTCD and Section 12 of the Standard Specification and Special Provisions 12-5.03 CONSTRUCTION Contractor is responsible to clear and grub the areas where the temporary pavement will be placed. Prepare and compact existing native soil to 90% Place 0.25' HMA lift to match existing road edge of pavement. Once the phase of the project is constructed. Contractor is responsible for removing existing Temporary pavement, barriers (if needed) and grading site per plans. Contractor is responsible for removing and disposing of any excess material from temporary pavement. 12-5.04 PAYMENT Full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all work involved in constructing and removing the temporary pavements and barriers as per the provisions of this section, including, but not limited to, coordination with the County Engineer, clearing and grubbing, HMA material and placement, placement and removal of barriers, demolishing and rebuilding and final grading to final grade shown in the plans shall be considered to be included as part of the Bid Item "Traffic Control System" as a lump sum of work, and no further compensation shall be paid therefor. 13 WATER POLLUTION CONTROL Add to Section 13-1.01: STATE WATER RESOURCES CONTROL BOARD (SWRCB) NOTICE OF INTENT FILING (NOI) FEE Complete the NOI filing process started by the County on the SWRCB website using information available in the contract, field and website. The Engineer will link your plan to the project on the SWRCB website. The SWRCB NOI bid item is specifically provided to reimburse Contractor for payment of NOI filing fee charged by the SWRCB and paid by the Contractor after the Contractor has completed the NOI filing process started by the County. The amount paid will be the amount of the fee only. No payment will be made for overhead or processing costs. Full compensation for any overhead and processing costs will be considered to be included in the various items of work, and no separate compensation will be made therefor. The provisions of section 9-1.06 for increased or decreased quantities shall not apply to the "State Water Resources Control Board Notice of Intent" bid item. The SWRCB website can be found at: https://smarts.waterboards.ca.gov/smarts/faces/SwSmarts Log i n.xhtm I The dollar amount shown in the Proposal is an estimate only, and shall be included in each bidder's proposal. Replace 13-1.01A with: 13-1.01A Summary Section 13-1 includes general specifications for preventing, controlling, and abating water pollution within waters of the State. Information on forms, reports, and other documents is in the following Caltrans manuals: 1. Field Guide to Construction Site Dewatering 2. Stormwater Pollution Prevention Plan (SWPPP) and Water Pollution Control Program (WPCP) Preparation Manual 3. Construction Site Best Management Practices (BMPs) Manual 4. Construction Site Monitoring Program Guidance Manual You may view these manuals at the Stormwater and Water Pollution Control Information link at the Caltrans Division of Construction website or purchase them at the Caltrans Publication Distribution Unit. A WPCP and a SWPPP must comply with the Caltrans Stormwater Pollution Prevention Plan (SWPPP) and Water Pollution Control Program (WPCP) Preparation Manual and must be prepared using the latest template posted on the Construction stormwater website. Replace Section 13-1.01 D92) with 13-1.01 D(2) Regulatory Requirements Comply with the discharge requirements in the NPDES General Permit for Storm Water Discharges Associated with Construction and Land Disturbance Activities; Order No. 2009-000 9-DWQ, CAS000002 (Construction General Permit)and any amendments thereto issued by the SWRCB. The Construction General Permit may be found at: http://www.waterboards.ca.gov/water issues/prog ra ms/stormwater/constperm its.s html Discharges from manufacturing facilities, such as batch plants and crushing plants, must comply with the discharge requirements in the NPDES General Permit for Storm Water Discharges Associated with Industrial Activities; Order No. 2014-0057-DWQ, CAS000001 (Industrial General Permit), issued by the SWRCB. For the Industrial General Permit, go to the SWRCB website. For a batch plant and crushing plant outside a job site or within a job site that serves one or more contracts, obtain coverage under the Industrial General Permit before operating a batch plant to manufacture concrete, HMA, or other material or a crushing plant to produce rock or aggregate. This Project disturbs 5.7 acres of soil. A SWPPP is required for this project. Replace Section 13-1.01 D(4)(b)with: 13-1.01 D(4)(b) Qualifications The WPC manager must: 1. Comply with the requirements provided in the Construction General Permit for: 1.1. QSP if the project requires a WPCP 1.2. QSD if the project requires a SWPPP 2. Complete the stormwater management training described at the Stormwater and Water Pollution Control Information link at the Caltrans Division of Construction website Add to the end of section 13-2.01A: Add to section 13-3.01A: This project's risk level is 1. Add between the 4th and 5th paragraphs of section 13-3.01C(2)(a): The Central Valley Regional Water Quality Control Board will review the authorized SWPPP. Replace Section 13-3.01 C(2)(b)(iv)with: 13-3.01C(2)(b)(iv) Sampling and Analysis Plan If a sampling and analysis plan is required, submit a sampling and analysis plan that complies with the Caltrans Construction Site Monitoring Program Guidance Manual. The sampling and analysis plan must describe: 1. Sampling equipment and sample containers. 2. Preparation of samples. 3. Collection and holding times. 4. Field measurement methods. 5. Analytical methods. 6. Quality assurance and quality control. 7. Sample preservation and labeling. 8. Collection documentation, including the names of personnel collecting samples and their training. 9. Shipment of samples. 10. Chain of custody. 11. Data management and reporting. 12. Precautions from the construction site health and safety plan, including procedures for collecting samples during precipitation. List the conditions under which you are not required to collect samples, such as: 12.1. Dangerous weather 12.2. Flooding or electrical storms 12.3. Times outside of normal working hours 13. Procedures for collecting and analyzing at least 3 samples for each day of each qualifying rain event for a risk level 2 or risk level 3 project. 14. Procedures for collecting effluent samples at all locations where the stormwater is discharged off the job site. The sampling and analysis plan must identify the State-certified laboratory that will perform the analyses. For a list of State-certified laboratories, go to the SWRCB's website. Submit a revised plan if discharges or sampling locations change because of changed work activities or knowledge of site conditions. Replace Section 13-3.01 C(5)with: 13-3.01C(5) Annual Certification Submit an annual certification of compliance as described in the Caltrans Stormwater Pollution Prevention Plan (SWPPP) and Water Pollution Control Program (WPCP) Preparation Manual before July 15th of each year. Replace Section 13-4.03G with: 13-4.03G Dewatering Dewatering consists of discharging accumulated stormwater, groundwater, or surface water from excavations or temporary containment facilities. If dewatering is required, perform dewatering work as specified for the work items involved, such as a temporary ATS or dewatering and discharge. If dewatering and discharging activities are not specified for a work item and you perform dewatering activities: 1. Conduct dewatering activities under the Caltrans Field Guide for Construction Site Dewatering. 2. Ensure any dewatering discharge does not cause erosion, scour, or sedimentary deposits that could impact natural bedding materials. 3. Discharge the water within the project limits. Dispose of the water if it cannot be discharged within project limits due to site constraints or contamination. 4. Do not discharge stormwater or nonstormwater that has an odor, discoloration other than sediment, an oily sheen, or foam on the surface. Immediately notify the Engineer upon discovering any such condition. Replace Section 13-5.04 with: 13-5.04 PAYMENT The payment quantity for temporary soil stabilization bid items paid for by the area is the area measured parallel with the ground surface not including the additional quantity used for overlaps. If there is no bid item for temporary soil stabilization, payment therefor is considered to be included in the bid item for prepare water pollution control program or in the bid item for prepare stormwater pollution prevention plan, as applicable. Replace Section 13-6.04 with: 13-6.04 PAYMENT The payment quantity for temporary sediment control bid items paid for by the length is the length measured along the centerline of the installed material. The payment quantity, if any, for temporary fiber roll does not include the additional quantity used for overlaps. The Department does not pay for the relocation of temporary drainage inlet protection during work progress. If there are no bid items for installing or maintaining temporary sediment control payment therefor is considered to be included in the bid item for prepare water pollution control program or in the bid item for prepare stormwater pollution prevention plan, as applicable. Replace Section 13-7.03D with: 13-7.03D Payment The Department does not pay for the relocation of temporary construction entrances or roadways during work progress. If there are no bid items for installing or maintaining temporary construction entrances or roadways, payment therefor is considered to be included in the bid item for prepare water pollution control program or in the bid item for prepare stormwater pollution prevention plan, as applicable. Replace Section 13-8.01C92) with: 13-8.01 C(2) Active Treatment System Plan Within 20 days of Contract approval, submit 3 copies of the ATS plan if an ATS plan is required for the project. The plan, if required, must include: 1. Title sheet. 2. Table of contents. 3. Certification and approval sheet described in the Caltrans Stormwater Prevention Plan (SWPPP) and Water Pollution Control Program (WPCP) Preparation Manual. 4. Amendment log and format described in the Caltrans Stormwater Prevention Plan (SWPPP) and Water Pollution Control Program (WPCP) Preparation Manual. 5. Description and schedule of the discharge activities. 6. Discharge alternatives, including: 6.1. Reuse of treated water for job site activities, such as dust control, irrigation, fill compaction, or concrete batch plant activities 6.2. Percolation 6.3. Discharge into storm sewers 6.4. Discharge into surface waters 7. Treatment system description and components. 8. Anticipated flow rates. 9. Operation and maintenance manual for the equipment. 10. Monitoring, sampling, and reporting plan, including QA and QC. 11. Health and safety plan. 12. Spill prevention plan. 13. Field-recorded data, visual inspection, calibration procedures, and examples of logs. 14. Descriptions of measuring equipment. 15. Shop drawings showing: 15.1. Section and plan views of stormwater effluent treatment systems 15.2. Location of sampling points for water quality measurements 15.3. Flow path and placement of pipes, hoses, pumps, holding tanks, and other equipment used to convey water 15.4. General position of treatment components relative to excavations or other areas requiring dewatering 15.5. Point of stormwater discharge 16. Daily inspection report form. 17. Municipal batch discharge permit from a publicly owned treatment works if required. 18. Coagulant-handling work plan if you use chemical coagulants, in-line flocculants, or both in the treatment system. The coagulant-handling work plan must include: 18.1. Description of WPC practices to prevent accidental spillage, overfeeding into the treatment system, or other mishandling of coagulant agents 18.2. Monitoring plan for all coagulants, flocculants, or both 18.3. Description of the coagulation and flocculating agents, including chemical and trade names 18.4. Determination of acute or chronic toxicity for aquatic organisms conforming to EPA methods for the agents 18.5. Monitoring plan to detect a residual agent at concentrations at or below the established acute toxicity levels for freshwater and marine conditions for that agent Allow 20 days for review. If revisions are required, the Engineer notifies you of the date the review stopped and provides comments. Submit a revised ATS plan within 15 days of receiving the comments. The Department's review resumes when a complete plan has been resubmitted. Submit an electronic copy on a read-only CD, DVD, or other Engineer-authorized data storage device and 4 printed copies of the authorized ATS plan. Allow 15 days for the Engineer to submit the plan to the SWRCB and the RWQCB. If the Engineer requests revisions based on comments from the SWRCB or RWQCB, submit a revised plan within 5 business days. 14 ENVIRONMENTAL STEWARDSHIP Add Section 14-12.04: 14-12.04 RELATIONS WITH SAN JOAQUIN VALLEY AIR POLLUTION CONTROL DISTRICT (SJVAPCD) You are responsible for compliance with all applicable SJVAPCD regulations and requirements. This section is provided for your information, and nothing herein or elsewhere within these special provisions shall be construed as limiting your responsibility for complying with all applicable rules and regulations. In accordance with SJVAPCD Regulation VIII — Fugitive PM10 Prohibitions: Rule 8021, implementation of an SJVAPCD-approved dust control plan is required prior to commencement of any dust generating activities. Prepare and submit a dust control plan to provide any information to the extent necessary to accurately reflect your proposed operations. The Engineer completes the review within two working days after receipt thereof. In the event that the Engineer determines your submittal as incomplete or inadequate submit a corrected plan. The Engineer completes review of any re-submittal within two working days after receipt thereof. Upon approval by the Engineer, submit the proposed dust control plan to the SJVAPCD. Pay to the SJVAPCD any fees which may be required for the dust control plan. You are solely responsible for prompt preparation and submittal to the Engineer, and immediately upon approval by the Engineer, submittal to the SJVAPCD of all proposed modifications to the dust control plan. Do not commence work until the SJVAPCD has approved or conditionally approved the dust control plan and the Engineer authorizes. When a modification to an approved dust control plan is under consideration do not perform work which is inconsistent with the approved dust control plan prior to receiving written approval. Compensation for delays associated with review and approval of dust control plans is only considered in the event that: 1)the Engineer fails to review any dust control plan submitted by the Contractor within two working days after submittal thereof by the Contractor; or 2)the SJVAPCD fails to review and to either approve or disapprove a dust control plan within 30 calendar days after their receipt thereof. Disapproval of a proposed dust control plan by the Engineer or by the SJVAPCD shall not be considered as a basis for an extension of contract time nor as the basis for any additional compensation. Only in the event that it is determined by the Engineer that the Contractor was unreasonably delayed, through no fault of the Contractor, will compensation for delays be considered in conformance with the provisions in Section 8- 1.07, "Delays," of the Standard Specifications. It is your responsibility to be fully informed of the requirements of the Dust Control Plan and all rules, regulations, plans and conditions that may govern your operations and to conduct the work accordingly. You must comply with the modifications to the Dust Control Plan approved by the SJVAPCD and accepted by the Engineer. Ensure the provisions of this section and SJVAPCD-approved Dust Control Plan is made part of every subcontract executed pursuant to this contract. Full compensation for preparing and submitting the Dust Control, revising and resubmitting it as necessary until approved by the SJVAPCD, and paying the necessary fees shall be included in the bid item DUST CONTROL PLAN and no further compensation shall be paid therefor. Replace Section 14-12.04-14.12.08 With: 14-12.05-14.12.08 RESERVED 15 EXISTING FACILITIES Add to the end of Section 15-1.03C: All work performed in salvaging existing inlets shall conform to the applicable Sections of these Specifications or as otherwise shown on the Plans or specified in the Special Provisions. Salvageable material shall remain the property of Fresno Metropolitan Flood Control District (FMFCD) and shall be reinstalled at the new inlets by the Contractor at the location specified in the plans. Salvage existing inlet frames and lids as shown on the Plans to FMFCD. In all cases, the Contractor shall exercise recognized good and applicable construction practices in the completion of the Work. Faulty workmanship as determined by the Engineer will be rejected and shall be removed/replaced by the Contractor at its expense. Full compensation for salvaging existing inlets and its appurtenances shall be considered to be included in the"Salvage Drain Inlet to FMFCD", and no further compensation shall be paid therefor. Replace Section 15-1.03D with: 15-1.03D Remove and Dispose of Existing Light Fixtures Demolish, remove and dispose of existing light fixtures and attached wiring at the locations shown on the plans. Materials shall be hauled from the site for proper disposal per all applicable laws and regulations. Full compensation for demolishing, removing and properly disposing the existing light fixtures, posts, concrete footings and its appurtenances shall be considered to be included in the "Remove and Dispose Light Fixtures", and no further compensation shall be paid therefor. This item may be eliminated if property owner removes light fixture before construction commencement. The provisions in Section 9-1.06, "Changed Quantity Pay Adjustments"of the Standard Specifications shall not apply to the item "Remove and Dispose Light Fixtures." The Contractor shall have no claim for anticipated overhead or profit should the County fail to authorize performing this work or should the value of authorized work be less than anticipated by the Contractor. Replace Section 15-1.03E with: 15-1.03E Remove and Dispose of Existing Shed Demolish, remove and dispose of existing sheds (x2) and their foundations at the locations shown on the plans. Materials shall be hauled from the site for proper disposal per all applicable laws and regulations. Full compensation for demolishing, removing and properly disposing the existing sheds, building, concrete footings and its appurtenances shall be considered to be included in the "Remove and Dispose Sheds" items of work, and no further compensation shall be paid therefor. This item may be eliminated if property owner removes existing sheds before construction commencement. The provisions in Section 9-1.06, "Changed Quantity Pay Adjustments"of the Standard Specifications shall not apply to the item "Remove and Dispose Sheds". The Contractor shall have no claim for anticipated overhead or profit should the County fail to authorize performing this work or should the value of authorized work be less than anticipated by the Contractor. Replace Section 15-1.03F with: 15-1.03F Remove and Dispose of Existing Sign Structures Demolish, remove and dispose of existing sign structure and their foundations at the locations shown on the plans. Materials shall be hauled from the site for proper disposal per all applicable laws and regulations. Full compensation for demolishing, removing and properly disposing the existing sign structure, posts, concrete footings and its appurtenances shall be considered to be included in the "Remove and Dispose Sign Structure" items of work, and no further compensation shall be paid therefor. This item may be eliminated if property owner removes existing sign and structures before construction commencement. The provisions in Section 9-1.06, "Changed Quantity Pay Adjustments" of the Standard Specifications shall not apply to the item "Remove and Dispose Sign Structure". The Contractor shall have no claim for anticipated overhead or profit should the County fail to authorize performing this work or should the value of authorized work be less than anticipated by the Contractor. 15-1.03G Remove and Dispose of Existing RCP Pipe Furnish all labor, materials, tools, equipment, and incidentals to trench, remove existing pipe, install all temporary plates, and backfill per Section 19. The payment quantity for removing and disposing existing pipe is the length measured along the centerline of the pipe. Replace Section 15-1.03H with: 15-1.03H Remove and Dispose of existing wood fence Demolish, remove and dispose of existing wood fence assembly at the locations shown on the plans. Materials shall be hauled from the site for proper disposal per all applicable laws and regulations. Full compensation for demolishing, removing and properly disposing the existing fence and gates, posts, concrete footings and its appurtenances shall be considered to be included in this item of work, and no further compensation shall be paid therefor. The payment quantity for removing and disposing existing fence is the length measured along the centerline of the fence. This item may be reduced or eliminated if property owner removes or partially removes existing fence before construction commencement. The provisions in Section 9-1.06, "Changed Quantity Pay Adjustments" of the Standard Specifications shall not apply to this item. The Contractor shall have no claim for anticipated overhead or profit should the County fail to authorize performing this work or should the value of authorized work be less than anticipated by the Contractor. Replace Section 15-1.031 with: 15-1.031 Remove and Dispose of Existing Hog-Wire Fence Demolish, remove and dispose of existing hog-wire fence assembly at the locations shown on the plans. Materials shall be hauled from the site for proper disposal per all applicable laws and regulations. Full compensation for demolishing, removing and properly disposing the existing fence and gates, posts, concrete footings and its appurtenances shall be considered to be included in this item of work, and no further compensation shall be paid therefor. The payment quantity for removing and disposing existing fence is the length measured along the centerline of the fence. This item may be reduced or eliminated if property owner removes or partially removes existing fence before construction commencement. The provisions in Section 9-1.06, "Changed Quantity Pay Adjustments" of the Standard Specifications shall not apply to this item. The Contractor shall have no claim for anticipated overhead or profit should the County fail to authorize performing this work or should the value of authorized work be less than anticipated by the Contractor. Replace Section 15-1.03J with: 15-1.03J Remove and Dispose of Existing barbwire fence Demolish, remove and dispose of existing barbwire fence assembly at the locations shown on the plans. Materials shall be hauled from the site for proper disposal per all applicable laws and regulations. Full compensation for demolishing, removing and properly disposing the existing fence and gates, posts, concrete footings and its appurtenances shall be considered to be included in this item of work, and no further compensation shall be paid therefor. The payment quantity for removing and disposing existing fence is the length measured along the centerline of the fence. This item may be reduced or eliminated if property owner removes or partially removes existing fence before construction commencement. The provisions in Section 9-1.06, "Changed Quantity Pay Adjustments" of the Standard Specifications shall not apply to this item. The Contractor shall have no claim for anticipated overhead or profit should the County fail to authorize performing this work or should the value of authorized work be less than anticipated by the Contractor. 15-1.03K Remove and Dispose of Underground Septic System Contractor is responsible for obtaining and paying for a permit with the County of Fresno Building department. The dummy permit is included in the Project Detail of the Special Provisions. Contractor is responsible for locating existing underground septic tank, pipeline and drain well. The existing building plumbing has been abandoned for several years. Contractor shall uncover the septic tank and well. If necessary dewater drain well and septic tank with sewer truck and haul fluid to facility approved to accept waste. Completely remove existing septic tank. Cut and remove all concrete that comprises drain well to a depth of 6 ft below designed ground surface. Backfill drain well with native soil and compact to 90% meet grade level. The effluent pipe from the building shall be cut and capped at the Right of Way line. Full compensation for potholing, removing potential sewage, demolishing, removing and disposing tank and filling the drain well void shall be considered to be included in this item of work, and no further compensation shall be paid therefor. The payment quantity for removing and disposing of underground septic system is lump sum 15-1.03L Remove and Dispose of Bollards Remove & dispose bollards and foundations at locations shown on the Plans. The unit price paid for REMOVE BOLLARDS shall include full compensation for furnishing all labor, materials, tools, equipment and performing all the work involved in removing bollards, including but not limited to excavation, backfill, and disposal. The payment for REMOVE BOLLARDS will be measured and paid for by each (EA) bollards removed and disposed from the locations specified in the plans. 15-1.05 Utility Relocation Utility relocation as shown on the plans "by others"will be performed by the appropriate agency and coordinated by the County. Ensure the project site is prepared as necessary and ready for work on the day(s)scheduled for such work. Inform the Engineer ten (10)working days in advance of completion of site preparation for relocation so the County can schedule work properly. Any traffic control measures needed for the utility relocation shall be responsibility of the Contractor and shall be included in the traffic control system bid item. The cost or coordinating the relocation with the Engineer and the Utility Company shall be included in the various items of the work and no further compensation shall be paid therefor. DIVISION III EARTHWORK AND LANDSCAPPE 17 GENERAL Add to the 4th paragraph in section 17-2.03A: Vegetation along the south and north side of Olive Ave west of Fowler Ave shown in the plans to be removed should be considered as part of the bid Item "Clearing and Grubbing" Replace the 1st sentence in the 2"d paragraph in section 17-2.03A with: Cut tree branches that extend over the roadway and hang within 20 feet of finished grade and as directed by the engineer. Add to end of 17-2.03C: Any trees with a trunk diameter greater than or equal to 6"will constitute as a "tree removal" and will have separate bid item. Any tree or shrub less than 6" shall be considered in the bid item for"clearing and grubbing". 19 EARTHWORK Add to the end of section 19-2.04: Full compensation for furnishing all labor, materials, tools, equipment, incidentals, and for doing all work involved in the provisions of this section, including, but not limited to, coordination with the County Engineer, potholing, excavating, grading and compacting to the grades shown in the plans between proposed edge of pavement (including dike where occur) as specified in the Plans, Standard Specifications and these Special Provisions, shall be considered to be included in the prices paid for "Roadway Excavation" per cubic yard of soil excavated. This item is final pay Full compensation for furnishing all labor, materials, tools, equipment, incidentals, and for doing all work involved in the provisions of this section, including, but not limited to, coordination with the County Engineer, potholing, excavating, grading and compacting to the grades shown in the plans from proposed edge of pavement to Right of way lines as specified in the Plans, Standard Specifications and these Special Provisions, shall be considered to be included in the prices paid for"Roadway Ditch Excavation" per cubic yard of soil excavated. This item is final pay Add to the end of section 19-3.04: Full compensation for furnishing all labor, materials, tools, equipment, incidentals, and for doing all work involved in the provisions of this section, including, but not limited to, coordination with the County Engineer, coordination with FMFCD inspector, backfilling with concrete slurry as specified in the Plans, Standard Specifications and these Special Provisions, shall be considered to be included in the bid item paid for"3-Sack concrete slurry backfill" per cubic yard of concrete slurry used. Add between the 1st and 2nd paragraphs of section 19-5.03B: Item 2 of the 1 sc paragraph does not apply. Replace section 19-9.02 with: Material for shoulder backing may be native or generated from roadway excavation. Material shall be readily compactable, shall not contain deleterious materials, shall pass 100%through a 2-inch sieve, 20% to 40% passing the #200 sieve, a Plasticity Index less than 10, and shall provide a stable surface and uniform appearance as determined by the engineer. 20 LANDSCAPE Replace Section 20-1.026 with: 20-1.0213 Water Make arrangements for supplying water. Water must be of a quality that promotes plant growth. 21 EROSION CONTROL Replace Section 21-2.01C(4)with: 21-2.01C(4) Tackifier Submit a certificate of compliance for tackifier and bonded fiber matrix at least 5 business days before application. Certificates of compliance must include: 1. SDS 2. Product label 3. List of applicable nonvisible pollutant indicators for soil amendment and stabilization materials as shown in the table titled "Pollutant Testing Guidance Table" in the Caltrans Construction Site Monitoring Program Guidance Manual. For the manual, go to the Caltrans Division of Construction website 4. Report of acute and chronic toxicity tests on aquatic organisms complying with EPA methods 5. List of ingredients, including chemical formulation 6. Properties of polyacrylamide in tackifier including: 6.1. Percent purity by weight 6.2. Percent active content 6.3. Average molecular weight 6.4. Charge density 22 FINISHING ROADWAY DIVISION V SURFACINGS AND PAVEMENTS 36 GENERAL Replace the headings and paragraphs of Section 36-3 with: 36-3 PAVEMENT SMOOTHNESS 36-3.01 GENERAL 36-3.01A Summary Section 36-3 includes specifications for measuring the smoothness of pavement surfaces. 36-3.01 B Definitions Reserved 36-3.01C Submittals 36-3.01C(1) General Reserved 36-3.01 C(2) Reserved 36-3.01 C(3) Reserved 36-3.01C(4) Straightedge Measurements Within 2 business days of measuring smoothness with a straightedge, submit a list of the areas requiring smoothness correction. Identify the areas by: 1. Location number 2. District-County-Route 3. Beginning station or post mile to the nearest 0.01 mile 4. For correction areas within a traffic lane: 4.1. Lane direction, NB, SB, EB, or WB 4.2. Lane number from left to right in the direction of travel 4.3. Wheel path, L for left, R for right, or B for both 5. For correction areas not within a traffic lane: 5.1. Identify the pavement area, such as shoulder, weigh station, or turnout 5.2. Direction and distance from the centerline, L for left or R for right 6. Estimated size of correction area 36-3.01D Quality Assurance 36-3.01D(1) General Reserved 36-3.01 D(2) Reserved 36-3.01 D(3) Quality Control 36-3.01 D(3)(a) General Reserved 36-3.01 D(3)(b) Smoothness 36-3.01 D(3)(b)(i) General Test pavement smoothness using a 12-foot straightedge for the pavement at: 1. Traffic lanes less than 1,000 feet in length, including ramps, turn lanes, and acceleration and deceleration lanes 2. Areas within 15 feet of manholes 3. Shoulders 4. Weigh-in-motion areas 5. Miscellaneous areas such as medians, gore areas, turnouts, and maintenance pullouts 6. Any other areas selected by the Engineer. 36-3.01 D(3)(b)(ii) Reserved 36-3.01 D(3)(b)(iii) Reserved 36-3.01 D(4) Department Acceptance The Department accepts pavement surfaces for smoothness based on compliance with the smoothness specifications for the type of pavement surface specified. For areas that require pavement smoothness determined using a 12-foot straightedge, the pavement surface must not vary from the lower edge of the straightedge by more than: 1. 0.01 foot when the straightedge is laid parallel with the centerline 2. 0.02 foot when the straightedge is laid perpendicular to the centerline and extends from edge to edge of a traffic lane 3. 0.02 foot when the straightedge is laid within 24 feet of a pavement conform 36-3.02 MATERIALS Not Used 36-3.03 CONSTRUCTION Perform pavement smoothness testing in areas selected by the Engineer in the presence of the Engineer. 36-3.04 PAYMENT Not Used 37-6 CRACK TREATMENTS 37-6.01 GENERAL 37-6.01A Summary Section 37-6 includes specifications for treating cracks in asphalt concrete pavement. 37-6.01 B Definitions Reserved 37-6.01C Submittals If your selected crack treatment material is on the Authorized Material List for flexible pavement crack treatment material, submit a certificate of compliance including: 1. Manufacturer's name 2. Production location 3. Brand or trade name 4. Designation 5. Batch or lot number 6. Crack treatment material type 7. Contractor or subcontractor name 8. Contract number 9. Lot size 10. Shipment date 11. Manufacturer's signature If your selected crack treatment material is not on the Authorized Material List for flexible pavement crack treatment material, submit a sample and test results from each batch or lot 20 days before use. Testing must be performed by an authorized laboratory and test results must show compliance with the specifications. Test reports must include the information specified for the certificate of compliance submittal. Each hot-applied crack treatment material sample must be a minimum of 3 lb and submitted in a silicone release container. Each cold-applied crack treatment material sample must be a minimum of 2 quarts and submitted in a plastic container. At least 10 days before the start of work, submit sand gradation test results under California Test 202. Submit the following with each delivery of crack treatment material to the job site: 1. Manufacturer's heating and application instructions 2. Manufacturer's SIDS 3. Name of the manufacturer's recommended detackifying agent 37-6.01D Quality Assurance 37-6.01D(1) General Hot-applied crack treatment material must be sampled at least once per project in the Engineer's presence. Collect two 3-pounds-minimum samples of crack treatment material from the dispensing wand into silicone release boxes. Cold-applied crack treatment material must be sampled at least once per project in the Engineer's presence. Collect 2 samples of crack treatment material from the dispensing wand into 1-quart containers. 37-6.01 D(2) Quality Control Reserved 37-6.01 D(3) Department Acceptance Crack treatment acceptance is based on: 1. Visual inspection for uniform filling of cracks throughout the work limits including: 1.2. Crack treatment is not more than a 1/4 inch below the specified level 1.3. Sealant failures 1.4. Crack re-opening 1.5. Crack overbanding is less than 3 inches wide 2. The Department's sampling and testing for compliance with the requirements shown in the following table: Crack Treatment Acce tance Criteria Quality characteristics Test methodb Requirement Type 1 Type 2 Type 3 Type 4 Type 5 Softening point min, °C ASTM D36 102 96 90 84 84 Cone penetration at 77 OF (max) ASTM D5329 35 40 50 70 90 Resilience at 77 OF, unaged (%) ASTM D5329 20-60 25-65 30-70 35-75 40-80 Flexibility(°C)° ASTM D3111 0 0 0 -11 -28 Tensile adhesion (min, %) ASTM D5329 300 400 400 500 500 Specific gravity (max) ASTM D70 1.25 1.25 1.25 1.25 1.25 Asphalt compatibility ASTM D5329 Pass Pass Pass Pass Pass Sieve test % passing) See note d 100 100 100 100 100 sCold-applied crack treatment material residue collected under ASTM D6943, Method B and sampled under ASTM D140 must comply with the grade specified. bExcept for viscosity, cure each specimen at a temperature of 23 ± 2 °C and a relative humidity of 50 ± 10 percent for 24 ±2 hours before testing. °For the flexibility test, the specimen size must be 6.4 ± 0.2 mm thick by 25 ±0.2 mm wide by 150 ± 0.5 mm long. The test mandrel diameter must be 6.4 ± 0.2 mm. The bend arc must be 180 degrees. The bend rate must be 2 ± 1 seconds. At least 4 of 5 test specimens must pass at the specified test temperature without fracture, crazing, or cracking. dFor hot-applied crack treatment, dilute with toluene and sieve through a no. 8 sieve. For cold- applied crack treatment, sieve the material as-received through a no. 8 sieve. If the manufacturer provides a statement that added components passed the no. 16 sieve before blending, this requirement is void. 37-6.02 MATERIALS 37-6.02A General Reserved 37-6.02B Crack Treatment Material A crack treatment material must comply with the requirements shown in the following table: Crack Treatment Material Quality characteristics Test methodb Requirement Type 1 1 Type 2 1 Type 3 1 Type 4 FType 5 Softening point min, °C ASTM D36 102 96 90 84 84 Cone penetration at 77 °F (max) ASTM D5329 35 40 50 70 90 Resilience at 77 °F, unaged (%) ASTM D5329 20-60 25-65 30-70 35-75 40-80 Flexibility(°C)° ASTM D3111 0 0 0 -11 -28 Tensile adhesion (min, %) ASTM D5329 300 400 400 500 500 Specific gravity (max) ASTM D70 1.25 1.25 1.25 1.25 1.25 Asphalt compatibility ASTM D5329 Pass Pass Pass Pass Pass Sieve test % passing) See note d 100 100 100 100 100 aCold-applied crack treatment material residue collected under ASTM D6943, Method B and sampled under ASTM D140 must comply with the grade specifications. bExcept for viscosity, cure each specimen at a temperature of 23 ± 2 °C and a relative humidity of 50 ± 10 percent for 24± 2 hours before testing. °For the flexibility test, the specimen size must be 6.4 ± 0.2 mm thick by 25± 0.2 mm wide by 150 ± 0.5 mm long. The test mandrel diameter must be 6.4 ± 0.2 mm. The bend arc must be 180 degrees. The bend rate must be 2 ± 1 seconds. At least 4 of 5 test specimens must pass at the specified test temperature without fracture, crazing, or cracking. dFor hot-applied crack treatment, dilute with toluene and sieve through a no. 8 sieve. For cold-applied crack treatment, sieve the material as-received through a no. 8 sieve. If the manufacturer provides a statement that added components passed the no. 16 sieve before blending, this requirement is void. A crack treatment material must be delivered to the job site with the information listed below. If crack treatment material is delivered to the job site in containers, each container must be marked with the following information. 1. Manufacturer's name 2. Production location 3. Brand or trade name 4. Designation 5. Crack treatment trade name 6. Batch or lot number 7. Maximum heating temperature 8. Expiration date for cold application only Hot-applied crack treatment must be delivered to the job site premixed in cardboard containers with meltable inclusion liners or in a fully meltable package. Cold-applied crack treatment must have a minimum shelf life of 3 months from the date of manufacture. 37-6.02C Sand Sand applied to tacky crack treatment material must be clean, free of clay, and comply with the gradation shown in the following table: Sand Gradation Quality characteristic Test method Requirement Gradation (% passing by weight) Sieve size: No. 4 California Test 202 100 No. 50 0-30 No. 200 0-5 37-6.03 CONSTRUCTION Treat cracks from 1/4 to 1 inch in width for the entire length of the crack. Fill or repair cracks wider than 1 inch as ordered. Filling cracks wider than 1 inch is change order work. If treating cracks on a traffic lane adjacent to a shoulder, treat the cracks on the shoulder. For hot-applied crack treatment material, rout cracks or saw cut to form a reservoir. Cracks must be clean and dry before treating. Before treating, blast cracks with oil-free compressed air at a pressure of at least 90 psi. If the pavement temperature is below 40 degrees F or if there is evidence of moisture in the crack, use a hot air lance immediately before applying crack treatment. The hot air lance must not apply flame directly on the pavement. Heat and apply hot-applied crack treatment material under with the manufacturer's instructions. Apply cold-applied crack treatment material with a distributor kettle, a piston, or a diaphragm barrel pump that can deliver from 50 to 75 psi. The application line must have a pressure gauge and a filter. The pressure in the application line must not exceed 20 psi. The pressure gauge must have a regulator. Use a high-pressure hose with a 1/2-inch NPT swivel connection and a dispensing wand. Apply crack treatment with a nozzle inserted into the crack. Fill the crack flush. If after 2 days the crack treatment is more than 1/4 inch below the specified level, the sealant fails, or the crack re-opens, re-treat the crack. Immediately remove crack treatment material that is spilled or deposited on the pavement surface. Before opening to traffic, apply sand or the manufacturer's recommended detackifying agent to tacky crack treatment material on the traveled way. Sweep up excess sand before opening to traffic. 37-6.04 PAYMENT The payment quantity for crack treatment is the length measured in lane miles along the edge of each paved lane parallel to the pavement's centerline. The payment for a lane includes crack treatment of the adjacent shoulder. 37-7-37-10 RESERVED Replace Section 39 with: 39 ASPHALT CONCRETE 39-1 GENERAL 39-1.01 GENERAL Section 39 includes specifications for performing asphalt concrete work. 39-1.02 MATERIALS Not Used 39-1.03 CONSTRUCTION Not Used 39-1.04 PAYMENT Not Used 39-2 HOT MIX ASPHALT 39-2.01 GENERAL 39-2.01A General 39-2.01A(1) Summary Section 39-2.01 includes general specifications for producing and placing hot mix asphalt. HMA includes one or more of the following types: 1. Type A HMA 2. RHMA-G 3. OGFC 4. BWC 5. Minor HMA WMA technologies must be on the Authorized Material List for WMA authorized technologies. For HMA that uses asphalt binder containing crumb rubber modifier, submit a Crumb Rubber Usage Report form monthly and at the end of the project. Wherever reference is made to the following test methods, the year of publication for these test methods is as shown in the following table: Test method Year of publication AASHTO M 17 2011 2015 AASHTO M 323 2013 AASHTO R 30 2002 2015 AASHTO R 35 2014 AASHTO T 27 2014 AASHTO T 49 2014 AASHTO T 59 2013 AASHTO T 96 2002 2010 AASHTO T 164 2014 AASHTO T 176 2008 AASHTO T 209 2012 AASHTO T 269 2014 AASHTO T 275 2007 2012 AASHTO T 283 2014 AASHTO T 304 2011 AASHTO T 305 2014 AASHTO T 308 2010 AASHTO T 312 2014 AASHTO T 324 2014 AASHTO T 329 2013 AASHTO T 335 2009 ASTM D36/D36M 2014E' ASTM D92 2012b ASTM D217 2010 ASTM D297 2013 ASTM D445 2014 ASTM D2007 2011 ASTM D2074 2007 Reapproved 2013 ASTM D2995 1999 (Reapproved 2009) ASTM D4791 2010 ASTM D5329 2009 ASTM D7741/D7741 M 2011 E1 Asphalt Institute MS-2 7th edition (2015) Temporary pavement if Contractor elects to utilize during the phasing of the project shall conform to Section 39-2.07 MINOR HOT MIX ASPHALT 39-2.01A(2) Definitions binder replacement: Binder from RAP expressed as a percent of the total binder in the mix. coarse aggregate: Aggregate retained on a no. 4 sieve. fine aggregate: Aggregate passing a no. 4 sieve. leveling course: Thin layer of HMA used to correct minor variations in the longitudinal and transverse profile of the pavement before placement of other pavement layers. miscellaneous areas: Areas outside the traveled way and shoulders such as: 1. Median areas not including inside shoulders 2. Island areas 3. Sidewalks 4. Gutters 5. Ditches 6. Overside drains 7. Aprons at ends of drainage structures 8. Driveways and driveway approaches processed RAP: RAP that has been fractionated. supplemental fine aggregate: Mineral filler consisting of rock dust, slag dust, hydrated lime, hydraulic cement, or any combination of these and complying with AASHTO M 17. 39-2.01A(3) Submittals 39-2.01A(3)(a) General Reserved 39-2.01A(3)(b) Job Mix Formula 39-2.01A(3)(b)(i) General Except for the HMA to be used in miscellaneous areas and dikes, submit your proposed JMF for each type of HMA to be used. The JMF must be submitted on the Contractor Job Mix Formula Proposal form along with: 1. Mix design documentation on Contractor Hot Mix Asphalt Design Data form dated within 12 months of submittal 2. JMF verification on a Caltrans Hot Mix Asphalt Verification form, if applicable 3. JMF renewal on a Caltrans Job Mix Formula Renewal form, if applicable 4. SIDS for: 4.1. Asphalt binder 4.2. Supplemental fine aggregate except fines from dust collectors 4.3. Antistrip additives The Contractor Hot Mix Asphalt Design Data form must show documentation on aggregate quality. If you cannot submit a Department-verified JMF on a Caltrans Hot Mix Asphalt Verification form dated within 12 months before HMA production, the Engineer verifies the JMF. Submit a new JMF if you change any of the following: 1. Target asphalt binder percentage greater than ±0.2 percent 2. Asphalt binder supplier 3. Combined aggregate gradation 4. Aggregate sources 5. Liquid antistrip producer or dosage 6. Average binder content in a new processed RAP stockpile by more than ±2.00 percent from the average RAP binder content reported on page 4 of your Contractor Hot Mix Asphalt Design Data form 7. Average maximum specific gravity in a new processed RAP stockpile by more than ±0.060 from the average maximum specific gravity value reported on page 4 of your Contractor Hot Mix Asphalt Design Data form 8. Any material in the JMF, except lime supplier and source Allow the Engineer 5 business days from a complete JMF submittal for document review of the aggregate qualities, mix design, and JMF. The Engineer notifies you if the proposed JMF submittal is accepted. If your JMF fails verification testing, submit an adjusted JMF based on your testing. The adjusted JMF must include a new Contractor Job Mix Formula Proposal form, Contractor Hot Mix Asphalt Design Data form, and the results of the failed verification testing. You may submit an adjusted aggregate gradation TV on a Contractor Job Mix Formula Proposal form before verification testing. Aggregate gradation TV must be within the TV limits specified. 39-2.01A(3)(b)(ii) Job Mix Formula Renewal You may request a JMF renewal by submitting: 1. Proposed JMF on a Contractor Job Mix Formula Proposal form 2. Previously verified JMF documented on a Caltrans Hot Mix Asphalt Verification form dated within 12 months 3. Mix design documentation on a Contractor Hot Mix Asphalt Design Data form used for the previously verified JMF 39-2.01A(3)(b)(iii) Job Mix Formula Modification For an authorized JMF, submit a modified JMF if you change any of the following: 1. Asphalt binder supplier 2. Liquid antistrip producer 3. Liquid antistrip dosage You may change any of the above items only once during the Contract. Submit your modified JMF request at least 15 days before production. Each modified JMF submittal must include: 1. Proposed modified JMF on Contractor Job Mix Formula Proposal form, marked Modified. 2. Mix design records on Contractor Hot Mix Asphalt Design Data form for the authorized JMF to be modified. 3. JMF verification on Hot Mix Asphalt Verification form for the authorized JMF to be modified. 4. Test results for the modified JMF in compliance with the mix design specifications. Perform tests at the mix design OBC as shown on the Contractor Asphalt Mix Design Data form. With an accepted modified JMF submittal, the Engineer verifies each modified JMF within 10 days of receiving all verification samples. 39-2.01A(3)(c) Quality Control Plan With your proposed JMF submittal, submit a QC plan for HMA. The QC plan must describe the organization and procedures for: 1. Controlling HMA quality characteristics 2. Taking samples, including sampling locations 3. Establishing, implementing, and maintaining QC 4. Determining when corrective actions are needed 5. Implementing corrective actions 6. Using methods and materials for backfilling core locations The QC plan must address the elements affecting HMA quality, including: 1. Aggregates 2. Asphalt binder 3. Additives 4. Production 5. Paving The QC plan must include aggregate QC sampling and testing during lime treatment. The QC Plan must include action and suspension limits and details of corrective action to be taken if any process is outside of those limits. Suspension limits must not exceed specified acceptance criteria. The QC plan must describe how test results will be submitted including times for sampling and testing for each quality characteristic. Allow 5 business days for review of the QC plan. If you change QC procedures, personnel, or sample testing locations, submit a QC plan supplement before implementing the proposed change. Allow 3 business days for review of the QC plan supplement. 39-2.01A(3)(d) Test Results For mix design, JMF verification, production start-up, and each 10,000 tons, submit AASHTO T 283 and AASHTO T 324 (Modified)test results to the Engineer. Submit all QC test results, except AASHTO T 283 and AASHTO T 324 (Modified), within 3 business days of a request. Submit AASHTO T 283 QC tests within 15 days of sampling. For tests performed under AASHTO T 324 (Modified), submit test data and 1 tested sample set within 5 business days of sampling. If coarse and fine durability index tests are required, submit test results within 2 business days of sampling. If a tapered notched wedge is used, submit compaction test result values within 24 hours of testing. 39-2.01A(3)(e) Reserved 39-2.01A(3)(f) Liquid Antistrip Treatment If liquid antistrip treatment is used, submit the following with your proposed JMF submittal: 1. One 1 pt sample 2. Infrared analysis, including copy of absorption spectra 3. Certified copy of test results 4. Certificate of compliance for each liquid antistrip shipment. On each certificate of compliance, include: 4.1. Your signature and printed name 4.2. Shipment number 4.3. Material type 4.4. Material specific gravity 4.5. Refinery 4.6. Consignee 4.7. Destination 4.8. Quantity 4.9. Contact or purchase order number 4.10. Shipment date 5. Proposed proportions for the liquid antistrip For each delivery of liquid antistrip to the HMA production plant, submit a 1 pt sample to the Engineer. Submit shipping documents. Label each liquid antistrip sampling container with: 1. Liquid antistrip type 2. Application rate 3. Sample date 4. Contract number At the end of each day's production shift, submit production data in electronic media. Present data on electronic media in a tab delimited format. Use line feed carriage return with 1 separate record per line for each production data set. Allow enough fields for the specified data. Include data titles at least once per report. For each HMA mixing plant type, submit the following information in the order specified: 1. For batch plant mixing: 1.1. Production date 1.2. Time of batch completion 1.3. Mix size and type 1.4. Each ingredient's weight 1.5. Asphalt binder content as a percentage of the total weight of mix 1.6. Liquid antistrip content as a percentage of the asphalt binder weight 2. For continuous mixing plant: 2.1. Production date 2.2. Data capture time 2.3. Mix size and type 2.4. Flow rate of wet aggregate collected directly from the aggregate weigh belt 2.5. Aggregate moisture content as a percentage of the dry aggregate weight 2.6. Flow rate of asphalt binder collected from the asphalt binder meter 2.7. Flow rate of liquid antistrip collected from the liquid antistrip meter 2.8. Asphalt binder content as a percentage of the total weight of mix calculated from: 2.8.1. Aggregate weigh belt output 2.8.2. Aggregate moisture input 2.8.3. Asphalt binder meter output 2.9. Liquid antistrip content as a percentage of the asphalt binder weight calculated from: 2.9.1. Asphalt binder meter output 2.9.2. Liquid antistrip meter output 39-2.01A(3)(g) Lime Treatment If aggregate lime treatment is used, submit the following with your proposed JMF submittal and each time you produce lime-treated aggregate: 1. Exact lime proportions for fine and coarse virgin aggregates 2. If marination is required, the averaged aggregate quality test results within 24 hours of sampling 3. For dry lime aggregate treatment, a treatment data log from the dry lime and aggregate proportioning device in the following order: 3.1. Treatment date 3.2. Time of day the data is captured 3.3. Aggregate size being treated 3.4. HMA type and mix aggregate size 3.5. Wet aggregate flow rate collected directly from the aggregate weigh belt 3.6. Aggregate moisture content, expressed as a percentage of the dry aggregate weight 3.7. Flow rate of dry aggregate calculated from the flow rate of wet aggregate 3.8. Dry lime flow rate 3.9. Lime ratio from the authorized JMF for each aggregate size being treated 3.10. Lime ratio from the authorized JMF for the combined aggregates 3.11. Actual lime ratio calculated from the aggregate weigh belt output, aggregate moisture input, and dry lime meter output, expressed as a percentage of the dry aggregate weight 3.12. Calculated difference between the authorized lime ratio and the actual lime ratio 4. For lime slurry aggregate treatment, a treatment data log from the slurry proportioning device in the following order: 4.1. Treatment date 4.2. Time of day the data is captured 4.3. Aggregate size being treated 4.4. Wet aggregate flow rate collected directly from the aggregate weigh belt 4.5. Moisture content of the aggregate just before treatment, expressed as a percentage of the dry aggregate weight 4.6. Dry aggregate flow rate calculated from the wet aggregate flow rate 4.7. Lime slurry flow rate measured by the slurry meter 4.8. Dry lime flow rate calculated from the slurry meter output 4.9. Authorized lime ratio for each aggregate size being treated 4.10. Actual lime ratio calculated from the aggregate weigh belt and slurry meter output, expressed as a percentage of the dry aggregate weight 4.11. Calculated difference between the authorized lime ratio and actual lime ratio 4.12. Dry lime and water proportions at the slurry treatment time Each day during lime treatment, submit the treatment data log on electronic media in tab delimited format. Each continuous treatment data set must be a separate record using a line feed carriage return to present the specified data on 1 line. The reported data must include data titles at least once per report. 39-2.01A(3)(h) Warm Mix Asphalt Technology If a WMA technology is used, submit the following with your proposed JMF submittal: 1. SIDS for the WMA technology 2. For water injection foam technology: 2.1. Name of technology 2.2. Proposed foaming water content 2.3. Proposed HMA production temperature range 2.4. Certification from binder supplier stating no antifoaming agent is used 3. For additive technology: 3.1. Name of technology 3.2. Percent admixture by weight of binder and percent admixture by total weight of HMA as recommended by the manufacturer 3.3. Methodology for inclusion of admixture in laboratory-produced HMA 3.4. Proposed HMA production temperature range Collect and hold data for the duration of the Contract and submit the electronic media daily. The snapshot of production data must include the following: 1. Production date 2. Production location 3. Time of day the data is captured 4. HMA mix type being produced and target binder rate 5. HMA additive type, brand, and target rate 6. Temperature of the binder and HMA mixture 7. For a continuous mixing plant, the rate of flow of the dry aggregate calculated from the wet aggregate flow rate as determined by the conveyor scale 8. For a continuous mixing plant, the rate of flow of the asphalt meter 9. For a continuous mixing plant, the rate of flow of HMA additive meter 10. For batch plant mixing, actual batch weights of all ingredients 11. Dry aggregate to binder ratio calculated from metered ingredient output 12. Dry aggregate to HMA additive ratio calculated from metered output At the end of each day's production shift, submit electronic media from the HMA plant process controller. Present data on electronic media in comma-separated values or tab-separated values format. The captured data for the ingredients represented by the production snapshot must have allowances for sufficient fields to satisfy the amount of data required by these specifications and include data titles at least once per report. 39-2.01A(3)(i) Reserved 39-2.01A(3)(m)-39-2.01A(3)(o) Reserved 39-2.01A(4) Quality Assurance 39-2.01A(4)(a) General AASHTO T 324 (Modified) is AASHTO T 324 with the following parameters: 1. Target air voids must equal 7.0 ± 1.0 percent 2. Specimen height must be 60 ± 1 mm 3. Number of test specimens must be 4 to run 2 tests 4. Do not average the 2 test results 5. Test specimen must be a 150 mm gyratory compacted specimen 6. Test temperature must be set at: 6.1. 113 ± 2 degrees F for PG 58 6.2. 122 ± 2 degrees F for PG 64 6.3. 131 ± 2 degrees F for PG 70 and above 7. Measurements for impression must be taken at every 100 passes along the total length of the sample 8. Inflection point is the number of wheel passes at the intersection of the creep slope and the stripping slope at maximum rut depth 9. Testing shut off must be set at 25,000 passes 10. Submersion time for samples must not exceed 4 hours Take samples under California Test 125. If a WMA technology is used, a technical representative for the WMA technology must attend the preconstruction meeting. 39-2.01A(4)(b) Job Mix Formula Verification The Engineer verifies the JMF from samples taken from HMA produced by the plant to be used. The production set point at the plant must be within ±0.2 from the asphalt binder percentage TV shown in your Contractor Job Mix Formula Proposal form. Notify the Engineer at least 2 business days before sampling materials. Samples may be taken from a different project including a non-Department project if you make arrangements for the Engineer to be present during sampling. In the Engineer's presence and from the same production run, take samples of: 1. Aggregates. Coarse, fine, and supplemental fine aggregates must be taken from the combined cold- feed belt or the hot bins. If lime treatment is required, samples must be taken from individual stockpiles before lime treatment. Samples must be at least 120 lb for each coarse aggregate, 80 lb for each fine aggregate, and 10 lb for each type of supplemental fine aggregate. For hot-bin samples, the Department combines these aggregate samples to verify the TV submitted on a Contractor Job Mix Formula Proposal form. 2. Asphalt binder. Take at least four 1 qt samples. Each sample must be in a cylindrical-shaped can with an open top and friction lid. If the asphalt binder is modified or rubberized, the asphalt binder must be sampled with the components blended in the proportions to be used. 3. RAP. Samples must be at least 50 lb from each fractionated stockpile used or 100 lb from the belt. 4. Plant-produced HMA. The HMA samples must be at least 250 lb. For aggregate, RAP, and HMA, split the samples into at least 4 parts and label their containers. Submit 3 parts and keep 1 part. After acceptance of the JMF submittal, the Engineer verifies each proposed JMF within 20 days of receiving all verification samples. For JMF verification, the Engineer tests the following for compliance with the specifications: 1. Aggregate quality 2. Aggregate gradation 3. Voids in mineral aggregate on laboratory-produced HMA 4. HMA quality characteristics for Department acceptance To verify the HMA for air voids, voids in mineral aggregate, and dust proportion, the Engineer uses an average of 3 briquettes. The Engineer tests plant-produced material. If the Engineer verifies the JMF, the Engineer furnishes you a Hot Mix Asphalt Verification form. If the Engineer's test results on plant-produced samples do not show compliance with the specifications, the Engineer notifies you. Adjust your JMF based on your testing unless the Engineer authorizes reverification without adjustments. JMF adjustments may include a change in: 1. Asphalt binder content TV up to ±0.20 percent from the OBC value submitted on the Contractor Hot Mix Asphalt Design Data form 2. Aggregate gradation TV within the TV limits specified in the aggregate gradation table You may adjust the JMF only once due to a failed verification test. For each HMA type and aggregate size specified, the Engineer verifies up to 2 proposed JMF submittals including a JMF adjusted after verification failure. If you submit more than 2 JMFs for each type of HMA and aggregate size, the Engineer deducts $3,000 from payments for each verification exceeding this limit. This deduction does not apply to verifications initiated by the Engineer or if a JMF expires while HMA production is stopped longer than 30 days. A verified JMF is valid for 12 months. 39-2.01A(4)(c) Job Mix Formula Authorization You may start HMA production if: 1. Engineer's review of the JMF shows compliance with the specifications 2. Department has verified the JMF within 12 months before HMA production 3. Engineer authorizes the verified JMF 39-2.01A(4)(d) Job Mix Formula Renewal For a JMF renewal and upon request, in the Engineer's presence and from the same production run, take samples of: 1. Aggregates. Coarse, fine, and supplemental fine aggregates must be taken from the combined cold- feed belt or the hot bins. If lime treatment is required, samples must be taken from individual stockpiles before lime treatment. Samples must be at least 120 lb for each coarse aggregate, 80 lb for each fine aggregate, and 10 lb for each type of supplemental fines. For hot-bin samples, the Department combines these aggregate samples to verify the TV submitted on a Contractor Job Mix Formula Proposal form. 2. Asphalt binder. Take at least four 1 qt samples. Each sample must be in a cylindrical-shaped can with an open top and friction lid. If the asphalt binder is modified or rubberized, the asphalt binder must be sampled with the components blended in the proportions to be used. 3. RAP. Samples must be at least 50 lb from each fractionated stockpile. 4. Plant-produced HMA. The HMA samples must be at least 250 lb. Notify the Engineer at least 2 business days before sampling materials. For aggregate, RAP, and HMA, split samples into at least 4 parts. Submit 3 parts and use 1 part for your testing. Allow the Engineer 5 business days from a complete JMF reverification submittal for document review of the aggregate qualities, mix design, and JMF. The most recent aggregate quality test results within the past 12 months may be used for verification of JMF renewal or upon request, the Engineer may perform aggregate quality tests for verification of JMF renewal. The Engineer verifies the JMF for renewal under section 39-2.01A(4)(b)except: 1. Engineer keeps the samples until you provide test results for your part on a Contractor Job Mix Formula Renewal form. 2. Department tests samples of materials obtained from the HMA production unit after you submit test results that comply with the mix design specifications. 3. After completion of the JMF verification renewal document review, the Engineer verifies each proposed JMF within 20 days of receiving the verification renewal samples and the complete Contractor Job Mix Formula Renewal form. 4. You may not adjust the JMF due to a failed verification. 5. For each HMA type and aggregate gradation specified, the Engineer verifies at no cost to you 1 proposed JMF renewal within a 12-month period. If the Engineer verifies the JMF renewal, the Engineer furnishes you a Hot Mix Asphalt Verification form. The Hot Mix Asphalt Verification form is valid for 12 months. 39-2.01A(4)(e) Job Mix Formula Modification The Engineer verifies the modified JMF after the modified JMF HMA is placed and verification samples are taken within the first 750 tons. The Engineer tests verification samples for compliance with: 1. Hamburg wheel track mix design specifications 2. Air void content 3. Voids in mineral aggregate on plant-produced HMA mix design specifications 4. Dust proportion mix design specifications The Engineer may test for moisture susceptibility for compliance with the mix design specifications. If the modified JMF is verified, the Engineer revises your Hot Mix Asphalt Verification form to include the new asphalt binder source, new liquid antistrip producer, or new liquid antistrip dosage. Your revised form will have the same expiration date as the original form. If a modified JMF is not verified, stop production and any HMA placed using the modified JMF is rejected. The Engineer deducts $2,000 from payments for each JMF modification. 39-2.01A(4)(f) Certifications 39-2.01A(4)(f)(1) General Laboratories testing aggregate and HMA qualities used to prepare the mix design and JMF must be qualified under AASHTO Re:Source program and the Caltrans Independent Assurance Program. 39-2.01A(4)(f)(ii) Hot Mix Asphalt Plants Before production, the HMA plant must have a current qualification under the Caltrans Material Plant Quality Program. 39-2.01A(4)(f)(iii)-39-2.01A(4)(f)(v) Reserved 39-2.01A(4)(g) Reserved 39-2.01A(4)(h) Quality Control 39-2.01A(4)(h)(i) General QC test results must comply with the specifications for Department acceptance. Prepare 3 briquettes for air voids content and voids in mineral aggregate determination. Report the average of 3 tests. Except for smoothness, if 2 consecutive QC test results or any 3 QC test results for 1 day's production do not comply with the materials specifications: 1. Stop HMA production 2. Notify the Engineer 3. Take corrective action 4. Demonstrate compliance with the specifications before resuming production and placement For QC tests performed under AASHTO T 27, results are considered 1 QC test regardless of number of sieves out of compliance. Do not resume production and placement until the Engineer authorizes your corrective action proposal. You are not entitled to compensation for the suspension of work resulting from noncompliance with quality control requirements, including those identified in the QC Plan. 39-2.01A(4)(h)(ii) Reserved 39-2.01A(4)(h)(iii) Aggregates 39-2.01A(4)(h)(iii)(A) General Reserved 39-2.01A(4)(h)(iii)(B) Aggregate Lime Treatments If lime treatment is required, sample coarse and fine aggregates from individual stockpiles before lime treatment. Combine aggregate in the JMF proportions. Test the aggregates under the test methods and frequencies shown in the following table: Aggregate Quality Control Durin Lime Treatment Quality characteristic Test method Minimum sampling and testing frequency Sande uivalenta,b AASHTO T 176 1 per 750 tons of untreated aggregate Percent of crushed particles AASHTO T 335 Los Angeles Rattler AASHTO T 96 Fine aggregate angularity AASHTO T 304, Method A 1 per 10,000 tons or 2 per project whichever is greater Flat and elongated particles ASTM D4791 Fine durability index AASHTO T 210 aReport test results as the average of 3 tests from a single sample. bUse of a sand reading indicator is required as shown in AASHTO T 176, Figure 1. Sections 4.7, "Manual Shaker," 7.1.2, "Alternate Method No. 2," 8.4.2, "Manual Shaker Method, and 8.4.3, "Hand Method," do not apply. Prepare the stock solution as specified in section 4.8.1, "Stock solution with formaldehyde," except omit the addition of formaldehyde. For lime slurry aggregate treatment, determine the aggregate moisture content at least once every 2 hours of treatment. Calculate moisture content under AASHTO T 255 and report it as a percent of dry aggregate weight. Use the moisture content calculations as a set point for the proportioning process controller. The device controlling lime and aggregate proportioning must produce a treatment data log. The log must consist of a series of data sets captured at 10-minute intervals throughout daily treatment. The data must be a treatment activity register and not a summation. The material represented by a data set is the quantity produced 5 minutes before and 5 minutes after the capture time. Collected data must be stored by the controller for the duration of the Contract. If 3 consecutive sets of recorded treatment data indicate a deviation of more than 0.2 percent above or below the lime ratio in the authorized JMF, stop treatment and take corrective action. If a set of recorded treatment data indicates a deviation of more than 0.4 percent above or below the lime ratio in the authorized JMF, stop treatment and do not use the material represented by that set of data in H MA. If 20 percent or more of the total daily treatment indicates a deviation of more than 0.2 percent above or below the lime ratio in the authorized JMF, stop treatment and do not use that day's treated aggregate in H MA. The Engineer may order you to stop aggregate treatment activities for any of following: 1. You fail to submit treatment data log. 2. You fail to submit aggregate QC data for marinated aggregate. 3. You submit incomplete, untimely, or incorrectly formatted data. 4. You do not take corrective actions. 5. You take late or unsuccessful corrective actions. 6. You do not stop treatment when proportioning tolerances are exceeded. 7. You use malfunctioning or failed proportioning devices. If you stop treatment for noncompliance, notify the Engineer of any corrective actions taken and conduct a successful 20-minute test run before resuming treatment. 39-2.01A(4)(h)(iv) Liquid Antistrip Treatment For continuous mixing or batch-plant mixing, sample asphalt binder before adding liquid antistrip. For continuous mixing, sample the combined asphalt binder and liquid antistrip after the static mixer. 39-2.01A(4)(h)(v) Production Start-up Evaluation You and the Engineer evaluate HMA production and placement at production start-up. Within the first 750 tons produced on the 1st day of HMA production, in the Engineer's presence, and from the same production run, take samples of: 1. Aggregates. Samples must be at least 120 lb for each coarse aggregate, 80 lb for each fine aggregate, and 10 lb for each type of supplemental fines. For hot-bin samples, the Department combines these aggregate samples. 2. Asphalt binder. Take at least four 1 qt samples. Each sample must be in a cylindrical-shaped can with an open top and friction lid. If the asphalt binder is modified or rubberized, the asphalt binder must be sampled with the components blended in the proportions to be used. 3. RAP. Samples must be at least 50 lb.. 4. HMA. The HMA samples must be at least 250 lb. Sample aggregates from the combined cold-feed belt or hot bin. Take RAP samples from the RAP system. For aggregates, RAP, and HMA, split the samples into at least 4 parts and label their containers. Submit 3 parts and keep 1 part. You and the Engineer must test the samples and report test results, except for AASHTO T 324 (Modified) and AASHTO T 283 test results, within 5 business days of sampling. For AASHTO T 324 (Modified) and AASHTO T 283 test results, report test results within 15 days of sampling. If you proceed before receipt of the test results, the Engineer may consider the HMA placed to be represented by these test results. 39-2.01A(4)(h)(vi) RESERVED 39-2.01A(4)(h)(vii) RESERVED 39-2.01A(4)(h)(viii) Density Cores Except for HMA pavement placed using method compaction, take 4-or 6-inch diameter density cores at least once every 5 business days. Take 1 density core for every 250 tons of HMA from random locations the Engineer selects. Take density cores in the Engineer's presence, and backfill and compact holes with authorized material. Before submitting a density core, mark it with the density core's location and place it in a protective container. If a density core is damaged, replace it with a density core taken within 1 foot longitudinally from the original density core location. Relocate any density core located within 1 foot of a rumble strip to 1 foot transversely away from the rumble strip. For a tapered notched wedge joint, take 4-or 6-inch diameter density cores 6 inches from the upper vertical notch of the completed longitudinal joint for every 3,000 feet at locations selected by the Engineer. Take cores after the adjacent lane is placed and before opening the pavement to traffic. Take cores in the presence of the Engineer, and backfill and compact holes with authorized material. Before submitting a density core, mark it with the core's location, and place it in a protective container. 39-2.01A(4)(h)(ix) Pavement Smoothness For HMA pavement within 3 feet from and parallel to the construction joint formed between curbs, gutters, or existing pavement, test pavement smoothness using a 12-foot straightedge. 39-2.01A(4)(h)(x) Reserved 39-2.01A(4)(i) Department Acceptance 39-2.01A(4)(i)(i) General The Department tests treated aggregate for acceptance before lime treatment except for gradation. The Engineer takes HMA samples for AASHTO T 283 and AASHTO T 324 (Modified)from any of the following locations: 1. Plant 2. Truck 3. Windrow The Engineer takes HMA samples for all other tests from any of the following locations: 1. Plant 2. Truck 3. Windrow 4. Mat behind the paver To obtain workability of the HMA sample for splitting, the Engineer reheats each sample of HMA mixture not more than 2 cycles. Each reheat cycle is performed by placing the loose mixture in a mechanical forced-draft oven for 2 hours or less after the sample reaches 140 degrees F. The Engineer splits samples and provides you with a part if you request this. No single aggregate or HMA test result may represent more than 750 tons or one day's production, whichever is less, except AASHTO T 283 and AASHTO T 324 (Modified). Except for smoothness, if 2 consecutive Department acceptance test results or any 3 Department acceptance test results for 1 day's production do not comply with the specifications: 1. Stop HMA production 2. Take corrective action 3. Demonstrate compliance with the specifications before resuming production and placement For Department acceptance tests performed under AASHTO T 27, results are considered 1 Department acceptance test regardless of the number of sieves out of compliance. The Engineer accepts HMA based on: 1. Authorized JMF 2. Authorized QC plan 3. Asphalt binder compliance 4. Asphalt emulsion compliance 5. Visual inspection 6. Pavement smoothness 39-2.01A(4)(i)(ii) In-Place Density Except for HMA pavement placed using method compaction, the Engineer tests the density core you take from each 250 tons of HMA. The Engineer determines the percent of theoretical maximum density for each density core by determining the density core's density and dividing by the theoretical maximum density. Density cores must be taken from the final layer, cored through the entire pavement thickness shown. Where OGFC is required, take the density cores before placing OGFC. If the percent of theoretical maximum density does not comply with the specifications, the Engineer may accept the HMA and take a payment deduction as shown in the following table: Reduced Payment Factors for Percent of Maximum Theoretical Density HMA percent of Reduced payment HMA percent of Reduced payment maximum theoretical factor maximum theoretical factor density density 91.0 0.0000 97.0 0.0000 90.9 0.0125 97.1 0.0125 90.8 0.0250 97.2 0.0250 90.7 0.0375 97.3 0.0375 90.6 0.0500 97.4 0.0500 90.5 0.0625 97.5 0.0625 90.4 0.0750 97.6 0.0750 90.3 0.0875 97.7 0.0875 90.2 0.1000 97.8 0.1000 90.1 0.1125 97.9 0.1125 90.0 0.1250 98.0 0.1250 89.9 0.1375 98.1 0.1375 89.8 0.1500 98.2 0.1500 89.7 0.1625 98.3 0.1625 89.6 0.1750 98.4 0.1750 89.5 0.1875 98.5 0.1875 89.4 0.2000 98.6 0.2000 89.3 0.2125 98.7 0.2125 89.2 0.2250 98.8 0.2250 89.1 0.2375 98.9 0.2375 89.0 0.2500 99.0 0.2500 <89.0 Remove and replace >99.0 Remove and replace For acceptance of a completed tapered notched wedge joint, the Engineer determines density from cores you take every 3,000 feet. 39-2.01A(4)(i)(iii) Pavement Smoothness For areas that require pavement smoothness determined using an inertial profiler, the pavement surface must: 1. Have no areas of localized roughness with an International Roughness Index greater than 160 in/mi 2. Comply with the Mean Roughness Index requirements shown in the following table for a 0.1 mile section: HMA Pavement Smoothness Acceptance Criteria HMA thickness Mean Roughness Index requirement > 0.20 foot 60 in/mi or less <_ 0.20 foot 75 in/mi or less Note: These requirements do not apply to the OGFC surface. Smoothness requirements for OGFC are specified in section 39- 2.04A(4)(c)(iii). The final surface of HMA must comply with the Mean Roughness Index requirements before placing OGFC. Correct pavement to the Mean Roughness Index specifications. Areas of localized roughness greater than 160 in/mi must be corrected regardless of the Mean Roughness Index values of a 0.1-mile section. 39-2.01A(4)(i)(iv) Dispute Resolution You and the Engineer must work together to avoid potential conflicts and to resolve disputes regarding test result discrepancies. Notify the Engineer within 5 business days of receiving a test result if you dispute the test result. If you or the Engineer dispute the other's test results, submit your test results and copies of paperwork including worksheets used to determine the disputed test results. An independent third party performs referee testing. Before the third party participates in a dispute resolution, it must be qualified under AASHTO Materials Reference Laboratory program, and the Caltrans' Independent Assurance Program. The independent third party must have no prior direct involvement with this Contract. By mutual agreement, the independent third party is chosen from: 1. Caltrans laboratory in a district or region not in the district or region the project is located 2. Transportation Laboratory 3. Laboratory not currently employed by you or your HMA producer If the Department's portion of the split QC samples or acceptance samples are not available, the independent third party uses any available material representing the disputed HMA for evaluation. For a dispute involving JMF verification, the independent third party performs referee testing as specified in the 5th paragraph of section 39-2.01A(4)(b). If the independent third party determines the Department's test results are valid, the Engineer deducts the independent third party's testing costs from payments. If the independent third party determines your test results are valid, the Department pays the independent third party's testing costs. 39-2.01 B Materials 39-2.01B(1) General Reserved 39-2.01 B(2) Mix Design 39-2.01 B(2)(a) General The HMA mix design must comply with the Superpave HMA mix design as described in MS-2 Asphalt Mix Design Methods by the Asphalt Institute. The Contractor Hot Mix Asphalt Design Data form must show documentation on aggregate quality. 39-2.01 B(2)(b) Hot Mix Asphalt Treatments If the proposed JMF indicates that the aggregate is being treated with dry lime or lime slurry with marination, or the HMA with liquid antistrip, then testing the untreated aggregate under AASHTO T 283 and AASHTO T 324 is not required. If HMA treatment is required or being used by the Contractor, determine the plasticity index of the aggregate blend under California Test 204. Do not use an aggregate blend with a plasticity index greater than 10. If the plasticity index is from 4 to 10, treat the aggregate blend with dry lime with marination or lime slurry with marination. If the plasticity index is less than 4, treat the aggregate blend with dry lime or lime slurry with marination, or treat the HMA with liquid antistrip. 39-2.01 B(2)(c) Warm Mix Asphalt Technology For HMA with WMA additive technology, produce HMA mix samples for your mix design using your methodology for inclusion of WMA admixture in laboratory-produced HMA. Cure the samples in a forced- air draft oven at 275 degrees F for 4 hours ± 10 minutes. For WMA water injection foam technology, the use of foamed asphalt for mix design is not required. 39-2.01 B(3) Asphalt Binder Asphalt binder must comply with section 92. For a leveling course, the grade of asphalt binder for the HMA must be PG 64-10 or PG 64-16. 39-2.01 B(4) Aggregates 39-2.01 B(4)(a) General Aggregates must be clean and free from deleterious substances. The aggregates for a leveling course must comply with the grading specifications for Type A HMA in section 39-2.02B(4)(b). 39-2.01 B(4)(b) Aggregate Gradations Aggregate gradation must be determined before the addition of asphalt binder and must include supplemental fine aggregates. Test for aggregate gradation under AASHTO T 27. Do not wash the coarse aggregate. Wash the fine aggregate only. Use a mechanical sieve shaker. Aggregate shaking time must not exceed 10 minutes for each coarse and fine aggregate portion. Choose a TV within the TV limits shown in the tables titles "Aggregate Gradation for Type A HMA (Percentage Passing)". Gradations are based on nominal maximum aggregate size. 39-2.01 B(4)(c) Aggregate Lime Treatments 39-2.01 B(4)(c)(i) General If aggregate lime treatment is required as specified in section 39-2.01 13(2)(b), the virgin aggregate must comply with the aggregate quality specifications. Lime for treating aggregate must comply with section 24-2.02. Water for lime treatment of aggregate with lime slurry must comply with section 24-1.02B. Notify the Engineer at least 24 hours before the start of aggregate treatment. Do not treat RAP. The lime ratio is the pounds of dry lime per 100 lb of dry virgin aggregate expressed as a percentage. Water content of slurry or untreated aggregate must not affect the lime ratio. Coarse and fine aggregate fractions must have the lime ratio ranges shown in the following table: Aggregate fractions Lime ratio percent Coarse 0.4-1.0 Fine 1.5-2.0 Combined 0.8-1.5 The lime ratio for fine and coarse aggregate must be within ±0.2 percent of the lime ratio in the accepted JMF. The lime ratio must be within ±0.2 percent of the authorized lime ratio when you combine the individual aggregate sizes in the JMF proportions. The lime ratio must be determined before the addition of RAP. If marination is required, marinate treated aggregate in stockpiles from 24 hours to 60 days before using in HMA. Do not use aggregate marinated longer than 60 days. Treated aggregate must not have lime balls or clods. 39-2.01 B(4)(c)(ii) Dry Lime If marination is required: 1. Treat and marinate coarse and fine aggregates separately 2. Treat the aggregate and stockpile for marination only once 3. Treat the aggregate separately from HMA production Proportion dry lime by weight with an automatic continuous proportioning system. If you use a batch-type proportioning system for HMA production, control proportioning in compliance with the specifications for continuous mixing plants. Use a separate dry lime aggregate treatment system for HMA batch mixing including: 1. Pugmill mixer 2. Controller 3. Weigh belt for the lime 4. Weigh belt for the aggregate If a continuous mixing plant for HMA production without lime-marinated aggregates is used, use a controller that measures the blended aggregate weight after any additional water is added to the mixture. The controller must determine the quantity of lime added to the aggregate from the aggregate weigh belt input in connection with the manually input total aggregate moisture, the manually input target lime content, and the lime proportioning system output. Use a continuous aggregate weigh belt and pugmill mixer for lime treatment in addition to the weigh belt for the aggregate proportioning to asphalt binder in the HMA plant. If you use a water meter for moisture control for lime treatment, the meter must comply with Caltrans' MPQP manual. When mixing dry lime with aggregate, the aggregate moisture content must ensure complete lime coating. The aggregate moisture content must not cause aggregate to be lost between the point of weighing the combined aggregate continuous stream and the dryer. Add water to the aggregate for mixing and coating before dry lime addition. Immediately before mixing lime with aggregate, water must not visibly separate from the aggregate. Mix aggregate, water, and dry lime with a continuous pugmill mixer with twin shafts. Immediately before mixing lime with aggregate, water must not visibly separate from the aggregate. Store dry lime in a uniform and free-flowing condition. Introduce dry lime to the pugmill in a continuous process. The introduction must occur after the aggregate cold feed and before the point of proportioning across a weigh belt and the aggregate dryer. Prevent loss of dry lime. The pugmill must be equipped with paddles arranged to provide sufficient mixing action and mixture movement. The pugmill must produce a homogeneous mixture of uniformly coated aggregates at mixer discharge. If the aggregate treatment process is stopped longer than 1 hour, clean the equipment of partially treated aggregate and lime. Aggregate must be completely treated before introduction into the mixing drum. 39-2.01 B(4)(c)(iii) Lime Slurry For lime slurry aggregate treatment, treat aggregate separate from HMA production. Stockpile and marinate the aggregate. Proportion lime and water with a continuous or batch mixing system. Add lime to the aggregate as slurry consisting of mixed dry lime and water at a ratio of 1 part lime to from 2 to 3 parts water by weight. The slurry must completely coat the aggregate. Immediately before mixing lime slurry with the aggregate, water must not visibly separate from the aggregate. Proportion lime slurry and aggregate by weight in a continuous process. 39-2.01B(5) Liquid Antistrip Treatment Liquid antistrip must be from 0.25 to 1.0 percent by weight of asphalt binder. Do not use liquid antistrip as a substitute for asphalt binder. Liquid antistrip total amine value must be 325 minimum when tested under ASTM D2074. Use only 1 liquid antistrip type or brand at a time. Do not mix liquid antistrip types or brands. Store and mix liquid antistrip under the manufacturer's instructions. 39-2.01 B(6)-39-2.01 B(7) Reserved 39-2.01 B(8) Hot Mix Asphalt Production 39-2.01 B(8)(a) General Do not start HMA production before verification and authorization of JMF. The HMA plant must have a current qualification under Caltrans' Material Plant Quality Program. Weighing and metering devices used for the production of HMA modified with additives must comply with Caltrans' MPQP. If a loss-in-weight meter is used for dry HMA additive, the meter must have an automatic and integral material delivery control system for the refill cycle. Calibrate the loss-in-weight meter by: 1. Including at least 1 complete system refill cycle during each calibration test run 2. Operating the device in a normal run mode for 10 minutes immediately before starting the calibration process 3. Isolating the scale system within the loss-in-weight feeder from surrounding vibration 4. Checking the scale system within the loss-in-weight feeder for accuracy before and after the calibration process and daily during mix production 5. Using a minimum 15 minute or minimum 250 lb test run size for a dry ingredient delivery rate of less than 1 ton per hour. 6. Complying with the limits of Table B, "Conveyor Scale Testing Extremes," in Caltrans' MPQP Proportion aggregate by hot or cold-feed control. Aggregate temperature must not be more than 375 degrees F when mixed with the asphalt binder. Asphalt binder temperature must be from 275 to 375 degrees F when mixed with aggregate. Mix HMA ingredients into a homogeneous mixture of coated aggregates. HMA must be produced at the temperatures shown in the following table: HMA Production Temperatures HMA compaction Temperature °F HMA Density based <_ 325 Method 305-325 HMA with WMA technology Density based 240-325 Method 260-325 If you stop production for longer than 30 days, a production start-up evaluation is required. 39-2.01 B(8)(b) Liquid Antistrip If 3 consecutive sets of recorded production data show that the actual delivered liquid antistrip weight is more than ±1 percent of the authorized mix design liquid antistrip weight, stop production and take corrective action. If a set of recorded production data shows that the actual delivered liquid antistrip weight is more than ±2 percent of the authorized mix design liquid antistrip weight, stop production. If the liquid antistrip weight exceeds 1.2 percent of the asphalt binder weight, do not use the HMA represented by that data. The continuous mixing plant controller proportioning the HMA must produce a production data log. The log must consist of a series of data sets captured at 10-minute intervals throughout daily production. The data must be a production activity register and not a summation. The material represented by the data is the quantity produced 5 minutes before and 5 minutes after the capture time. For the duration of the Contract, the collected data must be stored by the plant controller or a computer's memory at the plant. The Engineer orders proportioning activities stopped for any of the following reasons: 1. You fail to submit data 2. You submit incomplete, untimely, or incorrectly formatted data 3. You fail to take corrective actions 4. You take late or unsuccessful corrective actions 5. You fail to stop production when proportioning tolerances are exceeded 6. You use malfunctioning or failed proportioning devices If you stop production, notify the Engineer of any corrective actions taken before resuming. 39-2.01 B(8)(c) Warm Mix Asphalt Technology Proportion all ingredients by weight. The HMA plant process controller must be the sole source of ingredient proportioning control and be fully interfaced with all scales and meters used in the production process. The addition of the HMA additive must be controlled by the plant process controller. Liquid ingredient additive, including a normally dry ingredient made liquid, must be proportioned with a mass flow meter at continuous mixing plants. Use a mass flow meter or a container scale to proportion liquid additives at batch mixing plants. Continuous mixing plants using HMA additives must comply with the following: 1. Dry ingredient additives for continuous production must be proportioned with a conveyor scale or a loss-in-weight meter. 2. HMA plant process controller and ingredient measuring systems must be capable of varying all ingredient-feed rates proportionate with the dry aggregate delivery at all production rates and rate changes. 3. Liquid HMA additive must enter the production stream with the binder. Dry HMA additive must enter the production stream at or before the mixing area. 4. If dry HMA additives are used at continuous mixing HMA plants, bag-house dust systems must return all captured material to the mix. This requirement is waived for lime-treated aggregates. 5. HMA additive must be proportioned to within ±0.3 percent of the target additive rate. Batch mixing plants using HMA additives must comply with the following: 1. Metered HMA additive must be placed in an intermediate holding vessel before being added to the stream of asphalt binder as it enters the pugmill. 2. If a container scale is used, weigh additive before combining with asphalt binder. Keep the container scale separate from other ingredient proportioning. The container scale capacity must be no more than twice the volume of the maximum additive batch size. The container scale's graduations must be smaller than the proportioning tolerance or 0.001 times the container scale capacity. 3. Dry HMA additive proportioning devices must be separate from metering devices for the aggregates and asphalt binder. Proportion dry HMA additive directly into the pugmill, or place in an intermediate holding vessel to be added to the pugmill at the appropriate time in the batch cycle. Dry ingredients for batch production must be proportioned with a hopper scale. 4. Zero tolerance for the HMA additive batch scale is±0.5 percent of the target additive weight. The indicated HMA additive batch scale weight may vary from the preselected weight setting by up to±1.0 percent of the target additive weight. 39-2.01 B(9) Geosynthetic Pavement Interlayer Geosynthetic pavement interlayer must comply with the specifications for pavement fabric, paving mat, paving grid, paving geocomposite grid, or geocomposite strip membrane as shown. The asphalt binder for geosynthetic pavement interlayer must be PG 64-10, PG 64-16, or PG 70-10. 39-2.01 B(10) Tack Coat Tack coat must comply with the specifications for asphaltic emulsion or asphalt binder. Choose the type and grade of emulsion or binder. 39-2.0113(11) Miscellaneous Areas and Dikes For miscellaneous areas and dikes: 1. Choose the aggregate gradation from: 1.1. 3/8-inch Type A HMA aggregate gradation 1.2. 1/2-inch Type A HMA aggregate gradation 1.3. dike mix aggregate gradation 2. Choose asphalt binder Grade PG 64-10, PG 64-16 or PG 70-10. 3. Minimum asphalt binder content must be: 3.1. 6.40 percent for 3/8-inch Type A HMA aggregate gradation 3.2. 5.70 percent for 1/2-inch Type A HMA aggregate gradation 3.3. 6.00 percent for dike mix aggregate gradation The area under the modified dike as shown on the contract plans shall be considered miscellaneous area. If you request and the Engineer authorizes, you may reduce the minimum asphalt binder content. Aggregate gradation for dike mix must be within the TV limits for the specified sieve size shown in the following table: Dike Mix Aggregate Gradation (Percentage Passing) Sieve size Target value limit Allowable tolerance 1/2" 100 -- 3/8" --- 95- 100 No. 4 73-77 TV± 10 No. 8 58-63 TV± 10 No. 30 29-34 TV± 10 No. 200 0 - 14 For HMA used in miscellaneous areas and dikes, sections 39-2.01A(3), 39-2.01A(4), 39-2.01B(2), 39- 2.01 B(4)(c), and 39-2.01 B(5)—(10) do not apply. 39-2.01 C Construction 39-2.01C(1) General Do not place HMA on wet pavement or frozen surface. You may deposit HMA in a windrow and load it in the paver if: 1. Paver is equipped with a hopper that automatically feeds the screed 2. Loading equipment can pick up the windrowed material and deposit it in the paver hopper without damaging base material 3. Activities for depositing, pickup, loading, and paving are continuous 4. For method compaction: 4.1. The temperature of the HMA and the HMA produced with WMA water injection technology in the windrow does not fall below 260 degrees F 4.2. The temperature of the HMA produced using WMA additive technology in the windrow does not fall below 250 degrees F HMA placed in a windrow on the roadway surface must not extend more than 250 feet in front of the loading equipment or material transfer vehicle. You may place HMA in 1 or more layers on areas less than 5 feet wide and outside the traveled way, including shoulders. You may use mechanical equipment other than a paver for these areas. The equipment must produce uniform smoothness and texture. HMA handled, spread, or windrowed must not stain the finished surface of any improvement, including pavement. Do not use petroleum products such as kerosene or diesel fuel to release HMA from trucks, spreaders, or compactors. HMA must be free of: 1. Segregation 2. Coarse or fine aggregate pockets 3. Hardened lumps 4. Marks 5. Tearing 6. Irregular Texture Complete finish rolling activities before the pavement surface temperature is: 1. Below 150 degrees F for HMA with unmodified binder 2. Below 140 degrees F for HMA with modified binder 39-2.01C(2) Spreading and Compacting Equipment 39-2.01 C(2)(a) General Paving equipment for spreading must be: 1. Self-propelled 2. Mechanical 3. Equipped with a screed or strike-off assembly that can distribute HMA the full width of a traffic lane 4. Equipped with a full-width compacting device 5. Equipped with automatic screed controls and sensing devices that control the thickness, longitudinal grade, and transverse screed slope Install and maintain grade and slope references. The screed must be heated and produce a uniform HMA surface texture without tearing, shoving, or gouging. The paver must not leave marks such as ridges and indentations unless you can eliminate them by rolling. Rollers must be equipped with a system that prevents HMA from sticking to the wheels. You may use a parting agent that does not damage the HMA or impede the bonding of layers. In areas inaccessible to spreading and compacting equipment: 1. Spread the HMA by any means to obtain the specified lines, grades, and cross sections 2. Use a pneumatic tamper, plate compactor, or equivalent to achieve thorough compaction 39-2.01C(2)(b) Material Transfer Vehicle If a material transfer vehicle is specified, the material transfer vehicle must have sufficient capacity to prevent stopping the paver and must be capable of: 1. Either receiving HMA directly from trucks or using a windrow pickup head to load it from a windrow deposited on the roadway surface 2. Remixing the HMA with augers before transferring into the paver's receiving hopper or feed system 3. Transferring HMA directly into the paver's receiving hopper or feed system 39-2.01C(2)(c) Method Compaction Equipment For method compaction, each paver spreading HMA must be followed by at least one of each of the following 3 types of rollers: 1. Breakdown roller must be a vibratory roller specifically designed to compact HMA. The roller must be capable of at least 2,500 vibrations per minute and must be equipped with amplitude and frequency controls. The roller's gross static weight must be at least 7.5 tons. 2. Intermediate roller must be an oscillating-type pneumatic-tired roller at least 4 feet wide. Pneumatic tires must be of equal size, diameter, type, and ply. The tires must be inflated to 60 psi minimum and maintained so that the air pressure does not vary more than 5 psi. 3. Finishing roller must be a steel-tired, 2-axle tandem roller. The roller's gross static weight must be at least 7.5 tons. Each roller must have a separate operator. Rollers must be self-propelled and reversible. 39-2.01 C(2)(d)-39-2.01 C(2)(f) Reserved 39-2.01C(3) Surface Preparation 39-2.01 C(3)(a) General Before placing HMA, remove loose paving particles, dirt, and other extraneous material by any means including flushing and sweeping. 39-2.01C(3)(b) Subgrade Prepare subgrade to receive HMA under the sections for the material involved. Subgrade must be free of loose and extraneous material. 39-2.01 C(3)(c) Reserved 39-2.01 C(3)(d) Reserved 39-2.01 C(3)(e) Reserved 39-2.01 C(3)(f) Tack Coat Apply a tack coat: 1. To existing pavement including planed surfaces 2. Between HMA layers 3. To vertical surfaces of: 3.1. Curbs 3.2. Gutters 3.3. Construction joints Equipment for the application of tack coat must comply with section 37-1.03B. Before placing HMA, apply a tack coat in 1 application at the minimum residual rate shown in the following table for the condition of the underlying surface: Tack Coat Application Rates for HMA Minimum residual rates al/sq d CSS1/CSS1h, CRS1/CRS2, Asphalt binder and HMA over: SS1/SS1h and RS1/RS2 and PMRS2/PMCRS2 QS1 h/CQS1 h QS1/CQS1 and asphaltic emulsion asphaltic emulsion PMRS2h/PMCRS2h asphaltic emulsion New HMA between layers) 0.02 0.03 0.02 Concrete pavement and existing asphalt concrete 0.03 0.04 0.03 surfacing Planed pavement 0.05 0.06 0.04 If a stress absorbing membrane interlayer as specified in section 37-2.05 is applied, the tack coat application rates for new HMA apply. Notify the Engineer if you dilute asphaltic emulsion with water. The weight ratio of added water to asphaltic emulsion must not exceed 1 to 1. Measure added water either by weight or volume under section 9-1.02 or use water meters from water districts, cities, or counties. If you measure water by volume, apply a conversion factor to determine the correct weight. With each dilution, submit: 1. Weight ratio of water to bituminous material in the original asphaltic emulsion 2. Weight of asphaltic emulsion before diluting 3. Weight of added water 4. Final dilution weight ratio of water to asphaltic emulsion Apply a tack coat to vertical surfaces with a residual rate that will thoroughly coat the vertical face without running off. If authorized, you may: 1. Change tack coat rates 2. Omit tack coat between layers of new HMA during the same work shift if: 2.1. No dust, dirt, or extraneous material is present 2.2. Surface is at least 140 degrees F Immediately in advance of placing HMA, apply additional tack coat to damaged areas or where loose or extraneous material is removed. Close areas receiving tack coat to traffic. Do not allow the tracking of tack coat onto pavement surfaces beyond the job site. If you use an asphalt binder for tack coat, the asphalt binder temperature must be from 285 to 350 degrees F when applied. 39-2.01C(3)(g) Geosynthetic Pavement Interlayer Where shown, place geosynthetic pavement interlayer over a coat of asphalt binder and in compliance with the manufacturer's instructions. Do not place the interlayer on a wet or frozen surface. If the interlayer, in compliance with the manufacturer's instructions, does not require asphalt binder, do not apply asphalt binder before placing the interlayer. Before placing the interlayer or asphalt binder: 1. Repair cracks 1/4 inch and wider, spalls, and holes in the pavement. This repair is change order work. 2. Clean the pavement of loose and extraneous material. If the interlayer requires asphalt binder, immediately before placing the interlayer, apply asphalt binder at a rate specified by the interlayer manufacturer; at 0.25±0.03 gal per square yard of interlayer; or at a rate that just saturates the interlayer; whichever is greater. Apply asphalt binder the width of the interlayer plus 3 inches on each side. At an interlayer overlap, apply asphalt binder on the lower interlayer the same overlap distance as the upper interlayer. If asphalt binder tracked onto the interlayer or brought to the surface by construction equipment causes interlayer displacement, cover it with a small quantity of HMA. If the interlayer placement does not require asphalt binder, apply tack coat prior to placing HMA at the application rates specified under section 39-2.01 C(3)(f) based on the condition of the underlying surface on which the interlayer was placed. Align and place the interlayer with no overlapping wrinkles, except a wrinkle that overlaps may remain if it is less than 1/2 inch thick. If the overlapping wrinkle is more than 1/2 inch thick, cut the wrinkle out and overlap the interlayer no more than 2 inches. Overlap the interlayer borders between 2 to 4 inches. In the direction of paving, overlap the following roll with the preceding roll at any break. You may use rolling equipment to correct distortions or wrinkles in the interlayer. Before placing HMA on the interlayer, do not expose the interlayer to: 1. Traffic, except for crossings under traffic control and only after you place a small HMA quantity 2. Sharp turns from construction equipment 3. Damaging elements Pave HMA on the interlayer during the same work shift. The minimum HMA thickness over the interlayer must be 0.12 foot including at conform tapers. 39-2.01C(4) Longitudinal Joints 39-2.01 C(4)(a) General Longitudinal joints in the top layer must match lane lines. Alternate the longitudinal joint offsets in the lower layers at least 0.5 foot from each side of the lane line. Other longitudinal joint placement patterns are allowed if authorized. A vertical longitudinal joint of more than 0.15 foot is not allowed at any time between adjacent lanes open to traffic. For an HMA thickness of 0.15 foot or less, the distance between the ends of the adjacent surfaced lanes at the end of each day's work must not be greater than can be completed in the following day of normal paving. For an HMA thickness greater than 0.15 foot, you must place HMA on adjacent traveled way lanes or shoulder such that at the end of each work shift the distance between the ends of HMA layers on adjacent lanes is from 5 to 10 feet. Place additional HMA along the transverse edge at each lane's end and along the exposed longitudinal edges between adjacent lanes. Hand rake and compact the additional HMA to form temporary conforms. You may place kraft paper or other authorized release agent under the conform tapers to facilitate the taper removal when paving activities resume. If placing HMA against the edge of existing pavement, saw cut or grind the pavement straight and vertical along the joint and remove extraneous material. 39-2.01C(4)(b) Tapered Notched Wedge For divided highways with an HMA lift thickness greater than 0.15 foot, you may construct a 1-foot wide tapered notched wedge joint as a longitudinal joint between adjacent lanes open to traffic. A vertical notch of 0.75 inch maximum must be placed at the top and bottom of the tapered wedge. The tapered notched wedge must keep its shape while exposed to traffic. Pave the adjacent lane within 1 day. Construct the tapered portion of the tapered notched wedge with an authorized strike-off device. The strike-off device must provide a uniform slope and must not restrict the main screed of the paver. You may use a device attached to the screed to construct longitudinal joints that will form a tapered notched wedge in a single pass. The tapered notched wedge must be compacted to a minimum of 91 percent compaction. 39-2.01 C(5) Pavement Edge Treatments Construct edge treatment on the HMA pavement as shown. Where a tapered edge is required, use the same type of HMA used for the adjacent lane or shoulder. The edge of roadway where the tapered edge is to be placed must have a solid base, free of debris such as loose material, grass, weeds, or mud. Grade the areas to receive the tapered edge as required. The tapered edge must be placed monolithic with the adjacent lane or shoulder and must be shaped and compacted with a device attached to the paver. The device must be capable of shaping and compacting HMA to the required cross section as shown. Compaction must be accomplished by constraining the HMA to reduce the cross sectional area by 10 to 15 percent. The device must produce a uniform surface texture without tearing, shoving, or gouging and must not leave marks such as ridges and indentations. The device must be capable of transitioning to cross roads, driveways, and obstructions. For the tapered edge, the angle of the slope must not deviate by more than ±5 degrees from the angle shown. Measure the angle from the plane of the adjacent finished pavement surface. If paving is done in multiple lifts, the tapered edge must be placed with each lift. Short sections of hand work are allowed to construct tapered edge transitions. The test section: 1. Must not be less than 0.1 mile in length. 2. Must have a width equal to the width of the pavement and tapered edge to be paved in one pass during production. 3. Locations shall be proposed by the Contractor and approved by the Engineer. The test section must be constructed with asphalt paver fitted with one of the following FHWA-approved tapered edge devices: 1. "Shoulder Wedge Maker" manufactured by Transtech Systems, Inc.,1594 State Street, Schenectady, NY 12304, Telephone 1-800-724-6306 or 518-370-5558 2. "Advant-Edger" manufactured by Advant-Edge Paving Equipment LLC, 33 Old Niskayuna Road, Loudonville, NY 12211, Telephone 814-422-3343 3. "Ramp Champ" manufactured by Advant-Edge Paving Equipment LLC, 33 Old Niskayuna Road, Loudonville, NY 12211, Telephone 814-422-3343 4. "SafeTSlope" manufactured by Troxler Electronic Laboratories, Inc., 3008 E. Cornwallis Rd. Research Triangle Park, NC 27709, Telephone 877-876-9537 Comply with manufacturer's instructions for attaching the device(s)to the paver. The Engineer accepts the use of selected tapered edge device when edge shape and compaction of the test section are in compliance with plans and specifications. No further paving operations which include the construction of the tapered edge shall commence unless means and methods for constructing the tapered edge are approved by the Engineer. 39-2.01C(6) Widening Existing Pavement If widening existing pavement, construct new pavement structure to match the elevation of the existing pavement's edge before placing HMA over the existing pavement. 39-2.01C(7) Shoulders, Medians, and Other Road Connections Until the adjoining through lane's top layer has been paved, do not pave the top layer of: 1. Shoulders 2. Tapers 3. Transitions 4. Road connections 5. Driveways 6. Curve widenings 7. Chain control lanes 8. Turnouts 9. Turn pockets If the number of lanes changes, pave each through lane's top layer before paving a tapering lane's top layer. Simultaneous to paving a through lane's top layer, you may pave an adjoining area's top layer, including shoulders. Do not operate spreading equipment on any area's top layer until completing final compaction. If shoulders or median borders are shown, pave shoulders and median borders adjacent to the lane before opening a lane to traffic. If shoulder conform tapers are shown, place conform tapers concurrently with the adjacent lane's paving. If a driveway or a road connection is shown, place additional HMA along the pavement's edge to conform to road connections and driveways. Hand rake, if necessary, and compact the additional HMA to form a smooth conform taper. 39-2.01C(8) Leveling Section 39-2.01C(8)applies if a bid item for hot mix asphalt(leveling) is shown on the Bid Item List. Fill and level irregularities and ruts with HMA before spreading HMA over the base, existing surfaces, or bridge decks. You may use mechanical equipment other than a paver for these areas. The equipment must produce uniform smoothness and texture. HMA used to change an existing surface's cross slope or profile is not paid for as hot mix asphalt (leveling). 39-2.01C(9) Miscellaneous Areas and Dikes Prepare the area to receive HMA for miscellaneous areas and dikes, including excavation and backfill as needed. Spread the HMA in miscellaneous areas in 1 layer and compact to the specified lines and grades. In median areas adjacent to slotted median drains, each layer of HMA must not exceed 0.20 foot maximum compacted thickness. The finished surface must be: 1. Textured uniformly 2. Compacted firmly 3. Without depressions, humps, and irregularities 39-2.01 C(10)-39-2.01 C(14) Reserved 39-2.01 C(15) Compaction 39-2.01 C(15)(a) General Rolling must leave the completed surface compacted and smooth without tearing, cracking, or shoving. If a vibratory roller is used as a finish roller, turn the vibrator off. Do not open new HMA pavement to traffic until its mid depth temperature is below 160 degrees F. If the surface to be paved is both in sunlight and shade, pavement surface temperatures are taken in the shade. 39-2.01C(15)(b) Method Compaction Use method compaction for all conditions. HMA compaction coverage is the number of passes needed to cover the paving width. A pass is 1 roller's movement parallel to the paving in either direction. Overlapping passes are part of the coverage being made and are not a subsequent coverage. Do not start a coverage until completing the prior coverage. Method compaction must consist of performing: 1. Breakdown compaction of each layer with 3 coverages using a vibratory roller. The speed of the vibratory roller in miles per hour must not exceed the vibrations per minute divided by 1,000. If the HMA layer thickness is less than 0.08 foot, turn the vibrator off. 2. Intermediate compaction of each layer of HMA with 3 coverages using a pneumatic-tired roller at a speed not to exceed 5 mph. 3. Finish compaction of HMA with 1 coverage using a steel-tired roller. Start rolling at the lower edge and progress toward the highest part. The Engineer may order fewer coverages if the layer thickness of HMA is less than 0.15 foot. The compacted lift thickness must not exceed 0.25 foot. 39-2.01 C(15)(c)-39-2.01 C(15)(e) Reserved 39-2.01C(16) Smoothness Corrections If the pavement surface does not comply with section 39-2.01A(4)(i)(iii), grind the pavement to within specified tolerances, remove and replace the pavement, or place an overlay of HMA. Do not start corrective work until your method is authorized. Do not use equipment with carbide cutting teeth to grind the pavement unless authorized. Smoothness corrections must leave at least 75 percent of the specified HMA thickness. If ordered, core the pavement at the locations selected by the Engineer. Coring, including traffic control, is change order work. Remove and replace deficient pavement areas where the overlay thickness is less than 75 percent of the thickness specified. Corrected HMA pavement areas must be uniform rectangles, half the lane width, with edges: 1. Parallel to and along the nearest HMA pavement edge or lane line 2. Perpendicular to the pavement centerline On ground areas not to be overlaid with OGFC, apply a fog seal under section 37-4.02. Where corrections are made within areas requiring testing with inertial profiler, reprofile the entire lane length with the inertial profiler. Where corrections are made within areas requiring testing with a 12-foot straightedge, retest the corrected area with the straightedge. 39-2.01 C(17) Data Cores Section 39-2.01C(17) applies if a bid item for data core is shown on the Bid Item List. Take data cores of the completed HMA pavement, underlying base, and subbase material. Notify the Engineer 3 business days before coring. Protect data cores and surrounding pavement from damage. Take 4-inch or 6-inch diameter data cores: 1. At the beginning, end, and every 1/2 mile within the paving limits of each route on the project 2. After all paving is complete 3. From the center of the specified lane On a 2-lane roadway, take data cores from either lane. On a 4-lane roadway, take data cores from the outermost lane in each direction. On a roadway with more than 4 lanes, take data cores from the innermost lane and the outermost lane in each direction. Each core must include the stabilized materials encountered. You may choose not to recover unstabilized material but you must identify the material. Unstabilized material includes any of the following: 1. Granular material 2. Crumbled or cracked stabilized material 3. Sandy or clayey soil Where data core samples are taken, backfill and compact the holes with an authorized material. After data core summary and photograph submittal, dispose of cores. 39-2.01 D Payment The payment quantity for geosynthetic pavement interlayer is the area measured from the actual pavement covered. Except for tack coat used in minor HMA, payment for tack coat is not included in the payment for hot mix asphalt. The Department does not adjust the unit price for an increase or decrease in the tack coat quantity. The payment quantity for HMA of the type shown on the Bid Item List is measured based on the combined mixture weight. If recorded batch weights are printed automatically, the bid item for HMA is measured by using the printed batch weights, provided: 1. Total aggregate and supplemental fine aggregate weight per batch is printed. If supplemental fine aggregate is weighed cumulatively with the aggregate, the total aggregate batch weight must include the supplemental fine aggregate weight. 2. Total virgin asphalt binder weight per batch is printed. 3. Each truckload's zero tolerance weight is printed before weighing the first batch and after weighing the last batch. 4. Time, date, mix number, load number and truck identification is correlated with a load slip. 5. Copy of the recorded batch weights is certified by a licensed weigh master and submitted. The payment quantity for place hot mix asphalt dike of the type shown on the Bid Item List is the length measured from end to end. Payment for the HMA used to construct the dike is not included in the payment for place hot mix asphalt dike. The payment quantity for place hot mix asphalt(miscellaneous areas) is the area measured for the in- place compacted area. Payment for the HMA used for miscellaneous areas is not included in the payment for place hot mix asphalt (miscellaneous areas). The Engineer does not adjust the unit price for an increase or decrease in the prepaving grinding day quantity. 39-2.02 TYPE A HOT MIX ASPHALT 39-2.02A General 39-2.02A(1) Summary Section 39-2.02 includes specifications for producing and placing Type A hot mix asphalt. You may produce Type A HMA using an authorized WMA technology. 39-2.02A(2) Definitions Reserved 39-2.02A(3) Submittals 39-2.02A(3)(a) General Reserved 39-2.02A(3)(b) Job Mix Formula The JMF must be based on the superpave HMA mix design as described in MS-2 Asphalt Mix Design Methods by the Asphalt Institute. 39-2.02A(3)(c) Reclaimed Asphalt Pavement Submit QC test results for RAP gradation with the combined aggregate gradation within 2 business days of taking RAP samples during Type A HMA production. 39-2.02A(3)(d)-39-2.02A(3)(f) Reserved 39-2.02A(4) Quality Assurance 39-2.02A(4)(a) General Reserved 39-2.02A(4)(b) Quality Control 39-2.02A(4)(b)(i) General Reserved 39-2.02A(4)(b)(ii) Aggregates Test the quality characteristics of aggregates under the test methods and frequencies shown in the following table: Aggregate Testing Frequencies Quality characteristic Test method Minimum testing frequency Gradationa AASHTO T 27 Sande uivalentb,° AASHTO T 176 1 per 750 tons and any remaining part Moisture contents AASHTO T 255 Crushed particles AASHTO T 335 Los Angeles Rattler AASHTO T 96 1 per 10,000 tons or 2 per project Flat and elongated particles ASTM D4791 whichever is greater Fine aggregate angularity AASHTO T 304 Method A Coarse durability index AASHTO T 210 1 per 3,000 or 1 per paving day, Fine durability index AASHTO T 210 whichever is greater alf RAP is used, test the combined aggregate gradation under California Test 384. bReported value must be the average of 3 tests from a single sample. °Use of a sand reading indicator is required as shown in AASHTO T 176, Figure 1. Sections 4.7, "Manual Shaker," 7.1.2, "Alternate Method No. 2," and 8.4.3, "Hand Method," do not apply. Prepare the stock solution as specified in section 4.8.1, "Stock solution with formaldehyde," except omit the addition of formaldehyde. sTest at continuous mixing plants only. If RAP is used, test the RAP moisture content at continuous mixing plant and batch mixing plant. For lime treated aggregate, test aggregate before treatment and test for gradation and moisture content during HMA production. 39-2.02A(4)(b)(iii) Reclaimed Asphalt Pavement Sample and test processed RAP at a minimum frequency of 1 sample per 1,000 tons with a minimum of 6 samples per fractionated stockpile. If the fractionated stockpile has not been augmented, the 3 RAP samples taken and tested for mix design can be part of this minimum sample requirement. If a processed RAP stockpile is augmented, sample and test processed RAP quality characteristics at a minimum frequency of 1 sample per 500 tons of augmented RAP. The combined RAP sample when tested under AASHTO T 164 must be within ±2.00 percent of the average asphalt binder content reported on page 4 of your Contractor Hot Mix Asphalt Design Data form. If a new processed RAP stockpile is required, the average binder content of the new processed RAP stockpile must be within ±2.00 percent of the average binder reported on page 4 of your Contractor Hot Mix Asphalt Design Data form. The combined RAP sample when tested under AASHTO T 209 must be within ±0.06 of the average maximum specific gravity reported on page 4 of your Contractor Hot Mix Asphalt Design Data form. During Type A HMA production, sample RAP twice daily and perform QC testing for: 1. Aggregate gradation at least once a day under California Test 384 2. Moisture content at least twice a day 39-2.02A(4)(b)(iv)-39-2.02A(4)(b)(viii) Reserved 39-2.02A(4)(b)(ix) Type A Hot Mix Asphalt Production Test the quality characteristics of Type A HMA under the test methods and frequencies shown in the following table: Type A HMA Production Testin Frequencies Quality characteristic Test method Minimum testing frequenc Asphalt binder content AASHTO T 308, Method A 1 per 750 tons and any remaining part HMA moisture content AASHTO T 329 1 per 2,500 tons but not less than 1 per paving day Air voids content AASHTO T 269 1 per 4,000 tons or 2 every 5 paving days, whichever is greater Voids in mineral MS-2MS-2 Asphalt Mixture aggregate Volumetrics 1 per 10,000 tons or 2 per project Dust proportion MS-2MS-2 Asphalt Mixture whichever is greater Volumetrics Density of core California Test 375 2 per paving day Nuclear gauge density California Test 375 3 per 250 tons or 3 per paving day, whichever is greater Hamburg wheel track AASHTO T 324 Modified 1 per 10,000 tons or 1 per project, Moisture susceptibility AASHTO T 283 whichever is greater 39-2.02A(4)(c)-39-2.02A(4)(d) Reserved 39-2.02A(4)(e) Department Acceptance The Department accepts Type A HMA based on compliance with: 1. Aggregate quality requirements shown in the following table: Aggregate Quality Quality characteristic Test method Requirement Aggregate radationa AASHTO T 27 JMF ±Tolerance Percent of crushed particles Coarse aggregate (min, %) One-fractured face 95 Two-fractured faces AASHTO T 335 90 Fine aggregate (min, %) (Passing No. 4 sieve and retained on No. 8 sieve.) One-fractured face 70 Los Angeles Rattler(max, %) Loss at 100 Rev. AASHTO T 96 12 Loss at 500 Rev. 40 Sandequivalent min. b,° AASHTO T 176 47 Flat and elongated particles (max, % by ASTM D4791 10 weight at 5:1 Fine aggregate angularity min, % d AASHTO T 304, Method A 45 Coarse durability index Dc, min AASHTO T 210 65 Fine durability index Dr, min AASHTO T 210 50 aThe Engineer determines combined aggregate gradations containing RAP under California Test 384. bReported value must be the average of 3 tests from a single sample. °Use of a sand reading indicator is required as shown in AASHTO T 176, Figure 1. Sections 4.7, "Manual Shaker," 7.1.2, "Alternate Method No. 2," and 8.4.3, "Hand Method," do not apply. Prepare the stock solution as specified in section 4.8.1, "Stock solution with formaldehyde," except omit the addition of formaldehyde. aThe Engineer waives this specification if HMA contains 10 percent or less of nonmanufactured sand by weight of total aggregate. Manufactured sand is fine aggregate produced by crushing rock or gravel. 2. If RAP is used, RAP quality requirements shown in the following table: Reclaimed Asphalt Pavement Quality Quality characteristic I Test method Requirement Binder content %within the average value reported) AASHTO T 164 ±2.00 Specific gravity (within the average value reported) AASHTO T 209 ±0.06 3. In place Type A HMA quality requirements shown in the following table: Type A HMA Acceptance In Place Quality characteristic Test method Requirement Asphalt binder content(%) AASHTO T 308 JMF -0.30, +0.50 Method A HMA moisture content max, % AASHTO T 329 1.00 Air voids content at Ndesign (%)a'b AASHTO T 269 4.0± 1.5 5.0± 1.5 for 1-inch aggregate) Voids in mineral aggregate on laboratory- MS-2MS-2 produced HMA(min, %)d Asphalt Mixture Gradation: Volumetrics No. 4 16.5-19.5 3/8-inch 15.5-18.5 1/2-inch 14.5-17.5 3/4-inch 13.5-16.5 1-inch with WAS = 1-inch 13.5-16.5 with WAS = 3/4-inch 14.5-17.5 Voids in mineral aggregate on plant-produced MS-2MS-2 HMA(min, %)a Asphalt Mixture Gradation: Volumetrics° No. 4 15.5-18.5 3/8-inch 14.5-17.5 1/2-inch 13.5-16.5 3/4-inch 12.5-15.5 1-inch with WAS = 1-inch 12.5-15.5 with WAS = 3/4-inch 13.5-16.5 Dust proportion MS-2MS-2 Asphalt Mixture 0.6-1.39 Volumetrics Density of core (% of max theoretical density)e,f California Test 91.0-97.0 375 Hamburg wheel track (min number of passes at AASHTO T 324 0.5-inch rut depth) (Modified) Binder grade: PG 58 10,000 PG 64 15,000 PG 70 20,000 PG 76 or higher 25,000 Hamburg wheel track (min number of passes at AASHTO T 324 inflection point) (Modified) Binder grade: PG 58 10,000 PG 64 10,000 PG 70 12,500 PG 76 or higher 15,000 Moisture susceptibility min, psi, dry strength) AASHTO T 283 100 Moisture susceptibility min, psi, wet strength) AASHTO T 283 70 aPrepare 3 briquettes. Report the average of 3 tests. bThe Engineer determines the bulk specific gravity of each lab-compacted briquette under AASHTO T 275, Method A, and theoretical maximum specific gravity under AASHTO T 209, Method A. °Determine bulk specific gravity under AASHTO T 275, Method A. dThe Engineer determines the laboratory-prepared Type A HMA value for only mix design verification. eThe Engineer determines percent of theoretical maximum density under California Test 375 except the Engineer uses: 1. AASHTO T 275 to determine in-place density of each density core 2. AASHTO T 209, Method A to determine theoretical maximum density instead of calculating test maximum density fThe Engineer determines theoretical maximum density under AASHTO T 209, Method A, at the frequency specified in California Test 375, part 5, section D. 9For lime-treated aggregates, the dust proportion requirement is 0.6-1.5. 39-2.02B Materials 39-2.02B(1) General Reserved 39-2.02B(2) Type A Hot Mix Asphalt Mix Design The mix design for Type A HMA must comply with the requirements shown in the following table: Type A HMA Mix Design Requirements Quality characteristic Test method Requirement Air voids content(%) AASHTO T 269a Ninitial > 8.0 Ndesign =4.0 (Ndesign = 5.0 for 1-inch aggregate) Nmax> 2.0 Gyration compaction (no. of gyrations) AASHTO T 312 Ninitiai = 8 Ndesign = 85.0 Nmax= 130 Voids in mineral aggregate (min, %)b MS-2 Gradation: Asphalt Mixture No. 4 Volumetrics 16.5-19.5 3/8-inch 15.5-18.5 1/2-inch 14.5-17.5 3/4-inch 13.5-16.5 1-inch with WAS = 1-inch 13.5-16.5 with WAS = 3/4-inch 14.5-17.5 Dust proportion MS-2 Asphalt Mixture 0.6-1.3 Volumetrics Hamburg wheel track (min number of passes AASHTO T 324 at 0.5-inch rut depth) (Modified)° Binder grade: PG 58 10,000 PG 64 15,000 PG 70 20,000 PG 76 or higher 25,000 Hamburg wheel track (min number of passes AASHTO T 324 at the inflection point) (Modified)° Binder grade: PG 58 10,000 PG 64 10,000 PG 70 12,500 PG 76 or higher 15,000 Moisture susceptibility, dry strength min, psi) AASHTO T 283° 100 Moisture susceptibility, wet strength (min, AASHTO T 283c,d 70 psi aCalculate the air voids content of each specimen using AASHTO T 275, Method A, to determine bulk specific gravity. Use AASHTO T 209, Method A, to determine theoretical maximum specific gravity. Use a digital manometer and pycnometer when performing AASHTO T 209. bMeasure bulk specific gravity using AASHTO T 275, Method A. °Test plant-produced Type A HMA. dFreeze thaw required. For Type A HMA mixtures using RAP, the maximum allowed binder replacement is 25.0 percent in the upper 0.2 foot exclusive of OGFC and 40.0 percent below. The binder replacement is calculated as a percentage of the approved JMF target asphalt binder content. For Type A HMA with a binder replacement percent less than or equal to 25 percent of your specified OBC, you may request that the performance graded asphalt binder grade with upper and lower temperature classifications be reduced by 6 degrees C from the specified grade. For Type A HMA with a binder replacement greater than 25 percent of your specified OBC and less than or equal to 40 percent of OBC, you must use a performance graded asphalt binder grade with upper and lower temperature classifications reduced by 6 degrees C from the specified grade. 39-2.02B(3) Asphalt Binder The grade of asphalt binder for Type A HMA must be PG 64-10. 39-2.02B(4) Aggregates 39-2.02B(4)(a) General Before the addition of asphalt binder and lime treatment, the aggregates must comply with the requirements shown in the following table: Aggregate Quality Quality characteristic Test method Requirement Percent of crushed particles: Coarse aggregate (min, %) One-fractured face 95 Two-fractured faces AASHTO T 335 90 Fine aggregate (min, %) (Passing No. 4 sieve and retained on No. 8 sieve.) One-fractured face 70 Los Angeles Rattler(max, %) Loss at 100 Rev. AASHTO T 96 12 Loss at 500 Rev. 40 Sand equivalent mina AASHTO T 176 47 Flat and elongated particles max, % by weight at 5:1 ASTM D4791 10 Fine aggregate angularity min, % b AASHTO T 304, Method A 45 aThe reported value must be the average of 3 tests from a single sample. Use of a sand reading indicator is required as shown in AASHTO T 176, Figure 1. Sections 4.7, "Manual Shaker," 7.1.2, "Alternate Method No. 2," and 8.4.3, "Hand Method," do not apply. Prepare the stock solution as specified in section 4.8.1, "Stock solution with formaldehyde," except omit the addition of formaldehyde. bThe Engineer waives this specification if the Type A HMA contains 10 percent or less of nonmanufactured sand by weight of total aggregate, except if your JMF fails verification. Manufactured sand is fine aggregate produced by crushing rock or gravel. 39-2.02B(4)(b) Aggregate Gradations The aggregate gradations for Type A HMA must comply with the requirements shown in the following table: Aggregate Gradation Requirements Type A HMA pavement thickness shown Gradation 0.10 foot 3/8 inch Greater than 0.10 to less than 0.20 foot 1/2 inch 0.20 to less than 0.25 foot 3/4 inch 0.25 foot or greater 3/4 inch or 1 inch Aggregate gradation must be within the TV limits for the specified sieve size shown in the following tables: Aggregate Gradations for Type A HMA (Percentage Passing) 1 inch Sieve size Target value limit Allowable tolerance ill 100 -- 3/4" 88-93 TV± 5 1/2" 72-85 TV± 6 3/8" 55-70 TV± 6 No. 4 35-52 TV± 7 No. 8 22-40 TV± 5 No. 30 8-24 TV±4 No. 50 5-18 TV±4 No. 200 3.0-7.0 TV±2.0 3/4 inch Sieve size Tar et value limit Allowable tolerance 1" 100 -- 3/4" 90-98 TV± 5 1/2" 70-90 TV± 6 No. 4 42-58 TV± 5 No. 8 29-43 TV± 5 No. 30 10-23 TV±4 No. 200 2.0-7.0 TV±2.0 1/2 inch Sieve size Target value limit Allowable tolerance 3/4" 100 -- 1/2" 95-98 TV± 5 3/8" 72-95 TV ± 5 No. 4 52-69 TV± 5 No. 8 35-55 TV± 5 No. 30 15-30 TV±4 No. 200 2.0-8.0 TV± 2.0 3/8 inch Sieve size Target value limit Allowable tolerance 1/2" 100 -- 3/8" 95-98 TV± 5 No. 4 55-75 TV± 5 No. 8 30-50 TV± 5 No. 30 15-35 TV± 5 No. 200 2.0-9.0 TV± 2.0 No. 4 Sieve size Target value limit Allowable tolerance 3/8" 100 No. 4 95-98 TV± 5 No. 8 70-80 TV± 6 No. 30 34-45 TV± 5 No. 200 2.0-12.0 TV±4.0 39-2.02B(5) Reclaimed Asphalt Pavement You may substitute RAP for part of the virgin aggregate in a quantity up to 25 percent of the aggregate blend. Provide enough space at your plant for complying with all RAP handling requirements. Provide a clean, graded base, well drained area for stockpiles. If RAP is from multiple sources, blend the RAP thoroughly and completely before fractionating. For RAP substitution greater than 15 percent of the aggregate blend, fractionate RAP stockpiles into 2 sizes, a coarse fraction RAP retained on 3/8-inch sieve and a fine fraction RAP passing 3/8-inch sieve. For RAP substitution of 15 percent of the aggregate blend or less, fractionation is not required. The RAP fractionation must comply with the requirements shown in the following table: RAP Stockpile Fractionation Gradation Requirements Size I Test method Requirement Coarse % passing the 1-inch sieve California Test 202a 100 Fine % passing the 3/8-inch sieve California Test 202a 98-100 aMaximum mechanical shaking time is 10 minutes. You may use the coarse fractionated stockpile, the fine fractionated stockpile, or a combination of the coarse and fine fractionated stockpiles. Isolate the processed RAP stockpiles from other materials. Store processed RAP in conical or longitudinal stockpiles. Processed RAP must not be agglomerated or be allowed to congeal in large stockpiles. 39-2.02B(6)-39-2.02B(10) Reserved 39-2.02B(11) Type A Hot Mix Asphalt Production If RAP is used, the asphalt plant must automatically adjust the virgin asphalt binder to account for RAP percentage and RAP binder. During production, you may adjust hot-or cold-feed proportion controls for virgin aggregate and RAP. RAP must be within ±3 of RAP percentage described in your Contractor Job Mix Formula Proposal form without exceeding 25 percent. 39-2.02C Construction Where the pavement thickness shown is greater than 0.30 foot, you may place Type A HMA in multiple lifts not less than 0.15 foot each. If placing Type A HMA in multiple lifts: 1. Aggregate gradation must comply with the requirements shown in the following table: Aggregate Gradation Requirements Type A HMA lift thickness Gradation 0.15 to less than 0.20 foot 1/2 inch 0.20 foot to less than 0.25 foot 3/4 inch 0.25 foot or greater 3/4 inch or 1 inch 2. Apply a tack coat before placing a subsequent lift 3. The Engineer evaluates each HMA lift individually for compliance If the ambient air temperature is below 60 degrees F, cover the loads in trucks with tarpaulins. If the time for HMA discharge to truck at the HMA plant until transfer to paver's hopper is 90 minutes or greater and if the ambient air temperature is below 70 degrees F, cover the loads in trucks with tarpaulins, unless the time from discharging to the truck until transfer to the paver's hopper or the pavement surface is less than 30 minutes. The tarpaulins must completely cover the exposed load until you transfer the mixture to the paver's hopper or the pavement surface. Spread Type A HMA at the ambient air and surface temperatures shown in the following table: Minimum Ambient Air and Surface Temperatures Lift thickness Ambient air °F Surface °F (feet) LUnmodified Modified asphalt Unmodified Modified asphalt asphalt binder binder asphalt binder binder Type A HMA and Type A HMA produced with WMA water injection technology <0.15 55 50 60 55 >_0.15 45 45 50 50 Type A HMA produced with WMA additive technology <0.15 45 45 50 45 >_0.15 40 40 40 40 For Type A HMA and Type A HMA produced with WMA water injection technology placed under method compaction, if the asphalt binder is: 1. Unmodified, complete: 1.1. 1st coverage of breakdown compaction before the surface temperature drops below 250 degrees F 1.2. Breakdown and intermediate compaction before the surface temperature drops below 190 degrees F 1.3. Finish compaction before the surface temperature drops below 150 degrees F 2. Modified, complete: 2.1. 1st coverage of breakdown compaction before the surface temperature drops below 240 degrees F 2.2. Breakdown and intermediate compaction before the surface temperature drops below 180 degrees F 2.3. Finish compaction before the surface temperature drops below 140 degrees F For Type A HMA produced with WMA additive technology placed under method compaction, if the asphalt binder is: 1. Unmodified, complete: 1.1 1st coverage of breakdown compaction before the surface temperature drops below 240 degrees F 1.2. Breakdown and intermediate compaction before the surface temperature drops below 190 degrees F 1.3. Finish compaction before the surface temperature drops below 140 degrees F 1.4 You may continue static rolling below 140 degrees F to remove roller marks. 2. Modified, complete: 2.1. 1st coverage of breakdown compaction before the surface temperature drops below 230 degrees F 2.2. Breakdown and intermediate compaction before the surface temperature drops below 170 degrees F 2.3. Finish compaction before the surface temperature drops below 130 degrees F 2.4. You may continue static rolling below 130 degrees F to remove roller marks. You may cool Type A HMA with water when rolling activities are complete if authorized. The final HMA lift shall be installed as one long run. 39-2.02D Payment Not Used 39-2.07 MINOR HOT MIX ASPHALT 39-2.07A General 39-2.07A(1) Summary Section 39-2.07 includes specifications for producing and placing minor hot mix asphalt. Minor HMA must comply with section 39-2.02 except as specified in this section 39-2.07. The inertial profiler requirements in section 36-3 do not apply. 39-2.07A(2) Definitions Reserved 39-2.07A(3) Submittals The QC plan and test results in sections 39-2.01A(3)(c) and 39-2.01A(3)(d)do not apply. 39-2.07A(4) Quality Assurance 39-2.07A(4)(a) General The JMF renewal requirements in section 39-2.01A(4)(d) do not apply. Test pavement smoothness with a 12 foot straightedge. 39-2.07A(4)(b) Quality Control Testing for compliance with the following quality characteristics is not required: 1. Flat and elongated particles 2. Fine aggregate angularity 3. Hamburg wheel track 4. Moisture susceptibility 39-2.07A(4)(c) Department Acceptance The Department accepts minor HMA under section 39-2.02A(4)(e) except for compliance with requirements for the following quality characteristics: 1. Flat and elongated particles 2. Fine aggregate angularity 3. Hamburg wheel track 4. Moisture susceptibility 39-2.0713 Materials 39-2.07B(1) General Reserved 39-2.07B(2) Minor Hot Mix Asphalt Mix Design The Hamburg wheel track and moisture susceptibility requirements do not apply to the mix design for minor HMA. 39-2.07B(3) Asphalt Binder The grade of asphalt binder for minor HMA must be PG-64-10 or PG-64-16. 39-2.07B(4) Liquid Antistrip Treatment Treat minor HMA with liquid antistrip unless you submit AASHTO T 283 and AASHTO T 324 (Modified) test results showing compliance with section 39-2.02B and dated within 12 months of the submittal. 39-2.07C Construction Not Used 39-2.07D Payment Not Used 39-2.08-39-2.10 RESERVED 39-3 EXISTING ASPHALT CONCRETE 39-3.01 GENERAL 39-3.01A General Section 39-3.01 includes general specifications for performing work on existing asphalt concrete facilities. Work performed on existing asphalt concrete facilities must comply with section 15. 39-3.01 B Materials Not Used 39-3.01 C Construction Before removing a portion of an asphalt concrete facility, make a 2-inch deep saw cut to a true line along the limits of the removal area. 39-3.01 D Payment Not Used 39-3.02 REPLACE ASPHALT CONCRETE SURFACING 39-3.02A General Section 39-3.02 includes specifications for replacing asphalt concrete surfacing. 39-3.0213 Materials HMA to be used for replacing asphalt concrete surfacing must comply with Type A HMA as specified in section 39-2.02. The grade of asphalt binder must be PG 64-10 or PG 64-16. Tack coat must comply with section 39-2.01 B(10). 39-3.02C Construction Where replace asphalt concrete surfacing is shown, remove the full depth of the existing asphalt concrete surfacing and replace with HMA. The Engineer determines the exact limits of asphalt concrete surfacing to be replaced. Replace asphalt concrete in a lane before the lane is specified to be opened to traffic. Before removing asphalt concrete, outline the replacement area and cut neat lines with a saw or grind to full depth of the existing asphalt concrete. Do not damage asphalt concrete and base remaining in place. If you excavate the base beyond the specified plane, replace it with HMA. Do not use a material transfer vehicle for replacing asphalt concrete surfacing. Before placing HMA, apply a tack coat as specified in section 39-2.01 C(3)(f). Place HMA using method compaction as specified in section 39-2.01C(2)(c). 39-3.021) Payment The payment quantity for replace asphalt concrete surfacing is the volume determined from the dimensions shown. 39-3.03 REMOVE ASPHALT CONCRETE DIKES 39-3.03A General Section 39-3.03 applies to removing asphalt concrete dikes outside the limits of excavation. 39-3.0313 Materials Not Used 39-3.03C Construction Reserved 39-3.03D Payment Not Used 39-3.04 COLD PLANING ASPHALT CONCRETE PAVEMENT 39-3.04A General Section 39-3.04 includes specifications for cold planning asphalt concrete pavement. Cold planning asphalt concrete pavement includes the removal of pavement markers, traffic stripes, and pavement markings within the area of cold planning. Schedule cold planing activities such that the pavement is cold planed, the HMA is placed, and the area is opened to traffic during the same work shift. 39-3.0413 Materials HMA for temporary tapers must be of the same quality that is used for the HMA overlay or comply with the specifications for minor HMA in section 39-2.07. 39-3.04C Construction 39-3.04C(1) General Do not use a heating device to soften the pavement. The cold planing machine must be: 1. Equipped with a cutter head width that matches the planing width unless a wider cutter head is authorized. 2. Equipped with automatic controls for the longitudinal grade and transverse slope of the cutter head and: 2.1. If a ski device is used, it must be at least 30 feet long, rigid, and a 1-piece unit. The entire length must be used in activating the sensor. 2.2. If referencing from existing pavement, the cold planing machine must be controlled by a self- contained grade reference system. The system must be used at or near the centerline of the roadway. On the adjacent pass with the cold planing machine, a joint-matching shoe may be used. 3. Equipped to effectively control dust generated by the planing operation 4. Operated such that no fumes or smoke is produced. Replace broken, missing, or worn machine teeth. If you do not complete placing the HMA surfacing before opening the area to traffic, you must: 1. Construct a temporary HMA taper to the level of the existing pavement. 2. Place HMA during the next work shift. 3. Submit a corrective action plan that shows you will complete cold planing and placement of HMA in the same work shift. Do not restart cold planing activities until the corrective action plan is authorized. 39-3.04C(2) Grade Control and Surface Smoothness Install and maintain grade and transverse slope references. The final cut must result in a neat and uniform surface. The completed surface of the planed pavement must not vary more than 0.02 foot when measured with a 12-foot straightedge parallel with the centerline. With the straightedge at right angles to the centerline, the transverse slope of the planed surface must not vary more than 0.03 foot. Where lanes are open to traffic, the drop-off of between adjacent lanes must not be more than 0.15 foot. 39-3.04C(3) Planed Material Remove cold planed material concurrently with planing activities such that the removal does not lag more than 50 feet behind the planer. 39-3.04C(4) Temporary HMA Tapers If a drop-off between the existing pavement and the planed area at transverse joints cannot be avoided before opening to traffic, construct a temporary HMA taper. Compact by any method that will produce a smooth riding surface Completely remove temporary tapers before placing permanent surfacing. 39-3.04D Payment Not Used 39-3.05 REMOVE BASE AND SURFACING 39-3.05A General Section 39-3.05 includes specifications for removing base and asphalt concrete surfacing. 39-3.0513 Materials Not Used 39-3.05C Construction Where base and surfacing are described to be removed, remove base and surfacing to a depth of at least 6 inches below the grade of the existing surfacing. Backfill resulting holes and depressions with embankment material under section 19. 39-3.0513 Payment The payment quantity for remove base and surfacing is the volume determined from the dimensions shown. 39-3.06-39-3.08 RESERVED 40 CONCRETE PAVEMENT Replace Section 40-1.01 D(4) with: 40-1.01 D(4) Qualifications Testing laboratories and their test equipment must be qualified under the Caltrans Independent Assurance Program. Use a laboratory that complies with ASTM C1077 to determine the mix proportions for concrete pavement. The laboratory must have a current AASHTO accreditation for: 1. AASHTO T 97 or ASTM C78 2. ASTM C192/C192M Use an ACI-certified concrete laboratory technician, Grade I, to perform field qualification tests and calculations. DIVISION VII DRAINAGE FACILITIES Add Section 65-2.01A The work for furnishing all materials and labor required to install rubber gasket reinforced concrete pipe as shown on the plans shall comply with Section 17 and other referenced sections of the Fresno Metropolitan Flood Control District Standard Plans & Specifications. In case of conflict between the Caltrans Standard Specifications and these FMFCD Standard plans or specifications, the FMFCD Standard shall take precedence over and be used in lieu of such conflicting portions. Add section 65-2.03D Staging Pipe Construction During work hours, construct pipe incrementally providing one-way traffic control and flaggers to protect vehicles and pedestrians from the open excavation. Provide proper shoring and worker protection per OSHA requirements and the standard specifications. During non-work hours provide trench plates or otherwise backfill and finish construction of pipe segments to allow two-way traffic control and protect vehicles and pedestrians from any open excavation. Add Section 65-2.03E Trenching and backfill shall conform to the trench excavation, backfill and surface restoration detail shown in the drainage details in the Plans and must comply with Standard Specifications Section 19. As required by the "Trench Construction Safety Orders" of the California Construction Safety Orders of the Division of Occupational Safety and Health, bracing and shoring shall be installed in trenches of five feet or greater depth to ensure the safety of workers and to protect and facilitate the work. The excavation shall be supported so that it will be safe and that the ground alongside the excavation will not slide or settle, and all existing improvements, either on public or private property, will be fully protected from damage. All support shall be removed after construction is completed, unless otherwise directed by the Engineer, and shall be withdrawn in a manner that will prevent the caving of the side of the excavation. All openings caused by the removal of supports shall be filled with suitable material properly compacted. Replace Section 65-2.04 with: Trenching and backfill, surface restoration, bracing and shoring and any equipment and materials needed to stage the construction of the drainage pipe and labor included therein is included in the applicable bid items. Replace Section 70-8 With: 70-8.01 GENERAL Section 70-8 includes specifications for constructing Manhole (Type A)to the size and location shown on the Plans. The work for furnishing all materials and labor required to install manholes as shown on the plans shall comply with Section 23 and other referenced sections of the Fresno Metropolitan Flood Control District Standard Plans & Specifications. Contractor is responsible for obtaining the most current and complete version of the FMFCD's specifications from the FMFCD website. Contractor is responsible for obtaining all FMFCD Standard Drawings required to install a fully functional manhole to the acceptance of the FMFCD's inspectors. Use link below to access specifications: District-Standard-Plans-and-Specifications.pdf(fresnofloodcontrol.org) 70-8.01 D PAYMENT The unit price paid for Manholes shall include full compensation for furnishing all labor, materials, tools and equipment and doing all the work involved in installing new Manholes in place complete including, but not limited to, all structural elements as shown on the Project Plans or Standard Plans, including excavation and backfill, connecting existing or new lateral or main pipelines, furnishing frame and cover, pressure, bolt-down or slotted cover where required, shall be paid by"each" manhole installed. The cost for furnishing all labor, materials, tools and equipment and doing all the work involved in modifying existing Storm drain Manhole on Olive Ave near STA 100+50 and/or cutting existing storm drain reinforced concrete pipe near STA 94 on Fowler Ave to allow for the installation of new manhole including, but not limited to, diversion system for potential water flow, structural repair of the existing manhole, excavation and backfill, connecting existing or new lateral or main pipelines, shall be paid as "lump sum" in the bid item "MISCELLANEOUS OPERATIONS (SPLICE EXIST SD, CUT OUT MANHOLE, ETC)" The cost for furnishing all labor, materials, tools and equipment and doing all the work involved in adjusting ring to grade and surface restoration shall be paid as "each" in the bid item "ADJUST MANHOLE LIDS TO GRADE" Replace Section 70-9 With: 70-9.01 GENERAL Section 70-9 includes specifications for constructing inlets (Type E)to the size and location shown on the Plans. The work for furnishing all materials and labor required to install inlets as shown on the plans shall comply with Section 24 and other referenced sections of the Fresno Metropolitan Flood Control District Standard Plans & Specifications. FMFCD Specifications applicable to the project has been incorporated into the Project Details for reference only. Contractor is responsible for obtaining the most current and complete version of the FMFCD's specifications from the FMFCD website. Contractor is responsible for obtaining all FMFCD Standard Drawings required to install a fully functional drainage system to the acceptance of the FMFCD's inspectors. Use link below to access specifications: http://www.fresnofloodcontrol.org/wp-content/uploads/2014/08/Std-Specifications-April-1-2011-approved- amended-1-1-12.pdf 70-9.04 PAYMENT The unit price paid for Storm Drain Inlets shall include full compensation for furnishing all labor, materials, tools, and equipment and doing all the work involved in constructing the structures in place, including but not limited to excavation, forming, backfill, connecting new lateral pipes, grouting, and grading where necessary shall be paid by"each" inlet installed. 72 SLOPE PROTECTION 72-4.02 Materials Use Rock gradation for 4-inch thick layer at ditch on Fowler Ave as shown in the plans. Add the Following to Section 72-4.02 Materials: Use Rock gradation for 4 inch thick layer Add the Following to Section 72-4.03 Construction: Excavate sloped ditch at least 4" below flow line indicated in the plans to install weed barrier and rock in a confined trench so that it is graded flush with the surrounding material. If directed by the Engineer, water test the rock for steadfastness to its final placement. 73 CONCRETE CURBS AND SIDEWALK Replace Section 73-1.04 PAYMENT With: Full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all work involved in the provisions of this section, including, but not limited to, coordination with the County Engineer, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer shall be considered to be included in prices paid for"Minor Concrete (Curb and Gutter)" and "Minor Concrete (Electrical Pad)" per linear foot and square yard, respectively. DIVISION VIII MISCELLANEOUS CONSTRUCTION 77 LOCAL INFRASTRUCTURE The Special Provisions for Local Infrastructure for this project are the City of Fresno Standard Specifications and Drawings. Contractor is responsible for obtaining the most current and complete version of the City of Fresno's specifications from the City website. Contractor is responsible for obtaining all City of Fresno Standard Drawings required to install a fully functional system to the acceptance of the City of Fresno inspectors. The specifications and drawings can be found on the City website, Department of Public Works, Technical Library. 77-1 RELOCATE ARV ASSEMBLY 77-1.01 GENERAL In general, the Section 77-1 shall include all work required to relocate Air Release Valves (ARV) assemblies including but not limited to: a) Remove &dispose concrete pads, thrust blocks, pipes &fittings b) Salvage ARV's & enclosures c) Disinfect line d) Install new ductile iron pipe &fittings e) Pour concrete pad. Pad shall comply with Section 90 f) Reinstall salvaged ARV&enclosures Materials shall be chosen for their strength, durability and ease of maintenance, with due consideration for dead and live loads, and resistance to corrosion. Pipe joints shall be selected to provide sufficient flexibility to adjust to the residual conditions during and after construction Contact Robert Vazquez, Water System Supervisor with City of Fresno Public Utilities at 559-621-5356 48 hrs prior to performing any work with water system to coordinate City of Fresno inspections. 77-1.02 MATERIALS 77-1.02A DUCTILE IRON PIPE Ductile iron pipe and associated fittings shall conform to the applicable sections of the City of Fresno Standard Specifications. All materials in contact with potable water shall be ANSI/NSF 61 certified In case of conflict between the Caltrans Standard Specifications and these City of Fresno Standard plans or specifications, the City of Fresno Standard shall take precedence over and be used in lieu of such conflicting portions. a) Fabrication Ductile iron pipe shall be Pressure Class 350 ductile iron for sizes up to and including 12 inch and Pressure Class 250 ductile iron from 14 inch to 20 inch; complete with all accessories and conforming to ANSI/AWWA C151/A21.51, unless otherwise indicated on the construction plans. Ductile iron pipe shall be eighteen (18)foot laying lengths. b) Joints Joining of ductile iron pipe shall be with elastomeric-gasket bell ends or couplings. The joints and rubber gaskets shall be in conformance with ANSI/AWWA C111/A21.11. c) Inspection and Testing Testing of the pipe to ensure compliance with these Specifications shall be made in accordance with applicable AWWA Standards latest edition. d) Fittings All fittings for use with ductile iron pipe shall be ductile iron manufactured in accordance with ANSI/AWWA C110/A21.10 or ANSI/AWWA C153/A21.53.All Mechanical Joint or push-on joint fittings shall be rated for 350 psi working pressure in sizes 4" through 24". Flange fittings shall be rated for 250 psi working pressure. Flange drilling pattern shall be in accordance with ANSI/AWWA C110/A21.10, or commonly referred to as a 125#drilling pattern. In accordance with Section 4.4 of ANSI/AWWA C153/A21.53, fittings may be provided with a cement-mortar lining and asphalt coating or fusion bonded epoxy inside and outside. Fusion bonded epoxy shall be in accordance with ANSI/AWWA C116/A21.16 and shall be applied to interior and exterior surfaces. All tees and crosses shall have all flanged ends with the exception of fire hydrant, blowoff, and pumping connections, which shall have flange by Mechanical Joint or push-on joint ends; reducers shall have flange by Mechanical Joint ends; elbows maybe either Mechanical Joint or flanged ends. e) Appurtenances All appurtenances used in conjunction with the ductile iron pipe shall meet the City of Fresno Standard Specifications. f) Swabbing and flushing The Contractor shall swab and flush water pipeline using 1% free chlorine disinfection solution. Flush with at least four(4)time the volume of the pipe being replaced. 77-1.02B Polyvinyl Chloride (PVC) Pressure Pipe Polyvinyl chloride(PVC)pressure pipe shall conform to the applicable sections of the City Standard Specifications. a) Fabrication Polyvinyl chloride pressure pipe shall be Class 235 DR 18 for 12" and smaller and Class 235 DR 18 for 14" and larger and shall conform to AWWA C-900-16 latest edition for 4" to 60", unless otherwise indicated on the construction Plans. b) Joints Joining of PVC pipe shall be with elastomeric-gasket bell ends or couplings.The bell ends shall be an integral thickened bell end (IB) or an integral Sleeve-reinforced bell end. The bell end joints shall have a minimum wall thickness of the bell or Sleeve-reinforced bell equal, at all points, to the DR Requirements for the pipe. The minimum wall thickness in the ring groove and bell-entry sections shall equal or exceed the minimum wall thickness of the pipe barrel. If bell ends are not part of the pipe, one PVC coupling, manufactured of the same material and by the same manufacturer as the pipe, shall be furnished with each length of pipe together with two (2) rubber rings. The coupling shall be designed to ensure a water-tight joint with the pipe. The coupling body and socket shall have a wall thickness equal to the pipe barrel thickness with which the coupling is to be used. All rubber rings shall be furnished by the pipe manufacturer. These rubber rings (Elastomeric Gaskets)shall be manufactured to conform with the requirements of ASTM F-477. c) Hydrostatic Proof-test Each length of pipe shall be proof-tested at four (4) times its rated Pressure Class for a minimum dwell of five (5) seconds. d) Inspection and Testing City of Fresno at its discretion may inspect the plant facilities, materials, manufacture and testing of the pipe to be furnished by Contractor. Testing of the pipe to ensure compliance with these Specifications shall be made in accordance with applicable AWWA Standards latest edition. e) Fittings All fittings for use with Polyvinyl chloride pipe shall be ductile iron manufactured in accordance with ANSI/AWWA C110/A21.10 or ANSI/AWWA C153/A21.53. All Mechanical Joint or push-on joint fittings shall be rated for 350 psi working pressure in sizes 4"through 24". Flange fittings shall be rated for 250 psi working pressure. Flange drilling pattern shall be in accordance with ANSI/AWWA C110/A21.10, or commonly referred to as a 125#drilling pattern. In accordance with Section 4.4 of ANSI/AWWA C153/A21.53, fittings may be provided with a cement-mortar lining and asphalt coating or fusion bonded epoxy inside and outside. Fusion bonded epoxy shall be in accordance with ANSI/AWWA C116/A21.16 and shall be applied to interior and exterior surfaces. All tees and crosses shall have all flanged ends with the exception of fire hydrant, blow-off, and pumping connections, which shall have flange by Mechanical Joint or push-on joint ends; reducers shall have flange by Mechanical Joint ends; elbows maybe either Mechanical Joint or flanged ends. A/C to C.I.O.D. PVC adapter rings may not be used. f) Appurtenances All appurtenances used in conjunction with PVC shall meet the City of Fresno Standard Specifications. 77-1.02C Gate Valves a) General These Specifications designate the requirements for the manufacture and installation of gate valves. The Contractor shall furnish all labor, materials, tools and equipment necessary to install, complete and ready for operation, the valves as shown on the Plans and herein specified. b) Materials and Workmanship Gate valves shall be non-rising stem resilient seated type. Valves shall conform to the latest version of AWWA C-509 and C-550. Valve bodies shall be ductile iron and wedges shall be fully rubber encapsulated. The stem shall have two O-rings above the collar and one O-ring below the collar. Stem seals must be replaceable with the valve under pressure. The stem material shall be stainless steel [ANSI-420], low zinc bronze or manganese bronze. The waterway shall be full size. No cavities or depressions are permitted in the seat area. Valve body and bonnet shall be electrostatically applied, fusion bonded, epoxy coated both inside and out by the valve manufacturer. The coating shall meet the requirements of AWWA C-550 or C-515 Ductile Iron and NSF 61 approved. All valve body and bonnets bolts and nuts shall be type 304 stainless steel. All valves must be tested by hydrostatic pressure equal to the requirements in the AWWA C- 509 specifications prior to shipment. Tapping gate valve assemblies shall be used only in conjunction with tapping Sleeves and shall be furnished and installed by the Water Division. Nuts and bolts used for bolting flanged-end gate valves to pipeline flanges above ground, shall be hexagonal head machine bolts and hexagonal nuts conforming to ASTM A307, Grade B. All buried flanged-end gate valves shall be bolted to the pipeline flanges with Ni-Cad nuts and bolts or approved equal. c) Gaskets Gaskets for flanged-end gate valves shall be right face 1/8". d) Valve Ends Valves may be provided with Mechanical Joint ends, push-on joint ends, flanged ends, Mechanical Joint by flange ends or push-on joint by flange ends. 77-1.02D Appurtenances Blow-off Assemblies for Water Mains a) General Blow-off assemblies shall be furnished and installed by the Contractor at the locations shown on the Plans. The Contractor shall furnish all labor, materials, tools, and equipment necessary to furnish and install, complete and ready for operation, the assemblies as shown on the plans and herein specified. See City Standard Drawing Nos. W-9 and W-10. b) Materials, Fabrication, and Installation 1) Materials: Shall be ductile iron and sized as designated on the City of Fresno Standard Drawing Nos. W-9 and W-10 or on the Plans. 2) Valves: Gate valves or butterfly valves for blow-off assemblies shall be as specified herein. 3) Pipes and Fittings: Shall be 4-inch or 6-inch ductile iron and shall conform with the standard for ductile iron pipe water main and fittings. Joints on the water main side of the gate valves shall be flanged. Properly restrained MJ fittings are allowed downstream of the gate valve. 4) Pipe Sleeves and Lids: Shall be used per City of Fresno Standard Drawing No. W-7. 5) Meter Boxes and Lids: Shall be per City of Fresno Standard Drawing Nos. W-9 and W-10 or Engineer approved equivalent and marked "Water". Covers shall be seated flush with the surface of the natural ground or paved surface, such that they may not be damaged by, nor present an obstruction or rough surface to traffic. Air Release Valve Assemblies Remove ARV from its existing location such as not to cause damage or render it unsuitable as inspected by the Engineer. No additional compensation shall be given to replace ARVs if damaged during construction. Install ARV at new location per manufacturer recommendation. ARV at new location shall function properly as determined by the City of Fresno Water System Supervisor. Contractor shall coordinate with the City of Fresno Water System Supervisor to request for control valve shut-offs to the ARV's prior to relocation. Remove enclosure from its existing location such as not to cause damage or render it unsuitable as inspected by the City of Fresno Water System Supervisor. No additional compensation shall be given to replace enclosures if damaged during construction. Install enclosure at new location per manufacturer recommendation. 77-1.03 CONSTRUCTION 77-1.03A Installation The Contractor performing the Work under this Specification shall furnish all labor tools and equipment, which are necessary to install, complete, and ready for operation, the pressure pipe water mains and appurtenances as herein specified and/or as indicated on the contract drawings. A temporary backflow device will be required when extending the 16" diameter pipeline. Installation of Ductile Iron pipe shall conform to AWWA C-600 and Installation of Ductile Iron Pipe and Fittings in AWWA Manual M41.Q2 Installation of PVC pipe shall conform to AWWA Standard C 605 and AWWA Manual M23. Bending of PVC pipe barrels to accomplish horizontal or vertical curves is not permitted. Quality of Workmanship All Work will be done by Persons experienced in the specific Work, under competent supervision and in a first-class manner to the Engineer's complete satisfaction. Every precaution shall be taken to prevent foreign material from entering the pipe while it is being placed in the trench. If the pipe-laying crew cannot put the pipe into the trench and in place without getting earth into it, the Engineer may require that before lowering the pipe into the trench a heavy tightly woven burlap bag of suitable size shall be placed over each end and left there until the connection is to be made to the adjacent pipe. During laying operations, no debris, tools, clothing, or other materials shall be placed in the pipe. After placing a length of pipe in the trench and completing the jointing operation, in a method approved by the pipe manufacturer, the pipe shall be secured in place with approved backfill material placed under it.At times when pipe laying is not in progress,the open ends of the pipe shall be closed by a watertight plug or other means approved by the Engineer. This provision shall apply during any Work stoppage. Connections to Existing Facilities Connections shall be performed by City of Fresno Water Division personnel only.Three(3) Days' notice shall be given before any connection is to be made. Excavations for appurtenance structures, such as blow-offs, hydrant runs, vaults, valves, etc., shall be deemed to be in the category of trench excavation. Trench and Structure Excavation Excavations shall be made to the depths and widths required accommodating construction of conduits and structures to specified dimensions and to the lines and grades indicated on the Plans. Unless otherwise indicated on the Plans, excavations for pipe construction may be open cut. The Contractor shall be responsible for locating and protecting subsurface obstructions in the field and shall notify the Engineer immediately if conflicts occur. The Contractor shall perform all excavations in accordance with the Trench Construction Safety Orders issued by the Division of Industrial Safety of the Department of Industrial Relations of the State of California and the Caltrans Standard Specifications. When a trench or structure Site is to be located in an existing oiled earth or pavement area,the existing surfacing to be removed shall be cut by methods approved by the Engineer along neat lines on each side of the trench or around the structure Site. Existing surfacing, when removed, shall be kept separated from the material that is to be returned to the excavation. Failure to comply with this requirement shall be grounds for rejection of the contained material for use as backfill. Material excavated from the trench shall be placed so as to offer minimum obstructions to traffic. All existing gas pipes, water pipes, conduits, Sewers, drains, fire hydrants, and other structures which are not, in the opinion of the Engineer, required to be changed in location shall be carefully supported and protected from injury by the Contractor; and in case of injury, they shall be restored by him/her, without additional compensation, to as good a condition as that in which they were found. The Contractor shall provide, without additional compensation, suitable temporary channels for the water that may flow along or across the site of the Work when necessary. If all excavated material cannot be stored on the Roadway in such a manner as to maintain access to property along side of the Work, the surplus material shall be removed from the Work and stored until needed for backfill at which time it shall be brought back. If the surplus material is to be stored on other than private property, prior approval must be obtained from the Engineer for the site to be used. The cost of removing and returning material shall be at the Contractor's expense. Bell Holes Bell holes are required for push-on and mechanical joint pipe. While push-on joints require only a small depression beneath each bell to allow pipe to lay flat on the trench bottom, mechanical joints require additional space for operation of a ratchet wrench. Minor excavations, which are necessary for removing the sling and for assembling the joints, shall be made in advance of the laying crew and filled after these operations are completed. Trench Width The trench must be wide enough to permit proper installation of the pipe with room for assembling joints and tamping backfill around the pipe. The trench must be at least 12 inches wider than the outside diameter of the pipe to allow for proper placement, tamping, and compaction of the initial backfill. Per the City Standard Specifications, Error! Reference source not found., the width of the trench at the top of the pipe shall not be greater than 16 inches more than the outside diameter of the barrel of the pipe to be laid therein.These requirements may be modified by the Engineer or as shown on the Plans. Trench Grade Alignment and elevation stakes shall be furnished to the Contractor at set intervals and agreed upon offsets. Where elevation stakes are furnished, the Engineer will also furnish the Contractor with cut sheets. For all pipe 12 inches or greater in diameter, the Contractor shall excavate for and provide an initial granular bedding at least 4 inches thick or 1/12 the O.D. of the pipe whichever is greater. This bedding material shall be placed at a uniform density with minimum compaction and fine graded as specified below. Bell or coupling holes shall be dug after the trench bottom has been graded. Such holes shall be of sufficient width to provide ample room for caulking, banding, or bolting. Holes shall be excavated only as necessary to permit accurate work in the making of the joints and to ensure that the pipe will rest upon the prepared bottom of the trench, and not be supported by any portion of the joint. Depressions for joints, other than bell-and-spigot, shall be made in accordance with the recommendations of the joint manufacturer for the particular joint used. Shoring In addition to, and consistent with public safety considerations, every precaution for safety must be provided for the workers at the Site. Shoring must comply with Cal-OSHA Standards. Grading and Stockpiling All grading in the vicinity of trench excavation shall be controlled to prevent surface water from flowing into the trenches. Any water accumulated in the trenches shall be removed by pumping or by other approved methods. During excavation, material suitable for backfilling shall be piled in an orderly manner, a sufficient distance back from the edges of trenches, to avoid overloading and to prevent slides or cave-ins. Material unsuitable for backfilling, or excess material, shall be hauled from the Site and disposed of by the Contractor. The Contractor shall, prior to final acceptance of the Work,submit a letter to the City stating the location of each disposal site for all excess or unsuitable material and certify that he has obtained the property owner's permission for the disposal of all such materials. Open Trench Except where otherwise noted in the special provisions, or approved in writing by the Engineer, trenches shall be excavated only as far in advance of pipe laying as can be backfilled in the same Day. The maximum total length of open trench shall be 600 feet (185 meters), except where approved in writing by the Engineer. Any excavated area shall be considered open trench until all aggregate subbase material for pavement replacement has been placed and compacted. With the approval of the Engineer, pipe laying may be carried on at more than one separate location, the restrictions on open trench applying to each location. Trenches across Streets shall be completely backfilled as soon as possible after pipe laying. Substantial steel plates with adequate trench bracing shall be used to bridge across trenches at Street crossings where trench backfill and temporary patches have not been completed during regular work hours. Safe and convenient passage for pedestrians shall be provided. The Engineer may designate a passage to be provided at any point she/he deems necessary. Access to hospitals, fire stations and fire hydrants must be maintained at all times. FOUNDATION, BEDDING, BACKFILLING AND COMPACTION OF TRENCHES Foundation and Bedding The material upon which the conduit or structure is to be placed shall be accurately finished to the grade or dimensions shown on the Plans or as directed by the Engineer. The bottom portion of the trench shall be brought to grade so that the conduit or structure will be continuously in contact with the material on which it is being placed. Whenever the bottom of the trench is soft, yielding or unsuitable as a foundation for the pipe, such material shall be removed to a minimum of 12 inches (300mm), or to a depth determined by the Engineer, below the bottom of the pipe or structure, and for a width equal to at least '/z diameter on each side of the pipe, and the space backfilled with sufficient clean granular material of the type directed by the Engineer to ensure a proper foundation. No additional payment will be made for over-excavation or placement of clean foundation material unless so indicated in the Specifications or approved by the Engineer. The maximum width of the trench at the top of the pipe shall not be greater than that specified in Table 17-3.1, unless otherwise specified on the approved Plans or Specifications for the Project. Trenches shall be excavated to the depths required for the foundation of Sewer pipes and their appurtenances shown on Plans and where conditions make it necessary to such depths as may be directed by the Engineer. The bottom of the trench shall be excavated or backfilled so that the barrel of the pipe shall have uniform bearing for its entire length, except for the area necessary for bell holes. All adjustment of pipe to line and grade must be made by scraping away or filling and tamping. The use of blocks as support is forbidden. An additional depth and width shall be hand dug at joint or bell locations of sufficient depth to relieve the bell of any load and to allow ample space for making the joint. Where the pipe is to be laid on sand having less than optimum moisture, as determined by the Engineer, the Contractor shall apply sufficient water and compact the sand prior to placing the pipe. Pipe Embedment Zone Pipe Embedment Zone shall be defined as that material supporting, surrounding, and extending to 12 inched (0.3m) above the top of the pipe. Material used for backfilling within the Pipe Embedment Zone shall consist of the following select Class II or Class III material as defined herein and shall be compacted to a minimum 90% as determined by ASTM D1557 (latest editions). Class Il: Washed concrete sand conforming to Section 90 1.02C(4)c of the State Standard Specifications. Class III: Select natural sand and coarse silty sand conforming to the following particle size gradation and sand equivalent: Sieve Size Percent Passing By Weight 3/8" 100 No. 4 75-100 No. 30 12-50 No. 100 5-20 No. 200 0-10 Sand Equivalent 30 Minimum Initial Backfill Initial backfill shall be the material between the top of the bedding material and 12 inches (0.3mm) above the top of the pipe. Initial Backfill shall consist of placing and firmly compacting selected granular backfill material under the haunches of the pipe and up to the spring-line of the pipe, and then filling to a level 12 inches (300mm) above the top of pipe. Initial backfill shall be placed immediately after the pipe has been laid to line and grade in the trench, inspected and passed by the Engineer. The material shall be carefully placed so as not to disturb or damage the pipe or its placement, and shall be brought up evenly on both sides. Initial backfill material shall be backfilled to one foot (1') above the top of the pipe, in layers not to exceed eight inches (8") in depth and tamped by hand or pneumatic tampers to a relative compaction of 90% as determined by ASTM D1557. The method of compacting and obtaining density requirements for all pipe trenches shall be such that the backfill material shall be completely compacted around the lower haunches of the pipe, such that line and grade of the pipe is not disturbed, and the pipe is not damaged. Where the City's water system is utilized for construction water, the Contractor shall obtain a water meter from the Water Division (fire hydrant meter are required for all users).The Contractor shall obtain the permission of the Water Division Engineer as to which hydrants are to be utilized. Jetting and Flooding of trenches from the top is not permitted. Final Backfill Final Backfill shall be the material above the Initial Backfill and consist of sound earthen material which is free of all rocks, hardpan, paving material,organic matter, broken concrete,wood or other deleterious material. Unless otherwise specified, this may be selected native material with no piece larger than 2 inches (50mm). When satisfactory compaction of the native material cannot be achieved, select material in accordance with Initial Backfill requirements shall be required except as necessary to achieve asphalt pavement subgrade requirements. Backfilling of trenches shall be accomplished and constructed per City Standard Drawing No. W-29 with the type of replacement noted on the plans or in the Specifications. Surface restoration shall be accomplished and constructed per City Standard Drawing No. P-48. Backfilling of trenches above the initial backfill as indicated in Section Error! Reference source not found., above, shall be as follows: a) Where mechanical compaction is used, the moisture content shall be such that the specified compaction can be obtained and the backfill shall be placed in lifts the height of which shall not exceed that which can be effectively compacted depending on the type of material, type of equipment and methods used, and under no circumstances shall exceed 4 feet. All backfill shall have a relative compaction of 90%to within twenty-four inches (24")of the surface and the top twenty-four inches (24") shall have a relative compaction of 95%. Test Method ASTM D 1557 shall be used to determine relative compaction, using the dry random sampling method (dry weight basis). No free water will be allowed in the top twenty-four inches (24")of backfill. Backfill, around Utilities that are exposed during trench excavation, shall be placed in accordance with the above bedding, backfill, and compaction methods. TESTING AND STERILIZATION General The Specifications constituting this section designate the requirements for the procedure, materials, performance, and payment for testing and sterilization of water mains and appurtenances intended for the conveyance of potable water under pressure. Scope of Work: The Contractor shall furnish all labor, material, tools, and equipment, including all chemicals, necessary to perform all operations required to complete the testing and sterilization as herein specified. Field Testing a) Hydrostatic Pressure Test: Hydrostatic Pressure test. After the pipe and all appurtenances have been laid and the backfill has been placed and compacted, a hydrostatic pressure test shall be conducted. A hydrostatic test shall be conducted on the entire pipeline for a period of 2 hours at a hydrostatic pressure of 200 psi for Class 200 pipe and 150 psi for Class 150 pipe. In locations where there is a combination of Class 200 and Class 150 pipe, the system testing pressure shall be 150 psi. All valves in the pipeline shall be in the open position during system testing. b) Preparation:The line shall be filled with water at least 24 hours prior to testing. While filling and immediately prior to testing, all air shall be expelled from the pipeline.Where air valves or other suitable outlets are not available for introducing water or releasing air for test purposes, taps and fittings approved by the Engineer shall be installed and later securely plugged. c) Procedure: The procedure shall follow those specified in the AWWA Standard C-600 Sec. 5.2 for ductile iron and C-605 Sec. 10.3 for PVC pipe.The pressure in the pipeline shall be pumped up to the specified test pressure. When the test pressure has been reached, the pumping shall be discontinued until the pressure in the line has dropped 5 psi, at which time the pressure shall again be pumped up to the specified test pressure. This procedure shall be repeated until the end of the test period.At the end of the test period, the pressure shall be pumped up to the test pressure for the last time. The total quantity of water pumped to maintain pressure shall be measured and compared to the allowable. d) Leakage: Shall not exceed the amount calculated, using AWWA Standard C-605 for PVC and C-600 for ductile iron. Sterilization Prior to pressure testing and prior to acceptance of Work, the entire pipeline including all valves, fitting, hydrants, service laterals, and other accessories shall be sterilized in accordance with AWWA C-601 latest revision. All mains shall be flushed with potable water after completion of construction and prior to disinfection. The Contractor shall provide a sufficient number of suitable outlets at the end(s) of the line(s) being sterilized in addition to those required by the Plans, to permit the main to be flushed with water at a velocity of at least 5.5 feet per second over its entire length. The outlets provided shall meet the requirements for fittings as specified for the type main constructed. Temporary blow-offs may be installed during the sterilization and flushing to satisfy these requirements. Drainage facilities shall be constructed such that the water lines cannot be contaminated through the flushing outlet.After flushing, chlorine gas or chlorine compound solution made with liquid chlorine, calcium hypochlorite in solution or sodium hypochlorite solution shall be water mixed and introduced into the mains to form a chlorine concentration of approximately 100 ppm or that which will provide a minimum residual of 50 ppm in all parts of the line after 24 hours have elapsed. During the sterilization process all valves, hydrants and other accessories shall be operated. After chlorination, the water shall be flushed from the line at its extremities until the replacement water tests are equal chemically and bacteriologically to those of the permanent source of supply. The placing of chlorine capsules or tablets in pipe sections during the laying process will be considered as an acceptable method of sterilization. The chlorine water solutions shall be diluted to a chlorine concentration of not more than 100 ppm and not less than 50 ppm measured in the water lines. The Contractor shall keep adequate chlorine residual testing and indicating apparatus available on the site during the entire sterilization period. After final flushing, the flushing fitting shall be plugged with devices intended for this purpose at the pressure class of the pipe. Where water main is coated, plugs and outlets shall be similarly coated. Bacteriologic samples of water for the specified bacteriologic test shall be taken from each end of the sterilized main (located downstream of the point of introduction of chlorine disinfectant and at other locations as determined necessary by the Engineer.)Additional samples shall be taken at intermediate points in such a manner that at least one sample is taken for each 700 feet of main. Bacterial samples will be taken a minimum of 48 hours after the mains have been flushed of all chlorine. The Contractor shall dechlorinate disinfecting water and flushing water if required by the Plans or the Engineer. 77-1.04 PAYMENT The payment quantity for"Relocate ARV Assembly" on the Bid Item List will be paid by each relocated assembly, including but not limited to removing and reinstalling the ARV, enclosure, removing existing and pouring concrete pad, cutting existing and extending pipe, testing, disinfecting and all necessary appurtenant material and labor to provide a fully operational ARV in the same manner as assembled prior to construction. The payment quantity for"Relocate blow-off Assembly"on the Bid Item List will be paid by each relocated assembly, including but not limited to removing and disposing existing blow-off assembly, cutting existing and extending 16" pipe and 6" pipe as shown on the plans, relocating existing gate valve, installing new blow-off assembly, testing, disinfecting and all necessary appurtenant material and labor to provide a fully operational blow-off assembly in the same manner as assembled prior to construction. The payment quantity for"Install Bollard" on the Bid Item List will be paid by each bollard installed, including but not limited to furnishing and material to excavation, pour foundation, installing bollard and all necessary appurtenant material and labor to install bollard per plans and specifications. 77-2 TEST STATION 77-2.01 GENERAL WORK INCLUDED: A. This section covers the work necessary to furnish and install a corrosion monitoring system, which includes test stations, electrical isolation, do blocking devices, and pipe joint bonds for electrical continuity, complete. B. Contractor to have a third party Corrosion Expert to perform Contractor required quality control testing as defined this section. STANDARDS C. The following standards are included by reference: 1. NACE SP-0169 2. NACE SP-0177 QUALITY CONTROL D. All CONTRACTOR specified testing shall be performed by a third party Corrosion Expert whom holds a current NACE accreditation as a Cathodic Protection Specialist (CP-4) or Cathodic Protection Technologist (CP-3), and/or a registered professional engineer with verifiable expertise in corrosion control and cathodic protection. E. Contractor performed quality control testing shall include the following tests, which shall be performed as defined this section. 1. Test wire continuity with pipe. 2. Test wire isolation between wires. 3. Other Testing as specified in Section 13115, Cathodic Protection 77-2.02 MATERIALS GENERAL: A. Like items of materials provided hereunder shall be the end product of one manufacturer to achieve standardization for appearance, maintenance, and replacement. B. Materials and workmanship as specified in this section shall be installed concurrently with pipe installation. Coordinate all work specified herein with related sections. SUPPLIERS: A. Alternate suppliers will be considered, subject to approval of the ENGINEER. Address given is that of the general office; contact these offices for information regarding the location of their representative nearest the project site. 1. Corrpro, Inc., Chicago, IL www.corrpro.com 2. Farwest Corrosion Control, Gardena, CA www.farwestcorrosion.com 3. Hoff Company, Inc. , Denver, CO www.pipelinesupplies.com 4. MESA Products, Tulsa, OK www.mesaproducts.com 5. Northtown Products, Huntington Beach, CA www.northtownproducts.com CATHODIC PROTECTION TEST STATIONS A. Flush Style, Vehicular Traffic: 1. Test Box: Concrete body cast with a cast iron ring,with a minimum weight of 55 pounds and minimum dimensions of 9-inch inside diameter and 12 inches long. 2. Furnish extensions as required to penetrate concrete surfaces by 4 inches minimum. 3. Furnish with a 14-pound cast iron lid with the words "CP Test" cast into the lid. 4. Manufacturer and Products: Brooks; Models 3RT or Christy Oldcastle Model G05, or equal. B. Flush Style Terminal Boards: 1. Dimensions: 5-inch by 8-inch by 1/4 inch thick 2. Material: Phenolic, micarta, or fiberglass. 3. Terminals: Stainless steel bolts, double nuts, double flat washers, lock washer, and shunt. Quantity and placement as shown on the Drawings. 4. Labels: Engrave terminal board with label of each terminal as shown on the Drawings and with the OWNER's name and contact number. VINYL LABELS A. Test station Identification labels shall be vinyl labels identical to the existing ones B. Labels shall be silk screened printed with graphics and text as shown on Drawings with UV resistant clear coat protection. C. Label shall be vinyl, self-adhesive, waterproof, weatherproof, UV resistant to fading or color change, and provide 10-year service life on properly prepared and cleaned surface. REFERENCE ELECTRODES: A. Prepackaged Copper-Copper Sulfate Reference Electrodes: 1. Material: Permanent type, copper-copper sulfate reference electrode suitable for direct burial with a minimum design life of 25 years. 2. Lead Wire: a. As specified under wire, this section, b. Length of 25 feet or as required for splice free installation. 3. Backfill: As recommended by the reference electrode manufacturer. B. Zinc Reference Electrodes: 1. Reference electrodes shall be 1.4 inches by 1.4 inches by 9 inches long cast of special high-grade zinc as specified in ASTM B 6-77. 2. Reference electrodes shall be supplied prepackaged in a permeable cloth bag with 75 percent gypsum, 20 percent bentonite, and 5 percent sodium sulfate backfill. 3. Lead wire shall be a minimum of 25 feet long of No. 12 AWG stranded copper wire with yellow, 600-volt, Type TW, THWN, or THHN insulation. 4. The lead wire shall be attached to the electrode core with the manufacturer's standard connection. The connection shall be stronger than the wire. WIRE: A. Pipe and Test Lead Wires: 1. Pipe Test Wires: No. 10 or 12 AWG wire, single-conductor, stranded copper with 600- volt, TW, THWN, or HMWPE insulation. 2. Insulation Color: Color shall indicate the function of each test wire and shall be as follows: a. Pipe: White b. Reference electrodes: Yellow c. Casings: Orange d. Foreign Pipe: Blue (Water)or Red (Gas or oil) e. Insulating Joints: White and Green as shown on Drawings f. Corrosion Coupons: Green B. Reference Electrode Wires: No. 14 or 12 AWG wire single-conductor, stranded copper with 600-volt, TW, THWN, USE2, or HMWPE insulation. Color code insulation as specified. Wire length of 25 feet or as required for splice free installation. CONDUIT, LOCKNUTS, AND STRAPS: A. Buried Conduit: 1. Conduit shall be PVC coated rigid steel. 2. Locknuts, two-hole straps, and other miscellaneous hardware shall be galvanized steel. Galvanized items shall be hot-dipped galvanized in accordance with ASTM A153. WIRE SPLICE INSULATING KIT: A. Tap Splice: Tap splice insulating kit for the connection of the anode wire to the anode header wire shall be 3M Company Scotchcast 90-131; Hexcel Kit No. 7K53; Raychem Corp.Thermofit No. ASE-4, or equal. B. In-Line Splice: In-line splice insulating kit for the connection of the anode wire to the anode header wire shall be 3M Company Scotchcast 82-A2; Hexcel Kit No. 7K32; Raychem Corp. Thermofit No. ASE-4, or equal. THERMITE WELD MATERIALS: A. General: 1. Thermite weld materials consist of wire sleeves, welders, and weld cartridges according to the weld manufacturer's recommendations for each wire size and pipe or fitting size and material. 2. Welding materials and equipment shall be the product of a single manufacturer. Interchanging materials of different manufacturers is not acceptable. B. Molds: Graphite, as recommended by manufacture for pipe and wire size. C. Adapter Sleeves: 1. For No. 12 AWG and No. 2 AWG wires. 2. Prefabricated factory sleeve joint bonds or bond wires with formed sleeves made in the field are acceptable. Attach field-formed joint bonds sleeves with the appropriate size and type of hammer die furnished by the thermite weld manufacturer. 3. Extend wire conductor 1/8 inch beyond the end of the adapter sleeve. D. Cartridges: 1. Steel: 32 grams, maximum. 2. Cast and Ductile Iron: 45 grams, maximum, XF-19 Alloy E. Welders and Cartridges: For attaching copper wire to pipe material: Cartridge Size, Pipe Material Weld Type Max. No. 6 AWG Wire & Smaller Steel HA, VS, HC 15 gm Ductile or Cast Iron HB, VH, HE 25 gm No. 4 AWG Wire & Smaller Steel HA, VS, HC 25 gm Ductile or Cast Iron HB, VH, HE 32 gm No. 2 Wire Joint Bonds Steel FS 32 gm Ductile or Cast Iron FC 45 gm Concrete Cylinder Pipe HA, GR 32 gm Copper Strap Joint Bonds Steel M-128 15 gm F. Welding Materials Manufacturers: 1. Erico Products Inc. (Cadweld), Cleveland, OH. 2. Continental Industries, Inc. (Thermo-Weld), Tulsa, OK. COATING REPAIR MATERIAL FOR PIPE AND FITTINGS A. General: 1. Complete coating repairs in accordance with recommendations of the pipe or fitting manufacturer. 2. B. Coating Requirements: 1. Steel Pipes: a. Coal tar coatings: Koppers Bitu mastic 50 or Denso or Tapecoat wax tape coatings; or equal, 20 mils dry film thickness, minimum. b. Polyurethane or Epoxy Coatings: Fast cure epoxy, 20 mils dry film thickness, minimum c. Tape Wrap or Extruded Polyethylene Coating: Thermite Weld Cap, Canusa CRP Patch, or Raychem PERP patch, or equal d. Cement Mortar Coating: In accordance with AWWA C205. 2. Ductile iron Pipe: a. Fast cure epoxy b. Thermite weld cap 3. Concrete Cylinder Pipe: a. Cement mortar, 1-inch minimum cover. C. Coating Materials: 1. Thermite Weld Caps: a. Royston Laboratories Handi-Cap IP, prefabricated primerless thermite weld cap and coating system. b. Provide primer unless specifically stated in product data sheet that no primer is required. 2. Fast Cure Epoxy Coating: a. 100 percent solids, fast curing epoxy suitable for submerged or buried conditions. b. Acceptable products or equal: (1) Denso Protal 7125 (low temperature) or Protal 7300 (2) Tapecoat TC 7010 (3) 3M ScotchKote 323 3. Cement Mortar: a. In accordance with AWWA C205. OTHER MISCELLANEOUS MATERIALS A. Test Station Wire Terminations: One-piece, tin-plated crimp-on ring tongue connector as manufactured by Burndy Co. or Thomas and Betts. B. Electrical Tape: 1. Linerless rubber high-voltage splicing tape and vinyl electrical tape suitable for moist and wet environments. 2. Use Scotch 130 C and Scotch 88 as manufactured by 3M Products. TEST STATION INSTALLATION A. General: 1. Test station location, type, and style shall be as shown on the Drawings. 2. CONTRACTOR shall maintain records showing actual pipeline stationing of test station wire connections to the pipe. 3. Records of actual pipeline stationing shall be provided to ENGINEER prior to preliminary electrical continuity testing. 4. Locate flush mounted test stations as indicated in the plans. a. All offset test station wires shall be protected with PVC coated rigid steel conduit from pipeline centerline to within 6-inches of test station as shown on the Drawings. Do not connect rigid conduit to test station. b. Test stations shall not be mounted inside of vaults, manholes, or other confined spaces. B. Style: 1. Test station style shall be as shown on the Drawings and as follows: 2. Flush mount style test stations shall be used for all type test stations in roads or areas where aesthetic requirements restrict use of aboveground facilities. C. Installation: 1. Flush Mounted Test Stations a. Place in concrete pad or sidewalk with cast iron cover as shown on Drawings. b. Place concrete box on top of 3-inch base of compacted sand. C. In unimproved areas provide blue "Carsonite" utility marker with yellow reflector on each side 1 foot from test box or as directed by the ENGINEER. D. Test Wires: 1. Wires shall be attached to the pipe as specified under WIRE CONNECTIONS, this section. 2. Wire connections shall be an individual connection with not less than 6-inches separation from other connections. Common connections will not be allowed. Where a steel tab is welded to pipe for test wire connections, a separate tab shall be provided for each wire connection. 3. Wires shall be buried a minimum of 24 inches below finished grade, except in undeveloped or cultivated areas where test wires shall be a minimum of 30-inches below finished grade. 4. Wires shall be direct buried except where test station offset is required. Offset wires shall be installed in PVC coated rigid steel conduit from the centerline of the pipeline to 6-inches from test station. Rigid conduit shall not be connected to the test station. 5. Provide 12-inch diameter loop in wires at the pipeline connection, at each end of rigid conduit, and below post mounted test stations to prevent wires from being stressed or broken. 6. Maintain sufficient slack in flush mount test wires to permit extension of terminal block 18-inches above test station. Connect all wires to a terminal board as specified. 7. Make wire connections to test station terminals with crimp-on ring tongue terminals, except where solid wire is specified. REFERENCE ELECTRODE INSTALLATION A. Remove plastic or paper wrapper and place reference electrode within the pipeline trench excavation 6 inches from pipe in a vertical position and activate reference electrode per manufacturer's written instructions. B. Install reference electrode at Type F test stations equidistant from each pipeline at the location as shown on the Drawings. C. Backfill hole with select native material in 6-inch layers and hand tamp each layer around anode. Use only native soil for backfill; do not use sand or flowable fill. Exercise care not to strike reference cell or lead wire with tamper. D. Terminate reference electrode wire in test station on separate terminal. THERMITE WELD WIRE CONNECTIONS: A. Use thermite weld method for electrical connection of copper wire to steel, ductile iron, and cast iron surfaces. Observe proper safety precautions, welding procedures, thermite weld material selection, and surface preparation as recommended by the material manufacturer. Assure that pipe or fitting wall thickness is of sufficient thickness that the thermite weld process will not damage the pipe or fitting wall's integrity or damage the lining in any way. B. Before the connection is made, the surface shall be cleaned to bare metal by making a 2- inch by 2-inch window in the coating, and then filing or grinding the surface with a vitrified wheel to produce a bright metal finish. Wire sleeves shall be installed on the ends of the wire before welding to the metal surface. C. After the weld connection is cooled, remove slag, visually inspect, and physically test wire connection by hitting with a hammer. Remove and replace any defective connections. D. Make wire connections to concrete cylinder pipe by thermite welding to the shop welded steel plates provided on the pipe for this purpose. E. Coat each completed wire connection as specified, this section. If lining is damaged by welding, repaired in accordance with the lining applicator's recommendations. TRENCHING AND BACKFILL A. General 1. Complete excavations and trenching regardless of the type, nature, or condition of materials encountered, and as required to accomplish specified construction to lines and grades shown. 2. CONTRACTOR shall complete all utility notifications prior to performing trenching and excavations work. 3. Take care to avoid damage to existing structures and utilities during excavating and trenching process. CONTRACTOR may modify location, where approved by the ENGINEER, to minimize possible damage to existing structures. Trench shall be of uniform depth and width, level, smooth, and free of sharp objects. B. Trench Depths: 1. Trench depths vary for conditions and requirements. Trench depths provided are minimum requirements. CONTRACTOR to meet minimum requirements or that required by local utilities, ordinances, or regulations, whichever is more stringent. a. Minimum depths for corrosion monitoring work shall be as defined herein or shown on the Drawings. If in conflict, the more stringent shall apply. Pipeline Test wires 30-inches (conduit) All other 30-inches C. Safety 1. Slope, shore, or brace excavations and trenches in accordance with OSHA regulations as necessary to prevent caving during excavation in unstable material, or to protect adjacent structures, property, workers, and the public. 2. CONTRACTOR shall have sole responsibility for ensuring safety of trenches and conformance to OSHA trench safety requirements. D. Backfill and Compaction 1. Backfill trench with excavated backfill materials, unless otherwise specified. 2. Compaction requirements shall be as specified for the pipeline or 90 percent compaction, whichever is more stringent. Backfill within 5 feet of roadways, paved areas, or other traffic areas shall be compacted to 95 percent. 3. Do not use backfill material of frozen or consolidated debris. Leave the trench with the excess backfill material neatly mounded, but not more than 4 inches above the existing ground level, for the entire width of the trench in undeveloped areas. 4. Replace topsoil in developed, landscaped, or cultivated areas. WIRE INSULATION REPAIR A. Underground splicing of wire will not be permitted, except where specifically shown on the drawings and approved by the ENGINEER. B. Where splicing is approved by the ENGINEER, splices shall mechanically secure and soldered with rosin cored 50/50 solder. Compression connectors will not be permitted. C. Splices or insulation damage to test station wires shall be spirally wrapped with two coats of high-voltage self-vulcanizing rubber splice tape and two layers of vinyl electrical tape. QUALITY CONTROL TESTING A. General: 1. Contractor shall correct all construction defects identified during testing. 2. Contractor required testing as defined herein shall be performed by a Corrosion Expert, with qualifications as specified this section, whom is an employee or subcontractor to the Contractor. 3. Corrosion Expert shall prepare, sign, and submit a certification letter asserting that the relocation of the Test Stations has been performed meeting standard for this work 77-2.04 PAYMENT The unit price paid for"RELOCATE TEST STATIONS" shall include full compensation for furnishing all labor, materials, tools, and equipment including but not limited to, removal of existing box and concrete, new conduits, wires, splicing, meter box and lid, concrete pad, coordination with City of Fresno, and any other the work as described herein these specifications, construction drawings and to provide fully operational Test Stations in the same manner as assembled prior to construction and accepted by City of Fresno. 78 INCIDENTAL CONSTRUCTION Add the Following to Section 78-2 Damaged or destroyed survey monuments shall be replaced with new survey monuments. Survey monuments shall be constructed or adjusted, as applicable, in accordance with Standard Drawing A-74 Type D. Survey control for the reestablishment of survey monuments will be provided by the Department. DIVISION IX TRAFFIC CONTROL DEVICES 82 SIGNS AND MARKERS Replace Section 82-1.01A with: 82-1.01A Summary Section 82-1 includes general specifications for fabricating and installing sign panels and markers and constructing roadside signs. Signs and markers must comply with the California MUTCD, California Sign Specifications, and the FHWA publication Standard Highway Signs and Markings. For the California Sign Specifications, go to the Caltrans Traffic Operations website. Replace Item 1 of the 2nd paragraph of section 82-2.02A with: 1. Phrase Property of The County of Fresno Add to section 82-2.02B: Signs must be 0.080 inch thick aluminum alloy and street name signs must be 0.125 inch thick alloy faced on both sides. Add to section 82-2.02C: Reflective sheeting on all signs shall be 3M Diamond Grade DG3 Series 4000 or equal, and must meet ASTM Type XI specifications. Add to section 82-2.02D: All signs must have the 3M 1160 graffiti resistant clear overlay film or equal. Replace Section 82-2.04 with: 82-2.04 PAYMENT Not Used Add to section 82-3.02A: All new roadside signs must be square post 14 gauge steel. Add to section 82-3.02B: All post for traffic signs must be 2"X2"X10' square by 14 gauge steel, with 7/16 inch holes punched one inch on center on all four sides for the entire length of the post. Welded Anchor (2 '/4"X2 '/4"X30") and sleeve (2 '/2"X2 '/2"X18") shell be used as a base to anchor post in the ground. Hole size and placement must be the same as the metal post. All mounting hardware shall be either galvanized or stainless steel. Banding shall be 3/4 inch wide stainless steel with flare leg sign brackets. Hose clamps are not permitted. All signs shall be mounted using 3/8" aluminum drive rivets. Nuts and bolts are not permitted. Replace Section 82-3.02D with: 82-3.02D Laminated Wood Box Posts Furnish a laminated wood box post with an attached metal cap at the top of each post. Replace the last line of section 82-3.04 with: Full compensation for furnishing sign panels is included in the bid item price per each Roadside Sign -One Post and Roadside Sign -Two Post. One or more sign panels furnished and installed on a single post will be counted as (1) one Roadside Sign - One Post. One or more sign panels furnished and installed on two posts will be counted as (1) one Roadside Sign -Two Post. 83 RAILINGS AND BARRIERS 84 MARKINGS Add to section 84-2.02C: Full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all work involved in the provisions of this section, including, but not limited to, coordination with the County Engineer, as specified in the Standard Specifications and these Special Provisions, and as directed by the Engineer shall be considered to be included in prices paid for"Paint HMA Dike (White)" per linear foot of paint. DIVISION X ELECTRICAL WORK 86 ELECTRICAL SYSTEMS 86-1.01 GENERAL The Special Provisions for Traffic Signals for this project are the City of Fresno Standard Specifications and are incorporated in Project Details. Coordination with PG&E for Traffic Signal: Contractor is responsible for coordinating, furnishing and installing all substructure and conduits and labor to connect to the point of service per PG&E exhibit PM#35298595 included in the Project Details of these special provisions and per construction plans and specifications. The Special Provisions for Traffic Signals for this project are the City of Fresno Standard Specifications and Drawings and are incorporated in Project Details for reference only. Contractor is responsible for obtaining the most current and complete version of the City of Fresno's specifications from the City website. Contractor is responsible for obtaining all City of Fresno Standard Drawings required to install a fully functional traffic signal to the acceptance of the City of Fresno inspectors. Drawings attached to the Project Details in these Special provisions may not be all drawings required to complete the work. The specifications and drawings can be found on the City website, Department of Public Works, Technical Library. Section 23 of the City of Fresno Standard Specifications shall apply, except as modified below. Model 2070LX Controller Assemblies: New Model 2070LX controller assembly or assemblies shall be furnished by the Contractor, as shown on Plans, and shall conform to Section 86-1.02Q of the State Standard Specifications and all addenda thereto, current at the time of project advertising, and these Specifications. The controller shall accompany manufacturer written verification and certification that the 2070LX controller meets or exceeds the requirements set for in the current Caltrans Transportation Electrical Specifications (TEES) — March 12, 2009 and all Errata. The City of Fresno will not accept the 2070LX controller without the certification. The certification shall have documentation from the Manufacturer indicating that the 2070LX controller has gone through Quality Assurance testing of all components; this will ensure the City receives a quality product. The Contractor shall provide the Model 2070LX unit as a complete, operational assembly, with local intersection-control software that is 100% compatible with current City of Fresno's Traffic Management System. The controller software shall be able to fully integrate into Traffic Management System without any additional hardware or software. The software license registration sticker shall be attached alongside the hardware serial number plate inside the front panel. The controller shall be the "lite"version Model 2070LX (California Transportation Department Rack Mount type)ATC traffic controller per State Standard Specifications, shall conform to the Transportation Electrical Equipment Specifications (TEES) Errata 2. The controller shall be equipped with the following modules: ➢ 2070-1C CPU with 64MB DRAM, 128MB Flash, Linux Operating System, 3 each - 10/100 Ethernet Ports, USB 2.0 full-speed port for memory, Nonvolatile SRAM, C13S connector, 3.3v/5v data key, TEES 2009 compatible, Freescale PowerQuick Processor and ATC 5.2b compliant ➢ 2070-2E+ 1/0 Module for 332 cabinets ➢ 2070-313 8x40 Line Display and dual keyboard panel ➢ 2070-4A Heavy-Duty 10 A Power Supply Module ➢ 2070-7A Dual Serial Port Card, RS-232 ➢ Linux 2.6.35 or higher kernel ➢ V76 Patriot V76.15Z Firmware installed in Controller 2070LX Controller part number shall be: 2070-F6330601 S10 Traffic loops shall be installed between the 2nd and 3rd HMA lifts. Placing the traffic loops after the final HMA lift has been placed will not be accepted. The manufacturer must provide a written warranty against defects in materials and workmanship for LED signal modules for a minimum period of 48 months after installation of LED signal modules. Replacement LED signal modules must be provided within 15 days after receipt of failed LED modules at your expense. The Department pays for shipping the failed modules to you. All warranty documentation must be submitted to the Engineer before installation. Replacement LED signal modules must be delivered to Fresno County Department of Public Works and Planning, Maintenance and Operations Division. Conduit shall conform to the City of Fresno Standard Specifications, except that trenching shall be allowed as described on the plans and slurry backfill shall be required or deleted as described on the plans. Potholing: Foundation locations shall be potholed (excavated)to determine if underground utilities or structures exist prior to ordering traffic signal equipment. The pothole locations shall be approved by the Engineer prior to excavation. If underground utilities or structures are encountered, the Contractor shall notify the Engineer immediately and an alternate foundation location shall be determined. Potholed locations shall be backfilled and repaired to a safe condition. Potholed locations within existing pavements to remain shall be patched with hot-patch asphalt or as approved by the Engineer. 86-1.04 PAYMENT Full compensation for potholing, furnishing, installation of the poles including foundation, installation of the Controller assembly, installation of the communication cabinet, antenna and other appurtenant work at the intersection of Olive Ave and Clovis Ave, furnishing and installing any other appurtenant material as specified in the construction drawings and special provisions City of Fresno, PG&E, testing and any other appurtenant work to provide a complete and fully functional traffic signal shall be considered to be included in Bid Item "Traffic Signal and Lighting System" as a lump sum of work, and no further compensation shall be paid therefor. The controller concrete pad shall be included in the"MINOR CONCRETE (ELECTRICAL PAD)" bid item. The payment quantity for furnishing and installing loop detectors shall be included in the bid item "Inductive loop detector" Payment for potholing shall be included in the lump sum price bid for "Traffic Signals and Lighting System", and no additional compensation will be allowed therefore. No additional payment will be made for additional potholes required after encountering utilities. DIVISION XI MATERIALS 90 CONCRETE Replace Section 90-1.01 D(3)with: 90-1.01 D(3) Shrinkage If shrinkage limitations are specified, test the concrete under AASHTO T 160, modified as follows: 1. Prepare specimens that have a 4 by 4-inch cross section. 2. Remove each specimen from the mold 23 ± 1 hours after mixing the concrete and place the specimen in lime water at 73 ± 3 degrees F until 7 days age. 3. Take a comparator reading at 7 days age and record it as the initial reading. 4. Store the specimens in a humidity-controlled room maintained at 73 ± 3 degrees F and 50 ±4 percent relative humidity for the remainder of the test. 5. Take subsequent readings at 7, 14, 21, and 28 days drying. Perform AASHTO T 160 testing at a laboratory that is accredited to perform AASHTO T 160 or that maintains a current rating of 3 or better for the Cement and Concrete Reference Laboratory concrete proficiency sample program. Shrinkage test data authorized by Caltrans no more than 3 years before the 1 st day of the Contract is authorized for the entire Contract. The test data must be for concrete with similar proportions and using the same materials and material sources to be used on the Contract. Concrete is considered to have similar proportions if no more than 2 mix design elements are varied and the variation is within the tolerances shown in the following table: Mix design element Tolerance ± Water to cementitious material ratio 0.03 Total water content % 5 Coarse aggregate content % 10 Fine aggregate content % 10 SCM content % 5 Admixture as originally doseda % 25 aAdmixtures must be the same brand. Replace Section 90-2.02E With: 90-2.02E Production Sections 90-1.02F, 90-1.02G(1), 90-1.02G(2), 90-1.02G(3), and 90-1.02G(4) do not apply to minor concrete. Store, proportion, mix, transport, and discharge the cementitious material, water, aggregate, and admixtures in compliance with recognized standards of good practice that result in thoroughly and uniformly mixed concrete suitable for the intended use. Recognized standards of good practice are outlined in various industry publications, such as those issued by ACI, AASHTO, or by Caltrans. Use a quantity of water that produces concrete with a consistency that complies with section 90-1.02G(6). Do not add water during hauling or after arrival at the delivery point unless allowed by the Engineer. Discharge ready-mixed concrete from the transport vehicle while the concrete is still plastic and before stiffening occurs. Take whatever action is necessary to eliminate quick stiffening, except do not add water. Conditions contributing to quick stiffening are: 1. Elapsed time of 1.5 hours in agitating hauling equipment or 1 hour in nonagitating hauling equipment 2. More than 250 revolutions of the drum or blades after introduction of the cementitious material to the aggregates 3. Concrete temperature over 90 degrees F The mixing time in a stationary mixer must be at least 50 seconds and no more than 5 minutes. The minimum required revolutions at mixing speed for transit-mixed concrete must be at least that recommended by the mixer manufacturer and must be increased as needed to produce thoroughly and uniformly mixed concrete. If you add a high-range water-reducing admixture to the concrete at the job site, the total revolutions must not exceed 300. Replace Section 90-4.02 With: 90-4.02 MATERIALS You may use Type III portland cement in PC concrete. The specifications for SCM content in section 90-1.02B(3)do not apply to PC concrete. For PC concrete, the SCM content must comply with one of the following: 1. Any combination of portland cement and SCM satisfying the following equation: Equation 1: [(25xUF) + (12x FA) + (10xFB) + (6xSL)]/TC>_X where: OF= silica fume, metakaolin, or UFFA, including the quantity in blended cement, Ib/cu yd FA = natural pozzolan or fly ash complying with AASHTO M 295, Class F or N, with a CaO content of up to 10 percent, including the quantity in blended cement, Ib/cu yd FB= natural pozzolan or fly ash complying with AASHTO M 295, Class F or N, with a CaO content of greater than 10 percent and up to 15 percent, including the quantity in blended cement, Ib/cu yd SL = GGBFS, including the quantity in blended cement, Ib/cu yd TC=total quantity of cementitious material, Ib/cu yd X= 0.0 for innocuous aggregate, 3.0 for all other aggregate 2. 15 percent Class F fly ash with at least 48 oz of LiNO3 solution added per 100 lb of portland cement. The CaO content of the fly ash must not exceed 15 percent. 3. Any combination of SCM and portland cement for which the expansion of cementitious material and aggregate does not exceed 0.10 percent when tested under ASTM C1567. Submit test data with each mix design. Test data authorized by Caltranst no more than 3 years before the 1st day of the Contract is authorized for the entire Contract. The test data must be for the same concrete mix and must use the same materials and material sources to be used on the Contract. If municipally supplied potable water is used for PC concrete, the testing specified in section 90-1.02D is waived unless requested. Portland cement based repair material must be on the Authorized Material List for precast Portland cement based repair material. 92 ASPHALT BINDERS Replace 92-1.01 D(2)With: 92-1.01 D(2) Certification Asphalt binder suppliers must comply with the Caltrans Certification Program for Suppliers of Asphalt. For a copy of the certification program, go to the METS website. Replace Section 92-1.02B With 92-1.02B Performance Grade Asphalt Binders PG asphalt binder must comply with the requirements shown in the following table: PG As halt Binders Test Requirement Quality characteristic method PG PG PG PG PG 58-22a 64-10 64-16 64-28 70-10 Ori inal Binder Flash point(min, °C) AASHTO 230 230 230 230 230 T 48 Solubilityb (min, %) AASHTO 99 99 99 99 99 T 44 Viscosity at 135 'C° AASHTO max, Pa-s T 316 3.0 3.0 3.0 3.0 3.0 Dynamic shear Test temperature at 10 AASHTO rad/s (°C) T 315 58 64 64 64 70 G*/sin(delta) (min, kPa) 1.00 1.00 1.00 1.00 1.00 G*/sin delta max, kPa 2.00 2.00 2.00 2.00 2.00 RTFOf teste AASHTO mass loss max, % T 240 1.00 1.00 1.00 1.00 1.00 RTFOf Test Aged Binder Dynamic shear Test temperature at 10 AASHTO rad/s (°C) T 315 58 64 64 64 70 G*/sin delta min, kPa 2.20 2.20 2.20 2.20 2.20 Ductility at 25 °C (min, cm) AASHTO T 51 75 75 75 75 75 PAV9 AASHTO Test temperature °C R 28 100 100 100 100 110 RTFOf Test and PAV9 A ed Binder Dynamic shear, Test temperature at 10 AASHTO rad/s (°C) T 315 22d 31d 28d 22d 34d G*sin delta max, kPa 5000 5000 5000 5000 5000 Creep stiffness, Test temperature, °C AASHTO -12 0 -6 -18 0 S-value (max, MPa) T 313 300 300 300 300 300 M-value min 0.300 0.300 0.300 0.300 0.300 allse as asphalt rubber base stock for high mountain and high desert area. bThe Engineer waives solubility requirements if the supplier is an authorized material source as defined by the Caltrans Certification Program for Suppliers of Asphalt. °The Engineer waives this specification if the supplier provides written certification the asphalt binder can be adequately pumped and mixed at temperatures meeting applicable safety standards. dTest the sample at 3 °C higher if it fails at the specified test temperature. G*sin(delta) remains 5000 kPa maximum. eThe residue from mass change determination may be used for other tests. fRTFO means rolling thin film oven. 9PAV means Pressure Aging Vessel. PG modified asphalt binder must comply with the requirements shown in the following table: PG Modified Asphalt Binders Requirement Quality characteristic Test method PG PG PG 58-34 M 64-28 M 76-22 M Original Binder Flash point min, °C AASHTO T 48 230 230 230 Solubility min, % AASHTO T 44a 97.5 97.5 97.5b Viscosity at 135 'Cr AASHTO T 316 max, Pa-s 3.0 3.0 3.0 Dynamic shear, Test temperature at 10 AASHTO T 315 rad/s (°C) 58 64 76 G*/sin delta min, kPa 1.00 1.00 1.00 RTF09 testd, AASHTO T 240 Mass loss max, % 1.00 1.00 1.00 RTF09 Test Aged Binder Dynamic shear, Test temperature at 10 AASHTO T 315 rad/s (°C) 58 64 76 G*/sin delta min, kPa 2.20 2.20 2.20 Dynamic shear, Test temperature at 10 AASHTO T 315 rad/s, °C Delta max, degree) 80e 80e 80e Elastic recoveryf, Test temperature (°C) AASHTO T 301 25 25 25 Recover min, % 75 75 65 PAVh, AASHTO R 28 Temperature °C 100 100 110 RTF09 Test and PAVh Age Binder Dynamic shear, Test temperature at 10 AASHTO T 315 rad/s (°C) 16 22 31 G*sin delta max, kPa 5000 5000 5000 Creep stiffness, Test temperature (°C) AASHTO T 313 -24 -18 -12 S-value (max, Mpa) 300 300 300 M-value min 0.300 0.300 0.300 aThe Department allows ASTM D5546 or ASTM D7553 instead of AASHTO T 44. Particles recovered from ASTM D5546 or ASTM D7553 or AASHTO T 44 must be less than 250 pm. bReport only for spray application. °The Engineer waives the viscosity requirements if the supplier provides written certification the asphalt binder can be adequately pumped and mixed at temperatures meeting applicable safety standards. aThe residue from mass change determination may be used for other tests. eTest temperature is the temperature at which G*/sin(delta) is 2.2 kPa. A graph of log G*/sin(delta) plotted against temperature may be used to determine the test temperature when G*/sin(delta) is 2.2 kPa. A graph of(delta)versus temperature may be used to determine delta at the temperature when G*/sin(delta) is 2.2 kPa. The graph must have at least 2 points that envelope G*/sin(delta) of 2.2 kPa, and the test temperature must not be more than 6 degree C apart. The Engineer also accepts direct measurement of delta at the temperature when G*/sin(delta) is 2.2 kPa. (Tests without a force ductility clamp may be performed. 9RTFO means rolling thin film oven. hPAV means Pressure Aging Vessel. Do not modify PG modified asphalt binder using polyphosphoric acid. Crumb rubber must be from automobile and truck tires and must be free from contaminants including fabric, metal, minerals, and other nonrubber substances. PG modified asphalt binder modified with crumb rubber must be homogeneous and must not contain visible particles of crumb rubber. The supplier of PG modified asphalt binder modified with crumb rubber must: 1. Report the quantity of crumb rubber by weight of asphalt binder 2. Certify a minimum of 10 percent of crumb rubber by weight of asphalt binder Add to Section 96-1.04 PAYMENT: The unit price paid for WEED BARRIER shall include full compensation for furnishing all labor, materials, tools, equipment and performing all the work involved in installing weed barrier as shown in the plans, including subgrade preparation, material hauling, placement, and anchoring in accordance with the Drawings, Specifications, and manufacturer recommendations. The payment for WEED BARRIER will be measured and paid per square foot (SF) covering the ground. The material used for the overlap per manufacturer instruction and install in the anchor trench will not be part of the square footage paid to the contractor. No measurement will be made for erosion control matting lost due to damage resulting from either the fault or the negligence of the Contractor Federal Requirements Contract Number 23-04-C FEDERAL REQUIREMENTS FOR FEDERAL-AID CONSTRUCTION PROJECTS General The work will be financed in whole or in part with Federal funds, and therefore all of the Federal statutes, rules, regulations, and provisions applicable to work financed in whole or in part with Federal funds will apply. In addition to the provisions in the Agreement, the Contractor shall comply with the following: Performance Of Previous Contracts The bidder shall execute the "Certification with Regard to the Performance of Previous Contracts or Subcontracts Subject to the Equal Opportunity Clause and the Filing of Required Reports" located in the proposal. No request for subletting or assigning any portion of the contract in excess of$10,000 will be considered under the provisions of Section VII of the required contract provisions unless such request is accompanied by the Certification referred to above, executed by the proposed subcontractor. Non-Collusion Provision The provisions in this section are applicable to all contracts except contracts for Federal Aid Secondary projects. Title 23, United States Code, Section 112, requires as a condition precedent to approval by the Federal Highway Administrator of the contract for this work that each bidder file a sworn statement executed by, or on behalf of, the person, firm, association, or corporation to whom such contract is to be awarded, certifying that such person, firm, association, or corporation has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with the submitted bid. A form to make the non-collusion affidavit statement required by Section 112 as a certification under penalty of perjury rather than as a sworn statement as permitted by 28, USC, Sec. 1746, is included in the proposal. Executive Order N-6-22 Under Executive Order N-6-22 as a contractor, subcontractor, or grantee, compliance with the economic sanctions imposed in response to Russia's actions in Ukraine is required, including with respect to, but not limited to, the federal executive orders identified in the EO and the sanctions identified on the U.S. Department of the Treasury website (https://home.treasury.gov/policy-issues/financial- sanctions/sanctions-programs-and-country-information/ukraine-russia-related-sanctions). Failure to comply may result in the termination of contracts or grants, as applicable. Specially Designated Nationals and Blocked Persons List(SDN) https://home.treasury.gov/policy-issues/financial-sanctions/specially-designated-nationals-and- blocked-persons-list-sdn-human-readable-lists Disadvantaged Business Enterprise Running Tally of Attainments After submitting an invoice for reimbursement that includes a payment to a DBE, but no later than the 101" of the following month, the prime contractor/consultant shall complete and email the Exhibit 9- F: Disadvantaged Business Enterprise Running Tally of Payments to business.support.unit(cDdot.ca.gov with a copy to the Agency. Federal Requirements 1 Federal Forms Links provided to Caltrans forms at time of publication • EXHIBIT 16-0 Federal-Aid Highway Construction Contractors Annual EEO Report (2018) https://dot.ca.gov/-/media/dot-media/programs/local-assistance/documents/lapm/c16/16oe.xlsx • EXHIBIT 17-F Final Report-Utilization of Disadvantaged Business Enterprises (DBE)And First-Tier Subcontractors (2023) https://dot.ca.gov/-/media/dot-media/programs/local-assistance/documents/lapm/cl 7/17f.pdf • EXHIBIT 17-0 Disadvantaged Business Enterprises (DBE) Certification Status Change (2015) https:Hdot.ca.gov/-/media/dot-media/programs/local-assistance/documents/lapm/c17/17o.pdf • Exhibit 16-Z1 Monthly DBE Trucking Verification (2018) https:Hdot.ca.gov/-/media/dot-media/programs/local-assistance/documents/lapm/c16/16z1.pdf • EXHIBIT 16-B Subcontracting Request (2021) https://forms.dot.ca.gov/v2Forms/servlet/FormRenderer?frmid=LAPM 16B • EXHIBIT 9-F: Disadvantaged Business Enterprise (DBE) Running Tally of Payments (2023) https:Hdot.ca.gov/-/media/dot-media/programs/local-assistance/documents/lapm/c09/09fe.xlsx Federal Requirements 2 Local Assistance Proccdures Manaul Exhibit 16-0 Federal-Aid Highway construction Contractors Annual EEO Report EXHIBIT 16-0 FEDERAL-AID HIGHWAY CONSTRUCTION CONTRACTORS ANNUAL EEO REPORT 1. MARK APPROPRIATE BLOCK 2.COMPANY NAME,CITY,STATE: 3.PROJECT NUMBER: 4.DOLLAR AMOUNT OF CONTRACT: 5. PROJECT LOCATION: (County and State) ❑Contractor ❑ Subcontractor This collection of information is required by law and regulation 23 U.S.C. 140a and 23 CFR Part 230.The OMB control number for this collection is 2125-0019 expiring in March,2016. 6. WORKFORCE ON FEDERAL-AID AND CONSTRUCTION SITE(S) DURING LAST FULL PAY PERIOD ENDING IN JULY 20, (INSERT YEAR) TABLE A BLACK or AMERICAN INDIAN NATIVE HAWAIIAN TOTAL TOTAL RACIAL/ HISPANIC OR OR OTHER TWO OR MORE ON THE JOB JOB CATEGORIES EMPLOYED ETHNIC MINORITY A LATINO OR A ASIAN PACIFIC RACES WHITE APPRENTICES TRAINEES AMERIC N RICAN NATTIVEIVE ISLANDER M F M F M F M F M F M F M F M F M F M F M F OFFICIALS 0 0 0 0 SUPERVISORS 0 0 0 0 FOREMEN/WOMEN 0 0 0 0 CLERICAL 0 0 0 0 EQUIPMENT OPERATORS 01 0 01 0 MECHANICS 0 0 0 0 TRUCK DRIVERS 0 0 0 0 IRONWORKERS 0 0 0 0 CARPENTERS 0 0 0 0 CEMENT MASONS 0 0 0 0 ELECTRICIANS 01 0 01 0 PIPEFITTER/PLUMBERS 0 0 0 0 PAINTERS 0 0 0 0 LABORERS-SEMI SKILLED 0 0 0 0 LABORERS-UNSKILLED 0 0 0 0 TOTAL 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TABLE C (Table B data by racial status) APPRENTICES 1 01 01 01 0 OJT TRAINEES 1 01 01 01 Oil d�� 11 8.PREPARED BY: 9.DATE 10.REVIEWED BY: (Signature and Title of State Highway Official) 11.DATE (Signature and Title of Contractors Representative) Form FHWA-1391 (Rev.09-13) PREVIOUS EDITIONS ARE OBSOLETE January 2018 Page 1 of 1 Local Assistance Procedures Manual Exhibit 17-F Final Report-Utilization of Disadvantaged Business Enterprises (DBE)and First-Tier Subcontractors Exhibit 17-F: Final Report-Utilization of Disadvantaged Business Enterprises (DBE) and First-Tier Subcontractors 1. Local Agency Contract Number 2. Federal-Aid Project Number 3. Local Agency 4.Contract Acceptance Date 5.Contractor/Consultant 6.Business Address 7.Final Contract Amount 8.Contract 11.DBE 12.Contract Payments 13.Date 14.Date of 9. Description of Work,Service,or 10.Company Name and Item Materials Supplied Business Address Certification Work Final Number pp Number Non-DBE DBE Completed Payment 15.ORIGINAL DBE COMMITMENT AMOUNT $ 16.TOTAL List all first-tier subcontractors/subconsultants and DBEs regardless of tier whether or not the firms were originally listed for goal credit.If actual DBE utilization(or item of work)was different than that approved at the time of award,provide comments on an additional page.List actual amount paid to each entity.If no subcontractors/subconsultants were used on the contract,indicate on the form. I CERTIFY THAT THE ABOVE INFORMATION IS COMPLETE AND CORRECT 17.Contractor/Consultant Representative's Signature 18.Contractor/Consultant Representative's Name 19.Phone 20. Date I CERTIFY THAT THE CONTRACTING RECORDS AND ON-SITE PERFORMANCE OF THE DBE(S)HAVE BEEN MONITORED 21.Local Agency Representative's Signature 22.Local Agency Representative's Name 23.Phone 24. Date DISTRIBUTION: Original—Local Agency,Copy—Caltrans District Local Assistance Engineer.Include with Final Report of Expenditures Page 1 of 2 January 2023 Local Assistance Procedures Manual Exhibit 17-F Final Report-Utilization of Disadvantaged Business Enterprises (DBE) and First-Tier Subcontractors INSTRUCTIONS— FINAL REPORT-UTILIZATION OF DISADVANTAGED BUSINESS ENTERPRISES (DBE) AND FIRST-TIER SUBCONTRACTORS 1. Local Agency Contract Number- Enter the Local Agency contract number or identifier. 2. Federal-Aid Project Number- Enter the Federal-Aid Project Number. 3. Local Agency- Enter the name of the local or regional agency that is funding the contract. 4. Contract Acceptance Date - Enter the date the contract was accepted by the Local Agency. 5. Contractor/Consultant - Enter the contractor/consultant's firm name. 6. Business Address - Enter the contractor/consultant's business address. 7. Final Contract Amount - Enter the total final amount for the contract. 8. Contract Item Number- Enter contract item for work, services, or materials supplied provided. Not applicable for consultant contracts. 9. Description of Work, Services, or Materials Supplied - Enter description of work, services, or materials provided. Indicate all work to be performed by DBEs including work performed by the prime contractor/consultant's own forces, if the prime is a DBE. If 100% of the item is not to be performed or furnished by the DBE, describe the exact portion to be performed or furnished by the DBE. See LAPM Chapter 9 to determine how to count the participation of DBE firms. 10. Company Name and Business Address - Enter the name, address, and phone number of all subcontracted contractors/consultants. Also, enter the prime contractor/consultant's name and phone number, if the prime is a DBE. 11. DBE Certification Number- Enter the DBE's Certification Identification Number. Leave blank if subcontractor is not a DBE. 12. Contract Payments - Enter the subcontracted dollar amount of the work performed or service provided. Include the prime contractor/consultant if the prime is a DBE. If the materials or supplies are obtained from a DBE manufacturer, count 100% of the cost of the materials or supplies toward DBE goals. If the materials or supplies are purchased from a DBE regular dealer/supplier, count 60% of the cost of the materials or supplies toward DBE goals. The Non-DBE column is used to enter the dollar value of work performed by firms that are not certified DBE or for work after a DBE becomes decertified. 13. Date Work Completed - Enter the date the subcontractor/subconsultant's item work was completed. 14. Date of Final Payment- Enter the date when the prime contractor/consultant made the final payment to the subcontractor/subconsultant for the portion of work listed as being completed. 15. Original DBE Commitment Amount- Enter the "Total Claimed DBE Participation Dollars"from Exhibits 15-G or 10-02 for the contract. 16. Total - Enter the sum of the "Contract Payments" Non-DBE and DBE columns. 17. Contractor/Consultant Representative's Signature - The person completing the form on behalf of the contractor/consultant's firm must sign their name. 18. Contractor/Consultant Representative's Name - Enter the name of the person preparing and signing the form. 19. Phone - Enter the area code and telephone number of the person signing the form. 20. Date - Enter the date the form is signed by the contractor's preparer. 21. Local Agency Representative's Signature -A Local Agency Representative must sign their name to certify that the contracting records and on-site performance of the DBE(s) has been monitored. 22. Local Agency Representative's Name - Enter the name of the Local Agency Representative signing the form. 23. Phone - Enter the area code and telephone number of the person signing the form. 24. Date - Enter the date the form is signed by the Local Agency Representative. Page 2 of 2 January 2023 Local Assistance Procedures Manual Exhibit 17-0 Disadvantaged Business Enterprises(DBE)Certification Status Change EXHIBIT 17-0 DISADVANTAGED BUSINESS ENTERPRISES(DBE)CERTIFICATION STATUS CHANGE 1. Local Agency Contract Number 2. Federal-Aid Project Number 3. Local Agency 4. Contract Completion Date 5. Contractor/Consultant 6. Business Address 7. Final Contract Amount 8.Contract 10. DBE 12.Certification/ Item 9. DBE Contact Information Certification 11.Amount Paid Decertification 13.Comments Number Number While Certified Date (Letter Attached) If there were no changes in the DBE certification of subcontractors/subconsultants,indicate on the form. I CERTIFY THAT THE ABOVE INFORMATION IS COMPLETE AND CORRECT 14.Contractor/Consultant Representative's Signature 15.Contractor/Consultant Representative's Name 16. Phone 17. Date I CERTIFY THAT THE CONTRACTING RECORDS AND ON-SITE PERFORMANCE OF THE DBE(S)HAS BEEN MONITORED 18. Local Agency Representative's Signature 19. Local Agency Representative's Name 20. Phone 21. Date DISTRIBUTION: Original—Local Agency,Copy—Caltrans District Local Assistance Engineer.Include with Final Report of Expenditures ADA NOTICE: For individuals with sensory disabilities,this document is available in alternate formats.For information,call(916)445-1233,Local Assistance Procedures Manual TTY 711,or write to Records and Forms Management,1120 N Street,MS-89,Sacramento,CA 95814. Page 1 of 2 July 23,2015 Local Assistance Procedures Manual Exhibit 17-0 Disadvantaged Business Enterprises(DBE)Certification Status Change INSTRUCTIONS—DISADVANTAGED BUSINESS ENTERPRISES (DBE) CERTIFICATION STATUS CHANGE 1. Local Agency Contract Number - Enter the Local Agency contract number or identifier. 2. Federal-Aid Project Number-Enter the Federal-Aid Project Number. 3. Local Agency-Enter the name of the local or regional agency that is funding the contract. 4. Contract Completion Date -Enter the date the contract was completed. 5. Contractor/Consultant-Enter the contractor/consultant's firm name. 6. Business Address -Enter the contractor/consultant's business address. 7. Final Contract Amount- Enter the total final amount for the contract. 8. Contract Item Number-Enter contract item for work, services, or materials supplied provided. Not applicable for consultant contracts. 9.DBE Contact Information - Enter the name, address, and phone number of all DBE subcontracted contractors/consultants. 10. DBE Certification Number - Enter the DBE's Certification Identification Number. 11.Amount Paid While Certified - Enter the actual dollar value of the work performed by those subcontractors/subconsultants during the time period they are certified as a DBE. 12. Certification/Decertification Date (Letter Attached) - Enter either the date of the Decertification Letter sent out by the Office of Business and Economic Opportunity(OBEO) or the date of the Certification Certificate mailed out by OBEO. 13. Comments - If needed,provide any additional information in this section regarding any of the above certification status changes. 14. Contractor/Consultant Representative's Signature - The person completing the form on behalf of the contractor/consultant's firm must sign their name. 15. Contractor/Consultant Representative's Name - Enter the name of the person preparing and signing the form. 16. Phone - Enter the area code and telephone number of the person signing the form. 17.Date - Enter the date the form is signed by the contractor's preparer. 18. Local Agency Representative's Signature - A Local Agency Representative must sign their name to certify that the contracting records and on-site performance of the DBE(s)has been monitored. 19. Local Agency Representative's Name - Enter the name of the Local Agency Representative signing the form. 20. Phone -Enter the area code and telephone number of the person signing the form. 21. Date - Enter the date the form is signed by the Local Agency Representative. Page 2 of 2 July 23,2015 Local Assistance Procedures Manual Exhibit 16-Z1 Monthly DBE Trucking Verification State of California-Department of Transportation Exhibit 16-Z1 Monthly DBE Trucking Verification Contract No. Month Year Truck Owner DBE Company Truck No. California Commission of Date Lease Arrangement Cert No. Name and Address Highway Patrol Amount Of Paid (if applicable) CA.No. Amount Paid* $ Lease Agreement ❑ with NON-DBE ❑ with DBE ❑ $ Lease Agreement ❑ with NON-DBE ❑ with DBE ❑ $ Lease Agreement ❑ with NON-DBE ❑ with DBE ❑ $ Lease Agreement ❑ with NON-DBE ❑ with DBE ❑ $ Lease Agreement ❑ with NON-DBE ❑ with DBE ❑ $ Lease Agreement ❑ with NON-DBE ❑ with DBE ❑ $ Lease Agreement ❑ with NON-DBE ❑ with DBE ❑ $ Lease Agreement ❑ with NON-DBE ❑ with DBE ❑ $ Lease Agreement ❑ with NON-DBE ❑ with DBE ❑ Total Amount $ Paid Prime Contractor Business Address Business Phone No. *Upon Request all Lease Agreements Shall be made available,in accordance with the special Provisions I CERTIFY THAT THE ABOVE INFORMATION IS COMPLETE AND CORRECT Contractor Representative Signature I Title Date Page 1 of 2 January 2018 Local Assistance Procedures Manual Exhibit 16-Z1 Monthly DBE Trucking Verification MONTHLY DBE TRUCKING VERIFFICATION The top of Form CEM-2404(F) contains boxes to put in the Contract Number,the Month of the reporting period and the Year of the reporting period. The Form CEM-2404(F) has a column to enter the name of the Truck Owner, the DBE Cert. No. (if DBE certified) and the Name and Address of the trucking company.The Form CEM-2404(F) also requires the Truck No. and the California Highway Patrol CA No. Form CEM-2404(F) is to be submitted prior to the 15th of each month and must show the dollar amount paid to the DBE trucking company(s) for trucking work performed by DBE certified trucks and for any fees or commissions of non DBE trucks utilized each month on the project. The amount paid to each trucking company is to be entered in the column called"Commission or Amount Paid," in accordance with the Special Provisions Section 5-1.X. Payment information is derived using the following: 1.) 100% for the trucking services provided by the DBE using trucks it owns,operates and insures. 2.) 100% for the trucking services provided by the trucks leased from other DBE firms. 3.) The fee or commission paid to non DBEs for the lease of trucks.The Prime does not receive 100% credit for these services because they are not provided by a DBE company. The total dollar figure of this column is to be placed in the box labeled"Total Amount Paid." The column"Date Paid" requires a date that each trucking company is paid for services rendered. The next column contains information that must be completed if a lease arrangement is applicable. Located at the bottom of the form is a space to put the name of the"Prime Contractor," their"Business Address" and their "Business Phone No." At the bottom of the form there is a space for the Contractor or designee"Contractor Representative's Signature,Title and Date" certifying that the information provided on the form is complete and correct. Page 2 of 2 January 2018 STATE OF CALIFORNIA• DEPARTMENT OF TRANSPORTATION Page 1 of 2 DLA SUBCONTRACTING REQUEST REQUEST NUMBER LAPM 16-B(NEW 12/2021) CONTRACTOR NAME COUNTY ROUTE BUSINESS ADDRESS CONTRACT NUMBER CITY AND STATE ZIP CODE FEDERAL-AID PROJECT NUMBER(from special provisions) CA STATE PUBLIC WORKS CHECK IF SUBCONTRACTORS CONTRACTOR CONTRACTOR BID ITEM PERCENTAGE (See NUMBER(S) OF BID ITEM Categories DESCRIBE WORK WHEN LESS DOLLAR AMOUNT (Name, Business Address, Phone) LICENSE REGISTRATION (1 per line) SUBCONTRACTED Below THAN 100%OF WORK IS BASED ON NUMBER NUMBER 1 2 SUBCONTRACTED BID AMOUNT Categories: 1. Listed Under Fair Practices Act 2. Certified Disadvantaged Business EnterprisefDisabled Veteran Business Enterprise I certify that: • The specifications for labor set forth in the contract apply to the subcontracted work. • If applicable (federal-aid projects only), Form FHWA-1273 has been inserted in the subcontracts and will be incorporated in any lower-tier subcontract. • Written contracts have been executed for the subcontracted work noted above. CONTRACTOR'S SIGNATURE DATE This section is to be completed by the resident engineer. 1. Total of bid items $ 2. Bid items previously subcontracted $ 3. Bid items subcontracted (this request) $ 4. Total of lines 2 and 3 $ 5. Maximum amount of work allowed to be subcontracted (multiply line 1 by %) $ 6. Minimum amount prime contractor must perform with own forces(multiply line 1 by %) $ APPROVED RESIDENT ENGINEER'S SIGNATURE DATE Copy Distribution: Original-Contractor Copy- Resident Engineer ADA Notice For individuals with sensory disabilities, this document is available in alternate formats. For alternate format information, contact the Forms Management Unit at(916)445-1233,TTY 711,or write to Records and Forms Management, 1120 N Street, MS-89,Sacramento, CA 95814. STATE OF CALIFORNIA• DEPARTMENT OF TRANSPORTATION DLA SUBCONTRACTING REQUEST LAPM 16-B(NEW 12/2021) INSTRUCTIONS All first-tier subcontractors must be included on a subcontracting request. Before subcontracting work starts, the contractor will submit an original Form LAPM 16-B according to the Standard Specifications. • Ensure all subcontractors are: 1. Listed on the subcontractor list at the time of bid, per the Subletting and Subcontracting Fair Practice Act; OR 2. All 1st tier subcontractors regardless of dollar value. When an entire item is subcontracted, show the contractor's bid price. When a portion of an item is subcontracted, describe the portion and show the percentage of the bid item and value. • Compare line 5 to line 4. If line 5 is greater than line 4 the request can be approved. • After approval, the resident engineer returns the original to the contractor and completes the remaining distribution as listed on the bottom of the form. • Labor Compliance Officer to review subcontractor licensing and registration. • Labor Compliance Officer completes PWC-100 form on California Department of Industrial Relations site for subcontractors that were not required to be listed at time of bid on the Subcontractor List form. THIS FORM IS NOT TO BE USED FOR SUBSTITUTIONS OF LISTED SUBCONTRACTORS OR DISADVANTAGED BUSINESS ENTERPRISE. ADA Notice For individuals with sensory disabilities, this document is available in alternate formats. For alternate format information, contact the Forms Management Unit at(916)445-1233,TTY 711,or write to Records and Forms Management, 1120 N Street, MS-89,Sacramento, CA 95814. Local Assistance Procedures Manual Exhibit 9-F DBE Running Tally of Payments EXHIBIT 9-F: DISADVANTAGED BUSINESS ENTERPRISE (DBE) RUNNING TALLY OF PAYMENTS Save this form using the following naming convention, [9 digit Federal Aid number]-[yyyymm]-[ss].xlsx. [yyyymm]is the reporting period. [ss]is two digit sequential numbering,applicable when consultant or contractor has more than one 9-F form to complete per pay period. For example,a valid saved file could read: 1234(567)-202207-01.xlsx. Prime contractors/consultants are required to submit this form no later than the 10th of the following month,after submitting an invoice for reimbursement that includes a payment to a DBE. If no payments have been made,do not submit the form. Email this form to Business.Support.Unit@dot.ca.gov with a copy to their local administering agencies. Do not submit this form with the invoice,it will not be processed. (1)Reporting Period(mm-yyyy) (2)Federal Aid Project Number (3)Caltrans District (4)Local Agency (5)Contract Number (6)Total Contract Award Amount($) (7)DBE Goal Percentage(%) (8)DBE Committed Percentage(%) (9)Business Name (10)Amount Prime Invoiced This Period($) (11)Amount Paid to Prime To Date($) (12)Prime Certified DBE? (13)DBE Subcontractor/Subconsultant (14)DBE Cert. (15)Contract (16)Date of (17)Amount of (18)Amount (19)Amount Name Number Type Payment This Payment Paid To Date Committed To (20)Comments This DBE Totals $0 $0 $0 List all DBEs regardless of tier,whether or not the firms were originally listed in Exhibit 10-02 or 15-G as a DBE commitment. If the actual DBE utilization was different than that approved at the time of award,provide comments in box(20).All payments reported, including payments to contractor/consultant,are for the date listed. Select the most appropriate contract type(Agent, Consultant,Joint Venture, Manufacturer, Prime, Regular Dealer,Subcontractor,Truck/Haul,Service Provider)for the DBE from dropdown list. By executing this 9-F,Contractor/Consultant represents and warrants,under penalty of perjury,that: Contractor/Consultant contracted with the Disadvantaged Business Enterprise companies(DBEs)as set forth in their awarded bid on Contract number Contractor/Consultant paid the full amounts listed on their 9-F to the DBEs set forth in Contractor's awarded bid,without reduction or offset. (21)Prime Contractor/Consultant Manager's Name(Print) (22)Business Phone Number (23)Date COPY DISTRIBUTION: Original-Prime Contractor/Consultant,Copy-E-mail:Business.Support.Unit@dot.ca.gov;Copy:Local Administering Agency Page 1 of 1 January 2023 Project Details Contract Number 23-04-C T I STREETS I_ w E SHIELDS AVE Z .+ D W Q >O E CLINTON AVE Q p �"w v w w Z 01 w Z a z Q z - _• r O a J lost Of w �; • E OLIVE AVE m Z •S _ . • . . • • a E BELMONT AVE W W LL l s I Q ` • Q w z Z Q - E OLIVE AVE > MILES ` O 0 0.5 1 Cn U BUTLE AVE 1 � � E HAMILTON AVE FRESNO COUNTY 1 - 4 E Garmin, (c)OpenStreetMap contributors,and the GIS ser SUPERVISORS o mu i urce:Esri, DigitalGlobe, GeoEye,Earthstar' 1 t ogra ie ES/Airbus DS,USDA,USGS,AeroGRID, IG ,and DISTRICT 5 r t RFWG se community • DATE: SCALE IN FEET CO ,� DEPARTMENT OF PUBLIC WORKS & PLANNING DESIGNED: C.M. 02/21/2020 FEET " CMAQ - FOWLER AVE AND OLIVE AVE DRAWN: C.M. 02/21/2020 0 100 200 ) � O TRAFFIC SIGNAL STATE BRIDGE NO. N/A fiIzEc' CITY OF FRESNO STANDARD SPECIFICATIONS AND STANDARD DRAWINGS SECTION 23 - TRAFFIC SIGNALS AND STREET LIGHTING 23-1 TECHNICAL SPECIFICATIONS FOR TRAFFIC SIGNALS 23-1.1 General Traffic Signal Poles & Standards shall be in accordance with State Standard Specifications, 1997 Edition, (113 km rating/70 mph rating). Furnishing and installing traffic signals and highway lighting and payment therefore shall conform to the provisions in Section 86 and 87 of the State Standard Specifications and the State Standard Drawings, the City Standard Drawings, Plans and Specifications. Signals and lighting Work is to be performed at the locations shown on the Plans. Existing electrical systems, or approved temporary replacements thereof, shall be kept in effective operation during the progress of the Work, except when shutdown is permitted. Work or equipment not specified or shown on the Plans which is necessary for the proper operation of the traffic signal in this section shall be provided and installed at no additional cost to the City. The locations of foundations, poles, standards, services, pull boxes and other appurtenances shown on the Plans are approximate. Exact locations and grades will be established as necessary by either the Traffic Engineer and/or City CM Engineer in the field. All work shall be completed in a neat and workmanlike manner. 23-1.2 Materials Attention is directed to Section 6 of the State Standard Specifications and SECTION 4 these Specifications. All materials required to complete the Work under this contract shall be furnished by the Contractor after receiving approved submittals from City of Fresno Traffic Signal and Street Lights (TSSL) Division. The materials furnished and used shall be new, except such used materials as may be specifically provided for on the Plans. All Work and materials shall be in full accordance with the latest rules and regulations of the National Board of Fire Underwriters, and local or State laws and regulations, the State of California Industrial Accident Commission's Safety Orders, City of Fresno Dept. of Public Works 23-1 A7 Mar. 2021 and Regulations of the Pacific Gas and Electric Company pertaining to service equipment and installations thereof. All Work shall comply with Section 11-104 of the City of Fresno Municipal Code, the National Electrical Manufacturer's Association Standards and all regulations and codes as stated in Section 86-1.01 D of the State Standard Specifications. Nothing in these Plans and Specifications shall be construed to permit Work not complying with these codes. 23-1.3 Equipment List Equipment list and drawings shall conform to the provisions in Section 86-1.01 C, of the State Standard Specifications and these Specifications. All equipment and materials that the Contractor proposes to install shall conform to these Specifications and the contract Plans. A list of substitute equipment and/or materials, along with a written descriptive summary, describing the functions of the components which the Contractor proposes to install shall be submitted along with his/her Proposal. The list shall be complete as to the name of the manufacturer, size and identifying number of each item. The list shall be supplemented by such other data as may be required. In all cases, the judgment of the Electrical Superintendent shall be final as to whether substitute equipment and/or material recommended by the Contractor conforms to the intent of these Specifications and is acceptable for use. 23-1.4 Warranties, Guarantees and Instruction Sheets Warranties, guarantees and instruction sheets shall conform to the provisions in Section 5-1 .47 of the State Standard Specifications and these Specifications. All equipment furnished shall be guaranteed to the City by the manufacturers for a period of not less than one (1) year, unless otherwise indicated, following the date of acceptance of the signal installation of such equipment. If any part(s) is found to be defective in materials or workmanship within the one-year period, and it is determined by the Electrical Superintendent, or by an authorized manufacturer's representative, that said part(s) cannot be repaired on the Site, the manufacturer shall provide a replacement part(s) of equal kind and/or type during the repair period and shall be responsible for the removal, handling, repair or replacement and reinstallation of the part(s) until such time as the traffic signal or Street lighting equipment is functioning as specified and as intended herein; the repair period shall in no event exceed 72 hours, including acquisition of parts. The one-year guarantee on the repaired or replaced parts shall again commence with the date of reassembly of the system. All Work done by the Contractor shall be guaranteed in writing to the City CM Engineer for the 12 months from the date of acceptance. City of Fresno Dept. of Public Works 23-2 A7 Mar. 2021 23-1.5 Maintaining Existing and Temporary Electrical Systems Existing traffic signal systems, including detection, and/or safety lighting, shall remain operational during construction, unless otherwise authorized in writing by the City Engineer. The Contractor shall notify the City CM Engineer at least two full working days (not less than 48 hours) prior to the shutdown of any traffic signal and lighting system. The Contractor may use temporary splices and wiring as approved by the City CM Engineer to maintain existing and temporary traffic signal and lighting systems. Shutdowns of traffic signal and lighting systems shall be limited to the period from 9 a.m. to 4 p.m. of normal working days, excluding legal holidays, weekends, and non- working days as determined by the City CM Engineer. 23-1.6 Scheduling of Work Scheduling of Work shall conform to the provisions in Section 8-1.02 of the State Standard Specifications and these Specifications. The Contractor shall notify the City CM Engineer at least two working days in advance of any electrical work and also at least two working days in advance of any Work done intermittently to facilitate inspection. 23-1.7 Foundations Foundations shall conform to the provisions in Section 56-3 of the 1997 State Standard Specifications and these Specifications. Concrete for reinforced pile foundations shall contain not less than 590 pounds of cement per cubic yard. Foundation concrete shall be placed in a single pour except that pouring of the top six inches may be postponed when prior approval has been obtained. Exact location for controller cabinet shall be designated by the Traffic Engineer and approved by Electrical Superintendent, 48-hour notice required. No Utilities shall be permitted to run through any foundations. PVC wire-ways in pole foundations shall be installed as detailed in City Standard Drawing No. E-27. Foundations shall be poured against undisturbed earth where practicable. The exposed portion shall be formed and finished to present a neat appearance. Where obstructions or other conditions prevent construction of planned foundations, the Contractor shall construct an effective foundation satisfactory to the City CM Engineer. City of Fresno Dept. of Public Works 23-3 A7 Mar. 2021 The bottom of concrete foundations shall rest on firm ground. When placing the foundations, the Contractor shall place all conduit ends in their proper position, at the correct heights and shall securely hold them in position during the pouring of concrete. Conduits exiting the controller foundation and entering into the controller cabinet shall be aligned to enter within the TEES specified cabinets without any modifications to the cabinet base. Conduit shall be capped before any concrete is poured. Both forms and earth to be in contact with foundations shall be thoroughly moistened before placing concrete. Anchor bolts shall be galvanized and shall extend above the finished base as needed to ensure a minimum extension above the top nut of 3 threads. The maximum extension above the top nut is 1 inch. Each bolt shall be supplied with 2 nuts and 2 flat washers to facilitate leveling. The distance between the bottom nut and the top of the finished foundation shall vary depending on the diameter of the anchor bolt being used. For anchor bolts 1" or less in diameter this distance is 1" minimum and 1-1/2" maximum. For anchor bolts greater than 1" in diameter the distance is 1-1/2" minimum and 2" maximum. The anchor bolts and conduits shall be held in place by means of a template until the concrete sets. Locations shown on the Plans are schematic. Poles, standards and pedestals shall not be erected until the foundation concrete has set at least seven Days and shall be plumbed or raked as directed by the City CM Engineer. Top of concrete foundations shall be finished relative to curb or sidewalk grade or as shown on the Plans or as directed by the City CM Engineer. The top of controller cabinet foundation shall be 12 inches above the surrounding grade or sidewalk, as shown in City Standard Drawingg. E-37. 23-1.8 Standards, Steel Pedestal and Posts Standards, steel pedestals and posts shall conform to the provisions in Section 56-3 of the 1997 State Standard Specifications and these Specifications. If relocation of Utilities is required, immediate notification shall be given to the appropriate Utility Company by the Contractor. The Contractor may install all underground electrical components, including foundations for signal standards and controller cabinet at the site of the project; however, no traffic signal standards shall be erected until all controlling equipment is available to the Contractor for installation. All nuts, washers, screws and other post hardware shall be galvanized. City of Fresno Dept. of Public Works 23-4 A7 Mar. 2021 Signal mast arms shall not have mid-arm tenons. Signal heads shall be installed with Astro-Bracket, or approved equal. 23-1.9 Conduit Conduit shall conform to the provisions in Section 86-1.02B of the State Standard Specifications and these Specifications. Nonmetallic-type conduit shall not be used, unless specifically called for on Plans, with the exception of conduits between standards and adjacent pull boxes which shall be installed per City Standard Drawing No. E-27. Conduit shall be of rigid type, conforming to Article 346 of the National Electrical Code. All conduit and fittings shall be hot dip galvanized. Each length shall bear the labels of Underwriters Laboratories, Inc. Installation shall conform to appropriate Articles of the Code. All couplings shall be tightened to provide a good electrical and mechanical connection throughout the entire length of the conduit run. All conduit ends shall be threaded and joined with City TSSL Division approved fittings. The use of threadless or set screw fittings is not allowed. No running threads are permitted. Three piece, Erickson type, couplings shall not be used without prior authorization from City TSSL Division and will be only allowed under special circumstances necessitating their use. Conduit threads cut in the field and damaged conduit surfaces on metal conduit shall be thoroughly painted with zinc rich paint conforming to Military Specification DOD- P-21035A. All conduit ends shall be threaded and capped with standard conduit caps until wiring is started. When the caps are removed the threaded ends shall be provided with approved insulated hot dipped galvanized malleable iron bushings with cast integral lay-in lugs. It shall be the privilege of the Contractor, at his/her own expense, to use larger size conduit than indicated on the plans if desired, and where larger size conduit is used, it shall be for the entire length of the run from outlet to outlet. No reducing couplings will be permitted. All conduit shall be laid to a depth of not less than twenty-four inches, nor greater than thirty-six inches below the curb grade in the sidewalk areas and from the finished surface in Street areas. Conduits in sidewalk areas parallel to the curb shall not be installed more than twenty-four inches from inside of curb line toward property line unless approved by the City CM Engineer. Conduits not able to be placed under concrete sidewalk, or roadway, shall be encased in at least 6" of two-sack slurry. City of Fresno Dept. of Public Works 23-5 A7 Mar. 2021 Conduit shall be placed under existing pavement by directional boring and jacking method. Pavement shall not be disturbed without the written permission of the City CM Engineer and then only in the event insurmountable obstructions are encountered. Excessive use of water, such that pavement might be undermined, or subgrade softened, will not be permitted. Conduit in pull boxes shall not extend more than two inches inside the box wall. No conduit may enter the pull box from the bottom unless approved by the City CM Engineer. No conduit or Utility shall pass through a signal, controller or Street light base or pull box except the conduit which terminates within the base or pull box. No 901 elbows shall be installed unless specified or approved by City of Fresno, Construction Management. After the installation of all conductors and cables, the ends of conduits terminating in pull boxes, the controller cabinet and service pedestal shall be sealed with an approved duct seal material. In as much as possible, conduit shall be run in a straight line from one pull box or pole to the next, maintaining a consistent setback from the curb. Any variation from this requirement shall be approved by the City CM Engineer. 23-1.10 Pull Boxes Concrete pull boxes shall conform to the provisions in Section 86-1.02C of the State Standard Specifications and these Specifications. All pull boxes shall be No. 5 unless otherwise noted on the Plans. See City Standard Drawings No. E-4A through E-4C, regarding requirements for grouting, drain hole, etc. All pull boxes shall be installed with extensions. The pull box lid at the Pacific Gas & Electric Company's point of connection shall be marked "PG&E." All others shall be inscribed "Traffic Signal," "Interconnect," "Electrical" or "Street Lights" as appropriate. Pull boxes on long runs shall be installed and spaced at not over 200-foot intervals, and shall be required in all conduit change of directions. All pull boxes shall be wrapped with 151b. roofing paper prior to backfilling. Pull boxes installed in non-concrete areas shall be surrounded by a one (1) foot wide concrete collar and to a depth equal to the pull box and extension. The collar shall be sloped to drain away from the pull box. City of Fresno Dept. of Public Works 23-6 A7 Mar. 2021 Existing pull boxes accessed during the course of work shall be cleaned, drain holes opened, bonding and grounding connections secured, conduits duct sealed and grout repaired. Any pull boxes broken in the course of work shall be replaced. Vandal resistant locking lids shall be installed by the contractor at final inspection. Contractor shall provide temporary lids during construction. Locking lids shall be galvanized steel diamond plate, minimum thickness 3/16 inches, with minimum two (2) clamping jaws and be keyed to the City of Fresno key. Locking lids shall be torqued to 25ft pounds (Ibs) prior to installing buttons. For concrete fiber optic vaults, refer to SECTION 31 of the City Standard Specifications. 23-1.11 Conductors and Wiring/Cables Conductors and wiring shall conform to the provisions in Section 86-1.02F of the State Standard Specifications and these Specifications. All 7-conductor, 5-conductor and 3-conductor cables shall conform to the latest International Municipal Signal Association (IMSA) Specification 20-1. The cable conductors shall be 14 AWG solid copper. When cables are pulled into the conduit, all ends of the cables shall be taped to exclude moisture, and shall be so kept until connected to terminals. A minimum of three feet of slack in each single conductor and cable run shall be left at each each pull box. No splices shall be allowed in multi-conductor cables. They shall run from the controller terminal strip to the appropriate TS-4 terminal block. No splicing of underground conductors is allowed. All single conductor wire shall be copper and of stranded construction with THWN type insulation. All conductors shall have insulation colors appropriate to their use and all applicable codes. The use of colored phase tape is not allowed. Splices in single conductor wire shall be limited to the load side of the service pedestal breakers and to tap type splices located in pull boxes. These splices shall be made using either split bolts or c-tap connectors. The c-taps shall be properly sized for the wires being joined and installed with the proper tooling. The splice shall be insulated as follows: minimum 2 layers of rubber tape, 1 layer--1/2 lapped plastic tape, 1 layer friction tape and then coated with an approved electrical sealing compound. Pedestrian push button circuits shall utilize a 3-conductor cable between the controller and a pedestrian TS-4 terminal assembly. The individual buttons shall be City of Fresno Dept. of Public Works 23-7 A7 Mar. 2021 connected to the terminal assembly using DLC (Reference City Standard Drawing No. E-20). At the pushbutton end, the conductors shall be attached using an insulated fork terminal properly sized for the wire and screw. The terminal shall be installed using the proper tooling and tinned with solder. At the terminal assembly end, the wire shall be stripped, loose strands of individual conductors twisted neatly and tinned with solder prior to installation into the box type pressure connector. Conductors within the 3, 5 and 7 conductor cables shall be connected within the terminal assemblies as shown on the "Terminal Location," City Standard Drawing Nos. E-19 and E-20. The single conductor #14 AWG THWN stranded copper wire installed between the TS-4 terminal block and the individual signal heads terminal block shall be terminated as follows: a) At the signal head end, it will be installed using an insulated spade terminal properly sized for the wire and the screw. The terminal shall be installed using the proper tooling. At the terminal assembly end, the wire shall be stripped, loose strands twisted neatly and tinned with solder prior to installation into the box type pressure connector. All multi-conductor cable conductors connected to the load bay shall be terminated at the controller cabinet using the AMP/TYCO 320359 spade terminals. All multi conductor cable conductors connected to the input terminal blocks shall be terminated at the controller cabinet using a fork terminal properly sized for the wire and the screw. The lugs used to connect with controller field terminals shall be soldered after being properly crimped. Soldering shall be by means of an iron or gun. No open flame torch may be used. Optical Detector Cable shall meet the requirements of IPCEA-S-61-402/NEMA WC5, Section 7.4, 600 volt control cable, 75°C., Type B, and the following: a) The cable shall contain 3 conductors, each of which shall be No. 20 (7x28) stranded, tinned copper with low-density polyethylene insulation. Minimum average insulation thickness shall be 25 mils. Insulation of individual conductors shall be color coded: 1-yellow, 1-blue, 1-orange. City of Fresno Dept. of Public Works 23-8 A7 Mar. 2021 b) The shield shall be either tinned copper braid or aluminized polyester film with a nominal 20 percent overlap. Where the film is used, a No. 20 (7x28) stranded tinned, bare drain wire shall be placed between the insulated conductors and in contact with the conductive surface of the shield. c) The jacket shall be black polyvinyl chloride with a minimum rating of 600 volts and 80' C (176°F) and a minimum average thickness of 45 mils. The jacket shall be marked as required by IPCEA/NEMA. d) The finished outside diameter of the cable shall not exceed 10 mm (0.35 inch). e) The capacitance, as measured between any conductor and the other conductors and the shield, shall not exceed 48 picofarads per foot at 1,000 Hz. f) The cable run between each detector and the controller shall be continuous without splices or shall be spliced only as directed by the detector manufacturer and approved by the City. Optical detector cable shall be connected within the terminal assemblies as shown on the "Opticom Connections" City Standard Drawing No. E-34A. The optical detector cable installed between the controller cabinet and the individual 721 detectors shall be terminated as follows: a) At the 721 detector end, the conductors shall be stripped; loose strands twisted neatly and tinned with solder prior to installation into the box type pressure connector. b) At the controller terminal assembly end, it will be installed using an insulated space terminal properly sized for the wire and the screw. The terminal shall be installed using the proper tooling and tinned with solder. 23-1.12 Fused Splice Connectors Fuses for safety lights and street lights will no longer be allowed in the pole hand hole. Each luminaire shall be internally fused per subsection 23-3.16. 23-1.13 Bonding and Grounding Bonding and grounding shall conform to the provisions in Section 87-1.03(0) of the State Standard Specifications and these Specifications. Ground will be obtained by installation of a ground rod within the service pedestal foundation. This ground rod shall be bonded to all metallic conduits within the City of Fresno Dept. of Public Works 23-9 A7 Mar. 2021 controller cabinet and all pull boxes shall be bonded in a similar manner. Within the service pedestal, controller cabinet and pull boxes adjacent to signal standards, one end of the solid #8 bonding conductor shall be extended to and attached to the pedestal, controller cabinet or signal standard using the grounding point as furnished. For signal standards not supplied with a hand hole, the grounding conductor shall be terminated on an anchor bolt between two washers installed above a leveling nut. A green #8 stranded wire may be used for pole grounding if a ring terminal, appropriately sized for the grounding bolt, is installed. All ground connections shall be left visible and accessible until the final acceptance inspection is complete. To ensure proper ground distribution, a #8 stranded copper conductor with green THWN insulation shall be installed in all conduits. The ends shall be attached to the bonding jumper at each end using split bolt or c-tap splices. 23-1.14 Testing Testing shall conform to the provisions in Sections 86 and 87 of the State Standard Specifications and these Specifications. When controller equipment is not supplied by the City, the Contractor shall provide the controller equipment to Traffic Signal Maintenance, 2101 'G' Street, Building E, Fresno, CA 93706. Ten working days will be allowed for testing and programming of the controller equipment. Note: Refer to these Specifications regarding Controllers, Cabinets and Ancillary devices. The controller equipment shall be capable of passing the "self-evaluation program" utilized by the City. Should any equipment fail to pass or be rejected as not complying with the Specifications, the Contractor shall remove said equipment within 3 working days after Notice of rejection is given. Should the equipment fail to be removed, it may be removed by City and shipped to the Contractor at his/her expense. The Contractor shall allow ten working days for evaluation, testing and programming of all replacement equipment. The ten working days will start when the new equipment is delivered to the City. The cost of all retesting and evaluation shall be the responsibility of the Contractor. City of Fresno Dept. of Public Works 23-10 A7 Mar. 2021 23-1.15 Painting All paint shall be furnished and applied by the Contractor. Minor touch-up painting on all material whose surface is damaged or not protected from rusting shall be painted as directed by the City CM Engineer. Cold galvanized zinc-rich paint, Military Specifications DOD-P-21035 A, shall be used on all damaged galvanized surfaces. 23-1.16 Service Service shall conform to the provisions in Section 87-1.03L of the State Standard Specifications and these Specifications. Electrical service pedestal installation and wiring shall be as detailed in City Standard Drawing Nos. E-15 and E-17. The underground conduit between the service pedestal and the P.G. & E. point of service shall be galvanized rigid conduit. Service feeders shall be sized to accommodate the full load amperage rating of the electrical service pedestal. Voltage drop shall be taken into consideration when sizing conductors. 23-1.17 Signal Faces and Signal Heads Signal faces, signal heads and auxiliary equipment as shown on the Plans, and the installation thereof, shall conform to the provisions in Section 86-1.02R of the State Standard Specifications and these Specifications. All signal sections shall be provided with 12" (300mm) diameter Light Emitting Diode (LED) modules conforming to the requirements of the Institute of Transportation Engineers (ITE) publication ST-017B and listed in the Qualified Products List (QPL). Green LED modules shall have clear lenses. Visors on vehicular signals shall be "tunnel" type with open slot at bottom. All signal heads, visors, and backplates shall be metallic. Signal heads shall be painted gloss dark green and backplates shall be painted flat black. Visors shall be black. Backplates shall be provided for all signal heads except on median mounted lower left turn signal. Mounting framework shall consist of 1.5" steel pipe, ductile iron fittings, and bronze terminal compartments. Slipfitter attachments, MAS/MAT, shall be bronze. After installation of the signal mounting framework, any through bolts that extend more than 1" beyond the nut shall be cut to three threads beyond the nut and painted with a zinc rich cold galvanizing compound. All set screws exposed to weather shall be zinc, stainless steel or cadmium plated and have square heads. City of Fresno Dept. of Public Works 23-11 A7 Mar. 2021 When a mast arm is not equipped with a mid-tenon, the Contractor shall provide a City approved Signal Mounting Bracket to install the MAS signals. The standard bracket is supplied with 29" mounting bands. Longer lengths are available and may be needed depending on the particular mast arm used. The bracket shall be installed using the manufacturers detailed installation instructions. Prior to mounting the bracket, the Contractor shall drill a 1" diameter hole in the mast arm corresponding to the desired signal placement. All burrs and sharp edges shall be removed. The area will be cleaned of any oil or drilling compound. A zinc-rich cold galvanizing compound will be applied to the bare metal. A 1" grommet will be installed in the drilled hole to protect the wiring. After the bands are adjusted and tightened, the tenon shall be marked and drilled to accept the MAS through bolt. After mounting and plumbing of the signal, the set screws shall be secured. Traffic Signal Head Modules (LED'S) shall conform to 86-1.02R of the State Standard Specifications, the State Department of Transportation QPL, and to City requirements. Green LEDs to have clear lens only. 23-1.18 Pedestrian Signals Pedestrian signals shall conform to the provisions in Sections 86-1.02S of the State Standard Specifications and these Specifications. Pedestrian signals shall be Type A. International type symbols shall be used. All pedestrian signal housings shall be metallic. The lenses and egg crate type visors shall be polycarbonate. Mounting framework shall consist of 1-1/2" steel pipe, ductile iron fittings and bronze terminal compartments. Clam shell mounting hardware shall not be used. After installation of the signal mounting framework, any through bolts that extend more than 1" beyond the nut shall be cut to three threads beyond the nut and painted with a zinc rich cold galvanizing compound. All set screws exposed to weather shall be zinc or cadmium plated and have square heads. The signal shall have an LED Hand and White Walking Man with a countdown feature. When allowed, reused pedestrian signals shall have an LED countdown retrofit kit installed. The installation shall not require any special tools or the drilling of any holes in the reflector or housing. If existing pedestrian housing will not City of Fresno Dept. of Public Works 23-12 A7 Mar. 2021 accommodate an LED retrofit kit, the Contractor shall furnish and install a new pedestrian housing. The luminous intensity, quantity and color of the LEDs shall be such that the intent of the current ITE specification for Pedestrian Traffic Control Signal Indications is satisfied. 23-1.19 Detection Detectors shall be supplied by an approved manufacturer and conform to provisions in Section 87-1.03V of the State Standard Specifications and these Specifications. Pavement saw cut detector loop wire shall be type 2. Loop Detector Lead-in Cable (DLC) shall be Type "C" IMSA spec. 50-2. Cable shall not be spliced between the termination pull box and the controller terminals. DLC drain wires shall be terminated in the cabinet as individual wires (Not twisted into groups) to allow for ease of future relocation. Loops in adjacent lanes shall be polarized and the loop conductor ends identified as detailed in State Standard Drawing, ES-5A note #8 and the `winding Details'. Loops locations shall be per City Standard Drawing No. E-14. The loop wire when spliced to the lead-in cable shall be insulated using Method `C' Handcrafted Insulation or by using approved heavy wall shrink tubing. All splices shall be made using uninsulated inline connectors, crimped and soldered. Resistance: max = 0.51 + 0.350/c of DLC. Insulation: min = 100 meg Q. The loop test measurements as detailed in the State Standard Drawing, ES-5A note # 17, shall be documented on the "Detector Loop Test Results" form provided in the controller cabinet and a copy is provided at the end of these Specifications. The form will be signed and dated by the individual performing the tests. The sealant for filling slots shall be Elastomeric Sealant or Hot-melt Rubberized Asphalt Sealant, and shall conform to State Standard Specification Section 87- 1.03W. 23-1.20 Pedestrian Push Buttons Pedestrian push buttons shall conform to the provisions in Section 86-1.02U of the State Standard Specifications, latest edition of California MUTCD, and these Specifications. City of Fresno Dept. of Public Works 23-13 A7 Mar. 2021 Pedestrian push buttons shall meet or exceed the 2010 Americans with Disabilities Act Standards for Accessible Design as specified in The Federal Register, as printed on September 15, 2010. Pedestrian push buttons, housing and sign shall be pre-approved by the City CM Engineer. Pedestrian push buttons shall be Type "B" with sign and housing. Housing shall be metallic and sign shall be international symbol and arrow. Push buttons shall be 2" diameter and mounted at a height of 40". Push buttons mounted on 2 '/2" diameter posts shall have integrated post caps, or caps from the push button manufacturer which attach to the pushbutton housing. The housing shall be adjusted to conform tightly to the curvature of the pole. 23-1.21 Audible Pedestrian Signal Specification When specified, the contractor shall furnish and install an Accessible (Audible) Pedestrian Signal (APS) system (2-wire Polara iNavigator2 or approved equal) in conformance with the city's Standard Specifications. The APS shall provide both a vibrating arrow button and audible sounds during the "Walk" interval as well as a locating tone during the pedestrian clearance and don't walk intervals. The APS shall meet current ADA and MUTCD requirements. The contractor shall supply the latest means of programming the APS system and digital copies of the "custom messages" to the City of Fresno TSSL Division. 23-1.22 Emergency Vehicle Priority Control System The priority control system shall offer the capability of identifying two levels of priority vehicles at signalized intersections and one level of probe vehicle. High priority for emergency vehicles and low priority for other authorized users will request the traffic signal controller to advance to and/or hold a desired traffic signal display selected from phases normally available. A Probe Vehicle Mode must be available for traffic engineering, run time analysis and response time data gathering. The probe vehicle mode will not preempt the traffic signal. The Probe Mode will record of the probe vehicle's presence at a Priority Controlled intersection. The system will only allow users with flash rates of 14.0359Hz +/-0.05% for high priority and 9.63855Hz +/- 0.05% for low priority activation of the system. The system shall also be capable of identifying up to 10,000 individual vehicles by the coded light signal of the vehicle emitter for security and vehicle logging. The system will have non-authorized vehicle control with the capability of only allowing use of the system to authorized users with valid identification codes. The system must be fully compatible with existing vehicle emitters currently installed on City of Fresno Dept. of Public Works 23-14 A7 Mar. 2021 City-owned fire apparatus, and City-owned signalized traffic signals, as well as contractually obligated mutual aid providers. The system will record up to 1000 activations, on a continuous basis. The latest preemption will replace the oldest preemption. The system must record the date and time of the preemption, the duration of the preemption, the direction from which the call was received, the vehicle identification number (class and ID), intersection name, log entry number, priority of vehicle and duration of call. Further, the system must record approximate distance of each emitter recorded during last moment of detection. This data is to be recorded in the phase selector located inside the cabinet. Information is to be easily accessible via RS232 port and software. The phase selector shall also have the capability to assign a relative priority to a call request within high or low priority based on the received vehicle ID class. The system shall offer automated signal intensity threshold settings. Activation range to be set by downloading a code through the software and by using a combination of the software and a special range setting emitter. The system range shall be capable of precise settings using 1200 increments; and actuating between 100 feet and up to 2500 feet passage of 8 separate emergency vehicles, individually approaching the test intersection. Each equipped emergency vehicle will be required to activate the test intersection at 1800 feet with a variance of 100 (+-) feet. The system must be able to set separate ranges on any detector; one for low priority and one for high priority. The system will be a matched component system with all components from one manufacturer consisting of: a) A Data-Encoded Emitter. The data-encoded emitter will trigger the system. It will send the infrared signal to the detector. It will be located on the priority or probe vehicle. b) Phase Selectors to be located in the controller cabinet with green sense harnesses wired into the traffic controller per manufacturer specifications. Phase selectors shall have two channels. c) Detector cable with four conductors yellow, blue, orange and bare. d) Vehicle detectors shall be dual input single output. The system shall offer the capability of detector diagnostics through connecting a lap top computer to the phase selector and reading electrical line noise between the traffic signal cabinet and detector mounted in the intersection. System must display information, such as optical noise levels, so as to confirm proper operation of detector and therefore reduce inspection time and effort. City of Fresno Dept. of Public Works 23-15 A7 Mar. 2021 Detectors shall be mounted with an Astro-Mini-Brac, or other approved bracket, on the traffic signal mast arm and aligned with the number one through traffic lane. Prior to mounting the bracket, the contractor shall drill a 1" diameter hole in the mast arm at the desired bracket location. All burrs and sharp edges shall be removed. The area will be cleaned of any oil or drilling compound and a zinc-rich cold galvanizing compound will be applied to the bare metal. A 1" grommet will be installed in the drilled hole to protect the wiring. Phase selectors shall be a two channel type. (Opticom 762 or approved equivalent.) 23-1.23 Traffic Signal Luminaires Luminaires at Traffic Signals shall be light emitting diode (LED) light source luminaires for new signal construction. The City Engineer maintains a list of approved luminaire products that meet the minimum illumination standards using typical signal pole spacing ranges. Approved traffic signal luminaires for the three Intersection size categories may be used in lieu of a specific design meeting the criteria in the remaining parts of this section. Small Traffic Signal Luminaire (STS) — Use small traffic signal luminaires when the maximum diagonal distance between the four signal pole bases with luminaires is 135 feet or less. Medium Traffic Signal Luminaire (MTS) — Use medium traffic signal luminaires when the maximum diagonal distance between the four signal pole bases with luminaires is more than 135 feet but less than 165 feet. Large Traffic Signal Luminaire (LTS) — Use large traffic signal luminaires when the maximum diagonal distance between the four signal pole bases with luminaires is more than 165 feet but less than 200 feet. Expressway Traffic Signal Luminaire (ETS) — Use expressway traffic signal luminaires when the maximum diagonal distance between the two farthest signal pole bases with luminaires is greater than 200 feet but less than 220 feet. Diagonal pole spacing greater than 220 feet requires an illuminance based photometric design to select the correct luminaire. The submitted traffic signal or street light plans shall include computer-generated point-by-point photometric analysis of maintained illumination levels. Analysis areas should be conducted on proposed roadways, sidewalks, intersections and crosswalks. This analysis that matches the submitted plans, should list all input parameters and reference files. The hardcopy and computer design shall be provided to the City engineering staff, amended as necessary by the lighting professional, and approved by the City Engineer prior to the approval of the luminaires. City of Fresno Dept. of Public Works 23-16 A7 Mar. 2021 The Public Works Technical Library on the following City website provides the most current list of approved luminaires for the three intersection size categories. http://www.fresno.gov/Government/DepartmentDirectory/PublicWorks/Developerpoo rway/Technical+Library/StandardSpecificationsandDrawings.htm These luminaires may be utilized for installation if listed at the time of installation or award of construction contract only if the installation is to be performed under a City Construction Contract. A photometric design will be required to demonstrate that proposed luminaires will provide the minimum signal/intersection illuminance if any of the following criteria are met. a. The new traffic signal will not have the standard signal lighting pole layout, i.e. all four corners with a luminaire over the signal mast arm; b. The maximum pole to pole diagonal distance is more than 220 feet; c. A luminaire different from the City Engineer approved list is proposed; d. The location has increased potential for night time vehicle or pedestrian conflicts as determined by the City Engineer necessitating an increase in the minimum illuminance values for signalized intersection listed below. Signalized Intersection Photometric Design Requirements When photometric design is required, the submitted traffic signal plans shall include computer-generated point-by-point photometric analysis of maintained illumination levels. Analysis areas should be conducted on proposed intersection and crosswalk configurations. This analysis that matches the submitted lighting plans, should list all input parameters and reference files. The hardcopy and computer design shall be provided to the City engineering Staff, amended as necessary by the lighting professional, and approved by the City Engineer prior to construction of the lighting system. City of Fresno Dept. of Public Works 23-17 A7 Mar. 2021 TABLE NO. 23-1.23 A LED TRAFFIC SIGNAL LUMINAIRE LUMINAIRE 60W Max MAXIMUM INPUT Major/Major Intersection Small Utility Label POWER Less than 135 feet diagonal between signal poles 6100 (+/- 5%) (Note: the lowest Lumen power luminaires that Major/Major Intersection Medium 80W Max can provide minimum Greater than 135 feet diagonal between signal poles and Utility Label illumination are less than165 feet 9300(+/-5/o) encouraged) Lumen Major/Major Intersection Large 100W Max Greater than 165 feet diagonal between signal poles and Utility Label less than 200 feet 12000 (+/-5/o) Lumen Expressway/Major Intersection Expressway, Greater HOW than 200 feet diagonal between signal poles and less (MAX') than 220 feet 13,400 (+/- 5%)Lumen. VOLTAGE Nominal luminaire input voltage (or range as applicable) 120 to 277 V WARRANTY Minimum luminaire warranty 10 yearst NOMINAL CCT Rated correlated color temperature 4000 K BUG RATINGS Maximum nominal for Small Major Street Intersection BI-U0-G2 (backlight-uplight- Maximum nominal for Medium/Large/Expressway glare) Major Street Intersection B2-UO-G2 Luminaire housing finish color Gray WEIGHT Luminaire weight 30 lb.Max EPA Max. effective projected area 0.7 ft2 t - City requires extended warrantee certificates from manufacturer's that do not offer a standard 10 year warrantee. The values in the table below represent minimum illuminance levels for typical City of Fresno major intersections with low night time pedestrian and vehicle conflict conditions. Where night time pedestrian and vehicle conflicts are anticipated to be higher than typical conditions, the minimum values provided may be increased at the discretion of the City Engineer depending on the expected site or facility use, and night time activity. In those cases a specific lighting design will be required for review and approval. City of Fresno Dept. of Public Works 23-18 A7 Mar. 2021 TABLE NO. 23-1.23 B SINGNALIZED INTERSECTION ILLUMINANCE CRITERIA MAINTAINED MAJOR/MAJOR INTERSECTION ILLUMINATION All Roadway Area from curb return Average horizontal luminance at pavement 0.75 fc Average to minimum uniformity ratio 3 Maximum to minimum uniformity ratio 6 MAINTAINED CROSSWALK ILLUMINATION Average horizontal at pavement 0.75 fc Average to minimum uniformity ratio (horizontal) 5 All Manufacture and Installation Requirements listed in Section 23-3.16 shall apply to luminaires on traffic signals under this section. After installation and plumbing of the pole, the luminaire shall be leveled on both the long and transverse axis by use of spirit level. The street light numbers shall be installed on the poles using minimum 2 1/2" high numerals in accordance to City Standard Drawing No. E-25. Numbers shall be adhesive backed Almetek PS-2.5 or approved equivalent. The numbers shall be black on a contrasting background. Pole numbers shall be shown on the as-built plans. 23-1.24 Traffic Signal Photoeletric Control and Shorting Caps If the service pedestal is equipped with a lighting contactor and no master photo control is installed, the Contractor shall install one atop the traffic signal mast arm pole adjacent to the service pedestal or atop the nearest streetlight pole. The master photo control shall be wired back to the service pedestal using three #12 AWG stranded copper wires color matched to the PEC. The PEC will be mounted using hardware manufactured for that purpose or fabricated and approved by the Electrical Superintendent. All streetlights and safety lights fed from a pedestal equipped with a contactor shall be switched by that contactor and their PEC's replaced with shorting caps. Photoelectric Controls and Shorting Caps shall be "Listed" by OSHA Nationally Recognized Testing Laboratory, such as, UL, CSA, ETL, and comply with City Specifications for Street Lighting, subsection 23-3.17. 23-1.25 Signal Turn-On Requirements a) The Traffic Engineer, TSSL Supervisor, and the Traffic Operations Center Supervisor shall be notified in writing, seven (7) working days in advance of proposed turn-on. City of Fresno Dept. of Public Works 23-19 A7 Mar. 2021 b) All turn-ons will have a pre-inspection one (1) day prior to turn-on. c) All wiring shall have passed the test for shorts and continuity. Detector loops shall have been "Meggered" and meet Specifications. d) All "field" connections shall be made and verified, including the pedestrian push buttons and the vehicular and pedestrian signal heads. e) All signal heads shall be properly aimed as directed by the City CM Engineer. f) All signal poles and heads shall have been in place a minimum of seven (7) Days. g) All auxiliary functions (e.g., safety lights, etc.) shall be operational. h) The "service" shall be complete, including the utility company meter. i) All signing and striping (including sign removal) shall be in place before signal can be turned on. When all of the above are complete and the intersection ready for turn-on, the Contractor shall notify the City CM Engineer. The City CM Engineer will then arrange with the Electrical Supervisor to meet with the Contractor at the Site to perform an initial inspection of the installation. If satisfactory, the signal may be placed in operation. Any items needing additional Work or correction will be listed and that list provided to City Construction Management and the Contractor. City Construction Management will ensure that these items are corrected as needed. The initial turn on shall be made between 9:00 a.m. and 2:00 p.m. unless otherwise specified. Functional tests shall start on any working day except Monday, Friday or the Day preceding a legal holiday. The Contractor is cautioned not to attempt turn- on prematurely. Time spent by the City's Traffic Signals and Streetlights staff at the Site in excess of two hours due to Work not completed by the Contractor prior to turn-on will be paid by the Contractor. Any inspections in excess of 2 re-inspections after a punch list has been generated will be paid by the Contractor. 23-1.26 Traffic Control Traffic control shall be provided in accordance with the latest Caltrans adopted California "Manual on Uniform Traffic Control Devices" (CAMUTCD), subsections 7- 10.4 and 7-10.5 of these specifications. A traffic control plan shall be provided in accordance with the latest Caltrans adopted California "Manual on Uniform Traffic Control Devices" (CAMUTCD), subsections 7- 10.4 and 7-10.5 of these specifications. Payment shall be included in lump sum bid for signals and lighting. City of Fresno Dept. of Public Works 23-20 A7 Mar. 2021 23-1.27 Payment Payment for new signals, lighting and modifications shall conform to the provisions in Section 9 of the State Standard Specifications and these Specifications. The Contract Price shall include traffic signal and safety lighting and no additional payment will be allowed. 23-2 TRAFFIC CONTROLLERS, CABINETS AND ANCILLARY DEVICES 23-2.1 General a) It is the purpose and intent of these Specifications to describe the minimum requirements for traffic signal controllers, cabinets, and other ancillary devices to be used by the City Traffic Engineering and Street Maintenance Divisions. b) All items not specifically mentioned which are required for a complete 8- phase unit shall be included in the unit. c) All equipment and accessories to be furnished must be new and in current production. All products shall conform in design, strength, quality of material and workmanship to current industry standards. d) Each item shall be accompanied by two (2) sets of the manufacturer's illustrated descriptive literature and specifications. A copy of the manufacturer's standard warranty shall also be attached to the equipment. All equipment and accessories shall comply with: a) Regulations of the Federal Occupational Safety and Health Administration (OSHA) and/or the California Occupational Safety and Health Administration (Cal/OSHA), whichever is more restrictive. b) Title 49, Code of Federal Regulations, Chapter III, Federal Highway Administration Department of Transportation. c) California Vehicle Code. d) State Standard Specifications, the most recent Traffic Signal Control Equipment Specifications, and all subsequent addenda. Technical Specifications: All material and equipment supplied must comply with the State Standard Specifications, except for those exceptions allowed herein, and must be manufactured by companies on CALTRANS' Qualified Products List (QPL). The City of Fresno Dept. of Public Works 23-21 A7 Mar. 2021 most recent QPL will be the list used to determine the qualification of the products offered. Any submittal with any products not on the QPL will be rejected. Any changes occurring in subsequent QPL's shall be considered in effect on all subsequent orders. Model 2070L Controller Assemblies: New Model 2070LX controller assembly or assemblies shall be furnished by the Contractor, as shown on Plans, and shall conform to Section 86-1.02Q of the State Standard Specifications and all addenda thereto, current at the time of project advertising, and these Specifications. The controller shall accompany manufacturer written verification and certification that the 2070LX controller meets or exceeds the requirements set for in the current Caltrans Transportation Electrical Specifications (TEES) — March 12, 2009 and all Errata. The City will not accept the 2070LX controller without the certification. The certification shall have documentation from the Manufacturer indicating that the 2070LX controller has gone through Quality Assurance testing of all components; this will ensure the City receives a quality product. The Contractor shall provide the Model 2070LX unit as a complete, operational assembly, with local intersection-control software that is 100% compatible with current City of Fresno's Traffic Management System. The controller software shall be able to fully integrate into Traffic Management System without any additional hardware or software. The software license registration sticker shall be attached alongside the hardware serial number plate inside the front panel. The Firmware version for the Model 2070LX shall be V76.13P minimum or greater. The controller shall be the "lite" version Model 2070LX (California Transportation Department Rack Mount type) ATC traffic controller per State Standard Specifications, shall conform to the Transportation Electrical Equipment Specifications (TEES) Errata 2. The controller shall be equipped with the following modules: a) 2070-1 C CPU with 64MB DRAM, 128MB Flash, Linux Operating System, 3 each - 10/100 Ethernet Ports, USB 2.0 full-speed port for memory, Non- volatile SRAM, C13S connector, 3.3v/5v data key, TEES 2009 compatible, Freescale PowerQuick Processor and ATC 5.2b compliant b) 2070-2A 1/0 Module for 332 cabinets c) 2070-313 8x40 Line Display and dual keyboard panel d) 2070-413 Heavy-Duty 3A Power Supply Module e) 2070-7A Dual Serial Port Card, RS-232 City of Fresno Dept. of Public Works 23-22 A7 Mar. 2021 f) Patriot V76.13P Firmware installed in Controller g) 2070LX shall be 100% compatible with the City's existing Trafficware/Naztec Advanced Transportation Management System (ATMS.NOW) without any hardware or software additions and/or modifications. 332L Cabinet: Shall meet all California Transportation Department and Federal Highway Administration requirements. The Model 332L Cabinets shall be anodized aluminum (0.125" thick). The 332L cabinet suppliers shall be qualified 332L suppliers. The cabinet shall include the power supply, two Model 204 flashers, all necessary relays, the Conflict Monitor, a red interface adaptor, a thermostatically controller fan, a door switch operated fluorescent light(s), a slide out shelf/drawer storage unit and four anchor bolts. All crimp type terminals between the Lower Input Panel and the Input files shall be soldered. For matching purposes, the City will accept the Corbin 3-point locking system lock, which shall be keyed alike to the City Standard Specifications, (No Substitutions). Model 332L Traffic Signal Controller Cabinet Modifications: Modify to City Standard Drawing No. E-34A for preemption and E-34B for the C-11 cable connections. Upgrade service panel Traffic Signal circuit breaker to 40A. Upgrade signal bus circuit breaker to 30A, flasher breaker to 15A and label PDA #21- breakers accordingly. Furnish and install any and all equipment for proper operation of traffic signals and cabinet as described in this Section 23-2 of the City Standard Specifications. 200 Load Switch: The load switch is a tri-pack, modular, solid state relay designed specifically to meet NEMA specifications, as well as California and New York Model 200 specifications. Each load switch contains 3 individually replaceable modules that are enclosed in a dust resistant metal enclosure. The load switch shall integrate with the Model 332 cabinet output file as well as with any NEMA loadbay. Quantities shall be supplied for an 8-phase operation. 12 shall be required installed at time of delivery. 222 Two Channel Loop Monitor: The loop inputs incorporate lightening and transient protection devices and the loop oscillator circuitry is transformer isolated. The lightening protection will withstand the discharge of a 10uF capacitor charged to 2,000V across the loop inputs or between any loop input and earth ground. The transformer isolation allows operation with City of Fresno Dept. of Public Works 23-23 A7 Mar. 2021 loops which are grounded at a single point. 22 shall be required installed at time of delivery. 242 Two-Channel D.C. Isolator: Two-channel dual change (DC) Isolator is designed to comply with CALTRANS Model 242 specifications. Each channel of the D.C. Isolator shall present a true signal (ground closure) at the input voltage of less than 8 VDC, for longer than 5 milliseconds. The D.C. Isolator shall integrate with the model 332 cabinet input file. 3 shall be required installed at time of delivery. 204 Flasher Unit: The flasher unit shall integrate with the model 332 cabinet. It has a dual circuit flasher designed for the traffic control industry, specifically to meet the CALTRANS Model 204 specifications. This unit is rated up to a 15 A per circuit. The flash rate is 56.25 flashes per minute and does not vary due to voltage or temperature variations. Two shall be required installed at time of delivery. Conflict Monitor 2010ECL Series + features: The Conflict/Voltage Signal Monitor unit is exempt from QPL qualification and shall be a Model 2010ECL, as manufactured by Solid State Devices or Eberle Designs Inc. The interface for the conflict/voltage signal monitor shall be installed in the cabinet output file at the factory per the conflict/voltage signal monitor manufacturer's instructions. The unused channel programming of the interface shall be configured for full quad 8-phase operation. Modification of the programming shall be possible without the use of any tools. For conflict monitors ordered as individual units, the interface provided shall be the monitor manufacturer's generic interface complete with all cables and hardware necessary to provide complete operation of the monitor. Conflict Monitor shall be installed at time of delivery. Testing: Prior to installation the Contractor must be able to deliver to the City facilities for testing and inspection all equipment. The controllers, cabinets and ancillary devices will be evaluated for performance. The Model 2070LX controller must pass the City diagnostic test. The City diagnostic is essentially identical to the CALTRANS Diagnostic and Acceptance Test Program, version 2.4, dated 1/04/95. A sample Detection Loop Test sheet is provided below. The purpose of the testing is to ensure that the equipment will work in the field, and as stated above meet all requirements. The City reserves the right during the testing process to contact the Contractor for additional information. Any equipment found to be defective will be rejected and shall be replaced by the Contractor within 30 Days of the date of notification by the City of Fresno Dept. of Public Works 23-24 A7 Mar. 2021 City and at no cost to the City. Testing of replacement equipment will be at the Contractor's expense. Any equipment not approved by the City because of testing failure shall be picked up by the Contractor at the Contractor's expense. The Contractor shall have 48 hours to remove equipment failures after notification by the Electrical Superintendent. The City will not accept or have installed any rejected equipment. Approved Manufacturer Equipment and Brands a) Cabinets and Ancillary Devices 1. Precision Design Company (PDC) 2. Eberle Design Inc. (EDI) 3. Solid State Devices 4. McCain Traffic Supply 5. Traffic Safety Supply 6. Safetran Traffic Systems, Inc. 7. Global Traffic Technologies (GTT) 8. Polara Engineering 9. Rene A&E City of Fresno Dept. of Public Works 23-25 A7 Mar. 2021 Detector Loop Test Results Agcy-Int. # Location: PW#-Fund-Org: Test By: Date: TB I Insulation VI Det 'Movement #QJ Slot TB' I Insulation I I Term #I Loop O Meg f) Slot Movement I # :Term #I Loop f2 Meg Q 1 1 HU 2 1-2 2 5 JIU 3 1-2 3 1 11L 2 3-4 4 5 JIL 3 3-4 5 2J2U 2 5-6 6 6 J2U 3 5-6 ---- ------ 7 2 12L 2 7-8 8 6 J2L 3 7-8 9 2 13U 2 9-10 lo 6 J3U 3 1 9-10 ------------------- 11 2J3L 2 � 11-12 1 12 1 6 J3L 1 3 111-121 13 2 14U 4 1-2 14 6 J4U 5 1-2 15 2 14L 4 3-4 16 6 J4L 5 3-4 17 3J5U 4 5-6 18 7 J5U 5 5-6 19 3 15L 4 7-8 20 7 J5L 5 7-8 21 4 16U 4 9-10 22 8 J6U 5 9-10 23 1 4J6L 1 1 4 111-12 1 1 24T8�J6L 1 5 11-12 25 4 17U 6 1-2 26 8 J7U 7 1 1-2 27 4 17L 6 3-4 28 8 J7L 7 3-4 29 4J8U 6 5-6-- 30 8 J8U 7 5-6 31 4 18L 6 7-8 32 8 J8L 7 7-8 33 1 19U 6 34 5 J9U 7 9-10 35 3j9L 6 11-12 36 7 J9L 7 11-12 37 HOU 10 5-6 38 J10U 10: 9-10 39 110L 10 7-8 40 J10L. 10111-12 41 2 I11U 10 1-2 42 6 JHU 10:0 3-4 43 41111LI 8 2-3 1 44 8 J11L 9 2-3 45 1 IJ14UI RR-1 19710-121 46, 1 IJ14LI RR-2 1 9 11-12] Check active locations Check active locations Loop 12=Ohmmeter reading across loop,in Ohms.(Max 0.592 per loop+0.6592per 100'#14DLCor 1.0592per 100'#16DLC) Insulation Meg 12=Megohm Meter reading,loop to ground @500volts,in Megohms. (Min. 100 Meg 92) City of Fresno Dept. of Public Works 23-26 A7 Mar. 2021 23-3 CITY SPECIFICATIONS FOR STREET LIGHTING 23-3.1 General Furnishing and installing streetlights and payment therefore shall conform to the provisions in Section 86 and 87 of the State Standard Specifications and the State Standard Drawings, most recent version; City Standard Drawings as applicable; and the Specifications and the Plans. Streetlight Work is to be performed at the locations shown on the Plans. Existing electrical systems, or approved temporary replacements thereof, shall be kept in effective operation during the progress of the Work, except when shutdown is permitted. Work or equipment not specified or shown on the Plans which is necessary for the proper operation of the Work in this section shall be provided and installed at no additional cost to the City. The locations of foundations, poles, services, pull boxes and other appurtenances shown on the Plans are approximate. Exact locations and grades will be established as necessary by either the Traffic Engineer and/or engineer in the field. All work shall be completed in a neat and workmanlike manner. 23-3.2 Materials Attention is directed to Section 6 of the State Standard Specifications and these Specifications. All materials required to complete the Work under this contract shall be furnished by the Contractor after receiving approved submittals from City of Fresno Traffic Signal and Street Lights (TSSL) Division. The materials furnished and used shall be new, except such used materials as may be specifically provided for on the Plans. All Work and materials shall be in full accordance with the latest rules and regulations of the National Board of Fire Underwriters, local and State laws and regulations, the State of California Industrial Accident Commission's Safety Orders, and Regulations of the Pacific Gas and Electric Company pertaining to service equipment and installations thereof. All Work shall comply with Section 11-104 of the City of Fresno Municipal Code, the National Electrical Manufacturer's Association Standards and all regulations and codes as stated in Section 86-1.01 D City of Fresno Dept. of Public Works 23-27 A7 Mar. 2021 of the State Standard Specifications. Nothing in these Plans and Specifications shall be construed to permit Work not complying with these codes. 23-3.3 Equipment List Equipment list and drawing shall conform to the provisions in Section 86-1.01 C of the State Standard Specifications and these Specifications. All equipment and materials that the Contractor proposes to install shall conform to these Specifications and the contract Plans. A list of substitute equipment and/or material, along with a written descriptive summary, describing the functions of the components which the Contractor proposes to install shall be submitted along with his/her Proposal. The list shall be complete as to the name of the manufacturer, size and identifying number of each item. The list shall be supplemented by such other data as may be required. In all cases, the judgment of the Electrical Superintendent shall be final as to whether substitute equipment and/or material recommended by the Contractor conforms to the intent of these Specifications and is acceptable for use. 23-3.4 Warranties, Guarantees and Instruction Sheets Warranties, guarantees and instruction sheets shall conform to the provisions in Section 5-1 .47 of the State Standard Specifications and these Specifications. All equipment furnished shall be guaranteed to the City by the manufacturers for a period of not less than one (1) year, unless otherwise indicated, following the date of acceptance of such equipment. If any part(s) is found to be defective in materials or workmanship within the one-year period, and it is determined by the Electrical Superintendent, or by an authorized manufacturer's representative that said part(s) cannot be repaired on the Site, the manufacturer shall provide a replacement part(s) of equal kind and/or type during the repair period and shall be responsible for the removal, handling, repair or replacement and reinstallation of the part(s) until such time as the street lighting equipment, is functioning as specified and as intended herein; the repair period shall in no event exceed 72 hours, including acquisition of parts. The one-year guarantee on the repaired or replaced parts shall again commence with the date of reassembly of the system. All Work done by the Contractor shall be guaranteed in writing to the City CM Engineer for the 12 months from the date of acceptance. City of Fresno Dept. of Public Works 23-28 A7 Mar. 2021 23-3.5 Maintaining Existing and Temporary Electrical Systems Existing lighting systems shall remain operational during construction, unless otherwise authorized in writing by the City Engineer. The Contractor shall notify the City CM Engineer at least one full working day (not less than 24 hours) prior to the shutdown of any street lighting system. The Contractor may use temporary splices and wiring as approved by the City CM Engineer to maintain existing and temporary street lighting systems. 23-3.6 Scheduling of Work Scheduling of Work shall conform to the provisions in Section 8-1.02 of the State Standard Specifications and these Specifications. The Contractor shall notify the City CM Engineer at least one working day in advance of any electrical Work and also at least one working day in advance of any Work done intermittently to facilitate inspection. 23-3.7 Foundations Foundations shall conform to the provision in Section 86-2.03 of the 1997 State Standard Specifications and these Specifications. Portland cement concrete shall conform to Section 90-2 of the State Standard Specifications. Foundation concrete shall be placed in a single pour except that pouring of the top six (6) inches may be postponed when prior approval has been obtained. All dirt and debris shall be cleaned from the top of the foundation prior to pouring the top 6". No utilities shall be permitted to run through a foundation. Foundations shall be poured against undisturbed earth where practicable. The exposed portion shall be formed and finished to present a neat appearance. Where obstructions or other conditions prevent construction of planned foundations, the Contractor shall construct an effective foundation satisfactory to the City CM Engineer. The bottom of concrete foundations shall rest on firm ground. When placing the foundations, the Contractor shall place all conduit ends in their proper position, at the correct heights and shall securely hold them in position during the pouring of concrete. The conduit ends shall be capped before any concrete is poured. Both forms and earth to be in contact with foundations shall be thoroughly moistened before placing concrete. City of Fresno Dept. of Public Works 23-29 A7 Mar. 2021 Anchor bolts shall be galvanized and shall extend above the finished base as needed to ensure a minimum extension above the top nut of 3 threads. The maximum extension above the top nut is 1 inch. The distance below the base plate allowed for leveling shall not be less than 1.5 times nor more than 2 times the thickness of the leveling nut. Each bolt shall be supplied with 2 nuts and 2 flat washers to facilitate leveling. The anchor bolts and conduits shall be held in place by means of a template until the concrete sets. Poles shall not be erected until the foundation concrete has set at least seven days and shall be plumbed as directed by the City CM Engineer. The top of concrete foundations shall be finished relative to curb or sidewalk grade as shown on the Plans or as directed by the City CM Engineer. When grouting the base of the pole, the Contractor shall take care not to allow grout to enter or foul the conduit within the foundation. Locations shown on the Plans are schematic. 23-3.8 Poles Poles shall conform to the provisions in Section 56-3 of the 1997 State Standard Specifications and these Specifications. All hand hole covers must be of steel construction to allow welding after installation. Embedded Steel poles shall conform to PG&E specifications for pole type 35-7274. If relocation of Utilities is required, immediate notification shall be given to the appropriate Utility company by the Contractor. The Contractor may install all underground electrical components, including foundations at the Site of the project; however, no streetlight poles shall be erected until underground conduit is in place. Street light numbers shall be installed on the poles using minimum 2 '/2" high numerals in accordance to City Standard Drawing No. E-25. Numbers shall be adhesive backed Almetek PS-2.5 or approved equivalent. The numbers shall be black on a contrasting background. Pole numbers shall be shown on the as-built plans. All nuts, washers, screws and other post hardware shall be galvanized. City of Fresno Dept. of Public Works 23-30 A7 Mar. 2021 23-3.9 Conduit Conduit shall conform to the provisions in Section 86-1.02B of the State Standard Specifications and these Specifications. Nonmetallic-type conduit may be used on minor/local and major Streets as shown on the Plans for Street Lights. All Street crossings using nonmetallic conduit shall be Schedule 80 conduit. Rigid Conduit shall conform to Article 346 of the National Electrical Code. All conduit and fittings shall be hot dip galvanized. Each length shall bear the UL label. Installation shall conform to appropriate Articles of the such Code. All couplings shall be tightened to provide a good electrical and mechanical connection throughout the entire length of the conduit run. All conduit ends shall be threaded and joined with approved fittings. The use of threadless or set-screw type fittings is not allowed. No running threads are permitted. Three piece, Erickson type, couplings shall not be used without prior authorization from TSSL Division and will only be allowed under special circumstances necessitating their use. Conduit threads cut in the field and damaged conduit surfaces on metal conduit shall be thoroughly painted with zinc rich paint conforming to Military Specifications DOD-P-21023A. All conduit ends shall be threaded and capped with standard conduit caps until wiring is started. When the caps are removed the threaded ends shall be provided with approved insulated hot dipped galvanized malleable iron bushings with cast integral lay-in lugs. The size of conduit used shall be as shown on the Plans. It shall be the privilege of the Contractor, at his/her own expense, to use larger size conduit if desired, and where large size conduit is used, it shall be for the entire length of the run from outlet to outlet. No reducing couplings will be permitted. All conduit shall be laid to a depth of not less than twenty-four inches nor greater than thirty-six inches below the curb grade in the sidewalk areas and from the finished surface in Street areas. Conduits in sidewalk areas and parallel to the curb shall not be installed more than twenty-four inches back of curb unless approved by the City CM Engineer. Conduits not able to be placed under concrete sidewalk, or roadway, shall be encased in at least 6" of two-sack slurry. Conduit shall be placed under existing pavement by approved jacking or boring methods. The pavement shall not be disturbed without the written permission of the City CM Engineer and then only in the event insurmountable obstructions are City of Fresno Dept. of Public Works 23-31 A7 Mar. 2021 encountered. Excessive use of water, such that pavement might be undermined, or subgrade softened, will not be permitted. Conduit ends terminating in pole foundations shall extend 2" vertically above the top of the foundation. Conduit in direct buried poles shall extend to within 2" of the bottom of the hand hole and may not extend above the lowest part of the hand hole opening. Attention is called to City Standard Drawing No. E-27 with regard to the requirements of conduit within the foundation. Conduit in pull boxes shall not extend more than two inches inside the box wall. With the exception of pull boxes in non-concrete areas, all conduit entering the pull box from the bottom shall be approved by the City CM Engineer. No conduit or Utility shall pass through a streetlight foundation or pull box except the conduit which terminates within the foundation or pull box. After the installation of all conductors the ends of conduits terminating in pull boxes and service pedestals shall be sealed with an approved duct seal material. Where shown on the Plans, conduit will be extended to the limits of the project for future use. The end of such conduits shall be threaded and capped. In as much as possible, conduit shall be run in a straight line from one pull box or pole to the next maintaining a consistent setback from the curb. Any variation from this requirement shall be approved by the City CM Engineer or Electrical Superintendent. 23-3.10 Pull Boxes Concrete pull boxes shall conform to the provisions in Section 86-1.02C of the State Standard Specifications and these Specifications. Nonconcrete pull boxes shall not be used. All pull boxes shall be #3-1/2 unless otherwise noted on the Plans. See City Standard Drawings No. E-4A through E-4C, regarding requirements for grouting, drain hole, etc. All pull boxes shall be installed with extensions. The pull box lid at PG&E's point of connection shall be marked 'PG&E'. All others shall be marked "Street Lights." Pull boxes on long runs shall be installed and spaced at not over 200-foot intervals, and shall be required in all conduit change of directions. All pull boxes shall be wrapped with 151b. roofing paper prior to backfilling. City of Fresno Dept. of Public Works 23-32 A7 Mar. 2021 Pull boxes installed in non-concrete areas shall be surrounded by a one (1) foot wide concrete collar, and to a depth equal to the pull box and extension. All conduits shall enter these pull boxes through the bottom, using 90 degree elbows and extend 3-5 inches above the finished grout in the bottom of the pull box. The collar shall be sloped to drain away from the pull box. Vandal resistant locking lids shall be installed by the contractor at final inspection for the point of service pull box. Contractor shall provide temporary lids during construction. Locking lids shall be galvanized steel diamond plate, minimum thickness 3/16 inches, with minimum two (2) clamping jaws and be keyed to the City of Fresno key. Locking lids shall be torqued to 25 ft-lbs prior to installing buttons. Existing pull boxes accessed during the course of work shall be cleaned, drain holes opened, bonding and grounding connections secured, conduits duct sealed and grout repaired. Any pull boxes broken in the course of work shall be replaced. 23-3.11 Conductors and Wiring/Cables Conductors and wiring shall conform to the provisions in Section 86-1.02F of the State Standard Specifications and these Specifications. All wiring and wiring methods shall conform to the provisions of the applicable Codes. All circuit conductors shall be stranded copper with THWN insulation and be of the gauge as shown on the Plans. All conductors shall have insulation colors appropriate to their use and all applicable codes. The use of colored phase tape is not allowed. A minimum of three feet of slack in each conductor shall be left at each streetlight standard and in each pull box. No splicing of underground conductors is allowed. City Standard Drawing No. E-5 details the field connections of the circuit conductors. With the exception of "Point Of Service" pull boxes, no current carrying conductors shall be spliced in Street light pull boxes. Conductors within the pole shall be #10 awg Type THWN stranded copper. Splices in single conductor wire shall be limited to the load side of the service. These splices shall be made using either split bolts or c-tap connectors. The c-tap shall be properly sized for the wires being joined and installed with the proper tooling. City of Fresno Dept. of Public Works 23-33 A7 Mar. 2021 The splice shall be insulated to be waterproof as follows: a) Minimum 2 layers of rubber tape, b) 1 layer— 1/2 lapped plastic tape, c) 1 layer friction tape, and then d) Coated with an approved electrical sealing compound. Should splices between existing aluminum and new copper conductors be required, the splice shall be made using a split bolt designed for that purpose. The conductors and split bolt shall have an appropriate joint compound, designed to prevent oxidation, liberally applied prior to installation. 23-3.12 Fused Splice Connectors Fuses for street lights and safety lights will no longer be allowed in the pole hand hole. Each luminaire shall be internally fused per subsection 23-3.16 of these specifications. At service points other than pedestals, a fuse holder and fuse shall be installed in each ungrounded current carrying conductor. The fuse holder shall be a TRON HEJ type with an SC fuse; 40 amp for #8 awg wire, 60 amp for #4 or #6 awg wire. The holder shall be crimped to the wire using the proper tooling and insulated as described above for tape type splices. 23-3.13 Bonding and Grounding Bonding and grounding shall conform to the provisions in Section 87-1.030 of the State Standard Specifications and these Specifications. Ground will be obtained by installation of a ground rod within the service. This ground rod shall be bonded to all metallic conduits within the service by means of a bare #8 solid copper conductor. The metallic conduits within all pull-boxes shall be bonded in a similar manner. Within pull-boxes adjacent to streetlight standards, one end of the solid #8 bonding conductor shall be extended to and attached to the standard using the grounding point as furnished. A green #8 stranded wire may be used for pole grounding if a ring terminal, appropriately sized for the grounding bolt, is installed. When a grounding lug is present, a green #8 standard wire shall be used for pole grounding if the wire is stripped loose strands twisted neatly and tinned with solder City of Fresno Dept. of Public Works 23-34 A7 Mar. 2021 prior to installation. Soldering shall be by means of an iron or gun. No open flame torch shall be used. Within all conduits, a #8 stranded copper conductor with green THWN insulation shall be installed. It shall be connected to the ground rod at the service and connected to all pole grounding connections. Tap splices at pull boxes shall be made using either split bolts or c-taps. 23-3.14 Painting All paint shall be furnished by the Contractor. Minor touch-up painting on all material whose surface has been damaged or not protected from corrosion shall be accomplished as directed by the City CM Engineer. Cold galvanizing zinc-rich paint, MILSPEC DOD-P-21035 A, shall be used on all damaged galvanized surfaces. 23-3.15 Service The service shall conform to the provisions in Section 87-1.03L of the State Standard Specifications and these Specifications. All services for multiple streetlight circuits shall be 120/240 volt, 3 wire single phase. This will also be required for installations that have probable expansion adjacent to the current installation. Single street light installations shall be 120 volt 2 wire. Service feeders shall be sized to accommodate the full load amperage rating of the electrical service pedestal. Voltage drop shall be taken into consideration when sizing conductors. The service pedestal for street light installations shall be as detailed in City Standard Drawing No. E-18. If designed to feed from a Combination Traffic Signal and Streetlight service pedestal it shall be as detailed in City Standard Drawing E-15. The Contractor shall be responsible for any modification necessary to existing pedestals not in conformance with the current standard. The Electrical Superintendent shall be contacted for component information as needed. The underground service if used shall be as detailed in City Standard Drawing Nos. E-4C and E-6. The conductors from the service pull box to the PG&E pull box shall be a minimum #6 awg. 23-3.16 Luminaire The following sections provide design parameters as well as product and installation requirements for standard cobra head style light emitting diode (LED) light source luminaires for new street light construction. See Section 23-4.17 for luminaire requirements Ornamental or non-cobra head style luminaires. City of Fresno Dept. of Public Works 23-35 A7 Mar. 2021 The City Engineer maintains a list of approved cobra head style luminaire products that meet the minimum illumination standards listed herein mounted on standard E-1 or E-2 poles, and maximum pole spacing indicated in these City Standards. In a standard lighting design approved luminaires for the six lighting configurations described below and on the Standard Drawings may be used in lieu of a specific design meeting the criteria in the remaining parts of this section. a) Mid-Block/Local Roadway (MBLR) Utilized to illuminate local roadways and intersections, as well as the mid-block roadways of major streets. b) Local Cul-De-Sac (LCDS) Utilize this Iuminaire at local roadway knuckles or cul-de-sacs where typical Mid-Block/Local elongated roadway lights could provide nuisance level light pollution of adjacent residences. c) Major/Local Intersection (MLI)— Use a Major/Local Safety Iuminaire at the intersections for local streets and major streets where the intersection conflict zone extends less than 70 feet across the major street (see Standard Drawing E-8a) d) 4 through 6 — Traffic Signal Intersection — see subsection 23-1.23 for definitions for Small, Medium and Large Traffic signal luminaires. The Public Works Technical Library, published at the following City website provides the most current list of approved luminaires for the six category uses. http://www.fresno.gov/Government/DepartmentDirectorV/PublicWorks/Developerpoo rway/Technical+Library/StandardSpecificationsandDrawings.htm These luminaires may be utilized for installation if listed at the time of installation or award of construction contract only if the installation is to be performed under a City Construction Contract. A photometric design will be required to demonstrate that proposed luminaires will provide the minimum roadway and non-signal intersection luminance if any of the following criteria are met. a) The roadway will not have the standard lighting pole heights or arm lengths (per Standard Drawing E-1 or E-2). b) The roadway geometrics have non-typical layout, i.e. horizontal or vertical curves where standard luminaires and poles may not provide adequate coverage. City of Fresno Dept. of Public Works 23-36 A7 Mar. 2021 c) The pole-to-pole distances will exceed the maximum values, or street lights cannot be placed within the layout requirement indicated on the standard drawings (E-7 through E-12), or the standard roadway geometry is changed. d) A luminaire different from the City Engineer approved list is proposed. e) The location has increased potential for night time vehicle or pedestrian conflicts as determined by the City Engineer necessitating an increase in the minimum illuminance values listed in the Photometric Design Section below. Roadway Photometric Design Requirements When photometric design is required, the submitted street light plans shall include computer-generated point-by-point photometric analysis of maintained illumination levels. Analysis areas should be conducted on proposed roadways, sidewalks, intersections, and crosswalks. This analysis that matches the submitted lighting plans, should list all input parameters and reference files. The hardcopy and computer design shall be provided to the City engineering staff, amended as necessary by the lighting professional, and approved by the City Engineer prior to construction of the lighting system. Table 23-3.16 A LED LUMINAIRE LUMINAIRE 30 W Max MAXIMUM INPUT Local and Major Mid-Block, 165 foot max Utility Label, POWER Spacing for Major Street; 250 foot max 3400 (+/- 5%) spacing for Local Lumen Major/Local Intersection 75W Max Depth of intersection conflict zone is less Utility Label, than 50 feet and width less than 80 feet from 9300 (+/- 5%) pole Lumen VOLTAGE Nominal luminaire input voltage (or range as 120 to 277 V applicable WARRANTY Minimum luminaire warranty 10 earst NOMINAL CCT Rated correlated color temperature 4000 K BUG RATINGS Maximum nominal for Local/Residential (backlight-uplight- Street; and Mid-Block Major Street B 1-U0-G 1 glare) Maximum nominal for Major/Local Street Intersection (without back light shield). B2-UO-G2 Maximum nominal for Major/Local Street B 1-U0-G2 Intersection with back light shield FINISH Luminaire housing finish color Gray WEIGHT Luminaire weight 30 lb. Max EPA Max. effective projected area 0.7 ft2 City of Fresno Dept. of Public Works 23-37 A7 Mar. 2021 MOUNTING Arm Length E-1 or E-2 Tenon nominal pipe size (NPS) 2-318 inch OD Pole founded in-ground (ANSI C136.31) or Caltrans 611 Level 1 VIBRATION pole founded on Bridge or overpass (ANSI C136.31 or Caltrans 611 Level Typical min. ambient temperature during 20 °C THERMAL operation ENVIRONMENT Typical max. ambient temperature during 40 °C operation ELECTRICAL ANSI C136.2 Comb. Wave Test Level Basic (6kV/ IMMUNITY 3kA CONTROL ANSI C136.41, INTERFACE 7-pin LED DRIVER Dimmable, 0-10V IEC 60929 t - City requires extended warrantee certificates from manufacturer's that do not offer a standard 10 year warranty. The values in the tables below represent minimum illuminance levels for typical City of Fresno streets with low night time pedestrian and vehicle conflict conditions. Where night time pedestrian and vehicle conflicts are anticipated to be higher than typical conditions, the minimum values provided may be increased at the discretion of the City Engineer depending on the expected site or facility use, and night time activity. In those cases a specific lighting design will be required for review and approval. Table 23-3.16 B LOCAL/RESIDENTIAL STREET PERFORMANCE CRITERIA MAINTAINED ROADWAY ILLUMINATION All Roadway Area from Curb to Curb Average horizontal illuminance at pavement 0.2 fc Average to minimum uniformity ratio 20 MAINTAINED SIDEWALK ILLUMINATION All Sidewalk area from back of curb to ROW line or back of sidewalk Average horizontal illuminance at sidewalk 0.15 fc Average to minimum uniformity ratio 15 City of Fresno Dept. of Public Works 23-38 A7 Mar. 2021 MAINTAINED LOCAL/LOCAL INTERSECTION or LOCAL PREDSTRIAN CROSSING ILLUMINATION (see Drawing E-8a for computation area) Average horizontal illuminance on pavement 0.3 fc Average to minimum uniformity ratio 5 Maximum to minimum uniformity ratio 10 MAJOR STREET PERFORMANCE CRITERIA MAINTAINED ROADWAY ILLUMINATION All Roadway Area from Curb to Curb (Do not include median) Average horizontal illuminance at pavement 0.2 fc Average to minimum uniformity ratio 20 MAINTAINED SIDEWALK ILLUMINATION All Sidewalk area from back of Curb to ROW line or back of sidewalk Average horizontal illuminance at sidewalk 0.15 fc Average to minimum uniformity ratio 15 MAINTAINED MAJOR/LOCAL INTERSECTION ILLUMINATION See Drawing E-9 for Area Average horizontal illuminance at pavement 0.50fc Average to Minimum uniformity ratio 6 Maximum to Minimum uniformity ratio 20 MAINTAINED CROSSWALK ILLUMINATION Average horizontal at pavement along Major Street 0.75 fc Average horizontal at pavement along Minor Street 0.3 fc Average to Minimum uniformity ratio along Major Street 35 Average to Minimum uniformity ratio along Minor Street 4 The street light plans as submitted shall include the photometric analysis of the proposed poles, luminaires and layout that demonstrates the lighting system will provide the minimum illumination for the roadways. The photometric analysis shall include calculation zones for all of the defined illumination conditions in these Specifications. Analysis should provide all geometric and photopic parameters, including but not limited to the following: City of Fresno Dept. of Public Works 23-39 A7 Mar. 2021 Calculations shall be for maintained values, i.e. Light Loss Factor (LLF) < 1.0, where LLF = LLD. Lamp Lumen Depreciation (LLD) shall be the value as a % of initial output at 50,000 hours operation @ 25°C. Locked IES LM-63 format electronic file containing luminous intensity data associated with submitted LM-79 report(s) must be submitted for each proposed luminaire used for point-by-point calculations. (.ies files). Mesopic multipliers (i.e., effective luminance factors) shall not be used. All values shall assume photopic visual adaptation. Analysis shall be provided to and reviewed by City engineering staff. Analyses comments will be provided to the designer, the design shall be amended as necessary by the lighting professional. The final design shall be approved by the City Engineer prior to construction of the lighting system. Any field adjustments to the lighting design, either by product change or light location adjustments shall be approved by the lighting designer and the City Engineer prior to final installation. Manufacturer and Installation Requirements LED light source(s) and driver(s) shall be RoHS compliant. Nominal luminaire input wattage shall account for nominal applied voltage and any reduction in driver efficiency due to sub-optimal driver loading. Luminaire shall accept the voltage or voltage range specified at 50/60 Hz, and shall operate normally for input voltage fluctuations ranging from 95 volts to 277 volts . All internal components shall be assembled and pre-wired using modular electrical connections. The following shall be in accordance with corresponding sections of ANSI C136.37. a) Wiring and grounding b) Terminal blocks for incoming AC lines (electrical mains wires) c) Photocontrol receptacle d) Latching and hinging e) Mounting provisions f) Ingress protection Painted or finished luminaire surfaces exposed to the environment shall exceed a rating of six per ASTM D1654 after 1000 hours of testing per ASTM B117. Also the coating shall exhibit no greater than 30% reduction of gloss per ASTM D523, after 500 hours of QUV testing at ASTM G154 Cycle 6. City of Fresno Dept. of Public Works 23-40 A7 Mar. 2021 Thermal management - Luminaire shall start and operate in ambient temperature range specified. Maximum rated case temperature of driver and other internal components shall not be exceeded when luminaire is operated in ambient temperature range specified. Mechanical design of protruding external surfaces (heat sink fins) shall facilitate hose-down cleaning and discourage debris accumulation. Liquids or other moving parts shall be clearly indicated in submittals, shall be consistent with product testing, and shall be subject to review by City Engineer. A completed ENERGY STAR TM-21 Calculator as an electronic Excel file will be required for luminaires to demonstrate Lumen Maintenance % and ambient temperature requirements. LED driver, photo control receptacle, and control interface - Luminaire designation(s) indicated "ANSI C136.41, 7-pin" shall be fully prewired and shall incorporate an ANSI C136.41 compliant receptacle. If a dimmable LED driver is specified, its 0-10V or DALI control wires shall be connected to the receptacle pads as specified in ANSI C136.41; connection of the two remaining pads shall be by Supplier, as directed by Owner. Electrical Safety Testing - Luminaire shall be "Listed" for wet locations by a U.S. Occupational Safety Health Administration (OSHA) Nationally Recognized Testing Laboratory (NRTL). Luminaire shall have locality-appropriate governing mark and certification. Luminaire shall meet the performance requirements specified in ANSI C136.2 for dielectric withstand, using the DC test level and configuration. Electrical Immunity - Luminaire shall meet the performance requirements specified in ANSI C136.2 for electrical immunity, using the combination wave test level. Manufacturer shall indicate on submittal form whether failure of the electrical immunity system can possibly result in disconnect of power to luminaire. Interference and power quality - Luminaire shall comply with FCC 47 CFR part 15 interference criteria for Class A (non-residential) digital devices. Luminaire shall comply with section 5.2.5 (luminaires rated for outdoor use) of ANSI C82.77 at full input power and across specified voltage range. Color attributes - Color Rendering Index (CRI) shall be no less than 70. Nominal Correlated Color Temperature (CCT) shall be as specified in the Luminaire Designation Tables. If submitted nominal CCT is listed in the table below, measured CCT and Duv shall be as listed. Allowable CCT and Duv (adapted from ANSI C78.377 Manufacturer- Allowable IES LM-79 Rated Chromaticity Values Nominal CCT Measured Measured (K) CCT K Duv City of Fresno Dept. of Public Works 23-41 A7 Mar. 2021 3000 2870 to -0.006 to 3220 0.006 4000 3710 to -0.005 to 4260 0.007 If submitted nominal CCT is not listed in the above table, measured CCT and Duv shall be as per the criteria for Flexible CCT defined in ANSI C78.377. Identification - Luminaire shall have an external label per ANSI C136.15. Luminaire shall have an internal label per ANSI C136.22. Fusing — New Luminaires shall be protected from unanticipated current spikes using a slow burn fuse. Fuses are required in the Luminaire (not in the pole base). A fuse with a maximum rating of 5 amps (or less if recommended by the manufacturer) shall be installed. The fuse within the Luminaire housing can be either: 1) a manufacturer installed mounted fuse holder; or 2) an in-line fuse on the supply lead before it is connected to the terminal block (Buss HLR Fuse Holder with a Buss GMF Time Delay fuse, or approved equivalent). The street light numbers will be installed on the poles in accordance to City Standard Drawing No. E-25. They shall be stenciled or use adhesive backed numbers suitable for outdoor use. The numbers shall be black on a contrasting background. After installation and plumbing of the light standard, the luminaire shall be leveled on both the long and transverse axis by use of a spirit level. Required Submittals If a specific model Luminaire to be provided appears on the City of Fresno approved Luminaire Products at the time of installation (or the time of bid if a City Construction Contract), then a submittal package is not required. If an "or equal" luminaire is proposed for installation, the submittals listed below, with the completed submittal form will be required for review and approval prior to installation. Submittals must include: The submittal shall include OSHA Nationally Recognized Test Laboratory (NRTL) luminaire "Listing Report" or "Listed" to Standard for Safety UL1598 Luminaires. The required Listing Report shall demonstrate compliance to various construction and test requirements in the City's Standard Specifications, including all NRTL Certified components to the appropriate Standards for Safety, such as, UL 8750 Standard for Light Emitting Diode Equipment for Use in Lighting Products; UL 1449 Standard for Surge Protective Devices; UL 746C Standard for Safety Polymeric Materials; among other Certified components, as applicable, Coatings for Steel Enclosures for Outdoor City of Fresno Dept. of Public Works 23-42 A7 Mar. 2021 Use Electrical Equipment, Wiring, Terminal Blocks, Fuses, Photo Electric Control, Shorting Caps, Gaskets, Marking and Labeling System. The submittal shall include product cut sheets for Luminaire; LED light source(s); LED driver(s) and surge protection device. If dimmable LED driver is specified, provide diagrams illustrating light output and input power as a function of control signal. The Submittal shall include instructions for installation and maintenance, and, summary of luminaire recycled content and recyclability shall be in accordance with the FTC Green Guides, expressed as a percentage of luminaire weight. The submittal shall include LED Lighting Facts, CALIPER, or NVLAP accredited testing laboratory IES LM-79 Report, Approved Method Electrical and Photometric Measurements of Solid State Lighting Products; and IES LM-80 Report, Approved Method for Measuring Lumen Maintenance of LED Light Sources. The LM79 and LM80 reports shall include the following: a) Name of test laboratory b) Report number c) Date of testing d) Complete luminaire catalog number e) Description of luminair, LED light source(s), and LED drivier(s) f) Goniophotometry 1. IES TM-15 Backlight-Uplight-Glare (BUG)rating shall be for initial (worst- case) values, i.e., Light Loss Factor (LLF) = 1.0 2. If luminaires are tilted upward, BUG ratings shall correspond to the same angle(s) of tilt. g) Lumen maintenance calculations and supporting test data shall be in accordance with LED Lighting Facts guidance. Exception: calculations shall be based on the cumulative hours of operation specified in the appropriate Luminaire Designation Table. h) Completed ENERGY STAR TM-21 Calculator as an electronic Excel file. City of Fresno Dept. of Public Works 23-43 A7 Mar. 2021 i) Computer-generated point-by-point photometric analysis of maintained illumination levels shall be provided for review and approval for new street lighting systems. See previous paragraphs of this section for requirements. j) Fusing method, including manufacturer, model types, and specifications if not constructed by the Luminaire manufacturer. k) Summary of Joint Electron Devices Engineering Council (JEDEC) or Japan Electronics and Information Technology Industries (JEITA) reliability testing performed for LED packages 1) Summary of reliability testing performed for LED driver(s) m) Written product warranty as per Warrantee, and/or extended warrantee certification if the manufacturer does not provide the minimum term The submittal shall include OSHA NRTL, NVLAP, CALiPER, LED Lighting Facts accredited testing laboratory Certification of compliance to American National Standard for Roadway Lighting Equipment, ANSI C136.31-2010, Luminaire Vibration, or Certification of compliance to California Test 611. The submittal shall include documentation supporting any U.S. origin claims for the product, in accordance with FTC guidance. Warranty Warranty shall be of the minimum duration specified in the Luminaire Designation Tables and shall cover maintained integrity and functionality of the following: Luminaire housing, wiring, and connections; LED light source(s) (Negligible light output from more than 10 percent of the LED packages constitutes luminaire failure); and LED driver(s) Warranty period shall begin 90 days after date of invoice, or as negotiated by City such as in the case of an auditable asset management system. If the standard manufacturer's warrantee does not meet the minimum requirements listed above, the City will accept an extended warrantee certificate from the manufacturer to meet the minimum requirements at no additional charge to the City. Normative References The publications listed below form a part of this specification to the extent referenced. Publications are referenced within the text by their basic designation only. Versions listed shall be superseded by updated versions as they become available. City of Fresno Dept. of Public Works 23-44 A7 Mar. 2021 American National Standards Institute (ANSI) a) C78.377-2011 (or latest), American National Standard for the Chromaticity of Solid State Lighting Products b) C82.77-2002 (or latest), American National Standard for Harmonic Emission Limits - Related Power Quality Requirements for Lighting Equipment c) C136.2-2014 (or latest), American National Standard for Roadway and Area Lighting Equipment — Dielectric Withstand and Electrical Immunity Requirements d) C136.10-2010 (or latest), American National Standard for Roadway and Area Lighting Equipment — Locking-Type Photocontrol Devices and Mating Receptacles— Physical and Electrical Interchangeability and Testing e) C136.15-2011 (or latest), American National Standard for Roadway and Area Lighting Equipment — Luminaire Field Identification f) C136.22-2004 R2009 (or latest), American National Standard for Roadway and Area Lighting Equipment — Internal Labeling of Luminaires g) C136.31-2010 (or latest), American National Standard for Roadway Lighting Equipment — Luminaire Vibration h) C136.37-2011 (or latest), American National Standard for Roadway and Area Lighting Equipment - Solid State Light Sources Used in Roadway and Area Lighting i) C136.41-2013 (or latest), American National Standard for Roadway and Area Lighting Equipment—Dimming Control Between an External Locking Type Photocontrol and Ballast or Driver American Society for Testing and Materials International (ASTM): a) B117-11 (or latest), Standard Practice for Operating Salt Spray (Fog) Apparatus b) D523-08 (or latest), Standard Test Method for Specular Gloss c) D1654-08 (or latest), Standard Test Method for Evaluation of Painted or Coated Specimens Subjected to Corrosive Environments d) G154-06 (or latest), Standard Practice for Operating Fluorescent Light Apparatus for UV Exposure of Nonmetallic Materials City of Fresno Dept. of Public Works 23-45 A7 Mar. 2021 ENERGY STAR: a) ENERGY STAR TM-21 Calculator, rev. 020712 (or latest, www.energVstar.gov/TM-21 Calculator) Federal Communications Commission (FCC) a) 47 CFR Part 15, Telecommunication — Radio Frequency Devices Federal Trade Commission (FTC) a) Complying with the Made in USA Standard, December 1998 (http://business.ftc.gov/advertising-and-marketing/made-usa) b) Green Guides, 16 CFR Part 260, Guides for the Use of Environmental Marketing Claims Illuminating Engineering Society of North America (IESNA or IES) a) LM-50-13 (or latest), IES Approved Method for Photometric Measurement of Roadway and Street Lighting Installations b) LM-61-06 (or latest), IESNA Approved Guide for Identifying Operating Factors Influencing Measured Vs. Predicted Performance for Installed Outdoor High Intensity Discharge (HID) Luminaires c) LM-63-02 (R2008 or latest), ANSI/IESNA Standard File Format for the Electronic Transfer of Photometric Data and Related Information d) LM-79-08 (or latest), IESNA Approved Method for the Electrical and Photometric Measurements of Solid-State Lighting Products e) LM-80-08 (or latest), IESNA Approved Method for Measuring Lumen Maintenance of LED Light Sources f) RP-8-00 (or latest), ANSI / IESNA American National Standard Practice for Roadway Lighting g) RP-16-10 (or latest), ANSI/IES Nomenclature and Definitions for Illuminating Engineering h) TM-15-11 (or latest), Luminaire Classification System for Outdoor Luminaires i) TM-21-11 (or latest), Projecting Long Term Lumen Maintenance of LED Light Sources City of Fresno Dept. of Public Works 23-46 A7 Mar. 2021 International Electrotechnical Commission (IEC) a) 60929 Annex E, Control Interface for Controllable Ballasts (0-10V) b) 62386, Digital Addressable Lighting Interface (DALI) LED Lighting Facts a) Submission Requirements (http://www.lightingfacts..com/About/Content/Manufacturers/Submission Reg ui rements) Municipal Solid-State Street Lighting Consortium (MSSLC) a) Model Specification for Networked Outdoor Lighting Control Systems, V2.0 (or latest) National Electrical Manufacturers Association (NEMA) a) LSD 63-2012, Measurement Methods and Performance Variation for Verification Testing of General Purpose Lamps and Systems Underwriters Laboratories (UL) a) Standard for Safety, UL 1598 Third Edition (or latest), Standard for Luminaires b) Standard for Safety, UL 8750 Standard for Light Emitting Diode Equipment for Use in Lighting Products c) Standard for Safety, UL1449 Standard for Surge Protective Devices d) Standard for Safety, UL 746C Standard for Standard for Polymeric Materials 23-3.17 Photoelectric Control (PEC) and Photocell Bypass (Shorting Cap) Photoelectric controls (PEC) shall be "Listed" for the application by Occupational Safety and Health Administration (OSHA) Nationally Recognized Test Laboratory (NRTL) such as UL, CSA, or ETL. PEC shall meet ANSI C136.10 and C136.24 Standards and must be RoHS compliant. PEC shall be compatible with the selected LED luminaires. The PEC shall be rated 120-270 Volt AC, 1,000 Watt/1,800VA, 15 Amps; PEC relay shall be tested to 15,000 cycle operations; surge protection MOV minimum shall be 600 Jewels; City of Fresno Dept. of Public Works 23-47 A7 Mar. 2021 temperature rating shall be -200C +70°C; enclosure shall be UV stabilized; failure mode shall be fail-on; color shall be ANSI/UL standard blue; PEC turn-on level shall be 1.0 foot-candles and turn-off shall be 1.5 foot candles. The PEC shall have a manufacturer Warranty of 10 years. Shorting caps shall be "Listed" for the application by Occupational Safety and Health Administration (OSHA) Nationally Recognized Test Laboratory (NRTL) such as UL, CSA, or ETL. The shorting cap shall install on an ANSI C136-10 NEMA style 3-pin receptacle to connect load pins to bypass local photocell control. The shorting cap shall have a rating of 120-270 Volt AC, 15 Amp. The shorting cap shall be constructed with UV stabilized polypropylene cap, black polypropylene base and neoprene blended gasket. The shorting cap shall meet all environmental and electrical requirements of ANSI C136.10. The Shorting Cap shall have a manufacturer Warranty of 10 years. If the service pedestal is equipped with a lighting contactor and no master photo control is installed, the Contractor shall install a pec atop the traffic signal mast arm pole adjacent to the service pedestal or atop the nearest streetlight pole. The master photo control shall be wired back to the service pedestal using three #12 AWG stranded copper wires color matched to the PEC. The PEC will be mounted using hardware manufactured for that purpose or fabricated and approved by the Electrical Superintendent. All streetlights and safety lights fed from a pedestal equipped with a contactor shall be switched, by that contactor and their PEC's replaced with shorting caps. 23-3.18 Traffic Control Traffic control shall be provided in accordance with the latest Caltrans adopted California "Manual on Uniform Traffic Control Devices" (CAMUTCD), sections 7-10.4 and 7-10.5 of these specifications. A traffic control plan shall be provided in accordance with the latest Caltrans adopted California "Manual on Uniform Traffic Control Devices" (CAMUTCD), sections 7-10.4 and 7-10.5 of these specifications. Payment shall be included in lump sum bid for signals and lighting. 23-4 ORNAMENTAL STREET LIGHTING 23-4.1 INTENT It is the intent of these Specifications to describe the minimum acceptable parameters for ornamental streetlight installation in the City. It should be noted that the City only allows Ornamental Street Lighting in designated Downtown areas (see Drawing E-29) to match existing Historical Street Lights. The City will also allow Ornamental Lights in new areas that don't have existing Ornamental Street Lights City of Fresno Dept. of Public Works 23-48 A7 Mar. 2021 only if the new lights are included in one of the City's Community Facilities Districts for the added maintenance. The City will not accept, nor maintain Ornamental Streetlights not in the Downtown area and not included in a Community Facilities District. Due to the wide variety of luminaire and pole configurations for ornamental (non- standard cobra head) street lights, the City does not provide a list of approved products for use in a standard design. So all new ornamental street lights will require photometric illumination analysis to demonstrate that the ornamental street light system will provide the minimum illumination requirements for the street(s). Photometric design is required; the submitted street light plans shall include computer-generated point-by-point photometric analysis of maintained illumination levels. Analysis areas should be conducted on proposed roadways, sidewalks, yards (front, side, and/or rear) intersections, and crosswalks. This analysis that matches the submitted lighting plans, shall list all input parameters and reference files. The hardcopy and computer design shall be provided to City Engineering Staff, amended as necessary by the lighting professional, and approved by the City Engineer prior to approval of the lighting system. 23-4.2 GENERAL Each project may select a pole, color, luminaire and ornamentation as provided by this standard. To provide adequate individualization the following variety is provided as an example of style only: a) Pole Height: 16 feet minimum for major streets and 12 feet minimum for residential streets b) Colors: 2 (black, dark green) c) Configurations: 2 (single/double-may be mixed) d) Cross Arms: 2 designs e) Luminaries: 1. Capitals: 2 designs 2. Globes: 2 designs/2 sizes 3. Wattage: LED 30 to 40 Watt Maximum (See Ornamental Design Luminaire Criteria Table) and per approved Lighting Design by City Engineer 4. Ornamentation: Final and/or Band City of Fresno Dept. of Public Works 23-49 A7 Mar. 2021 To minimize future costs to the City in view of the wide range of design options, each installer must provide to the City spares of all components in quantities dependent upon the number of poles installed in the project. Poles Installed Spares 12 or less 2 13-30 3 31 or more 4 23-4.3 SPECIFICATIONS Furnishing and installing streetlights shall conform to the provisions of these Specifications and the streetlight Plan(s). Specifically, the ornamental street lights will comply with all the requirements of section 23-3 of these specifications that are not amended by this section for Ornamental Street Lights. 23-4.4 STREETLIGHT PLAN The designer shall submit to the City Engineering Division for review a detailed plan of the proposed installation. This plan shall include proposed locations of the streetlights, existing streetlights in or adjacent to the project, location of electrical service, photo electric control, pull boxes and routing of conduit. The street light plans as submitted shall include a photometric analysis of the proposed poles, luminaires and layout that demonstrates the lighting system will provide the minimum illumination for the roadways. Analysis requirements are detailed in subsection 23-3.16 and amended for Ornamental luminaires in subsection 23-4.10. Analysis shall be reviewed by City engineering Staff, amended as necessary by the lighting professional, and approved by the City Engineer prior to construction of the lighting system. After any required changes are made, the plan(s) will be approved and signed. No installation Work shall be undertaken until the plans are signed. Work or equipment not specified or shown on the Plan(s) which is necessary for the proper operation of the installation shall be provided and installed at no additional cost to the City. The locations of foundations, poles, services, pull boxes and other appurtenances shown on the Plan(s) are approximate. Exact locations and grades will be established if necessary by either the Project inspector or the TSSL Supervisor or his/her authorized representative. When the project is complete and all lights are working, a final inspection has been made and all punch list items are corrected, the Contractor shall provide an "as-built" drawing to the City. City of Fresno Dept. of Public Works 23-50 A7 Mar. 2021 23-4.5 MATERIALS All materials required to complete the Work under this contract shall be furnished by the Contractor after receiving approved submittals from City of Fresno Traffic Signal and Street Lights (TSSL) Division. The materials furnished and used shall be new, except such used materials as may be specifically provided for on the Plans. All Work and materials shall be in full accordance with the latest rules and regulations of the National Board of Fire Underwriters, local and State laws and regulations, the State Industrial Accident Commission's Safety Orders, and the regulations of the Pacific Gas and Electric Company pertaining to service equipment and installations thereof. All Work shall comply with Section 11-104 of the City of Fresno Municipal Code, the National Electrical Manufacturer's Association Standards and all regulations and codes as stated in Section 86-1.01 D of the State Standard Specifications. Nothing in these Plans and Specifications shall be construed to permit work not complying with these codes. 23-4.6 EQUIPMENT LIST All equipment and materials that the Contractor proposes to install shall conform to these Specifications and the Plans. A list of substitute equipment and/or materials, along with a written descriptive summary, describing the functions of the components which the Contractor proposes to install shall be submitted along with his/her streetlight plan. The list shall be complete as to the name of the manufacturer, size and identifying number of each item. The list shall be supplemented by such other data as may be required. In all cases, the judgment of the TSSL Supervisor shall be final as to whether substitute equipment and/or material recommended by the Contractor conforms to the intent of these Specifications and is acceptable for use. The wattage and spacing of the streetlights shall be such that the appropriate average maintained illuminance is provided per ANSI/IES RP-8, Table 2(b). 23-4.7 WARRANTIES, GUARANTEES AND INSTRUCTION SHEETS All equipment furnished shall be guaranteed to the City by the manufacturers for a period of not less than one (1) year, unless otherwise indicated, following the date of acceptance of such equipment. If any part(s) is found to be defective in materials or workmanship within the one-year period, and it is determined by the TSSL Supervisor or by an authorized manufacturer's representative that said part(s) cannot be repaired on the Site, the manufacturer shall provide a replacement part(s) of equal kind and/or type during the repair period and shall be responsible for the removal, handling, repair or replacement and reinstallation of the part(s) until such time as the street lighting equipment is functioning as specified and as intended City of Fresno Dept. of Public Works 23-51 A7 Mar. 2021 herein; the repair period shall in no event exceed 72 hours, including acquisition of parts. The one-year guarantee on the repaired or replaced parts shall again commence with the date of reassembly of the system. All Work done by the Contractor shall be guaranteed in writing to the Engineer for the one-year period from the date of acceptance. Copies of all operating instructions, parts lists, assembly diagrams, etc., shall be provided to the City with the "As-Built" plan(s). 23-4.8 FOUNDATIONS The foundation shall be set back 30 inches on center from the face of the curb. Foundation concrete shall contain not less than 590 pounds of cement per cubic yard. It shall be placed in a single pour against undisturbed earth where practicable. The top portion shall be formed and finished to present a neat appearance. The top of the finished foundation shall be level. The use of leveling nuts to plumb a pole will not be permitted. No Utilities shall be permitted to run through a foundation. Where obstructions or other conditions prevent construction of planned foundations, the Contractor shall construct an effective foundation satisfactory to the Engineer. The bottom of concrete foundations shall rest on firm ground. When placing the foundations, the Contractor shall place all conduit ends in their proper position and at the correct heights and shall securely hold them in position during the pouring of concrete. The conduits ends shall be capped before any concrete is poured. Both forms and earth to be in contact with foundations shall be thoroughly moistened before placing concrete. Anchor bolts shall be galvanized and shall extend above the finished base as needed to ensure the proper installation of anchoring hardware. The anchor bolts and conduits shall be held in place by means of a template until the concrete sets. Poles shall not be installed until the foundation concrete has set at least five Days. 23-4.9 POLES In order to reduce the possibility of wire theft, all poles must be of steel construction and approved by City of Fresno TSSL Division prior to installation. All hardware shall be tamper resistant stainless steel. The color of the poles shall be black or City of Fresno Dept. of Public Works 23-52 A7 Mar. 2021 gray. The poles shall be engineered to withstand 110 mph wind forces per the AASHTO standards including a 30% gust factor. If relocation of Utilities is required, immediate notification shall be given to the appropriate Utility Company by the Contractor. The Contractor may install all underground electrical components, including foundations at the site of the project; however, no streetlight poles shall be installed until underground conduit is in place. The anchor bolts and associated hardware shall be hot dipped galvanized. The anchor bolts shall be 3/4" x 18", "L" type. The top of the pole shall be provided with a 3 inch outside diameter tenon to facilitate mounting of the luminaire assembly or cross arm. The two way cross arm assembly, if and where used, shall be galvanized steel or cast aluminum. The finish shall be a premium polyurethane coating and shall match the color of the pole. Pole height shall be a minimum of 12 feet for residential areas or minimum 16 feet for non-residential areas or major streets. 23-4.10 ORNAMENTAL LUMINAIRE Ornamental Luminaires shall be light emitting diode (LED) light sources for new street light construction. All ornamental luminaires shall comply with the requirements listed in subsection 23-3.16. However, the following tables provide amendments to the standard Iuminaire requirements for ornamental luminaires. Ornamental Luminaire Design Criteria (amendments to Table in Section 23-3.16) ORNAMENTAL LED LUMINAIRE LUMINAIRE Local and Major Mid-Block Single Luminaire 30 W(MAX) MAXIMUM INPUT Non-Residential/Downtown POWER Major Mid-Block Dual Luminaire 40 W(MAX.) - (Note: the lowest EACH power luminaires that can provide minimum illumination are encouraged) VOLTAGE Nominal Iuminaire input voltage (or range as 120 to 277 V applicable WARRANTY Minimum Iuminaire warranty 10 earst City of Fresno Dept. of Public Works 23-53 A7 Mar. 2021 NOMINAL CCT correlated color temperature 3000 K BUG RATINGS Maximum nominal for Local/ Street, and B1-U4-G3 (backlight-uplight- Downtown/Non-Residential. glare) Maximum nominal for Major Street B2-U5-G3 Since many ornamental luminaires provide more backlight, uplight and glare than typical cobra head style luminaries, ornamental lighting systems are more likely to promote light pollution on adjacent private properties. This is a concern of the City particularly near residential properties. Therefore, the following additional design requirements are provided for photometric design of Ornamental Street Lighting systems adjacent to residential properties or mixed use properties with upper floor residential units. The City shall require the use of shields to provide additional protection from light pollution when Ornamental Street Lighting systems are placed adjacent to residential properties. RESIDENTIAL/MIXED USE PROPERTY STREET LIGHT ILLUMINIATION LIMITS Single Family Residential Maximum illuminance at any point on private property 0.5 fc (beyond Right-if Way) from a street light Maximum Average horizontal illuminance of yard or 0.1 fc landscape area Maximum Vertical illuminance at any point on a residence 0.1 fc Mixed Use with Residential Maximum Vertical illuminance on a residence window 0.1 fc Maximum Average vertical illuminance on residential 0.1 fc balcony The capital portion of the Iuminaire assembly shall be cast aluminum. The finish shall be a premium polyurethane coating and shall match the color of the pole. 23-4.11 ORNAMENTAL PHOTOELECTRIC CONTROL The Photoelectric Control (PEC) shall be a twist lock, long life type installed in the capital portion of the pole. The PEC shall meet the requirements listed in subsection 23-3.17 for standard luminaires. If controlled from a service pedestal, the PEC shall be installed at the pole nearest the service pedestal. The PEC shall be OSHA NRTL "Listed" rated at 1000 watts minimum. It shall be wired back to the service pedestal with 3 #12 AWG stranded copper conductors color coded to match the PEC. City of Fresno Dept. of Public Works 23-54 A7 Mar. 2021 If controlled from a Combination Traffic Signal/Streetlight service pedestal, no additional PEC is required. The associated safety light PEC will control the lighting contactor. City of Fresno Dept. of Public Works 23-55 A7 Mar. 2021 METERING 4 JAW tAWG TEST S N BLOCKS 120V NOT TO EXCEED AMPERAGESERVICE HUBBEL CS6377 OF BREAKER DISCONNECT W/METAL FLANGE100/3 WATERPROOF COVER IGNAL EXTERNAL oio 20 ^ ITS PHOTOCELL _ (PEC) MAIN RATED 20 ITS SPARE H N ]] 010KAIC 20 ^ SPARE A 15 ^ CONTROL AUTO Cl 40/3 LANDING PAD O 30 � LIGHTING 1 Cl TEST C2 40/2 Z120V & 240V NOT TO 20 SAFETY LIGHTING EXCEED AMPERAGE OF BREAKER 30 LIGHTING 2 C2 UTILITY DISCONNECT TO P.G.&E. PROVIDED BY SERVICE POINT h-240V NOT TO EXCEED OTHERS (120/240V AMPERAGE OF BREAKER 10,3W) 40 UNMETERED SPARE SERVICE PEDESTAL SCHEMATIC IF FLASHING BEACON IS REQUIRED, 20 AMP SPARE IS AVAILABLE 40A 20A 20A 20A 15A 30A 30A 30A 30A 20A 40A 100A UNMET-1- SPARE I.T.S. I.T.S. CONTROL LIGHTING 1 LIGHTING 2 SAFETY SIGNAL MAIN SPARE SPARE LIGHTING SWITCH LOCATION NOTES: 1. SERVICE CABINET SHALL BE TESCO 26-100 LBS METERED/UNMETERED OR APPROVED EQUAL. REF. & REV. CITY OF FRESNO SIGNAL LIGHT �'� 2 MAR. 2021 (A.7) E - 15 WIRING NEW INSTALLATIONS 26-100 CABINETS DEMAND RESET DOOR 12.50" W/ 6"x6" LEXAN METER SOCKET METERING SECTION HOOD VIEWING WINDOW (100 AMP MIN.) FRONT—TOP & FACTORY WIRED FROM SIDES HINGED LINE LANDING LUGS TO METER SOCKET IN A 2090 SEPERATE WIREWAY 0 UNDERGROUND TERMINATION SERVICE CABINET PADLOCKABLE TESCO DRAW LATCH OR APPROVED EQUAL GROUND BUSHING �j WITH INTEGRAL LUG GENERATOR RECEPTACLE 2" FINISHED Ti I =T GRADE CONCRETE \��i FOUNDATION 24" LOAD 4 ANCHOR BOLTS f CONDUIT(S) 5/8" — 18"x4" p a. 2" RGC SERVICE CONDUIT 12" 1 " 2--, GROUND ROD FRONT I VIEW W/GROUND CLAMP LEFT SIDE 12.00" 8.00" 7.25" 5. 5" UNE LOAD 5" BASE PLAN NOTES: SCALE: NONE 1. IN ORDER FOR CONFORMITY AND REPLACEMENT PURPOSES ALL SERVICE PEDESTAL FOUNDATIONS TO BE CONSTRUCTED TO THESE SPECIFICATIONS. ANY DEVIATIONS FROM THESE REQUIREMENTS SHALL HAVE THE APPROVAL OF THE ELECTRICAL SUPERINTENDENT. 2. FRONT OF CABINET SHALL FACE ACCESSIBLE RIGHT OF WAY. REF. & REV. C1TY OF MSNO SIGNAL LIGHT JUNE 2015 E - 1 '7 SERVICE FOUNDATION DETAIL NOTES: FRONT DOOR 1. INSPECTOR SHALL APPROVE FORMS 5" AND CONDUIT PLACEMENT PRIOR TO 15 CABLE ENTRY PLACING CONCRETE. 8" PORT 2. CONSTRUCT MINIMUM 36"X36"X4" CONCRETE MAINTENANCE PAD AT ° FRONT AND BACK DOORS IF NO 6" 00 SIDEWALK EXISTS. �—o 8 12" X 12" 3. MAINTAIN WORKING CLEARANCES OPENING PER NEC. 4. BOND PER CURRENT NEC 1 " CHAMFER, TYP.—I STANDARD. . 3/4"0 ANCHOR 5. BOND ALL CONDUIT PER NEC 2" RGC (POWER) WITH PULL TAPE BOLT, TYP STANDARDS USE #6 SOLID BARE (IF EMPTY). END TO BE PLUGGED COPPER FOR BONDING. CONTRACTOR SHALL INSTALL 6. DOORS SHALL HAVE 4' WORKING GROUND BUSHING PER CITY CLEARANCE. SPECIFICATIONS. 7. FINISH SHALL BE ANODIZED PER 6-1j" HDPE CONDUITS WITH BELL ENDS CITY OF FRESNO REQUIREMENTS. AND PULL TAPE (IF EMPTY). ENDS TO 8. CABINET BASE SHALL NOT BE BE PLUGGED PER CITY SPECIFICATIONS. MODIFIED FOR INSTALLATION. ONE CONDUIT MUST HAVE TONE LOCATION WIRE. PLAN VIEW 3/4"0 ANCHOR ° BOLT MIN 12" EMBEDMENT, TYP O 0 O 1" CHAMFER F COMM CABINET ° 45', TYP. FOUNDATION mesa *PIPE HEIGHT SHALL of CONCRETE BE MIN. 2-3" ABOVE SIDEWALK, 1 F FOUNDATION SEE NOTE 2 18" COMM CABINET 18" 12" a FOUNDATION 12" a a 41' 4to 8" 95% RELATIVE =1 11= COMPACTION =1 HDPE CONDUIT 6-1j"o 22" 25" 2" RGC SIDE VIEW FRONT VIEW REF. & REV. Crff OF FnSNO MODEL 336 COMMUNICATION JUNE 2015 ITS - 20A CABINET DETAILS 12 COUNT LC FIBER DISTRIBUTION SMFO SPLICE CASSETTE UNIT 1 U CAMERA POE ® VELCRO WRAP ALL INJECTOR EQUIPMENT TO SHELVES WIRELESS ACCESS 19" VENTILATED SHELVES, POINT POE INJECTOR 10" DEEP POWER STRIP SURGE PROTECTED POWER CORD POWER STRIP SWITCH POWER SUPPLIES 3 METER LC TO LC FIBER OPTIC JUMPER RACK MOUNT DIN „.. •• n OUTDOOR SHIELDED RAIL ASSEMBLY ETHERNET CABLE FOR 12-COUNT FIBER OPTIC CAMERA CABLE TERMINATED TO HARDENED 1 GIG SFP SPLICE CASSETTE - 10' SLACK OUTDOOR SHIELDED POWER RECEPTACLE-- O ETHERNET CABLE FOR POWER STRIP FOR 2070 ONLY POWER FROM SERVICE VELCRO WRAP ALL PEDESTAL CABLES TO CABINET BELL ENDS AND DUCT PLUGS ON ALL HDPE CONDUIT TO CITY REQUIREMENT NOTE: MINIMUM 4" VERTICAL SPACING ABOVE 19" SHELF (ONLY FOR ETHERNET RUNS LONGER THAN 30Qa ETHERNET EXTENDER FOR CAMERA ETHERNET CABLE MAX SPAN 300 FEET ETHERNET CABLE TO SWITCH LESS THAN 300 FEET TO CAMERA POE INJECTOR ON ETHERNET EXTENDER LOWER SHELF IN COMMUNICATION WATERPROOF BUSHING 4"X4"X2" WATERPROOF CABINET JUNCTION BOX LOCATED 48V POWER SUPPLY ON IN PULL BOX OR LOWER SHELF IN PEDESTRIAN SIGNAL COMMUNICATION CABINET HEAD REF. & REV. Crff OF FRESNO MODEL 336 COMMUNICATION MAR.iu?m B (S ITS - 21 B CABINET EQUIPMENT ASSEMBLIES HARNESS PLU�W.�.( G/JACK NO.1 cz CABINET LAMP ASSEMBLY FAN JACK PLUG JACK PLUG THERMOSTAT F1 Lj AG-CB BUSS LI AC-BUSS LI I--'� CBl CB7-2�qFLS 'ICB1-2�LJ'JI 2 LI—3 ^ 3/10 AMP l 1 JHJ1-2 LUORESCENLUORESCEN :FAN O PROTECTIVE COVER IS NOT SHOWNm FROMREAR RLS1 HP1 HJ1 1 FUSE THERM 1 2 2 CBI-2 H� 1 1 AC-BUS LAMP AC+ NOTE:�CSH BUTTON NOTE:�CSH BUTTON LAMPAC+CEPT.AC+ �I f RECEP 20AMP FRONT VIEW REAR VIEW Iy—I LAMP LAMP Fri Ac-sus 2e.50^(APPROX.) ° ©©©©©©© [—EEQ GND CB7-2 u A LOUVERED b. HALF S TB3 1 2 3 4 5 6 23.25'(APPROX.) SHELF SHELF B EQ.GND BUS AC-BUS 1 RECEP.GND 1 RECEP.NEUT 2 2 LAMP AC- -3 LAMP AC- 4 4 HJ1-1 • LOUVERED HALF 5 5 14.00^(APPROX.) ' SHELF .I SHELF 6 6 7 7 C n 8 8 Z m� 9 RACK GND 9 N 10 10 0� 11 11 Cn 12 12 13 13 0.00°— 14 suAcir�moA 14 ^+v.' Mw 15 15 H� 1 2 3 TBS O 0 z d a T7 a o POWER DISTRIBUTION CV z 0 � cc c c cc ej ~d � 3 2 EA 15 3 2 EA 2 2 32EA O Q 14 42EA e A 34EA 22EA 2 EA 6 ras 3 EA 7 2 EA TB 16 19 d 10 _ 11 , 18 3 2 EA ZV I—I ° — E GROUND BUS y 1 0 4 4 yy Lj AC-BUSa e° �� 6 7 EA I~TI \ 1 0 c 00 c Ihy` 12 5 2 EA 3 1-48 2 EA ALL DIMENSIONS SHOWN FOR I—I O 11 REFERENCE ONLY. O J () O, li c c c O CL W W N O li K) O 27 2 SCREW, 2-56 X 3 16, PH, PN, SS 26 1 STANDOFF, 2-56 X 1, FEM-FEM, RN, AL 25 1 COVER, CB, LEXAN m rn 24 1 BRACKET, SUPPORT COVER 12 1 SURGE ARRESTOR, GAS TUBE m 23 2 WASHER #6 INT. TOOTH SS 11 2 BUS BAR ASSY, 15POS, COPPER o 22 2 SCREW 6-32 X 1 4,PH,PN 10 1 COVER, POWER BLOCK, LEXAN 211 1 1 1 RECEPTACLE, 5-20R,20A DUPLEX 9 1 HARN, SVC PNL, 336S, 20 1 BRKT, ENCLOSED, 334Z, CKT 8 2 NUT, SO HD GROMMET 19 1 CKT BKR,20A,1P W/O AUX 7 2 WASHER, 8, EXT. TOOTH, SS 18 1 HANDY BOX COVER, METAL DUPLEX 6 2 WASHER, 4, SPLIT LOCK, SS 17 1 GROMMET PLASTIC SB-875-11 5 2 SCREW 10-24 X 1 PH SL NYLON c] 16 1 HANDY BOX, 4 X 2-1/8,METAL 4 2 SCREW 8 X 3 4 PH PN SS 15 1 TERM BLK, 6POS, 2R, COMB 3 10 SCREW, #8 X 5 8, PH, PN, SS, 14 1 TERM BLK, 3POS, 6-32 SCREWS 2 2 SCREW, 4-40 X 3 8, SL, FIL 0 13 2 ASSY, VARISTOR, M.O. 1 1 SVC PANEL, 336S �y QTY. NOMENCLATURE REy QTY.OR DESCRIPRON NOMENCLATUKL OR DESCRIPTION z 0 WIRELESS ITS EQUIPMENT, SEE NOTE 2 AND PW STD. ITS- 0 O O OUTDOOR SHIELDED CAT 5e O CABLE, MAX RUN LENGTH = 300'. SEE NOTE 5. O O m TRAFFIC SIGNAL CONTROLLER CABINET (OR ITS CABINET AS APPLICABLE—SEE PLANS) IE7 SEE NOTE 1 SEE NOTE 3 SEE NOTE 6 0 EXISTING PULL BOX (T(P.) NOTES: 1. FOR NETWORKING CONNECTIONS, SEE SPECIFICATIONS. NETWORK CABLE TERMINATING AT ACCESS POINT SHALL BE WRAPPED WITH BLUE TAPE FOR IDENTIFICATION IN ALL PULL BOXES AND IN CABINET. NETWORK CABLE SHIELDING SHALL BE GROUNDED IN CONTROLLER CABINET. 2. CONTRACTOR SHALL PERFORM A FIELD SURVEY WITH A BUCKET TRUCK TO LOCATE OPTIMAL POSITION OF EQUIPMENT ON MAST ARM IN THE PRESENCE OF THE CITY ENGINEER PRIOR TO INSTALLATION. 3. EXTEND CABLES THROUGH TRAFFIC SIGNAL CONDUIT AND PULL BOXES. COIL MIN. 6' OF SLACK IN EACH PULL BOX. 4. CABLE SHALL BE INSTALLED INSIDE SIGNAL MAST ARM FOR TRAFFIC SIGNAL POLES CONFORMING TO CALTRANS STANDARDS DATED 1977 OR NEWER. FOR TRAFFIC SIGNAL POLES CONFORMING TO OLDER STANDARDS — SEE PLANS. 5. CONTRACTOR MAY ULTILIZE YELLOW WIRE AS A PULL TAPE TO BRING CAT 5e CABLE INTO PROPOSED WIRELESS EQUIPMENT (NOTE; YELLOW WIRE TO RE—INSTALL BACK IN GOOD CONDITION). CONTRACTOR SHALL COORDINATE THEIR SCHEDULE WITH CITY TSSL TO PLACE SIGNAL IN TEMPORARY FLASHING PRIOR TO INSTALLATION. 6. POLE HAND HOLE SHALL BE WELDED IN PLACE AFTER ALL PROPOSED WORK IS COMPLETED AND INSPECTED ON SIGNAL POLE. CONTRACTOR SHALL PROTECT CONDUCTORS FROM DAMAGE DURING WELDING. REF. & REV. CITY OF MSNO dUL 2011 WIRELESS ITS INSTALLATION MAR. 2021 (A.7) ITS - 2 r7A F--2' 8"—LONG, 1.5" DIAMETER TRAFFIC SIGNAL BACKPLATE ALUMINUM PIPE WIRELESS ACCESS POINT 2-4' ANTENNA ANTENNA 1 (BACK) CABLES, SEE NOTE 5 EXPOSE CABLE THROUGH MAST ARM ANTENNA 2 (AHEAD) WITH WATERPROOF RUBBER GROMMET SEE NOTE 2 OPENING 16"—LONG, 1.5" DIAMETER ALUMINUM PIPE OUTDOOR SHIELDED CAT 5e CABLE MAST ARM Fla MINI ASTRO—BRAG MINI ASTRO—BRAC OR APPROVED OR EQUAL WITH ELBOW EQUAL WITH NO ELBOW CAT 5e DRIP LOOP DRIP LOOP PROFILE 16"—LONG, 1.5" DIAMETER ALUMINUM ANTENNA 2 PIPE 2-4' ANTENNA CABLE (TYP.) 8"—LONG, 1.5" DIAMETER ALUMINUM PIPE ACCESS POINT BRACKET WIRELESS ACCESS POINT ANTENNA 1 TRAFFIC SIGNAL MAST ARM OUTDOOR SHIELDED ETHERNET CABLE TO BE PLACED INSIDE MAST ARM ETHERNET CABLE DRIP LOOP ACCESS HOLE, SEE NOTE 3 MINI ASTRO—BRAC OR APPROVED EQUAL CROSS SECTION NOTES: 1. ANTENNA 2 WILL BE REQUIRED FOR ALL INTERSECTIONS FOR EXTENSION OF WIRELESS CORRIDOR, SEE PLANS. 2. ANTENNA 2 MOUNTING IS SIMILAR TO THAT SHOWN IN THE CROSS SECTION ABOVE, BUT NO HOLES ARE DRILLED IN THE MAST ARM, A 16"—LONG ALUMINUM PIPE IS USED, AN ACCESS POINT IS NOT INSTALLED. 3. DRILL MAX �X" BEVELED HOLE. GROMMET SHALL FORM A TIGHT SEAL BETWEEN POLE AND CABLE. 4. ANTENNA 1 AND ANTENNA 2 SHALL HAVE A MINIMUM 2' OF SEPARATION. 5. SECURELY STRAP ANTENNA CABLE TO MAST ARM WITH STAINLESS STEEL NYLON COATED STRAPS (FOLLOW NEC STANDARD FOR SPACING). 6. ALL ELECTRICAL CONNECTIONS SHALL CONFORM TO MANUFACTURER REQUIREMENTS TO ENSURE WEATHER PROOF CONNECTIONS. REF. & REV. CITY OF MSNO 2011- WIRELESS ITS INSTALLATION' MAR. 2021 (A•7) ITS - 2 7 B DETAILS Construction Funding Sign Contract Number 23-04-C 96" 18" 4"TYPICAL TYPICAL EA. 3/8" HOLE 8 TYPICAL Ek 1 8 1/2" w "v��, our Tax Dollars �s 18" l 24" 6� O 856 � A T WORK 41! k ' www.rebuildingca.ca.gov 6 " PROJECT FUNDED B - 21/2" 3" FEDERAL HIGHWAY TRUST FUND 2"TYPICAL FSB-1 REBUILDING CALIFORNIA BE WORK ZONE ALERT 4- CONTRACT No. DATE: coU DEPARTMENT OF PUBLIC WORKS AND PLANNING DESIGNED: S.ARTAL 05/04/2023 SCALE NONE CONSTRUCTION PROJECT FUNDING SIGN DRAWN: S.ARTAL 05/04/2023 DRAWING NO. -- �� n g6�p CMAQ - FOWLER AND OLIVE CHECKED: S. ARTAL 05/04/2023 FRE$ INTERSECTION IMPROVEMENT PG&E Rule 16 Contract Number 23-04-C REQUIRED PERMITS ®COUNTY ® CITY 1.APPLICANT TO INSTALL ALL CONDUITS APPLICANT TO® TRAFFIC CONTROL 2' LLIKFl ING,AND COMPAAC ALL TITINGNG, 50'-4 3. SAND SHADING REQUIRED AROUND ALL ELECTRICAL FACILITIES IN 4. CALL UNDERGROUND SERVICE ALERT (TRENCHING OR DIGGING•(811AT LEAST 48 HRS )TOR TO 5. PG&E TO INSPECT TRENCH &CONDUIT PRIOR TO BACKFILLING. CALL PG&E AT: (559) 263-7400 100A MAIN APPLICANT TO CONNECT 120/240V 10 3W TO METER a SCI = 100.000A J418139 1418140 �� O EDGE OF CITRUS IQ ]E OLIV]E AV i 45' J418141 3-715A 12W ��_1 P.OS 40' 1418142 a � 25' CGC#41 B0064-51903 a w 120/240V 30 4W ES.D. 30 = 22.8KVA 40-80% LF, SI C� LEGEND RISER QUADRANT -SV- 1/OA TPX SVC IN 3'CONDUIT w 5'/ ' -——- APPLICANT INSTALL SVC 'ate 2 =R RISER c) P.O.S. �2� PROPOSED SECONDARY ENCLOSURE 17U'X15'K Z 3 Ly PROPOSED ELECTRIC METER CONSTRUCTION NOTE:THIS JOB CAN BE WORKED ALONG SIDE PM 35298702 WHICH RELATES TO RELOCATING POLES ALONG FOWLER PRIMO VOLTAGE: 12 kV VOLTAGE AREA 2 CONSTRUCTION SKETCH EST: ROBERT HAYNIE 559-417-0829 LATITUDE: 36.7581 LONGITUDE: -119.6822 ADE:RICHARD PEnNAK 559-347-5016 SOURCE SIDE DEVICE:821263 5900 E OLIVE SUR HENRY DIAZ - SUB & CIRCUIT:BARTON 1115 F R ES N 0 REP:ROBIN STRICKLAND 559-347-5202 DSGN SAG:RURAL I RAPTOR ZONE:YES PLNR: LOADING AREA:UGHT I ARRESTER DIST:2 rim Know whafs below. NO ENVIRONMEN JPp. . PG96103 Y E.1 -IOU _ CORROSION AREA:NON INSULATION DIST.B Call before you dig. ISSUES NOiIF: 122241265 DATE:2 25 2'3Z2 'XiM9 CUiIF 1N51: NA I FIR Alit',: _nit-1' GAS CONFLICT: NEAR LOC: N 629695 SHIT:1 OF 1 110. Estimator: ROBERT HAYNIE Notification# 122241265 ADE: RICHARD PETINAK Electric Underground PM Order# 35298595 Rep: ROBIN STRICKLAND Specifications D&C# Supervisor: HENRY DIAZ Date: 3/7/2022 Applicant: JAMES POLSGROVE Location: 5900 E OLIVE, FRESNO Service Voltage 120/240 Main Size 100 1 ph.Load: kva. 3ph.Load: kva. SC Amps Sym. Primary Cable: Number:= Size: EPR -CONC - ENCAP - PE 25KV Service Cable: 2 1/0 AL. XLP. 600V. 1 1 2 AL. XLP. 600V. Number Hot legs number and size Numbe Neutral number and size Applicant to Provide and InstallConduit, Trench, and Substructures (As indicated below and/or on the attached drawing) Primary: Conduit--Size No. Bend--Radius Degrees Secondary: Conduit--Size No. Bend--Radius Degrees Service: Conduit--Size 3" No. 1 Bend--Radius 24" Degrees 90 Streetlight: Conduit--Size No. Bend--Radius Degrees Primary Trench: Overall Depth Minimum Cover Secondary Trench: Overall Depth: " Minimum Cover Service Trench: Overall Depth: 30" Minimum Cover 24" Streetlight Trench: Overall Depth: " Minimum Cover Barrier Post Type/Style: Size: Code: Req. Transformer Pad: (Type, Size,and Code) I ❑ Primary 3-Box Pad: (Type, Size, and Code I ❑ Type/Style: Size: Traffic Load: Code: Primary Pull Box: (Type, Size,and Code) Sec./Svc. Box/Ped: (Type, Size,Code) I Pull /Splice 17"x 30" x 24" 0 FVT. 19588 All Applicant Installations must pass PG&E inspection,do not backfill*the trench until it has been inspected and approved. Contact the construction Department at 559-263-7312 or Email: fresnodivisioninspectionrequest@pge.com 48 hours in advance for inspection. Cost of PG&E materials are subject to change if this design is altered by the applicant. Please contact ROBIN STRICKLAND at 559-347-5202 of any changes or need for additional information. �X Please Call USA 811 at least 48 hours prior to excavating this area: OX All existing facility locations are approximate, verify with hand tool excavation. Mains 201 Amp and above, lugs to be supplied by pg&e. Conduit to be direct burial (DB), PVC marked ASTM F512 DB120PVC or schedule 40 marked UL Approved 90°C. Conduit above ground level to meet Engr. Standard Dwgs. *All conduits shall be proven free and clear of dirt, rocks, etc. by means of a mandrel, wire brush, etc. A polyester pulling tape shall be installed in all conduits and attached to an end cap. (No manufactured bends or use of heat shall be used to obtain conduit sweeps.) Conduit depths are shown as minimums and may need to be increased when entering or leaving secondary splice boxes UG Spec Sheet 3/7/2022 1 of 4 REFERENCE DRAWINGS are available via the PG&E web site at: http://www.pge.com/greenbook. Refer to the Electric and Gas Service Requirements (Green Book) Section 3, Electric Service - Underground. Or you may contact your PG&E representative for copies of the following. Corrosion Resistant Ground Rods and Ground Rod Clamps 013109 �X Secondary Enclosures for Electric Underground (secondary service) 028028 0 Concrete Pad for Three-Phase, Loop Style Pad-Mounted Transformers 045292 Loc, Clearance, and Mechanical Details for Pad-Mounted and Subsurface Equipment. 051122 FX Terminating UG. Electric Service 0-600 Volt in Customer-Owned Facilities. 058817 Landscape Screen for Pad-Mounted Transformers 063422 Methods and Requirements for Installing Res. UG. Elec. Service 0-600V. 063927 �X Methods and Requirements for Installing Comm. UG. Elec. Service 0-600V. 063928 Requirements for Bus Duct Entrance Termination Unit for Use With P/M Transformers. 063929 Installation of Pad-Mounted, Load-Break Junction. 066212 UG Spec Sheet 3/7/2022 2 of 4 Applicant Notes Refer to Electric&Gas Service Requirements (Green Book) or Separate PG&E Standard Drawings. Contact Your PG&E Representative for Copies, or Accsess https://www.pcie.com/greenbook. Conduit, Trenching and Backfill: 1 All dimensions and locations are estimated, approximate and may be superseded by a JOINT TRENCH or COMPOSITE DRAWING. 2 Applicant to provide and install all underground facilities shown on this drawing in accordance with PG&E engineering standards and the following. 3 Applicant to provide all TRENCHING, SHADING, BACKFILL,AND COMPACTION. 4 4" of sand is required above and below conduit if native soil is not free of rocks, hardpan, etc. Backfill shall meet approval of PG&E Inspector 5 Service Conduit: 063927, Page 2 Tbl.1 &2(Residential.) Service Conduit: 063928, Page 3 Tbl.1, 2, &3 (Commercial / Industrial) 6 Distribution Conduit: PG&E Drawing 062288, Pages 1-14. 7 Provide long conduit sweeps where indicated. Recommended sweep radius(10'OF RADIUS PER INCH OF CONDUIT DIAMETER) Example:4"CONDUIT=40' RADIUS. 8 Manufactured bends or application of heat shall not be used to obtain long conduit sweeps. Do not exceed 300 degrees of bends including feed location. 9 All conduits shall be proven FREE and CLEAR, and a POLYESTER PULLING TAPE installed Manufactured bends are not to be CUT, SHORTENED, or ALTERED in any way. 11 Install: a)Temporary caps on conduits stubbed at riser poles, pads, and boxes b) Permanent caps on buried conduits ends c End Bell Fittings are required for all conduits entering an enclosure knockout or pad window (they must be routed d) 36" minimum bend radius for primary conduit. e) 24" minimum bend radius for service and secondary conduit. 12 Identify ends of buried conduit with a vertical conduit scrap installed from ridged cap to ground level. 13 IConduits entering primary boxes shall be at a right angle to the window or wall. Subsurface Transformers and enclosures / sec. Boxes and Pedestals: 15 Single Phase Horizontal Transformer: PG&E drawing 060578, Pages 12 Of 12 16 Primary Underground Enclosures: PG&E drawing 062000, Pages 1-14 17 Substructure Clearance: 051122, Pages 1-25 18 Secondary Pedestals and Splice boxes: 028028, Pages 1-14 Padmounted Transformers, Switches, and ]unction Boxes: I Grounds, Barrier Protection, and Landscape: 25 Ground Rods: 013109, Pages 1-3. 26 Applicant to install all ground rods and interconnecting wire between grounds. 27 Protection (BARRIER POST)for padmounted equipment: 051122, Pages 8-25 28 Final determination of barrier post installation and number will be by PG&E Inspector. 29 Landscape Screening: 063422, Pages 1-12 ❑ Safety &Workmanship: ❑ Insert Drawing: EST: ROBERT HAYNIE PM: 35298595 ADE: RICHARD PETINAK SD: SUPV: HENRY DIAZ NOTIF 122241265 REP: ROBIN STRICKLAND OTHER: PLNR: I I ISHT: UG Spec Sheet 3/7/2022 3 of 4 b 10 tF ZZOW/£ laa4S:)adS E)n ANVdWOD DI2i ]Tl 13 SV9 DIdIDdd 2 Fresno Metropolitan Flood Control District STANDARD PLANS AND SPECIFICATIONS April 1 , 2011 Section 11 SECTION 11 —REINFORCEMENT 11-1 General This work shall consist of furnishing and placing steel reinforcement of the shape and dimensions shown on the Plans and as specified in these Specifications and the Special Provisions. 11-2 Materials Bar reinforcement and welded wire fabric shall conform to the following requirements: 11-2.01 Bar Reinforcement Bar reinforcement shall conform to the specifications of ASTM Designation A-615, Grades 40 or 60. The various grades shall not be used interchangeably. 11-2.02 Welded Wire Fabric Welded Wire Fabric shall conform to the specifications of ASTM Designation A-185A. The gage of the wire and dimensions of the mesh shall be as shown on the Plans or specified in the Special Provisions. 11-3 Cleaning Before concrete is placed, the reinforcement to be imbedded shall be free of mortar, oil, dirt, excessive mill scale and loose rust, and other coatings of any character that would destroy or reduce the bond. 11-4 Bending Reinforcement shall conform accurately to the dimensions shown on the plans. Bars shall not be bent or straightened in a manner that will injure the material. Bars with kinks or improper bends shall not be used. 11-5 Placing Before placing bar reinforcement, when required by the Special Provisions or the Engineer, the Contractor shall furnish shop drawings showing reinforcement details to the Engineer for approval. The reinforcing bars shall be placed as shown on the approved reinforcement details and as shown on the Plans. Reinforcement shall be firmly and securely held in position by wiring at intersections and splices and by using pre-cast mortar blocks or ferrous metal chairs, spacers, metal hangers, and other approved devices of sufficient strength to resist crushing under applied loads. Tack welding on reinforcing bars will not be permitted. Reinforcement shall have a clear coverage of two (2) inches except as otherwise shown on the Plans or specified in the Special Provisions. If ordered by the Engineer, additional coverage shall be provided. Clear coverage shall be measured from the surface of the concrete to the outside of the reinforcement. Placing bars on layers of fresh concrete as the work progresses will not be permitted. 11-1 Fresno Metropolitan Flood Control District Standard Specifications-2011 Section 11 Welded wire fabric shall be rolled flat before placing concrete, unless otherwise shown on the Plans. Welded wire fabric shall be firmly held in place against vertical or transverse movement by means of devices satisfactory to the Engineer. 11-6 Splicing Splicing of bar reinforcement shall be done in accordance with Section 52-1.08, "Splicing", of the Caltrans Standard Specifications, latest edition. 11-7 Inspection No concrete shall be placed until the Engineer has inspected the reinforcement placement and has authorized the pouring of concrete. 11-8 Measurement and Payment Unless otherwise provided in the Special Provisions, no separate measurement of Reinforcement will be made. The cost of furnishing and placing Reinforcement shall be included in the price bid for the various structures requiring reinforcement; and no additional payment will be made therefor. 11-2 Fresno Metropolitan Flood Control District Standard Specifications-2011 Section 12 SECTION 12 -PORTLAND CEMENT CONCRETE; CEMENT MORTAR 12-1 General Portland Cement Concrete shall be composed of cement, fine aggregate, coarse aggregate, admixtures if specified, and water, proportioned and mixed as herein specified. Cement content for the listed classes of concrete shall be as follows: Class A - Concrete shall contain 564 pounds (6 sacks) of cement per cubic yard. Class B - Concrete shall contain 470 pounds (5 sacks) of cement per cubic yard. Unless otherwise specified in the Special Provisions, the class and minimum compressive strength of concrete shall be as required in these Specifications for the items of work requiring Portland Cement Concrete. Cement Mortar shall comply with the requirements of Section 12-8, "Cement Mortar". Slurry Cement Backfill shall conform to Section 15-2.03, "Slurry Cement Backfill". 12-2 Materials The materials for manufacturing Portland Cement Concrete and Cement Mortar shall conform to the following requirements: 12-2.01 Cement Cement used in the manufacture of concrete or mortar, including cement used in precast products, or Slurry Cement Backfill, shall be Type II Portland Cement conforming to the specifications of ASTM Designation: C 150, latest edition, unless otherwise specified in the Special Provisions. Any reference in these Specifications to a "sack" of cement refers to a 94 lb sack or bag of Portland Cement. The Contractor shall make arrangements with the manufacturer of ready-mixed concrete, or pre-cast products to provide adequate facilities to assure that cement meeting the requirements specified herein will be kept separate from other cement in order to prevent any but the specified cement entering the Work. All cement not conforming to these Specifications or the Special Provisions, and all cement damaged or contaminated, shall be removed immediately and not used in the Work. 12-2.02 Water Water for washing aggregates and for mixing with concrete or mortar shall be free from oil and shall not contain other impurities in a sufficient amount to cause a significant change in the true setting time of the concrete, reduction in the concrete compressive strength, discoloration of the concrete, or produce etching of the concrete or mortar surface. The 12-1 Fresno Metropolitan Flood Control District Standard Specifications-2011 Section 12 quantity of water used for manufacturing concrete shall comply with Section 12-3, "Amount of Water and Slump Test". 12-2.03 Coarse Aggregate Coarse aggregate for use in manufacturing Portland Cement Concrete shall consist of gravel, crushed gravel, crushed rock, or combination thereof. It shall be free from deleterious coatings, roots, barks, sticks, rags and other extraneous material. Regardless of source, all coarse aggregate shall be thoroughly and uniformly washed before use. Coarse aggregate when sampled at the batching bin shall have a Cleanness Value of not less than 75 when subjected to the cleanness test performed in accordance with California Department of Transportation(Caltrans) California Test 227. Coarse aggregates shall be furnished in the following sizes determined in accordance with ASTM Test Designation: C136, as follows: Size of Aimrmate Sieve 1-1/2" to #4 1" to#4 3/4" to#4 Mesh Size Percent Passing Percent Passing Percent Passing 2" 100 1-1/2" 90 - 100 100 1" 20 - 55 90 - 100 100 3/4" 0 - 15 60 - 85 90 - 100 3/8" 10 - 30 15 - 40 20 - 55 #4 0 - 5 0 - 10 0 - 10 The maximum size of coarse aggregate shall be as required in these Specifications for the items of Work requiring Portland Cement Concrete or as otherwise specified in the Special Provisions. Coarse aggregate, when tested for soundness in conformance with the requirements in Caltrans California Test 214, shall lose not more than ten(10)per cent by weight. 12-2.04 Fine Aggregate Fine aggregate for use in manufacturing Portland Cement Concrete shall be natural sand, sand manufactured from larger aggregate, or a combination thereof. The aggregate shall be of such character that makes possible the production of a workable concrete within the limits of water content provided in Section 12- 3, "Amount of Water and Slump Test". It shall be free from deleterious coatings, roots, barks, sticks, rags and other extraneous material. 12-2 Fresno Metropolitan Flood Control District Standard Specifications-2011 Section 12 When testing for organic impurities in accordance with the test method of ASTM Designation: C40, fine aggregate shall not indicate a color darker than the reference standard color solution unless it is determined by the Engineer that a darker color is acceptable. When tested for soundness in conformance with the requirements in Caltrans California Test 214, fine aggregate shall not have more than ten(10)percent loss by weight. Fine aggregate shall be well-graded and shall range in size uniformly within the following limits when tested in accordance with ASTM test method Designation: C136. Sieve Mesh Size Percent Passing 3/8" 100 #4 90 - 100 #8 65 - 90 #16 45 - 75 #30 20 - 45 #50 10 - 20 #100 0 - 8 #200 0 - 3 The fine aggregate shall contain not more than three (3) percent by weight of material passing the number two hundred (#200) mesh screen when tested in accordance with the test method of ASTM Designation: C136. 12-2.05 Ready-mixed Concrete Materials used in the production of Ready-mixed Concrete shall comply with all of the requirements of this Section 12. The maximum size of coarse aggregate and gradation of all aggregate shall be as required in these Specifications or as specified in the Special Provisions for the items of work requiring Portland Cement Concrete. Ready-mixed concrete delivered to the job site of the Work shall be discharged within one and one-half(11/2) hours after the addition of water to the cement and aggregates, or before the drum has been revolved two hundred fifty (250) revolutions, whichever comes first. In hot weather or under conditions contributing to quick stiffening of the concrete, the time between the introduction of water to the cement and aggregates and discharge shall be less 12-3 Fresno Metropolitan Flood Control District Standard Specifications-2011 Section 12 than one and one-half(1 1/2) hours, as directed by the Engineer, except that concrete shall not be discharged once the temperature of the concrete has reached eighty-five (85) degrees F or above. Should water be added at the job site, the drum shall be revolved a minimum of thirty (30) revolutions after the introduction of such water and before discharge is commenced. 12-2.06 Admixtures No admixture shall be used without written permission from the Engineer or unless elsewhere provided for in these Specifications or in the Special Provisions for the items of Work requiring Portland Cement Concrete or Cement Mortar. Admixtures may include, but are not limited to, Calcium Chloride, various air entrainment agents, and Fly Ash. 12-2.06.1 Calcium Chloride When the use of calcium chloride is permitted by the Engineer, or is specified in the Special Provisions, the calcium chloride shall conform to the specifications of ASTM Designation: D98. The quantity used shall not exceed the permitted or specified amount. If no dosage is specified, the admixture shall be used at the dosage usually recommended by the manufacturer of the admixture. 12-2.06.2 Air-Entraining Agent When the use of an air-entraining agent is permitted, or is specified in the Special Provisions, it shall be added at the rate designated by the Engineer to result in an air content of from three (3) to six (6) percent by volume, as determined by Caltrans California Test 504, in the freshly mixed concrete. 12-2.06.3 Fly Ash When the use of fly ash is permitted by the Engineer, or is specified in the Special Provisions, the fly ash shall conform to ASTM Designation: C618. When specified or approved for use as a cement replacement, the remaining cement shall be no less than seventy five (75) percent by weight of the specified minimum cementitious material content. The actual quantity used shall not exceed the permitted or specified amount. 12-3 Amount of Water and Slump Test The amount of water required for the proper consistency of concrete shall be determined by means of a Slump Test made in accordance with the Standard Test Method for Slump of Portland Cement Concrete, ASTM Designation C 143. The amount of slump shall be measured as twelve (12) inches minus the height (in inches) of the concrete test sample after subsidence. The allowance for slump shall be as follows: Cast-in-Place Pipe & Concrete Paving Not more than 3 inches All Concrete Structures Not more than 3 inches Concrete Curbs, Gutters & Sidewalks Not more than 5 inches 12-4 Fresno Metropolitan Flood Control District Standard Specifications-2011 Section 12 Batches of concrete with a slump exceeding the maximum values listed shall not be used in the Work. The amount of water used in the manufacture of Portland Cement Concrete shall not exceed six and one-half(6'/2) gallons, including moisture in the aggregate, per sack of cement for Class A concrete, and seven(7) gallons per sack of cement for Class B concrete. 12-4 Placing and Protecting Concrete Placing of concrete shall follow best construction practices, including the use of vibratory equipment as appropriate and as required by Section 12-7, "Vibrators", which result in a dense, un-segregated mixture completely filling the space intended to receive concrete, free of voids or surface irregularities. No concrete shall be placed on ground surfaces which have not been properly prepared and compacted, or against forms which are not true to lines and grades and adequately supported. In all cases, concrete shall not be placed without the Engineer's approval as to suitability of the supporting subsurface or forms, or as to other conditions as described in this Section 12-4. Concrete for structures shall not be placed on frozen ground nor shall it be mixed or placed while the atmospheric temperature is below thirty-five (35) degrees F, unless adequate means are employed to heat the aggregates and water, and satisfactory provision has been made for protecting the concrete. Provisions satisfactory to the Engineer shall be taken to protect concrete about to be poured when there is danger of temperature dropping below thirty-five (35) degrees F within the next twenty-four (24) hours. Concrete damaged by frost action shall be replaced by the Contractor at its expense. Placing of concrete under rainy conditions shall be stopped before the quantity of surface water is sufficient to damage the surface mortar or cause a flow or wash of the concrete surface, unless the contractor provides adequate protection against damage. Concrete shall not be placed when the air temperature in the shade in the vicinity of the Work exceeds ninety-five (95) degrees F, or when the temperature of the concrete exceeds eighty-five (85) degrees F. All surfaces against which concrete is to be placed shall be free from standing water, mud, and debris, and shall be firm enough to prevent contamination of the concrete by earth or other foreign material. Absorptive surfaces against which concrete is to be placed shall be moistened thoroughly so that moisture will not be drawn from the freshly placed concrete. 12-5 Forms Forms shall be smooth, mortar tight, true to the required lines and grades, and of sufficient strength to resist springing out of shape during the placing of the concrete. All dirt, chips, sawdust, nails, and other foreign matter shall be completely removed from forms before any concrete is deposited therein. Forms previously used shall be thoroughly cleaned of all dirt, 12-5 Fresno Metropolitan Flood Control District Standard Specifications-2011 Section 12 mortar, and foreign matter before being re-used. Before concrete is placed in forms, all surfaces against which the concrete will be placed shall be thoroughly coated with form oil. Prior to placing concrete, the Contractor shall have all forms checked by the Engineer for alignment and grade. 12-6 Curing Concrete Immediately after finishing, the exposed exterior surfaces of the concrete shall be cured by either the water method, pigmented curing compound method, or the waterproof membrane method, in accordance with Section 90-7, "Curing Concrete", of the Caltrans Standard Specifications, except that for cast-in-place concrete pipe, only the waterproof membrane method shall be used, as provided in Section 19-10, "Curing", of these Specifications. 12-7 Vibrators Reference is made to Section 12-4, "Placing and Protecting Concrete". Whenever a structure requiring reinforcement is to be constructed, the Contractor shall provide one or more portable vibrating machines to be used in the placement of concrete within the forms for such structures, as directed by the Engineer. Full compensation for providing vibrating machines shall be considered as being included in the various bid items of work and no additional payment will be made therefor. 12-8 Cement Mortar Materials used in the Manufacture of Cement Mortar shall comply with the applicable provisions of Section 12-2, "Materials". Cement mortar shall be composed of one part Portland Cement and two parts of clean, well-graded sand of such size that all will pass a No. 8 sieve. An admixture of hydrated lime, fire clay or diatomaceous earth may be used in the mortar to facilitate workability; the amount of such material used will be limited as ordered by the Engineer. Mortar shall be used within thirty (30) minutes after the mixing water has been added to the dry ingredients. Reference is made to Section 17, "Reinforced Concrete Pipe (RCP)". For use in concrete pipe joints, the consistency of laying mortar shall be such as to adhere to the ends of the pipe while it is being laid and be easily squeezed out of the joint when the pipe sections are squeezed together. Mortar used for jointing and exterior joint banding shall be of such consistency that it will readily adhere to the pipe. Quick setting cement may be used for manufacturing Cement Mortar when necessary to facilitate the early backfilling of the trench. 12-9 Certificate of Compliance; Samples The Contractor and its suppliers shall comply with the provisions of Section 6-3, "Samples and Tests", and Section 6-5, "Certificates of Compliance". When required by the Engineer, the Contractor shall furnish certificates certifying that the Portland Cement Concrete furnished for the Work complies in all respects with the provisions of this Section 12 and any other provisions as may be specified in the items of Work requiring Portland Cement Concrete or as may be specified in the Special Provisions. For pre-cast concrete structures used in the Work, the Contractor shall, when required by the Engineer, furnish certificates of compliance stating that the concrete used in the manufacture of the structures complies in all respects with this Section 12-6 Fresno Metropolitan Flood Control District Standard Specifications-2011 Section 12 12 and any other provisions as may be specified in the items of Work requiring Portland Cement Concrete or as may be specified in the Special Provisions. The Contractor shall also provide safe and ready access to suppliers' facilities for testing personnel to obtain samples of the various materials used in the manufacture of Portland Cement Concrete to be used for compliance testing. 12-10 Measurement and Payment Unless otherwise provided in the Special Provisions, the cost for providing Portland Cement Concrete or Cement Mortar shall be included in the various Contract items of Work requiring concrete or mortar and no additional payment will be made therefor. All costs shall include the cost for furnishing certificates of compliance, samples, and any tests consistent with this Section 12 as may be ordered by the Engineer or required by these Specifications or the Special Provisions for the various Contract items of Work requiring Portland Cement Concrete or Cement Mortar. 12-7 Fresno Metropolitan Flood Control District Standard Specifications-2011 Section 14 SECTION 14 - TRENCH AND STRUCTURE EXCAVATION, RETENTION BASIN EXCAVATION AND GRADING 14-1 General This Work shall consist of furnishing all labor, equipment, materials and incidentals required for the performance of all excavation necessary or required for the construction of pipelines, structures, retention basins, and related facilities required for the collection, transportation, and storage of storm water runoff, all as shown on the Plans and specified in the Special Provisions and these Specifications, and as directed by the Engineer. The District makes no guarantee as to the types of soil or of soil conditions existing within the project limits. In accordance with Section 2-4, "Examination of Plans, Specifications, Special Provisions, Contract, Documents, and Site of Work", and Section 2-5, "Pre-bid Tests," prior to submitting a bid proposal, the Contractor shall have performed any soils or other tests it deemed necessary to make itself fully aware of the soil types or conditions which may prevail throughout the project site, and the effects it may have on Trench and Structure Excavation and Retention Basin Excavation and Grading and the various related bid items. Where the District has conducted soils investigations and has made such report available to prospective Bidders, the data provided therein is for the Contractor's information and convenience only. No representation is made thereby as to the conditions to be encountered in performing any excavation or grading shown on the Plans or specified in the Special Provisions. The Contractor shall comply with all of the provisions of Section 10, "Underground Utilities", before commencing and during any excavation or grading. In addition, all excavations shall be made in compliance with Section 7-18, "Worker Protection From Caving Ground in Excavations", Section 7-19, "Worker Protection From Toxic or Explosive Gases; Confined Spaces Entry", Section 7-20, "Trenches and Excavations-Hazardous Waste", Section 7-21, "Protection of Archeological, Cultural, Paleontological Resources", the Construction Safety Orders issued by the Division of Industrial Safety of the California Department of Industrial Relations, and the permit issued by the Division of Occupational Safety and Health(Cal OSHA). 14-2 Permits In accordance with Section 7-10, "Permits, Licenses, and Fees", the Contractor shall obtain at its expense an Encroachment Permit from the applicable jurisdictional agency (City of Fresno, County of Fresno, City of Clovis, Caltrans), and an Excavation Permit from the State Division of Occupational Safety and Health (Cal OSHA) where such permit is required, or any other permit that may be required by the Work or as required by law, prior to commencing any exca- vation within any street, easement, or retention basin. 14-3 Trench and Structure Excavation Reference is made to Section 7-23, "Protection and Restoration of Existing Improvements", and to Section 10-1, "Underground Utility Locations, Markouts". Excavations shall be made to the depths and widths required to accommodate construction of pipelines and structures to specified dimensions, and to the lines and grades indicated on the Plans, except that pipe laterals shall be installed at the depth and grade specified by the Engineer after exposing existing intersecting utilities by the Contractor. The Contractor shall allow in its bid price for the various lateral pipe 14-1 Fresno Metropolitan Flood Control District Standard Specifications-2011 Section 14 installation quantities full compensation for any increase or decrease in anticipated depth of trench because of the location of intersecting utilities, whether shown on the plans or not. Laterals, as herein used, shall be taken to mean the pipeline which is installed to connect a storm drain inlet to the main storm drain, either directly or at a manhole. Reference is made to Section 10-2, "Utility Facilities Not Shown on Plans; Mains and Trunklines". Where conflicts arise between utilities and the planned location of storm drain mains or structures, as specified in said Section 10-2 in lieu of relocating a utility not shown on the Plans or is shown in a different location, the Engineer may direct that the storm drain main or structure be shifted in location or elevation, or both. In such a case, for increases in depth greater than eighteen (18) inches, the additional work resulting therefrom, if any, shall be classed as Extra Work and the increase in cost will be paid for as specified in Section 4-4, "Extra Work". No additional payment will be made for increases in depth of eighteen(18) inches or less. When a trench or structure excavation site is to be located in an existing paved area, the existing paving to be removed, whether by excavation or grinding where specified, shall be cut by methods approved by the Engineer along neat lines on each side of the trench or around the structure site. Reference is made to the Standard Plans, Drawing No. G-1 "Trench Excavation, Backfill, Surface Restoration". Before final paving is placed, the edge of additional pavement shall be ground and repaved to the limits required by the Plans or pursuant to said Standard Plan. The amount shown is minimum; the jurisdictional agency may require different widths or thicknesses to be ground and repaved. The more restrictive requirements of the jurisdictional agency or the Standard Plan shall apply, as determined by the Engineer. In accordance with Section 8-5.01, "Surfacing Removal", the existing asphalt concrete or other surfacing at any location shall be removed from proposed trench areas or structure excavation sites no sooner than forty-eight (48) hours prior to excavation at that location. No asphalt concrete or other surfacing shall be removed on a Friday or the day before a legal holiday unless excavation and follow-up work will occur the same day. Where asphalt concrete or other surfacing is to be removed by grinding, and the remaining surfacing is suitable for maintaining traffic use as determined by the jurisdictional agency and the Engineer, such grinding may proceed at an earlier time as approved by the Engineer in writing. Existing paving or any other deleterious material, when removed, shall be kept separated from the material which is to be returned to the excavation. Paving material that is removed by grinding and is to be later used in the backfill or structural section shall be stored in a manner as to prevent contamination. Failure to comply with these requirements shall be grounds for rejection of the material for use as backfill or for the structural section. Reference is made to Section 8-5.02, "Open Trench/Structure Excavation Time Limits". Structures and pipes shall be constructed or placed as soon as practicable after excavation, but in no case shall a trench be excavated more than one (1) calendar day before pipe construction. No trench shall be excavated on a Friday or the day before a legal holiday that is not to receive pipe on the same day, all in accordance with said Section 8-5.02. These requirements may be modified by the Engineer, under certain unusual circumstances, to allow up to a maximum trench length of one hundred fifty (150) feet to be left open for a length of time greater than one (1) calendar day (as specified by the Engineer), provided that access to affected properties can 14-2 Fresno Metropolitan Flood Control District Standard Specifications-2011 Section 14 adequately and safely be provided and maintained, and the trench is properly barricaded and suitably marked. In locations where the trench is allowed to be left open for extended periods (i.e. Holiday Weekends), the Contractor may also be required by the Engineer to furnish and install steel trench plating for access, traffic, or safety reasons at locations determined by the Engineer, with no additional payment made therefor. The time limits provided in this paragraph shall also apply to structure excavation sites, except that the time-lag between excavation and construction shall apply to the time between excavation of the site and the commencement of placing concrete forms for cast-in-place structures, or placing pre-cast structures where permitted. New manholes constructed in-line with new pipelines shall use the same time limits applied to the pipeline. Trenches for pre-cast pipe or excavations for structures shall be graded and prepared to provide a firm and uniform bearing throughout the entire length of the pipe or bottom of the structure. Reference is made to the specific excavation and bedding requirements in these Specifications for each type of precast pipe specified. Trenches for cast-in-place pipe shall be graded and prepared to provide full, firm and uniform support by undisturbed earth or compacted fill throughout the bottom two hundred twenty (220) degrees of the pipe periphery. For pre-cast pipe trenches, if rock, hardpan or like materials are encountered, the trench shall be over-excavated to a minimum depth of four (4) inches below the grade of the bottom of the pipe. The space shall be backfilled with suitable material complying with the bedding material requirements specified in these Specifications for the type of pipe installed and shall contain sufficient moisture to produce maximum compaction. The imported earth shall be compacted to the satisfaction of the Engineer, and finish graded to the original lines and grades as provided above for pre-cast and cast-in-place pipe. No additional payment will be made for such excava- tion or bedding backfill. In all trenches or structure sites where a firm foundation is not encountered, such as soft, spongy, or otherwise unsuitable material, the material shall be removed to a minimum of twelve (12) inches, or to such other depth determined by the Engineer, below the bottom of the pipe or structure, and the space backfilled with suitable material containing sufficient moisture to produce maximum compaction. The backfill material shall be free from lumps or other unsuitable material, and when compacted to the satisfaction of the Engineer, shall be finish graded as provided above for pre-cast and cast-in-place pipe, or as required by the Engineer for structures. No additional payment will be made for such additional excavation or backfill. All existing gas lines, water lines, conduits, sewers, drains, fire hydrants, and other structures which are not, in the opinion of the Engineer, required to be changed in location shall be carefully supported and protected from damage by the Contractor, and in case of damage, shall be restored by it, without additional compensation, to as good a condition as that in which they were found to the satisfaction of the owner and the Engineer, in accordance with Section 10, "Underground Utilities". 14-3 Fresno Metropolitan Flood Control District Standard Specifications-2011 Section 14 14-4 Retention Basin Excavation Excavation slopes, including basin floor areas, shall be finished to the lines and grades indicated on the Plans or established by the Engineer. All debris and loose material shall be removed and all surfaces brought to a reasonably smooth and even condition, subject to the following tolerances. When completed, the average plane of the basin floor shall not vary more than two- tenths (0.2) foot from the design elevations. The average plane of the slopes shall conform to the slopes indicated on the Plans, and no point on the completed slopes shall vary from the designated grade by more than five tenths (0.50) foot measured vertically from the proposed grade. The tops and bottoms of excavation slopes shall be rounded as indicated on the Plans, or as directed by the Engineer. 14-5 Maintaining Drainage, Trench and Structure Excavation The Contractor shall comply with the requirements of Section 7-28, "Maintaining Drainage", and the following. The Contractor shall keep trench and structure excavations as dry as practicable throughout the construction period, subject to the requirements of Section 12, "Portland Cement Concrete; Cement Mortar". Trenches damaged because of failure to provide temporary drainage control shall be repaired or reconstructed at the Contractor's expense. The cost of providing temporary drainage control shall be included in the various bid items of work with no additional compensation paid therefor. 14-6 Maintaining Drainage, Retention Basin Excavation Reference is made to Section 7-28, "Maintaining Drainage". Excavation of a retention basin shall not prevent the use of the excavated area, or a portion thereof, for storage of storm water runoff or non-storm-related flows such as seasonal lawn over-irrigation water, swimming pool draining, or discharge of irrigation tail-water from adjacent agricultural land, where said basin has historically received such water prior to the Contractor beginning excavation. Unless otherwise specified in the Special Provisions, where a retention basin contains water preventing the Contractor from commencing with the excavation as shown on the Plans, the Contractor shall provide dewatering of the basin to allow excavation to proceed in a timely manner. The Contractor shall notify the Engineer of the date when basin dewatering is proposed to start, and shall make all arrangements necessary for the disposal of the water in advance, including obtaining any required permits from jurisdictional agencies or irrigation districts. Disposal methods shall be approved in advance by the Engineer. Sufficient lead-time for dewatering the basin shall be provided by the Contractor to allow the excavation to proceed in a timely manner. After the initial dewatering of the basin by the Contractor, or after initial dewatering of the basin by the District when so specified in the Special Provisions, or in cases where there is initially no water in the basin preventing the commencement of excavation, the Contractor shall thereafter make provisions for water entering the basin during excavation by conducting its operations, including temporary berming and pumping, so as to allow for the orderly excavation of the site and its continued and uninterrupted use for storage of said waters. Details of the Contractor's operations shall be approved by the Engineer prior to commencing. Pipelines and surface 14-4 Fresno Metropolitan Flood Control District Standard Specifications-2011 Section 14 channels draining into the basin shall be kept open at all times, unless otherwise approved in advance by the Engineer. In the event the work area is completely inundated because of storm conditions and, in the opinion of the Engineer that: (1) the Contractor has diligently prosecuted the work up to the time of inundation, and (2) work can no longer proceed for an unreasonably long period, the Contract will be temporarily suspended, as provided in Section 8-10, "Temporary Suspension of Work", until such time as the Engineer determines that work can proceed. If the work will be interrupted for a short period only, as determined by the Engineer, in lieu of a temporary suspension of the Contract, an extension in Contract time will be granted, subject to the above two (2) same conditions and in accordance with Section 8-12, "Liquidated Damages", for the period for which it is determined by the Engineer that the Work could not proceed. No additional compensation will be paid for initial dewatering of the basin, maintaining drainage including temporary berming, pumping, or any other measures required to permit completion of the required excavation, or for delays due to the extension or temporary suspension of the Contract. Such costs shall be deemed as included in the various Contract items of Work 14-7 Disposal of Excess Materials The Contractor shall acquire a suitable site for the legal disposal of excess material, including existing paving or other deleterious material removed by trenching and structure excavation or retention basin excavation operations, in accordance with Section 7-31, "Disposal of Material". In disposing of such material, the Contractor shall comply with all local, State, or Federal regulations and laws governing such disposal. Reference is also made to Section 7-20, "Trenches and Excavations—Hazardous Waste". Full compensation for acquiring the site and disposing of excess material shall be included in the prices paid for the various items of the Work requiring excavation, as specified in the various sections of these Specifications, and no additional payment will be made therefor. 14-8 Payment Trench Excavation and Structure Excavation as specified in this Section 14 will be paid for in accordance with the provisions specified in the various sections of these Specifications covering construction requiring Trench or Structure Excavation. All costs pertaining to such excavation shall include the costs for any and all permits required by law, regulation, or these Specifications, to conduct Trench and Structure Excavation. Retention Basin Excavation, unless otherwise specified in the Special Provisions, will be paid for at the unit price bid per cubic yard of excavation which shall include the full cost for providing and furnishing all labor, materials, tools, and equipment and doing all the work involved in retention basin excavation, including but not limited to finish grading, disposal of material, maintaining drainage including pumping and temporary berming, and any and all permits required by law, regulation, or these Specifications to conduct Retention Basin Excavation as herein specified. 14-5 Fresno Metropolitan Flood Control District Standard Specifications-2011 Section 15 SECTION 15 - TRENCH AND STRUCTURE BACKFILL, RETENTION BASIN EMBANKMENT CONSTRUCTION 15-1 General This Work shall consist of furnishing all labor, equipment, materials and incidentals required for the performance of all backfill and embankment construction necessary or required for the construction of pipelines, structures, retention basins, and related facilities required for the collection, transportation and storage of storm water runoff, all as shown on the Plans and specified in the Special Provisions and these Specifications, the Standard Plans, and as directed by the Engineer. The Contractor shall also perform all trench and structure backfill, and embankment construction where applicable, in accordance with any special requirements of other sections of these Specifications or of the agencies responsible for issuing permits for the original excavation or other work. 15-2 Material 15-2.01 Native Material Except as otherwise provided in these Specifications, material used for trench or structure backfill, or for retention basin embankments, shall be native material free from debris, lumps, hardpan chunks, paving material, organic matter of other deleterious or unsuitable substances. Native Material shall be approved by the Engineer before use in the Work. 15-2.02 Imported Material In the event that Native Material does not conform to the materials requirements as may be specified in these Specifications or the Special Provisions, or there is insufficient Native Material to complete bedding, backfill or embankment construction operations due to unsuitability of the material or other causes as determined by the Engineer, or where the placement of imported material is shown on the Plans or specified in the Special Provisions, the Contractor shall import sufficient and suitable material as shown or specified to complete all operations. Imported Material shall be approved by the Engineer prior to use in the Work. Where a bid item is provided therefor, Imported Material shall be paid for at the unit price bid. Where no bid item is provided, and where approved by the Engineer, the Contractor will be compensated for furnishing Imported Material as provided in Section 4-4, "Extra Work", and Section 9-5, "Payment for Extra Work". The cost for removing and disposing of unsuitable material, which had it otherwise been suitable for backfill or embankment construction, shall be included in the cost for providing Imported Material. No additional payment will be made therefor. 15-2.03 Slurry Cement Backfill Slurry Cement, where shown on the Plans, specified in the Special Provisions, or approved by the Engineer to be used as trench or structure backfill or bedding material, shall conform to the provisions of Section 19-3.062, "Slurry Cement Backfill" of the Caltrans Standard Specifications, latest edition. Slurry Cement Backfill shall contain a minimum of one hundred eighty eight (188) pounds of Portland Cement (two 94 lb. sacks or bags) per cubic yard of mix. Where Slurry Cement Backfill is not shown on the Plans or specified in the 15-1 Fresno Metropolitan Flood Control District Standard Specifications-2011 Section 15 Special Provisions, and exigencies or other conditions warrant its use, or the Contractor for its convenience requests its use, Slurry Cement Backfill shall only be placed with the approval of the Engineer. Where Slurry Cement Backfill is shown on the Plans or specified in the Special Provisions, payment will be made in accordance with the Special Provisions. Where Slurry Cement Backfill is not shown on the Plans or specified in the Special Provisions, and is ordered by the Engineer, payment for Slurry Cement Backfill will be made as provided in Section 4-4, "Extra Work", and Section 9-5, "Payment for Extra Work". Where Slurry Cement Backfill is approved for use by the Engineer, but it is for the Contractor's convenience, no payment will be made therefor. In any case, the cost for removing and disposing of native material which otherwise would have been used for backfill shall be included in the cost for providing Slurry Cement Backfill, and no additional payment will be made therefor. In accordance with said Caltrans Section 19-3.062, backfill may be placed over Slurry Cement Backfill no sooner than four (4) hours after placement of the Slurry Cement Backfill unless concrete sand is used for the aggregate in the slurry cement, the adjacent undisturbed material is free draining, and water is no longer standing on the cement slurry, all as determined by the Engineer. 15-3 Bedding Where trenches are over-excavated due to unsuitable or unstable material as specified in Section 14-3, "Trench and Structure Excavation", Bedding for all pipe types allowed by these Specifications shall be placed in accordance with Section 19-3.025A, "Shaped Bedding", of the Caltrans Standard Specifications using select native material approved by the Engineer, or imported sand conforming to Section 19-3.025B, "Sand Bedding", of the Caltrans Standard Specifications, except that Bedding material for HDPE Plastic Pipe shall be Class IA, Class IB, Class II, or Class III conforming to ASTM Designation: D 2321 as provided in Section 22-3.02, "Bedding". For all pipe types, Bedding shall be placed in layers not exceeding six (6) inches in thickness and firmly compacted in accordance with Section 15-8, "Compaction", and graded smooth to provide consistent longitudinal contact and support for the pipe. Space for joint bells, collars, or other joint materials for all pipe types shall be accurately provided in the Bedding. For trenches which exceed the maximum trench widths specified for the various types of pre-cast pipe allowed by these Specifications, or where Slurry Cement is permitted or specified to be used for Bedding, reference is made to Section 15-4.02, "Trench Backfill, Pre-Cast Pipe", and to sub- sections thereof for the kind of pipe involved, for additional Bedding requirements. The cost for providing Bedding shall be considered as included in the price paid for the type of pipe involved, and no additional payment will be made therefor. 15-2 Fresno Metropolitan Flood Control District Standard Specifications-2011 Section 15 15-4 Trench Backfill, General Trench Backfill shall consist of material conforming to Section 15-2.01, "Native Material", or Section 15-2.02, "Imported Material". Where shown on the Plans, specified in the Special Provisions, or approved by the Engineer, Slurry Cement used for bedding or backfill shall conform to Section 15-2.03, "Slurry Cement Backfill". Trench Backfill for the various types of pipe allowed by these Specifications shall conform to the following provisions. 15-4.01 Trench Backfill, Cast-in-Place Concrete Pipe Backfill for trenches in which cast-in-place concrete pipe has been constructed shall consist of placing backfill material into the remaining trench cavity in one phase. Backfill shall be accomplished as soon as practicable and shall follow pipe construction by no more than seven (7) working days or as directed by the Engineer, provided that in no case shall backfill material be placed over the pipe sooner than twenty-four(24)hours following construction of the pipe. Backfill material shall be returned to the trench in lifts not to exceed eight (8) inches in thickness. Unless otherwise restricted by the jurisdictional agency permit, depending on the type of soil and compaction equipment used, the thickness of lifts may be increased by the Engineer, but not to exceed two (2) feet. Each lift shall be moisture conditioned to optimum levels for the full thickness of the lift to achieve or exceed the required compaction as specified in Section 15-8, "Compaction", prior to placement of the next lift of backfill material. In no case shall backfill material be allowed to free-fall directly onto the pipe. During the period before backfill is returned to the trench, at locations determined by the Engineer, the Contractor may be required to furnish and install steel trench plates for access, traffic, or safety reasons, with no additional payment therefor. 15-4.02 Trench Backfill, Pre-Cast Pipe Backfill material for trenches in which pre-cast pipe has been installed shall be placed in two phases, classified as Initial Backfill and Final Backfill. Reference is made to the Standard Plans, Drawing No. G-1, "Trench Excavation, Backfill, Surface Restoration". Initial backfill shall be considered as that material placed from the bottom of the trench where no bedding is required, or from top of bedding material where bedding is required, to one (1) foot above the outside top of the pipe. Initial backfill shall be accomplished no more than twenty-four (24) hours following trench excavation, and in most cases, as pipe-laying progresses. Final backfill shall be considered as that material placed from the top of initial backfill to the bottom of the structural section of the trench Surface Restoration. Final backfill shall be accomplished as soon as practicable, except that for mortar joint concrete pipe, final backfill shall not be placed until, in the opinion of the Engineer, the cement mortar in the joints has acquired a suitable degree of hardness. In no case, however, shall final backfill follow initial backfill by more than twenty-four (24) hours, nor initial excavation by more than forty-eight (48) hours. Final Backfill shall also conform to Section 15-4.03, "Final Backfill, Pre-Cast Pipe". 15-3 Fresno Metropolitan Flood Control District Standard Specifications-2011 Section 15 During the period before backfill is returned to the trench, at locations determined by the Engineer, the Contractor may be required to furnish and install steel trench plates for access, traffic, or safety reasons, with no additional payment therefor. Initial Backfill for pre-cast pipe shall conform to the following provisions. 15-4.02.1 Initial Backfill,RCP Reference is made to Section 17-4.05, "Initial Backfill and Compaction". Initial Backfill for RCP shall be accomplished as soon as practicable but no later than the time specified in Section 15-4.02, "Trench Backfill, Pre-Cast Pipe". Initial Backfill shall consist of placing and firmly compacting backfill material under the haunches and to the springline of the pipe so as to form a firm bedding for the pipe and prevent movement of the pipe during jointing operations. When jointing operations are complete, backfill shall then be placed and compacted to a depth of one (1) foot above the top of the pipe to prevent movement during final backfill and compaction operations. The material shall be placed in lifts not to exceed eight (8) inches in depth unless otherwise authorized by the Engineer, moisture conditioned to optimum levels for the full thickness of each lift, and each lift compacted in compliance with Section 15-8, "Compaction" to achieve or exceed the required compaction. Jurisdictional agency permits may restrict the lift thickness to eight(8) inches. 15-4.02.1(A) Special Initial Backfill, RCP As provided in Section 17-4.05.1, "Special Initial Backfill", where a Special Initial Backfill detail is shown on the Plans or specified in the Special Provisions, the Contractor shall furnish and place material for Initial Backfill in compliance with said detail or specification. In cases where native material is unsuitable for Initial Backfill as determined by the Engineer, the Contractor shall furnish and place material for Initial Backfill which complies with Section 19-3.025B, "Sand Bedding", of the Caltrans Standard Specifications. In lieu of providing Sand Bedding, the Contractor may request the Engineer to provide an alternative Initial Backfill detail which may include, but not be limited to, furnishing a higher strength class of pipe, a concrete cap, cradle, or arch, limitations on trench width, or special bedding requirements for the conditions under which the pipe is placed. Use of Slurry Cement conforming to Section 15-2.03, "Slurry Cement Backfill", or Class `B" Concrete conforming to Section 12, "Portland Cement Concrete; Cement Mortar", as bedding or backfill shall only be used with the specific approval of the Engineer or where specified in the Special Provisions. No additional payment will be made for providing sand bedding, a higher strength class of pipe, a concrete cradle or arch, special bedding, or slurry cement bedding or backfill, unless otherwise specified in the Special Provisions. 15-4 Fresno Metropolitan Flood Control District Standard Specifications-2011 Section 15 15-4.02.2 Initial Backfill, PVC Pipe Reference is made to Section 18-3.05, "Initial Backfill and Compaction". Initial backfill for PVC Pipe shall conform to the requirements of Section 15-4.02.1, "Initial Backfill, RCP". 15-4.02.2(A) Special Initial Backfill, PVC Pipe As provided in Section 18-3.01.1, "Trench Widths", where the trench width exceeds the maximum trench width specified in said Section 18-3.01.1, as measured at the top of the pipe, the Contractor shall provide shaped bedding in conformance with Sections 19-3.025A, "Shaped Bedding", and 19-3.025B, "Sand Bedding", of the Caltrans Standard Specifications. In lieu of providing shaped sand bedding, with the approval of the Engineer, the Contractor may provide a higher strength class of pipe in accordance with the manufacturer's recommendation for the conditions under which the pipe is placed. Use of Slurry Cement conforming to Section 15-2.03, "Slurry Cement Backfill", as bedding or backfill shall only be used with the specific approval of the Engineer or where specified in the Special Provisions. In such cases, the Contractor shall take appropriate measures to anchor the pipe to prevent floating, as specified in Section 18-3.03.1 "Floatation Prevention". Any pipe that has floated shall be removed and replaced at the correct line and grade. No additional payment will be made for providing shaped sand bedding, a higher strength class of pipe, or slurry cement bedding or backfill, unless otherwise specified in the Special Provisions. 15-4.02.3 Initial Backfill, CMP Reference is made to Section 21-5, "Initial Backfill and Compaction". Before proceeding with Initial Backfill, the bottom of the trench for CMP shall be prepared in accordance with Section 19-3.025A, "Shaped Bedding", of the Caltrans Standard Specifications using select native material approved by the Engineer, or imported sand conforming to Section 19-3.025B, "Sand Bedding", of the Caltrans Standard Specifications. Initial Backfill for CMP shall conform to the requirements of Section 15-4.02.1, "Initial Backfill, RCP", and the following provisions: Each layer of Initial Backfill shall be thoroughly rammed and hand tamped, being careful not to move or lift the pipe from its planned line and grade, to completely compact the material to the springline of the pipe, and then to one (1) foot above the pipe. Any pipe moved or lifted shall be removed and re-laid to the line and grade shown on the Plans. Use of Slurry Cement conforming to Section 15-2.03, "Slurry Cement Backfill", as bedding or backfill shall only be used with the specific approval of the Engineer or where specified in the Special Provisions. In such cases, the Contractor shall take appropriate measures to anchor the pipe to prevent floating. Any pipe that has floated shall be removed and replaced at the correct line and grade. 15-5 Fresno Metropolitan Flood Control District Standard Specifications-2011 Section 15 No additional payment will be made for providing Initial Backfill as specified in this Section 15-4.02.3, including any approved use of Slurry Cement bedding or backfill. 15-4.02.4 Haunching and Initial Backfill,HDPE Plastic Pipe Reference is made to Section 22-3.05, "Haunching, Initial Backfill, and Compaction", ASTM Designation: D 2321 and the HDPE manufacturer's specifications. The more restrictive of these shall govern the Haunching and Initial Backfill installation. Haunching shall consist of Initial Backfill material placed underneath the pipe haunches up to the springline of the pipe in layers not to exceed six (6) inches in depth, with each layer compacted in conformance with Section 15-8, "Compaction". Each layer shall be thoroughly rammed and hand tamped, being careful to completely compact the material but in such a manner as not to move or lift the pipe from its planned line and grade. The pipe shall be anchored as necessary to prevent movement or lifting. Any pipe that is moved or lifted shall be removed and re-laid to the line and grade shown on the Plans. Initial Backfill shall then be placed above the haunching in layers not to exceed six (6) inches in depth to a height of one (1) foot above the outside top of the pipe. Each layer shall be compacted in conformance with said Section 15-8. Haunching and Initial Backfill material shall meet the requirements of Class IA, Class IB, Class II, or Class III of ASTM Designation: D 2321. Use of Slurry Cement conforming to Section 15-2.03, "Slurry Cement Backfill" as bedding or backfill shall only be used with the specific approval of the Engineer or where specified in the Special Provisions. In such cases, the Contractor shall take appropriate measures to anchor the pipe to prevent floating as specified in Section 22-3.03.1, "Floatation Prevention". Any pipe that has floated shall be removed and re-laid at the correct line and grade. 15-4.03 Final Backfill,Pre-cast Pipe Final Backfill shall consist of placing approved backfill material into the remaining trench cavity following completion of Initial Backfill. Reference is made to Section 15-4.02, "Trench Backfill, Pre-Cast Pipe", for Final Backfill timing requirements. Final Backfill shall extend from the top of Initial Backfill to the bottom of the structural section for Surface Restoration. Reference is made to the Standard Plans, Drawing No. G-1, "Trench Excavation, Backfill, Surface Restoration". Backfill material shall be returned to the trench in lifts not to exceed eight (8) inches in depth. Unless otherwise restricted by jurisdictional agency permits, depending on the type of soil and compaction equipment used, the thickness of lifts may be increased by the Engineer, but not to exceed two (2) feet. Each lift shall be moisture conditioned to optimum levels for the full thickness of the lift to achieve or exceed the required compaction as specified in Section 15-8, "Compaction", prior to placement of the next lift of backfill material. In no case shall backfill material be allowed to free-fall directly onto the pipe. Where Slurry Cement Backfill is used to only partially fill the depth of the excavation, and soil backfill will be placed over the top of the slurry cement for the remainder of the excavation depth, the soil backfill shall be placed in conformance with this Section 15-4.03, 15-6 Fresno Metropolitan Flood Control District Standard Specifications-2011 Section 15 but no sooner than four (4) hours after placement of the Slurry Cement Backfill, or as otherwise provided Section 15-2.03, "Slurry Cement Backfill", or as directed by the Engineer. Compaction of soil backfill shall conform to the requirements of said Section 15- 8. 15-5 Structure Backfill Structure backfill shall consist of placing and compacting backfill material around structures to the lines and grades designated on the Plans or directed by the Engineer. Backfill and compaction for cast-in-place structures shall comply with the time and placement requirements for trench backfill for cast-in-place pipe as specified in Section 15-4.01, "Trench Backfill, Cast- in-Place Concrete Pipe". Backfill and compaction of pre-cast structures shall comply with the placement requirements for trench backfill for pre-cast pipe, including the use of Slurry Cement Backfill where approved by the Engineer, as specified in Section 15-4.02, "Trench Backfill, Pre- Cast Pipe". New manholes constructed in-line with new pipelines shall use the same backfill requirements applied to the pipeline. Unless otherwise provided in the Special Provisions, Structure Backfill for pump stations shall not be subject to the above time and placement requirements, but performed in a manner that permits completion of the Work within the time specified in the Contract. Compaction of Structure Backfill shall conform to the requirements of Section 15-8, "Compaction". 15-6 Embankment Construction, Retention Basins Embankment construction shall consist of the construction or reconstruction of retention basin dikes, side slopes, floor areas, or any other special feature requiring embankment construction, placing and compacting approved material to the lines and grades indicated on the Plans or established by the Engineer, finish grading, and maintaining drainage. Areas to receive embankment construction shall first be cleared of all debris, bushes, weeds, stumps, or other deleterious material, in accordance with Section 13, "Clearing and Grubbing". If embankment material is to be placed on existing slope areas, the existing surface shall be plowed, disked or scarified to a minimum depth of four (4) inches to produce a bond with the material to be placed. Unless otherwise specified in the Special Provisions, embankment material shall consist of select native material obtained from the site and approved by the Engineer, and shall conform to the requirements of Section 15-2.01, "Native Material". Embankments shall be constructed and compacted in layers of specified uniform thickness, but in no case shall any layer exceed two (2) feet in thickness. Construction shall be to the lines and grades indicated on the Plans and finish graded to provide a reasonably smooth and even surface, subject to the following tolerances. When completed, the average plane of the basin floor shall not vary more than two-tenths (0.2) foot from the design elevations. The average plane of the slopes shall conform to the slopes indicated on the Plans, and no point on the completed slopes shall vary from the designated slope by more than five tenths (0.5) foot measured vertically from 15-7 Fresno Metropolitan Flood Control District Standard Specifications-2011 Section 15 the slope. The tops and bottoms of embankment slopes shall be rounded as indicated on the Plans, or as directed by the Engineer. Compaction of embankments shall conform to Section 15-8, "Compaction". 15-7 Emergency Backfill At locations where traffic, safety, or other considerations warrant, the Engineer may order the immediate backfill of trenches or other excavations, regardless if the pipes or structures have been installed or not. Where pipe or structure was not installed, the trench or structure site shall not be re-excavated until provisions are made to prevent the conditions which caused the backfill to be ordered. No additional compensation will be paid for Emergency Backfill and re- excavation. 15-8 Compaction Compaction of trench and structure backfill and embankments shall be accomplished by moisture-conditioning the backfill material to optimum levels, supplemented by the use of approved compaction equipment, and shall equal or exceed the compaction herein required. Jetting of backfill material will not be permitted. Relative compaction of trench and structure backfill shall be determined by the Caltrans California Test Method 216, Test Method 231, or ASTM D1557, as appropriate for the location being tested, or as required by the jurisdictional agency permit. The frequency, locations, and intervals of tests shall be determined by the Engineer. Reference is made to the Standard Plan for Trench Excavation, Backfill, and Surface Restoration. Backfill of all trench and structure excavations located in public rights of way subject to permits issued by the jurisdictional agency shall be compacted to a minimum of ninety (90) percent relative compaction from the bottom of the excavation, including any over- excavation required pursuant to Section 14-3, "Trench and Structure Excavation", to two (2) feet below the finished surface grade of the excavation. The remaining two (2) feet of the backfill shall be compacted to a minimum of ninety five (95) percent relative compaction. These requirements are subject to the special compaction requirements of other sections of these Specifications or of the agencies responsible for issuing permits for the original excavation, regardless if said permit was issued or not. The more restrictive requirements of the jurisdictional agency or these Specifications shall apply. Unless otherwise shown on the Plans or specified in the Special Provisions, Work located in rights of way not subject to jurisdictional agency permits, such as in District retention basins or easement areas, backfill for trench or structure excavation, except for pumping stations, shall have a relative compaction of not less that eighty five (85) percent from the bottom of the excavation to within two (2) feet of the surface finish grade. The remaining top two (2) feet shall have a relative compaction of not less that ninety(90)percent. Pumping station backfill shall be compacted to a minimum of ninety five (95) percent relative compaction for the full depth and horizontal width of the pump station excavation up to the surface finish grade shown on the Plans. Reference is made to Section 26-3.05, `Backfill and Compaction". 15-8 Fresno Metropolitan Flood Control District Standard Specifications-2011 Section 15 Embankments shall be compacted to a minimum of eighty five (85) percent relative compaction or as specified in the Special Provisions. Relative compaction of embankments shall be determined by the test method specified for trench and structure backfill as provided in this Section 15-8. Initial compaction testing shall be provided by the District at no cost to the Contractor. The Contractor shall file adequate notice to the Engineer when he desires compaction testing. All required compaction retesting of backfill because of failure to pass original tests shall be at the expense of the Contractor. Attention is directed to Section 7-10, "Permits, Licenses, and Fees". A permit is required to obtain water from the jurisdictional agency's water system for use in moisture conditioning or other methods of compaction, or any other construction activities requiring the use of water. The Contractor shall make arrangements with the Engineer for any water obtained from District retention basins used for compaction or other construction purposes. 15-9 Maintaining Drainage, Retention Basin Embankment Construction Reference is made to Section 7-28, "Maintaining Drainage", and Section 14-6, "Maintaining Drainage, Retention Basin Excavation". Construction of embankments shall not prevent the use of the retention basin, or a portion thereof, for storage of storm water runoff, summer lawn over- irrigation water, or other non-storm related water from other sources, where said basin has historically received such water prior to the Contractor beginning construction. The contractor shall conduct his operations, including temporary berming and pumping, so as to allow for the orderly construction of the site and its continued and uninterrupted use for storage of said waters. Details of the Contractor's operations shall be approved by the Engineer prior to commencing. Pipelines and surface channels draining into the basin shall be kept open and operable unless otherwise approved in advance by the Engineer. In the event the Work area is completely inundated because of storm conditions, and, in the opinion of the Engineer that: (1) the contractor has diligently prosecuted the work up to the time of inundation, and (2) Work can no longer proceed for an unreasonably long period, the Contract will be temporarily suspended as provided in Section 8-10, "Temporary Suspension of Work", until such time as the Engineer determines that work can proceed. If the Work will be interrupted for a short period only, as determined by the Engineer, in lieu of a temporary suspension of the Contract, an extension in Contract time will be granted, subject to the above two same conditions and in accordance with Section 8-12, "Liquidated Damages", for the period for which it is determined by the Engineer that Work could not proceed. No additional compensation will be paid for maintaining drainage, or for delays due to the extension or temporary suspension of the Contract. Such costs shall be deemed as included in the various bid items of work. 15-9 Fresno Metropolitan Flood Control District Standard Specifications-2011 Section 15 15-10 Measurement and Payment Trench and Structure Backfill and Compaction will be paid for in accordance with the provisions specified in the various sections of these Specifications covering construction requiring Trench or Structure Backfill, or as otherwise specified in the Special Provisions. Unless otherwise specified in the Special Provisions, Retention Basin Embankment will be paid for at the unit price bid per cubic yard of embankment which shall include the full cost of providing and furnishing all labor, materials, tools and equipment, and doing all the work involved in the construction of embankments including, but not limited to, preparing areas to receive embankment construction, placing and compacting of embankment material including Imported Material as required or specified, finish grading to tolerances herein provided, maintaining drainage including pumping and temporary berming, and any other incidentals pertaining thereto. 15-10 Fresno Metropolitan Flood Control District Standard Specifications-2011 Section 17 SECTION 17—REINFORCED CONCRETE PIPE (RCP) 17-1 General This Work shall consist of furnishing all labor, materials, tools and equipment for installing Reinforced Concrete Pipe (RCP) at the locations shown on the Plans and specified in the Special Provisions, and in accordance with these Specifications and as directed by the Engineer. RCP shall be of the size,joint type, and strength class shown on the Plans or specified in the Special Provisions. The pipe strength class, as designated on the Plans, has been determined for vertical load under average trench conditions. Reference is made to Section 2-4, "Examination of Plans, Specifications, Special Provisions, Contract Documents, and Site Conditions", and Section 2-5, "Pre-bid Tests". Prior to submitting a bid proposal, the Contractor shall have conducted such tests it determines necessary to satisfy itself as to the trench conditions to be encountered throughout the project, and the effects thereof on the strength class and installation requirements of RCP. No additional payment will be made due to soil or trench conditions differing from that anticipated by the Contractor. Reference is made to Section 17-4.01, "Excavation", Section 17- 4.02, "Bedding", and Section 17-4.05.1, "Special Initial Backfill". 17-2 Materials, Pipe Unless otherwise shown on the Plans or specified in the Special Provisions, or unless otherwise required by a permit issued by a jurisdictional agency, RCP to be installed in the Work shall conform to ASTM Designation: C 76, as amended or revised. Upon request, the Contractor shall furnish to the Engineer a Certificate of Compliance from the manufacturer of the pipe in accordance with the provisions in Section 6-5, "Certificates of Compliance". 17-2.01 Pipe Substitutions Certain pipes of other manufactures may be permitted, as provided below, to be used in lieu of RCP twenty-four (24) inches in diameter or smaller. In any such case, the diameter of the substituted pipe shall match the size of the RCP for which substitution is allowed, but shall not exceed twenty-four (24) inches, or such other diameter as provided below, unless otherwise approved by the Engineer in writing. Unless otherwise specified in the Special Provisions, but subject to approval in advance by the Engineer, which approval will depend upon certain flow criteria and restrictions which must be reviewed and which may preclude substitution, PVC pipe conforming to Section 18, "Polyvinyl Chloride (PVC) Pipe", may be substituted for RCP twenty four (24) inches in diameter or smaller, unless otherwise specifically approved by the Engineer in writing. The substituted PVC pipe shall equal or exceed the bearing capacity of the RCP. HDPE Plastic Pipe conforming to Section 22, "High Density Polyethylene (HDPE) Plastic Pipe", shall be substituted for RCP twenty-four(24) inches in diameter or smaller only where shown on the Plans or specified in the Special Provisions or approved by the local jurisdictional agency as a permitted substitution, unless otherwise specifically approved by the Engineer in writing. The substituted HDPE Plastic Pipe shall equal or exceed the load bearing capacity of the RCP. 17-1 Fresno Metropolitan Flood Control District Standard Specifications-2011 Section 17 17-3 Materials,Joints The ends of RCP sections shall be of such design that when properly laid they shall have a smooth and uniform interior surface. Both ends of pipe sections shall be substantially free of cracks and broken edges. Pipe so found to be damaged shall be rejected for use in the Work. Each joint shall be sealed to prevent leakage and shall be either rubber gasket or cement mortar as indicated on the Plans or specified in the Special Provisions. Pre-manufactured joints shall conform to the following specifications. Construction joints, where shown on the Plans, specified in the Special Provisions, or required by the Engineer, shall comply with Section 17- 4.04, "Construction Joints". 17-3.01 Cement Mortar Joints Mortar shall conform to the requirements of Section 12-8, "Cement Mortar", of these Specifications. The ends of the concrete pipe shall be thoroughly wetted and cleaned prior to the application of mortar. The ends of the pipe, after being wetted and cleaned, shall be completely filled with mortar for the full periphery of the joint. The two sections to be joined shall be firmly placed together in such a manner that the bell or groove end of the pipe fits truly and snugly over the tongue end with maximum joint overlap at all points around the joint periphery. Mortar shall completely fill any space or gap within the joint. The interior surface of the pipe at the joint shall be brushed smooth and all surplus mortar removed. The completed surface of the joint on the interior of the pipe shall be flush with the pipe walls. Joints for pipes laid on curves shall comply with Section 17-5, "Curved Alignments". An external mortar band at least four (4) inches wide and three-fourths (3/4) inch thick shall be applied to the pipe, centered on the joint, by first thoroughly cleaning and wetting the areas immediately adjacent to the joint and placing mortar around the upper two hundred seventy (270) degrees of the pipe at the joint. The width and thickness of the external band shall be completely and immediately covered with an impervious membrane which shall be adequately anchored. In no case shall water be allowed to rise in or about the pipe before the mortar of the joint has become thoroughly set. 17-3.02 Rubber-Gasket Joints Rubber-gasket joints shall conform to the requirements of ASTM Designation: C 443. Joints shall be flexible, watertight, and able to withstand expansion, contraction and settlement. Rubber Gasket Joints shall be adequate to withstand internal hydrostatic pressures up to thirteen (13) psi, or thirty (30) feet of pressure head, without leakage when tested in accordance with said ASTM Designation: C 443. Rubber Gaskets (Elastomeric Seals) shall conform to ASTM C 1619. The gasket class shall be appropriate for the pressure requirements of the particular pipe application, and shall be oil resistant. 17-2 Fresno Metropolitan Flood Control District Standard Specifications-2011 Section 17 The ends of the rubber gasket pipe shall be thoroughly cleaned immediately prior to joining sections of pipe. The rubber gasket shall be lubricated per the pipe manufacturer's recommendations. The two sections joined shall be firmly placed together in such a manner that the tongue or gasket end of the pipe "homes" in the bell end of the pipe. No appreciable gap shall exist at the completed joint, except as permitted by the Engineer at locations where curves in the pipe alignment are specified or required. Reference is made to Section 17-5, "Curved Alignments". Excessive gaps in any case shall be cause for rejection of the work, and corrective measures shall be taken when ordered by the Engineer 17-4 Installation RCP shall be installed in accordance with Section 8, "Prosecution and Progress of the Work", and with this Section 17-4. 17-4.01 Excavation Excavation for installing RCP shall conform to the requirements of Section 14-3, "Trench and Structure Excavation", and to the following. The contractor shall exercise precautionary measures during trenching operations against trench cave-ins by providing adequate shoring or other devices to minimize the development of adversely wide trench conditions in the pipe zone. The Contractor shall comply with the requirements of Section 17-4.05.1, "Special Initial Backfill". As specified in said Section 14-3, in trenches where rock, hardpan, wet, spongy, or other material unsuitable for pipe bedding is encountered in the trench bottom, as determined by the Engineer, the unsuitable material shall be over-excavated to the depths specified in said Section 14-3 for the type of material encountered. The over-excavated space shall be backfilled with bedding as provided in Section 17-4.02, "Bedding". The cost of excavation of trenches, including trench over-excavation, shall be considered as included in the price paid for RCP, and no additional payment will be made therefor. 17-4.02 Bedding Where trenches must be over-excavated pursuant to Section 14-3, "Trench and Structure Excavation", due to encountering unsuitable pipe bedding conditions during trench excavation, Bedding for RCP shall be furnished and placed in accordance with Section 15-3, "Bedding". The cost for providing Bedding shall be considered as included in the price paid for RCP, and no additional payment will be made therefor. 17-4.03 Pipe Laying Pipes shall be laid in conformity with the prescribed lines and grades obtained from survey stakes set by the Engineer. The pipe shall be laid uphill from structure to structure with the bell end up-grade unless otherwise permitted by the Engineer. Pipe with elliptical reinforcement shall be placed with the minor axis in a vertical position. Adjustments of pipes to line and grade shall be made under the body of the pipe throughout its entire length and not by blocking or wedging. Bell holes shall be accurately placed and shall not be larger than is reasonably required to make the joint. Before the pipe is laid, the interior of the bell of the preceding pipe shall be carefully cleaned. After each section of pipe has been laid to line and 17-3 Fresno Metropolitan Flood Control District Standard Specifications-2011 Section 17 grade, it shall be joined to the preceding section as required in Section 17-3, "Materials, Joints". After jointing procedures have commenced, there shall be no movement of the pipe whatsoever in subsequent operations. Material shall be placed uniformly on either side of the pipe to prevent any movement, in accordance with Section 15-4.02.1, "Initial Backfill, RCP". For mortar joint pipe, no walking in the trench or working over the pipe after it has been laid, except as may be necessary in tamping the earth and refilling, will be permitted until the pipe has been braced as specified above. 17-4.04 Construction Joints Reference is made to the Standard Plan for Construction Joints. Whenever two sections of pipe are to be connected where standard joints are not available, such as joining reinforced concrete pipe to cast-in-place concrete pipe or plastic pipe, or in cases where field conditions are encountered which require a pipe joint to be deflected at an angle exceeding the manufacturer's maximum recommended deflection and the Engineer approves the use of a construction joint, an external concrete collar shall be constructed around the full periphery of the pipe and extending one (1) foot on both sides of the joint. The collar shall be of a minimum thickness equal to that of the concrete pipe wall, but in no case less than four (4) inches thick. The interior of the joint shall be smoothed with cement mortar and brushed. The area to receive the collar shall be thoroughly cleaned and dampened immediately prior to construction of the collar. 17-4.05 Initial Backfill and Compaction Initial Backfill shall be placed and compacted from the bottom of the trench where no bedding is required, or the top of bedding where it is installed, to one (1) foot above the outside top of pipe, in compliance with Section 15-4.02, "Trench Backfill, Pre-cast Pipe", Section 15-4.02.1, "Initial Backfill, RCP", and Section 15-8, "Compaction". 17-4.05.1 Special Initial Backfill Where a Special Initial Backfill detail is shown on the Plans or specified in the Special Provisions, the Contractor shall furnish and place material for Initial Backfill in compliance with said detail or specification. In cases where native material is unsuitable for Initial Backfill as determined by the Engineer, the Contractor shall furnish and place Special Initial Backfill in conformance with Section 15-4.02.1(A), "Special Initial Backfill, RCP". No additional payment will be made for Special Initial Backfill. 17-4.06 Final Backfill and Compaction Final backfill shall be performed in accordance with Section 15-4.03, "Final Backfill, Pre- cast Pipe". Compaction shall comply with Section 15-8, "Compaction". 17-4.07 Minimum Cover(Depth) Unless otherwise shown on the Plans or specified in the Special Provisions, where it is necessary to deviate from the pipe elevations shown on the Plans, as determined by the Engineer, RCP shall be placed such that the minimum cover over the pipe shall be three (3) feet, as measured from the lowest finish roadway elevation or ground surface elevation for non-roadway installations, except that within retention basins, the minimum cover over the pipe shall be four(4) feet. 17-4 Fresno Metropolitan Flood Control District Standard Specifications-2011 Section 17 In cases where the minimum cover over the pipe as above specified may be reduced to less than the specified amounts, the Contractor shall provide and place a higher strength class of pipe and/or bedding as directed by the Engineer for the conditions encountered. The additional cost of a higher strength class of pipe or special bedding will be paid for as Extra Work in accordance with Section 4-4, "Extra Work"' and Section 9-5, "Payment for Extra Work",but only when such change is directed by the Engineer. 17-5 Curved Alignments Pipes shown on the Plans to be laid on a radius shall be placed in strict conformance with the alignment determined by marker stakes set by the Engineer. In cases where field conditions require unanticipated shifts in alignment, said shift shall be accomplished at a curvature approved by the Engineer such that pipe joints shall be deflected no greater than the manufacturer's maximum recommended deflection angle. At locations where maximum recommended deflection angles must be exceeded, the Engineer may authorize a construction joint conforming to Section 17-4.04, "Construction Joints", and the Standard Plan therefor. Where adjustments in alignment do not require backfilling and re-excavating trenches, no additional payment will be made therefor. Where changes in alignment require backfilling and re-excavating trenches, the backfilling, compaction, and resurfacing the original trench, will be paid for as extra work in accordance with Section 4-4, "Extra Work", and Section 9-5, "Payment for Extra Work". Payment for construction joints will be made at the unit price bid therefor. Where no bid item is provided, construction joints will be paid for as Extra Work in accordance with said Section 4-4 and Section 9-5. 17-6 Protection of Pipe The requirements of this Section 17 shall not relieve the Contractor of the provisions of Section 7-14, "Contractor's Responsibility for Work and Materials". The Contractor shall exercise every precaution against damage to the pipe, including damage from subsequent backfill or compaction operations. Any damaged pipe shall be removed from the Work or repaired as directed by the Engineer. 17-7 Video Inspection Where specified in the Special Provisions, or where directed by the Engineer, the Contractor shall furnish a closed circuit television inspection of the interior of the newly installed RCP. The pipe shall be video inspected for line, grade,joint integrity, damage, and debris. Any portion of the pipeline failing any one of the foregoing criteria shall be repaired, replaced or re-laid, or cleaned as directed by the Engineer. Failed locations shall be re-videoed. Video inspections, when required, shall be conducted after trenches have been backfilled and compacted, but before the replacement of permanent AC pavement. A DVD disc showing the initial video inspection, as well as any subsequent video inspections, shall be furnished to the District at no cost. All costs for providing Video Inspection shall be included in the price bid per lineal foot of RCP, and no additional payment will be made therefor. 17-8 Measurement and Payment The length of Reinforced Concrete Pipe (RCP) to be paid for will be the horizontal length measured by the Engineer exclusive of structures, except that pipe placed in sloped areas of 17-5 Fresno Metropolitan Flood Control District Standard Specifications-2011 Section 17 retention basins or other substantially inclined surfaces, measurement shall be based on slope lengths, exclusive of structures. When pipes enter a structure at an angle different from a right angle and are cut to conform to the faces of the structure or of a slope, the quantity to be paid for will be measured along the center line of the pipe to the inside face of the structure, or to the face of the slope. The price paid per lineal foot of RCP shall include full compensation for furnishing all labor, materials, tools, equipment and incidentals, and doing all the Work involved in installing the pipe in place, including but not limited to excavation, backfill, and video inspection when required. Reference is made to Section 33, "Miscellaneous Facilities and Operations". Where a bid item is provided for said Section 33, the cost for construction joints shall be included therein. Where no bid item is provided, the cost of construction joints shall be included in the price bid per lineal foot of RCP, and no additional payment will be made therefor. 17-9 Payment Retention The placement of Reinforced Concrete Pipe (RCP) includes, but is not limited to, various items of work such as excavation, pipe installation, back filling and moisture conditioning, compaction, and clean-up. Section 17-8, "Measurement and Payment", is hereby modified to provide for the retention of up to fifty (50) per cent of the in-place value of Reinforced Concrete Pipe, or any substitutions allowed by this Section 17, said percentage to be determined by the Engineer in an amount, in his judgment, proportionate to the quantities of these various items of Work not completed at the time of payment. Payment in full shall not be made until such time as all the Work involved in furnishing and installing RCP complete and in accordance with these Specifications is approved by the Engineer. The retention provided by this Section 17-9 shall be in addition to the retention required by Section 9-7, "Progress Payments and Retentions". 17-6 Fresno Metropolitan Flood Control District Standard Specifications-2011 Section 23 SECTION 23 -MANHOLES 23-1 General This Work shall consist of furnishing all labor, materials, tools and equipment necessary for constructing Manholes of the sizes and types and at the locations shown on the Plans, as specified in the Special Provisions and these Specifications, and as directed by the Engineer. Manholes shall be constructed in accordance with the details shown on the Project Plans or the Standard Plans for the various sizes and types to be constructed. Manholes shall consist of a poured-in-place or pre-cast concrete base section, (except as otherwise provided by the Standard Plans), a pre-cast or cast-in-place riser section, a pre-cast reinforced concrete taper section, or reinforced concrete flat slab lid, grade rings, cast iron frame and cover, or bolt-down cast iron pressure cover, or slotted grate cover, and poured-in-place concrete collars for cast iron frames, and surface restoration around cast iron frames. 23-2 Materials Concrete and mortar shall conform to the requirements of Section 12, "Portland Cement Concrete; Cement Mortar". Concrete for the base, cast-in-place riser sections, and the concrete collar for the cast iron frame shall be Class "A", or alternative mix design approved by the Engineer. Pre-cast riser sections, tapered cones or flat slab lids, and grade rings shall be reinforced concrete and shall conform to ASTM Designation: C478,using Type II cement. Metal frames and covers shall be cast iron meeting the requirements of ASTM Designation: A48, Class 25. Frames and covers shall be manufactured in accordance with the Standard Plans. Steps, where required, shall be three-fourths (3/4) inch diameter steel bars conforming to ASTM Designation A108-07, galvanized after hot bending per ASTM Designation A123/A123M-09, as shown on the Standard Plans. 23-3 Excavation Excavation for Manholes shall conform to Section 14, "Trench and Structure Excavation, Retention Basin Excavation and Grading". 23-4 Forms Forms shall conform to the requirements of Section 12-5, "Forms". 23-5 Construction Manholes shall be constructed in accordance with the applicable Standard Plans and as herein specified. The riser portion of the manhole, whether cast-in-place or pre-cast riser sections are used, shall be constructed such that the distance from the finish grade of the manhole cover to the top of the tapered reducing cone, or to the top of the flat slab lid, shall not exceed two (2) feet. 23-1 Fresno Metropolitan Flood Control District Standard Specifications-2011 Section 23 All entering and leaving pipes shall be placed flush with the inside edge of the Manhole, except that all pipe edges shall be rounded and smoothed with cement mortar to a three (3) inch radius as shown on the Standard Plans. Any gap between the wall and the pipe after insertion shall be completely filled with mortar to provide a water-tight joint. The top of the base section shall be keyed to receive the tongue end of the riser section. The key shall be formed in the freshly poured concrete by using a template manufactured to the dimensions of the riser section or by a method approved by Engineer. If the riser is cast-in-place monolithically with the base section by using a slip form or other means, the key may be omitted between the base and riser. If the base and riser sections are not poured monolithically but separately, a key shall be provided in the base section. In either case, a key will be required in the top of the riser section to receive the tongue end of the tapered cone or flat slab. Cast-in- place riser sections shall have the minimum wall thickness shown on the Standard Plans. Where low-pressure manholes are shown on the Plans, the reinforcing steel used to anchor the various manhole segments and components together as shown on the Standard Plans shall have a minimum cover of two (2) inches of cement mortar or concrete conforming to Section 12, "Portland Cement Concrete; Cement Mortar". Where use of a flat slab lid is shown on the Plans or specified in the Special Provisions, or field conditions require the use as determined by the Engineer, the lid that is furnished and installed shall be designed for HS20-44 loading. The joints between the base and all pre-cast elements of the manhole, including adjustment rings and manhole frame, shall be filled with cement mortar, mastic band seal, or approved equal prior to joining the elements. The interior of the manhole shall be troweled smooth with a wooden trowel, removing excess mortar extruded out of joints for the entire height of the manhole, from the manhole frame to the floor. All excess mortar and any other debris shall be removed from the manhole. Where steps are required, they shall be installed in accordance with the Standard Plans therefor, and shall comply with Section 3277 of Article 4, Group 1 of Subchapter 7, General Industry Safety Orders, of Title 8 of the California Code of Regulations. 23-6 Backfill and Compaction Backfill and Compaction shall conform to the requirements of Section 15, "Trench and Structure Backfill, Retention Basin Embankment Construction". 23-7 Curing Exposed concrete surfaces shall be cured in accordance with Section 12-6, "Curing Concrete". 23-2 Fresno Metropolitan Flood Control District Standard Specifications-2011 Section 23 23-8 Raising to Grade Manholes constructed in finished roadway areas, or other finished areas, shall be brought to the same elevation as the surrounding finished surface as shown on the Project Plans or in accord- ance with the Standard Plans. Manholes constructed in unfinished areas shall be brought to the elevation shown on the Plans, specified in the Special Provisions, or as determined by the Engineer. In all cases where manhole covers are to be brought to finish grade, the method of pavement repair shall be as shown on the Plans or specified in the Special Provisions, or as specified by the jurisdictional agency issuing the permit for the work. In the absence of the forgoing, the repair shall be made in accordance with the applicable Standard Plans. Where trenches are to receive surface restoration by the Contractor as provided in Section 16, "Restoration of Surfaces", or the trench is located in a street or other area to be reconstructed or newly constructed by others, or at such other locations shown on the Plans, specified in the Special Provisions, or directed by the Engineer, Manholes shall be left a minimum of one (1) foot and a maximum of eighteen (18) inches below final finish grade of trench resurfacing or streets or other areas. The manhole frame and cover shall be temporarily set as specified by the Engineer. Unless otherwise specified in the Special Provisions, the Contractor shall be required to return to raise manholes to finish grade after completing surface restoration or following the construction or reconstruction of the street or other area by others. The cost for raising manholes to grade, including returning after surface restoration, or construction or reconstruction of streets or other areas by others, shall be included in the price aid per manhole, and no additional payment will be made unless a bid item is provided therefor. 23-9 Payment The unit price paid for Manholes shall include full compensation for furnishing all labor, materials, tools and equipment and doing all the work involved in constructing or installing the Manhole in place complete including, but not limited to, all structural elements as shown on the Project Plans or Standard Plans, including frame and cover, excavation and backfill, connecting existing or new lateral or main pipelines, furnishing frame and cover, pressure, bolt-down or slotted cover where required, raising to finish grade, concrete collars, and surface restoration. 23-3 Fresno Metropolitan Flood Control District Standard Specifications-2011 Section 24 SECTION 24 - STORM DRAIN INLETS AND OUTLETS 24-1 General This Work shall consist of providing all labor, materials, tools and equipment necessary to construct Storm Drain Inlets and Outlets of the types and locations shown on the Plans, as specified in the Special Provisions and these Specifications, and as directed by the Engineer. Storm Drain Inlets and Outlets shall be constructed in accordance with the details shown on the Project Plans or the applicable Standard Plans. 24-2 Materials Concrete and mortar shall conform to the requirements of Section 12, "Portland Cement Concrete; Cement Mortar". Concrete shall be Class "A", or an alternate mix design approved by the Engineer. All metal parts shall be structural grade steel, except those permitted to be cast iron by the project Plans or Standard Plans; bar reinforcement shall conform to the requirements of Section 11, "Reinforcement". Unless otherwise specified in the Special Provisions, a coating of an approved asphaltum black paint, or such other coating as may be approved by the Engineer, shall be applied by dipping or painting to all frames, grates, grate covers, access covers, and all other exposed metal parts. Prior to coating, the surfaces of all metal parts shall be prepared in accordance with Section 32, "Painting". 24-3 Forms Forms shall conform to the requirements of Section 12-5, "Forms". The Contractor shall not place concrete in any forms until the forms have been approved for line and grade by the Engineer. 24-4 Excavation Excavation shall conform to the requirements of Section 14, "Trench and Structure Excavation, Retention Basin Excavation and Grading". 24-5 Construction Storm Drain Inlets or Outlets may be constructed either by completely forming the interior and exterior of the structure, or by forming only the interior and upper section and neat pouring concrete for the lower section against undisturbed earth that has been excavated to the lines and grades indicated on the Plans or as directed by the Engineer. Storm Drain Inlets and Outlets eight (8) feet or less in depth shall be constructed monolithically (one pour), or if the Contractor elects, the structures may be constructed in two sections (two pour) as detailed on the Standard Plans, provided the second pour follows the first pour no later than forty-eight(48) hours. No additional payment will be made for two-pour construction. 24-1 Fresno Metropolitan Flood Control District Standard Specifications-2011 Section 24 The surface finish of the exterior exposed surfaces of concrete shall conform to the adjacent sidewalk or curb and gutter finish required by the jurisdictional agency issuing the permit for the work, and as required by Section 27-7, "Construction of Curbs and Gutters". The interior surface shall have a wood trowel finish. Excessive voids shall be chipped and repaired as directed by the Engineer. Depths of Storm Drain Inlets or Outlets may vary according to the depth and grade at which the lateral pipe must be installed in order to avoid existing utilities. The contractor shall allow in his bid price for the various inlet or outlet structures full compensation for any possible increase or decrease in the anticipated depth because of adjustment in depth of lateral pipes. Lateral pipes connecting to Storm Drain Inlets and Outlets shall be installed flush with the inside walls of the structure, except that pipe edges shall be smoothed and rounded with cement mortar to a three (3) inch radius as specified on the Standard Plans for the type of inlet or outlet installed. Pipe connections shall be entirely sealed with cement mortar. Cement mortar used for pipe edge rounding and connection sealing shall conform to Section 12, "Portland Cement Concrete; Cement Mortar". Existing concrete work or other improvements shall be removed and replaced as necessary to install proposed inlets and outlets. A concrete pavement saw shall be used, unless determined to be impractical by the Engineer, or unless some other method is approved by the Engineer, such as removal of concrete to an adjacent expansion joint. A minimum of one and one-half(1'/2) inch deep saw cut depth shall be required. Full compensation for sawcutting as necessary and removal and replacement of existing improvements shall be included in the price bid for Miscellaneous Facilities and Operations unless a more specific bid item is provided therefor. If no bid item is provided for Miscellaneous Facilities and Operations, or if no specific bid item is provided, the cost for sawcutting and removal and replacement of existing improvements shall be included in the prices bid for the various bid items of Work, and no additional payment will be made therefor. At locations where Inlets or Outlets are constructed behind curb lines and within landscaped areas, all structure patching, final backfilling, final sprinkler system repairing, lawn reseeding, replacement of other landscaping damaged or removed by the Work, and mulching behind the curb line shall be completed within ten (10) calendar days of placing the structure. Full compensation therefor shall be included in the price bid for Miscellaneous Facilities and Operations. If no bid item is provided for Miscellaneous Facilities and Operations, the cost shall be included in the prices bid for the various bid items of Work, and no additional payment will be made therefor. Grading work in the immediate vicinity of the installed Inlet or Outlet structures shall be done by the Contractor as directed by the Engineer so as to provide for the movement of surface water to or from the newly installed structures. Full compensation for said grading work shall be included in the price bid for Inlets or Outlets, and no additional payment will be made therefor. 24-2 Fresno Metropolitan Flood Control District Standard Specifications-2011 Section 24 24-6 Backfill and Compaction Backfill and Compaction for Storm Drain Inlets and Outlets shall conform to the requirements of Section 15, "Trench and Structure Backfill, Retention Basin Embankment Construction", and as specified herein. Where it is necessary to construct the curb and gutter portions of Storm Drain Inlets and Outlets on disturbed earth, a foundation shall be prepared by thoroughly compacting the disturbed material to the satisfaction of the Engineer. 24-7 Protection of Inlets or Outlets The Contractor shall exercise every precaution against damage to Storm Drain Inlets or Outlets, including damage from subsequent backfill or compaction operations. Any damaged Inlet or Outlet shall be removed from the Work or repaired as directed by the Engineer. Any painted surfaces damaged during construction, backfilling, or compaction shall be repainted in accordance with Section 24-2, "Materials". The requirements of this Section 24-7 shall not relieve the Contractor of the provisions of Section 7-14, "Contractor's Responsibility for Work and Materials. 24-8 Curing Exposed concrete surfaces shall be cured in accordance with Section 12-6, "Curing Concrete". 24-9 Payment The unit price paid for Storm Drain Inlets and Outlets shall include full compensation for furnishing all labor, materials, tools, and equipment and doing all the work involved in constructing the structures in place, including but not limited to excavation, forming, backfill, connecting existing or new lateral pipes, grouting, and grading where necessary. 24-3 Fresno Metropolitan Flood Control District Standard Specifications-2011 Section 32 SECTION 32 -PAINTING 32-1 General This Work shall include furnishing all labor, materials, tools and equipment and all incidentals necessary to paint exposed metal surfaces where shown on the Plans or specified in the Special Provisions. Unless otherwise specified in other sections of these Specifications or the Special Provisions, Painting shall conform to the provisions of this Section 32. 32-2 Materials Materials shall conform to the following specifications: 32-2.01 Metal Etch Only an approved etching chemical shall be used by the Contractor for cleaning metal surfaces prior to primering or painting. The Contractor shall observe all State and Federal regulations pertaining to use of such chemicals. 32-2.02 Metal Primer Metal Primer shall be a professional quality interior/exterior rust preventative alkyd primer suitable for the protection of metal surfaces. The Metal Primer shall be similar in all respects to Devoe Coatings Devgard 4141-7100 (oil base, red) or approved equal. 32-2.03 Finish Coat Except for metal parts for Storm Drain Inlets, the Finish Coat or all other surfaces to be painted shall be a premium quality acrylic enamel coating or other coating as approved by the Engineer. The Finish Coat shall be similar to, but not limited to, Devflex HP paint or approved equal. The Finish Coat color shall be black unless otherwise shown on the Plans, specified in the Special Provisions, or approved by the Engineer. Unless otherwise specified, the sheen shall be "eggshell" or semi-gloss. The coating for Storm Drain Inlet/Outlet metal parts shall be an approved asphaltum black paint, or such other coating as may be approved by the Engineer. 32-3 Application All surfaces to be painted shall be thoroughly cleaned of all foreign matter before applying the protective coating. All surfaces shall be free from loose existing protective coatings before applying an additional coating. Metal etch shall be used as necessary to remove deleterious coatings and provide a good bonding surface for primer and paint. If galvanized surfaces are to be painted, they shall be considered as metal surfaces without a protective coating, and shall be etched with metal etch before applying paint. After cleaning preparations, surfaces not having a protective coating shall be painted with metal primer at the approximate rate of five hundred (500) square feet per gallon of primer, equivalent to three-to-four(3 to 4) mils wet-film thickness. Those surfaces having a protective coating of less than three (3) mils film thickness shall be painted with metal primer to provide a minimum of three (3) mils film thickness. 32-1 Fresno Metropolitan Flood Control District Standard Specifications-2011 Section 32 All surfaces to be painted shall have a Finish Coat applied at the approximate rate of five hundred fifty (550) square feet per gallon of paint equivalent to three-to-four (3 to 4) mils wet film thickness. 32-4 Payment Unless otherwise specified in the Special Provisions, the cost of Painting shall be included in the price paid for the various items requiring Painting, and no additional payment will be made therefor. 32-2 Fresno Metropolitan Flood Control District Standard Specifications-2011 Section 33 SECTION 33 -MISCELLANEOUS FACILITIES AND OPERATIONS 33-1 General This Work shall consist of furnishing all labor, materials, tools and equipment, and all incidentals necessary to furnish, install, and construct Miscellaneous Facilities and Operations, which shall include, but not be limited to, installing, constructing, providing, or performing all Work or operations shown on the Plans or specified in the Special Provisions, or doing Work patently necessary for the completion of the Work specified in the Contract. Miscellaneous Facilities and Operations may include such things as, but not be limited to, the following: Mobilization; potholing; clearing and grubbing; dewatering existing facilities; minor grading; dust control; traffic control; providing temporary security fences or other security measures for the Work, private or District property; protecting existing utilities and improvements in or near excavations; protection of existing trees or landscaping; and Removing and replacing existing fences, landscaping, irrigation facilities, mailboxes; abandoning existing storm drain facilities; removal of existing drainage facilities (including existing RCP); removing and disposing of existing facilities; plug or remove, as directed by the Engineer, any abandoned facility encountered in the excavation; and Salvaging existing facilities; replacing existing concrete improvements; connecting new facilities to existing facilities; connecting new facilities to new facilities; sawcutting and removing/replacing existing asphalt or other improvements not covered under a specific bid item; constructing concrete collars, field connections, or field bends; placing and/or removing concrete or brick and mortar plugs; and Providing any other facilities and/or operations set forth and required but not specifically included in another bid item. All Work shall be done in accordance with the Plans and Special Provisions, these Specifications, any applicable local codes and ordinances, any permits issued by the jurisdictional agency, and as directed by the Engineer. This Section 33 is intended to be inclusive. However, depending on project circumstances, such as size, complexity, or other factors, some Contracts may include a separate bid item for one or more of the above-listed facilities or operations. In such cases, the costs for any such facilities or operations shall be included in the bid item and omitted from any bid item for this Section 33. Relatedly, not all conceivable facilities and operations are listed, but shall be considered as being included in this Section 33. 33-1 Fresno Metropolitan Flood Control District Standard Specifications-2011 Section 33 33-2 Materials All materials used in furnishing Miscellaneous Facilities and Operations shall conform to the applicable Sections of these Specifications. Any materials used in the Work not covered by these Specifications shall comply with standards referenced on the Plans or in the Special Provisions, the applicable Caltrans Standard Specifications, and/or ASTM Designations for the material involved. 33-3 Performance All work performed in providing Miscellaneous Facilities and Operations shall conform to the applicable Sections of these Specifications or as otherwise shown on the Plans or specified in the Special Provisions. In all cases, the Contractor shall exercise recognized good and applicable construction practices in the completion of the Work associated with this Section 33. Faulty workmanship as determined by the Engineer will be rejected and shall be removed/replaced by the Contractor at its expense. 33-4 Measurement and Payment Where a bid item is provided for Miscellaneous Facilities and Operations, measurement and payment shall be on a Lump Sum basis, and shall include full compensation for all costs including labor, materials, tools, and equipment, and all incidentals necessary to complete all of the Work shown on the Plans, specified in the Special Provisions and these Specifications, and as directed by the Engineer. Unless otherwise specified in the Special Provisions, each Progress Payment period the Engineer shall make a determination of the percentage of completion of the total of all bid items excluding Miscellaneous Facilities and Operations. Said percentage shall be used as the basis for computing the amount to be paid for Miscellaneous Facilities and Operations for each respective Progress Payment. The Engineer may increase or decrease the percentage to be paid based on the demonstrated performance of the Contractor in completing the various components listed in the bid item. Where no bid item is provided for Miscellaneous Facilities and Operations, the cost thereof shall be included in the various other items of work, and no additional payment will be made therefor. 33-2 Fresno Metropolitan Flood Control District Standard Specifications-2011 County of Fresno Dummy Permit COtj� CONSTRUCTION PERMIT ACTIVE PERMITS YES NO COUNTY OF FRESNO PHONE NUMBERS o 24-HR REQUEST LINE MDLEVEING DLDOPMEoNTAS ERVICESE STREET,6th QDI VISION 93721 LOCAL 4131 60 m OFFICE LOCATION:SOUTHWEST CORNER OF TULARE TOLL FREE:800-742-1011 0 560 &'M'STREETS,SUITE A FAX:600-4201 C `3 Ref#: D Project Address Cross Street Project Description IG 6000 E OLIVE AVE N FOWLER AVE ELECTRIC METER SERVICE CHANGE FOR TRAFFIC SIGNAL FRESNO CA 93727 *DUMMY PERMIT* rn Permit#: 23-003291-FC Issued on: APN: 310083 t) Z Owner: COUNTY OF FRESNO(DESIGN DIVISION) Applicant: COUNTY OF FRESNO(DESIGN Contractor: 0 DIVISION) 0 Address: 2220 TULARE ST FLOOR 7 FRESNO Address: 2220 TULARE ST FLOOR 7 FRESNO CA Address: w CA 4 N Phone: Work:(559)-600-4109 Phone: Work:(559)-600-4109 Phone: Home: (559)-- Home:(559)-- License#: License#: Approvals Approved By Date Application Requirements Permit Application Reviewer Zoning District Required Setbacks: Front Side Rear AE20 Min Max Interior Street Min PROJECT INFORMATION Big Dry Creek Basin:No : FMFCD Rural Streams:No Roof Classification:Class C or better : Soil Bearing Capacity(psf):1000 Submittal Method:Submitted by County : WMP Occupancy Pending:NO Employee MECHANICAL ELECTRICAL 11 Service/sub-panel 0 -200 an PLUMBING LICENSED CONTRACTOR'S DECLARATION I hereby affirm that I am licensed under provisions of Chapter 9(commencing with Section 7000)of Division 8 of the Business and Professions Code,and my license is in full force and effect.Lic. Number Class-Contractor-COUNTY OF FRESNO(DESIGN DIVISION) FOR OWNER BUILDER SEE FORM F174 ATTACH WORKER'S COMPENSATION DECLARATION I hereby affirm under penalty of perjury on of the following declarations: ❑ I have and will maintain a certificate on consent to self-insure for workers'compensation as provided for by Section 3700 of the Labor code,for the performance of the work for which this permit is issued. ❑ I have and will maintain workers'compensation insurance,as required by Section 3700 of the Labor Code for the performance of the work for which this permit is issued. My workers'compensation insurance carrier and policy number: Carrier Policy#' (This section does not need to be completed if the permit is for one hundred dollars($100)or less.) I certify that in the performance of the work for which this permit is issued,I shall not employ any person in any manner so as to become subject to the worker's compensation laws of California and agree that if I should become subject to the workers compensation provisions of Section 3700 of the Labor Code.I shall forthwith comply with those provisions. Applicant COUNTY OF FRESNO(DESIGN DIVISION) WARNING:FAILURE TO SECURE WORKERS'COMPENSATION COVERAGE IS UNLAWFUL AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS($100,000),IN ADDITION TO THE COST OF COMPENSATION,DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE,INTEREST,AND ATTORNEY'S FEES. CONSTRUCTION LENDING AGENCY I certify that I have read this application and state that the above information is correct.I agree to comply with I hereby affirm that there is a construction lending agency for the performance of the work for which this permit is issued all city and county ordinances and state laws relating to building construction,and hereby authorize (Sec.3097,Div.C). representatives of this county to enter upon the above-mentioned property for inspection purposes. Lenders Name Address Applicant Or Agent City State Date HIS PERMIT SHALL EXPIRE BY LIMITATION AND BECOME NULL AND VOID IF THE WORK IS NOT COMMENCED OR IF NO INSPECTIONS ARE COMPLETED WITHIN 180 DAYS. SELF-DEALING TRANSACTION DISCLOSURE FORM (1) Company Board Member Information: Name: Date: Job Title: (2) Company/Agency Name and Address: (3) Disclosure (Please describe the nature of the self-dealing transaction you are a party to) (4) Explain why this self-dealing transaction is consistent with the requirements of Corporations Code 5233 (a) (5) Authorized Signature Signature: Date: SELF-DEALING TRANSACTION DISCLOSURE FORM INSTRUCTIONS In order to conduct business with the County of Fresno (hereinafter referred to as "County"), members of a contractor's board of directors (hereinafter referred to as "County Contractor"), must disclose any self- dealing transactions that they are a party to while providing goods, performing services, or both for the County. A self-dealing transaction is defined below: 'A self-dealing transaction means a transaction to which the corporation is a party and which one or more of its directors has a material financial interest" The definition above will be utilized for purposes of completing the disclosure form. (1) Enter board member's name, job title (if applicable), and date this disclosure is being made. (2) Enter the board member's company/agency name and address. (3) Describe in detail the nature of the self-dealing transaction that is being disclosed to the County. At a minimum, include a description of the following: a. The name of the agency/company with which the corporation has the transaction; and b. The nature of the material financial interest in the Corporation's transaction that the board member has. (4) Describe in detail why the self-dealing transaction is appropriate based on applicable provisions of the Corporations Codes. (5) Form must be signed by the board member that is involved in the self-dealing transaction described in Sections (3) and (4). REVISED STANDARD SPECIFICATIONS DATED 09-02-16 ORGANIZATION Revised standard specifications are under headings that correspond with the main-section headings of the Standard Specifications.A main-section heading is a heading shown in the table of contents of the Standard Specifications. A date under a main-section heading is the date of the latest revision to the section. Each revision to the Standard Specifications begins with a revision clause that describes or introduces a revision to the Standard Specifications. For a revision clause that describes a revision, the date on the right above the clause is the publication date of the revision. For a revision clause that introduces a revision, the date on the right above a revised term, phrase, clause, paragraph, or section is the publication date of the revised term, phrase, clause, paragraph, or section. For a multiple-paragraph or multiple-section revision, the date on the right above a paragraph or section is the publication date of the paragraphs or sections that follow. Any paragraph added or deleted by a revision clause does not change the paragraph numbering of the Standard Specifications for any other reference to a paragraph of the Standard Specifications. AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA DIVISION I GENERAL PROVISIONS 1 GENERAL 07-15-16 Add to the 1st table of section 1-1.06: 07-15-16 APCD air pollution control district AQMD air quality management district CISS cast-in-steel shell CSL crosshole sonic logging GGL gamma-gamma logging AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA 7 LEGAL RELATIONS AND RESPONSIBILITY TO THE PUBLIC 07-15-16 Replace the paragraphs in section 7-1.021(2)with: 05-06-16 Under 2 CA Code of Regs§ 11105: 1. During the performance of this contract,the recipient, contractor, and its subcontractors shall not deny the contract's benefits to any person on the basis of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition,genetic information, marital status, sex, gender, gender identity, gender expression, age, sexual orientation, or military and veteran status, nor shall they discriminate unlawfully against any employee or applicant for employment because of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, gender, gender identity, gender Page 1 of 183 expression, age, sexual orientation, or military and veteran status. Contractor shall insure that the evaluation and treatment of employees and applicants for employment are free of such discrimination. 2. Contractor shall comply with the provisions of the Fair Employment and Housing Act(Gov. Code, § 12900 et seq.), the regulations promulgated thereunder(Cal. Code Regs., tit. 2, § 11000 et seq.),the provisions of Article 9.5, Chapter 1, Part 1, Division 3, Title 2 of the Government Code(Gov. Code, §§ 11135-11139.5), and the regulations or standards adopted by the awarding state agency to implement such article. 3. Contractor or recipient shall permit access by representatives of the Department of Fair Employment and Housing and the awarding state agency upon reasonable notice at any time during the normal business hours, but in no case less than 24 hours' notice, to such of its books, records, accounts, and all other sources of information and its facilities as said Department or Agency shall require to ascertain compliance with this clause. 4. Recipient, contractor and its subcontractors shall give written notice of their obligations under this clause to labor organizations with which they have a collective bargaining or other agreement. 5. The contractor shall include the nondiscrimination and compliance provisions of this clause in all subcontracts to perform work under the contract. Under 2 CA Code of Regs§ 11122: STANDARD CALIFORNIA NONDISCRIMINATION CONSTRUCTION CONTRACT SPECIFICATIONS (GOV. CODE SECTION 12990) These specifications are applicable to all state contractors and subcontractors having a construction contract or subcontract of$5,000 or more. 1. As used in the specifications: a. "Act" means the Fair Employment and Housing Act. b. "Administrator"means Administrator, Office of Compliance Programs, California Department of Fair Employment and Housing, or any person to whom the Administrator delegates authority; 2. Whenever the contractor or any subcontractor subcontracts a portion of the work, it shall include in each subcontract of$5,000 or more the nondiscrimination clause in this contract directly or through incorporation by reference. Any subcontract for work involving a construction trade shall also include the Standard California Construction Contract Specifications, either directly or through incorporation by reference. 3. The contractor shall implement the specific nondiscrimination standards provided in paragraphs 6(a) through (e)of these specifications. 4. Neither the provisions of any collective bargaining agreement, nor the failure by a union with whom the contractor has a collective bargaining agreement,to refer members of any group protected by the Act shall excuse the contractor's obligations under these specifications, Government Code section 12990, or the regulations promulgated pursuant thereto.5. In order for the nonworking training hours of apprentices and trainees to be counted, such apprentices and trainees must be employed by the contractor during the training period, and the contractor must have made a commitment to employ the apprentices and trainees at the completion of their training, subject to the availability of employment opportunities.Trainees must be trained pursuant to training programs approved by the U.S. Department of Labor or the California Department of Industrial Relations. 5. In order for the nonworking training hours of apprentices and trainees to be counted, such apprentices and trainees must be employed by the contractor during the training period, and the contractor must have made a commitment to employ the apprentices and trainees at the completion of their training, subject to the availability of employment opportunities.Trainees must be trained pursuant to training programs approved by the U.S. Department of Labor or the California Department of Industrial Relations. 6. The contractor shall take specific actions to implement its nondiscrimination program.The evaluation of the contractor's compliance with these specifications shall be based upon its effort to achieve maximum results from its actions.The contractor must be able to demonstrate fully its efforts under steps a.through e. below: a. Ensure and maintain a working environment free of harassment, intimidation, and coercion at all sites, and at all facilities at which the contractor's employees are assigned to work. The contractor shall specifically ensure that all foremen, superintendents, and other on-site Page 2 of 183 supervisory personnel are aware of and carry out the contractor's obligations to maintain such a working environment. b. Provide written notification within seven days to the director of the DFEH when the referral process of the union or unions with which the contractor has a collective bargaining agreement has impeded the contractor's efforts to meet its obligations. C. Disseminate the contractor's equal employment opportunity policy by providing notice of the policy to unions and training, recruitment and outreach programs and requesting their cooperation in assisting the contractor to meet its obligations; and by posting the company policy on bulletin boards accessible to all employees at each location where construction work is performed. d. Ensure all personnel making management and employment decisions regarding hiring, assignment, layoff, termination, conditions of work,training, rates of pay or other employment decisions, including all supervisory personnel, superintendents, general foremen, on-site foremen, etc., are aware of the contractor's equal employment opportunity policy and obligations,and discharge their responsibilities accordingly. e. Ensure that seniority practices,job classifications,work assignments, and other personnel practices, do not have a discriminatory effect by continually monitoring all personnel and employment related activities to ensure that the equal employment opportunity policy and the contractor's obligations under these specifications are being carried out. 7. Contractors are encouraged to participate in voluntary associations that assist in fulfilling their equal employment opportunity obligations.The efforts of a contractor association,joint contractor-union, contractor-community, or other similar group of which the contractor is a member and participant, may be asserted as fulfilling any one or more of its obligations under these specifications provided that the contractor actively participates in the group, makes every effort to assure that the group has a positive impact on equal employment opportunity in the industry, ensures that the concrete benefits of the program are reflected in the contractor's workforce participation, and can provide access to documentation that demonstrates the effectiveness of actions taken on behalf of the contractor.The obligation to comply, however, is the contractor's. 8. The contractor is required to provide equal employment opportunity for all persons. Consequently, the contractor may be in violation of the Fair Employment and Housing Act(Government Code section 12990 et seq.) if a particular group is employed in a substantially disparate manner. 9. The contractor shall not use the nondiscrimination standards to discriminate against any person because race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, gender,gender identity, gender expression, age, sexual orientation, or military and veteran status. 10. The contractor shall not enter into any subcontract with any person or firm decertified from state contracts pursuant to Government Code section 12990. 11. The contractor shall carry out such sanctions and penalties for violation of these specifications and the nondiscrimination clause, including suspension, termination and cancellation of existing subcontracts as may be imposed or ordered pursuant to Government Code section 12990 and its implementing regulations by the awarding agency.Any contractor who fails to carry out such sanctions and penalties shall be in violation of these specifications and Government Code section 12990. 12. The contractor shall designate a responsible official to monitor all employment related activity to ensure that the company equal employment opportunity policy is being carried out, to submit reports relating to the provisions hereof as may be required by OCP and to keep records. Records shall at least include for each employee the name, address, telephone numbers,construction trade, union affiliation if any, employee identification number when assigned,status, (e.g., mechanic, apprentice trainee, helper, or laborer), dates of changes in status, hours worked per week in the indicated trade, rate of pay, and locations at which the work was performed. Records shall be maintained in any easily understandable and retrievable form; however, to the degree that existing records satisfy this requirement, contractors shall not be required to maintain separate records. Add to the end of the 2nd sentence in the 1st paragraph of section 7-1.02K(1): 04-22-16 and hauling and delivery of ready-mixed concrete. Page 3 of 183 Add between the 4th and 5th paragraphs of section 7-1.02K(3): 04-22-16 Submitted certified payrolls for hauling and delivering ready-mixed concrete must be accompanied by a written time record.The time record must include: 1. Truck driver's full name and address 2. Name and address of the factory or batching plant 3. Time the concrete was loaded at the factory or batching plant 4. Time the truck returned to the factory or batching plant 5. Truck driver's signature certifying under penalty of perjury that the information contained in this written time record is true and correct Add between the 9th and 10th paragraphs of section 7-1.03: 07-15-16 If a height differential of more than 0.04 foot is created by construction activities at a joint transverse to the direction of traffic on the traveled way or a shoulder subject to public traffic, construct a temporary taper at the joint with a slope complying with the requirements shown in the following table: Temporary Tapers Height differential Slope(horizontal:vertical) (foot) Taper use of 14 days or less Taper use of more than 14 days Greater than 0.08 100:1 or flatter 200:1 or flatter 0.04-0.08 70:1 or flatter 70:1 or flatter For a taper on existing asphalt concrete or concrete pavement, construct the taper with minor HMA under section 39-2.07. Grind existing surfaces to accommodate a minimum taper thickness of 0.10 foot under either of the following conditions: 1. HMA material such as rubberized HMA, polymer-modified bonded wearing course, or open-graded friction course is unsuitable for raking to a maximum 0.02 foot thickness at the edge 2. Taper will be in place for more than 14 days For a taper on a bridge deck or approach slab, construct the taper with polyester concrete under section 60-3.04B. The completed surface of the taper must be uniform and must not vary more than 0.02 foot from the lower edge of a 12-foot straightedge when placed on its surface parallel and perpendicular to traffic. If authorized, you may use alternative materials or methods to construct the required taper. Replace§337.15 in the 3rd item in the list in the paragraph of section 7-1.06B with: 05-06-16 §337.1 Add between the 1st and 2nd paragraphs of section 7-1.11A: 02-12-16 Comply with 46 CFR 381.7(a)—(b). AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA Page 4 of 183 8 PROSECUTION AND PROGRESS 07-15-16 Replace the table in the 3rd paragraph of section 8-1.10A with: 07-15-16 Liquidated Damages Total bid Liquidated damages From over To per day $0 $60,000 $1,400 $60,000 $200,000 $2,900 $200,000 $500,000 $3,200 $500,000 $1,000,000 $3,500 $1,000,000 $2,000,000 $4,000 $2,000,000 $5,000,000 $4,800 $5,000,000 $10,000,000 $6,800 $10,000,000 $20,000,000 $10,000 $20,000,000 $50,000,000 $13,500 $50,000,000 $100,000,000 $19,200 $100,000,000 $250,000,000 $25,300 nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn 9 PAYMENT 01-15-16 Replace may withhold in the 1st paragraph of section 9-1.16E(4)with: 01-15-16 withholds nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn DIVISION II GENERAL CONSTRUCTION 10 GENERAL 04-15-16 Replace section 10-1.0213 with: 04-15-16 10-1.02B Traffic Elements Before starting the operational test of a traffic management system that directly impacts traffic, the system must be ready for operation, and all signs, pavement delineation, and pavement markings must be in place at the system's location. If maintaining existing traffic management system elements during construction is shown on the Bid Item List, a list of the systems shown within the project limits and their operational status is included in the Information Handout. Before starting job site activities, conduct a preconstruction operational status check of the existing system's elements and each element's communication status with the transportation management center to which it communicates. If an existing system element is discovered and has not been identified, the Department adds the element to the list of systems.The pre-and postconstruction operational status check of the discovered elements is change order work. If maintaining existing traffic management system elements during construction is not shown on the Bid Item List and an existing system element is discovered during the work, notify the Engineer.The Engineer orders a pre-and postconstruction operational status check of the discovered elements.The status check of the discovered elements is change order work. Page 5 of 183 Conduct the status check with the Engineer and an electrical representative from the traffic operations office of the district in which the work is located. The Department provides you a list of the preconstruction operational status-check results, including: 1. Existing traffic management system elements and their locations within the project limits 2. Fully functioning elements 3. Nonoperational elements Before Contract acceptance, conduct a postconstruction operational status check of all elements shown on the list with the Engineer and an electrical representative from the traffic operations office of the district in which the work is located. Replace 10-3 of section 10 with: 04-15-16 10-2-10-3 RESERVED nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn 12 TEMPORARY TRAFFIC CONTROL 07-15-16 Replace section 12-3.32 with: 04-15-16 12-3.32 PORTABLE CHANGEABLE MESSAGE SIGNS 12-3.32A General 12-3.32A(1) Summary Section 12-3.32A includes specifications for placing portable changeable message signs. 12-3.32A(2) Definitions Reserved 12-3.32A(3) Submittals If requested, submit a certificate of compliance for each PCMS. Submit your cell phone number before starting the first activity that requires a PCMS. 12-3.32A(4) Quality Assurance Reserved 12-3.32B Materials Each PCMS must have a message board, controller unit, power supply, and a structural support system. The unit must be assembled to form a complete self-contained PCMS that can be delivered to the job site and placed into immediate operation.The sign unit must be capable of operating at an ambient air temperature from -4 to 158 degrees F and must be unaffected by mobile radio transmissions other than those required to control the PCMS. A PCMS must be permanently mounted on a trailer, truck bed, or truck cab under the manufacturer's instructions.The PCMS must be securely mounted on the support vehicle such that it remains attached during any impact to the vehicle. If it is mounted on a trailer, the trailer must be capable of being leveled and plumbed. A minimum of 3 feet of retroreflective material must be permanently affixed on all 4 sides of the trailer. The retroreflective material need not be continuous but must be visible on the same plane. The sign panel must be capable of displaying a 3-line message with at least 7 characters per line. The characters must be at least 18 inches in height where the useable shoulder area is at least 15 feet wide. Page 6 of 183 To prevent encroachment onto the traveled way where the useable shoulder area is less than 15 feet wide, you may use a smaller message panel with at least 12-inch-high characters. The message displayed on the sign must be visible from a distance of 1,500 feet and legible from a distance of 750 feet at noon on a cloudless day and during the night by persons with 20/20 vision or vision corrected to 20/20. The characters on a sign panel may be 10 inches in height if: 1. PCMS is mounted on a service patrol truck or other incident response vehicle or used for traffic control operations on a highway facility where the posted speed limit is less than 40 mph 2. Message is legible from a distance of at least 650 feet at noon on a cloudless day and during the night by persons with 20/20 vision or vision corrected to 20/20 A matrix sign must provide a complete alphanumeric selection. A PCMS must automatically adjust its brightness under varying light conditions to maintain the legibility of the message. The sign must be equipped with an automatic-dimming mode that automatically compensates for the influence of temporary light sources or abnormal lighting conditions.The sign must have 3 or more manual dimming modes of different intensities. During the hours of darkness, a matrix sign not using lamps must be either internally or externally illuminated. The controller must be an all solid-state unit containing the necessary circuitry for the storage of at least 5 preprogrammed messages.The controller must be installed at a location that allows the operator to perform all functions from a single position. The controller must have a keyboard entry system that allows the operator to generate an infinite number of additional messages in addition to the preprogrammed stored messages. The keyboard must be equipped with a security lockout feature to prevent unauthorized use of the controller. The controller must have: 1. Nonvolatile memory that stores keyboard-created messages during periods when the power is not activated 2. Variable display rate that allows the operator to match the information display to the speed of approaching traffic 3. Screen upon which messages may be reviewed before being displayed on the sign The flashing-off time must be adjustable from within the control cabinet. 12-3.32C Construction Place a PCMS as far from the traveled way as practicable where it is legible to approaching traffic without encroaching on the traveled way.Where the vertical roadway curvature restricts the sight distance of approaching traffic, place the sign on or before the crest of the curvature where it is most visible to the approaching traffic.Where the horizontal roadway curvature restricts the sight distance of approaching traffic, place the sign at or before the curve where it is most visible to approaching traffic.Where practicable, place the sign behind guardrail or Type K temporary railing. Make a taper consisting of 9 traffic cones placed 25 feet apart to delineate the location of a PCMS except where the sign is placed behind guardrail or Type K temporary railing. When in full operation, the bottom of a sign must be at least 7 feet above the roadway in areas where pedestrians are anticipated and 5 feet above the roadway elsewhere, and the top of the sign must be not more than 14.5 feet above the roadway. Operate the PCMS under the manufacturer's instructions. Keep the PCMS clean to provide maximum visibility. If multiple signs are needed, place each sign on the same side of the road at least 1,000 feet apart on freeways and expressways and at least 500 feet apart on other types of highways. Page 7 of 183 If more than one PCMS is simultaneously visible to traffic, only 1 sign may display a sequential message at any time. Do not use dynamic message displays, such as animation, rapid flashing, dissolving, exploding,scrolling, horizontal movement, or vertical movement of messages.The message must be centered within each line of the display. You may use an additional PCMS if more than 2 phases are needed to display a message. Display only messages shown or ordered. Repeat the entire message continuously in not more than 2 phases of at least 3 seconds per phase. The sum of the display times for both of the phases must be a maximum of 8 seconds. If more than 2 phases are needed to display a message, use an additional PCMS. You must be available by cell phone during activities that require a sign. Be prepared to immediately change the displayed message if ordered. You may operate the sign with a 24-hour timer control or remote control if authorized. After the initial placement, move a sign from location to location as ordered. When a PCMS is not in use, move it to an area at least 15 feet from the edge of the traveled way or remove it from the job site away from traffic. 12-3.32D Payment Not Used Add between the 1st sentence and 2nd sentences in the 1st paragraph of section 12-4.02A(3)(a): 07-15-16 For a project in District 7, submit the request at least 15 days before the proposed closure date. Replace section 12-4.02C(2)with: 01-15-16 12-4.02C(2) Lane Closure System 12-4.02C(2)(a) General The Department provides LCS training. Request the LCS training at least 30 days before submitting the 1 st closure request. The Department provides the training within 15 days after your request. LCS training is web-based or held at a time and location agreed upon by you and the Engineer. For web- based training,the Engineer provides you the website address to access the training. With 5 business days after completion of the training, the Department provides LCS accounts and user IDs to your assigned,trained representatives. Each representative must maintain a unique password and current user information in the LCS. 04-15-16 The project is not accessible in LCS after Contract acceptance. 01-15-16 12-4.02C(2)(b) Status Updates for Authorized Closures Update the status of authorized closures using the LCS Mobile web page. For a stationary closure, use code: 1. 10-97 immediately before you place the 1st advance warning sign 2. 10-98 immediately after you remove all of the advance warning signs For a moving closure, use code: 1. 10-97 immediately before the actual start time of the closure 2. 10-98 immediately after the actual end time of the closure Page 8 of 183 Cancel an authorized closure by using code 10-22 within 2 hours after the authorized start time. If you are unable to access the LCS Mobile web page, immediately notify the Engineer of the closure's status. Replace the 1st sentence in the 3rd paragraph of section 12-6.03Awith: 07-15-16 When the Engineer determines the temporary pavement delineation is no longer required for the direction of traffic, remove the temporary pavement delineation, including any underlying adhesive for temporary pavement markers,from the final layer of surfacing and from the pavement to remain in place. nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn 13 WATER POLLUTION CONTROL 09-02-16 Replace General Industrial Permit in the 2nd item in the list in the paragraph of section 13-1.01 C(3) with: 05-06-16 Industrial General Permit Replace the 2nd paragraph of section 13-1.01 D(2)with: 05-06-16 Discharges from manufacturing facilities, such as batch plants and crushing plants, must comply with the discharge requirements in the NPDES General Permit for Storm Water Discharges Associated with Industrial Activities; Order No.2014-0057-DWQ, CAS000001 (Industrial General Permit), issued by the SWRCB. For the Industrial General Permit, go to the SWRCB website. Replace General Industrial Permit in the 3rd paragraph of section 13-1.01 D(2)with: 05-06-16 Industrial General Permit Replace the 2nd paragraph of section 13-3.01 D(2)with: 09-02-16 For a project in the Lake Tahoe Hydrologic Unit, discharges of stormwater from the project must comply with the NPDES General Permit for General Waste Discharge Requirements and National Pollutant Discharge Elimination System General Permit for Storm Water Discharges Associated with Construction Activity in the Lake Tahoe Hydrologic Unit, Counties of Alpine, El Dorado, and Placer, (Order No. R6T- 2016-0010 and NPDES No. CAG616002). You may view the General Permit for the Lake Tahoe Hydrologic Unit at the Construction Storm Water Program page of the SWRCB website. Replace the 2nd paragraph of section 13-8.01 D(2)with: 09-02-16 For a project within the Lake Tahoe Hydrologic Unit,the design, installation, operation, and monitoring of the temporary ATS and monitoring of the treated effluent must comply with Attachment E of the NPDES General Permit for General Waste Discharge Requirements and National Pollutant Discharge Elimination System General Permit for Storm Water Discharges Associated with Construction Activity in the Lake Tahoe Hydrologic Unit, Counties of Alpine, El Dorado, and Placer, (Order No. R6T-2016-0010 and NPDES No. CAG616002). You may view the General Permit for the Lake Tahoe Hydrologic Unit at the Construction Storm Water Program page of the SWRCB website. Page 9 of 183 nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn 16 TEMPORARY FACILITIES 04-15-16 Add between the 1st and 2nd sentences of section 16-2.03A(1): 04-15-16 Constructing a high-visibility fence includes the installation of any signs specified in the special provisions. AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA DIVISION III EARTHWORK AND LANDSCAPE 20 LANDSCAPE 07-15-16 Replace 86 in the 1st paragraph of section 20-2.01C(2)with: 04-15-16 87 Replace the 8th paragraph of section 20-2.01 C(2)with: 07-15-16 Trenches for irrigation supply lines and conduits 3 inches and larger in diameter must be a minimum of 18 inches below the finished grade, measured to the top of the installed pipe. Replace 86 in the 1st paragraph of section 20-2.01C(3)with: 04-15-16 87 Replace section 20-2.04A(4)with: 04-15-16 Perform conductors test.The test must comply with the specifications in section 87. Where the conductors are installed by trenching and backfilling, perform the test after a minimum of 6 inches of backfill material has been placed and compacted over the conductors. Replace the 1st paragraph of section 20-2.04C(4)with: 04-15-16 Splice low voltage control and neutral conductors under section 87, except do not use Method B. Replace the 3rd paragraph of section 20-2.05B with: 07-15-16 The impeller must be glass reinforced nylon on a tungsten carbide shaft. Replace 86 in the 2nd paragraph of section 20-2.06C with: 04-15-16 87 Page 10 of 183 Replace section 20-2.07B(5)with: 04-15-16 20-2.07B(5) PVC Pipe Conduit Sleeve PVC pipe conduit sleeves must be schedule 40 complying with ASTM D1785. Fittings must be schedule 80. Replace section 20-2.07C(3)with: 04-15-16 20-2.07C(3) PVC Pipe Conduit Sleeve Where PVC pipe conduit sleeves 2 inches or less in outside diameter is installed under surfacing, you may install by directional boring under section 20-2.07C(2)(b). For sleeves 2 inches or less in diameter,the top of the conduit must be a minimum of 18 inches below surfacing. Extend sleeves 6 inches beyond surfacing. Cap ends of conduit until used. Replace sections 20-2.0913 and 20-2.09C with: 07-15-16 20-2.0913 Materials 20-2.09B(1) General Swing joints must match the inlet connection size of the riser. Where shown, a sprinkler assembly must include a check valve. Threaded nipples for swing joints and risers must be schedule 80, PVC 1120 or PVC 1220 pipe, and comply with ASTM D1785. Risers for sprinkler assemblies must be UV resistant. Fittings for sprinkler assemblies must be injection-molded PVC, schedule 40, and comply with ASTM D2466. Flexible hose for sprinkler assemblies must be leak-free, non-rigid and comply with ASTM D2287, cell Type 6564500.The hose must comply with ASTM D2122 and have the thickness shown in the following table: Nominal hose diameter Minimum wall thickness (inch) (inch) 1/2 0.127 3/4 0.154 1 0.179 Solvent cement and fittings for flexible hose must comply with section 20-2.08B(5). 20-2.09B(2) Pop-Up Sprinkler Assemblies Each pop-up sprinkler assembly must include a body, nozzle, swing joint, pressure reducing device, fittings, and sprinkler protector where shown. 20-2.09B(3) Riser Sprinkler Assemblies Each riser sprinkler assembly must include a body, flexible hose, threaded nipple, nozzle, swing joint (except for a Type V riser), pressure reducing device,fittings, and riser support where shown. 20-2.09B(4) Tree Well Sprinkler Assemblies Each tree well sprinkler assembly must include a threaded nipple, nozzle, swing joint,fittings, perforated drainpipe, and drain grate. Page 11 of 183 The perforated drainpipe must be commercial-grade, rigid PVC pipe with holes spaced not more than 6 inches on center on 1 side of the pipe. The drain grate must be a commercially-available, 1-piece, injection-molded grate manufactured from structural foam polyolefins with UV light inhibitors. Drain grate must be black. Gravel for filling the drainpipe must be graded such that 100 percent passes the 3/4-inch sieve and 100 percent is retained on the 1/2-inch sieve. The gravel must be clean, washed, dry, and free from clay or organic material. 20-2.09C Construction Where shown, install a flow shut-off device under the manufacturer's instructions, unless you use equipment with a preinstalled flow shut-off device. Where shown, install a pressure reducing device under the manufacturer's instructions, unless you use equipment with a preinstalled pressure reducing device. Install pop-up and riser sprinkler assembly: 1. From 6-1/2 to 8 feet from curbs, dikes, and sidewalks 2. At least 10 feet from paved shoulders 3. At least 3 feet from fences and walls If sprinkler assembly cannot be installed within these limits, the location will be determined by the Engineer. Set sprinkler assembly riser on slopes perpendicular to the plane of the slope. Replace the paragraph of section 20-2.10B(3)with: 07-15-16 Each check valve must be one of the following: 1. Schedule 80 PVC with a factory setting to withstand a minimum 7-foot head on risers 2. Class 200 PVC if used on a nonpressurized plastic irrigation supply line 3. Internal to the sprinkler body with a factory setting to withstand a minimum 7-foot head Replace the paragraph of section 20-2.10C(3)with: 07-15-16 Install check valves as necessary to prevent low-head drainage. Replace the paragraphs of section 20-3.01 B(10)with: 07-15-16 Each plant stake for vines must be nominal 1 by 1 inch and 18 inches long. Each plant stake for trees must be nominal 2 by 2 inches or nominal 2 inches in diameter and long enough to keep the tree in an upright position. Replace the paragraph of section 20-3.01 B(11)with: 07-15-16 Each plant tie for vines must be extruded vinyl-based tape, 1 inch wide and at least 8 mils thick. Each plant tie for trees must be a (1)minimum 3/4-inch-wide, UV-resistant,flexible vinyl tie complying with ASTM D412 for tensile and elongation strength, or(2)lock-stitch,woven polypropylene with a minimum 900 lb tensile strength. Page 12 of 183 Add between the 7th and 8th paragraphs of section 20-3.02C(3)(b): 07-15-16 Spread the vine shoots and tie them with a plant tie to each stake above the crossing point. Replace the 8th paragraph of section 20-3.02C(3)(b)with: 07-15-16 Tie trees to the stakes with 2 tree ties, 1 tie to each stake. Each tie must form a figure eight by crossing the tie between the tree and the stake. Install ties at the lowest position that will support the tree in an upright position. Install the ties such that they provide trunk flexibility but do not allow the trunk to rub against the stakes.Wrap each end of the tie 1-1/2 turns around the stake and securely tie or nail it to the stake. Replace the 1st paragraph of section 20-5.02C(1)with: 07-15-16 Where edging is used to delineate the limits of inert ground cover or wood mulch areas, install the edging before installing the inert ground cover or wood mulch. 07-15-16 Delete AND MULCHES in the heading of section 20-5.03. 07-15-16 Delete and mulches in the paragraph of section 20-5.03A(1)(a). Replace the paragraph of section 20-5.03A(3)(a)with: 07-15-16 Before installing inert ground cover, remove plants and weeds to the ground level. 07-15-16 Delete or mulch at each occurrence in sections 20-5.03A(3)(c)and 20-5.03A(3)(d). Replace section 20-5.03E with: 07-15-16 20-5.03E Reserved Replace section 20-5.04 with: 07-15-16 20-5.04 WOOD MULCH 20-5.04A General 20-5.04A(1) Summary Section 20-5.04 includes specifications for placing wood mulch. 20-5.04A(2) Definitions Reserved 20-5.04A(3) Submittals Submit a certificate of compliance for wood mulch. Submit a 2 cu ft mulch sample with the mulch source shown on the bag. Obtain authorization before delivering the mulch to the job site. 20-5.04A(4) Quality Assurance Reserved Page 13 of 183 20-5.04B Materials 20-5.04B(1) General Mulch must not contain more than 0.1 percent of deleterious materials such as rocks, glass, plastics, metals, clods, weeds, weed seeds, coarse objects, sticks larger than the specified particle size, salts, paint, petroleum products, pesticides or chemical residues harmful to plant or animal life. 20-5.04B(2) Tree Bark Mulch Tree bark mulch must be derived from cedar, Douglas fir, or redwood species. The mulch must be ground such that at least 95 percent of the material by volume is less than 2 inches long in any dimension and no more than 30 percent by volume is less than 1 inch long in any dimension. 20-5.04B(3) Wood Chip Mulch Wood chip mulch must: 1. Be derived from clean wood 2. Not contain leaves or small twigs 3. Contain at least 95 percent by volume of wood chips with a width and thickness from 1/16 to 3/8 inch and a length from 1/2 to 3 inches 20-5.04B(4) Shredded Bark Mulch Shredded bark mulch must: 1. Be derived from trees 2. Be a blend of loose, long, thin wood, or bark pieces 3. Contain at least 95 percent by volume of wood strands with a width and thickness from 1/8 to 1-1/2 inches and a length from 2 to 8 inches 20-5.04B(5) Tree Trimming Mulch Tree trimming mulch must: 1. Be derived from chipped trees and may contain leaves and small twigs 2. Contain at least 95 percent by volume of material less than 3 inches long for any dimension and not more than 30 percent by volume of material less than 1 inch long for any dimension 20-5.04B(6)-20-5.04B(11) Reserved 20-5.04C Construction Before placing wood mulch, remove plants and weeds to the ground level. Maintain the planned flow lines, slope gradients, and contours of the job site. Grade the subgrade to a smooth and uniform surface. Place mulch after the plants have been planted. Place mulch in the plant basin at the rate described. Mulch must not come in contact with the plant crown and stem. Place mulch as shown in areas outside of plant basins to a uniform thickness. Spread mulch from the outside edge of the plant basin to the adjacent edges of shoulders, paving, retaining walls, dikes, edging, curbs, sidewalks,walls,fences, and existing plantings. If the plant is 12 feet or more from the adjacent edges of any of these elements, spread the mulch 6 feet beyond the outside edge of the plant basin. Do not place mulch within 4 feet of: 1. Flow line of earthen drainage ditches 2. Edge of paved ditches 3. Drainage flow lines Page 14 of 183 20-5.04D Payment The payment quantity for wood mulch is the volume measured in the vehicle at the point of delivery. AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA 21 EROSION CONTROL 07-15-16 Add between tube and 12 in the 1st paragraph of section 21-2.02Q: 07-15-16 8 or AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA DIVISION IV SUBASES AND BASES 23 GENERAL 07-15-16 Replace the headings and paragraphs in section 23 with: 07-15-16 23-1 GENERAL 23-1.01 GENERAL 23-1.01A Summary Section 23 includes general specifications for constructing subbases and bases. 23-1.01B Definitions Reserved 23-1.01C Submittals Submit a QC plan for the types of subbases or bases where described. 23-1.01 D Quality Assurance 23-1.01D(1) General 23-1.01 D(1)(a) General Take samples under California Test 125. 23-1.01D(1)(b) Test Result Disputes You and the Engineer must work together to avoid potential conflicts and to resolve disputes regarding test result discrepancies. Notify the Engineer within 5 business days of receiving the test result if you dispute the test result. If you or the Engineer dispute each other's test results, submit your test results and copies of paperwork including worksheets used to determine the disputed test results.An independent third party performs referee testing. Before the independent third party participates in a dispute resolution, it must be qualified under AASHTO Materials Reference Laboratory program and the Department's Independent Assurance Program.The independent third party must have no prior direct involvement with this Contract. By mutual agreement,the independent third party is chosen from: 1. Department laboratory in a district or region not in the district or region the project is located 2. Transportation Laboratory 3. Laboratory not currently employed by you or your material producer If split acceptance samples are not available,the independent third party uses any available material representing the disputed material for evaluation. Page 15 of 183 If the independent third party determines the Department's test results are valid, the Engineer deducts the independent third party testing costs from payments. If the independent third party determines your test results are valid,the Department pays the independent third party testing costs. 23-1.01 D(2) Quality Control 23-1.01 D(2)(a) General Provide a QC manager when the quantity of subbase or base is as shown in the following table: QC Manager Requirements Subbase or base Requirement Stabilized soils d >_20,000 Aggregate subbases(cu yd) >_20,000 Aggregate bases (cu yd) >_20,000 CTB (cu yd) >_ 10,000 Lean concrete base(cu yd) >_2,000 Rapid strength concrete base(cu yd) >_ 1,000 Lean concrete base rapid setting (cu yd) >_ 1,000 Concrete base (cu yd) >_ 1,000 Treated permeable bases (cu yd) >_2,000 Reclaimed pavements(sq yd) >_ 10,000 Provide a testing laboratory to perform quality control tests. Maintain sampling and testing equipment in proper working condition. You are not entitled to compensation for the suspension of work resulting from noncompliance with quality control requirements, including those identified within the QC plan. 23-1.01D(2)(b) Quality Control Plan The QC plan must describe the organization and procedures used to: 1. Control the production process 2. Determine if a change to the production process is needed 3. Implement a change The QC plan must include action and suspension limits and details of corrective action to be taken if any process is outside of those limits. Suspension limits must not exceed specified acceptance criteria. The QC plan must describe how test results will be submitted including times for sampling and testing for each quality characteristic. 23-1.01D(2)(c) Qualifications Testing laboratories and testing equipment must comply with the Department's Independent Assurance Program. Personnel performing sampling and testing must be qualified under the Department's Independent Assurance Program for the sampling and testing performed. 23-1.01 D(3) Department Acceptance Reserved 23-1.02 MATERIALS Not Used 23-1.03 CONSTRUCTION Not Used 23-1.04 PAYMENT Not Used Page 16 of 183 23-2-23-7 RESERVED nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn 24 STABILIZED SOILS 07-15-16 Add to section 24-1.01 C(1): 07-15-16 Submit a stabilized soil quality control plan. Add to section 24-1.01 D(1): 07-15-16 Construct test pads for compaction tests by scraping away material to the depth ordered. If a compaction test fails, corrective action must include the layers of material already placed above the test pad elevation. Replace section 24-1.01 D(2)with: 07-15-16 24-1.01 D(2) Quality Control 24-1.01 D(2)(a) General Reserved 24-1.01D(2)(b) Quality Control Plan Reserved 24-1.01D(2)(c) Qualifications Reserved 24-1.01 D(2)(d) Preparing Basement Material After preparing an area for soil stabilization, verify the surface grades. 24-1.01D(2)(e) Mixing Except for clods larger than 1 inch, randomly test the adequacy of the mixing with a phenolphthalein pH indicator solution. Replace the 1st paragraph of section 24-1.03C with: 07-15-16 The Engineer orders the application rate as pounds of stabilizing agent per square yard of basement material to be stabilized. 07-15-16 Delete section 24-2.01D(1)(c) Replace 250 in the 2nd sentence in the 2nd paragraph of section 24-2.01 D(2)(c)with: 07-15-16 500 Page 17 of 183 Add to section 24-2.01 D(2): 07-15-16 24-2.01 D(2)(d) Quality Control Testing Lime stabilized soil quality control must include testing the quality characteristics at the frequencies shown in the following table: QC Testing Frequencies Quality characteristic Test method Sampling location Minimum frequency Ground surface temperature -- Each temperature 1 test per 20,000 sq ft, before adding lime and full depth location minimum 1 per day ground temperature during mixing operations Lime application rate Calibrated Roadway 1 test per 40,000 sq ft, tray orequal minimum 2 per day Gradation on mixed material California Roadway 1 per 500 cu yd, Test 202 minimum 1 per day Moisture content California Roadway 1 per 500 cu yd on each Test 226 layer, each day during mixing and mellowing periods, minimum 1 per day Relative compaction California Roadway 1 per 500 cu yd on each Test 231 layer, minimum 1 per -day AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA 25 AGGREGATE SUBBASES 07-15-16 Replace Reserved in section 25-1.01C with: 07-15-16 Submit an aggregate subbase QC plan. Replace Reserved in section 25-1.01 D(2)with: 07-15-16 25-1.01 D(2)(a) General Reserved 25-1.01 D(2)(b) Quality Control Plan Reserved 25-1.01D(2)(c) Qualifications Reserved 25-1.01D(2)(d) Quality Control Testing AS quality control must include testing the quality characteristics at the frequencies shown in the following table: Page 18 of 183 QC Testing Frequencies Quality Test method Sampling location Minimum frequency characteristic R-value California Test Stockpiles, 1 test before beginning work and 301 transportation units, every 2000 cu yd thereafter' windrows,or roadways Aggregate California Test Stockpiles, gradation 202 transportation units, windrows,or roadways 1 per 500 cu yd but at least one per Sand equivalent California Test Stockpiles, day of placement 217 transportation units, windrows,or roadways Relative California Test Roadway 1 per 500 sq yd on each layer compaction 231 'Additional R-value frequency testing will not be required when the average of 4 consecutive sand equivalent tests is 4 or more above the specified operating range value. Add between the 2nd and 3rd paragraphs of section 25-1.01 D(3): 07-15-16 The Engineer takes aggregate subbase samples for R-value, aggregate gradation, and sand equivalent from any of the following locations: 1. Windrow 2. Roadway 07-15-16 Delete for each noncompliant test result in the 4th paragraph of section 25-1.01 D(3). 07-15-16 Delete a in the 5th paragraph of section 25-1.01 D(3). nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn 26 AGGREGATE BASES 07-15-16 Replace Reserved in section 26-1.01 C with: 07-15-16 Submit an aggregate base QC plan. Replace Reserved in section 26-1.01D(1)with: 07-15-16 Aggregate samples must not be treated with lime, cement, or chemicals before testing for durability index. Aggregate from untreated reclaimed processed AC, PCC, LCB, or CTB is not considered treated. Page 19 of 183 Replace Reserved in section 26-1.01 D(2)with: 07-15-16 26-1.01 D(2)(a) General Reserved 26-1.01 D(2)(b) Quality Control Plan Reserved 26-1.01D(2)(c) Qualifications Reserved 26-1.01 D(2)(d) Quality Control Testing AB quality control must include testing the quality characteristics at the frequencies shown in the following table: QC Testing Frequencies Quality characteristic Test method Sampling location Minimum frequency R-value California Test 301 Stockpiles, 1 test before starting work and transportation units, every 2,000 cu yd thereafter windrows,or roadways Aggregate gradation California Test 202 Stockpiles, 1 per 500 cu yd but at least transportation units, one per day of placement windrows,or roadways Sand equivalent California Test 217 Stockpiles, transportation units, windrows,or roadways Durability indexb California Test 229 Stockpiles, 1 per project transportation units, windrows,or roadways Relative compaction California Test 231 Roadway 1 1 per 500 sq yd on each layer aAdditional R-value frequency testing will not be required when the average of 4 consecutive sand equivalent tests is 29 or greater for Class 2 AB or 25 or greater for Class 3 AB. bApplies if section 26-1.02 contains an applicable requirement for durability index Add between requirements, and and in the 1st paragraph of section 26-1.01 D(3): 07-15-16 durability, Add between the 2nd and 3rd paragraphs of section 26-1.01 D(3): 07-15-16 The Engineer takes aggregate base samples for R-value, aggregate gradation, sand equivalent, and durability index from any of the following locations: 1. Windrow 2. Roadway 07-15-16 Delete the 3rd paragraph of section 26-1.01 D(3). Page 20 of 183 nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn 27 CEMENT TREATED BASES 07-15-16 Add to section 27-1.01 C: 07-15-16 Submit cement treated base QC plan. Replace the headings and paragraphs in section 27-1.01 D with: 07-15-16 27-1.01 D Quality Assurance 27-1.01D(1) General After the CTB has been spread on the subgrade and before initial compaction, the cement content of the completed mixture of CTB must not vary from the specified cement content by more than 0.6 percent of the weight of the dry aggregate when tested under California Test 338. For Class A CTB, compaction is tested under California Test 312 or 231. The relative compaction of CTB must be at least 95 percent. Each layer of CTB may be tested for compaction, or all layers may be tested together at the option the Engineer. If all layers are tested together, you are not relieved of the responsibility to achieve the required compaction in each layer placed. 27-1.01D(1)(a) Aggregate When tested under California Test 301, aggregate for Class B CTB must have (1) an R-value of at least 60 before mixing with cement and (2)an R-value of at least 80 when aggregate is mixed with an amount of cement that does not exceed 2.5 percent by weight of the dry aggregate. Before sand equivalent testing, aggregate samples must not be treated with lime, cement, or chemicals. If the aggregate gradation test results,the sand equivalent test results, or both comply with contract compliance requirements but not operating range requirements, you may continue placing CTB for the remainder of the work day. Do not place additional CTB until you demonstrate to the Engineer that the CTB to be placed complies with the operating range requirements. If the aggregate gradation test results, sand equivalent test results, or both do not comply with contract compliance requirements, remove the CTB or request a payment deduction. If your request is authorized, $2.50/cu yd is deducted. If CTB is paid for by weight,the Engineer converts tons to cubic yards for the purpose of reducing payment for noncompliant CTB left in place.An aggregate gradation and a sand equivalent test represents up to (1)500 cu yd or(2) 1 day's production if less than 500 cu yd. 27-1.01D(1)(b) Road-Mixed Cement Treated Base Moisture Content Just before initial compaction the moisture content of the completed mixture must be at least the optimum moisture content less 1 percent. The moisture content is determined under California Test 226 and optimum moisture content is determined under California Test 312. 27-1.01D(1)(c) Plant-Mixed Cement Treated Base Moisture Content At the point of delivery to the work,the moisture content of the completed mixture must be at least the optimum moisture content less 1 percent.The moisture content is determined under California Test 226 and optimum moisture content under California Test 312. 27-1.01D(2) Quality Control 27-1.01 D(2)(a) General Reserved 27-1.01D(2)(b) Quality Control Plan Reserved Page 21 of 183 27-1.01 D(2)(c) Qualifications Reserved 27-1.01 D(2)(d) Quality Control Testing CTB quality control must include testing the quality characteristics at the frequencies shown in the following table: QC Testing Frequencies Quality characteristic Test method Sampling location Minimum frequency Aggregate gradation California Test 202 Stockpiles,plant, modified transportation units, 1 per 500 cu yd but at windrow, or roadway least one per day of Sand equivalent California Test 217 Stockpiles,plant, placement transportation units, windrow, or roadway R-value' California Test 301 Stockpiles,plant, 1 test before starting work transportation units, and every 2000 cu yd windrows,or roadway thereafterb Optimum moisture California Test 312 Plant,transportation 1 per day of placement content units,windrow, or roadway Moisture content California Test 226 Roadway 1 per 500 cu yd but at least one per day of placement Cement content California Test 338 Windrows or roadway 1 per 1000 cu yd but at least one per day of placement Relative compaction California Test 312 or Roadway 1 per 2000 sq yd but at 231 least one per day of placement Compressive strength° California Test 312 Windrow or roadways 1 per day of placement R-value is required for Class B CTB only bAdditional R-value frequency testing will not be required while the average of 4 consecutive sand equivalent tests is 4 or more above the specified operating range value. °Compressive strength is required for Class A CTB only when specified 27-1.01 D(3) Department Acceptance The Department's acceptance testing includes testing the CTB quality characteristics shown in the following table: CTB Requirements for Acceptance Quality characteristic Test method Aggre ate gradation California Test 202 modified Sand equivalent California Test 217 R-value' California Test 301 Optimum moisture content California Test 312 Moisture content California Test 226 Cement content California Test 338 Relative compaction California Test 312 or 231 Compressive strength California Test 312 R-value is required for Class B CTB only bCompressive strength is required for Class A CTB only when specified The Engineer takes samples for aggregate gradation and sand equivalent from any of the following locations: 1. Plant Page 22 of 183 2. Truck 3. Windrow,for road-mixed only 4. Roadbed,for road-mixed only Add to section 27-1.02: 07-15-16 Water must comply with section 90-1.02D. Add to section 27-1.03F: 07-15-16 The relative compaction of CTB must be at least 95 percent. nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn 28 CONCRETE BASES 07-15-16 Replace the headings and paragraphs in section 28-1.01 D with: 07-15-16 28-1.01 D Quality Assurance 28-1.01D(1) General Aggregate samples must not be treated with lime, cement, or chemicals before testing for sand equivalent. Stop concrete base activities and immediately notify the Engineer whenever: 1. Any QC or QA test result does not comply with the specifications 2. Visual inspection shows a noncompliant concrete base If concrete base activities are stopped, before resuming activities: 1. Notify the Engineer of the adjustments you will make 2. Remedy or replace the noncompliant concrete base 3. Field qualify or construct a new test strip as specified for the concrete base involved to demonstrate compliance with the specifications 4. Obtain authorization 28-1.01 D(2) Quality Control 28-1.01 D(2)(a) General Reserved 28-1.01 D(2)(b) Quality Control Plan Reserved 28-1.01D(2)(c) Qualifications Reserved 28-1.01 D(3) Department Acceptance Reserved Add to section 28-2.01 C(1): 07-15-16 Submit a lean concrete base QC plan. Page 23 of 183 Replace the headings and paragraphs in section 28-2.01 D with: 07-15-16 28-2.01 D Quality Assurance 28-2.01D(1) General 28-2.0113(1)(a) General The molds for compressive strength testing under ASTM C31 or ASTM C192 must be 6 by 12 inches. If the aggregate gradation test results, sand equivalent test results or both comply with the contract compliance requirements but not the operating range requirements, you may continue placing LCB for the remainder of the work day. Do not place additional LCB until you demonstrate the LCB to be placed complies with the operating range requirements. 28-2.01D(1)(b) Qualifications Field qualification tests and calculations must be performed by an ACI certified "Concrete Laboratory Technician, Grade I. 28-2.01D(1)(c) Aggregate Qualification Testing Qualify the aggregate for each proposed aggregate source and gradation.The qualification tests include (1)a sand equivalent and (2)an average 7-day compressive strength under ASTM C39 of 3 cylinders manufactured under ASTM C192 except cure cylinders in molds without lids after initial curing. For the compressive strength test,the cement content for each cylinder must be 300 Ib/cu yd.The 7-day average compressive strength must be at least 610 psi.The cement must be Type II portland cement. LCB must have from 3 to 4 percent air content during aggregate qualification testing. 28-2.0113(1)(d) Field Qualification Testing Before placing LCB, you must perform field qualification testing and obtain authorization for each mix design. Retest and obtain authorization for changes to the authorized mix designs. Notify the Engineer at least 5 business days before field qualification. Perform the field qualification at the job site or an authorized location. Field qualification testing includes tests for compressive strength, air content, and penetration or slump. For compressive strength field qualification testing: 1. Prepare 12 cylinders under ASTM C31 except final cure cylinders in molds without lids from a single batch. 2. Perform 3 tests; each test consists of determining the average compressive strength of 2 cylinders at 7 days under ASTM C39. The average compressive strength for each test must be at least 530 psi If you submitted a notice to produce LCB qualifying for a transverse contraction joint waiver, manufacture additional specimens and test the LCB for compressive strength at 3 days. Prepare the compressive strength cylinders under ASTM C31 except final cure cylinders in molds without lids at the same time using the same material and procedures as the 7-day compressive strength cylinders except do not submit 6 additional test cylinders.The average 3-day compressive strength for each test must be not more than 500 psi. 28-2.01D(2) Quality Control 28-2.01 D(2)(a) General Reserved 28-2.01 D(2)(b) Quality Control Manager Reserved 28-2.01D(2)(c) Quality Control Testing Test the LCB under the test methods and at the locations and frequencies shown in the following table: Page 24 of 183 LCB Sampling Location and Testing Frequencies Quality characteristic Test method Sampling location Minimum sampling and testing frequency Sandequivalent ASTM D2419 Source Aggregate gradation ASTM C136 Air content ASTM C231 1 per 500 cubic yards Penetration ASTM C360 but at least 1 per day of Slumpa ASTM C143 Job site production Compressive strength ASTM C39 Test for either penetration or slump bPrepare cylinders under ASTM C31 except final cure cylinders in molds without lids. 28-2.01 D(3) Department Acceptance The Department accepts LCB based on compliance with the requirements shown in the following table: LCB Requirements for Acceptance Quality characteristic I Test method Requirement Compressive strength (min, psi at 7 days) I ASTM C39a 530 Cylinders prepared under ASTM C31 except final cure cylinders in molds without lids. bA compressive strength test represents up to (1) 1,000 cu yd or(2) 1 day's production if less than 1,000 cu yd. Replace section 28-2.01D(4)in item 3 of the 5th paragraph in section 28-2.03D with: 07-15-16 section 28-2.01 D(1)(c) Replace the 1st paragraph in section 28-2.03F with: 07-15-16 After finishing LCB, cure LCB with pigmented curing compound under section 90-1.03B(3)and 40-1.031. Apply curing compound: 1. In 2 separate applications 2. Before the atmospheric temperature falls below 40 degrees F 3. At a rate of 1 gal/150 sq ft for the first application 4. At a rate of 1 gal/200 sq ft for the second application Replace Reserved in section 28-3.01C(3)with: 07-15-16 Submit a rapid strength concrete base QC plan. Replace the headings and paragraphs in section 28-3.01 D with: 07-15-16 28-3.01 D Quality Assurance 28-3.01D(1) General 28-3.01 D(1)(a) General At the preconstruction meeting be prepared to discuss the project specifications and methods of performing each item of work. Items discussed must include the processes for: 1. Production 2. Transportation Page 25 of 183 3. Placement 4. QC plan, if specified in the special provisions 5. Contingency plan 6. QC sampling and testing 7. Acceptance criteria Beams for modulus of rupture testing must be fabricated and tested under California Test 524. The beams may be fabricated using an internal vibrator under ASTM C31. For each test, 3 beam must be fabricated and the test results averaged. No single test represents more than that day's production or 130 cu yd, whichever is less. For early age testing, beams must be cured so the monitored temperatures in the beams and the test strip are always within 5 degrees F. The internal temperatures of the RSC base and early age beams must be monitored and recorded at intervals of at least 5 minutes.Thermocouples or thermistors connected to strip-chart recorders or digital data loggers must be installed to monitor the temperatures. Temperature recording devices must be accurate to within ±2 degrees F. Until early age testing is completed, internal temperatures must be measured at 1 inch from the top, 1 inch from the bottom, and no closer than 3 inches from any edge. For other age testing, beams must be cured under California Test 524 except beams must be placed into sand at a time that is the earlier of either from 5 to 10 times the final set time, or 24 hours. RSC base must have an opening age modulus of rupture of not less than 400 psi and a 7-day modulus of rupture of not less than 600 psi. 28-3.01D(1)(b) Preconstruction Meeting Reserved 28-3.01D(1)(c) Test Strip Reserved 28-3.01D(2) Quality Control 28-3.01 D(2)(a) General Reserved 28-3.01D(2)(b) Quality Control Manager Reserved 28-3.01D(2)(c) Quality Control Testing Test the rapid strength concrete base under the test methods and at the locations and frequencies shown in the following table: Page 26 of 183 Rapid Strength Concrete Base Sampling Location and Testing Frequencies Quality characteristic Test method Sample Location Minimum testing frequencya Cleanness value California Test 227 1 per 500 cubic yards but at Sand equivalent California Test 217 Source least 1 per shift Aggregate gradation California Test 202 Air content California Test 504 1 per 130 cu yd but at least 1 per shift Yield California Test 518 1 per shift Slump or penetration ASTM C143 or California 1 per 2 hours of placement Test 533 Job site Density California Test 518 1 per shift Aggregate moisture California Test 223 or 1 per shift meter calibration California Test 226 Modulus of rupture California Test 524 1 per 130 cu yd but at least 1 per shift Test at the most frequent interval. bCheck calibration of the plant moisture meter by comparing moisture meter readings with California Test 223 or California Test 226 test results. Notify the Engineer at least 2 business days before any sampling and testing. Submit testing results within 15 minutes of testing completion. Record inspection, sampling, and testing on the forms accepted with the QC plan and submit them within 48 hours of completion of each day of production and within 24 hours of 7-day modulus of rupture tests. During the placement of RSC base,fabricate beams and test for the modulus of rupture: 1. At opening age 2. At 7 days after placing the first 30 cu yd 3. At least once every 130 cu yd 4. Within the final truckload Opening age tests must be performed in the presence of the Engineer. 28-3.01 D(3) Department Acceptance The Department accepts RSC base based on compliance with the requirements shown in the following table: RSC Base Requirements for Acceptance Quality characteristic I Test method Requirement Modulus of rupture minpsi at 7 days) California Test 524 600 The Engineer adjust payment for RSC base for the 7-day modulus of rupture as follows: 1. Payment for a base with a modulus of rupture of 600 psi or greater is not adjusted. 2. Payment for a base with a modulus of rupture of less than 600 and greater than or equal to 550 psi is reduced by 5 percent. 3. Payment for a base with a modulus of rupture of less than 550 and greater than or equal to 500 psi is reduced by 10 percent. 4. Payment for a base with a modulus of rupture of less than 500 psi is not adjusted and no payment is made. Remove and replace this base. Add to section 28-4.01C(1): 07-15-16 Submit a lean concrete base rapid setting QC plan. Page 27 of 183 Replace the headings and paragraphs in section 28-4.01 D with: 07-15-16 28-4.01 D Quality Assurance 28-4.01D(1) General 28-4.01 D(1)(a) General For compressive strength testing, prepare 6 cylinders under California Test 540. Test cylinders must be 6 by 12 inches.As an alternative to rodding, a vibrator may be used under California Test 524. Test cylinders under California Test 521 and perform 3 tests with each test consisting of 2 cylinders. The test result is the average from the 2 cylinders. 28-4.01D(1)(b) Field Qualification Before placing lean concrete base rapid setting, you must perform field qualification testing and obtain authorization for each mix design. Retest and obtain authorization for changes to authorized mixed designs. Proposed mix designs must be field qualified before you place the base represented by those mix designs.The technician performing the field test must hold current ACI certification as a Concrete Field Testing Technician-Grade I. Notify the Engineer at least 5 days before field qualification. Perform field qualification within the job site or a location authorized. Field qualification testing includes compressive strength, air content, and penetration or slump in compliance with the table titled "Lean Concrete Base Rapid Setting Requirements." Field qualification must comply with the following: 1. Test for compressive strength at opening age and 7 days of age 2. At opening age, the compressive strength for each test must be at least 180 psi and the average strength for the 3 tests must be at least 200 psi 3. At 7 days age, the compressive strength for each test must be at least 600 psi and the average strength for the 3 tests must be at least 725 psi 28-4.01 D(2) Quality Control 28-4.01 D(2)(a) General Reserved 28-4.01 D(2)(b) Quality Control Manager Reserved 28-4.01 D(2)(c) Quality Control Testing Test the base under the test methods and at the locations and frequencies shown in the following table: LCB Rapid Setting Sampling Location and Testing Frequencies Quality characteristic Test method Sampling Minimum sampling and testing location frequency Sand equivalent ASTM D2419 1 per 500 cu yd, minimum 1 per day Aggregate gradation ASTM C136 Source of production Air content ASTM C231 Penetration ASTM C360 Slumpa ASTM C143 Job site 1 per 4 hours of placement work, plus Compressive strength California Test 521 one in the last hour of placement work aTest either penetration or slump During placement of lean concrete base rapid setting,fabricate cylinders and test compressive strength for opening age and 7 days. Opening age tests must be performed in the presence of the Engineer. Page 28 of 183 28-4.01 D(3) Department Acceptance The Department accepts LCB rapid setting based on compliance with the requirement shown in the following table: LCB Rapid Setting Requirements for Acceptance Quality characteristic Test method Require Compressive strength (min, psi at 7 days) California Test 521 725 'Cylinders made under California Test 540 Replace the 2nd and 3rd paragraphs in section 28-4.03A with: 07-15-16 Concrete paving operations with equipment not supported by the base may start before opening age. Do not open pavement for traffic before opening age of the LCB rapid setting. Any other paving operations must start after the final set time of the base. The base must have a compressive strength of at least 450 psi under California Test 521 before: 1. Placing HMA 2. Placing other base material 3. Operating equipment on the base Replace Reserved in section 28-5.01C with: 07-15-16 Submit a concrete base QC plan. Replace the headings and paragraphs in section 28-5.01 D(2)with: 07-15-16 28-5.01 D(2) Quality Control 28-5.01 D(2)(a) General Reserved 28-5.01 D(2)(b) Quality Control Manager Reserved 28-5.01D(2)(c) Quality Control Testing Test the concrete base under the test methods and at the locations and frequencies shown in the following table: Page 29 of 183 Concrete Base Sampling Location and Testing Frequencies Quality characteristic Test method Sample location Minimum testing frequencya Cleanness value California Test 227 1 per 500 cubic yards but at Sand equivalent California Test 217 Source least 1 per shift Aggregate gradation California Test 202 Air content California Test 504 1 per 500 cu yd but at least 1 per shift Yield California Test 518 1 per shift Slump or penetration ASTM C143 or California 1 per 2 hours of placement Test 533 Job site Density California Test 518 1 per shift Aggregate moisture California Test 223 or 1 per shift meter calibration California Test 226 Modulus of rupture California Test 524 1 per 500 cu yd but at least 1 per shift Test at the most frequent interval. bCheck calibration of the plant moisture meter by comparing moisture meter readings with California Test 223 or California Test 226 test results. 28-5.01 D(3) Department Acceptance The Department accepts a concrete base based on compliance with the requirements shown in the following table: Concrete Base Requirements for Acceptance Quality characteristic I Test method Requirement Modulus of rupture min psi at 28 days) California Test 523 570 Acceptance for the modulus of rupture is on a lot basis. The Department provides the molds and machines for the modulus of rupture acceptance testing. Provide any material and labor the Engineer may require for the testing. AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA 29 TREATED PERMEABLE BASES 07-15-16 Replace the headings and paragraphs in section 29-1.01 with: 07-15-16 29-1.01 GENERAL 29-1.01A Summary Section 29-1 includes general specifications for constructing treated permeable bases. 29-1.01B Definitions Reserved 29-1.01C Submittals Submit a treated permeable base quality control plan. 29-1.01 D Quality Assurance 29-1.01D(1) General Reserved Page 30 of 183 29-1.01 D(2) Quality Control 29-1.01 D(2)(a) General Reserved 29-1.01 D(2)(b) Quality Control Plan Reserved 29-1.01D(2)(c) Qualifications Reserved 29-1.01 D(3) Department Acceptance Reserved Replace the headings and paragraphs in section 29-2.01 D with: 07-15-16 29-2.01 D Quality Assurance 29-2.011)(1) General The Engineer determines the asphalt content of the asphalt mixture under California Test 382. The bitumen ratio, pounds of asphalt per 100 lb of dry aggregate, must not vary more than 0.5 lb of asphalt above or below the quantity designated by the Engineer. Samples used to determine the bitumen ratio are obtained from trucks at the plant or from the mat behind the paver before rolling. If the sample is taken from the mat behind the paver,the bitumen ratio must not be less than the quantity designated by the Engineer, less 0.7 lb of asphalt per 100 lb of dry aggregate. 29-2.01 D(2) Quality Control 29-2.01 D(2)(a) General Reserved 29-2.01 D(2)(b) Quality Control Testing ATPB quality control must include testing the quality characteristics at the frequencies shown in the following table: QC Testing Frequencies Quality characteristic Test method Sampling location Minimum frequency Gradation California Test Stockpiles or plant 1 for every 4 hours of 202 production but at least one per day of placement Cleanness value California Test Stockpiles or plant 1 for every 4 hours of 227 production but at least one per day Percentage of crushed California Test Stockpiles or plant 1 test before production and particles 205 one every 5,000 cu yd thereafter Los Angeles rattler loss at California Test Stockpiles or plant 1 test before production and 500 rev 211 one every 5,000 cu yd thereafter Film stripping California Test Plant 1 test before production and 302 one every 5000 cu yd thereafter Asphalt content of the California Test Plant,transportation 1 for every 4 hours of asphalt mixture 382 units,windrows, or production but at least one roadway per day Page 31 of 183 29-2.01 D(3) Department Acceptance The Department accepts ATPB based on aggregate gradation, cleanness value, percent of crushed particles, Los Angeles rattler,film stripping and asphalt content requirements specified in section 29-2.02 and section 29-2.01 D(1). The Engineer takes samples for aggregate gradation, cleanness value, percent of crushed particles, Los Angeles rattler, and film stripping from the plant. The Engineer takes samples for asphalt content of the asphalt mixture from any of the following locations: 1. Plant 2. Truck 3. Windrow 4. Roadbed Replace the headings and paragraphs in section 29-3.01 with: 07-15-16 29-3.01 GENERAL 29-3.01A Summary Section 29-3 includes specifications for constructing cement treated permeable bases. 29-3.01 B Definitions Reserved 29-3.01C Submittals Reserved 29-3.01 D Quality Assurance 29-3.01D(1) General Reserved 29-3.01 D(2) Quality Control 29-3.01 D(2)(a) General Reserved 29-3.01 D(2)(b) Quality Control Testing CTPB quality control must include testing the quality characteristics at the frequencies shown in the following table: QC Testing Frequencies Quality characteristic Test method Sampling location Minimum frequency Gradation California Test Stockpiles or plant 1 for every 4 hours of 202 production but at least one per day of placement Cleanness value California Test Stockpiles or plant 1 for every 4 hours of 227 production but at least one per day Los Angeles rattler California Test Stockpiles or plant 1 test before production and loss at 500 rev 211 one every 5,000 cu yd thereafter Soundness California Test Stockpiles or plant 1 test before production and 214 one every 5,000 cu yd thereafter Page 32 of 183 29-3.01 D(3) Department Acceptance The Department accepts CTPB based on aggregate gradation, cleanness value, Los Angeles rattler and soundness requirements in section 29-3.02. The Engineer takes samples for aggregate gradation, cleanness value, Los Angeles rattler and soundness from the plant. Add to section 29-3.02A: 07-15-16 Water must comply with section 90-1.02D. Replace 3rd in the 2nd paragraph in section 29-3.03 with: 07-15-16 4th nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn 30 RECLAIMED PAVEMENT 07-15-16 Replace section 30-1.01C(2)(c)in the 1st paragraph of section 30-3.01C(2)(c)with: 07-15-16 section 30-1.01 C(3)(c) Page 33 of 183 Replace the table in section 30-3.02A with: 07-15-16 FDR—Foamed Asphalt Quality Characteristic Requirements Quality characteristic Test method Requirement Moisture content before HMA paving California Test 226 < 50% of OMC Asphalt binder expansion ratio 10 (min, %) Note a Asphalt binder halt-life 12 (seconds,min) Gradation(%, passing) Sieve Size: 3 inch California Test 202 100 2 inch 95-100 1-1/2 inch 85-100 Moisture content Maximum California Test 226 OMC Minimum OMC-2% In-place wet density California Test 216 Report only Ib/cu ft Relative compaction California Test 231 98 (min, %) Indirect dry tensile strength (psi)b California Test 371 90%of mix design value Indirect wet tensile strength (psi)b California Test 371 90%of mix design value Tensile strength ratio California Test 371 90%of mix design value (%) Test at the foaming temperature and percentage of foaming water by dry weight of FDR—foamed asphalt material designated in the mix design.To test asphalt binder expansion ratio and half-life, use a pail of known volume and a dipstick calibrated for the pail. From the inspection nozzle on the asphalt binder spray bar, inject foamed asphalt into the pail without exceeding the pail's capacity. With the dipstick, immediately measure and record the level of foamed asphalt in the pail. Record the half-life in seconds from the time the injection of foamed asphalt in the pail is turned off to half the dip stick reading after peak. Calculate the expansion ratio as the volume of the foamed asphalt upon injection divided by the volume of the unfoamed asphalt binder. bFrom material passing the 1-inch sieve, compact 6 specimens under California Test 304, Part 2. Cure the specimens at 100 °F for 72 hours and allow the specimens to cool to room temperature. Test 3 specimens for dry tensile strength under California Test 371. Test 3 specimens for wet tensile strength under California Test 371 after moisture conditioning. Replace section 30-4.01D(3) in the 2nd paragraph of section 30-4.01 D(1)with: 07-15-16 section 30-4.01 D(4) Replace section 30-4.01D(1)(a) in the table in section 30-4.02Awith: 07-15-16 section 30-4.01 D(2) AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA Page 34 of 183 DIVISION V SURFACINGS AND PAVEMENTS 37 BITUMINOUS SEALS 07-15-16 Replace section 37 with: 07-15-16 37 SEAL COATS 37-1 GENERAL 37-1.01 GENERAL 37-1.01A Summary Section 37-1 includes general specifications for applying seal coats. 37-1.0113 Definitions Reserved 37-1.01C Submittals At least 10 days before the preconstruction meeting submit a list of participants in the preconstruction meeting. Provide each participant's name, employer,title, and role in the production and placement of the seal coats. At least 10 days before starting seal coat activities, submit the names of the authorized laboratories for quality control testing. For each delivery of asphalt binder or asphaltic emulsion to the job site, submit a certificate of compliance and a copy of the specified test results. For a seal coat that uses crumb rubber modifier, submit a Crumb Rubber Usage Report form monthly and at the end of project. 37-1.01 D Quality Assurance 37-1.0113(1) General For aggregate testing, quality control laboratories must be in compliance with the Department's Independent Assurance Program to be an authorized laboratory. Quality control personnel must be qualified under the Department's Independent Assurance Program. For emulsion testing, quality control laboratories must participate in the AASHTO Material's Reference Laboratory proficiency sample program. 37-1.01D(2) Preconstruction Meeting Hold a preconstruction meeting within 5 days before start of seal coat work at a mutually agreed time and place with the Engineer and your: 1. Project superintendent 2. Project foreman 3. Traffic control foreman Make arrangements for the conference facility. Preconstruction meeting participants must sign an attendance sheet provided by the Engineer. Be prepared to discuss: 1. Quality control testing 2. Acceptance testing 3. Seal coat placement 4. Proposed application rates for asphaltic emulsion or asphalt binder and aggregate. 5. Training on placement methods 6. Checklist of items for proper placement 7. Unique issues specific to the project, including: 7.1. Weather 7.2. Alignment and geometrics 7.3. Traffic control requirements Page 35 of 183 7.4. Haul distances 7.5. Presence and absence of shaded areas 7.6. Any other local conditions 8. Contingency plan for material deliveries, equipment breakdowns, and traffic handling 9. Who in the field has authority to adjust application rates and how adjustments will be documented 10. Schedule of sweepings 37-1.02 MATERIALS Not Used 37-1.03 CONSTRUCTION 37-1.03A General If seal coat activities affect access to public parking, residential property, or commercial property, post signs at 100-foot intervals on the affected streets. Signs must display No Parking— Tow Away. Signs must state the dates and hours parking or access will be restricted. Notify residents, businesses, and local agencies at least 24 hours before starting activities.The notice must: 1. Describe the work to be performed 2. Detail streets and limits of activities 3. Indicate dates and work hours 4. Be authorized Asphaltic emulsion or asphalt binder for seal coats may be reheated if necessary. After loading the asphaltic emulsion or asphalt binder into a truck for transport to the job site, do not heat asphaltic emulsion above 160 degrees F and asphalt rubber binder above 425 degrees F. During reheating, circulate or agitate the asphaltic emulsion or asphalt binder to prevent localized overheating. Except for fog seals, apply quick setting Grade 1 asphaltic emulsions at a temperature from 75 to 130 degrees F and apply quick setting Grade 2 asphaltic emulsions at a temperature from 110 to 185 degrees F. You determine the application rates for asphaltic emulsion or asphalt binder and aggregate and the Engineer authorizes the application rates. 37-1.03B Equipment A self-propelled distributor truck for applying asphaltic emulsion or asphalt binder must be equipped with: 1. Pressure-type system with insulated tanks with circulating unit 2. Spray bars: 2.1. With minimum length of 9 feet and full-circulating type 2.2. With full-circulating-type extensions if needed to cover a greater width 2.3. Adjustable to allow positioning at various heights above the surface to be treated 2.4. Operated by levers such that 1 or all valves may be quickly opened or closed in one operation 3. Devices and charts to provide for accurate and rapid determination and control of asphaltic emulsion or asphalt binder quantities being applied. Include an auxiliary wheel type meter that registers: 3.1. Speed in ft/min 3.2. Trip by count 3.3. Total distance in feet 4. Distribution system: 4.1. Capable of producing a uniform application of asphaltic emulsion or asphalt binder in controlled quantities ranging from 0.02 to 1 gal/sq yd of surface and at a pressure ranging from 25 to 75 psi 4.2. Pumps that spray asphaltic emulsion or asphalt binder within 0.02 gal/sq yd of the set rate 4.3. With a hose and nozzle for application of asphaltic emulsion to areas inaccessible to the spray bar 4.4. With pressure gauges and a thermometer for determining temperatures of the asphaltic emulsion or asphalt binder Page 36 of 183 You may use cab-controlled valves for the application of asphaltic emulsion or asphalt binder. The valves controlling the flow from nozzles must act positively to provide a uniform unbroken application of asphaltic emulsion or asphalt binder. Maintain distributor and storage tanks at all times to prevent dripping. 37-1.04 PAYMENT Not Used 37-2 CHIP SEALS 37-2.01 GENERAL 37-2.01A General 37-2.01A(1) Summary Section 37-2.01 includes general specifications for applying chip seals. 37-2.01A(2) Definitions Reserved 37-2.01A(3) Submittals At least 15 days before starting placement of chip seal, submit: 1. Samples for: 1.1. Asphaltic emulsion chip seal,two 1-quart wide mouth plastic containers with screw top lid of asphaltic emulsion 1.2. Polymer modified asphaltic emulsion chip seal,two 1-quart wide mouth plastic containers with screw top lid of polymer modified asphaltic emulsion 1.3. Asphalt rubber binder chip seal,two 1-quart cans of base asphalt binder 1.4. Asphalt rubber binder chip seal,five 1-quart cans of asphalt rubber binder 2. Asphaltic emulsion, polymer modified asphaltic emulsion, asphalt binder or asphalt rubber binder data as follows: 2.1. Supplier and Type/Grade of asphaltic emulsion or asphalt binder 2.2. Type of modifier used including polymer or crumb rubber or both 2.3. Percent of crumb rubber, if used as modifier 2.4. Copy of the specified test results for asphaltic emulsion or asphalt binder 3. 50 lb of uncoated aggregate 4. Aggregate test results for the following: 4.1. Gradation 4.2. Los Angeles Rattler 4.3. Percent of crushed particles 4.4. Flat and elongated particles 4.5. Film stripping 4.6. Cleanness value 4.7. Durability 5. Vialit test results Submit quality control test results for the quality characteristics within the reporting times allowance after sampling shown in the following table: Quality Control Test Result Reporting Quality characteristic Maximum reporting time allowance Los Angeles Rattler loss max % 48 hours Percent of crushed particles min, % 48 hours Flat and elongated particles max by weight at 3:1, % 48 hours Film stripping max, % 48 hours Durability min 48 hours Gradation(percentage passing) 24 hours Cleanness value min 24 hours Asphaltic emulsion spread rate al/sq d 24 hours Page 37 of 183 Within 3 days after taking asphaltic emulsion or asphalt binder quality control samples, submit the authorized laboratory's test results. 37-2.01A(4) Quality Assurance 37-2.01A(4)(a) General Reserved 37-2.01A(4)(b) Quality Control 37-2.01A(4)(b)(i) General Reserved 37-2.01A(4)(b)(ii) Aggregate All tests must be performed on uncoated aggregate except for film stripping which must be performed on precoated aggregate. For aggregate,the authorized laboratory must perform sampling and testing at the specified frequency and location for the following quality characteristics: Aggregate Quality Control Requirements Quality characteristic Test method Minimum Location of sampling sampling and testing frequency Los Angeles Rattler loss (max, %) California Test 1 st day of See California At 100 revolutions 211 production Test 125 At 500 revolutions Percent of crushed particles Coarse aggregate(min, %) One-fractured face 1 st day of See California Two-fractured faces AASHTO T 335 production Test 125 Fine aggregate(min, %) (Passing No. 4 sieve and retained on No. 8 sieve) One fractured face Flat and elongated particles(max by weight at ASTM D4791 1 st day of See California 3:1, % production Test 125 Film stripping (max, %) California Test 1 st day of See California 302 production Test 125 Durability(min) California Test 1 st day of See California 229 production Test 125 Gradation (% passing) California Test 2 per day See California 202 Test 125 Cleanness value(min) California Test 2 per day See California 227 Test 125 37-2.01A(4)(b)(iii) Chip Seals For a chip seal,the authorized laboratory must perform sampling and testing at the specified frequency and location for the following quality characteristics: Chip Seal Quality Control Requirements Quality characteristic Test method Minimum sampling Location of and testing frequency sampling Asphaltic emulsion binder spread rate California 1 per day per Pavement surface al/s d Test339 distributor truck 37-2.01A(4)(c) Department Acceptance Department Acceptance shall not apply to identified areas where the existing surfacing before application of chip seal, contains defective areas as determined by the Engineer and Contractor.At least 7 days Page 38 of 183 before starting placement of the chip seal, the Contractor shall submit a written list of existing defective areas, identifying the lane direction, lane number, starting and ending highway post mile locations, and defect type. The Engineer must agree on which of the identified areas are defective. Defective areas are defined as one of the following: 1. Areas with wheel path rutting in excess of 3/8 inch when measured by placing a straightedge 12 feet long on the finished surface perpendicular to the center line and measuring the vertical distance between the finished surface and the lower edge of the straightedge 2. Areas exhibiting flushing For a chip seal, acceptance is based on visual inspection for the following: 1. Uniform surface texture 2. Raveling, which consists of the separation of the aggregate from the asphaltic emulsion or asphalt binder 3. Flushing, which consists of the occurrence of a film of asphaltic material on the surface of the chip seal. 4. Streaking,which consists of alternating longitudinal bands of asphaltic emulsion or asphalt binder without uniform aggregate retention, approximately parallel with the lane line. Areas of raveling,flushing or streaking that are greater than 0.5 sq ft shall be considered defective and must be repaired. Raveling and streaking must be repaired by placing an additional layer of chip seal over the defective area. For asphaltic emulsion or asphalt binder, acceptance is based on the Department's sampling and testing for compliance with the requirements for the quality characteristics specified. For aggregate, acceptance is based on the Department's sampling and testing for compliance with the requirements shown in the following table: Chip Seal Aggregate Acceptance Criteria Quality characteristic Test method Requirements Los Angeles Rattler loss (max, %) At 100 revolutions California Test 211 10 At 500 revolutions 40 Percent of crushed particles: AASHTO T 335 Coarse aggregate(min, %) One-fractured face 95 Two-fractured faces 90 Fine aggregate(min, %) (Passing No. 4 sieve and retained on No. 8 sieve) One fractured face 70 Flat and elongated particles (max by weight at 3:1, %) ASTM D4791 10 Film stripping (max, %) California Test 302 25 Durability(min) California Test 229 52 Gradation (% passing by weight) California Test 202 Aggregate Gradation table shown under Materials for the chip seal type specified. Cleanness value min California Test 227 80 If test results for the aggregate gradation do not comply with specifications, you may remove the chip seal represented by these tests or request that it remain in place with a payment deduction.The deduction is $1.75 per ton for the aggregate represented by the test results. Page 39 of 183 If test results for aggregate cleanness value do not comply with the specifications, you may remove the chip seal represented by these tests or you may request that the chip seal remain in place with a pay deduction corresponding to the cleanness value shown in the following table: Chip Seal Cleanness Value Deductions Cleanness value Deduction 80 or over None 79 $2.00/ton 77-78 $4.00/ton 75-76 $6.00/ton If the aggregate cleanness value is less than 75, remove the chip seal. 37-2.01 B Materials 37-2.01B(1) General Reserved 37-2.01B(2) Asphaltic Emulsions and Asphalt Binders Reserved 37-2.01 B(3) Aggregate 37-2.01 B(3)(a) General Aggregate must be broken stone, crushed gravel, or both. Aggregate must comply with the requirements shown in the following table: Chip Seal Aggregate Requirements Quality characteristic Test method Requirements Los Angeles Rattler loss (max, %) At 100 revolutions California Test 211 10 At 500 revolutions 40 Percent of crushed particles AASHTO T 335 Coarse aggregate(min, %) One-fractured face 95 Two-fractured faces 90 Fine aggregate(min, %) (Passing No. 4 sieve and retained on No. 8 sieve) One fractured face 70 Flat and elongated particles (max by weight at 3:1, %) ASTM D4791 10 Film stripping (max, %) California Test 302 25 Durability(min) California Test 229 52 Gradation (% passing by weight) California Test 202 Aggregate Gradation table shown under Materials for the chip seal type specified. Cleanness value(min) California Test 227 80 The authorized laboratory must conduct the Vialit test using the proposed asphaltic emulsion or asphalt binder and aggregate for compliance with the requirements shown in the following table: Page 40 of 183 Chip Retention Requirements Quality characteristic Test method Requirement Chip retention (%) Vialit test method for aggregate in chip seals, 95 French chip(Modified)' The asphaltic emulsion or asphalt binder must be within the field placement temperature range and application rate during specimen preparation. For asphalt binder cure the specimen for first 2 hours at 100 'F. 37-2.01 13(3)(b) Precoated Aggregate Precoating of aggregate must be performed at a central mixing plant. The plant must be authorized under the Department's MPQP. When precoating aggregate, do not recombine fine materials collected in dust control systems. Precoated aggregate must be preheated from 260 to 325 degrees F. Coat with any of the asphalts specified in the table titled "Performance Graded Asphalt Binder" in section 92.The asphalt must be from 0.5 to 1.0 percent by weight of dry aggregate. You determine the exact asphalt rate for precoating of aggregate. Do not stockpile precoated aggregate. 37-2.01 C Construction 37-2.01C(1) General For chip seals on 2-lane, 2-way roadways, place a W8-7(LOOSE GRAVEL)sign and a W 13-1 (35)plaque at 2,000-foot maximum intervals along each side of the traveled way where aggregate is spread on a traffic lane and at public roads or streets entering the chip seal area. Place the 1st W8-7 sign in each direction where traffic first encounters the loose aggregate, regardless of which lane the aggregate is spread on. A W13-1 (35) plaque is not required where the posted speed limit is less than 40 mph. For chip seals on freeways, expressways, and multilane conventional highways, place a W8-7, (LOOSE GRAVEL)sign and a W 13-1 (35)plaque at 2,000-foot maximum intervals along the outside edge of the traveled way nearest to the lane worked on, at on ramps, and at public roads or streets entering the chip seal area. Place the 1 st W8-7 sign where the aggregate starts with respect to the direction of travel on that lane. A W 13-1 (35) plaque is not required where the posted speed limit is less than 40 mph. Pilot cars must have cellular or radio contact with other pilot cars and personnel in the work zone. The maximum speed of the pilot cars convoying or controlling traffic through the traffic control zone must be 15 mph on 2-lane,two-way highways and 25 mph on multilane divided and undivided highways. Pilot cars must only use traffic lanes open to traffic. On the days that closures are not allowed, you may use a moving closure to maintain the seal coat surface.The moving closure is only allowed during daylight hours when traffic will be the least inconvenienced and delayed. The Engineer determines the hours for the moving closure. Maintain signs in place at each location until the final sweeping of the chip seal surface for that location is complete. Signs may be set on temporary portable supports with the W 13-1 sign below the W8-7 sign or on barricades with the W13-1 sign alternating with the W8-7 sign. Schedule chip seal activities so that the chip seals are placed on both lanes of the traveled way each work shift. If traffic is routed over a surface where a chip seal application is intended, the chip seal must not be applied to more than half the width of the traveled way at a time, and the remaining width must be kept free of obstructions and open to traffic until the previously applied width is ready for traffic use. Wherever maintenance sweeping of the chip seal surface is complete, place permanent traffic stripes and pavement markings within 10 days. Page 41 of 183 If you fail to place the permanent traffic stripes and pavement markings within the specified time, the Department withholds 50 percent of the estimated value of the chip seal work completed that has not received permanent traffic stripes and pavement markings. 37-2.01C(2) Equipment Equipment for chip seals must include and comply with the following: 1. Aggregate haul trucks must have: 1.1. Tailgate that discharge aggregate 1.2. Device to lock onto the rear aggregate spreader hitch 1.3. Dump bed that will not push down on the spreader when fully raised 1.4. Dump bed that will not spill aggregate on the roadway when transferred to the spreader hopper 1.5. Tarpaulin to cover precoated aggregate when haul distance exceeds 30 minutes or ambient temperature is less than 65 degrees F 2. Self-propelled aggregate spreaders must have: 2.1. Aggregate hopper in the rear 2.2. Belt conveyor that carries the aggregate to the front 2.3. Spreading hopper capable of providing a uniform aggregate spread rate over the entire width of the traffic lane in 1 application. 3. Self-propelled power brooms must: 3.1. Not be steel-tined brooms on emulsion chip seals 3.2. Be capable of removing loose aggregate adjacent to barriers that prevent aggregate from being swept off the roadway, including curbs, gutters, dikes, berms, and railings 4. Pneumatic or foam filled rubber tired rollers must: 4.1. Be an oscillating type at least 4 feet wide 4.2. Be self-propelled and reversible 4.3. Have tires of equal size, diameter, type, and ply 4.4. Carry at least 3,000 Ibs of load on each wheel 4.5 Have tires with an air pressure of 100±5 psi or be foam filled 37-2.01C(3) Surface Preparation Before applying chip seals, cover manholes, valve and monument covers, grates, or other exposed facilities located within the area of application, using a plastic or oil resistant construction paper secured by tape or adhesive to the facility being covered. Reference the covered facilities with enough control points to relocate the facilities after the application of the chip seal. Immediately before applying chip seals, clean the surface to receive a chip seal by removing any extraneous material affecting adhesion of the chip seal with the existing surface and drying. Use self- propelled power brooms to clean the existing pavement. 37-2.01C(4) Placement 37-2.01C(4)(a) General Schedule the operations so that chip seals are placed on both lanes of the traveled way each work shift. At the end of the work shift,the end of the chip seals on both lanes must generally match. 37-2.01 C(4)(b) Applying Asphaltic Emulsions or Asphalt Binders Prevent spraying on existing pavement not intended for chip seals or on previously applied chip seals using a material such as building paper. Remove the material after use. Align longitudinal joints between chip seal applications with designated traffic lanes. For asphaltic emulsion or asphalt binder, overlap longitudinal joints by not more than 4 inches. You may overlap longitudinal joints up to 8 inches if authorized. For areas not accessible to a truck distributor bar apply: 1. Asphaltic emulsions by hand spraying 2. Asphalt binders with a squeegee or other authorized means Page 42 of 183 You may overlap the asphaltic emulsion or asphalt binder applications before the application of aggregate at longitudinal joints. Do not apply the asphaltic emulsion or asphalt binder unless there is sufficient aggregate at the job site to cover the asphaltic emulsion or asphalt binder. Discontinue application of asphaltic emulsion or asphalt binder early enough to comply with lane closure requirements.Apply to 1 lane at a time and cover the lane width entirely in 1 operation. 37-2.01C(4)(c) Spreading Aggregates 37-2.01C(4)(c)(i) General Prevent vehicles from driving on asphaltic emulsion or asphalt binder before spreading aggregate. Spread aggregate within 10 percent of your determined rate. Spread aggregate at a uniform rate over the full lane width in 1 application. Apply to 1 lane at a time. Sweep excess aggregate at joints before spreading adjacent aggregate. Operate the spreader at speeds slow enough to prevent aggregate from rolling over after dropping. If the spreader is not moving, aggregate must not drop. If you stop spreading and aggregate drops, remove the excess aggregate before resuming activities. 37-2.01C(4)(c)(ii) Precoated Aggregate Application During transit, cover precoated aggregate with tarpaulins if the ambient air temperature is below 65 degrees F or the haul time exceeds 30 minutes. When applied, precoated aggregate must be from 225 to 325 degrees F. 37-2.01C(4)(d) Finishing 37-2.01 C(4)(d)(i) General Remove piles, ridges, or unevenly distributed aggregate. Repair permanent ridges, bumps, streaks or depressions in the finished surface. Spread additional aggregate and roll if aggregate is picked up by rollers or vehicles. Chip seal joints between adjacent applications of a chip seal must be smooth, straight, uniform, and completely covered. A coverage is 1 roller movement over the entire width of lane. A pass is 1 roller movement parallel to the chip seal application in either direction. Overlapping passes are part of the coverage being made and are not part of a subsequent coverage. Do not start a new coverage until completing the previous coverage. Before opening to traffic, finish the chip seals in the following sequence: 1. Perform initial rolling consisting of 1 coverage with a pneumatic-tired roller 2. Perform final rolling consisting of 2 coverages with a pneumatic-tired roller 3. Sweep excess aggregate from the roadway and adjacent abutting areas 4. Apply a flush coat if specified 5. Remove covers from the facilities 37-2.01C(4)(d)(ii) Traffic Control With Pilot Car For 2-lane 2-way roadways under 1-way traffic control, upon completion of final rolling, traffic must be controlled with pilot cars and routed over the new chip seal for a period of 2 to 4 hours before opening the lane to traffic not controlled with pilot cars. For multilane roadways, when traffic is controlled with pilot cars, a maximum of 1 lane in the direction of travel must be open to traffic. Traffic must be controlled with pilot cars and be routed on the new chip seal surface of the lane for a minimum of 2 hours after completion of the initial sweeping and before opening the lane to traffic not controlled with pilot cars. Once traffic controlled with pilot cars is routed over the chip seal at a particular location, continuous control must be maintained at that location until the chip seal placement and sweeping on adjacent lanes to receive a chip seal is completed. Page 43 of 183 37-2.01C(4)(d)(iii) Sweeping Sweeping must be performed after the chip seal has set and there is no damage or dislodging of aggregate from the chip seal surface.As a minimum, sweeping is required at the following times: 1. On 2-lane 2-way roadways, from 2 to 4 hours after traffic, controlled with pilot cars, has been routed on the chip seal 2. On multilane roadways, from 2 to 4 hours after aggregate have been placed 3. In addition to previous sweeping, perform final sweeping immediately before opening any lane to public traffic, not controlled with pilot cars 37-2.01C(4)(d)(iv) Excess Aggregate Dispose of excess aggregate. If ordered, salvaging and stockpiling of excess aggregate is change order work. 37-2.01C(4)(e) Chip Seal Maintenance Perform sweeping on the morning following the application of aggregate on any lane that has been open to traffic not controlled with pilot cars and before starting any other activities. Chip seal surfaces must be maintained for 4 consecutive days from the day aggregate is applied. Maintenance must include sweeping to maintain a surface free of loose aggregate and to prevent formation of corrugations. Sweeping must not dislodge aggregate set in asphaltic emulsion or asphalt binder. After 4 consecutive days, excess aggregate must be removed from the paved areas. 37-2.01 D Payment If there is no bid item for traffic control system, furnishing and using a pilot car is included in the various items of the work involved in applying the chip seal. The payment quantity for precoated aggregate is the weight measured after the aggregate is preheated and precoated with asphalt binder. If recorded batch weights are printed automatically,the payment quantity for aggregate is the weight determined from the printed batch weights if: 1. Total weight for the precoated aggregate per batch is printed 2. Total asphalt binder weight per batch is printed 3. Zero tolerance weight is printed before weighing the first batch and after weighing the last batch for each truckload 4. Time, date, mix number, load number, and truck identification are correlated with a load slip 5. Copy of the recorded batch weights is certified by a licensed weighmaster 37-2.02 ASPHALTIC EMULSION CHIP SEALS 37-2.02A General 37-2.02A(1) Summary Section 37-2.02 includes specifications for applying asphaltic emulsion chip seals.An asphaltic emulsion chip seal includes applying an asphaltic emulsion, followed by aggregate, and then a flush coat. A double asphaltic emulsion chip seal is the application of an asphaltic emulsion followed by aggregate, applied twice in sequence and then a flush coat. 37-2.02A(2) Definitions Reserved 37-2.02A(3) Submittals Immediately after sampling, submit two 1-quart plastic containers of asphaltic emulsion taken in the presence of the Engineer. Samples must be submitted in insulated shipping container. Page 44 of 183 37-2.02A(4) Quality Assurance 37-2.02A(4)(a) General Reserved 37-2.02A(4)(b) Quality Control 37-2.02A(4)(b)(i) General Reserved 37-2.02A(4)(b)(ii) Asphaltic Emulsions Circulate asphaltic emulsion in the distributor truck before sampling.Take samples from the distributor truck at mid load or from a sampling tap or thief. Before taking samples, draw and dispose of 1 gallon. In the presence of the Engineer,take two 1-quart samples in a plastic container with lined sealed lid for acceptance testing. For asphaltic emulsion, the authorized laboratory must perform quality control sampling and testing at the specified frequency and location for the following quality characteristics: Asphaltic Emulsion Quality characteristic Test method Minimum sampling and Sampling location testing frequency Saybolt Furol Viscosity, at 25°C (Saybolt Furol seconds) Sieve Test(%) AASHTO T 59 Minimum 1 per day per Distributor truck deliver Storage stability, 1 day(%) delivery truck Residue by distillation (%) Particle chargea Tests on Residue from Distillation Test: Penetration, 25°C AASHTO T 49 Ductility AASHTO T 51 Minimum 1 per day per Distributor truck Solubility in trichloroethylene AASHTO T 44 delivery truck alf the result of the particle charge is inconclusive,the asphaltic emulsion must be tested for pH under ASTM E70. Grade QS1 h asphaltic emulsion must have a minimum pH of 7.3. Grade CQS1 h asphaltic emulsion must have a maximum pH of 6.7. 37-2.02A(4)(c) Department Acceptance Aggregate acceptance is based on the Department's sampling and testing for compliance with the requirements shown in the following table: Aggregate Gradation Acceptance Criteria Quality characteristic Test method Requirement Gradation (% passing by weight) 3/8" 5/16" 1/4" Sieve size: 3/4" -- -- -- 1/2" 100 -- -- 3/8" 85-100 100 100 No.4 California Test 202 0-15 0-50 60-85 No. 8 0-5 0-15 0-25 No. 16 -- 0-5 0-5 No. 30 -- 0-3 0-3 No. 200 0-2 0-2 0-2 37-2.02B Materials 37-2.02B(1) General Reserved Page 45 of 183 37-2.02B(2)Asphaltic Emulsions Reserved 37-2.02B(3)Aggregate Aggregate gradation for an asphaltic emulsion chip seal must comply with the requirements shown in the following table: Asphaltic Emulsion Chip Seal Aggregate Gradation Quality characteristic Test method Requirement Gradation (% passing by weight) 3/8" 5/16" 1/4" Sieve size: 3/4" -- -- -- 1/2" 100 -- -- 3/8" California Test 85-100 100 100 No.4 202 0-15 0-50 60-85 No. 8 0-5 0-15 0-25 No. 16 -- 0-5 0-5 No. 30 -- 0-3 0-3 No. 200 0-2 0-2 0-2 37-2.02C Construction 37-2.02C(1) General Reserved 37-2.02C(2) Asphaltic Emulsions Asphaltic emulsions must be applied within the application rate ranges shown in the following table: Asphaltic Emulsion Application Rates Aggregate gradation Application rate range (gal/sq yd) 3/8" 0.30-0.45 5/16" 0.25-0.35 1/4" 0.20-0.30 For double asphaltic emulsion chip seals,the asphaltic emulsions must be applied within the application rates shown in the following table: Asphaltic Emulsion Application Rates Double chip seals Application rate range (gal/sq yd) 1 st application 0.30-0.45 2nd application 0.20-0.30 When applied,the temperature of the asphaltic emulsions must be from 130 to 180 degrees F. Apply asphaltic emulsions when the ambient air temperature is from 65 to 110 degrees F and the pavement surface temperature is at least 80 degrees F. Do not apply asphaltic emulsions when weather forecasts predict the ambient air temperature will fall below 39 degrees F within 24 hours after application. 37-2.02C(3) Spreading Aggregates Aggregate must be spread within the spread rate ranges shown in the following table: Page 46 of 183 Aggregate Spread Rates Aggregate gradation Spread rate range (lb/sq yd) 3/8" 20-30 5/16" 16-25 1/4" 12-20 For double asphaltic emulsion chip seals, aggregate must be spread within the spread rate ranges shown in the following table: Aggregate Spread Rates Double chip seal Spread rate range (lb/sq yd) 1 st application 23-30 2nd application 12-20 Remove excess aggregate on the 1st application before the 2nd application of asphaltic emulsion. You may stockpile aggregate for asphaltic emulsion chip seals if you prevent contamination.Aggregate must have a damp surface at spreading. If water visibly separates from the aggregate, do not spread. You may re-dampen aggregate in the delivery vehicle. Spread aggregate before an asphaltic emulsion sets or breaks. Do not spread aggregate more than 2,500 feet ahead of the completed initial rolling. 37-2.02D Payment Not Used 37-2.03 POLYMER MODIFIED ASPHALTIC EMULSION CHIP SEALS 37-2.03A General 37-2.03A(1) Summary Section 37-2.03 includes specifications for applying polymer modified asphaltic emulsion chip seals. A polymer modified asphaltic emulsion chip seal includes applying a polymer modified asphaltic emulsion, followed by aggregate, and then a flush coat. A double polymer modified asphaltic emulsion chip seal is the application of a polymer modified asphaltic emulsion followed by aggregate, applied twice in sequence and then a flush coat. 37-2.03A(2) Definitions Reserved 37-2.03A(3) Submittals Immediately after sampling, submit two 1-quart cans of polymer modified asphaltic emulsion taken in the presence of the Engineer. A sample must be submitted in an insulated shipping container. 37-2.03A(4) Quality Assurance 37-2.03A(4)(a) General Reserved 37-2.03A(4)(b) Quality Control 37-2.03A(4)(b)(i) General Reserved 37-2.03A(4)(b)(ii) Polymer Modified Asphaltic Emulsions Circulate polymer modified asphaltic emulsions in the distributor truck before sampling. Take samples from the distributor truck at mid load or from a sampling tap or thief. Before taking samples, draw and dispose of 1 gallon. In the presence of the Engineer, take two 1-quart samples for acceptance testing. Page 47 of 183 For polymer modified asphaltic emulsions,the authorized laboratory must perform quality control sampling and testing at the specified frequency and location for the following quality characteristics: Polymer Modified Asphaltic Emulsion Minimum Quality characteristic Test method sampling and testing Sampling frequency location Saybolt Furol Viscosity, at 50 °C (Saybolt Furol seconds Settlement, 5 days(max, %) Storage stability test, 1 day(max, %) AASHTO T 59 Minimum 1 Distributor Sieve test(max, %) per day per Demulsibility(min, %) delivery truck truck Particle charge Ash content(max, %) ASTM D3723 Residue by evaporation (min, %) California Test 331 Tests on residue from evaporation test: Penetration, 25°C AASHTO T 49 Penetration, 4 °C, 200g for 60 seconds AASHTO T 49 Minimum 1 Distributor Ductility, 25 °C (min, mm) AASHTO T 51 per day per truck Torsional recover min, %) California Test 332 delivery truck Ring and Ball Softening Point(min, °F) AASHTO T 53 37-2.03A(4)(c) Department Acceptance Aggregate acceptance is based on the Department's sampling and testing for compliance with the requirements shown in the following table: Aggregate Gradation Acceptance Criteria Quality characteristic Test method Requirement Gradation (% passing by weight) 3/8" 5/16" 1/4" Sieve size: 3/4" -- -- -- 1/2" 100 -- -- 3/8" California Test 85-100 100 100 No.4 202 0-15 0-50 60-85 No. 8 0-5 0-15 0-25 No. 16 -- 0-5 0-5 No. 30 -- 0-3 0-3 No. 200 0-2 0-2 0-2 37-2.03B Materials 37-2.03B(1) General Reserved 37-2.03B(2) Polymer Modified Asphaltic Emulsions A polymer modified asphaltic emulsion must include elastomeric polymer. A polymer modified asphaltic emulsion must be Grade PMRS2, PMRS2h, PMCRS2, or PMCRS2h. Polymer content in percent by weight does not apply. A polymer modified asphaltic emulsion must comply with section 94 and the quality characteristic requirements in the following table: Page 48 of 183 Polymeric Asphaltic Emulsion Quality characteristic Test method Requirement Penetration 4 °C 200q for 60 seconds min AASHTO T 49 6 Ring and Ball Softening Point(min, °F) AASHTO T 53 135 37-2.03B(3) Aggregate The aggregate gradation for a polymer modified asphaltic emulsion chip seal must comply with the requirements shown in the following table: Asphaltic Emulsion Chip Seal Aggregate Gradation Quality characteristic Test method Requirement Gradation (% passing by weight) 3/8" 5/16" 1/4" Sieve Size 3/4" -- -- -- 1/2" 100 -- -- California Test 3/8" 85-100 100 100 No.4 202 0-15 0-50 60-85 No. 8 0-5 0-15 0-25 No. 16 -- 0-5 0-5 No. 30 -- 0-3 0-3 No. 200 0-2 0-2 0-2 37-2.03C Construction Polymer modified asphaltic emulsions must be applied within the application rate ranges shown in the following table: Polymer Modified Asphaltic Emulsion Application Rates Aggregate gradation Application rate range (gal/sq yd) 3/8" 0.30-0.45 5/16" 0.25-0.35 1/4" 0.20-0.30 For double polymer modified asphaltic emulsion chip seals, polymer modified asphaltic emulsions must be applied within the application rates shown in the following table: Polymer Modified Asphaltic Emulsion Application Rates Double application Application rate range (gal/sq yd) 1 st application 0.30-0.45 2nd application 0.20-0.30 Apply polymer modified asphaltic emulsions when the ambient air temperature is from 60 to 105 degrees F and the pavement surface temperature is at least 80 degrees F. Do not apply polymer modified asphaltic emulsions when weather forecasts predict the ambient air temperature will fall below 39 degrees F within 24 hours after application. Aggregate must be spread within the spread rate ranges shown in the following table: Page 49 of 183 Aggregate Spread Rates Chip seal type Spread rate range (lb/sq yd) 3/8" 20-30 5/16" 16-25 1/4" 12-20 For double chip seals, aggregate must be spread within spread rate ranges shown in the following table: Aggregate Spread Rates Double application Spread rate range (lb/sq yd) 1 st application 23-30 2nd application 12-20 Remove excess aggregate on the 1 st application before the 2nd application of asphaltic emulsion. You may stockpile aggregate for the polymer modified asphaltic emulsion chip seals if you prevent contamination.Aggregate must have damp surfaces at spreading. If water visibly separates from the aggregate, do not spread.You may redampen aggregate in the delivery vehicle. Spread aggregate before the polymer modified asphaltic emulsion sets or breaks. Do not spread aggregate more than 2,500 feet ahead of the completed initial rolling. 37-2.03D Payment Not Used 37-2.04 ASPHALT RUBBER BINDER CHIP SEALS 37-2.04A General 37-2.04A(1) Summary Section 37-2.04 includes specifications for applying asphalt rubber binder chip seals. An asphalt rubber binder chip seal consists of applying asphalt rubber binder followed by heated aggregate precoated with asphalt binder followed by a flush coat. 37-2.04A(2) Definitions crumb rubber modifier: Combination of ground or granulated high natural scrap tire crumb rubber and scrap tire crumb rubber derived from waste tires described in Pub Res Code§42703. descending viscosity reading: Subsequent viscosity reading at least 5 percent lower than the previous viscosity reading. high natural scrap tire crumb rubber: Material containing 40 to 48 percent natural rubber. scrap tire crumb rubber: Any combination of vehicle tires or tire buffing. 37-2.04A(3) Submittals At least 5 business days before use, submit the permit issued by the local air district for asphalt rubber binder field blending equipment and application equipment. If an air quality permit is not required by the local air district for producing asphalt rubber binder, submit verification from the local air district that an air quality permit is not required. For each delivery of asphalt rubber binder ingredients to the job site, submit a certificate of compliance with a copy of the specified test results. Submit a certified volume or weight slip for each delivery of asphalt rubber binder ingredients and asphalt rubber binder. Submit a SIDS for each asphalt rubber binder ingredient and the asphalt rubber binder. Page 50 of 183 At least 15 days before use, submit: 1. Samples of each asphalt rubber binder ingredient: 1.1. 2 Ibs of scrap tire crumb rubber 1.2. 2 Ibs of high natural scrap tire crumb rubber 1.3. Two 1-quart cans of base asphalt binder 1.4. Two 1-quart cans of asphalt modifier 2. Asphalt rubber binder formulation and data as follows: 2.1. For asphalt modifier, include: 2.1.1. Source of asphalt modifier 2.1.2. Type of asphalt modifier 2.1.3. Percentage of asphalt modifier by weight of asphalt binder 2.1.4. Percentage of combined asphalt binder and asphalt modifier by weight of asphalt rubber binder 2.1.5. Test results for the specified quality characteristics 2.2. For crumb rubber modifier, include: 2.2.1. Each source and type of scrap tire crumb rubber and high natural scrap tire crumb rubber 2.2.2. Percentage of scrap tire crumb rubber and high natural scrap tire crumb rubber by total weight of asphalt rubber binder 2.2.3. Test results for the specified quality characteristics 2.3. For asphalt rubber binder, include minimum reaction time and temperature Immediately after sampling, submit five 1-quart cans of asphalt rubber binder taken in the presence of the Engineer. Sample must be submitted in insulated shipping containers. Submit notification 15 minutes before each viscosity test or submit a schedule of testing times. Submit the log of asphalt rubber binder descending viscosity test results within 1 business day after sampling. Submit asphalt rubber binder quality control viscosity test results within 1 business day after sampling. 37-2.04A(4) Quality Assurance 37-2.04A(4)(a) General The equipment used in producing asphalt rubber binder and the equipment used in spreading asphalt rubber binder must be permitted for use or exempted by the local air district. 37-2.04A(4)(b) Quality Control 37-2.04A(4)(b)(i) General Reserved 37-2.04A(4)(b)(ii) Asphalt Modifiers For asphalt modifiers, the authorized laboratory must perform quality control sampling and testing at the specified frequency for the following quality characteristics: Asphalt Modifier for Asphalt Rubber Binder Quality characteristic Test method Frequency Viscosity ASTM D445 1 per shipment Flash point ASTM D92 Molecular Analysis: Asphaltenes ASTM D2007 1 per shipment Aromatics ASTM D2007 37-2.04A(4)(b)(iii) Crumb Rubber Modifiers Sample and test scrap tire crumb rubber and high natural scrap tire crumb rubber separately. Perform quality control sampling and testing at the specified frequency for the following quality characteristics: Page 51 of 183 Crumb Rubber Modifier Quality characteristic Test method Frequency Scrap tire crumb rubber gradation California Test 385 1 per 10,000 High natural scrap tire crumb rubber gradation California Test 385 1 per 3,400 lb Wire in CRM California Test 385 Fabric in CRM California Test 385 CRM particle length 1 per 10,000 lb CRM specific gravity California Test 208 Natural rubber content in high natural scrap tire crumb ASTM D297 1 per 3,400 lb rubber 37-2.04A(4)(b)(iv) Asphalt Rubber Binders For asphalt rubber binders, the authorized laboratory must perform quality control sampling and testing at the specified frequency and location for the following quality characteristics: Asphalt Rubber Binder Quality Control Requirements Quality characteristic Test method Sampling location Frequency Descending viscositya at 375°F (Pa-s ASTM D7741 Reaction vessel 1 per lot x10 Viscosity at 375°F (Pa-s x 10- ) ASTM D7741 Distribution truck 15 minutes before use per lot Cone penetration at 25°C (0.10 mm) ASTM D217 Resilience at 25 °C(% rebound) ASTM D5329 Distribution truck 1 per loth Softening point(°C) ASTM D36 aStart taking viscosity readings at least 45 minutes after adding crumb rubber modifier and continue taking viscosity readings every 30 minutes until 2 consecutive descending viscosity readings have been obtained and the final viscosity complies with the specification requirement. bA lot is defined in the MPQP. Retain samples from each lot.Test samples for cone penetration, resilience, and softening point for the first 3 lots and if all 3 lots pass, the testing frequency may be reduced to once for every 3 lots. If QC test results indicate that the asphalt rubber binder does not comply with the specifications,take corrective action and notify the Engineer. 37-2.04A(4)(c) Department Acceptance 37-2.04A(4)(c)(i) General Reserved 37-2.04A(4)(c)(ii) Asphalt Modifiers The Department accepts asphalt modifier based on compliance with the requirements shown in the following table: Asphalt Modifier for Asphalt Rubber Binder Quality characteristic Test method Requirement Viscosity at 100 °C (m /s x 10 ) ASTM D445 X ±3a Flash point(min, °C) ASTM D92 207 Molecular Analysis: Asphaltenes(max, % by mass) ASTM D2007 0.1 Aromatics(min, % by mass) ASTM D2007 55 aThe symbol "X" is the asphalt modifier viscosity. 37-2.04A(4)(c)(iii) Crumb Rubber Modifiers Scrap tire CRM and high natural CRM are sampled and tested separately. Page 52 of 183 The Department accepts scrap tire CRM and high natural CRM based on compliance with the requirements shown in the following table: Crumb Rubber Modifier for Asphalt Rubber Binder Quality characteristic Test method Requirement Wire in CRM max % California Test 385 0.01 Fabric in CRM (max, %) California Test 385 0.05 CRM particle length (max, in) -- 3/16 CRM specific gravity California Test 208 1.1-1.2 Natural rubber content in high natural CRM (%) ASTM D297 40.0-48.0 The Department accepts CRM gradation based on the requirements shown in the following table: Crumb Rubber Modifier Gradation Requirements Quality characteristic Test Requirement method Gradation (% passing by weight) Scrap tire crumb rubber High natural scrap tire Sieve size: crumb rubber Operating Contract Operating Contract range compliance range compliance No. 110 California 95-0 0 100 90-100 100 100 No. 16 Test 385 35-85 32-88 92-100 85-100 No. 30 2-25 1-30 25-95 20-98 No. 50 0-10 0-15 6-35 2-40 No. 100 0-5 0-10 0-7 0-10 No. 200 0-2 0-5 0-3 0-5 If a test result for CRM gradation does not comply with the specifications, the Department deducts the corresponding amount for each gradation test as shown in the following table: Material Gradation test resulta Deduction Scrap tire crumb rubber Operating range <TR<Contract compliance $250 Scrap tire crumb rubber TR>Contract compliance $1,100 High natural scrap tire crumb rubber Operating range <TR<Contract compliance $250 High natural scrap tire crumb rubber TR>Contract compliance $600 aTest Result=TR Each gradation test for scrap tire crumb rubber represents 10,000 lb or the quantity used in that day's production,whichever is less. Each gradation test for high natural scrap tire crumb rubber represents 3,400 lb or the quantity used in that day's production, whichever is less. 37-2.04A(4)(c)(iv) Asphalt Rubber Binders For Department acceptance testing,take a sample of asphalt rubber binder in the Engineer's presence every 5 lots or once a day, whichever is greater. Each sample must be in five 1-quart cans with an open top and friction lid. For an asphalt rubber binder, acceptance is based on the Department's sampling and testing for compliance with the requirements shown in the following table: Page 53 of 183 Asphalt Rubber Binder Quality characteristic Test method Requirement Cone penetration at 25 °C 0.10 mm ASTM D217 25-60 Resilience at 25 °C % rebound ASTM D5329 18-50 Softening point(°C) ASTM D36 55-88 Viscosity at 375 °F Pa•s x 10 a ASTM D7741 1 500-2 500 aPrepare sample for viscosity test under California Test 388. 37-2.04A(4)(c)(v) Precoated Aggregate The Department accepts precoated aggregate based on compliance with the requirements shown in the following table: Precoated Aggregate Gradation Acceptance Criteria Quality Characteristic Test method Requirement 1/2"gradation (% passing by weight) California Test 202 Sieve size: 3/4" 100 1/2" 85-90 3/8" 0-30 No.4 0-5 No. 8 -- No. 200 0-1 3/8"gradation (% passing by weight) California Test 202 Sieve size: 3/4" 100 1/2" 95-100 3/8" 70-85 No.4 0-15 No. 8 0-5 No. 200 0-1 37-2.04B Materials 37-2.04B(1) General Reserved 37-2.04B(2) Asphalt Binders Asphalt binder used as the base binder for asphalt rubber binder must comply with the specifications for asphalt binder. Do not modify asphalt binder with polymer. 37-2.04B(3) Asphalt Modifiers An asphalt modifier must be a resinous, high flash point, and aromatic hydrocarbon.An asphalt modifier must comply with the requirements shown in the following table: Asphalt Modifier for Asphalt Rubber Binder Quality characteristic Test method Requirement Viscosity at 100 °C (m /s x 10 ) ASTM D445 X ±3a Flash point min, CL.O.C., °C ASTM D92 207 Molecular analysis: Asphaltenes by mass max, % ASTM D2007 0.1 Aromatics by mass (min, %) ASTM D2007 55 aXdenotes the proposed asphalt modifier viscosity from 19 to 36. A change in X requires a new asphalt rubber binder submittal. 37-2.04B(4) Crumb Rubber Modifiers The CRM to be used must be on the Authorized Materials List for crumb rubber modifier. Page 54 of 183 The CRM must be ground or granulated at ambient temperature. Scrap tire crumb rubber and high natural scrap tire crumb rubber must be delivered to the asphalt rubber binder production site in separate bags. Steel and fiber must be separated. If steel and fiber are cryogenically separated, it must occur before grinding and granulating. Cryogenically-produced CRM particles must be large enough to be ground or granulated. The CRM must be dry, free-flowing particles that do not stick together.A maximum of 3 percent calcium carbonate or talc by weight of CRM may be added. The CRM must not cause foaming when combined with the asphalt binder and asphalt modifier. The CRM must comply with the requirements shown in the following table: Crumb Rubber Modifier for Asphalt Rubber Binder Quality characteristic Test method Requirement Wire in CRM max % California Test 385 0.01 Fabric in CRM (max, %) California Test 385 0.05 CRM particle length (max, in) -- 3/16 CRM specific gravity California Test 208 1.1-1.2 The CRM must comply with the requirements shown in the following table: Crumb Rubber Modifier Requirements Requirement Quality characteristic Test method Scrap tire crumb rubber High natural scrap tire crumb rubber Acetone extract % 6.0-16.0 4.0-16.0 Rubber hydrocarbon (min, %) 42.0-65.0 50.0 Natural rubber content(%) ASTM D297 22.0-39.0 40.0-48.0 Carbon black content(%) 28.0-38.0 -- Ash content(max, %) 8.0 -- Scrap tire crumb rubber gradation must comply with the gradation requirements shown in the following table: Scrap Tire Crumb Rubber Gradation Quality characteristic Test Requirement method Gradation (% passing by Gradation limit Operating range Contract weight) compliance Sieve size: No. 8 100 100 100 No. 10 California 98-100 95-100 90-100 No. 16 Test 385 45-75 35-85 32-88 No. 30 2-20 2-25 1-30 No. 50 0-6 0-10 0-15 No. 100 0-2 0-5 0-10 No. 200 0 1 0-2 0-5 High natural scrap tire crumb rubber gradation must comply with the gradation requirements shown in the following table: Page 55 of 183 High Natural Scrap Tire Crumb Rubber Gradation Quality characteristic Test Requirement method Gradation (% passing by Gradation limit Operating range Contract weight) compliance Sieve size: No. 10 100 100 100 No. 16 California 95-100 92-100 85-100 No. 30 Test385 35-85 25-95 20-98 No. 50 10-30 6-35 2-40 No. 100 0-4 0-7 0-10 No. 200 0-1 0-3 0-5 37-2.04B(5) Asphalt Rubber Binders An asphalt rubber binder must be a combination of: 1. Asphalt binder 2. Asphalt modifier 3. Crumb rubber modifier Asphalt rubber binder blending equipment must be authorized under the Department's MPQP. The blending equipment must allow the determination of weight percentages of each asphalt rubber binder ingredient. An asphalt rubber binder must be 79± 1 percent by weight asphalt binder and 21 ± 1 percent by weight of CRM. The minimum percentage of CRM must be 20.0 percent and lower values must not be rounded up. The CRM must be 75±2 percent by weight scrap tire crumb rubber and 25±2 percent by weight high natural scrap tire crumb rubber. An asphalt modifier and asphalt binder must be blended at the production site.An asphalt modifier must be from 2.5 to 6.0 percent by weight of the asphalt binder in the asphalt rubber binder. The asphalt rubber binder supplier determines the exact percentage. If blended before adding CRM,the asphalt binder must be from 375 to 440 degrees F when an asphalt modifier is added and the mixture must circulate for at least 20 minutes. An asphalt binder, asphalt modifier, and CRM may be proportioned and combined simultaneously. The blend of an asphalt binder and an asphalt modifier must be combined with the CRM at the asphalt rubber binder production site. The asphalt binder and asphalt modifier blend must be from 375 to 440 degrees F when the CRM is added. Combined ingredients must be allowed to react at least 45 minutes at temperatures from 375 to 425 degrees F except the temperature must be at least 10 degrees F below the flash point of the asphalt rubber binder. After reacting, the asphalt rubber binder must comply with the requirements shown in the following table: Asphalt Rubber Binder Quality characteristic Test method Requirement Cone penetration at 25°C 0.10 mm ASTM D217 25-60 Resilience at 25 °C(% rebound) ASTM D5329 18-50 Softening point(°C) ASTM D36 55-88 Viscosity at 375 °F (Pa-s x 10 )a ASTM D7741 1,500-2,500 aPrepare sample for viscosity test under California Test 388. Maintain asphalt rubber binder at a temperature from 375 to 415 degrees F. Page 56 of 183 Stop heating unused asphalt rubber binder 4 hours after the 45-minute reaction period. Reheating asphalt rubber binder that cools below 375 degrees F is a reheat cycle. Do not exceed 2 reheat cycles. If reheating,the asphalt rubber binder must be from 375 to 415 degrees F before use. During reheating, you may add CRM. The CRM must not exceed 10 percent by weight of the asphalt rubber binder.Allow added CRM to react for at least 45 minutes. Reheated asphalt rubber binder must comply with the specifications for asphalt rubber binder. 37-2.04B(6) Precoated Aggregate Before precoating with asphalt binder, aggregate for an asphalt rubber binder chip seal must comply with the gradation requirements shown in the following table: Asphalt Rubber Binder Chip Seal Aggregate Gradation Quality characteristic Test method Requirement Gradation (% passing by weight) 1/2" 3/8" Sieve size: 3/4" 100 100 1/2" California Test 85-90 95-100 3/8" 202 0-30 70-85 No.4 0-5 0-15 No. 8 -- 0-5 No. 200 0-1 0-1 37-2.04C Construction 37-2.04C(1) General Reserved 37-2.04C(2) Equipment Distributor trucks must be equipped with: 1. Mixing and heating unit 2. Observation platform on the rear of the truck for an observer on the platform to see the nozzles and unplug them if needed 37-2.04C(3) Asphalt Rubber Binder Application Apply the asphalt rubber binder when the ambient temperature is from 60 to 105 degrees F and the pavement surface temperature is at least 55 degrees F. Do not apply the asphalt rubber binder unless enough aggregate is available at the job site to cover the asphalt rubber binder within 2 minutes. Intersections, turn lanes, gore points, and irregular areas must be covered within 15 minutes. Do not apply asphalt rubber binder when pavement is damp or during high wind conditions. If authorized, you may adjust the distributor bar height and distribution speed and use shielding equipment during high wind conditions. When applied,the temperature of the asphalt rubber binder must be from 385 to 415 degrees F. Apply the asphalt rubber binder at a rate from 0.55 to 0.65 gal/sq yd. You may reduce the application rate by 0.050 gal/sq yd in the wheel paths. 37-2.04C(4) Precoated Aggregate Spreading Spread aggregate at a rate from 28 to 40 Ib/sq yd. Do not spread aggregate more than 200 feet ahead of the completed initial rolling. 37-2.04C(5) Rolling and Sweeping Perform initial rolling within 90 seconds of spreading aggregate. If authorized for final rolling, you may use a steel-wheeled roller weighing from 8 to 10 tons in static mode only. Page 57 of 183 Perform a final sweeping before Contract acceptance. The final sweeping must not dislodge aggregate. 37-2.04D Payment Asphalt rubber binder is measured as specified for asphalt binder. 37-2.05 STRESS ABSORBING MEMBRANE INTERLAYERS 37-2.05A General Section 37-2.05 includes specifications for placing stress absorbing membrane interlayers(SAMI). Comply with section 37-2.04 except a flush coat is not required. Traffic must not be allowed on a SAMI. 37-2.05B Materials For a SAMI, aggregate must comply with the 3/8-inch gradation. 37-2.05C Construction If a SAMI is overlaid in the same work shift, section 37-2.01 C(4)(e)does not apply. Final sweeping is not required for a SAMI. 37-2.05D Payment Not Used 37-2.06 MODIFIED ASPHALT BINDER CHIP SEALS Reserved 37-2.07 SCRUB SEALS Reserved 37-3 SLURRY SEALS AND MICRO-SURFACINGS 37-3.01 GENERAL 37-3.01A General 37-3.01A(1) Summary Section 37-3.01 includes general specifications for applying slurry seals and micro-surfacings. 37-3.01A(2) Definitions Reserved 37-3.01A(3) Submittals At least 15 days before starting placement of a slurry seal or micro-surfacing, submit: 1. Samples for: 1.1. Asphaltic emulsion slurry seal, two 1-quart wide mouth plastic containers with screw top lid of asphaltic emulsion 1.2 Polymer modified asphaltic emulsion slurry seal, two 1-quart wide mouth plastic containers with screw top lid of polymer modified asphaltic emulsion 1.3. Micro-surfacing, two 1-quart wide mouth plastic containers with screw top lid of micro-surfacing emulsion 2. Asphaltic emulsion, polymer modified asphaltic emulsion, or micro-surfacing emulsion data as follows: 2.1. Supplier and Type/Grade of asphaltic emulsion 2.2. Type of modifier polymer for polymer modified asphaltic emulsion or micro-surfacing emulsion 2.3. Copy of the specified test results for asphaltic emulsion, polymer modified asphaltic emulsion, or micro-surfacing emulsion 3. 50 lb of aggregate 4. Aggregate test results for the followings: 4.1. Gradation 4.2. Los Angeles Rattler 4.3. Percent of crushed particles Page 58 of 183 4.4 Sand equivalent 4.5 Durability At least 10 days before starting placement of a slurry seal or micro-surfacing, submit a laboratory report of test results and the proposed mix design from an authorized laboratory. The authorized laboratory must sign the laboratory report and mix design. The report must include: 1. Test results used in the mix design compared with specification requirements 2. Proportions based on the dry weight of aggregate, including ranges,for: 2.1. Aggregate 2.2. Water 2.3. Additives 2.4. Mineral filler 2.5. Slurry seal emulsion or micro-surfacing emulsion residual asphalt content 3. Recommended changes to the proportions based on heating the mixture to 100 degrees F and mixing for 60 seconds, if atmospheric temperatures during application will be 90 degrees F or above, for: 3.1. Water 3.2. Additives 3.3. Mineral filler 4. Quantitative moisture effects on the aggregate's unit weight determined under ASTM C29M If the mix design consists of the same materials covered by a previous laboratory report, you may submit the previous laboratory report that must include material testing data performed within the previous 12 months for authorization. If you change any of the materials in the mix design, submit a new mix design and laboratory report at least 10 days before starting slurry seal or micro-surfacing work. Submit a certificate of compliance as specified for asphaltic emulsion in section 94-1.01 C with each shipment of asphaltic emulsion, polymer modified asphaltic emulsion or micro-surfacing emulsion. Submit quality control test results for the quality characteristics within the reporting times allowance after sampling shown in the following table: Quality Control Test Reporting Requirements Quality characteristic Maximum reporting time allowance Los Angeles Rattler loss max, % 2 business days Percent of crushed particles min, % 2 business days Durability min 2 business days Resistance of fine aggregate to degradation by abrasion in the Micro- 2 business days Deval Apparatus % loss by weight) Gradation % passing by wei ht 48 hours Sand equivalent min 48 hours Moisture content % 48 hours Within 3 days after taking asphaltic emulsion, polymer modified asphaltic emulsion or micro-surfacing emulsion quality control samples, submit the authorized laboratory's test results. 37-3.01A(4) Quality Assurance 37-3.01A(4)(a) General Your authorized laboratory must be able to perform International Slurry Surfacing Association tests and mix design. Page 59 of 183 37-3.01A(4)(b) Quality Control 37-3.01A(4)(b)(i) General Reserved 37-3.01A(4)(b)(ii) Aggregate For aggregate,the authorized laboratory must perform sampling and testing at the specified frequency and location for the following quality characteristics: Aggregate Quality Control Quality characteristic Test method Minimum Location of sampling and sampling testing frequency Los Angeles Rattler loss (max, %) California Test 211 1 st day of See California At 500 revolutions production Test 125 Percent of crushed particles (min, %) AASHTO T 335 1 st day of See California roduction Test 125 Sand equivalent(min) California Test 217 1 per working See California stockpile per day Test 125 Resistance of fine aggregate to ASTM D7428 degradation by abrasion in 1 per working See California the Micro-Deval Apparatus (% loss stockpile per day Test 125 by weight) Gradation (% passing by weight) California Test 202 1 per working See California stockpile per day Test 125 Moisture content,from field stockpile AASHTO T 255a 1 per working See California (%) I I stockpile per day I Test 125 aTest aggregate moisture at field stockpile every 2 hours if you are unable to maintain the moisture content to within a maximum daily variation of±0.5 percent. 37-3.01A(4)(b)(iii) Slurry Seals and Micro-surfacings Reserved 37-3.01A(4)(c) Department Acceptance Slurry Seal and micro-surfacing acceptance is based on: 1. Visual inspection for the following: 1.1. Uniform surface texture throughout the work limits. 1.2. Marks in the surface: 1.2.1. Up to 4 marks in the completed slurry seal or micro-surfacing surface that are up to 1 inch wide and up to 6 inches long per 1000 square feet of slurry seal or micro- surfacing placed. 1.2.2. No marks in the completed slurry seal or micro-surfacing surface that are over 1 inch wide or 6 inches long. 1.3. Excessive raveling consisting of the separation of the aggregate from the asphaltic emulsion, polymer modified asphaltic emulsion or micro-surfacing emulsion. 1.4. Bleeding consists of the occurrence of a film of asphaltic material on the surface of the slurry seal or micro-surfacing. 1.5. Delaminating of slurry seal or micro-surfacing from the existing pavement. 1.6. Rutting or wash-boarding. 2. Department's sampling and testing for compliance with the requirements for aggregate shown in the following table: Page 60 of 183 Aggregate Gradation Acceptance Criteria Quality characteristic Test method Requirements Gradation (% passing by weight) Type I Type 11 Type III Sieve Size: 3/8" -- 100 100 No.4 California Test 100 94-100 70-90 No. 8 202 90-100 65-90 45-70 No. 16 60-90 40-70 28-50 No. 30 40-65 25-50 19-34 No. 200 10-20 5-15 5-15 An aggregate gradation test represents 300 tons or 1 day's production, whichever is less. If test results for aggregate gradation do not comply with the specifications, you may remove the slurry seal or micro-surfacing represented by the test results or request it remain in place with a payment deduction. If your request is authorized,the Department deducts: 1. $1.75 per ton of slurry seal for each noncompliant aggregate gradation 2. $2.00 per ton of micro-surfacing for each noncompliant aggregate gradation 37-3.01 B Materials 37-3.01B(1) General Additional water must not cause separation of the asphaltic emulsion, polymer modified asphaltic emulsion or micro-surfacing emulsion from the aggregate before placement. You may use an additive that does not adversely affect the slurry seal or micro-surfacing. 37-3.01 B(2) Aggregate Aggregate must be rock dust.Aggregate must be free from vegetable matter, deleterious substances, caked or clay lumps, and oversized particles. Aggregate for a slurry seal and micro-surfacing must comply with the gradations shown in the following table: Aggregate Gradation Quality characteristic Test method Requirements Gradation (% passing by weight) Type I Type II Type III Sieve size: 3/8" -- 100 100 No. 4 California 100 94-100 70-90 No. 8 Test 202 90-100 65-90 45-70 No. 16 60-90 40-70 28-50 No. 30 40-65 25-50 19-34 No. 200 10-20 5-15 5-15 37-3.01C Construction 37-3.01C(1) General Before applying slurry seals or micro-surfacings, cover manholes, valve and monument covers, grates, and other exposed facilities located within the area of application using plastic or oil resistant construction paper secured by tape or adhesive to the facility being covered. Reference the covered facilities with enough control points to relocate the facilities after application of the slurry seals or micro-surfacings. 37-3.01C(2) Proportioning Proportion slurry seal and micro-surfacing ingredients in compliance with the authorized mix design. Page 61 of 183 37-3.01C(3) Mixing and Spreading Equipment 37-3.01 C(3)(a) General Mixing and spreading equipment for slurry seals and micro-surfacings must proportion the asphaltic emulsions, water, aggregate, and any additives by volume and mix them in continuous pug mill mixers. Introduce emulsions into the mixer with a positive displacement pump. If you use a variable-rate pump, the adjusting unit must be sealed in its calibrated position. Introduce water into the mixer through a meter that measures gallons. Choose a truck mounted mixer-spreader or continuous self-loading mixer spreader. 37-3.01C(3)(b) Truck Mounted Mixer Spreaders Truck mounted mixer spreaders must comply with: 1. Rotating and reciprocating equipment must be covered with metal guards. 2. Proportion aggregate using a belt feeder with an adjustable cutoff gate. The Engineer verifies the height of the gate opening. 3. Belt feeder must have a depth monitor device.The depth monitor device must automatically shut down power to the belt feeder when the aggregate depth is less than 70 percent of the target depth. 4. Separate monitor device must detect the revolutions of the belt feeder.This device must automatically shut down power to the belt feeder if it detects no revolutions. If the belt feeder is an integral part of the equipment's drive chain,the monitor device is not required. 5. Aggregate belt feeder must be connected directly to the drive on the emulsion pump. The aggregate feeder drive shaft must have a revolution counter reading the nearest 0.10 revolution for micro- surfacing, and nearest 1 revolution for slurry seal. 6. Emulsion storage must be equipped with a device that automatically shuts down power to the emulsion pump and aggregate belt feeder when the level of stored emulsion is lowered.To allow for normal fluctuations,there may be a delay of 3 seconds between detection of low emulsion storage levels or low aggregate depths and automatic power shut down. 7. Emulsion storage must be located immediately before the emulsion pump. 8. Emulsion storage tank must have a temperature indicator at the pump suction level.The indicator must be accurate to±5 degrees F. 9. No-flow and revolution warning devices must be in working condition. Low-flow indicators must be visible while walking alongside the equipment. 37-3.01C(3)(c) Continuous Self-Loading Mixer Spreaders Continuous self-loading mixer spreaders must be automatically sequenced and self-propelled.The mixing machine must deliver each material to a double shafted mixer and discharge the mixed material on a continuous flow basis. The mixing machines must have sufficient storage capacity to maintain a continuous supply of material to the proportioning controls.The mixing machine operators must have full control of forward and reverse speeds during placement. 37-3.01 C(3)(d) Spreader Boxes The spreader boxes used to spread slurry seals and micro-surfacings must be: 1. Capable of spreading the slurry seal or micro-surfacing a minimum of 12 feet wide and preventing the loss of slurry seal or micro-surfacing. 2. Equipped with flexible rubber belting on each side. The belting must contact the pavement to prevent the loss of slurry seal or micro-surfacing from the box. 3. Equipped to uniformly apply the slurry seal or micro-surfacing on superelevated sections and shoulder slopes. Micro-surfacing spreader box must be equipped with reversible motor driven augers. 4. Equipped with a series of strike-off devices at its rear. 4.1. The leading strike off device must be: 4.1.1. Fabricated of a suitable material such as steel or stiff rubber 4.1.2. Designed to maintain close contact with the pavement during spreading 4.1.3. Capable of obtaining the specified thickness 4.1.4. Capable of being adjusted to the various pavement cross sections 4.2. The final strike-off device must be: 4.2.1. Fabricated of flexible material that produces a uniform texture in the finished surface Page 62 of 183 4.2.2. Cleaned daily and changed if longitudinal scouring occurs in the slurry seal of micro- surfacing 5. Clean and free of slurry seal or micro-surfacing at the start of each work shift. 37-3.01C(3)(e) Shoulder Equipment Spread the slurry seal or micro-surfacing on shoulders with a device such as an edge box that forms clean and straightjoints and edges. 37-3.01C(3)(f) Equipment Calibration Equipment calibration must comply with the MPQP. Notify the Engineer at least 5 business days before calibrating. If the Department authorizes a truck or continuous mixer spreader, its calibration is valid for 6 months provided you: 1. Use the same truck or continuous mixer spreader verified with a unique identifying number 2. Use the same materials in compliance with the authorized mix design 3. Do not perform any repair or alteration to the proportioning systems Calibrate the adjustable cut-off gate settings of each truck or continuous mixer spreader on the project to achieve the correct delivery rate of aggregate and emulsion per revolution of the aggregate feeder under the MPQP. Checks must be performed for each aggregate source using an authorized vehicle scale. Individual checks of the aggregate belt feeder's delivery rate to the pug mill mixer must not vary more than 2 percent from the average of 3 runs of at least 3 tons each. Before using a variable-rate emulsion pump,the pump must be calibrated and sealed in the calibrated condition under the MPQP. Individual checks of the emulsion pump's delivery rate to the pug mill mixer must not vary more than 2 percent from the average of 3 runs of at least 500 gal each. 37-3.01C(4) Surface Preparation Immediately before applying slurry seals or micro-surfacings, clean the surface to receive slurry seals or micro-surfacings by removing any extraneous material affecting adhesion of the slurry seal or micro- surfacing with the existing surface. Use self-propelled power brooms or other methods such as flushing to clean the existing pavement. 37-3.01C(5) Placement 37-3.01 C(5)(a) General If truck-mounted mixer-spreaders are used, keep at least 2 operational spreaders at the job site during placement. Spread slurry seals and micro-surfacings uniformly and do not spot, rehandle, or shift the mixture. However in areas inaccessible to spreading equipment,spread the slurry seal or micro-surfacing mixtures with hand tools or other authorized methods. If placing with hand tools, lightly dampen the area first. You may fog the roadway surface with water ahead of the spreader box. The fog spray must be adjusted for pavement: 1. Temperature 2. Surface texture 3. Dryness You determine the application rates for slurry seals or micro-surfacings and the Engineer authorizes the application rates. Spread within 10 percent of authorized rate. The mixtures must be uniform and homogeneous after spreading, and there must not be separation of the emulsion and aggregate after setting. Page 63 of 183 37-3.01C(5)(b) Weather Conditions Only place slurry seals or micro-surfacings if both the pavement and air temperatures are at least 50 degrees F and rising.The expected high temperature must be at least 65 degrees F within 24 hours after placement. Do not place slurry seals or micro-surfacings if rain is imminent or the air temperature is expected to be below 36 degrees F within 24 hours after placement. 37-3.01C(5)(c) Joints Transverse and longitudinal joints must be: 1. Uniform 2. Straight 3. Neat in appearance 4. Without material buildup 5. Without uncovered areas Transverse joints must be butt-type joints. Prevent double placement at transverse joints over previously placed slurry seals or micro-surfacings. Place longitudinal joints: 1. On centerlines, lane lines, edge lines, or shoulder lines 2. With overlaps not more than 4 inches You may request other longitudinal joint patterns if they do not adversely affect the slurry seals or micro- surfacings. The maximum difference between the pavement surface and the bottom edge of a 12-foot straightedge placed perpendicular to the longitudinal joint must be 0.04 foot. 37-3.01C(5)(d) Finished Surfaces Finished slurry seals or micro-surfacings must be smooth and free of irregularities such as scratch or tear marks.You may leave up to 4 marks that are up to 1 inch wide and 6 inches long per 75 linear feet of slurry seal or micro-surfacing placed. Do not leave any marks that are over 1 inch wide or 6 inches long. 37-3.01 C(5)(e) Maintenance Sweeping Sweep the slurry seals or micro-surfacings 24 hours after placement without damaging the slurry seals or micro-surfacings. For 4 days afterwards,sweep the slurry seals or micro-surfacings daily unless determined otherwise by the Engineer. 37-3.01 C(5)(f) Repair of Early Distress The slurry seals or micro-surfacings must not show bleeding, raveling, separation, or other distresses for 15 days after placing. If bleeding, raveling, delaminating, rutting, or wash-boarding occurs after placing the slurry seals or micro-surfacings, make repairs using an authorized method. 37-3.01 D Payment Not Used 37-3.02 SLURRY SEALS 37-3.02A General 37-3.02A(1) Summary Section 37-3.02 includes specifications for applying slurry seals. Applying a slurry seal consists of spreading a mixture of asphaltic emulsion or polymer modified asphaltic emulsion, aggregate, additives, and water on a surface or pavement. 37-3.02A(2) Definitions Reserved Page 64 of 183 37-3.02A(3) Submittals Immediately after sampling, submit two 1-quart wide mouth plastic containers of asphaltic emulsion or polymer modified asphaltic emulsion taken in the presence of the Engineer. Samples must be submitted in insulated shipping containers. 37-3.02A(4) Quality Assurance 37-3.02A(4)(a) General Reserved 37-3.02A(4)(b) Quality Control 37-3.02A(4)(b)(i) General Take samples of asphaltic emulsion and polymer modified asphaltic emulsion from the tank truck at mid load or from a sampling tap or thief. Before taking samples, draw and dispose of 1 gallon. In the presence of the Engineer take two 1-quart samples in wide mouth plastic containers with lined, sealed lids for acceptance testing. 37-3.02A(4)(b)(ii) Asphaltic Emulsion For asphaltic emulsions,the authorized laboratory must perform quality control sampling and testing at the specified frequency and location for the following quality characteristics: Asphaltic Emulsion Quality characteristic Test method Minimum sampling and Sampling location testing frequency Saybolt Furol Viscosity, at 25 °C(Saybolt Furol seconds) Sieve Test(%) ° AASHTO T 59 Minimum 1 per day per Delivery truck Storage stability, 1 day(/°) delivery truck Residue by distillation (%) Particle charges Tests on Residue from Distillation Test: Penetration, 25°C AASHTO T 49 Ductility AASHTO T 51 Minimum 1 per day per Delivery truck Solubility in tricloroethylene AASHTO T 44 delivery truck slf the result of the particle charge is inconclusive, the asphaltic emulsion must be tested for pH under ASTM E70. Grade QS1 h asphaltic emulsion must have a minimum pH of 7.3. Grade CQS1 h asphaltic emulsion must have a maximum pH of 6.7. 37-3.02A(4)(b)(iii) Polymer Modified Asphaltic Emulsion For polymer modified asphaltic emulsions,the authorized laboratory must perform quality control sampling and testing at the specified frequency and location for the following quality characteristics: Page 65 of 183 Polymer Modified Asphaltic Emulsion Minimum Sampling Quality characteristic Test method sampling and Location testing frequency Tests on emulsion: Saybolt Furol Viscosity at 25°C AASHTO T 59 Sa bolt Furol seconds Sieve test(%) AASHTO T 59 Minimum 1 per da Storage stability after 1 day(%) AASHTO T 59 y per delivery Delivery truck truck Residue by evaporation (min, %) California Test 331 Particle charge AASHTO T 59 Tests on residue by evaporation: Penetration at 25°C AASHTO T 49 Ductility at 25 °C(min, mm) AASHTO T 51 Torsional recovery(min, %) California Test 332 Minimum 1 per Or day per delivery Delivery truck truck Polymer content based on residual California Test 401 asphalt min, 37-3.02A(4)(c) Department Acceptance For a slurry seal asphaltic emulsion and polymer modified asphaltic emulsion, acceptance is based on the Department's sampling and testing for compliance with the requirements for the quality characteristics specified. Aggregate acceptance is based on the Department's sampling and testing for compliance with the requirements shown in the following table: Aggregate Acceptance Criteria Quality characteristic Test method Requirement Los Angeles Rattler loss (max, %) California Test 211 a At 500 revolutions 35 Percent of crushed particles (min, %) California Test 205 95 Durability(min) California Test 229 55 Sand equivalent(min) Type 45 Type II California Test 217 55 Type 111 60 aCalifornia Test 211 must be performed on the source aggregate before crushing. A sand equivalent test represents 300 tons or 1 day's production, whichever is less. If test results for sand equivalent do not comply with the specifications, you may remove the slurry seal represented by the test results or request it remain in place with a payment deduction. If your request is authorized, the Department deducts $1.75 per ton of slurry seal for each noncompliant sand equivalent test. 37-3.0213 Materials 37-3.02B(1) General Reserved 37-3.02B(2) Asphaltic Emulsions An asphaltic emulsion must comply with the requirements in Section 94.The asphaltic emulsion must be Grade CQS1 h. Page 66 of 183 37-3.02B(3) Polymer Modified Asphaltic Emulsions A polymer modified asphaltic emulsion must: 1. Consist of an elastomeric polymer mixed with an asphaltic material uniformly emulsified with water and an emulsifying or stabilization agent. 2. Use either neoprene polymer or butadiene and styrene copolymer. The polymer must be homogeneous and milled into the asphaltic emulsion at the colloid mill. 3. Be Grade PMCQS1 h and must comply with the requirements shown in the following table: Polymer Modified Asphaltic Emulsion Requirements Quality characteristic Test method Requirement Tests on emulsion: Saybolt Furol Viscosity at 25°C (Saybolt Furol AASHTO T 59 15-90 seconds Sieve test(%) AASHTO T 59 0-0.3 Storage stability after 1 day(%) AASHTO T 59 0-1 Residue by evaporation (min, %) California Test 331 60 Particle charge AASHTO T 59 Positive Tests on residue by evaporation: Penetration at 25°C AASHTO T 49 40-90 Ductility at 25 °C(min, mm) AASHTO T 51 400 Torsional recovery(min, %) California Test 332 18 Or Polymer content based on residual asphalt(min, %) California Test 401 2.5 37-3.02B(4) Aggregate Aggregate must comply with the quality characteristic requirements shown in the following table: Aggregate Requirements Quality characteristic Test method Requirement Los Angeles Rattler loss (max, %) California Test 211a At 500 revolutions 35 Percent of crushed particles min, % California Test 205 95 Durability min California Test 229 55 Sand equivalent(min) Typel 45 Te II California Test 217 55 Yp Type III 60 aCalifornia Test 211 must be performed on the source aggregate before crushing. The aggregate supplier must certify that the crushed aggregate being used on the project is manufactured from the source aggregate complying with the LA rattler requirements. 37-3.02B(5) Slurry Seal Mix Design The slurry seal mix design, using project source aggregate, an asphaltic emulsion, and set-control agents if any, must comply with the requirements shown in the following table: Page 67 of 183 Slurry Seal Mix Design Requirements Quality characteristic Test method aRequirement Consistency max mm Technical Bulletin 106 30 Wet stripping Technical Bulletin 114 Pass Compatibility Technical Bulletin 115 Passb Cohesion test, within 1 hour(min, kg-mm) Technical Bulletin 139 200 Wet track abrasion (max, g/m2) Technical Bulletin 100 810 Test methods are by the International Slurry Surfacing Association. bMixing test must pass at the maximum expected air temperature at the job site during placement. The mix design must have the percent of asphaltic residue, based on percentage by weight of the dry aggregate,within the ranges shown in the following table: Slurry seal type Residue range Type 1 10-16 Type II 7.5-13.5 Type III 6.5-12.0 Determine the exact percentage based on the design asphalt binder content and the asphalt residual content of the asphaltic emulsion furnished. 37-3.02C Construction 37-3.02C(1) General Reserved 37-3.02C(2) Proportioning After proportioning,slurry seal mixtures must be workable. 37-3.02C(3) Mixing and Spreading Equipment Reserved 37-3.02C(4) Placement The slurry seal spread rates must be within the ranges shown in the following table: Slurry Seal Spread Rates Slurry seal type Application range (lb of dry aggregate/sq yd) Type 1 8-12 Type II 10-18 Type III 20-25 Within 4 hours after placement, slurry seals must be set enough to allow traffic without pilot cars. Protect slurry seals from damage until it has set and will not adhere or be picked up by vehicle tires. Slurry seals must not exhibit distress from traffic such as bleeding, raveling, separation or other distresses. 37-3.02D Payment The payment quantity for slurry seal is the weight determined by combining the weights of the aggregate and asphaltic emulsion or polymeric asphaltic emulsion.The payment quantity for slurry seal does not include the weights of the added water and set-control additives. 37-3.03 MICRO-SURFACINGS 37-3.03A General 37-3.03A(1) Summary Section 37-3.03 includes specifications for applying micro-surfacings. Page 68 of 183 Applying a micro-surfacing consists of spreading a mixture of a micro-surfacing emulsion,water, additives, mineral filler, and aggregate on the pavement. 37-3.03A(2) Definitions Reserved 37-3.03A(3) Submittals Immediately after sampling, submit two 1-quart wide mouth plastic containers of micro-surfacing emulsion taken in the presence of the Engineer. Samples must be submitted in insulated shipping container. 37-3.03A(4) Quality Assurance 37-3.03A(4)(a) General Reserved 37-3.03A(4)(b) Quality Control 37-3.03A(4)(b)(i) General Reserved 37-3.03A(4)(b)(ii) Micro-surfacing Emulsions Take samples from the truck tank at mid load from a sampling tap or thief. Before taking samples, draw and dispose of 1 gallon. In the presence of the Engineer, take two 1-quart wide mouth plastic containers for acceptance testing. For a micro-surfacing emulsion,the authorized laboratory must perform quality control sampling and testing at the specified frequency and location for the quality characteristics shown in the following table: Micro-Surfacing Emulsion Minimum sampling Sampling Quality characteristic Test method and testing location frequency Tests on emulsion: Saybolt Furol Viscosity, at 25°C Sa bolt Furol seconds AASHTO T 59 Minimum 1 per day Delivery truck Storage stability, 1 daymax, % a per delivery truck Sieve test max, Residue by evaporation (min, %) California Test Minimum 1 per day Delivery truck 331 per deliver truck Tests on residue from evaporation test: Penetration at 25°C AASHTO T 49d Minimum 1 per day Delivery truck Softening point min, °C AASHTO T 53 per delivery truck aStorage stability test will be run if the storage exceeds 48 hours 37-3.03A(4)(c) Department Acceptance For micro-surfacing emulsions, acceptance is based on the Department's sampling and testing for compliance with the requirements shown in the following table: Page 69 of 183 Micro-surfacing Emulsion Acceptance Criteria Quality characteristic Test method Requirement Tests on emulsion: Saybolt Furol Viscosity at 25°C AASHTO T 59 15-90 Sa bolt Furol seconds Sieve test(%) AASHTO T 59 0.30 Storage stability, 1 day(max, %) AASHTO T 59 0-1 Settlementa, 5 days (max, %) ASTM D244 5 Residue by evaporation (min, %) California Test 331 62 Tests on residue by evaporation: Penetration at 25°C AASHTO T 49 40-90 Softening point(min,°C) AASHTO T 53 57 aSettlement test on emulsion is not required if used within 48 hours of shipment. Acceptance of aggregate, except mineral filler, is based on the Department's sampling and testing for compliance with the requirements shown in the following table: Aggregate Acceptance Criteria Quality characteristic Test method Requirement Los Angeles Rattler loss (max, %) California Test 211 a At 500 revolutions 35 Percent of crushed particles (min, %) California Test 205 95 Durability min California Test 229 65 Sand equivalent(min) California Test 217 Type II 65 Type III 65 aCalifornia Test 211 must be performed on the aggregate before crushing. The aggregate supplier must certify that the crushed aggregate being used on the project is manufactured from the source aggregate complying with the LA rattler requirements. An aggregate sand equivalent test represents 300 tons or 1 day's production,whichever is less. If the test results for aggregate sand equivalent do not comply with the specifications, you may remove the micro-surfacing represented by the test results or request it remain in place with a payment deduction. If your request is authorized,the Department deducts$2.00 per ton of micro-surfacing for each noncompliant aggregate sand equivalent test. 37-3.0313 Materials 37-3.03B(1) General Reserved 37-3.03B(2) Micro-surfacing Emulsions A micro-surfacing emulsion must be a homogeneous mixture of asphalt, an elastomeric polymer and an emulsifier solution. Add an elastomeric polymer modifier to asphalt or emulsifier solution before emulsification.An elastomeric polymer solid must be a minimum of 3 percent by weight of the micro-surfacing emulsion's residual asphalt. A micro-surfacing emulsion must comply with the requirements shown in the following table: Page 70 of 183 Micro-surfacing Emulsion Requirements Quality characteristic Test method Requirement Tests on emulsion: Saybolt Furol Viscosity at 25°C (Saybolt Furol AASHTO T 59 15-90 seconds Sieve test(%) AASHTO T 59 0.30 Storage stability, 1 day(max, %) AASHTO T 59 0-1 Settlementa, 5 days (max, %) ASTM D244 5 Residue by evaporation (min, %) California Test 331 62 Tests on residue by evaporation: Penetration at 25°C AASHTO T 49 40-90 Softening point(min, °C) AASHTO T 53 57 aSettlement test on emulsion is not required if used within 48 hours of shipment. 37-3.03B(3) Aggregate Aggregate must comply with the quality characteristic requirements shown in the following table: Aggregate Requirements Quality characteristic Test method Requirement Los Angeles Rattler loss (max, %) California Test 211a At 500 revolutions 35 Percent of crushed particles (min, %) California Test 205 95 Durability(min) California Test 229 65 Sand equivalent(min) California Test 217 Type I I 65 Type III 1 1 65 aCalifornia Test 211 must be performed on the source aggregate before crushing. The aggregate supplier must certify that the crushed aggregate being used on the project is manufactured from the source aggregate complying with the LA rattler requirements. 37-3.03B(4) Mineral Fillers If a mineral filler is used, it must be type I or type II Portland cement.A mineral filler used during mix design must be used during production. 37-3.03B(5) Micro-Surfacing Mix Designs The micro-surfacing mix design must have the material proportion limits shown in the following table: Micro-surfacing Mix Design Proportion Limits Material Proportion limits Micro-surfacing emulsion asphalt residual content(% 5.5-10.5 of dry wei ht of aggregate) Water and additives As Required Mineral filler % of dry weight of aggregate) 0-3 The micro-surfacing mix design must comply with the requirements shown in the following table: Page 71 of 183 Micro-surfacing Mix Design Requirements Quality characteristics Test method Requirement Wet cohesion At 30 minutes (set) (min, kg-cm) Technical Bulletin 139 12 At 60 minutes traffic min, kg-cm) 20 Excess asphalt(max, g/m ) Technical Bulletin 109 540 Wet stripping (min, %) Technical Bulletin 114 90 Wet track abrasion loss 6-day soak(max, g/m2) Technical Bulletin 100 810 Displacement Lateral(max, %) Technical Bulletin 147A 5 Specific gravity after 1000 cycles of 57 kg 2.10 max Classification compatibility(min, grade points) Technical Bulletin 144 (AAA, BAA) 11 Mix time at 25 °C (min) Technical Bulletin 113 Controllable to 120 seconds aTest methods are by the International Slurry Surfacing Association. 37-3.03B(6)Tack Coats If there is a bid item for tack coat, you must coat the pavement surface with an asphaltic emulsion mixed with additional water before applying a micro-surfacing.The maximum ratio of water to asphaltic emulsion must be 2 to 1.Apply the tack coat at a rate from 0.08 to 0.15 gal/sq yd. The exact rate must be authorized. You determine the grade of slow-setting or quick setting asphaltic emulsion to be used. 37-3.03C Construction 37-3.03C(1) General Reserved 37-3.03C(2) Proportioning Field conditions may require adjustments to the proportions within the authorized mix design during construction. 37-3.03C(3) Mixing and Spreading Equipment 37-3.03C(3)(a) General Reserved 37-3.03C(3)(b) Scratch Course Boxes Spread the scratch courses with the same type of spreader box used to spread micro-surfacings except use an adjustable steel strike-off device instead of a final strike-off device. 37-3.03C(3)(c) Wheel Path Depression Boxes Each wheel path depression box must have adjustable strike-off device between 5 and 6 feet wide to regulate depth.The wheel path depression box must also have devices such as hydraulic augers capable of: 1. Moving the mixed material from the rear to the front of the filling chamber 2. Guiding larger aggregate into the deeper section of the wheel path depression 3. Forcing the finer material towards the outer edges of the spreader box 37-3.03C(4) Test Strips If micro-surfacing placement will require more than 1 day, you must construct a test strip. The test strip must be: 1. From 300 to 450 feet long 2. The same as the full production micro-surfacing 3. On 1 of the application courses specified at an authorized location Page 72 of 183 4. At the same time of day or night the full production micro-surfacing is to be applied If multiple application courses are specified, you may construct test strips over 2 days or nights. The Engineer evaluates the test strip after traffic has used it for 12 hours. If the Engineer determines the mix design or placement procedure is unacceptable, make modifications and construct a new test strip for the Engineer's evaluation. 37-3.03C(5) Placement 37-3.03C(5)(a) General Reserved 37-3.03C(5)(b) Repair Wheel Path Depressions If repairing wheel path depressions is shown in plans,fill wheel path depressions and irregularities with micro-surfacing material before spreading micro-surfacing. If the depressions are less than 0.04 foot deep,fill with a scratch course. If the depressions are 0.04 foot deep or more,fill the depressions using a wheel path depression box. Spread scratch courses by adjusting the steel strike-off of a scratch course box until it is directly in contact with the pavement surface. Spread micro-surfacings with a wheel path depression box leaving a slight crown at the surface. Use multiple applications to fill depressions more than 0.12 foot deep. Do not apply more than 0.12 foot in a single application. Allow traffic to compact each filled wheel path depression for a minimum of 12 hours before placing additional micro-surfacings. 37-3.03C(5)(c) Micro-surfacing Pavement Surfaces The micro-surfacing spread rates must be within the ranges shown in the following table: Micro-surfacing type Application range (lb of dry aggregate/sq yd) Tvoe II 10-20 Type Illa 20-32 Type Illb 30-32 Over asphalt concrete pavement bOver concrete pavement and concrete bridge decks Within 2 hours after placement, micro-surfacings must be set enough to allow traffic without pilot cars. Protect the micro-surfacings from damage until it has set and will not adhere or be picked up by vehicle tires. Micro-surfacings must not exhibit distress from traffic such as bleeding, raveling, separation or other distresses. 37-3.03D Payment The payment quantity for micro-surfacing is the weight determined by combining the weights of the aggregate and micro-surfacing emulsion.The payment quantity for micro-surfacing does not include the weights of added water, mineral filler, and additives. 37-3.04 RUBBERIZED AND MODIFIED SLURRY SEALS Reserved 37-4 FOG SEALS AND FLUSH COATS 37-4.01 GENERAL 37-4.01A General 37-4.01A(1) Summary Section 37-4.01 includes general specifications for applying fog seals and flush coats. Page 73 of 183 37-4.01A(2) Definitions Reserved 37-4.01A(3) Submittals At least 15 days before use, submit: 1. Sample of asphaltic emulsion in two 1-quart plastic container with lined, sealed lid 2. Asphaltic emulsion information and test data as follows: 2.1. Supplier 2.2. Type/Grade of asphalt emulsion 2.3. Copy of the specified test results for asphaltic emulsion 37-4.01 B Materials Not Used 37-4.01 C Construction 37-4.01C(1) General Reserved 37-4.01C(2) Weather Conditions Only place a fog seal or flush coat if both the pavement and ambient temperatures are at least 50 degrees F and rising. Do not place a fog seal or flush coat within 24 hours of rain or within 24 hours of forecast rain or freezing temperatures. 37-4.01 D Payment Not Used 37-4.02 FOG SEALS 37-4.02A General 37-4.02A(1) Summary Section 37-4.02 includes specifications for applying fog seals. Applying a fog seal includes applying a diluted slow-setting or quick setting asphaltic emulsion. 37-4.02A(2) Definitions Reserved 37-4.02A(3) Submittals Immediately after sampling, submit two 1-quart plastic container of asphaltic emulsion taken in the presence of the Engineer. Samples must be submitted in insulated shipping container. 37-4.02A(4) Quality Assurance 37-4.02A(4)(a) General Reserved 37-4.02A(4)(b) Quality Control 37-4.02A(4)(b)(i) General Reserved 37-4.02A(4)(b)(ii) Asphaltic Emulsions Circulate asphaltic emulsions in the distributor truck before sampling.Take samples from the distributor truck at mid load or from a sampling tap or thief. Before taking samples, draw and dispose of 1 gallon. In the presence of the Engineer, take asphalt emulsion sample in two 1-quart plastic container with lined, sealed lid. For asphaltic emulsions,the authorized laboratory must perform quality control sampling and testing at the specified frequency and location for the following quality characteristics: Page 74 of 183 Asphaltic Emulsion Quality characteristic Test Method Minimum sampling and Sampling location testing frequency Saybolt Furol Viscosity, at 25°C Saybolt Furl seconds Sieve Test(%) AASHTO T 59 Minimum 1 per day per Distributor truck Storage stability, 1 day(%) delivery truck Residue by distillation (%) Particle charge Tests on Residue from Distillation Test: Penetration, 25°C AASHTO T 49 Ductility AASHTO T 51 Minimum 1 per day per Distributor truck Solubility in tricloroethylene AASHTO T 44 delivery truck alf the result of the particle charge is inconclusive,the asphaltic emulsion must be tested for pH under ASTM E70. Grade QS1 h asphaltic emulsion must have a minimum pH of 7.3. Grade CQS1 h asphaltic emulsion must have a maximum pH of 6.7. 37-4.02A(4)(b)(iii) Asphaltic Emulsion Spread Rates For fog seals, the authorized laboratory must perform sampling and testing at the specified frequency and location for the following quality characteristics: Fog Seal Quality Control Requirements Quality characteristic Test method Minimum sampling Location of and testing frequency sampling Asphaltic emulsion spread rate California Test 339 2 per day Pavement al/s d surface 37-4.02A(4)(c) Department Acceptance Fog seal acceptance is based on: 1. Visual inspection for the following: 1.1. Uniform surface texture throughout the work limits 1.2. Flushing consisting of the occurrence of a film of asphaltic material on the surface 1.4 Streaking consisting of alternating longitudinal bands of asphaltic emulsion approximately parallel with the lane line 2. The Department's sampling and testing for compliance with the requirements for the quality characteristics specified in section 94 for asphaltic emulsion 3. Department's sampling and testing for compliance with the requirements for fog seal shown in the following table: Fog Seal Acceptance Criteria Quality Characteristic Test Method Requirement Asphaltic emulsions read rate al/s d California Test 339 TV± 10% 37-4.0213 Materials You determine the grade of slow-setting or quick setting asphaltic emulsion to be used. 37-4.02C Construction Apply asphaltic emulsions for fog seals at a residual asphalt rate from 0.02 to 0.06 gal/sq yd. If additional water is added to the asphaltic emulsions,the resultant mixture must not be more than 1 part asphaltic emulsion to 1 part water. You determine the dilution rate. If the fog seals become tacky, sprinkle water as required. Page 75 of 183 If fog seals and chip seals are on the same project, the joint between the seal coats must be neat and uniform. 37-4.02D Payment The Department does not adjust the unit price for an increase or decrease in the asphaltic emulsion quantity. 37-4.03 FLUSH COATS 37-4.03A General 37-4.03A(1) Summary Section 37-4.03 includes specifications for applying flush coats. Applying a flush coat includes applying a fog seal coat followed by sand. 37-4.03A(2) Definitions Reserved 37-4.03A(3) Submittals At least 15 days before use, submit: 1. Proposed target X values for sand gradation. 2. Gradation test results for sand Submit quality control test results for sand gradation within 2 business days of sampling. 37-4.03A(4) Quality Assurance 37-4.03A(4)(a)General Reserved 37-4.03A(4)(b) Quality Control For sand,the authorized laboratory must perform sampling and testing at the specified frequency and location for the following quality characteristics: Sand Quality Control Quality characteristic Test method Minimum sampling Location of and testing frequency sampling Gradation (% passing by weight) California Test 1 per day See California 202 Test125 37-4.03A(4)(c) Department Acceptance Flush coat acceptance is based on fog seal acceptance and the following: 1. Visual inspection for uniform application of sand. 2. Sand acceptance is based on the Department's sampling and testing for compliance with the requirements shown in the following table: Page 76 of 183 Sand Gradation Acceptance Criteria Quality characteristic Test method Requirement Gradation (% passing by weight) Sieve size: 3/8" 100 No.4 93-100 No. 8 California Test 202 61-99 No. 16 X ± 13 No. 30 X ± 12 No. 50 X ±9 No.100 1-15 No. 200 0-10 NOTE: "X"is the gradation that you propose to furnish for the specific sieve size. 37-4.03B Material 37-4.03B(1) General Reserved 37-4.03B(2) Sand Sand must be free from deleterious coatings, clay balls, roots, bark, sticks, rags, and other extraneous material. Sand for a flush coat must comply with the gradations shown in the following table: Sand Gradation Quality characteristic Test method Requirement Gradation (% passing by weight) Sieve size: 3/8" 100 No.4 93-100 No. 8 California Test 202 61-99 No. 16 X± 13 No. 30 X± 12 No. 50 X±9 No.100 1-15 No. 200 0-10 NOTE: "X"is the gradation that you propose to furnish for the specific sieve size. Fine aggregate sizes must be distributed such that the difference between the total percentage passing the No. 16 and No. 30 sieves is from 10 to 40, and the difference between the percentage passing the No. 30 and No. 50 sieves is from 10 to 40. 37-4.03C Construction 37-4.03C(1) General During flush coat activities, close adjacent lanes to traffic. Do not track asphaltic emulsion on existing pavement surfaces. Apply sand immediately after applying asphaltic emulsions. Spread sand aggregate with a mechanical device that spreads sand at a uniform rate over the full width of a traffic lane in a single application. Spread sand at a rate from 2 to 6 Ib/sq yd. You determine the application rates for sand and the Engineer authorizes the application rate. 37-4.03C(2) Sweeping Sweep loose sand material remaining on the surface 24 hours after application. Page 77 of 183 37-4.03D Payment The Department does not adjust the unit price for an increase or decrease in the sand cover(seal) quantity. 37-5 PARKING AREA SEALS 37-5.01 GENERAL 37-5.01A Summary Section 37-5 includes specifications for applying parking area seals. Sealing a parking area consists of spreading a mixture of asphaltic emulsion, aggregate, polymer, and water. 37-5.0113 Definitions Reserved 37-5.01C Submittals At least 15 days before starting placement, submit a 20 lb sample of the aggregate to be used. At least 10 days before starting placement, submit: 1. Name of the authorized laboratory to perform testing and mix design. 2. Laboratory report of test results and a proposed mix design. The report and mix design must include the specific materials to be used and show a comparison of test results and specifications. The mix design report must include the quantity of water allowed to be added at the job site. The authorized laboratory performing the tests must sign the original laboratory report and mix design. 3. Manufacturer's data for oil seal primer and polymer. If the mix design consists of the same materials covered by a previous laboratory report, you may submit the previous laboratory report that must include material testing data performed within the previous 12 months for authorization. If you request substitute materials, submit a new laboratory report and mix design at least 10 days before starting placement. Submit a certificate of compliance for the parking area seal material. Immediately after sampling, submit two 1-quart plastic containers of parking area seal taken in the presence of the Engineer. Samples must be submitted in insulated shipping containers. 37-5.01 D Quality Assurance 37-5.011)(1) General Reserved 37-5.01 D(2) Quality Control 37-5.01 D(2)(a) General Reserved 37-5.01 D(2)(b) Asphaltic Emulsions For an asphaltic emulsion,the authorized laboratory must perform quality control sampling and testing at the specified frequency and location for the following quality characteristics: Page 78 of 183 Asphaltic Emulsion Quality characteristic Test Method Minimum sampling Sampling and testing frequency location Saybolt Furol Viscosity, at 25°C Sa bolt Furol seconds Sieve Test(%) AASHTO T 59 Minimum 1 per day Distributor truck Storage stability, 1 day(%) per delivery truck Residue by distillation (%) Particle charge Tests on Residue from Distillation Test Penetration, 25°C AASHTO T 49 Ductility AASHTO T 51 Minimum 1 per day Distributor truck Solubility in trichloroethylene AASHTO T 44 per delivery truck alf the result of the particle char is inconclusive,the asphaltic emulsion must be tested for pH under ASTM E70. Grade QS1 h asphaltic emulsion must have a minimum pH of 7.3. Grade CQS1 h asphaltic emulsion must have a maximum pH of 6.7. 37-5.01 D(2)(c) Sand For sand,the authorized laboratory must perform sampling and testing at the specified frequency and location for the following quality characteristics: Sand Quality Control Quality characteristic Test method Minimum sampling Location of and testing frequency sampling Gradation (% passing by weight) California Test 202 One per project See California Test 125 37-5.01 D(2)(d) Parking Area Seals For a parking area seal,the authorized laboratory must perform quality control sampling and testing at the specified frequency for the following quality characteristics: Parking Area Seal Requirements Quality characteristic Test method Frequency Mass per liter k ASTM D244 Cone penetration (mm) California Test 413 Nonvolatile % ASTM D2042a Nonvolatile soluble in trichloroeth lene % One per project Wet track abrasion /m ASTM D3910 Dried film color -- Viscosity KU ASTM D562 aWeigh 10 g of homogenous material into a previously tarred, small can. Place in a constant temperature oven at 165 ± 5 °C for 90 ± 3 minutes. Cool, reweigh, and calculate nonvolatile components as a percent of the original weight. bKrebs units 37-5.01 D(3) Department Acceptance Parking area seal acceptance is based on: 1. Visual inspection for: 1.1. Uniform surface texture throughout the work limits 1.2 Marks in the surface: 1.2.1. Up to 4 marks in the completed parking area seal that are up to 1 inch wide and up to 6 inches long per 1,000 square feet of parking area seal placed. 1.2.2. No marks in the completed parking area seal surface that are over 1 inch wide or 6 inches long. Page 79 of 183 1.2. Raveling consisting of the separation of the aggregate from the asphaltic emulsion 1.3. Bleeding consisting of the occurrence of a film of asphaltic material on the surface of the parking area seal 1.4 Delaminating of the parking area seal from the existing pavement 1.5 Rutting or wash-boarding 2. The Department's sampling and testing of aggregate for compliance with 100 percent passing no. 16 sieve under California Test 202 3. The Department's sampling and testing for compliance with the requirements shown in the following table: Parking Area Seal Acceptance Criteria Quality characteristic Test method Requirement Mass per liter min, k ASTM D244 1.1 Cone penetration (mm) California Test 413 340-700 Nonvolatile min % ASTM D20428 50 Nonvolatile soluble In trichloroethylene(%) 10-35 Wet track abrasion (max, g/m2) ASTM D3910 380 Dried film color -- Black Viscosity(min, KU)b ASTM D562 75 aWeigh 10 g of homogenous material into a previously tared, small ointment can. Place in a constant temperature oven at 165±5 °C for 90±3 minutes. Cool, reweigh, and calculate nonvolatile components as a percent of the original weight. bKrebs units 37-5.02 MATERIALS 37-5.02A General Aggregate must be clean, hard, durable, uncoated, and free from organic and deleterious substances. One hundred percent of the aggregate must pass the no. 16 sieve. Asphaltic emulsion must be either Grade SS1 h or CSS1 h, except the values for penetration at 25 degrees C for tests on residue from distillation must be from 20 to 60. Polymer must be either neoprene, ethylene vinyl acetate, or a blend of butadiene and styrene. Oil seal primer must be a quick-drying emulsion with admixtures. Oil seal primer must be manufactured to isolate the parking area seal from pavement with residual oils, petroleum grease, and spilled gasoline. Crack sealant must comply with section 37-6. Water must be potable and not separate from the emulsion before the material is placed. 37-5.0213 Mix Design The proposed mix design for a parking area seal must comply with the requirements shown in the following table: Page 80 of 183 Parking Area Seal Mix Design Requirements Quality characteristic Test method Requirement Mass per liter min, k ASTM D244 1.1 Cone penetration (mm) California Test 413 340-700 Nonvolatile min % ASTM D2042a 50 Nonvolatile soluble in trichloroethylene(°/o) 10-35 Wet track abrasion (max, g/m2) ASTM D3910 380 Dried film color -- Black Viscosity(min, KU)b ASTM D562 75 'Weigh 10 g of homogenous material into a previously tarred, small ointment can. Place in a constant temperature oven at 165±5 °C for 90±3 minutes. Cool, reweigh, and calculate nonvolatile components as a percent of the original weight. bKrebs units A parking area seal must contain a minimum of 2 percent polymer by volume of undiluted asphaltic emulsion. 37-5.02C Proportioning Parking area seal ingredients must be mixed at a central plant. The plant must include mechanical or electronic controls that consistently proportion the ingredients. Mix an asphaltic emulsion with the other ingredients mechanically. Store the parking area seal in a tank equipped with mixing or agitation devices. Keep stored materials thoroughly mixed. Protect stored materials from freezing conditions. 37-5.03 CONSTRUCTION 37-5.03A General Request that the Engineer shut off the irrigation control system at least 5 days before placing the seal. Do not water plants adjacent to the seal at least 24 hours before and after the seal coat placement. 37-5.0313 Surface Preparations If cracks in the existing pavement are from 1/4 to 1 inch wide, treat the cracks under section 37-6. Do not place the parking area seals until the Engineer determines that the crack treatments are cured. If cracks in the existing pavement are greater than 1 inch wide, the Engineer orders the repair. This work is change order work. After any crack treatment and before placing parking area seals, clean the pavement surface, including removal of oil and grease spots. Do not use solvents. If cleaning the pavement with detergents,thoroughly rinse with water.Allow all water to dry before placing parking area seals. You must seal oil and grease spots that remain after cleaning. Use an oil seal primer and comply with the manufacturer's instructions. If the existing pavement has oil and grease spots that do not come clean and sealing is insufficient, the Engineer orders the repair of the pavement.This work is change order work. Before placing the parking area seals, dampen the pavement surface using a distributor truck. Place the seal on the damp pavement but do not place it with standing water on the pavement. 37-5.03C Placement If adding water at the job site based on the manufacturer's instructions for consistency and spreadability, do not exceed 15 percent by volume of undiluted asphaltic emulsion. Place the parking area seals in 1 or more application.The seals must be uniform and smooth,free of ridges or uncoated areas. Page 81 of 183 If placing in multiple applications, allow the last application to thoroughly dry before the subsequent application. Do not allow traffic on the parking area seals for at least 24 hours after placement. Do not stripe over the parking area seals until it is dry. 37-5.04 PAYMENT The payment quantity for parking area seal is the weight determined by combining the weights of the aggregate and asphaltic emulsion. The payment quantity for parking area seal does not include the added water and set-control additive. 37-6 CRACKTREATMENTS 37-6.01 GENERAL 37-6.01A Summary Section 37-6 includes specifications for treating cracks in asphalt concrete pavement. 37-6.01 B Definitions Reserved 37-6.01C Submittals If your selected crack treatment material is on the Authorized Material List for flexible pavement crack treatment material, submit a certificate of compliance including: 1. Manufacturer's name 2. Production location 3. Brand or trade name 4. Designation 5. Batch or lot number 6. Crack treatment material type 7. Contractor or subcontractor name 8. Contract number 9. Lot size 10. Shipment date 11. Manufacturer's signature If your selected crack treatment material is not on the Authorized Material List for flexible pavement crack treatment material, submit a sample and test results from each batch or lot 20 days before use.Testing must be performed by an authorized laboratory and test results must show compliance with the specifications.Test reports must include the information specified for the certificate of compliance submittal. Each hot-applied crack treatment material sample must be a minimum of 3 lb and submitted in a silicone release container. Each cold-applied crack treatment material sample must be a minimum of 2 quarts and submitted in a plastic container. At least 10 days before the start of work, submit sand gradation test results under California Test 202. Submit the following with each delivery of crack treatment material to the job site: 1. Manufacturer's heating and application instructions 2. Manufacturer's SIDS 3. Name of the manufacturer's recommended detackifying agent 37-6.01 D Quality Assurance 37-6.01D(1) General Hot-applied crack treatment material must be sampled at least once per project in the Engineer's presence. Collect two 3-pounds-minimum samples of crack treatment material from the dispensing wand into silicone release boxes. Page 82 of 183 Cold-applied crack treatment material must be sampled at least once per project in the Engineer's presence. Collect 2 samples of crack treatment material from the dispensing wand into 1-quart containers. 37-6.01D(2) Quality Control Reserved 37-6.01 D(3) Department Acceptance Crack treatment acceptance is based on: 1. Visual inspection for uniform filling of cracks throughout the work limits including: 1.2. Crack treatment is not more than a 1/4 inch below the specified level 1.3. Sealant failures 1.4. Crack re-opening 1.5. Crack overbanding is less than 3 inches wide 2. The Department's sampling and testing for compliance with the requirements shown in the following table: Crack Treatment Acceptance Criteria Quality characteristica Test method b Requirement Type 1 Type 2 Type 3 Type 4 Type 5 Softening point min, °C ASTM D36 102 96 90 84 84 Cone penetration at 77 °F (max) ASTM D5329 35 40 50 70 90 Resilience at 77°F, una ed % ASTM D5329 20-60 25-65 30-70 35-75 40-80 Flexibility(°C)° ASTM D3111 0 0 0 -11 -28 Tensile adhesion (min, %) ASTM D5329 300 400 400 500 500 Specific gravity(max) ASTM D70 1.25 1.25 1.25 1.25 1.25 Asphalt compatibility ASTM D5329 Pass Pass Pass Pass Pass Sieve test % passing) See note d 100 100 100 100 100 aCold-applied crack treatment material residue collected under ASTM D6943, Method B and sampled under ASTM D140 must comply with the grade specified. bExcept for viscosity, cure each specimen at a temperature of 23±2 °C and a relative humidity of 50± 10 percent for 24±2 hours before testing. °For the flexibility test, the specimen size must be 6.4±0.2 mm thick by 25±0.2 mm wide by 150±0.5 mm long. The test mandrel diameter must be 6.4±0.2 mm.The bend arc must be 180 degrees. The bend rate must be 2± 1 seconds.At least 4 of 5 test specimens must pass at the specified test temperature without fracture, crazing, or cracking. dFor hot-applied crack treatment, dilute with toluene and sieve through a no. 8 sieve. For cold-applied crack treatment, sieve the material as-received through a no. 8 sieve. If the manufacturer provides a statement that added components passed the no. 16 sieve before blending, this requirement is void. 37-6.02 MATERIALS 37-6.02A General Reserved 37-6.02B Crack Treatment Material A crack treatment material must comply with the requirements shown in the following table: Page 83 of 183 Crack Treatment Material Quality characteristica Test method Requirement Type 1 Type 2 Type 3 Type 4 Type 5 Softening point min °C ASTM D36 102 96 90 84 84 Cone penetration at 77 °F (max) ASTM D5329 35 40 50 70 90 Resilience at 77°F, unaged (%) ASTM D5329 20-60 25-65 30-70 35-75 40-80 Flexibility(°C)° ASTM D3111 0 0 0 -11 -28 Tensile adhesion (min, %) ASTM D5329 300 400 400 500 500 Specific gravity(max) ASTM D70 1.25 1.25 1.25 1.25 1.25 Asphalt compatibility ASTM D5329 Pass Pass Pass Pass Pass Sieve test(% passing) See note d 100 100 100 100 100 aCold-applied crack treatment material residue collected under ASTM D6943, Method B and sampled under ASTM D140 must comply with the grade specifications. bExcept for viscosity, cure each specimen at a temperature of 23±2 °C and a relative humidity of 50± 10 percent for 24±2 hours before testing. °For the flexibility test, the specimen size must be 6.4±0.2 mm thick by 25±0.2 mm wide by 150±0.5 mm long.The test mandrel diameter must be 6.4±0.2 mm. The bend arc must be 180 degrees.The bend rate must be 2 ± 1 seconds. At least 4 of 5 test specimens must pass at the specified test temperature without fracture, crazing, or cracking. dFor hot-applied crack treatment, dilute with toluene and sieve through a no. 8 sieve. For cold-applied crack treatment, sieve the material as-received through a no. 8 sieve. If the manufacturer provides a statement that added components passed the no. 16 sieve before blending, this requirement is void. A crack treatment material must be delivered to the job site with the information listed below. If crack treatment material is delivered to the job site in containers, each container must be marked with the following information. 1. Manufacturer's name 2. Production location 3. Brand or trade name 4. Designation 5. Crack treatment trade name 6. Batch or lot number 7. Maximum heating temperature 8. Expiration date for cold application only Hot-applied crack treatment must be delivered to the job site premixed in cardboard containers with meltable inclusion liners or in a fully meltable package. Cold-applied crack treatment must have a minimum shelf life of 3 months from the date of manufacture. 37-6.02C Sand Sand applied to tacky crack treatment material must be clean,free of clay, and comply with the gradation shown in the following table: Sand Gradation Quality characteristic Test method Requirement Gradation (% passing by weight) Sieve size: No.4 California Test 202 100 No. 50 0-30 No. 200 0-5 37-6.03 CONSTRUCTION Treat cracks from 1/4 to 1 inch in width for the entire length of the crack. Fill or repair cracks wider than 1 inch as ordered. Filling cracks wider than 1 inch is change order work. Page 84 of 183 If treating cracks on a traffic lane adjacent to a shoulder, treat the cracks on the shoulder. For hot-applied crack treatment material, rout cracks or saw cut to form a reservoir. Cracks must be clean and dry before treating. Before treating, blast cracks with oil-free compressed air at a pressure of at least 90 psi. If the pavement temperature is below 40 degrees F or if there is evidence of moisture in the crack, use a hot air lance immediately before applying crack treatment. The hot air lance must not apply flame directly on the pavement. Heat and apply hot-applied crack treatment material under with the manufacturer's instructions. Apply cold-applied crack treatment material with a distributor kettle, a piston, or a diaphragm barrel pump that can deliver from 50 to 75 psi. The application line must have a pressure gauge and a filter. The pressure in the application line must not exceed 20 psi. The pressure gauge must have a regulator. Use a high-pressure hose with a 1/2-inch NPT swivel connection and a dispensing wand. Apply crack treatment with a nozzle inserted into the crack. Fill the crack flush. If after 2 days the crack treatment is more than 1/4 inch below the specified level, the sealant fails, or the crack re-opens, re-treat the crack. Immediately remove crack treatment material that is spilled or deposited on the pavement surface. Before opening to traffic, apply sand or the manufacturer's recommended detackifying agent to tacky crack treatment material on the traveled way. Sweep up excess sand before opening to traffic. 37-6.04 PAYMENT The payment quantity for crack treatment is the length measured in lane miles along the edge of each paved lane parallel to the pavement's centerline. The payment for a lane includes crack treatment of the adjacent shoulder. 37-7-37-10 RESERVED nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn 39 ASPHALT CONCRETE 07-15-16 Replace SP-2 at each occurrence in section 39 with: 01-15-16 MS-2 Replace the 3rd paragraph of section 39-2.01A(1)with: 07-15-16 WMA technologies must be on the Authorized Material List for WMA authorized technologies. Add between the 3rd and 4th paragraphs of section 39-2.01A(1): 04-15-16 For HMA that uses asphalt binder containing crumb rubber modifier, submit a Crumb Rubber Usage Report form monthly and at the end of the project. Page 85 of 183 Add to the table in the 4th paragraph of section 39-2.01A(1): 01-15-16 Asphalt Institute MS-2 7th edition (2015) Add to item 8 in the 4th paragraph of section 39-2.01A(3)(b)(i): 07-15-16 except lime supplier and source Replace the headings and paragraphs of section 39-2.01A(3)(i)with: 01-15-16 39-2.01A(3)(i) Reserved Replace the 2nd sentence in the 3rd paragraph of section 39-2.01A(4)(b)with: 01-15-16 Submit 3 parts and keep 1 part. Add between single and test in the 7th paragraph of section 39-2.01A(4)(i)(1): 07-15-16 aggregate or HMA Replace the 1st paragraph of section 39-2.01 B(2)(b)with: 07-15-16 If the proposed JMF indicates that the aggregate is being treated with dry lime or lime slurry with marination, or the HMA with liquid antistrip, then testing the untreated aggregate under AASHTO T 283 and AASHTO T 324 is not required. If HMA treatment is required or being used by the Contractor, determine the plasticity index of the aggregate blend under California Test 204. Add between aggregate and with dry lime in the 3rd and 4th paragraphs of section 39-2.01 B(2)(b): 07-15-16 blend Replace the 9th through 11th paragraphs of section 39-2.01 B(8)(a)with: 07-15-16 HMA must be produced at the temperatures shown in the following table: HMA Production Temperatures HMA compaction Temperature(°F) HMA Density based :5 325 Method 305-325 HMA with WMA technology Density based 240-325 Method 260-325 Page 86 of 183 04-15-16 Delete the 1st paragraph of section 39-2.01 B(11). Add after the 2nd paragraph of section 39-2.01 B(11): 04-15-16 For miscellaneous areas and dikes: 1. Choose the aggregate gradation from: 1.1. 3/8-inch Type A HMA aggregate gradation 1.2. 1/2-inch Type A HMA aggregate gradation 1.3. 1/2-inch dike mix aggregate gradation 2. Choose asphalt binder Grade PG 64-10, PG 64-16 or PG 70-10. 3. Minimum asphalt binder content must be: 3.1. 6.40 percent for 3/8-inch Type A HMA aggregate gradation 3.2. 5.70 percent for 1/2-inch Type A HMA aggregate gradation 3.3. 6.40 percent for 1/2-inch dike mix aggregate gradation If you request and the Engineer authorizes, you may reduce the minimum asphalt binder content. Aggregate gradation for 1/2-inch dike mix must be within the TV limits for the specified sieve size shown in the following table: Aggregate Gradation for 1/2-inch Dike Mix (Percentage Passing) Sieve size Target value limit Allowable tolerance 3/4" 100 -- 1/2" 90-95 TV±5 No.4 70-75 TV±5 No. 8 23-25 TV±5 No. 50 15-35 TV±5 No. 200 7.0-13.0 TV±2.0 Replace item 4 in the 2nd paragraph of section 39-2.01C(1)with: 07-15-16 4. For method compaction: 4.1. The temperature of the HMA and the HMA produced with WMA water injection technology in the windrow does not fall below 260 degrees F 4.2. The temperature of the HMA produced using WMA additive technology in the windrow does not fall below 250 degrees F 07-15-16 Delete item 3 in the 8th paragraph of section 39-2.01C(1). Replace 39-2.01A(3)(m)(iv)in the 6th paragraph of section 39-2.01C(3)(e)with: 01-15-16 36-3.01 C(3) Replace 2.06 in the 4th paragraph of section 39-2.01C(3)(f)with: 07-15-16 2.05 Page 87 of 183 Add to the end of section 39-2.01 C(15)(b): 07-15-16 The compacted lift thickness must not exceed 0.25 foot. Add between rectangles and with in the 4th paragraph of section 39-2.01C(16): 04-15-16 half the lane width, Add between to and the in item 1 of the 4th paragraph of section 39-2.01 C(16): 04-15-16 and along 07-15-16 Delete coat in the 5th paragraph of section 39-2.01C(16). Replace 37 in the 5th paragraph of section 39-2.01 C(16)with: 07-15-16 37-4.02 Replace section 39-2.02A(3)(b)with: 01-15-16 The JMF must be based on the superpave HMA mix design as described in MS-2 Asphalt Mix Design Methods by the Asphalt Institute. Add between the 1st and 2nd paragraphs of section 39-2.02C: 07-15-16 If the ambient air temperature is below 60 degrees F, cover the loads in trucks with tarpaulins. If the time for HMA discharge to truck at the HMA plant until transfer to paver's hopper is 90 minutes or greater and if the ambient air temperature is below 70 degrees F, cover the loads in trucks with tarpaulins, unless the time from discharging to the truck until transfer to the paver's hopper or the pavement surface is less than 30 minutes. The tarpaulins must completely cover the exposed load until you transfer the mixture to the paver's hopper or the pavement surface. Replace the table in the 2nd paragraph of section 39-2.02C with: 07-15-16 Minimum Ambient Air and Surface Temperatures Lift thickness Ambient air(OF) Surface('IF) (feet) Unmodified Modified asphalt Unmodified asphalt Modified asphalt asphalt binder binder binder binder Type A HMA and T ne A HMA produced with WMA water inmection technology <0.15 55 50 60 55 >_0.15 45 45 50 50 Type A HMA produced with WMA additive technology <0.15 45 45 50 45 >_0.15 40 40 40 40 Page 88 of 183 07-15-16 Delete the 3rd paragraph of section 39-2.02C. Add between HMA and placed in the 1st sentence of the 4th paragraph of section 39-2.02C: 07-15-16 and Type A HMA produced with WMA water injection technology Add between the 4th and the 5th paragraphs of section 39-2.02C: 07-15-16 For Type A HMA produced with WMA additive technology placed under method compaction, if the asphalt binder is: 1. Unmodified,complete: 1.1 1 st coverage of breakdown compaction before the surface temperature drops below 240 degrees F 1.2. Breakdown and intermediate compaction before the surface temperature drops below 190 degrees F 1.3. Finish compaction before the surface temperature drops below 140 degrees F 1.4 You may continue static rolling below 140 degrees F to remove roller marks. 2. Modified,complete: 2.1. 1 st coverage of breakdown compaction before the surface temperature drops below 230 degrees F 2.2. Breakdown and intermediate compaction before the surface temperature drops below 170 degrees F 2.3. Finish compaction before the surface temperature drops below 130 degrees F 2.4. You may continue static rolling below 130 degrees F to remove roller marks. Replace the 2nd paragraph of section 39-2.03A(3)(b)with: 01-15-16 The JMF must be based on the superpave HMA mix design as described in MS-2 Asphalt Mix Design Methods by the Asphalt Institute. Replace the requirement in the row for Voids in mineral aggregate on plant produced HMA in the 2nd table in section 39-2.03A(4)(e)(i)with: 01-15-16 18.0-23.0 Add before the 1st paragraph of section 39-2.03A(4)(e)(ii)(C): 04-15-16 CRM used must be on the Authorized Materials List for Crumb Rubber Modifier. CRM must be a ground or granulated combination of scrap tire crumb rubber and high natural scrap tire crumb rubber, CRM must be 75.0 ±2.0 percent scrap tire crumb rubber and 25.0 ±2.0 percent high natural scrap tire crumb rubber by total weight of CRM. Scrap tire crumb rubber and high natural scrap tire crumb rubber must be derived from waste tires described in Pub Res Code § 42703. Page 89 of 183 Replace the row for Hamburg wheel track in the table in section 39-2.03B(2)with: 01-15-16 Hamburg wheel track(min, number of passes at the inflection AASHTO T 324 point) (Modified)d Binder grade: PG 58 10,000 PG 64 12,500 PG 70 15,000 Replace RHMA-G in the 3rd and 5th paragraphs of section 39-2.03C with: 07-15-16 RHMA-G and RHMA-G produced with WMA water injection technology Add between the 5th and 6th paragraphs of section 39-2.03C: 07-15-16 For RHMA-G produced with WMA additive technology placed under method compaction: 1. Complete the 1 st coverage of breakdown compaction before the surface temperature drops below 260 degrees F 2. Complete breakdown and intermediate compaction before the surface temperature drops below 230 degrees F 3. Complete finish compaction before the surface temperature drops below 180 degrees F 4. You may continue static rolling below 140 degrees F to remove roller marks Replace the 6th and 7th paragraphs of section 39-2.04C with: 07-15-16 For HMA-O and HMA-O produced with WMA water injection technology: 1. With unmodified asphalt binder: 1.1. Spread and compact only if the atmospheric temperature is at least 55 degrees F and the surface temperature is at least 60 degrees F. 1.2. Complete the 1 st coverage using 2 rollers before the surface temperature drops below 240 degrees F. 1.3. Complete all compaction before the surface temperature drops below 200 degrees F. 2. With modified asphalt binder, except asphalt rubber binder: 2.1. Spread and compact only if the atmospheric temperature is at least 50 degrees F and the surface temperature is at least 50 degrees F. 2.2. Complete the 1 st coverage using 2 rollers before the surface temperature drops below 240 degrees F. 2.3. Complete all compaction before the surface temperature drops below 180 degrees F. For HMA-O produced with WMA additive technology: 1. With unmodified asphalt binder: 1.1. Spread and compact only if the atmospheric temperature is at least 45 degrees F and the surface temperature is at least 50 degrees F. 1.2. Complete the 1 st coverage using 2 rollers before the surface temperature drops below 230 degrees F. 1.3. Complete all compaction before the surface temperature drops below 190 degrees F. 2. With modified asphalt binder, except asphalt rubber binder: 2.1. Spread and compact only if the atmospheric temperature is at least 40 degrees F and the surface temperature is at least 40 degrees F. 2.2. Complete the 1 st coverage using 2 rollers before the surface temperature drops below 230 degrees F. Page 90 of 183 2.3. Complete all compaction before the surface temperature drops below 170 degrees F. Replace RHMA-O and RHMA-O-HB in the 8th paragraph of section 39-2.04C with: 07-15-16 RHMA-O and RHMA-O produced with WMA water injection technology, and RHMA-O-HB and RHMA-O- HB produced with WMA water injection technology Add between the 8th and 9th paragraphs of section 39-2.04C: 07-15-16 For RHMA-O produced with WMA additive technology and RHMA-O-HB produced with WMA additives technology: 1. Spread and compact if the ambient air temperature is at least 45 degrees F and the surface temperature is at least 50 degrees F 2. Complete the 1st coverage using 2 rollers before the surface temperature drops below 270 degrees F 3. Complete all compaction before the surface temperature drops below 240 degrees F Add to the 2nd paragraph of section 39-2.05A(3)(b): 01-15-16 The material transfer vehicle must receive HMA directly from the truck. Replace Table 6.1 at each occurrence in the table in section 39-2.05B(2)with: 01-15-16 Table 8.1 Replace SP-2 Asphalt Mixture in the 1st footnote in the table in the 2nd paragraph of section 39- 2.05B(2)(b)with: 01-15-16 MS-2 Asphalt Mix Design Methods Replace Manual Series No. 2(MS-2) in the 1st footnote in the table in the 2nd paragraph of section 39-2.05B(2)(b)with: 01-15-16 MS-2 Asphalt Mix Design Methods Replace 39-3.05 in the 1st paragraph of section 39-3.04Awith: 01-15-16 39-3.04 Add to the end of section 39-3.04A: 07-15-16 Schedule cold planing activities such that the pavement is cold planed, the HMA is placed, and the area is opened to traffic during the same work shift. 07-15-16 Delete the 2nd sentence of the 1st paragraph in section 39-3.04C(4). Page 91 of 183 Replace 39-3.06 in the 1st paragraph of section 39-3.05Awith: 01-15-16 39-3.05 AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA DIVISION VI STRUCTURES 47 EARTH RETAINING SYSTEMS 07-15-16 Replace the 6th paragraph in section 47-2.02A with: 07-15-16 Rock for rock slope protection at drain pipe outlets must be small-rock slope protection and must comply with the gradation specified for 7-inch-thick layer in section 72-4.02. AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA 49 PILING 07-15-16 04-15-16 Delete the 2nd paragraph of section 49-1.01 A. Replace the 1st sentence in the 5th paragraph of section 49-1.01 D(3)with: 07-15-16 Load test and anchor piles must comply with the specifications for piling as described and Class N steel pipe piling. Add to the list in 7th paragraph of section 49-1.01 D(3): 07-15-16 5. Welds that connect the anchor pile and the anchor pile head must be tested under section 49- 2.02A(4)(b)(iii)(C) Replace the 10th paragraph of section 49-1.01 D(3)with: 07-15-16 Furnish labor, materials,tools, equipment, and incidentals as required to assist the Department in the transportation, installation, operation, and removal of Department-furnished steel load test beams,jacks, bearing plates, drills, and other test equipment. This is change order work. Replace the 7th paragraph of section 49-1.01 D(4)with: 07-15-16 Piles to be dynamically monitored must: 1. Have an additional length of 2 times the pile diameter plus 2 feet. 2. Be available to the Department at least 2 business days before driving. 3. Be safely supported at least 6 inches off the ground in a horizontal position on at least 2 support blocks. If requested, rotate the piles on the blocks. 4. Be positioned such that the Department has safe access to the entire pile length and circumference for the installation of anchorages and control marks for monitoring. Page 92 of 183 07-15-16 Delete business in item 6 in the list in the 8th paragraph of section 49-1.01 D(4). Add to the list in 9th paragraph of section 49-1.01D(4): 07-15-16 3. Cut pile to the specified cut-off elevation after bearing acceptance criteria is provided by the Department 04-15-16 Delete the 3rd paragraph of section 49-1.03. 04-15-16 Delete the 2nd paragraph of section 49-1.04. 01-15-16 Delete the 4th paragraph of section 49-2.01C(5). Replace item 3 in the list in the 2nd paragraph of section 49-3.01A with: 07-15-16 3. CISS concrete piles Add between undisturbed material and in a dry in the 1st paragraph of section 49-3.01C: 07-15-16 casing, or steel shell Replace the 2nd and 3rd paragraphs of section 49-3.01C with: 07-15-16 Place and secure reinforcement. Securely block the reinforcement to provide the minimum clearance shown between the reinforcing steel cage and the sides of the drilled hole, casing, or steel shell. Steel shells, casings, and drilled holes must be clean and free of debris before reinforcement and concrete are placed. Replace dewatered in the 4th paragraphs of section 49-3.01C with: 07-15-16 drilled Add to section 49-3.02A(1): 07-15-16 Permanent steel casing and driven steel shell must comply with section 49-2.02. Replace the paragraph of section 49-3.02A(2)with: 07-15-16 dry hole: A drilled hole that requires no work to keep it free of water. dewatered hole: A drilled hole that: 1. Accumulates no more than 12 inches of water at the bottom during a 1 hour period without any pumping from the hole. Page 93 of 183 2. Has no more than 3 inches of water at the bottom immediately before placing concrete. 3. Does not require temporary casing to control the groundwater. Replace item 8 in the list in the 1st paragraph of section 49-3.02A(3)(b)with: 07-15-16 8. Drilling plan and sequence 9. Concrete sequence and placement plan 10. If inspection pipes are required, methods for ensuring the inspection pipes remain straight, undamaged, and properly aligned during concrete placement Replace 1 business day in the paragraph of section 49-3.02A(3)(d)with: 07-15-16 2 business days Add to section 49-3.02A(3)(d): 07-15-16 The log must: 1. Show the pile location,tip elevation, cutoff elevation, dates of excavation and concrete placement, total quantity of concrete placed, length and tip elevation of any casing, and details of any hole stabilization method and materials used. 2. Include an 8-1/2 by 11 inch graph of concrete placed versus depth of hole filled as follows: 2.1. Plot the graph continuously throughout concrete placement. Plot the depth of drilled hole filled vertically with the pile tip at the bottom and the quantity of concrete placed horizontally. 2.2. Take readings at each 5 feet of pile depth, and indicate the time of the reading on the graph. Add after the sentence in the paragraph of section 49-3.02A(3)(e): 07-15-16 Allow 10 days for the review. Replace the 3rd sentence in the paragraph of section 49-3.02A(3)(f)with: 07-15-16 Allow 10 days for the review and analysis of this report. Add after rejected pile in the 1st sentence in the 1st paragraph of section 49-3.02A(3)(g): 07-15-16 to be mitigated 07-15-16 Delete the 2nd paragraph of section 49-3.02A(3)(g). Replace item 3 in the list in the 3rd paragraph of section 49-3.02A(3)(g)with: 07-15-16 3. Step by step description of the mitigation work to be performed, including drawings if necessary. If the ADSC Standard Mitigation Plan is an acceptable mitigation method, include the most recent version. For the most recent version of the ADSC Standard Mitigation Plan, go to: http://www.dot.ca.gov/hq/esc/geotech/ft/adscmitplan.htm Page 94 of 183 Replace the 2nd sentence in the paragraph of section 49-3.02A(3)(i)with: 07-15-16 Allow 10 days for the review. Add to section 49-3.02A(3): 07-15-16 49-3.02A(3)0) Certifications If synthetic slurry is used, submit as an informational submittal the names and certifications of your employees who are trained and certified by the synthetic slurry manufacturer. Add after excavated hole in the 1st sentence in the 3rd paragraph of section 49-3.02A(4)(c): 07-15-16 lined with plastic Replace the 1st paragraph of section 49-3.02A(4)(d)(i)with: 07-15-16 Section 49-3.02A(4)(d)applies to CIDH concrete piles except for piles(1) less than 24 inches in diameter or(2)constructed in dry or dewatered holes. Replace gamma-gamma logging in the 2nd paragraph of section 49-3.02A(4)(d)(i)with: 07-15-16 GGL Replace the 1st sentence in the 3rd paragraph of section 49-3.02A(4)(d)(i)with: 07-15-16 After notification by the Engineer of pile acceptance,fill the inspection pipes and cored holes with grout. Replace gamma-gamma logging in section 49-3.02A(4)(d)(ii)with: 07-15-16 GGL Replace the 3rd and 4th paragraphs of section 49-3.02A(4)(d)(iii)with: 07-15-16 The Department may perform CSL to determine the extent of the anomalies identified by GGL and to further evaluate a rejected pile for the presence of anomalies not identified by GGL. The pile acceptance test report will indicate if the Department intends to perform CSL and when the testing will be performed. Allow the Department 20 additional days for a total of 50 days to perform CSL and to provide supplemental results. If authorized, you may perform testing on the rejected pile. 07-15-16 Delete the 8th paragraph of section 49-3.02A(4)(d)(iii). Add to the end of section 49-3.02A(4)(d)(iii): 07-15-16 If the Engineer determines it is not feasible to repair the rejected pile, submit a mitigation plan for replacement or supplementation of the rejected pile. Page 95 of 183 Add to section 49-3.02A(4): 07-15-16 49-3.02A(4)(e) Certifications If synthetic slurry is used, your employees who will be providing technical assistance in the slurry activities must be trained and certified by the synthetic slurry manufacturer to show their competency to perform inspection of slurry operations. Replace section 49-3.02B(4)with: 07-15-16 49-3.02B(4) Reserved Replace near in the 3rd, 4th,and 5th paragraphs of section 49-3.02B(6)(b)with: 07-15-16 within 2 feet of Replace twice per shift in item 2 in the 3rd paragraph of section 49-3.02B(6)(b)with: 07-15-16 every 4 hours 07-15-16 Delete the 7th and 8th paragraphs of section 49-3.02B(6)(b). 07-15-16 Delete the 3rd paragraph of section 49-3.02B(6)(c). Replace near in item 2 in the 4th paragraph of section 49-3.02B(6)(c)with: 07-15-16 within 2 feet of Replace item 5 in the 4th paragraph of section 49-3.02B(6)(c)with: 07-15-16 5. After final cleaning and immediately before placing concrete. Replace section 49-3.02B(9)with: 07-15-16 49-3.02B(9) Inspection Pipes Inspection pipes must be schedule 40 PVC pipe complying with ASTM D1785 with a nominal pipe size of 2 inches. Watertight PVC couplers complying with ASTM D2466 are allowed to facilitate pipe lengths in excess of those commercially available. Add to the beginning of section 49-3.02C(1): 07-15-16 Unless otherwise authorized, drilling the hole and placing reinforcement and concrete in the hole must be performed in a continuous operation. Page 96 of 183 Replace the 5th paragraph of section 49-3.02C(2)with: 07-15-16 If slurry is used during excavation, maintain the slurry level at a height required to maintain a stable hole, but not less than 10 feet above the piezometric head. Replace the 1st sentence in the 9th paragraph of section 49-3.02C(2)with: 07-15-16 Remove water that has infiltrated the dewatered hole before placing concrete, as required for dewatered hole. Replace the 1st sentence in the 10th paragraph of section 49-3.02C(2)with: 07-15-16 If authorized,to control caving or water seepage, you may enlarge portions of the hole, backfill the hole with slurry cement backfill, concrete, or other material, and redrill the hole to the diameter shown. Replace the 4th paragraph of section 49-3.02C(3)with: 07-15-16 Remove the temporary casing during concrete placement. Maintain the concrete in the casing at a level required to maintain a stable hole, but not less than 5 feet above the bottom of the casing, to prevent displacement of the concrete by material from outside the casing. Replace the 5th paragraph of section 49-3.02C(4)with: 07-15-16 For a single CIDH concrete pile supporting a column: 1. If the pile and the column share the same reinforcing cage diameter, this cage must be accurately placed as shown 2. If the pile reinforcing cage is larger in diameter than the column cage: 2.1. Maintain a clear horizontal distance of at least 3.5 inches between the two cages, if the concrete is placed under dry conditions 2.2. Maintain a clear horizontal distance of at least 5 inches between the two cages if the concrete is placed under slurry 2.3. The offset between the centerlines of the two cages must not exceed 6 inches Replace the paragraphs in section 49-3.02C(5)with: 07-15-16 For acceptance testing, install and test vertical inspection pipes as follows: 1. Log the location of the inspection pipe couplers with respect to the plane of pile cutoff. 2. Cap each inspection pipe at the bottom. Extend the pipe from 3 feet above the pile cutoff to the bottom of the reinforcing cage. Provide a temporary top cap or similar means to keep the pipes clean before testing. If pile cutoff is below the ground surface or working platform, extend inspection pipes to 3 feet above the ground surface or working platform. 3. If any changes are made to the pile tip, extend the inspection pipes to the bottom of the reinforcing cage. 4. Install inspection pipes in a straight alignment and parallel to the main reinforcement. Securely fasten inspection pipes in place and provide protective measures to prevent misalignment or damage to the inspection pipes during installation of the reinforcement and placement of concrete in the hole. Construct CIDH concrete piles such that the relative distance of inspection pipes to vertical steel reinforcement remains constant. 5. After concrete placement is complete,fill inspection pipes with water to prevent debonding of the pipe. 6. Provide safe access to the tops of the inspection pipes. Page 97 of 183 7. After placing concrete and before requesting acceptance testing, test each inspection pipe in the Engineer's presence by passing a rigid cylinder through the length of pipe. The rigid cylinder must be 1-1/4-inch diameter by 4.5-foot long, weigh 12 pounds or less, and be able to freely pass down through the entire length of the pipe under its own weight and without the application of force. 8. When performing acceptance testing, inspection pipes must provide a 2-inch-diameter clear opening and be completely clean, unobstructed, and either dry or filled with water as authorized. 9. After acceptance testing is complete, completely fill the inspection pipes with water. If the rigid cylinder fails to pass through the inspection pipe: 1. Completely fill the inspection pipes in the pile with water immediately. 2. Core a nominal 2-inch-diameter hole through the concrete for the entire length of the pile for each inspection pipe that does not pass the rigid cylinder. Coring must not damage the pile reinforcement. 3. Locate cored holes as close as possible to the inspection pipes they are replacing and no more than 5 inches clear from the reinforcement. Core holes using a double wall core barrel system with a split tube type inner barrel. Coring with a solid type inner barrel is not allowed. Coring methods and equipment must provide intact cores for the entire length of the pile. Photograph and store concrete cores as specified for rock cores in section 49-1.01 D(5). The coring operation must be logged by an engineering geologist or civil engineer licensed in the State and experienced in core logging. Coring logs must comply with the Department's Soil and Rock Logging, Classification, and Presentation Manual for rock cores. Coring logs must include core recovery, rock quality designation of the concrete, locations of breaks, and complete descriptions of inclusions and voids encountered during coring. The Department evaluates the portion of the pile represented by the cored hole based on the submitted coring logs and concrete cores. If the Department determines a pile is anomalous based on the coring logs and concrete cores, the pile is rejected. Replace item 2 in the list in the 2nd paragraph of section 49-3.02C(7)with: 07-15-16 2. Extend at least 5 feet below the construction joint. If placing casing into rock or a dry hole, the casing must extend at least 2 feet below the construction joint. Add to the beginning of section 49-3.02C(9): 07-15-16 49-3.02C(9)(a) General Replace the 2nd sentence of the 3rd paragraph of section 49-3.02C(9)with: 04-15-16 Do not vibrate the concrete. Add after concrete pump in the 8th paragraph of section 49-3.02C(9): 07-15-16 and slurry pump Replace item 3 in the list in the 11th paragraph of section 49-3.02C(9)with: 07-15-16 3. Maintain the slurry level at a height required to maintain a stable hole, but not less than 10 feet above the piezometric head. Page 98 of 183 Replace the 13th paragraph of section 49-3.02C(9)with: 07-15-16 Maintain a log of concrete placement for each drilled hole. Replace 14th and 15th paragraphs of section 49-3.02C(9)with: 07-15-16 If a temporary casing is used, maintain concrete placed under slurry at a level required to maintain a stable hole, but not less than 5 feet above the bottom of the casing.The withdrawal of the casing must not cause contamination of the concrete with slurry. The equivalent hydrostatic pressure inside the casing must be greater than the hydrostatic pressure on the outside of the casing to prevent intrusion of water, slurry, or soil into the column of freshly placed concrete. Remove scum, Iaitance, and slurry-contaminated concrete from the top of the pile. Add to section 49-3.02C(9): 07-15-16 49-3.02C(9)(b) Mineral Slurry Remove any caked slurry on the sides or bottom of hole before placing reinforcement. If concrete is not placed immediately after placing reinforcement, the reinforcement must be removed and cleaned of slurry, the sides of the drilled hole must be cleaned of caked slurry, and the reinforcement again placed in the hole for concrete placement. 49-3.02C(9)(c) Synthetic Slurry A manufacturer's representative must: 1. Provide technical assistance for the use of their material 2. Be at the job site before introduction of the synthetic slurry into the drilled hole 3. Remain at the job site until released by the Engineer After the manufacturer's representative has been released by the Engineer, your employee certified by the manufacturer must be present during the construction of the pile under slurry. Replace the heading of section 49-3.03 with: 07-15-16 CAST-IN-STEEL SHELL CONCRETE PILING Replace the 1st paragraph of section 49-3.03A(1)with: 07-15-16 Section 49-3.03 includes specifications for constructing CISS concrete piles consisting of driven open- ended or closed-ended steel shells filled with reinforcement and concrete. Add to the end of section 49-3.03A(1): 07-15-16 CISS concrete piles include Class 90 Alternative V and Class 140 Alternative V piles. Add to section 49-3.03A(3): 01-15-16 Submit a Pile and Driving Data Form under section 49-2.01 A(3)(a) if specified in the special provisions. Page 99 of 183 Replace the paragraph of section 49-3.03D with: 07-15-16 Furnish piling is measured along the longest side of the pile from the specified tip elevation shown to the plane of pile cutoff. Replace section 49-4.03 with: 01-15-16 49-4.03 CONSTRUCTION 49-4.03A General Reserved 49-4.03B Drilled Holes Drill holes for steel soldier piles into natural foundation material. Drilled holes must be accurately located, straight, and true. Furnish and place temporary casings or tremie seals where necessary to control water or to prevent caving of the hole. Before placing the steel soldier pile, remove loose materials existing at the bottom of the hole after drilling operations have been completed. Do not allow surface water to enter the hole. Remove all water in the hole before placing concrete. If temporary casings are used, they must comply with section 49-3.02C(3). 49-4.03C Steel Soldier Piles Plumb and align the pile before placing concrete backfill and lean concrete backfill. The pile must be at least 2 inches clear of the sides of the hole for the full length of the hole to be filled with concrete backfill and lean concrete backfill. Ream or enlarge holes that do not provide the clearance around steel piles. Maintain alignment of the pile in the hole while placing backfill material. Clean and prepare piles in anticipated heat affected areas before splicing steel piles or welding concrete anchors. AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA 50 PRESTRESSING CONCRETE 07-15-16 Add to the end of section 50-1.01 C: 07-15-16 50-1.01 C(8) Post-tensioning Jack Calibration Chart Submit the post-tensioning jack calibration plot. 50-1.01C(9) Pretensioning Jack Calibration Chart For any pretensioning jack calibrated by an authorized laboratory, submit a certified calibration plot. Replace section 50-1.01 D(2)(b)with: 07-15-16 50-1.01 D(2)(b) Equipment and Calibration 50-1.01 D(2)(b)(i) General Each jack body must be permanently marked with the ram area. Each pressure gauge must be fully functional and have an accurately reading, clearly visible dial or display. The dial must be at least 6 inches in diameter and graduated in 100 psi increments or less. Page 100 of 183 Each load cell must be calibrated and have an indicator that can be used to determine the force in the prestressing steel. The range of each load cell must be such that the lower 10 percent of the manufacturer's rated capacity is not used in determining the jacking force. Each jack must be calibrated equipped with its gauges. Mechanically calibrate the gauges with a dead weight tester or other authorized means before calibration of the jacking equipment. 50-1.01D(2)(b)(ii) Post-tensioning Equip each hydraulic jack used to tension prestressing steel with 2 pressure gauges or 1 pressure gauge and a load cell. Only 1 pressure gauge must be connected to the jack during stressing. Each jack used to tension prestressing steel permanently anchored at 25 percent or more of its specified minimum ultimate tensile strength must be calibrated by METS within 1 year of use and after each repair. You must: 1. Schedule the calibration of the jacking equipment with METS. 2. Verify that the jack and supporting systems are complete, with proper components, and are in good operating condition. 3. Provide labor, equipment, and material to(1) install and support the jacking and calibration equipment and (2)remove the equipment after the calibration is complete. 4. Plot the calibration results. Each jack used to tension prestressing steel permanently anchored at less than 25 percent of its specified minimum ultimate tensile strength must be calibrated by an authorized laboratory within 180 days of use and after each repair. 50-1.01 D(2)(b)(iii) Pretensioning Each jack used to pretension prestressing steel must be calibrated, equipped with its gauges, by a laboratory on the Authorized Laboratory List within 1 year of use and after each repair. Calibrate pretensioning jacks: 1. Under ASTM E4 using an authorized laboratory. Certification that the calibration is performed to ASTM accuracy is not required. 2. In the presence of the Engineer. Notify the Engineer at least 2 business days before calibrating the jack. 3. Using 3 test cycles. Average the forces from each test cycle at each increment. 4. To cover the load range used in the work. Gauges for pretensioning jacks may: 1. Be electronic pressure indicators that display either: 1.1. Pressure in 100 psi increments or less 1.2. Load to 1 percent of the maximum sensor/indicator capacity or 2 percent of the maximum load applied,whichever is smaller 2. Have a dial less than 6 inches in diameter Gauges displaying pressure must have been calibrated within 1 year of the jack calibration. Each hydraulic jack used for pretensioning must be equipped with either 2 gauges or 1 gauge and a load cell or you must have a calibrated standby jack with its gauge present on site during stressing. AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA Page 101 of 183 51 CONCRETE STRUCTURES 07-15-16 Add to the list in the 2nd paragraph of section 51-1.01A: 04-15-16 8. Pile extensions 07-15-16 9. Drainage inlets Add to the list in the 6th paragraph of section 51-1.01A: 07-15-16 7. Drainage inlets Add to section 51-1.021: 07-15-16 Metal frames, covers, grates, and other miscellaneous iron and steel used with drainage inlets must comply with section 75-2. Add to section 51-1.03B: 07-15-16 You may use PC drainage inlets as an alternative to CIP drainage inlets. Add between the 10th and 11th paragraphs of section 51-1.03C(2)(a): 07-15-16 For drainage inlets, extend the outside forms at least 12 inches below the top of the inlet. You may place concrete against excavated earth below this depth except: 1. You must use full-depth outside forms or other protection when work activities or unstable earth may cause hazardous conditions or contamination of the concrete. 2. You must increase the wall thickness 2 inches if placing concrete against the excavated surface.The interior dimensions must be as shown. Add to section 51-1.03C(2)(b): 07-15-16 For drainage inlets, remove exterior forms to at least 12 inches below the final ground surface. Exterior forms below this depth may remain if their total thickness is not more than 1 inch. Add to the list in the 2nd paragraph of section 51-1.03F(2): 07-15-16 4. Interior and top surfaces of drainage inlets Add to section 51-1.04: 07-15-16 The payment quantity for structural concrete, drainage inlet is the volume determined from the dimensions shown for CIP drainage inlets. Add to section 51-4.01 C(1): 07-15-16 For PC drainage inlets, submit field repair procedures and a patching material test sample before repairs are made.Allow 10 days for the Engineer's review. Page 102 of 183 Add to section 51-4.01C(2)(a): 07-15-16 For drainage inlets with oval or circular cross sections, submit shop drawings with calculations. Shop drawings and calculations must be sealed and signed by an engineer who is registered as a civil engineer in the State.Allow 15 days for the Engineer's review. Add to section 51-4.01 D(3): 07-15-16 The Engineer may reject PC drainage inlets exhibiting any of the following: 1. Cracks more than 1/32 inch wide 2. Nonrepairable honeycombed or spalled areas of more than 6 square inches 3. Noncompliance with reinforcement tolerances or cross sectional area shown 4. Wall, inlet floor, or lid less than minimum thickness 5. Internal dimensions less than dimensions shown by 1 percent or 1/2 inch, whichever is greater 6. Defects affecting performance or structural integrity Add to section 51-4.02C: 07-15-16 Materials for PC drainage inlets must comply with the following: 1. Preformed flexible joint sealant must be butyl-rubber complying with ASTM C990 2. Resilient connectors must comply with ASTM C923 3. Sand bedding must comply with section 19-3.02F(2) 4. Bonding agents must comply with ASTM C1059/C1059,Type II Add to section 51-4.02D: 07-15-16 51-4.02D(8) Drainage Inlets PC units for drainage inlets must be rectangular, round, or oval in cross section, or any combination. Transitions from a rectangular grate opening to a round or oval basin must be made in not less than 8 inches. Provide means for field adjustment to meet final grade, paving, or surfacing. If oval or circular shape cross-sections are furnished,they must comply with AASHTO LRFD Bridge Design Specifications, Sixth Edition with California Amendments. Wall and slab thicknesses may be less than the dimensions shown by at most 5 percent or 3/16 inch, whichever is greater. Reinforcement placement must not vary more than 1/2 inch from the positions shown. Add to section 51-4.03: 07-15-16 51-4.03H Drainage Inlets Repair PC drainage inlet sections to correct damage from handling or manufacturing imperfections before installation. Center pipes in openings to provide a uniform gap. Seal gaps between the pipe and the inlet opening with nonshrink grout under the grout manufacturer's instructions. For systems designated as watertight, seal these gaps with resilient connectors. Match fit keyed joints to ensure uniform alignment of walls and lids. Keys are not required at the inlet floor level if the floor is precast integrally with the inlet wall. Seal keyed joint locations with preformed butyl rubber joint sealant. You may seal the upper lid and wall joint with nonshrink grout. Page 103 of 183 Clean keyed joint surfaces before installing sealant. Joint surfaces must be free of imperfections that may affect the joint. Use a primer if surface moisture is present. Use a sealant size recommended by the sealant manufacturer. Set joints using sealant to create a uniform bearing surface. Flat drainage inlet floors must have a field-cast topping layer at least 2 inches thick with a slope of 4:1 (horizontal:vertical)toward the outlet. Use a bonding agent when placing the topping layer.Apply the bonding agent under the manufacturer's instructions. Replace the 2nd paragraph of section 51-7.01Awith: 07-15-16 Minor structures include structures described as minor structures. 07-15-16 Delete the 4th paragraph of section 51-7.01 B. 07-15-16 Delete the 1st and 3rd paragraphs of section 51-7.01C. 07-15-16 Delete the heading and paragraph of section 51-7.02. AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA 52 REINFORCEMENT 01-15-16 Replace the 3rd paragraph of section 52-6.03B with: 01-15-16 For uncoated and galvanized reinforcing bars complying with ASTM A615/A615M, Grade 60,ASTM A706/A706M, or ASTM A767/A767M, Class 1, the length of lap splices must be at least: 1. 45 diameters of the smaller bar spliced for reinforcing bars no. 8 or smaller 2. 60 diameters of the smaller bar spliced for reinforcing bars nos. 9, 10, and 11 For epoxy-coated reinforcing bars and alternatives to epoxy-coated reinforcing bars complying with ASTM A775/A775M,ASTM A934/A934M,ASTM Al 035/A1035M, or ASTM Al 055/A1055M, the length of lap splices must be at least: 1. 65 diameters of the smaller bar spliced for reinforcing bars no. 8 or smaller 2. 85 diameters of the smaller bar spliced for reinforcing bars nos. 9, 10, and 11 nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn 53 SHOTCRETE 01-15-16 Replace 632 in item 1 in the list in the 3rd paragraph of section 53-1.02 with: 01-15-16 675 Page 104 of 183 Replace item 2 in the list in the 3rd paragraph of section 53-1.02 with: 01-15-16 2. You may substitute a maximum of 30 percent coarse aggregate for the fine aggregate. Coarse aggregate must comply with section 90-1, except section 90-1.02C(4)(d)does not apply. The gradation for the coarse aggregate must comply with the gradation specified in section 90-1.02C(4)(b) for the 1/2 inch x No.4 or the 3/8 inch x No. 8 primary aggregate nominal size. Replace shotcrete in the 2nd sentence of the 4th paragraph of section 53-1.02 with: 01-15-16 concrete AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA 56 OVERHEAD SIGN STRUCTURES, STANDARDS, AND POLES 07-15-16 Replace section 56-1.01 with: 07-15-16 56-1.01 GENERAL 56-1.01A Summary Section 56-1 includes general specifications for constructing overhead sign structures, standards, and poles. 56-1.01B Definitions Reserved 56-1.01C Submittals Reserved 56-1.01D Quality Assurance 56-1.01D(1) General Reserved 56-1.01D(2) Quality Control 56-1.01 D(2)(a) General Reserved 56-1.0113(2)(b) Nondestructive Testing 56-1.01 D(2)(b)(i) General Perform NDT of steel members under AWS D1.1 and the requirements shown in the following table: Page 105 of 183 Nondestructive Testing for Steel Standards and Poles Weld location Weld type Minimum required NDT Circumferential splices around the perimeter of CJP groove weld with 100% UT or RT tubular sections, poles, backing ring and arms Longitudinal seam CJP or PJP groove Random 25% MT weld Longitudinal seam within 6 inches of a circumferential CJP groove weld 100% UT or RT splice CJP groove weld with t>_ 5/16 inch: 100% UT and 100% MT Welds attaching base backing ring and t< 5/16 inch: 100% MT after root weld plates,flange plates, pole reinforcing fillet pass and final weld pass plates, or mast arm plates External (top)fillet to poles or arm tubes weld for socket-type 100% MT connections Hand holes and other Fillet and PJP welds MT full length on random 25% of all appurtenances standards and poles NOTE: t= pole or arm thickness Page 106 of 183 Nondestructive Testing for Overhead Sign Structures Weld location Weld type Minimum required NDT CJP groove weld Base plate to post with backing ring 100% UT and 100% MT and reinforcing fillet Base plate to gusset plate CJP groove weld 100% UT Circumferential splices of pipe CJP groove weld 100% UT or RT or tubular sections with backing ring Split post filler plate welds CJP groove weld 100% UT or RT with backing bar Longitudinal seam weld for CJP groove weld t< 1/4 inch: 100% MT pipe posts t>_ 1/4 inch: 100% UT or RT PJP groove weld Random 25% RT Chord angle splice weld CJP groove weld 100% UT or RT with backing bar Truss vertical,diagonal, and Fillet weld Random 25% MT wind angles to chord angles Upperjunction plate to chord Fillet weld Random 25% MT cantilever type truss Bolted field splice plates CJP groove weld 100% UT and 100% MT (tubular frame type) Cross beam connection plates (lightweight extinguishable Fillet weld Random 25% MT message si n Arm connection angles (lightweight extinguishable Fillet weld 100% MT message sign) Mast arm to arm plate CJP groove weld t>_5/16 inch: 100% UT and 100% MT (lightweight extinguishable with backing ring t<5/16 inch: 100% MT after root message sin) weld pass and final weld pass Post angle to post(lightweight Fillet weld 100% MT extinguishable message sign) Hand holes and other Fillet and PJP MT full length on random 25% of all appurtenances welds sign structures NOTE: t= pole or arm thickness 56-1.01D(2)(b)(ii) Ultrasonic Testing For UT of welded joints with any members less than 5/16 inch thick or tubular sections less than 13 inches in diameter,the acceptance and repair criteria must comply with Clause 6.13.3.1 of AWS D1.1. For UT of other welded joints, the acceptance and repair criteria must comply with Table 6.3 of AWS D1.1 for cyclically loaded nontubular connections. After galvanization, perform additional inspection for toe cracks along the full length of all CJP groove welds at tube-to-transverse plate connections using UT. When performing UT, use an authorized procedure under AWS D1.1,Annex S. 56-1.01 D(2)(b)(iii) Radiographic Testing The acceptance criteria for radiographic or real time image testing must comply with AWS D1.1 for tensile stress welds. 56-1.01 D(2)(b)(iv) Longitudinal Seam Welds The Engineer selects the random locations for NDT. Grind the cover pass smooth at the locations to be tested. Page 107 of 183 If repairs are required in a portion of a tested weld, perform NDT on the repaired portion and on 25 percent of the untested portions of the weld. If more repairs are required, perform NDT on the entire weld. 56-1.01 D(3) Department Acceptance Reserved Replace section 56-2.01 D(2)(b)with: 07-15-16 Reserved Replace the 2nd sentence of the 1st paragraph of section 56-2.02F with: 07-15-16 Manufactured pipe posts must comply with one of the following: Add to the list in the 1st paragraph of section 56-2.02F: 07-15-16 4. ASTM A1085, Grade A Replace the 2nd paragraph of section 56-2.02F with: 07-15-16 You may fabricate pipe posts from structural steel complying with ASTM A36/A36M,ASTM A709/A709M, Grade 36, or ASTM A572/A572M, Grades 42 or 50. 07-15-16 Delete the last sentence in the 1st paragraph of section 56-2.02K(2). 07-15-16 Delete the 3rd paragraph of section 56-2.02K(2). Replace the 2nd paragraph of section 56-2.02K(4)with: 07-15-16 Safety cable at walkways must not be kinked, knotted, deformed,frayed, or spliced. Replace the 1st sentence of the paragraph in section 56-2.02K(5)with: 07-15-16 The edges of handholes and other large post and arm openings must be ground smooth. Replace the heading of section 56-3 with: 07-15-16 56-3 STANDARDS, POLES, PEDESTALS, AND POSTS Replace the paragraph in section 56-3.01Awith: 07-15-16 Section 56-3 includes general specifications for fabricating and installing standards, poles, pedestals, and posts. Page 108 of 183 Replace section 56-3.01 B(2)(b)with: 07-15-16 Standards with handholes must comply with the following: 1. Include a UL-listed lug and 3/16-inch or larger brass or bronze bolt for attaching the bonding jumper for non-slip-base standards. 2. Attach a UL-listed lug to the bottom slip base plate with a 3/16-inch or larger brass or bronze bolt for attaching the bonding jumper for slip-base standards. Replace the 1st sentence of the 3rd paragraph of section 56-3.01C(2)(a)with: 07-15-16 After each standard, pole, pedestal, and post is properly positioned, place mortar under the base plate. Replace the 2nd sentence of the 4th paragraph of section 56-3.01 C(2)(a)with: 07-15-16 The top of the foundation at curbs or sidewalks must be finished to curb or sidewalk grade. Replace the 10th paragraph of section 56-3.01 C(2)(a)with: 07-15-16 Except when located on a structure,construct foundations monolithically. Replace the 13th paragraph of section 56-3.01 C(2)(a)with: 07-15-16 Do not erect standards, poles, pedestals, or posts until the concrete foundation has cured for at least 7 days. Replace the 14th paragraph in section 56-3.01 C(2)(a)with: 07-15-16 The Engineer selects either the plumbing or raking technique for standards, poles, pedestals, and posts. Plumb or rake by adjusting the leveling nuts before tightening nuts. Do not use shims or similar devices. After final adjustments of both top nuts and leveling nuts on anchorage assemblies have been made and each standard, pole, pedestal, and post on the structure is properly positioned, tighten nuts as follows: 1. Tighten leveling nuts and top nuts,following a crisscross pattern, until bearing surfaces of all nuts, washers, and base plates are in firm contact. 2. Use an indelible marker to mark the top nuts and base plate with lines showing relative alignment of the nut to the base plate. 3. Tighten top nuts following a crisscross pattern: 3.1. Additional 1/6 turn for anchor bolts greater than 1-1/2 inches in diameter. 3.2. Additional 1/3 turn for other anchor bolts. 3.3. Tightening tolerance for all top nuts is± 1/8 turn. Replace the 1 st sentence of the 4th paragraph of section 56-3.01 C(2)(b)with: 07-15-16 If shown, use sleeve nuts on Type 1 standards. Add to section 56-3.01 C(2)(b): 07-15-16 Spiral reinforcement must be continuous above the bottom of the anchor bolts.The top termination must be either: Page 109 of 183 1. V-6" lap beyond the end of pitch with a 90-degree hook extending to the opposite side of the cage, or 2. V-6" lap beyond the end of pitch with 2 evenly spaced authorized mechanical couplers Replace the 1st sentence of the paragraph in section 56-3.02A(4)(b)with: 07-15-16 For cast slip bases for standards and poles with shaft lengths of 15 feet or more, perform RT on 1 casting from each lot of a maximum of 50 castings under ASTM E94. Replace the 2nd paragraph of section 56-3.02B(1)with: 07-15-16 Material for push button posts, pedestrian barricades, and guard posts must comply with ASTM A53/A53M or ASTM A500/A500M. Add to section 56-3.02B(1): 07-15-16 Steel pipe standards and mast arms must be hot dip galvanized after manufacturing. Remove spikes from galvanized surfaces. Replace the 2nd paragraph of section 56-3.02B(2)with: 07-15-16 HS anchor bolts, nuts, and washers must comply with section 55-1.02D(1)and the following: 1. Bolt threads must be rolled 2. Hardness of HS anchor bolts must not exceed 34 HRC when tested under ASTM F606 3. Galvanization must be by mechanical deposition 4. Nuts must be heavy-hex type 5. Each lot of nuts must be proof load tested Replace the 2nd sentence of the 9th paragraph of section 56-3.02B(2)with: 07-15-16 During manufacturing, properly locate the position of the luminaire arm on the arm plate to avoid interference with the cap screw heads. Add to section 56-3.02B(3)(a): 07-15-16 Steel having a nominal thickness greater than 2 inches that is used for tube-to-transverse plate connections must have a minimum CVN impact value of 20 ft-lb at 20 degrees F when tested under ASTM E23. Add to section 56-3.02B(3)(c): 07-15-16 The length of telescopic slip-fit splices must be at least 1.5 times the inside diameter of the exposed end of the female section. For welds connecting reinforced handholes or box-type pole plate connections to a tubular member, the start and stop points must be at points located on a longitudinal axis of symmetry of the tube coinciding with the axis of symmetry of the hand hole or pole plate. Page 110 of 183 Replace the table in the 1st paragraph of section 56-3.02C with: 07-15-16 Slip Base Bolt Tightening Requirements Standard type Torque(ft-lb) 15-S B 150 15-SBF 150 30 150 31 200 Replace the 1st sentence of the 2nd paragraph of section 56-3.02C with: 07-15-16 Bolted connections attaching signal or luminaire arms to standards, poles, and posts are considered slip critical. Add to section 56-3.06B: 07-15-16 Manufacture the mast arm from standard pipe,free from burrs. Each mast arm must have an insulated wire inlet and wood pole mounting brackets for the mast arm and tie-rod cross arm. Manufacture tie rod from structural steel and pipe. 07-15-16 Delete the 2nd paragraph of section 56-3.06C. Replace the 1st sentence of the 3rd paragraph of section 56-3.06C with: 07-15-16 Mount the mast arm for luminaires to provide a 34-foot mounting height for a 165 W LED luminaire and a 40-foot mounting height for a 235 W LED luminaire. nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn 59 STRUCTURAL STEEL COATINGS 07-15-16 Replace Type S in the 2nd paragraph of section 59-1.02A with: 01-15-16 Type M or Type S Add to the list in the 2nd paragraph of section 59-1.0213: 07-15-16 5. Manufactured abrasives. Replace Mineral and slag in the 3rd paragraph of section 59-1.0213 with: 07-15-16 Mineral, manufactured, and slag Page 111 of 183 07-15-16 Delete the 4th paragraph of section 59-2.01 C(1). nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn 60 EXISTING STRUCTURES 07-15-16 07-15-16 Delete the 2nd sentence in the 11th paragraph of section 60-3.04B(3)(c). nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn 64 PLASTIC PIPE 07-15-16 Replace Reserved in section 64-3 with: 07-15-16 64-3.01 GENERAL 64-3.01A Summary Section 64-3 includes specifications for constructing slotted plastic pipe. Slotted plastic pipe includes structure excavation, concrete backfill, connecting new pipe to new or existing facilities, concrete collars, reinforcement, and other connecting devices. 64-3.0113 Definitions Reserved 64-3.01C Submittals If an or equal slotted plastic pipe is being considered, it must be submitted 30 days before installation for approval. If RSC is used for concrete backfill for slotted plastic pipe, submit the concrete mix design and test data from an authorized laboratory 10 days before excavating the pipe trench. The laboratory must specify the cure time required for the concrete mix to attain 2,000 psi compressive strength when tested under California Test 521. Heel-resistant grates if specified must be submitted 30 days before installation for approval. Anchorage details must be included in the submittal. 64-3.01 D Quality Assurance Reserved 64-3.02 MATERIALS 64-3.02A General Not Used 64-3.0213 Slotted Plastic Pipes Slotted plastic pipe must be one of the following or equal: Slotted Plastic Pipe 12"diameter 18"diameter Zurn Z888-12 Zurn Z888-18 ACO Qmax 350 ACO Qmax 365 ADS Duraslot-12 ADS Duraslot-18 Page 112 of 183 64-3.02C Concrete Backfill Concrete for concrete backfill for slotted plastic pipe must comply with the specifications for minor concrete. You may use RSC instead of minor concrete for concrete backfill. If RSC is used for concrete backfill, the RSC must: 1. Contain at least 590 pounds of cementitious material per cubic yard 2. Comply with section 90-3.02A, except section 90-1 does not apply 3. Comply with section 90-2 64-3.02D Heel-Resistant Grates Heel-resistant grate must: 1. Be designed to carry traffic loadings 2. Comply with ADA requirements 3. Be constructed of steel or cast iron 4. Be provided by the same manufacturer of the slotted plastic pipe 5. Comply with the manufacturer's instructions 64-3.02E Bar Reinforcement Bar reinforcement must comply with ASTM A615/A615M, Grade 60 or ASTM A706/A706M, Grade 60. 64-3.02F Miscellaneous Metal Ductile iron, nuts, bolts, and washers must comply with section 75. 64-3.02G Grout Grout must be non-shrink grout complying with ASTM C1107/C1107M. 64-3.02H Curing Compound Non-pigmented curing compound must comply with ASTM C309, Type 1, Class B. 64-3.021 End Caps End cap must: 1. Be provided by the same manufacturer of the slotted plastic pipe 2. Prevent concrete backfill from entering the pipe 64-3.03 CONSTRUCTION 64-3.03A General Cover the grate slots with heavy-duty tape or other authorized covering during paving and concrete backfilling activities to prevent material from entering the slots. 64-3.03B Preparation Pave adjacent traffic lanes before installing slotted plastic pipes. Excavation must comply with section 19-3. 64-3.03C Installation Lay and join slotted plastic pipes under the pipe manufacturer's instructions. Lay pipes to line and grade with sections closelyjointed and adequately secured to prevent separation during placement of the concrete backfill. If the pipes do not have a positive interlocking mechanism like a slot and tongue connection, secure the sections together with nuts, bolts, and washers before backfilling. The top of slotted plastic pipes must not extend above the completed surface. Position the pipes so that the concrete backfill is flush with the surrounding grade and above the top of the grate from 1/8 to 1/4 inch. Place channels with the male and female ends facing each other. Page 113 of 183 Place lateral support bar reinforcement on both sides of the grate slots. The support bar reinforcement must run the full length of the slots. Anchor heel-resistant grates to the concrete backfill under the manufacturer's instructions. 64-3.03D Concrete Backfill Wherever minor concrete is used for concrete backfill for slotted plastic pipe, do not allow traffic on top of the backfill within 7 days of placement. Wherever RSC is used for concrete backfill for slotted plastic pipe, do not allow traffic on top of the backfill before the required cure time of 2,000 psi is achieved. Place concrete backfill where shown. Consolidate the concrete backfill with high-frequency internal vibrators. Texture the concrete backfill surface with a broom or burlap drag to produce a durable skid-resistant surface. Apply a non-pigmented curing compound to the exposed concrete backfill surface whenever the atmospheric temperature is 90 degrees F or greater after placement. 64-3.03E Transition Fittings Use transition fittings to connect slotted plastic pipes to drainage inlets.The transition fittings must be supplied by the same pipe manufacturer. Where welds are required in transition fittings, welds must comply with the pipe manufacturer's instructions.The completed welds must not have visible pinholes.Fill the gaps around the pipes in the inlet structure wall with non-shrink grout where the pipes connect to an existing drainage structure. Install the grout under the pipe manufacturer's instructions. Cut the pipes as shown after the grout used to seal the transition fitting has cured for at least 24 hours. 64-3.04 PAYMENT Slotted plastic pipe is measured along the centerline of the pipe and parallel with the slope line. If the pipe is cut to fit a structure or slope,the payment quantity is the length of pipe necessary to be placed before cutting, measured in 2-foot increments. AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA DIVISION VII DRAINAGE FACILITIES 71 EXISTING DRAINAGE FACILITIES 01-15-16 Replace items 5 and 6 in the list in the 1st paragraph of section 71-3.01D with: 01-15-16 5. Performing postrehabilitation inspection Add after the 4th paragraph of section 71-3.01D: 01-15-16 Record the quantity of grout that is installed and submit this quantity.The Department does not pay for grout that leaks through to the inside of the culvert. The Department does not pay for grout material that is wasted, disposed of, or remaining on hand after the completion of the work. Page 114 of 183 Replace the 2nd heading in section 71-5.03 with: 01-15-16 71-5.0313 Frames, Covers, Grates, and Manholes nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn DIVISION VIII MISCELLANEOUS CONSTRUCTION 72 SLOPE PROTECTION 07-15-16 Replace the 1 st and 2nd paragraphs of section 72-2.0213 with: 07-15-16 For method A and B placement and the class of RSP described, comply with the rock gradation shown in the following table: Rock Gradation Nominal RSP class Nominal by median particle median d15C(inches) d50C(inches) d100° Placement diameter particle (inches) Diameter weight Classy inches W c,d Min Max Min Max Max Method 1 6 201b 3.7 5.2 5.7 6.9 12.0 B 11 9 601b 5.5 7.8 8.5 10.5 18.0 B 111 12 1501b 7.3 10.5 11.5 14.0 24.0 B IV 15 3001b 9.2 13.0 14.5 17.5 30.0 B V 18 1/4 ton 11.0 15.5 17.0 20.5 36.0 B VI 21 3/8 ton 13.0 18.5 20.0 24.0 42.0 A or B V11 24 1/2 ton 14.5 21.0 23.0 27.5 48.0 A or B Vill 30 1 ton 18.5 26.0 28.5 34.5 48.0 A or B IX 36 2 ton 22.0 31.5 34.0 41.5 52.8 A X 42 3 ton 25.5 36.5 40.0 48.5 60.5 A XI 46 4 ton 28.0 39.4 43.7 53.1 66.6 A 'For RSP Classes I-VIII, use Class 8 RSP fabric. For RSP Classes IX-XI, use Class 10 RSP fabric. bIntermediate or B dimension (i.e., width) where A dimension is length and C dimension is thickness. °d%, where % denotes the percentage of the total weight of the graded material. dValues shown are based on the minimum and maximum particle diameters shown and an average specific gravity of 2.65.Weight will vary based on specific gravity of rock available for the project. Replace the table in section 72-2.02C with: 07-15-16 Fabric Class Class Largest rock gradation class used in slope protection 8 Classes I-VIII 10 Classes IX-XI Page 115 of 183 Replace the table in the 1st paragraph of section 72-3.02C with: 07-15-16 Concreted-Rock Gradation Nominal RSP class by Nominal median particle median d15° d5o° dloo° diameter particle weight Class (inchze es)es) W50cd Min Max Min Max Max Weight' 1 6 20lb 3.7 5.2 5.7 6.9 12.0 11 9 60lb 5.5 7.8 8.5 10.5 18.0 111 12 150lb 7.3 10.5 11.5 14.0 24.0 V 18 1/4 ton 11.0 15.5 17.0 20.5 36.0 VII 24 1/2 ton 14.5 21.0 23.0 27.5 48.0 Use Class 8 RSP fabric. bIntermediate or B dimension (i.e.,width)where A dimension is length and C dimension is thickness. °d%, where% denotes the percentage of the total weight of the graded material. dValues shown are based on the minimum and maximum particle diameters shown and an assumed specific gravity of 2.65.Weight will vary based on specific gravity of rock available for the project. Replace the table in section 72-3.03E with: 07-15-16 Minimum Concrete Penetration Rock class VII V 111 II 1 Penetration 18 14 10 8 6 inches AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA 73 CONCRETE CURBS AND SIDEWALKS 07-15-16 Replace section 73-3.01 A with: 07-15-16 Section 73-3 includes specifications for constructing sidewalks, gutter depressions, island paving, curb ramps,and driveways. AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA 74 PUMPING EQUIPMENT AND CONTROLS 04-15-16 Replace 87-1.03K in the 4th paragraph of section 74-3.03B(2)with: 04-15-16 87 nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn Page 116 of 183 80 FENCES 07-15-16 Replace section 80-4 with: 07-15-16 80-4 WILDLIFE EXCLUSION FENCES 80-4.01 GENERAL 80-4.01A General Section 80-4 includes specifications for constructing wildlife exclusion fences. Constructing a wildlife exclusion fence includes the installation of any signs specified in the special provisions. 80-4.01 B Materials Each T post must: 1. Comply with ASTM A702 2. Be metal and have an anchor plate 3. Be painted black or galvanized 80-4.01 C Construction Not Used 80-4.01 D Payment Not Used 80-4.02 DESERT TORTOISE FENCES 80-4.02A General Section 80-4.02 includes specifications for constructing desert tortoise fences. 80-4.0213 Materials 80-4.0213(1) Permanent Desert Tortoise Fences 80-4.0213(1)(a) General Each wire tie and hog ring for a permanent desert tortoise fence must comply with section 80-2.02F. Each hold down pin must: 1. Be U-shaped,with 2 minimum 6-inch long legs 2. Have pointed ends 3. Be at least 11-gauge wire 4 Be galvanized 5. Be commercial quality 80-4.0213(1)(b) Hardware Cloth The hardware cloth must: 1. Comply with ASTM A740 2. Be welded or woven galvanized steel wire fabric 3. Be made of at least 14-gauge wire 4. Be 36 inches wide 80-4.0213(1)(c) Barbless Wire The barbless wire must: 1. Comply with ASTM A641/A641 M 2. Be at least 14-gauge wire 3. Have a Class 1 zinc coating Page 117 of 183 80-4.02B(1)(d) Posts Each post must: 1. Comply with ASTM F1083 2. Be standard weight, schedule 40 steel pipe with a nominal pipe size of 1 inch 3. Be galvanized steel fence post conforming to ASTM A702 80-4.02B(2) Temporary Desert Tortoise Fences The materials for a temporary desert tortoise fence must comply with section 80-4.02B(1), except the hardware cloth must be made of at least 16-gauge wire. 80-4.02C Construction 80-4.02C(1) General Extend the hardware cloth a minimum of 24 inches above the ground. Plumb the posts and pull the hardware cloth taut. Correct any alignment issues. 80-4.02C(2) Permanent Desert Tortoise Fences Excavate the ground to form a trench before installing the posts and hardware cloth. Embed the posts at maximum 5-foot intervals into the ground. If T posts are used, use 5-foot lengths and embed the posts to match the above-ground height shown for the posts. Securely fasten the hardware cloth to the posts with wire ties and to barbless wire with hog rings as shown. Pass the wire ties through the hardware cloth. Encircle the posts and barbless wire with the ties and tie them by twisting a minimum of 3 complete turns. Bend the twisted ends of the ties down to prevent possible snagging. Close hog rings with their ends overlapping. Bury the hardware cloth a minimum of 12 inches into the ground. Install the cloth in 1 continuous piece. You may cut the cloth into shorter segments if authorized. Overlap the hardware cloth segments at posts,with a minimum overlap of 6 inches centered at a post. Wire tie the overlapped cloth to posts as shown. Prevent fraying by threading barbless wire along the vertical edges of the hardware cloth on either side of the post or use 3 equally spaced hog rings (6 hog rings per location)along each wire cloth edge. Where bedrock or caliche substrate is encountered, use the bent hardware cloth detail if authorized. Transitions from buried-to-bent or bent-to-buried configuration must occur at a post location with a minimum 6-inch overlap of the hardware cloth as shown. The maximum spacing for hold down pins is 24 inches on center.Anchor in place with hold down pins the beginning and end corners of the hardware cloth placed on the ground. Backfill the removed earth material into the trench created to install the hardware cloth and posts. Use an 8 lb or heavier hand tamper to compact the backfill around the posts and hardware cloth. Install a post at each corner of the cloth segments. If a gate must be installed, attach the hardware cloth to the gate frame such that there is contact along the entire length of the gate between the finished ground surface and the lower edge of the cloth. Install the gate under section 80-10. 80-4.02C(3) Temporary Desert Tortoise Fences Fold the horizontal edge of the hardware cloth at a 90° angle toward the tortoise habitat area. Ensure the clearance to the ground at the bend is from 0 to 2 inches. Where the hardware cloth overlaps, secure the bend piece with one of the following: 1. Barbless wire threaded along the width of the cloth 2. Minimum of 4 hog rings equally spaced along the edge Fasten the bent piece to the ground with hold down pins pushed completely into the ground. Page 118 of 183 When the temporary fence is no longer needed, compact soil into post holes with an 8 lb or heavier hand tamper. 80-4.02D Payment Not Used 80-4.03-80-4.09 RESERVED AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA DIVISION IX TRAFFIC CONTROL DEVICES 83 RAILINGS AND BARRIERS 04-15-16 04-15-16 Delete to in the 4th paragraph of section 83-1.02B. nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn 84 MARKINGS 07-15-16 Add to the beginning of section 84-8.03A: 07-15-16 Select the method and equipment for constructing ground-in indentations. Replace the 1st paragraph of section 84-8.03Awith: 07-15-16 Do not construct rumble strips: 1. On structures, approach slabs, or concrete weigh-in-motion slabs 2. At intersections 3. Bordering two-way left turn lanes, driveways, or other high-volume turning areas 4. Within 6 inches of any concrete pavement joint Add between the 2nd and 3rd paragraphs of section 84-8.03A: 07-15-16 Modify rumble strip spacing to avoid locating a groove on a concrete pavement joint. Replace the 3rd paragraph of section 84-8.03A with: 07-15-16 Indentations must comply with the dimensions shown and not vary more than: 1. 10 percent in length 2. 0.06 inch in depth 3. 10 percent in width 4. 1 inch in center-to-center spacing between rumble strips Page 119 of 183 Add to the end of section 84-8.03A: 07-15-16 The noise level created by the combined grinding activities must not exceed 86 dBA when measured at a distance of 50 feet at right angles to the direction of travel. Break rumble strips before and after intersections, driveways, railroad crossings,freeway gore areas, and freeway ramps. Place breaks and break distances as shown. You may adjust breaks and the break distances as needed at low-volume driveways or other locations if authorized. 07-15-16 Delete new in the 1st paragraph of section 84-8.03B. 07-15-16 Add to the end of section 84-8.0313: Remove grinding residue under section 13-4.03E(7). Replace the 1st paragraph of section 84-8.03C with: 07-15-16 Construct rumble strips in the top layer of HMA and asphalt concrete surfacing by the ground-in method. Add between the 2nd and 3rd paragraphs of section 84-8.03C: 07-15-16 Dispose of the removed material. 07-15-16 Delete the 2nd paragraph of section 84-8.03C. Replace 37-2 in the 3rd paragraph of section 84-8.03C with: 07-15-16 37-4.02 Replace section 84-8.04 with: 07-15-16 The payment quantity for any type of rumble strip is the length measured by the station along the length of the rumble strip without deductions for gaps between indentations. Replace the 2nd paragraph of section 84-9.03B with: 04-15-16 Completely remove traffic stripes and pavement markings, including any paint in the gaps, by methods that do not remove pavement to a depth of more than 1/8 inch. Add between the 2nd and 3rd paragraphs of section 84-9.03B: 04-15-16 Submit your proposed method for removing traffic stripes and pavement markings at least 7 days before starting the removal work.Allow 2 business days for the review. Remove pavement marking such that the old message cannot be identified. Make any area removed by grinding rectangular.Water must not puddle in the ground areas. Fog seal ground areas on asphalt concrete pavement. Page 120 of 183 04-15-16 Delete materially in the 1st paragraph of section 84-9.03D. nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn DIVISION X ELECTRICAL WORK Replace section 86 with: 04-15-16 86 GENERAL 04-15-16 86-1.01 GENERAL 86-1.01A Summary Section 86 includes general specifications for furnishing electrical equipment and materials. Electrical equipment and materials must comply with part 4 of the California MUTCD and 8 CA Code of Regs, chapter 4, subchapter 5, "Electrical Safety Orders." Galvanized equipment and materials must comply with section 75-1.02B. 86-1.0113 Definitions accessible pedestrian signal: Accessible pedestrian signal as defined in the California MUTCD. accessible walk indication: Activated audible and vibrotactile action during the walk interval. actuation: Actuation as defined in the California MUTCD. ambient sound level: Background sound level in dB at a given location. ambient sound sensing microphone: Microphone that measures the ambient sound level in dB and automatically adjusts the accessible pedestrian signal speaker's volume. audible speech walk message: Audible prerecorded message that communicates to pedestrians which street has the walk interval. channel: Discrete information path. CALiPER: Commercially Available LED Product Evaluation and Reporting.A U.S. Department of Energy program that individually tests and provides unbiased information on the performance of commercially available LED luminaires and lights. controller assembly: Assembly for controlling a system's operations, consisting of a controller unit and auxiliary equipment housed in a waterproof cabinet. controller unit: Part of the controller assembly performing the basic timing and logic functions. correlated color temperature: Absolute temperature in kelvin of a blackbody whose chromaticity most nearly resembles that of the light source. detector: Detector as defined in the California MUTCD. electrolier: Assembly of a lighting standard and luminaire. flasher: Device for opening and closing signal circuits at a repetitive rate. flashing beacon control assembly: Assembly of switches, circuit breakers,terminal blocks,flasher, wiring, and other necessary electrical components housed in a single enclosure for operating a beacon. Page 121 of 183 house side lumens: Lumens from a luminaire directed to light up areas between the fixture and the pole, such as sidewalks at intersection or areas off the shoulders on freeways. illuminance gradient: Ratio of the minimum illuminance on a 1-foot square of sign panel to that on an adjacent 1-foot square of sign panel. inductive loop detector: Detector capable of being actuated by an inductance change caused by a vehicle passing or standing over the loop. An inductive loop detector includes a loop or group of loops installed in the roadway and a lead-in cable installed and connected inside a controller cabinet. junction temperature: Temperature of the electronic junction of the LED device. The junction temperature is critical in determining photometric performance, estimating operational life, and preventing catastrophic failure of the LED. L70: Extrapolated life in hours of the luminaire when the luminous output depreciates 30 percent from the initial values. lighting standard: Pole and mast arm supporting the luminaire. LM-79: Test method from the Illumination Engineering Society of North America specifying the test conditions, measurements, and report format for testing solid state lighting devices, including LED luminaires. LM-80: Test method from the Illumination Engineering Society of North America specifying the test conditions, measurements, and report format for testing and estimating the long-term performance of LEDs for general lighting purposes. luminaire:Assembly that houses the light source and controls the light emitted from the light source. National Voluntary Laboratory Accreditation Program: U.S. Department of Energy program that accredits independent testing laboratories. powder coating: Coating applied electrostatically using exterior-grade, UV-stable, polymer powder. power factor: Ratio of the real power component to the complex power component. pretimed controller assembly:Assembly operating traffic signals under a predetermined cycle length. programming mechanism: Device to program the accessible pedestrian signal operation. pull box: Box with a cover that is installed in an accessible place in a conduit run to facilitate the pulling in of wires or cables. push button information message: Push button information message as defined in the California MUTCD. push button locator tone: Push button locator tone as defined in the California MUTCD. signal face: Signal face as defined in the California MUTCD. signal head: Signal head as defined in the California MUTCD. signal indication: Signal indication as defined in the California MUTCD. signal section: Signal section as defined in the California MUTCD. signal standard: Pole with or without mast arms carrying 1 or more signal faces. street side lumens: Lumens from a luminaire directed to light up areas between the fixture and the roadway, such as traveled ways and freeway lanes. surge protection device: Subsystem or component that protects equipment against short-duration voltage transients in power line. total harmonic distortion: Ratio of the rms value of the sum of the squared individual harmonic amplitudes to the rms value of the fundamental frequency of a complex waveform. Page 122 of 183 traffic-actuated controller assembly: Assembly for operating traffic signals under the varying demands of traffic as registered by detector actuation. traffic phase: Traffic phase as defined in the California MUTCD. vehicle: Vehicle as defined in the California Vehicle Code. vibrotactile pedestrian device: Vibrotactile pedestrian device as defined in the California MUTCD. 86-1.01C Submittals 86-1.01C(1) General Within 15 days after Contract approval, submit a list of equipment and materials you propose to install. Submit the list before shipping equipment and materials to the job site. The list must include: 1. Manufacturer's name 2. Make and model number 3. Month and year of manufacture 4. Lot and serial numbers 5. Contract number 6. Your contact information Submit confirmation of the vendor's acceptance of the order for the electrical equipment and materials as an informational submittal. Submit 3 sets of computer-generated, schematic wiring diagrams for each cabinet. Diagrams, plans, and drawings must be prepared using graphic symbols in IEEE 315, "Graphic Symbols for Electrical and Electronic Diagrams." Submit a schedule of values within 15 days after Contract approval. Do not include costs for the traffic control system in the schedule of values. Submit a manufacturer's maintenance manual or combined maintenance and operation manual as an informational submittal. The manual must have a master item index that includes: 1. Specifications 2. Design characteristics 3. General operation theory 4. Function of all controls 5. Troubleshooting procedure 6. Parts list, descriptions, stock numbers, and settings 7. Block circuit diagram 8. Layout of components 9. Schematic diagrams 86-1.01C(2) Pull Boxes Submit the manufacturer's installation instructions for pull boxes, including: 1. Quantity and size of entries that can be made without degrading the strength of the pull box below the load rating 2. Locations where side entries can be made 3. Acceptable method for creating the entry Submit load-rating test reports for pull boxes from a NRTL. 86-1.01C(3) LED Luminaires Submit for an LED luminaire: 1. Maximum power in watts 2. Maximum designed junction temperature 3. Heat sink area in square inches Page 123 of 183 4. Designed junction-to-ambient thermal resistance calculation with thermal resistance components clearly defined 5. L70 in hours when extrapolated for the average nighttime operating temperature 6. Life expectancy based on the junction temperature 7. Manufacturer's data sheet for the power supply, including the rated life Submit the manufacturer's QC test data for LED luminaires as an informational submittal. 86-1.01C(4) Low-Pressure Sodium Luminaires Submit the manufacturer's QC test data for low-pressure sodium luminaires as an informational submittal. 86-1.01C(5) Service Equipment Enclosures Submit shop drawings for a service equipment enclosure to METS. 86-1.01C(6) Signal Heads Submit a certificate of compliance and the manufacturer's QC test data for signal heads as an informational submittal. 86-1.01C(7) LED Signal Modules Submit the manufacturer's QC test data for LED signal modules as an informational submittal. 86-1.01C(8) Visors Submit a certificate of compliance and the manufacturer's QC test data for visors as an informational submittal. 86-1.01C(9) LED Countdown Pedestrian Signal Face Modules Submit the manufacturer's QC test data for LED countdown pedestrian signal face modules as an informational submittal. 86-1.01C(10) Accessible Pedestrian Signals Submit the manufacturer's QC test data for accessible pedestrian signals as an informational submittal. 86-1.01D Quality Assurance 86-1.01D(1) General Electrical equipment must comply with one or more of the following standards: 1. ANSI 2. ASTM 3. EIA/ECIA 4. NEMA 5. NETA 6. UL/NRTL 7. TIA Materials must comply with: 1. FCC rules 2. ITE standards 3. NEC 4. California Electrical Code 86-1.01D(2) Source Quality Control Service equipment enclosures and cabinets must be inspected and tested at the source. 86-1.01 D(3) Department Acceptance Deliver material and equipment for testing to METS. Allow 30 days for testing. The Department notifies you when testing is complete. Page 124 of 183 If the Department accepts the material or equipment, you must pick it up from the test site and deliver it to the job site. If the Department rejects material or equipment, remove it within 5 business days after you are notified it is rejected. If it is not removed within that period,the Department may remove it and ship it to you and deduct the costs of labor, material and shipping. Resubmit a new sample and allow 30 days for retesting.The retesting period starts when the replacement material or equipment is delivered to METS. 86-1.02 MATERIALS 86-1.02A General Anchor bolts, anchor bars or studs, and nuts and washers must comply with section 75-1.02. Bolt threads must accept galvanized standard nuts without requiring tools or causing removal of protective coatings. 86-1.02B Conduit and Accessories 86-1.02B(1) General Conduit and fittings must comply with the requirements shown in the following table: Conduit and Fitting Requirements Type Requirement 1 Must be hot-dip galvanized rigid steel complying with UL 6 and ANSI C80.1. The zinc coating must comply with copper sulfate test requirements in UL 6. Fittings must be electrogalvanized and certified under UL 514B. 2 Must comply with requirements for Type 1 conduit and be coated with PVC or polyethylene. The exterior thermoplastic coating must have a minimum thickness of 35 mils. The internal coating must have a minimum thickness of 2 mils. Coated conduit must comply with NEMA RN 1, or NRTL PVC-001. 3 Must be Type A, extruded, rigid PVC conduit complying with UL 651 or must be HDPE conduit complying with U L 651 A. 4 Must have an inner,flexible metal core covered by a waterproof, nonmetallic, sunlight-resistant jacket, and must be UL listed for use as a grounding conductor. Fittings must be certified under UL 514B. 5 Must be intermediate steel complying with UL 1242 and ANSI C80.6. The zinc coating must comply with copper sulfate test requirements specified in UL 1242. Fittings must be electro alvanized and certified under UL 514B. Bonding bushings installed on metal conduit must be insulated and either a galvanized or zinc-alloy type. 86-1.02B(2) Structures Accessories Steel hangers, steel brackets, and other fittings used to support conduit in or on a wall or bridge superstructure must comply with section 75-3. Precast concrete cradles for conduit must be made of minor concrete and commercial-quality welded wire fabric. The minor concrete must contain a minimum of 590 lb of cementitious material per cubic yard. The cradles must be moist cured for a minimum of 3 days. 86-1.02C Pull Boxes 86-1.02C(1) General Pull box cover must have a marking on the top that is: 1. Clearly defined 2. Uniform in depth 3. Parallel to either side 4. 1 to 3 inches in height Cover marking must be: Page 125 of 183 1. SERVICE for service circuits between a service point and service disconnect 2. SERVICE IRRIGATION for circuits from a service equipment enclosure to an irrigation controller 3. SERVICE BOOSTER PUMP for circuits from a service equipment enclosure to the booster pump 4. TDC POWER for circuits from a service equipment enclosure to telephone demarcation cabinet 5. LIGHTING for a lighting system 6. SIGN ILLUMINATION for a sign illumination system 7. SIGNAL AND LIGHTING for a signal and lighting system 8. RAMP METER for a ramp metering system 9. TMS for a traffic monitoring station 10. FLASHING BEACON for a flashing beacon system 11. CMS for a changeable message sign system 12. INTERCONNECT for an interconnect conduit and cable system The load rating must be stenciled on the inside and outside of the pull box and the cover. If a transformer or other device must be placed in the pull box, include recesses for a hanger. The hardware must be stainless steel with 18 percent chromium and 8 percent nickel content. 86-1.02C(2) Nontraffic Pull Boxes A nontraffic pull box and cover must comply with ANSI/SCTE 77, "Specification for Underground Enclosure Integrity,"for Tier 22 load rating and must be gray or brown. Each new pull box must have a cover with an electronic marker cast inside. A pull box extension must be made of the same material as the pull box. The extension may be another pull box if the bottom edge of the pull box fits into the opening for the cover. The bolts, nuts, and washers must be a captive design and galvanized. Captive bolts for securing the cover of nontraffic pull boxes must be capable of withstanding a torque from 55 to 60 ft-lb and a minimum pull-out strength of 750 lb. 86-1.02C(3) Traffic Pull Boxes A traffic pull box and cover must comply with ASTM C857 for HS20-44 loading. The frame must be anchored to the box with 2-1/4-inch-long concrete anchors with a 1/4 inch diameter. A no. 3-1/2(T) pull box must have 4 concrete anchors, one placed in each corner. No. 5(T)and no. 6(T) pull boxes must have 6 concrete anchors, one placed in each corner and one near the middle of each of the longer sides. Nuts must be vibration-resistant, zinc-plated, carbon steel and have a wedge ramp at the root of the thread. Before galvanizing a steel or cast iron cover, the manufacturer must apply the cover marking by one of the following methods: 1. Use a cast iron strip at least 1/4 inch thick with letters raised a minimum of 1/16 inch. Fasten the strip to the cover with 1/4-inch,flathead, stainless steel machine bolts and nuts. Peen the bolts after tightening. 2. Use a sheet steel strip at least 0.027 inch thick with letters raised a minimum of 1/16 inch. Fasten the strip to the cover by spot welding, tack welding, or brazing with 1/4-inch stainless steel rivets or 1/4- inch, roundhead, stainless steel machine bolts and nuts. Peen the bolts after tightening. The steel cover must be countersunk approximately 1/4 inch to accommodate the bolt head.When tightened,the bolt head must be no more than 1/8 inch above the top of the cover. 86-1.02C(4) Reserved 86-1.02D Tapes 86-1.02D(1) General Reserved Page 126 of 183 86-1.02D(2) Pull Tape Pull tape must be a flat,woven, lubricated, soft-fiber, polyester tape with a minimum tensile strength of 1,800 lb. The tape must have sequential measurement markings every 3 feet. 86-1.02D(3) Reserved 86-1.02E Reserved 86-1.02F Conductors and Cables 86-1.02F(1) Conductors 86-1.02F(1)(a) General Reserved 86-1.02F(1)(b) Reserved 86-1.02F(1)(c) Copper Conductors 86-1.02F(1)(c)(i) General Copper wire must comply with ASTM B3 and B8. Conductor must be clearly and permanently marked the entire length of its outer surface with: 1. Manufacturer's name or trademark 2. Insulation-type letter designation 3. Conductor size 4. Voltage 5. Temperature rating 6. Number of conductors for a cable The minimum insulation thickness and color code requirements must comply with NEC. A conductor must be UL listed or NRTL certified and rated for 600 V(ac). Insulation for no. 14 to no. 4 conductors must be one of the following: 1. Type TW PVC under ASTM D2219 2. Type THW PVC 3. Type USE, RHH, or RHW cross-linked polyethylene The insulation for no. 2 and larger conductors must be one of the above or THWN. Conductors must be identified as shown in the following table: Page 127 of 183 Conductor Identification Identification Insulation color Circuit Signal phase or function Base Stripe' Band symbols Size 2, 6 Red, yel, brn Blk 2, 6 14 4, 8 Red, yel, brn Ora 4, 8 14 Signals 1, 5 Red, yel, brn None 1, 5 14 (vehicle)''b 3, 7 Red, yel, brn Pur 3, 7 14 Ramp meter 1 Red, yel, brn None NBR 14 Ramp meter 2 Red, yel, brn Blk NBR 14 2p, 6p Red, brn Blk 2p, 6p 14 Pedestrian 4p, 8p Red, brn Ora 4p, 8p 14 signals 1 p, 5p Red, brn None 1 p, 5p 14 3p, 7p Red, brn Pur 3p, 7p 14 2p, 6p Blu Blk P-2, P-6 14 Pedestrian 4p, 8p Blu Ora P-4, P-8 14 push buttons 1 p, 5p Blu None P-1, P-5 14 3p, 7p Blu Pur P-3, P-7 14 Traffic signal Ungrounded circuit controller conductor Blk None CON-1 6 cabinet Grounded circuit conductor Wht None CON-2 6 Highway Ungrounded- line 1 Blk None NBR 14 lighting pull box Ungrounded- line 2 Red None NBR 14 to luminaire Grounded Wht None NBR 14 Multiple Ungrounded- line 1 Blk None ML1 10 highway lighting Ungrounded- line 2 Red None ML2 10 Ungrounded-PEU Blk None C1 14 Lighting control Switching leg from PEU unit or SM transformer Red None C2 14 Ungrounded -line 1 Service (signals) Blk None NBR 6 Ungrounded -line 2 (lighting) Red None NBR 8 Sign lighting Ungrounded- line 1 Blk None SL-1 10 Ungrounded- line 2 Red None SL-2 10 Flashing Ungrounded between beacons flasher and beacons Red or yel None F-Loc.° 14 Pedestrian push buttons Wht Blk NBR 14 Signals and multiple Grounded lighting Wht None NBR 10 circuit Flashing beacons and conductor sign lighting Wht None NBR 12 Lighting control Wht None C-3 14 Service Wht None NBR 14 Railroad preemption Blk None R 14 Spares Blk None NBR 14 NBR= No band required PEU=Photoelectric unit 'On overlaps,the insulation is striped for the 1 st phase in the designation, e.g., phase (2+3)conductor is striped as for phase 2. bBand for overlap and special phases as required °Flashing beacons having separate service do not require banding. dColor Code:Yel-Yellow, Brn-Brown, Blu-Blue, Blk-Black,Wht-White, Ora-Orange, Pur-Purple Page 128 of 183 The insulation color must be homogeneous throughout the full depth of the insulation.The identification stripe must be continuous throughout the length of the conductor. 86-1.02F(1)(c)(ii) Bonding Jumpers and Equipment Grounding Conductors A bonding jumper must be copper wire or copper braid of the same cross-sectional area as a no. 8 conductor or larger. An equipment grounding conductor may be bare or insulated. 86-1.02F(1)(c)(iii) Inductive Loop Conductors Inductive loop conductor must comply with the requirements shown in the following table: Conductor Requirements for Inductive Loop Detectors Loop wire Requirement Type 1 Type RHW-USE neoprene-jacketed or Type USE cross-linked polyethylene, insulated, no. 12 stranded copper wire with a minimum 40-mils insulation thickness at any point. Type THWN or Type XHHW, no. 14, stranded copper wire in a plastic tubing.The plastic Type 2 tubing must be polyethylene or vinyl rated for use at 105 °C and resistant to oil and gasoline.The outside diameter of the tubing must be at most 0.27 inch with a wall thickness of at least 0.028 inch. 86-1.02F(1)(d) Reserved Reserved 86-1.02F(2) Cables 86-1.02F(2)(a) General Reserved 86-1.02F(2)(b) Reserved Reserved 86-1.02F(2)(c) Reserved 86-1.02F(2)(d) Copper Cables 86-1.02F(2)(d)(i) General The conductor wire size for a detector lead-in cable must comply with the requirements of ASTM B286. Cable, except a detector lead-in cable, must be clearly and permanently marked the entire length of its outer surface with: 1. Manufacturer's name or trademark 2. Insulation-type letter designation 3. Conductorsize 4. Voltage 5. Temperature rating 6. Number of conductors for a cable 86-1.02F(2)(d)(ii) Conductors Signal Cables A conductors signal cable must have a black polyethylene jacket with an inner polyester binder sheath. The cable jacket must be rated for 600 V(ac)and 75 degrees C. Filler material, if used, must be polyethylene. The individual conductors in the cable must be solid copper complying with ASTM B286 with Type THWN insulation.The minimum thickness of insulation must comply with NEC for conductor sizes no. 14 to no.10.The minimum thickness of the nylon jacket must be 4 mils. Cable must comply with the requirements shown in the following table: Page 129 of 183 Cable Conductor Cable jacket thickness Maximum Conductor color code type' quantity and mils nominal type Average Minimum outside diameter (inch) 3CSC 3 no. 14 44 36 0.40 Blue/black,blue/orange, white/black stripe 5CSC 5 no. 14 44 36 0.50 Red, yellow, brown, black, white 9CSC 8 no. 14 60 48 0.65 No. 12-white, 1 no. 12 no. 14- red, yellow, brown, black, and red/black,yellow/black, brown/black,white/black stripe 12CSC 11 no. 14 60 48 0.80 No. 12-white, 1 no. 12 no. 14- red, yellow, brown, red/black stripe, yellow/black stripe, brown/black stripe, black/red stripe, black/white stripe, black, red/white stripe, brown/white stripe 28CSC 27 no. 14 80 64 0.90 No. 10-white 1 no. 10 no. 14-red/black stripe, yellow/black stripe, brown/black stripe, red/orange stripe, yellow/orange stripe, brown/orange stripe, red/silver stripe, yellow/silver stripe, brown/silver stripe, red/purple stripe, yellow/purple stripe, brown/purple stripe, red/2 black stripes, brown/2 black stripes, red/2 orange stripes, brown/2 orange stripes, red/2 silver stripes, brown/2 silver stripes, red/2 purple stripes, brown/2 purple stripes, blue/black stripe, blue/orange stripe, blue/silver stripe, blue/purple stripe, white/black stripe, black/red stripe, black 86-1.02F(2)(d)(iii) Detector Lead-in Cables Conductors for a loop detector lead-in cable must be two no. 16, 19-by-29, stranded,tinned copper wires with calculated cross-sectional areas complying with ASTM B286, table 1 and must comply with the requirements shown in the following table: Page 130 of 183 Conductor Requirements for Loop Detector Lead-In Cables Lead-in cable Requirement Type B Insulated with 20 mils of high-density polyethylene. Conductors must be twisted together with at least 2 turns per foot, and the twisted pair must be protected with a copper or aluminum polyester shield. A minimum no. 20 copper drain wire must be connected to the equipment ground within the cabinet. Cable must have a high-density polyethylene or high-density polypropylene outer jacket with a nominal thickness of 32 mils. Include an amorphous, interior, moisture penetration barrier of nonhydroscopic polyethylene or polypropylene fillers. Type C Comply with International Municipal Signal Association Specification no. 50-2.A minimum no. 20 copper drain wire must be connected to the equipment ground within the cabinet. 86-1.02F(2)(d)(iv) Reserved 86-1.02F(2)(d)(v) Signal Interconnect Cables A signal interconnect cable must be a 6-pair type with stranded,tinned, copper no. 20 conductors.The insulation for each conductor must be color-coded polypropylene with a minimum 13-mils nominal thickness. The conductors must be in color-coded,twisted pairs. Each pair must be wrapped with an aluminum polyester shield and have a no. 22 or larger, stranded, tinned, copper drain wire inside the shielded pair. The cable jacket must be black HDPE rated for a minimum of 300 V(ac)and 60 degrees C. The jacket must have a minimum nominal wall thickness of 40 mils. 86-1.02F(2)(e) Reserved 86-1.02G Equipment Identification Characters Equipment identification characters must be 2-1/2 inch, series D lettering, except on wood poles,they must be 3-inch lettering. The characters must be self-adhesive reflective labels or paint, except on wood poles,they must be embossed on aluminum. 86-1.02H Splicing Materials Splicing materials include: 1. Connectors 2. Electrical insulating coating 3. PVC electrical tape 4. Butyl rubber stretchable tape 5. PVC pressure-sensitive adhesive tape 6. Heat shrink tubing Connectors must be C-shaped compression or butt type. Electrical insulating coating must be a fast drying sealant with low nontoxic fumes. PVC electrical tape must have a minimum thickness of 80 mils. Butyl rubber stretchable tape with liner must have a minimum thickness of 120 mils. PVC pressure-sensitive adhesive electrical tape must have a minimum thickness of 6 mils. Electrical tapes must be self-fusing, oil-and flame-resistant, synthetic rubber and be UL listed or NRTL certified. Heat-shrink tubing must be made of irradiated polyolefin tubing with a minimum wall thickness of 40 mils before contraction and an adhesive mastic inner wall. When heated, the inner wall must melt and fill the crevices and interstices of the covered splice area and the outer wall must shrink to form a waterproof insulation. Page 131 of 183 Heat-shrink tubing must comply with the requirements for extruded, insulating tubing at 600 V(ac) specified in UL Standard 468D and ANSI C119.1 and the requirements shown in the following table: Heat-Shrink Tubing Requirements Quality characteristic Requirement Shrinkage ratio of supplied diameter'(max, %) 33 Dielectric strength (min, kV/in) 350 Resistivity(min, 0/in) 25 x 1013 Tensile strength (min, psi) 2,000 Operating temperature(°C) -40-90 (135 °C in emergency) Water absorption (max, %) 0.5 'When heated to 125°C and allowed to cool to 25 °C 86-1.021 Connectors and Terminals A connector and terminal must comply with SAE-AS7928 and be a crimp type, rated for 600 V(ac)and either UL listed or NRTL certified. 86-1.02J Standards, Poles, Pedestals,and Posts Standards for signals, lighting, and flashing beacons, poles for closed circuit television, pedestals for cabinets, posts for extinguishable message sign and posts for pedestrian push button assemblies must comply with section 56-3. 86-1.02K Luminaires 86-1.02K(1) General Luminaire must be either LED or low-pressure-sodium type. 86-1.02K(2) LED Luminaires LED luminaire must be on the Authorized Material List for LED luminaires and must: 1. Be self-contained, not requiring assembly. 2. Comply with UL 1598 for luminaires in wet locations. 3. Have a power supply with: 3.1. ANSI/IEC rating of at least IP65. 3.2. 2 leads to accept standard 0-10 V(dc). 3.3. Dimming control compatible with IEC 60929,Annex E. If the control leads are open or the analog control signal is lost, the circuit must default to 100-percent power. 3.4. Case temperature self rise of 77 degrees F or less above ambient temperature in free air with no additional heat sinks. 4. Weigh no more than 35 lb. 5. Have a minimum operating life of 63,000 hours when operated for an average time of 11.5 hours at an average temperature of 70 degrees F. 6. Be designed to operate over a temperature range from -40 to 130 degrees F. 7. Be operationally compatible with photoelectric controls. 8. Have a correlated color temperature range from 3,500 to 6,500 K and a color rendering index of 65 or greater. 9. Have a maximum-effective projected area of 1.4 sq ft when viewed from either side or end. 10. Have a housing color that matches a color no. 26152 to 26440, 36231 to 36375, or 36440 of FED- STD-595. 11. Have an ANSI C1 36.41-compliant, locking-type, photocontrol receptacle with dimming connections and a watertight shorting cap. 12. Comply with LM-79, LM-80 and California Test 611. The individual LEDs must be connected such that a catastrophic loss or a failure of 1 LED does not result in the loss of more than 20 percent of the luminous output of the luminaire. The luminaire must be permanently marked inside the unit and outside of its packaging box. Marking consists of: 1. Manufacturer's name or trademark Page 132 of 183 2. Month and year of manufacture 3. Model, serial, and lot numbers 4. Rated voltage,wattage, and power in VA An LED luminaire's onboard circuitry must include a surge protection device to withstand high-repetition noise transients caused by utility line switching, nearby lightning strikes, and other interferences.The device must protect the luminaire from damage and failure due to transient voltages and currents as defined in Tables 1 and 4 of ANSI/IEEE C64.41.2 for location category C-High. The surge protection device must comply with UL 1449 and ANSI/IEEE C62.45 based on ANSI/IEEE C62.41.2 definitions for standard and optional waveforms for location category C-High. An LED luminaire and its associated onboard circuitry must comply with the Class A emission limits under 47 CFR 15(B)for the emission of electronic noise. The fluctuations of line voltage must have no visible effect on the luminous output. The operating voltage may range from 120 to 480 V(ac), 60±3 Hz. Luminaire must operate over the entire voltage range or the voltage range must be selected from one of the following: 1. Luminaire must operate over a voltage range from 95 to 277 V(ac).The operating voltages for this option are 120 V(ac)and 240 V(ac). 2. Luminaire must operate over a voltage range from 347 to 480 V(ac).The operating voltage for this option is 480 V(ac). LED luminaire must have a power factor of 0.90 or greater.The total harmonic distortion, current, and voltage induced into a power line by a luminaire must not exceed 20 percent. The L70 of the luminaire must be the minimum operating life or greater. Illuminance measurements must be calibrated to standard photopic calibrations. The maximum power consumption and maintained illuminance of the LED luminaires must comply with the isofootcandle curves as shown. LED luminaire must not allow more than 10 percent of the rated lumens to project above 80 degrees from vertical and 2.5 percent of the rated lumens to project above 90 degrees from vertical. Luminaire must have passive thermal management with enough capacity to ensure proper heat dissipation and functioning of the luminaire over its minimum operating life. The maximum junction temperature for the minimum operating life must not exceed 221 degrees F. The junction-to-ambient thermal resistance must be 95 degrees F per watt or less. The use of fans or other mechanical devices is not allowed for cooling the luminaire. The heat sink must be made of aluminum or other material of equal or lower thermal resistance.The luminaire must contain circuitry that automatically reduces the power to the LEDs so the maximum junction temperature is not exceeded when the ambient temperature is 100 degrees F or greater. The luminaire's housing must be fabricated from materials designed to withstand a 3,000-hour salt spray test under ASTM B117.All aluminum used in housings and brackets must be made of a marine-grade alloy with less than 0.2 percent copper.All exposed aluminum must be anodized. A chromate conversion undercoating must be used underneath a thermoplastic polyester powder coat. The housing must be designed to prevent the buildup of water on its top surface. Exposed heat sink fins must be oriented to allow water to run off the luminaire and carry dust and other accumulated debris away from the unit.The optical assembly of the luminaire must be protected against dust and moisture intrusion to at least an UL 60529 rating of IP66. The power supply enclosure must be protected to at least an UL 60529 rating of IP43. The housing must have a slip fitter capable of being mounted on a 2-inch-diameter pipe tenon. Slip fitter must: 1. Fit on mast arms with outside diameters from 1-5/8 to 2-3/8 inches 2. Be adjustable to a minimum of±5 degrees from the axis of the tenon in a minimum of 5 steps: +5, +2.5, 0, -2.5, -5 3. Have clamping brackets that: Page 133 of 183 3.1. Are made of corrosion-resistant materials or treated to prevent galvanic reactions 3.2. Do not bottom out on the housing bosses when adjusted within the designed angular range 3.3. Do not permanently set in excess of 1/32 inch when tightened Each refractor or lens must be made of UV-inhibiting high-impact plastic, such as acrylic or polycarbonate, or heat-and impact-resistant glass.The refractor or lens must be resistant to scratching. Polymeric materials, except for the lenses of enclosures containing either the power supply or electronic components of the luminaire, must be made of UL94 V-0 flame-retardant materials. An LED luminaire and its internal components must be able to withstand mechanical shock and vibration. If the components are mounted on a down-opening door, the door must be hinged and secured to the luminaire's housing separately from the refractor or flat lens frame.The door must be secured to the housing to prevent accidental opening. A safety cable must mechanically connect the door to the housing. An LED luminaire must have a barrier-type terminal block secured to the housing to connect field wires. The terminal screws must be captive and equipped with wire grips for conductors up to no. 6. The conductors and terminals must be identified and marked. 86-1.02K(3) Low-Pressure Sodium Luminaires A low-pressure sodium luminaire must be an enclosed cutoff or semi-cutoff type and be self-contained, not requiring assembly. The housing must be either(1)a minimum 1/1 6-inch-thick, corrosion-resistant, die-cast aluminum sheet and plate with concealed continuous welds or(2)a minimum 3/32-inch-thick, acrylonitrile-butadiene- styrene sheet material on a cast aluminum frame. The housing must provide mounting for all electrical components and a slip fitter. The housing must be divided into optical and power compartments that are individually accessible for service and maintenance. The painted exterior surface of the luminaire must be finished with a fused coating of electrostatically applied polyester powder paint or other UV-inhibiting film.The color must be aluminum gray. A sealing ring must be installed in the pipe tenon opening to prevent the entry of water and insects into the power and optical compartments. The ring must be made of high-temperature neoprene or equal material. The power unit assembly must be accessible through a weather-tight, hinged cover secured to the housing with spring latches or captive screws. The luminaire's hardware must be stainless steel or cadmium plated. Removable components must be secured with machine screws or bolts instead of sheet metal screws. A semi-cutoff luminaire or a molded refractor-style cutoff luminaire must include a refractor. Other cutoff luminaires must include a flat lens. The refractor assembly and flat lens assembly must be designed to rigidly maintain their shape and be hinged and secured to the housing with spring latches. The refractor must be either a 1-piece injection-molded polycarbonate with a minimum thickness of 3/32 inch or a 1-piece injection-molded acrylic with a minimum thickness of 1/8 inch. Alternate methods of manufacturing the refractor may be authorized provided minimum specified thicknesses are maintained. The flat lens must be a 1-piece polycarbonate with a minimum thickness of 3/32 inch, mounted to a metal frame. The lamp socket must be made of high-temperature,flame-retardant, thermoset material with self-wiping contacts or an equal. The socket must be rated for 660 W and 1,000 V(ac). The position of the socket and support must maintain the lamp in the correct relationship with the reflector and refractor for the designed light distribution pattern.The reflector may be an integral part of the housing. The luminaire must comply with the isofootcandle curves as shown. Low-pressure sodium lamp must: 1. Bea 180 W, single-ended, bayonet-base,tubular, gas-discharge lamp Page 134 of 183 2. Maintain a minimum of 93 percent of its initial lumens over its rated life 3. Reach 80 percent of its light output within 10 minutes 4. Restrike within 1 minute after a power outage or voltage drop at the lamp socket 5. Have ANSI L74/E designation The lamp operating position must be at±20 degrees from the horizontal. Lamp must comply with the minimum performance requirements shown in the following table: Minimum Performance Requirements Quality characteristic Requirement Initial lumens Im 33,000 Rated average life at 10 h/start(h) 18,000 The low-pressure sodium lamp ballast must be an autotransformer or high-reactance type.The power factor must be not less than 90 percent when the ballast is operated at the nominal line voltage with a nominally-rated reference lamp.The lamp wattage regulation spread must not vary by more than ±6 percent for±10 percent input voltage variation from nominal through life. At the line voltage, the ballast must have a lamp current crest factor not exceeding 1.8 and ballast loss not exceeding 24 percent for a 180 W ballast. The ballast must include a multi-circuit connector for quick disconnection. 86-1.02K(4) Reserved 86-1.021L Reserved 86-1.02M Photoelectric Controls Photoelectric control types are as shown in the following table: Photoelectric Control Types Control type Description I Pole-mounted photoelectric unit.Test switch housed in an enclosure. II Pole-mounted photoelectric unit. Contactor and test switch located in a service equipment enclosure. III Pole-mounted photoelectric unit. Contactor and a test switch housed in an enclosure. IV A photoelectric unit that plugs into a NEMA twist-lock receptacle, integral with the luminaire. V A photoelectric unit, contactor, and test switch located in a service equipment enclosure. The pole-mounted adaptor for Type I, II, and III photoelectric controls must include a terminal block and cable supports or clamps to support the wires. The enclosure for Type I and III photoelectric controls must be a NEMA 3R type. The enclosure must have a factory-applied, rust-resistant prime coat and finish coat. The enclosure must be hot-dip galvanized or painted to match the color of the lighting standard. Photoelectric unit must: 1. Have a screen to prevent artificial light from causing cycling. 2. Have a rating of 60 Hz, 105-130 V(ac), 210-240 V(ac), or 105-240 V(ac). 3. Operate at a temperature range from -20 to 55 degrees C. 4. Consume less than 10 W. 5. Be a 3-prong,twist-lock type with a NEMA IP 65 rating,ANSI C136.10-compliant 6. Have a fail-on state 7. Fit into a NEMA-type receptacle 8. Turn on from 1 to 5 footcandles and turn off from 1.5 to 5 times the turn-on level. Measurements must be made by procedures in EEI-NEMA Standards for Physical and Electrical Interchangeability of Light-Sensitive Control Devices Used in the Control of Roadway Lighting. Page 135 of 183 Type I, II, III, and V photoelectric controls must have a test switch to allow manual operation of the lighting circuit. Switch must be: 1. Single-hole mounting,toggle type 2. Single pole and single throw 3. Labeled Auto-Test on a nameplate Photoelectric control's contactor must be: 1. Normallyopen 2. Mechanical-armature type with contacts of fine silver, silver alloy, or equal or better material 3. Installed to provide a minimum space of 2-1/2 inches between the contactor terminals and the enclosure's sides The terminal blocks must be rated at 25 A, 600 V(ac), molded from phenolic or nylon material, and be the barrier type with plated-brass screw terminals and integral marking strips. 86-1.02N Fused Splice Connectors The fused splice connector for 240 and 480 V(ac)circuits must simultaneously disconnect both ungrounded conductors. The connector must not have exposed metal parts except for the head of the stainless steel assembly screw. The head of the assembly screw must be recessed a minimum of 1/32 inch below the top of the plastic boss that surrounds the head. The connector must protect the fuse from water or weather damage. Contact between the fuse and fuse holder must be spring loaded. Fuses must: 1. Be standard, midget,ferrule type 2. Have a nontime-delay feature 3. Be 3/32 by 1-1/2 inches 86-1.020 Grounding Electrodes Grounding electrode must be: 1. 1 piece 2. Minimum 10-foot length of one of the following: 2.1. Galvanized steel rod or pipe not less than 3/4 inch in diameter 2.2. Copper clad steel rod not less than 5/8 inch in diameter 86-1.02P Enclosures 86-1.02P(1) General The enclosures must be rated NEMA 3R and include a dead front panel and a hasp with a 7/16-inch- diameter hole for a padlock. The enclosure's machine screws and bolts must not protrude outside the cabinet wall. The fasteners on the exterior of an enclosure must be vandal resistant and not be removable.The exterior screws, nuts, bolts, and washers must be stainless steel. 86-1.02P(2) Service Equipment Enclosures A service equipment enclosure must be factory wired and manufactured from steel and galvanized or have factory-applied, rust-resistant prime and finish coats, except Types 11 and III. Type II and III service equipment enclosures must: 1. Be made of 0.125-inch minimum thickness 5052-H32 aluminum sheet complying with ASTM B209. 2. Be manufactured using gas metal arc welding with bare aluminum welding electrodes. The electrodes must comply with AWS A5.10 Class ER5356. Page 136 of 183 3. Be manufactured using welding procedures, welders, and welding operators that comply with the requirements for welding procedures,welders, and welding operators in in AWS B2.1, "Specification for Welding Procedure and Performance Qualification." 4. Have full-seal weld exterior seams. 5. Exterior welds must be ground smooth and edges filed to a radius of at least 0.03 inch. 6. Have a surface finish that complies with MIL-A-8625 for a Type 11, Class I coating, except the anodic coating must have a minimum thickness of 0.0007 inch and a minimum coating weight of 0.001 oz/sq in. If a Type III enclosure houses a transformer of more than 1 kVA, the enclosure must have effective screened ventilation louvers of no less than 50 sq. in for each louver.The framed screen must be stainless no. 304 with a no. 10 size mesh and secured with at least 4 bolts. The dead front panel on a Type III service equipment enclosure must have a continuous stainless steel or aluminum piano hinge. The panel must be secured with a latch or captive screws. No live part must be mounted on the panel. The enclosure must be watertight and marked as specified in NEC to warn of potential electric-arc flash hazards. Internal conductors for the photoelectric control unit must be 600 V(ac), 14 AWG (THHN)stranded machine tool wire.Where subject to flexing, 19 stranded wire must be used. The meter area must be have a sealable, lockable, weather-tight cover that can be removed without the use of tools. For Type III-A, III-B, and III-C enclosures,the meter socket must be a 5-clip type, and the landing lug must be suitable for multiple conductors. For a Type III-D enclosure, the meter socket must be a 7-clip type, and the landing lug must be suitable for multiple conductors. The pedestal must comply with the Electric Utility Service Equipment Requirements Committee drawing no. 308 or 309. Landing lugs must be(1)sized for the incoming service utility conductors, (2)compatible with either copper or aluminum conductors, and (3)made of copper or tin-plated aluminum. Live parts of the electrical equipment must be guarded against accidental contact. The main and neutral busses of the enclosure must be made of tin-plated copper, be rated for 125 A, and be suitable for copper or aluminum conductors. Each service equipment enclosure must have up to 2 main circuit breakers that will simultaneously disconnect ungrounded service-entrance conductors. Circuit breaker for a service equipment enclosure must: 1. Be quick-break on either automatic or manual operation 2. Be trip indicating 3. Be internal-trip type 4. Be UL listed or NRTL certified and comply with UL 489 or equal 5. Be clearly marked with the frame size 6. Have an operating mechanism that is enclosed and trip-free from the operating handle on overload 7. Have the trip rating clearly marked on the operating handle 8. Have an interior made of copper Circuit breakers used as disconnects must have a minimum interrupting capacity of 10,000 A, rms. The interior of the enclosure must accept plug-in circuit breakers.A minimum of 6 standard single-pole circuit breakers, 3/4" nominal, must be provided for branch circuits. Identify each circuit breaker and component by description using an engraved phenolic nameplate attached with stainless steel rivets or screws. Nameplate must be installed: Page 137 of 183 1. Adjacent to the breaker on the dead front panel. The characters must be a minimum of 1/8 inch high. 2. Adjacent to the component on the back panel.The characters must be a minimum of 1/8 inch high. 3. At the top exterior of the door panel. The nameplate must include the system number, voltage, and number of phases engraved in minimum 3/16-inch-high characters. A plastic-laminated wiring diagram must be attached inside the enclosure with brass eyelets by a UL- listed or NRTL-certified method. 86-1.02P(3) Lighting and Sign Illumination Enclosures A lighting and sign illumination enclosure must be manufactured from steel and either galvanized, cadmium plated, or powder coated. 86-1.02Q Cabinets 86-1.02Q(1) General Cabinets must be factory wired except for battery backup system cabinets. The fasteners on the exterior of a cabinet, except for battery backup system cabinets, must be removable and vandal resistant.The exterior screws, nuts, bolts, and washers must be stainless steel. Terminal blocks, circuit breakers, and a power supply must be UL approved. 86-1.02Q(2) Department-Furnished Controller Cabinets A Department-furnished controller assembly consists of a Model 170E or 2070E controller unit, a wired controller cabinet, and all auxiliary equipment required to operate the system. The Department does not furnish anchor bolts. 86-1.02Q(3) Controller Cabinets The controller cabinet must be a Model 334L, comply with TEES, and be on the Authorized Material List for traffic signal control equipment. The cabinet must have 3 drawer shelves. Each shelf must be attached to the tops of 2 supporting angles with 4 screws. 86-1.02Q(4) Telephone Demarcation Cabinets 86-1.02Q(4)(a) General The doors of a telephone demarcation cabinet must be attached using continuous stainless steel piano hinges. 86-1.02Q(4)(b) Type ATelephone Demarcation Cabinets Reserved 86-1.02Q(4)(c) Type B Telephone Demarcation Cabinets A Type B telephone demarcation cabinet consists of a mounting panel, outlets, circuit breaker,fan, dead front plates, and fuse. The mounting panel must be made of 3/4-inch-thick ACX-grade plywood. The mounting panel must be fastened to the cabinet with nuts, lock washers, and flat washers to 10 welded studs. The cabinet must be made of 0.125-inch-thick anodized aluminum. The cabinet door must be hung and secured with drawn latches, lockable with a padlock.The padlock latches must each have a minimum 7/16-inch-diameter hole. Ventilation louvers must be located on the door. The fan must be located in a ventilator housing and be controlled thermostatically. The thermostat control must have a range from 80 to 130 degrees F. The thermostat and fan circuit must be protected with a fuse rated for 175 percent of the motor capacity. The fan capacity must be a minimum 25 cfm. Page 138 of 183 86-1.02Q(4)(d) Type C Telephone Demarcation Cabinets Reserved 86-1.02Q(5) Battery Backup System Cabinets The cabinet for a battery backup system must comply with TEES and be on the Authorized Material List for traffic signal control equipment. 86-1.02R Signal Heads 86-1.02R(1) General A signal head consists of a signal mounting assembly, backplate, and signal face. The head must have a terminal block attached to the back of one housing. The terminal block must have enough positions to accommodate all indications. Each position must be permanently labeled for the indications used. The metal signal heads must not fracture or deflect more than half the lens diameter when tested under California Test 666. The plastic signal heads must not fracture or deflect when tested under California Test 605. The deflection must not be more than 10 degrees in either the vertical or horizontal plane after the wind load has been removed from the front of the signal face or more than 6 degrees in either the vertical or horizontal plane after the wind load has been removed from the back of the signal face. 86-1.02R(2) Signal Mounting Assemblies Signal mounting assembly must include: 1. 1-1/2-inch-diameter steel pipe or galvanized conduit 2. Pipe fitting made of ductile iron, galvanized steel, bronze, or aluminum alloy,Type AC-8413, no. 380 3. Mast arm and post-top slip fitters and terminal compartments made of cast bronze or hot-dip galvanized ductile iron The horizontal distance between the vertical centerlines of the terminal compartment or slip fitter and of each signal face must not exceed 11 inches except where required for proper signal face alignment or to allow programming of programmed visibility signal sections. The mounting assembly must be watertight and free of sharp edges or protrusions that might damage conductor insulation.The assembly must have positive-locking serrated fittings that prevent signal faces from rotating when the fittings are mated with similar fittings on the faces. Each terminal compartment must be fitted with a terminal block having a minimum of 12 positions, each with 2 screw-type terminals. Each terminal must accommodate at least five no. 14 conductors.The terminal compartment must have a cover for easy access to the terminal block. 86-1.02R(3) Backplates The backplate material must be a homogeneous black color with a lusterless finish. A metal backplate must be made of a minimum 1/16-inch-thick 3001-14 aluminum. A plastic backplate must have a minimum thickness of 1/16 inch and be formed from sheet plastic or assembled from extruded, molded, or cast plastic sections. Sections must be factory joined using one of the following: 1. Appropriate solvent cement. 2. Aluminum rivets and washers painted or permanently colored to match the backplate. 3. No. 10 machine screws with flat washers, lock washers, and nuts painted to match the backplate. Each plastic backplate must be secured to the plastic signal face such that it resists removal or permanent deformation. 86-1.02R(4) Signal Faces Signal face consists of signal sections with signal housings, LED modules, and visors. Page 139 of 183 Signal face must: 1. Be adjustable and allow for 360-degree rotation about the vertical axis 2. Comply with ITE publications ST-052-E, Vehicle Traffic Control Signal Heads: Light Emitting Diode (LED) Circular Signal Supplement and ST-054, Vehicle Traffic Control Signal Heads:Light Emitting Diode(LED) Vehicle Arrow Traffic Signal Supplement 3. Be sealed with a neoprene gasket at the top opening A metal signal face must have a metal backplate and visor. A plastic signal face must have a plastic backplate and visor. If a signal face is supported by a Type MAS slip fitter, spacers are required between the 2 sections. The spacers must be made of the same material as the housing. The vertical dimension of the spacers must allow proper seating of the serrations between the slip fitter and the 2 sections.The 2 sections must be joined with at least two no. 10 minimum machine screws through holes near the front of the housing and the spacers and matching holes in a reinforcing plate installed in the housing. 86-1.02R(4)(a) Signal Sections 86-1.02R(4)(a)(i) General Signal section must have: 1 Opening at the top and bottom for a 1-1/2-inch pipe 2. Maximum height of 10-1/4 inches for an 8-inch section and 14-3/4 inches for a 12-inch section 3. Hinge pins, door-latching devices, and other exposed hardware manufactured of Type 304/304L or 305 stainless steel 4. Interior screws and fittings manufactured of stainless steel or steel with a corrosion-resistant plating or coating 5. Gaskets made of a material that is not degraded if installed in a section with metal or plastic housing Sections must be capable of being joined together to form a signal face in any combination.This interchangeability is not required between metal and plastic sections. Each section must be joined to an adjacent section by one of the following: 1. Minimum of 3 machine screws for 8-inch sections and 4 machine screws for 12-inch sections, installed through holes near the front and back of the housing. Each screw must be a no. 10 and have a nut,flat washer, and lock washer. 2. 2 machine screws, each with a nut, flat washer, and lock washer, installed through holes near the front of the housing and a fastener through the 1-1/2-inch pipe opening.The fastener must have 2 large,flat washers to distribute the load around the pipe's opening and 3 carriage bolts, each with a nut and lock washer. The minimum screw size must be no. 10, and the carriage bolt size must be 1/4 inch. The holes for the machine screws must be either cast or drilled during signal section fabrication. Each hole must be surrounded by a minimum 1/8-inch-wide boss to allow contact between signal sections about the axis of the hole. A serrated nylon washer must be inserted between each plastic signal section and the metal mounting assembly. Each serrated nylon washer must be from 3/16 to 1/4 inch thick. The serrations must match those on the signal section and the mounting assembly. 86-1.02R(4)(a)(ii) Programmed Visibility Signal Sections Programmed visibility signal section must have: 1. Nominal 12-inch-diameter circular or arrow indication 2. Cap visor 3. Adjustable connection that: 3.1. Provides incremental tilting from 0 to 10 degrees above or below the horizontal 3.2. Maintains a common vertical axis through couplers and mountings Page 140 of 183 The terminal connection must allow external adjustment about the mounting axis in 5-degree increments. The visibility of each signal section must be capable of adjustment or programming within the section. The adjustment for the section must be preset at 4 degrees below the horizontal. 86-1.02R(4)(a)(iii) Signal Housings The signal housing must: 1. Be die-cast aluminum, permanent mold-cast aluminum, or if specified, structural plastic 2. Comply with ITE publications ST-052-E, Vehicle Traffic Control Signal Heads:Light Emitting Diode (LED) Circular Signal Supplement and ST-054, Vehicle Traffic Control Signal Heads:Light Emitting Diode (LED) Vehicle Arrow Traffic Signal Supplement if made of die-cast or permanent mold-cast aluminum 3. Have a 1-piece, hinged, square-shaped door that is: 3.1. Designed to allow access for replacement of modules without the use of tools 3.2. Secured such that it remains closed during loading tests 4. Have a watertight module or lens mounted in the door 5. Have a terminal block attached to the back, with the terminals permanently labeled for conductors to facilitate field wiring Each housing must have reinforcement plates. Reinforcement plates must be either sheet aluminum, galvanized steel, or cast aluminum. Each plate must have a minimum thickness of 0.11 inch and a hole concentric with a 1-1/2-inch pipe-mounting hole in the housing. Reinforcement plates must be placed as specified in the following table: Reinforcement Plate Placement Material Placement Sheetaluminum Inside and outside of housing Galvanized steel Inside of housing Cast aluminum Outside of housing Reinforcement plates placed outside of the housing must be finished to match the signal housing color and be designed to allow a proper serrated coupling between the signal face and the mounting hardware. A minimum of three no. 10 machine screws must be installed through holes in each plate and matching holes in the housing. Each screw must have a round or binder head, a nut, and a lock washer. A metal housing must have a metal visor. Plastic housing must: 1. Be molded in a single piece or fabricated from 2 or more pieces joined into a single piece 2. Be a black color throughout, including the door, matching color no. 17038, 27038, or 37038 of FED- STD-595 3. Have UV stability 4. Be self-extinguishing If reinforcing webs are used to connect the back of the housing to the top, bottom, and sides of the adjacent housing, reinforcement plates are not required. The exterior of the housing must be painted as specified in sections 78-4.08 and 59. 86-1.02R(4)(b) LED Signal Modules An LED signal module must be on the Authorized Material List for LED traffic signal modules. An LED signal module must comply with ITE publications ST-052-E, Vehicle Traffic Control Signal Heads: Light Emitting Diode (LED) Circular Signal Supplement and ST-054, Vehicle Traffic Control Signal Heads: Light Emitting Diode (LED) Vehicle Arrow Traffic Signal Supplement, except: 1. Maximum module weight must be 4 lb 2. Module must be a sealed unit with: Page 141 of 183 2.1. 2 color-coded conductors for the power connection except lane control modules must use 3 color-coded conductors 2.2. Printed circuit board that complies with TEES, chapter 1, section 6 2.3. Lens that is: 2.3.1. Convex or flat with a smooth outer surface 2.3.2. Made of UV-stabilized plastic or glass 2.4. 1-piece EPDM gasket 3. Module must include 3-foot-long conductors with attached quick-disconnect terminals 4. Identification must include: 4.1. Month and year of manufacture 4.2. 1-inch-diameter symbol of the module type with the module color written adjacent to the symbol in 0.50-inch-high letters 5 LED must be the ultra-bright type rated for 100,000 hours of continuous operation 6. Module must have an integral power supply Individual LEDs must be wired such that a loss or failure of 1 LED will not result in a loss of more than 5 percent of the module's light output. Failure of an individual LED in a string must not result in a loss of an entire string or other indication. The symbol for a 12-inch U-turn section must be a 15/16-inch-wide inverted U with an arrow on the left end. A lane control section must be a combination module with a red Xand green arrow. The conductor function and color code must be as shown in the following table: Conductor Function and Color Code Function Color Neutral White Red X Red Green arrow Brown The minimum power consumption for an LED signal module must be 5 W. The maximum power consumption for an LED signal module must be as shown in the following table: Maximum Power Consumption LED signal module Power consumption W Red Yellow Green type 25°C 74 °C 25 °C 74 °C 25 °C 74 °C 8-inch circular 8 13 13 16 12 12 12-inch circular 11 17 22 25 15 15 12-inch arrow 9 12 10 12 11 11 12-inch U-turn 9 12 10 12 11 11 Bicycle 11 17 22 25 15 15 Programmed visibility 11 17 22 25 15 15 Lane control (X) 9 12 -- -- -- -- Lane control (Arrow) -- -- -- -- 11 11 Red and green LED signal modules operating over a temperature range from -40 to 74 degrees C and yellow LED signal modules operating at 25 degrees C must maintain the minimum illumination values for 48 months as shown in the following tables: Page 142 of 183 Minimum Maintained Intensities for Circular Indications Intensities cd 8-inch 12-inch Angle(v,h) Red Yellow Green Red Yellow Green 2.5, ±2.5 133 267 267 339 678 678 2.5, ±7.5 97 194 194 251 501 501 2.5, ±12.5 57 113 113 141 283 283 2.5, ±17.5 25 48 48 77 154 154 7.5, ±2.5 101 202 202 226 452 452 7.5, ±7.5 89 178 178 202 404 404 7.5, ±12.5 65 129 129 145 291 291 7.5, ±17.5 41 81 81 89 178 178 7.5, ±22.5 18 37 37 38 77 77 7.5, ±27.5 10 20 20 16 32 32 12.5, ±2.5 37 73 73 50 101 101 12.5, ±7.5 32 65 65 48 97 97 12.5, ±12.5 28 57 57 44 89 89 12.5, ±17.5 20 41 41 34 69 69 12.5, ±22.5 12 25 25 22 44 44 12.5, ±27.5 9 16 16 16 32 32 17.5, ±2.5 16 32 32 22 44 44 17.5, ±7.5 14 28 28 22 44 44 17.5, ±12.5 10 20 20 22 44 44 17.5, ±17.5 9 16 16 22 44 44 17.5, ±22.5 6 12 12 20 41 41 17.5, ±27.5 4 9 9 16 32 32 Minimum Maintained Luminance for Indications Indication type Luminance(fL) Red Yellow Green Arrow 1,610 3,210 3,210 U-turn 1,610 3,210 3,210 Bicycle 1,610 1,610 1,610 Lane control (X) 1,610 -- -- Lane control (Arrow) -- -- 1,610 Minimum Maintained Luminance for Programmed Visibility Indications Luminance cd Indication type Red Yellow Green PV at angle v=2.5, h=±2.5 314 314 314 Conductors must be prewired to the terminal block. 86-1.02R(4)(c) Visors and Directional Louvers The visor must be a tunnel type. The visor must have a downward tilt from 3 to 7 degrees with a minimum length of 9-1/2 inches for nominal 12-inch round lenses and 7 inches for nominal 8-inch round lenses. A metal visor must be formed from minimum 0.050-inch-thick aluminum alloy sheet. A plastic visor must be either formed from sheet plastic or blow-molded. The plastic must be a black homogeneous color with a lusterless finish.A visor must withstand a wind load applied to its side for 24 Page 143 of 183 hours without permanent deformation or removal from its door when tested under California Test 605 for plastic visors and California Test 666 for metal visors. If directional louvers are used, the louvers must fit into full-circular signal visors. Louvers must consist of one of the following: 1. Outside cylinder constructed of sheet steel with a minimum nominal thickness of 0.030 inch and vanes constructed of sheet steel with a minimum nominal thickness of 0.016 inch. 2. Outside cylinder and vanes constructed of 5052-1-132 aluminum alloy of equal thickness. 86-1.02S Pedestrian Signal Heads 86-1.02S(1) General A pedestrian signal head consists of a pedestrian signal mounting assembly and a pedestrian signal face comprising of a pedestrian signal housing, an LED countdown pedestrian signal face module, and a front screen. 86-1.02S(2) Pedestrian Signal Mounting Assemblies A pedestrian signal mounting assembly must comply with the specifications for a signal mounting assembly in section 86-1.02R, except mast arm slip fitters are not required. 86-1.02S(3) Pedestrian Signal Faces 86-1.02S(3)(a) General Each pedestrian signal face must include a light-duty terminal block rated at 5 A and have 12 positions with no. 6-by-1/8-inch binder head screws. Each position must have 1 screw-type terminal. The wiring and terminal block must comply with ITE publication ST-055-E, Pedestrian Traffic Control Signal Indicators:Light Emitting Diode (LED) Signal Modules. 86-1.02S(3)(b) Pedestrian Signal Housings Pedestrian signal housing must comply with the specifications for a signal housing in 86-1.02R(4)(a)(iii), except the maximum overall dimensions must be 18-1/2 inches wide, 19 inches high, and 11-1/2 inches deep and without: 1. Visor 2. Watertight module or lens mounted in the door 3. Reinforcement plates The housing must have a terminal block attached to the back. The terminal block must have enough positions to accommodate all indications. Each position must be permanently labeled for the indications used. 86-1.02S(3)(c) LED Countdown Pedestrian Signal Face Modules An LED countdown PSF module must comply with ITE publication ST-055-E, Pedestrian Traffic Control Signal Indicators:Light Emitting Diode (LED) Signal Modules, except the material must comply with ASTM D3935 and the module must have: 1. Ultra-bright-type LED rated for 100,000 hours of continuous operation. 2. Lot number and month and year of manufacture permanently marked on the back of the module 3. Prominent and permanent vertical markings for accurate indexing and orientation within the pedestrian signal housing if a specific mounting orientation is required. Markings must be a minimum of 1 inch in height and include an up arrow and the word up or top. 4. Circuit board complying with TEES, chapter 1, section 6. Individual LEDs must be wired such that a loss or failure of 1 LED will not result in a loss of more than 5 percent of the module's light output. Failure of an individual LED in a string must not result in a loss of an entire string or other indication. Each symbol must be at least 9 inches high and 5-1/4 inches wide. The 2-digit countdown timer, Upraised Hand, and Walking Person indications must be electronically isolated from each other.The 3 indications must not share a power supply or interconnect circuitry. Page 144 of 183 The module must operate over the specified ambient temperature and voltage range and be readable both day and night at distances up to the full width of the area to be crossed. Upon initial testing at 25 degrees C,the module must have at least the luminance values shown in the following table: Luminance Values PSF module symbol Luminance Upraised hand and 2- 1,094 digit countdown timer fL Walking person(fL) 1,547 The module must not exceed the power consumption requirements shown in the following table: Maximum Power Consumption Requirements PSF module display At 24°C At 74°C Upraised Hand 10.0 W 12.0 W Walking Person 9.0 W 12.0 W 2-digit countdown timer 6.0 W 8.0 W 86-1.02S(3)(d) Front Screen Pedestrian signal face must have a front screen that is one of the following types: 1. 3/8-inch-thick aluminum honeycomb screen with 0.2-inch-wide cells or a 1/2-inch-thick plastic screen with 3/8-inch-wide squares with 1/1 6-inch wall thickness that: 1.1. Is installed so it tilts downward at an angle of 15±2 degrees from the top and completely covers the message plate. 1.2. Includes a clear front cover made of either a minimum 1/8-inch-thick acrylic plastic sheet or a minimum 1/1 6-inch-thick polycarbonate plastic. 1.3. Is held firmly in place, including the cover, with stainless steel or aluminum clips or stainless steel metal screws. 2. Polycarbonate screen that: 2.1. Has a nominal thickness of 1/32 inch. 2.2. Is a 1-1/2-inch-deep eggcrate or Z-crate type. 2.3. Is mounted in a frame constructed of aluminum alloy or polycarbonate with a minimum thickness of 0.040 inch. 2.4. Is held in place with stainless steel screws. The screen and frame of a pedestrian signal face must be made of either(1) plastic that is a flat black color or(2)anodized aluminum that is a flat black color or finished with lusterless, black, exterior-grade latex paint formulated for application to metal surfaces. 86-1.02T Accessible Pedestrian Signals Accessible pedestrian signal must comply with the California MUTCD, chapter 4E, and have: 1. Audible speech message that plays when the push button is actuated. The message must include the name of the street to be crossed. The accessible pedestrian signal must have at least 5 audible message options. 2. Push button locator tone that clicks or beeps. 3. Feature that activates the pedestrian phase during a failure of the audible message, locator tone, or vibrotactile device. An accessible pedestrian signal must function with the Department-furnished Model 170E/2070E controller assembly. No part of the accessible pedestrian signal must be installed inside the controller cabinet. Power for the accessible pedestrian signal must be from the pedestrian signal housing terminal block. The housing for the signal assembly must be made of corrosion-resistant material. Theft-proof bolts used for mounting the housing to the standard must be stainless steel with a content of 17 percent chromium and 8 percent nickel. The housing must be shaped to fit the pole's curvature. Page 145 of 183 The color of a metallic housing must match color no. 33538 of FED-STD-595. The color of a plastic housing must match color no. 17038, 27038, or 37038 of FED-STD-595. Accessible pedestrian signal must: 1. Have electronic switches, a potentiometer, or an access port for a device for controlling and programming the volume level and messaging 2. Be weatherproof and shockproof Enclosure for the accessible pedestrian signal must: 1. Weigh less than 7 lb 2. Measure less than 16 by 6 by 5 inches 3. Have a wiring hole with a diameter not exceeding 1-1/8 inches 5. Have a switch for a push button 6. Have a vibrotactile device on the push button or on the arrow 7. Have an internal weatherproof speaker and microphone that senses the ambient sound level The separation between adjacent holes used for conductors and mounting must be at least twice the diameter of the larger hole. The speaker grills must be located on the surface of the enclosure. The speakers must not interfere with the housing or its mounting hardware. The conductor cable between the accessible pedestrian signal assembly and the pedestrian signal head must be a 9 no. 20 conductor cable complying with MIL-W-16878D. 86-1.02U Push Button Assemblies The housing for a push button assembly must be made of die-cast aluminum, permanent mold-cast aluminum, or UV-stabilized self-extinguishing structural plastic.The plastic housing must have a color throughout that matches color no. 17038, 27038, or 37038 of FED-STD-595. If the push button is to be attached to a pole,the housing must be shaped to fit the pole's curvature. The assembly must be waterproof and shockproof. The push button's switch must be a single-pole, double-throw switching unit with screw-type terminals rated 15 A at 125 V(ac). Switch for the push button must have: 1. Plunger actuator and a U frame to allow recessed mounting in the push button housing 2. Operating force of 3.5 lb 3. Maximum pretravel of 5/64 inch 4. Minimum overtravel of 1/32 inch 5. Differential travel from 0.002 to 0.04 inch 6. Minimum 2-inch diameter actuator 86-1.02V Reserved 86-1.02W Loop Detector Sealants 86-1.02W(1) General Sealant for filling loop detector slots must be one of the following: 1. Asphaltic emulsion 2. Elastomeric sealant 3. Epoxy sealant for inductive loops 4. Hot-melt rubberized asphalt 86-1.02W(2) Asphaltic Emulsion Sealant Asphaltic emulsion sealant must comply with the State Specification 8040-41A-15. Page 146 of 183 86-1.02W(3) Elastomeric Sealant Elastomeric sealant must be a polyurethane material that cures only in the presence of moisture if used within the stated shelf life. The sealant must be suitable for use in both asphalt concrete and concrete pavement. The cured elastomeric sealant must comply with the requirements shown in the following table: Cured Elastomeric Sealant Requirements Quality characteristic Test method Requirement Hardness ASTM D2240a 65-85 Tensile strength (min, MPa) ASTM D412b 3.45 Elongation (min, %) 400 Flex at-40 °C° -- No cracks Weathering resistance ASTM D822 Slight chalking Salt spray resistance: Tensile strength (min, MPa) ASTM B117e 3.45 Elongation (min, %) 400 Dielectric constant(%) ASTM D150 <25 Indentation at 25 °C and 50% relative humidity(Rex. Type A, Model 1700 only) bDie C pulled at 508 mm/minute °0.6-mm free film bend (180°)over 13-mm mandrel dWeatherometer 350 h, cured 7 days at 25 °C and 50% relative humidity e28 days at 38 °C with 5% NaCl, Die C, and pulled at 508 mm/minute) (Change over a temperature range from -30 to 50 °C 86-1.02W(4) Hot-Melt Rubberized Asphalt Sealant Hot-melt rubberized asphalt sealant must: 1. Be in solid form at room temperature and fluid at an application temperature range from 190 to 205 degrees C 2. Not produce toxic fumes 3. Be suitable for use in both asphalt concrete and concrete pavement 4. Be packaged in containers clearly marked Detector Loop Sealant with the manufacturer's batch and lot number. The cured hot-melt rubberized asphalt sealant must comply with the requirements shown in the following table: Cured Hot-Melt Rubberized Asphalt Sealant Requirements Quality characteristic Test method Requirement Cone penetration (max, 1/10 mm) ASTM D5329, sec. 6a 35 Flow(max, mm) ASTM D5329, sec. 8b 5 Resilience (min, %) ASTM D5329, sec. 12° 25 Softening point(min, °C) ASTM D36 82 Ductility(min, cm) ASTM D113d 30 Flash point, Cleveland Open Cup (min, °C) ASTM D92 288 Viscosity(Pa-s) ASTM D4402e 2.5-3.5 aAt 25 °C, 150 g, 5 s ')At 60 °C °At 25 °C dAt 25°C, 5 cm/minute eBrookfield Thermosel, no. 27 spindle, 20 rpm, 190°C 86-1.02X Reserved 86-1.02Y Transformers A transformer must be single-phase and may be a nonsubmersible or submersible type. Page 147 of 183 A transformer must be a dry type designed for operation on a 60 Hz supply. The transformer must have a decal showing a connection diagram. The diagram must show either color coding or wire tagging with primary(H 1, H2)or secondary(X1,X2)markers and the primary and secondary voltage and volt-ampere rating.A transformer must comply with the electrical requirements shown in the following table: Transformer Electrical Requirements Quality characteristic Requirement Rating(V(ac)) 120/480, 120/240,240/480, or 480/120 Efficiency(%) >95 Secondary voltage regulation and tolerance from half load to full ±3 load Secondary 240 and 480 V(ac)windings must be center tapped. The transformer must withstand the application of 2,200 V(ac)from core to coils and from coil to coil for a 1-minute period when tested immediately after operation of the transformer at full load for 24 hours. The external leads for the secondary connections must be no. 10 Type USE rated for 600 V(ac). The transformer's leads must extend a minimum of 12 inches from the case. The transformer's insulation must be NEMA 185 C or better. Each transformer must: 1. Include metal half-shell coil protection. 2. Have moisture-resistant,synthetic-varnish-impregnated windings. 3. Be waterproof and suitable for outdoor operation. Each submersible transformer must: 1. Include a handle and a hanger. 2. Be securely encased in a rugged, corrosion-resistant,watertight case. 3. Have leads that extend out through 1 or more sealed hubs. 4. Be manufactured to withstand a 5-day test with 12-hour on and off periods submerged in 2 feet of salt water that is 2 percent salt by weight. The operating periods must be at full load. 86-1.02Z Batteries Battery must: 1. Be deep-cycle,sealed, prismatic, lead-calcium-based,absorbed-glass-mat,valve-regulated, lead- acid type 2. Be rated for 12 V 3. Be rated for a temperature range from -25 to 60 degrees C 4. Be group size 24 5. Be commercially available and stocked locally 6. Be marked with a date code, maximum recharge data, and recharge cycles 7. Be new and fully charged when furnished 8. Be free from damage or deformities 9. Have a carrying handle 10. Have 2 top-mounted, threaded-stud posts that include all washers and nuts 11. Include insulating rubber covers for protecting the lugs, posts, and wiring: red for the positive terminal and black for the negative terminal If a battery is used for a battery backup system, it must accommodate 3/8-inch ring lugs of a Department- furnished battery harness. 86-1.03 CONSTRUCTION Not Used Page 148 of 183 86-1.04 PAYMENT Not Used Replace section 87 with: 04-15-16 87 ELECTRICAL SYSTEMS 04-15-16 87-1 GENERAL 87-1.01 GENERAL 87-1.01A Summary Section 87 includes general specifications for constructing and installing electrical systems. The Department deducts the cost for maintenance performed by the Department on new or portions of existing systems modified under the Contract. 87-1.0113 Definitions Reserved 87-1.01C Submittals Reserved 87-1.01 D Quality Assurance 87-1.01D(1) General Reserved 87-1.01D(2) Quality Control Before shipping the material to the job site, submit to METS test samples of: 1. Accessible pedestrian signals 2. LED countdown pedestrian signal face modules 3. LED signal modules 4. LED luminaires Submit a sample size as shown in the following table: Electrical Material Sampling Contract quantity Test sample size 1-8 1 9-15 2 16-25 3 26-90 5 91-150 8 151-280 13 281-500 20 501-1200 32 Before starting operation of an electrical system, perform a conductor test in the presence of the Engineer. Conductor test consists of testing each conductor and the conductors in cables for: Page 149 of 183 1. Continuity. 2. Grounds. 3. Insulation resistance at 500 V(dc) between the circuit and ground. The insulation resistance must be a minimum of 10 M0 on circuits, except it must be a minimum of 100 Mn for inductive loop detector circuits. Start the operational test of the system on any day except Friday or the day before a holiday. The operational test for signals must start from 9:00 a.m.to 2:00 p.m. Notify the Engineer 48 hours before starting the test. An operational test consists of a minimum of 5 business days of continuous, satisfactory operation of the system. If the system fails, correct the problem and retest the system.A shutdown of the system caused by traffic, a power interruption, or unsatisfactory performance of Department-furnished materials does not constitute discontinuity of the test. 87-1.02 MATERIALS Not Used 87-1.03 CONSTRUCTION 87-1.03A General The Engineer determines the final locations of electrical systems. Verify the locations of electrical systems and the depths of existing detectors, conduits, and pull boxes. Notify the Engineer before performing work on the existing system. You may shut down the system for alteration or removal. Where an existing Department underground facility is shown within 10 feet of any excavation, locate and field mark the facility before performing work that could damage or interfere with the existing facility. If an existing facility is within 2 feet of an excavation, determine the exact location of the facility by excavating with hand tools before using any power-operated or power-driven excavating or boring equipment.A vacuum excavator may be used if authorized. Notify the Engineer immediately if an existing facility is damaged by your activities. If existing underground conduit is to be incorporated into a new system, clean it with a mandrel or cylindrical wire brush and blow it clean with compressed air. Limit the shutdown of traffic signal systems to normal working hours. Notify the local traffic enforcement agency before shutting down the signal. Place temporary W3-1 and R1-1 signs in each direction to direct traffic through the intersection during shutdown of the signal. Place two R1-1 signs for 2-lane approaches.The signs must comply with part 2 of the California MUTCD. Cover signal faces when the system is shut down overnight. Cover temporary W3-1 and R1-1 signs when the system is turned on. If you work on an existing lighting system and the roadway is to remain open to traffic, ensure the system is in operation by nightfall. Replace detectors you damage within 72 hours, or the Department replaces them and deducts the cost. Work performed on an existing system not described is change order work. Do not use electrical power from existing highway facilities unless authorized. Maintain a minimum 48-inch clearance for a pedestrian pathway when placing equipment. Except for service installation or work on service equipment enclosures, do not work above ground until all materials are on hand to complete the electrical work at each location. Page 150 of 183 Bond all metal components to form a continuous grounded system as specified in NEC. Ground metallic equipment mounted less than 8 feet above the ground surface on a wood pole. If you damage any portion of a concrete curb, sidewalk, curb ramp, driveway, or gutter depression, replace the entire section between contraction or expansion joints under section 73. Apply equipment identification characters. Orient louvers, visors, and signal faces such that they are clearly visible to approaching traffic from the direction being controlled. Test loops and the detector lead-in cable circuit for continuity, ground, and insulation resistance at the controller cabinet before connecting detector lead-in cable to the terminal block. Perform an operational test of the systems. Before starting the operational test for systems that impact traffic,the system must be ready for operation, and all signs, pavement delineation, and pavement markings must be in place at that location. 87-1.03113 Conduit Installation 87-1.0313(1) General The installation of conduit includes installing caps, bushings, and pull tape and terminating the conduit in pull boxes,foundations, poles, or a structure. Limit the number of bends in a conduit run to no more than 360 degrees between pull points. Use conduit to enclose conductors except where they are installed overhead or inside standards or posts. You may use a larger size conduit than specified for the entire length between termination points. Do not use a reducing coupling. Extend an existing conduit using the same material.Terminate conduits of different materials in a pull box. Install 2 conduits between a controller cabinet and the adjacent pull box. Use a minimum trade size of conduit of: 1. 1-1/2 inches from an electrolier to the adjacent pull box 2. 1 inch from a pedestrian push button post to the adjacent pull box 3. 2 inches from a signal standard to the adjacent pull box 4. 3 inches from a controller cabinet to the adjacent pull box 5. 2 inches from an overhead sign to the adjacent pull box 6. 2 inches from a service equipment enclosure to the adjacent pull box 7. 1-1/2 inches if unspecified Use Type 1 conduit: 1. On all exposed surfaces 2. In concrete structures 3. Between a structure and the nearest pull box Ream the ends of shop-cut and field-cut conduit to remove burrs and rough edges. Make the cuts square and true. Do not use slip joints and running threads to couple conduit. If a standard coupling cannot be used for metal-type conduit, use a threaded union coupling.Tighten the couplings for metal conduit to maintain a good electrical connection. Cap the ends of conduit to prevent debris from entering before installing the conductors or cables. Use a plastic cap for Type 1, 2, and 5 conduits and a standard pipe cap for all other types of conduit. For Type 1, 2, and 5 conduits, use threaded bushings and bond them using a jumper. For other types of conduit, use nonmetallic bushings. Page 151 of 183 Do not install new conduit through foundations. Cut Type 2 conduit with pipe cutters; do not use hacksaws. Use standard conduit-threading dies for threading conduit. Tighten conduit into couplings or fittings using strap wrenches or approved groove joint pliers. Cut Type 3 conduit with tools that do not deform the conduit. Use a solvent weld for connections. Protect shop-cut threads from corrosion under the standards shown in the following table: Shop-Cut Thread Corrosion Protection Conduit Standard Types 1 and 2 ANSI C80.1 Type 5 ANSI C80.6 Apply 2 coats of unthinned, organic zinc-rich primer to metal conduit before painting. Use a primer on the Authorized Material List for organic zinc-rich primers. Do not use aerosol cans. Do not remove shop- installed conduit couplings. For conduits, paint: 1. All exposed threads 2. Field-cut threads, before installing conduit couplings to metal conduit 3. Damaged surfaces on metal conduit If a Type 2 conduit or conduit coupling coating is damaged: 1. Clean the conduit or fitting and paint it with 1 coat of rubber-resin-based adhesive under the manufacturer's instructions 2. Wrap the damaged coating with at least 1 layer of 2-inch-wide, 20 mils-minimum-thickness, PVC tape under ASTM D1000 with a minimum tape overlap of 1/2 inch You may repair damaged spots of 1/4 inch or less in diameter in the thermoplastic coating by painting with a brushing-type compound supplied by the conduit manufacturer. If factory bends are not used, bend the conduit to a radius no less than 6 times its inside diameter without crimping or flattening it. Comply with the bending requirements shown in the following table: Conduit-Bending Requirements Type Requirement 1 Use equipment and methods under the conduit manufacturer's instructions. 2 Use a standard bending tool designed for use on thermoplastic-coated conduit. The conduit must be free of burrs and pits. 3 Use equipment and methods under the conduit manufacturer's instructions. Do not expose the conduit to a direct flame. 5 Use equipment and methods under the conduit manufacturer's instructions. Install pull tape with at least 2 feet of slack in each end of the conduit that will remain empty. Attach the tape's ends to the conduit. Install conduit terminating in a standard or pedestal from 2 to 3 inches above the foundation. Slope the conduit toward the handhole opening. Terminate conduit installed through the bottom of a nonmetallic pull box 2 inches above the bottom and 2 inches from the wall closest to the direction of the run. 87-1.03B(2) Conduit Installation for Structures 87-1.03B(2)(a) General Paint exposed Type 1 conduit the same color as the structure. Page 152 of 183 Install galvanized steel hangers, steel brackets, and other fittings to support conduit in or on a wall or bridge. 87-1.03B(2)(b) New Structures Seal and make watertight the conduits which lead to soffits, wall-mounted luminaires, other lights, and fixtures located below the pull box grade. If you place a conduit through the side of a nonmetallic pull box, terminate the conduit 2 inches from the wall and 2 inches above the bottom. Slope the conduit toward the top of the box to facilitate pulling conductors. For ease of installation and if authorized, you may use Type 4 conduit instead of Type 1 conduit for the final 2 feet of conduit entering a pull box in a reinforced concrete structure. Install an expansion fitting where a conduit crosses an expansion joint in a structure. Each expansion fitting for metal conduit must include a copper bonding jumper having the ampacity as specified in NEC. Install an expansion-deflection fitting for an expansion joint with a 1-1/2-inch movement rating.The fitting must be watertight and include a molded neoprene sleeve, a bonding jumper, and 2 silicon bronze or zinc-plated iron hubs. For an expansion joint with a movement rating greater than 1-1/2 inches, install the expansion-deflection fitting as shown. For conduit installed inside of bridge structures, you must: 1. Install precast concrete cradles made of minor concrete and commercial-quality welded wire fabric. The minor concrete must contain a minimum of 590 lb of cementitious material per cubic yard. The cradles must be moist cured for a minimum of 3 days. 2. Bond precast concrete cradles to a wall or bridge superstructure with one of the following: 2.1. Epoxy adhesive for bonding freshly-mixed concrete to hardened concrete. 2.2. Rapid-set epoxy adhesive for pavement markers. 2.3. Standard-set epoxy adhesive for pavement markers. 3. Use a pipe sleeve or form an opening for a conduit through a bridge superstructure.The sleeve or opening through a prestressed member or conventionally reinforced precast member must be: 3.1. Oriented transverse to the member. 3.2. Located through the web. 3.3. No more than 4 inches in size. 4. Wrap the conduit with 2 layers of asphalt felt building paper and securely tape or wire the paper in place for a conduit passing through a bridge abutment wall. Fill the space around the conduit with mortar under section 51-1, except the proportion of cementitious material to sand must be 1 to 3. Fill the space around the conduits after prestressing is completed. Thread and cap a conduit installed for future use in structures. Mark the location of the conduit's end in a structure, curb, or wall directly above the conduit with a Ythat is 3 inches tall. 87-1.03B(2)(c) Existing Structures Run surface-mounted conduit straight and true, horizontal or vertical on the wall, and parallel to walls on ceilings or similar surfaces. Support the conduit at a maximum of 5-foot intervals where needed to prevent vibration or deflection. Support the conduit using galvanized, malleable-iron, conduit clamps, and clamp backs secured with expansion anchorage devices complying with section 75-3.02C. Use the largest diameter of galvanized,threaded studs that will pass through the mounting hole in the conduit clamp. 87-1.03B(3) Conduit Installation Underground 87-1.03B(3)(a) General Install conduit to a depth of: 1. 14 inches for the trench-in-pavement method 2. 18 inches, minimum, under sidewalk and curbed paved median areas 3. 42 inches, minimum, below the bottom of the rail of railroad tracks Page 153 of 183 4. 30 inches, minimum, everywhere else below grade Place conduit couplings at a minimum of 6 inches from the face of a foundation. Place a minimum of 2 inches of sand bedding in a trench before installing Type 2 or Type 3 conduit and 4 inches of sand bedding over the conduit before placing additional backfill material. If installing conduit within the limits of hazardous locations as specified in NEC for Class I, division 1, install and seal Type 1 or Type 2 conduit with explosion-proof sealing fittings. 87-1.03B(3)(b) Conduit Installation under Paved Surfaces You may lay conduit on existing pavement within a new curbed median constructed on top. Install conduit under existing pavement by the jacking or drilling methods. You may use the trench-in- pavement method for either of the following conditions: 1. If conduit is to be installed behind the curb under the sidewalk 2. If the delay to vehicles will be less than 5 minutes Do not use the trench-in-pavement method for conduit installations under freeway lanes or freeway-to- freeway connector ramps. 87-1.03B(3)(c) Reserved 87-1.03B(3)(d) Conduit Installation under Railroad Tracks Install Type 1 or Type 2 conduit with a minimum diameter of 1-1/2 inches under railroad tracks. If you use the jacking or drilling method to install the conduit, construct the jacking pit a minimum of 13 feet from the tracks'centerline at the near side of the pit. Cover the jacking pit with planking if left overnight. 87-1.03B(4) Reserved 87-1.03B(5) Conduit Installation by the Jacking or Drilling Method Keep the jacking or drilling pit 2 feet away from the pavement's edge. Do not weaken the pavement or soften the subgrade with excessive use of water. If an obstruction is encountered, obtain authorization to cut small holes in the pavement to locate or remove the obstruction. You may install Type 2 or Type 3 conduit under the pavement if a hole larger than the conduit's diameter is predrilled.The predrilled hole must be less than one and half the conduit's diameter. Remove the conduit used for drilling or jacking and install new conduit for the completed work. 87-1.03B(6) Conduit Installation by the Trenching-In-Pavement Method Install conduit by the trenching-in-pavement method using a trench approximately 2 inches wider than the conduit's outside diameter but not exceeding 6 inches in width. Where additional pavement is to be placed, you must complete the trenching before the final pavement layer is applied. If the conduit shown is to be installed under the sidewalk, you may install it in the street within 3 feet of and parallel to the face of the curb. Install pull boxes behind the curb. Cut the trench using a rock-cutting excavator. Minimize the shatter outside the removal area of the trench. Dig the trench by hand to the required depth at pull boxes. Place conduit in the trench. Backfill the trench with minor concrete to the pavement's surface by the end of each work day. If the trench is in asphalt concrete pavement and no additional pavement is to be placed, backfill the top 0.10 foot of the trench with minor HMA within 3 days after trenching. Page 154 of 183 87-1.03C Installation of Pull Boxes 87-1.03C(1) General Install pull boxes no more than 200 feet apart. You may install larger pull boxes than specified or shown and additional pull boxes to facilitate the work except in structures. Install a pull box on a bed of crushed rock and grout it before installing conductors. The grout must be from 0.5 to 1 inch thick and sloped toward the drain hole. Place a layer of roofing paper between the grout and the crushed rock sump. Make a 1-inch drain hole through the grout at the center of the pull box. Set the pull box such that the top is 1-1/4 inches above the surrounding grade in unpaved areas and leveled with the finished grade in sidewalks and other paved areas. Place the cover on the box when not working in it. Grout around conduits that are installed through the sides of the pull box. Bond and ground the metallic conduit before installing conductors and cables in the conduit. Bond metallic conduits in a nonmetallic pull box using bonding bushings and bonding jumpers. Do not install pull boxes in concrete pads, curb ramps, or driveways. Reconstruct the sump of a pull box if disturbed by your activities. If the sump was grouted, remove and replace the grout. 87-1.03C(2) Nontraffic Pull Boxes If you bury a nontraffic pull box, set the box such that the top is 6 to 8 inches below the surrounding grade. Place a 20-mil-thick plastic sheet made of HDPE or PVC virgin compounds to prevent water from entering the box. Place mortar between a nontraffic pull box and a pull box extension. Where a nontraffic pull box is in the vicinity of curb in an unpaved area, place the box adjacent to the back of the curb if practical. Where a nontraffic pull box is adjacent to a post or standard, place the box within 5 feet upstream from traffic if practical. If you replace the cover on a nontraffic pull box, anchor it to the box. 87-1.03C(3) Traffic Pull Boxes Place minor concrete around and under a traffic pull box. Bolt the steel cover to the box when not working in it. Bond the steel cover to the conduit with a jumper and bolt it down after installing the conductors and cables. 87-1.03C(4) Structure Pull Boxes Bond metallic conduit in a metal pull box in a structure using locknuts, inside and outside of the box, bonding bushings, and bonding jumpers connected to bonding wire running in the conduit system. 87-1.03D Reserved 87-1.03E Excavating and Backfilling for Electrical Systems 87-1.03E(1) General Notify the Engineer at least 72 hours before starting excavation activities. Dispose of surplus excavated material. Restrict closures for excavation on a street or highway to 1 lane at a time unless otherwise specified. Page 155 of 183 87-1.03E(2) Trenching Dig a trench for the electrical conduits or direct burial cables. Do not excavate until the conduit or direct burial cable will be installed. Place excavated material in a location that will not interfere with traffic or surface drainage. After placing the conduit or direct burial cable, backfill the trench with the excavated material. Compact the backfill placed outside the hinge point of slopes and not under pavement to a minimum relative compaction of 90 percent. Compact the backfill placed within the hinge points and in areas where pavement is to be constructed to a minimum relative compaction of 95 percent. Restore the sidewalks, pavement, and landscaping at a location before starting excavation at another location. 87-1.03E(3) Concrete Pads, Foundations,and Pedestals Construct foundations for standards, poles, metal pedestals, and posts under section 56-3. Construct concrete pads,foundations,and pedestals for controller cabinets,telephone demarcation cabinets, and service equipment enclosures on firm ground. Install anchor bolts using a template to provide proper spacing and alignment. Moisten the forms and ground before placing the concrete. Keep the forms in place until the concrete sets for at least 24 hours to prevent damage to the surface. Use minor concrete for pads,foundations, and pedestals. In unpaved areas, place the top of the foundation 6 inches above the surrounding grade, except place the top: 1. 1 foot 6 inches above the grade for Type M and 336L cabinets 2. 1 foot 8 inches above the grade for Type C telephone demarcation cabinets 3. 2 inches above the grade for Type G and Type A cabinets and Type III service equipment enclosures The pad must be 2 inches above the surrounding grade. In and adjacent to the sidewalk and other paved areas, place the top of the foundation 4 inches above the surrounding grade, except place the top: 1. 1 foot 6 inches above the grade for Type M and 336L cabinets 2. 1 foot 8 inches above the grade for Type C telephone demarcation cabinets 3. Level with the finished grade for Type G and Type A cabinets and Type III service equipment enclosures The pad must be level with the finished grade. Apply an ordinary surface finish under section 51-1.03F. Allow the foundation to cure for at least 7 days before installing any equipment. 87-1.03F Conductors and Cable Installations 87-1.03F(1) General The installation of conductors and cables includes splicing conductors and attaching the terminals and connectors to the conductors. Clean the conduit and pull all conductors and cables as a unit. If new conductors or cables are to be added in an existing conduit: 1 Remove the content 2. Clean the conduit 3. Pull both old and new conductors and cables as a unit Page 156 of 183 Wrap conductors and secure cables to the end of the conduit in a pull box. Seal the ends of conduits with a sealing compound after installing conductors or cables. Neatly arrange conductors and cables inside pull boxes and cabinets. Tie the conductors and cables together with self-clinching nylon cable ties or enclose them in a plastic tubing or raceway. Identify conductors and cables by direct labeling, tags, or bands fastened in such a way that they will not move. Use mechanical methods for labeling. Provide band symbol identification on each conductor or each group of conductors comprising a signal phase in each pull box and near the end of terminated conductors. Tape the ends of unused conductors and cables in pull boxes to form a watertight seal. Do not connect the push-button or accessible pedestrian signal neutral conductor to the signal neutral conductor. 87-1.03F(2) Cables 87-1.03F(2)(a) General Reserved 87-1.03F(2)(b) Reserved 87-1.03F(2)(c) Copper Cables 87-1.03F(2)(c)(i) General Reserved 87-1.03F(2)(c)(11) Detector Lead-in Cables Install a Type B or C detector lead-in cable in conduit. Waterproof the ends of the lead-in cable before installing it in the conduit to prevent moisture from entering the cable. Splice loop conductors for each direction of travel for the same phase, terminating in the same pull box, to a separate lead-in cable running from the pull box adjacent to the loop detector to a sensor unit mounted in the controller cabinet. Install the lead-in cable without splices except at the pull box. Verify in the presence of the Engineer that the loops are operational before making the final splices between loop conductors and the lead-in cable. Identify and tag each lead-in cable with the detector designation at the cabinet and pull box adjacent to the loops. 87-1.03F(2)(c)(iii) Conductors Signal Cables Do not splice signal cables except for a 28-conductor cable. Provide identification at the ends of terminated conductors in a cable as shown. Provide identification for each cable in each pull box showing the signal standard to which it is connected except for the 28-conductor cable. Connect conductors in a 12-conductor cable as shown in the following table: Page 157 of 183 12CSC Color Code and Functional Connection Color code Termination Phase Red Red signal 2 4 6 or 8 Yellow Yellow signal 21 4, 6, or 8 Brown Green signal 2, 4, 6, or 8 Red/black stripe Red signal 1, 3, 5, or 7 Yellow/black stripe Yellow signal 1, 3, 5, or 7 Brown/black stripe Green signal 1, 3, 5, or 7 Black/red stripe Spare or as required for red or DONT -- WALK Black/white stripe Spare or as required for yellow -- Black Spare or as required for green or WALK -- Red/white stripe Pedestrian signal DONT WALK -- Brown/white stripe Pedestrian signal WALK -- White Terminal block Neutral Provide identification for each 28-conductor cable C1 or C2 in each pull box. The cable labeled C1 must be used for signal phases 1, 2, 3, and 4. The cable labeled C2 must be used for signal phases 5, 6, 7, and 8. Connect conductors in a 28-conductor cable as shown in the following table: Page 158 of 183 28CSC Color Code and Functional Connection Color code Termination Phase Red/black stripe Red signal 2 or 6 Yellow/black stripe Yellow signal 2 or 6 Brown/black stripe Green signal 2 or 6 Red/orange stripe Red signal 4 or 8 Yellow/orange stripe Yellow signal 4 or 8 Brown/orange stripe Green signal 4 or 8 Red/silver stripe Red signal 1 or 5 Yellow/silver stripe Yellow signal 1 or 5 Brown/silver stripe Green signal 1 or 5 Red/purple stripe Red signal 3 or 7 Yellow/purple stripe Yellow signal 3 or 7 Brown/purple stripe Green signal 3 or 7 Red/2 black stripes Pedestrian signal DONT WALK 2 or 6 Brown/2 black stripes Pedestrian signal WALK 2 or 6 Red/2 orange stripes Pedestrian signal DONT WALK 4 or 8 Brown/2 orange stripes Pedestrian signal WALK 4 or 8 Red/2 silver stripes Overlap A, C OLAa, OLCa Brown/2 silver stripes Overlap A, C OLA°, OLC° Red/2 purple stripes Overlap B, D OLBa, OLD Brown/2 purple stripes Overlap B, D OLB°, OLD° Blue/black stripe Pedestrian push button 2 or 6 Blue/orange stripe Pedestrian push button 4 or 8 Blue/silver stripe Overlap A, C OLAb, OLCb Blue/purple stripe Overlap B, D OLBb, OLDb White/black stripe Pedestrian push button common -- Black/red stripe Railroad preemption -- Black Spare -- White Terminal block Neutral OL= Overlap; A, B, C, and D =Overlapping phase designation a For red phase designation bFor yellow phase designation °For green phase designation Use the neutral conductor only with the phases associated with that cable. Do not intermix neutral conductors from different cables except at the signal controller. 87-1.03F(2)(c)(iv) Signal Interconnect Cable For a signal interconnect cable, provide a minimum of 6 feet of slack inside each controller cabinet. Do not splice the cable unless authorized. If splices are authorized, insulate the conductor splices with heat-shrink tubing and overlap the insulation at least 0.6 inch. Cover the splice area of the cable with heat-shrink tubing and overlap the cable jacket at least 1-1/2 inches. Provide a minimum of 3 feet of slack at each splice. 87-1.03F(3) Conductors 87-1.03F(3)(a) General Do not run conductors to a terminal block on a standard unless they are to be connected to a signal head mounted on that standard. Provide 3 spare conductors in all conduits containing ramp metering and traffic signal conductors. Page 159 of 183 Install a separate conductor for each terminal of a push button assembly and accessible pedestrian signal. Provide conductor slack to comply with the requirements shown in the following table: Conductor Slack Requirements Location Slack(feet) Signal standard 1 Lighting standard 1 Signal and lighting standard 1 Pull box 3 Splice 3 Standards with slip base 0 87-1.03F(3)(b) Reserved 87-1.03F(3)(c) Copper Conductors 87-1.03F(3)(c)(i) General Install a minimum no. 8, insulated, grounding copper conductor in conduit and connect it to all-metal components. Where conductors from different service points occupy the same conduit or standard, enclose the conductors from one of the services in flexible or rigid metal conduit. 87-1.03F(3)(c)(ii) Inductive Loop Conductors Install a Type 1 or 2 inductive loop conductor except use Type 2 for Type E loop detectors. Install the conductor without splices except at the pull box. 87-1.03F(4) Manual Installation Method Use an inert lubricant for placing conductors and cables in conduit. Pull the conductors and cables into the conduit by hand using pull tape. 87-1.03G Equipment Identification Characters The Engineer provides you with a list of the equipment identification characters. Stencil the characters or apply the reflective self-adhesive labels to a clean surface. Treat the edges of self-adhesive characters with an edge sealant. Place the characters on the side facing traffic on: 1. Front doors of cabinets and service equipment enclosures. 2. Wood poles,fastened with 1-1/4-inch aluminum nails,for pole mounted enclosures 3. Adjacent bent or abutment at approximately the same station as an illuminated sign or soffit luminaire 4. Underside of the structure adjacent to the illuminated sign or soffit luminaire if no bent or abutment exists nearby 5. Posts of overhead signs 6. Standards Before placing new characters on existing or relocated equipment, remove the existing characters. 87-1.03H Conductor and Cables Splices 87-1.03H(1) General You may splice: 1. Grounded conductors in a pull box 2. Accessible pedestrian signal and push bottom conductors in a pull box 3. Ungrounded signal conductors in a pull box if signals are modified Page 160 of 183 4. Ungrounded signal conductors to a terminal compartment or a signal head on a standard with conductors of the same phase in the pull box adjacent to the standard 5. Ungrounded lighting circuit conductors in a pull box if lighting circuits are modified Solder all splices using the hot iron, pouring, or dipping method. Do not perform open-flame soldering. 87-1.03H(2) Splice Insulation Methods Insulate splices in a multiconductor cable to form a watertight joint and to prevent moisture absorption by the cable. Use heat-shrink tubing or Method B to insulate a splice. Use heat-shrink tubing as follows: 1. Cover the splice area completely with an electrical insulating coating and allow it to dry. 2. Place mastic around each conductor before placing them inside the tubing. Use the type of mastic specified in the tubing manufacturer's instructions. 3. Heat the area under the manufacturer's instructions. Do not perform open-flame heating.After contraction, each end of the heat-shrink tubing or the open end of the tubing's end cap must overlap the conductor insulation at least 1-1/2 inches. 4. Cover the entire splice with an electrical insulating coating and allow it to dry. Use Method B as follows: 1. Cover the splice area completely with an electrical insulating coating and allow it to dry. 2. Apply 3 layers of half-lapped, 80-mils, PVC tape. 3. Apply 2 layers of 120-mils, butyl-rubber, stretchable tape with liner. 4. Apply 3 layers of half-lapped, 6-mils, PVC, pressure-sensitive, adhesive tape. 5. Cover the entire splice with an electrical insulating coating and allow it to dry. 87-1.031 Connectors and Terminals Apply connectors and terminals to cables and conductors using a crimping compression tool under the manufacturer's instructions.The tool must prevent opening of the handles until the crimp is completed. Install crimp-style terminal lugs on stranded conductors smaller than no. 14. Solder no. 8 and smaller conductors to connectors and terminal lugs. 87-1.03J Standards, Poles, Pedestals,and Posts Install standards, poles, pedestals, and posts under section 56-3. Ground standards with a handhole by attaching a bonding jumper from the bolt or lug inside the standard to a metal conduit or to the grounding wire in the adjacent pull box. The bonding jumper must be visible when the handhole cover is removed. Ground standards without a handhole or standards with a slip base by attaching a bonding jumper to all anchor bolts using ground clamps and connecting it to a metal conduit or to the grounding wire in the adjacent pull box. The bonding jumper must be visible after mortar has been placed on the foundation. 87-1.03K Reserved 87-1.03L Utility Service 87-1.03L(1) General Install the service equipment early enough to allow the utility to complete its work before completion of the electrical work. At least 15 days before permanent electrical and telecommunication service is required, request the service connections for permanent installations.The Department arranges with the utilities for completion of the connections and pays all costs and fees required by the utilities. Page 161 of 183 87-1.03L(2) Electric Service 87-1.03L(2)(a) General If service equipment is to be installed on a utility-owned pole,furnish and install the conduit, conductors, pull boxes, and other necessary material to complete the service installation.The service utility decides the position of the riser and equipment on the pole. 87-1.03L(2)(b) Electric Service for Irrigation Establishing electric service for irrigation includes installing conduit, conductors, and pull boxes and making connections from the service point to the irrigation controllers. 87-1.03L(2)(c) Electric Service for Booster Pumps Establishing electric service for a booster pump includes installing conduit, conductors, and pull boxes and making connections from the service point to the booster pump enclosure. 87-1.03L(3) Telecommunications Service Establishing telecommunication service includes installing conduit, conductors, and pull boxes and making connections from the service point to the telephone demarcation cabinet. 87-1.03M Photoelectric Controls Mount the photoelectric unit on the top of the pole for Type I, II, and III photoelectric controls. Use mounting brackets where pole-top mounting is not possible. Orient the photoelectric unit to face north. Mount the enclosure at a height of 6 feet above finished grade on the same standard as the photoelectric unit. Install a minimum 100 VA, 480/120 V(ac)transformer in the contactor enclosure to provide 120 V(ac)for the photoelectric control unit when switching 480 V(ac), 60 Hz circuits. 87-1.03N Fused Splice Connectors Install a fuse splice connector in each ungrounded conductor for luminaires mounted on standards.The connector must be located in the pull box adjacent to the standard. Crimp the connector terminals onto the ungrounded conductors using a tool under the manufacturer's instructions. Insulate the terminals and make them watertight. 87-1.030 Grounding Electrodes Install a grounding electrode for each cabinet, service equipment enclosure, and transformer. Attach a grounding conductor from the electrode using either a ground clamp or exothermic weld. Connect the other end of the conductor to the cabinet, service equipment enclosure, and transformer. 87-1.03P Service Equipment Enclosures Installing a service equipment enclosure includes constructing the foundation and pad and installing conduit, adjacent pull boxes, and grounding electrode. Locate the foundation such that the minimum clearance around the front and back of the enclosure complies with NEC, article 110.26, "Spaces About Electrical Equipment, (600 V, nominal or less)." Bond and ground metal conduit as specified in NEC and by the service utility except the grounding electrode conductor must be no. 6 or larger. If circuit breakers and components do not have a description on engraved phenolic nameplates, install them using stainless steel rivets or screws under section 86-1.02P(2). 87-1.03Q Cabinets 87-1.03Q(1) General Installing a cabinet includes constructing the foundation and pad and installing conduit, adjacent pull boxes, and grounding electrode. Apply a mastic or caulking compound before installing the cabinet on the foundation to seal the openings. Page 162 of 183 Connect the field wiring to the terminal blocks in the cabinet. Neatly arrange and lace or enclose the conductors in plastic tubing or raceway. Terminate the conductors with properly sized captive or spring spade terminals.Apply a crimp-style connector and solder them. Install and solder a spade-type terminal on no. 12 and smaller field conductors and a spade-type or ring- type terminal on conductors larger than no. 12. 87-1.03Q(2) Department-Furnished Controller Cabinets Arrange for the delivery of Department-furnished controller cabinets. 87-1.03Q(3) Reserved 87-1.03Q(4) Telephone Demarcation Cabinets Installing a telephone demarcation cabinet includes installing conduit, cable, and pull boxes to the controller cabinet. Install the cabinet with the back toward the nearest lane of traffic. 87-1.03R Signal Heads 87-1.03R(1) General Installing a signal head includes mounting the heads on standards and mast arms, installing backplates and visors, and wiring conductors to the terminal blocks. Keep the heads covered or direct them away from traffic until the system is ready for operation. 87-1.03R(2) Signal Faces Use the same brand and material for the signal faces at each location. Program the programmable visibility signal faces under the manufacturer's instructions.The indication must be visible only in those areas or lanes to be controlled. 87-1.03R(3) Backplates Install backplates using at least six 10-24 or 10-32 self-tapping and locking stainless steel machine screws and flat washers. If a plastic backplate requires field assembly, attach each joint using at least four no.10 machine screws. Each machine screw must have an integral or captive flat washer, a hexagonal head slotted for a standard screwdriver, and either a locking nut with an integral or captive flat washer or a nut,flat washer, and lock washer. Machine screws, nuts, and washers must be stainless steel or steel with a zinc or black oxide finish. If a metal backplate has 2 or more sections, fasten the sections with rivets or aluminum bolts peened after assembly to avoid loosening. Install the backplate such that the background light is not visible between the backplate and the signal face or between sections. 87-1.03R(4) Signal Mounting Assemblies Install a signal mounting assembly such that its members are arranged symmetrically and plumb or level. Orient each mounting assembly to allow maximum horizontal clearance to the adjacent roadway. For a bracket-mounted assembly, bolt the terminal compartment or pole plate to the pole or standard. In addition to the terminal compartment mounting, attach the upper pipe fitting of Type SV-1-T with 5 sections or a SV-2-TD to the standard or pole using the mounting detail for signal heads without a terminal compartment. Use a 4-1/2-inch slip fitter and set screws to mount an assembly on a post top. After installing the assembly, clean and paint the exposed threads of the galvanized conduit brackets and bracket areas damaged by the wrench or vise jaws. Use a wire brush to clean and apply 2 coats of unthinned, organic zinc-rich primer. Do not use an aerosol can to apply the primer. Page 163 of 183 Install the conductors in the terminal compartment and secure the cover. 87-1.03S Pedestrian Signal Heads Installing a pedestrian signal head includes mounting the heads on standards and wiring conductors to the terminal blocks. Install the pedestrian signal mounting assembly under section 87-1.03R(4). Use the same brand and material for the pedestrian signal faces at each location. Install a pedestrian signal face such that its members are arranged symmetrically and plumb or level. 87-1.03T Accessible Pedestrian Signals Use the same brand for the accessible pedestrian signals at each location. Install an accessible pedestrian signal and the R10 series sign on the crosswalk side of the standard. Attach the accessible pedestrian signal to the standard with self-tapping screws. Attach the sign to the standard using 2 straps and saddle brackets. Point the arrow on the accessible pedestrian signal in the same direction as the corresponding crosswalk. Furnish the equipment and hardware to set up and calibrate the accessible pedestrian signal. Arrange to have a manufacturer's representative at the job site to program the accessible pedestrian signal with an audible message or tone. 87-1.03U Push Button Assemblies Install the push button assembly and the R10 series sign on the crosswalk side of the standard. Attach the sign to the assembly for Type B assemblies. Attach the sign to the standard using 2 straps and saddle brackets for Type C assemblies. You may use straps and saddle brackets to secure the push button to the standard. Use a slip fitter to secure the assembly on top of a 2-1/2-inch-diameter post. 87-1.03V Detectors 87-1.03V(1) General Installing a detector includes installing inductive loop conductors, sealant, conduit, and pull boxes. Center the detectors in the traffic lanes. Do not splice the detector conductor. 87-1.03V(2) Inductive Loop Detectors Mark the location of the inductive loop detectors such that the distance between the side of the loop and a lead-in saw cut from an adjacent detector is at least 2 feet.The distance between lead-in saw cuts must be at least 6 inches. Saw cut the slots under section 13-4.03E(7).The bottoms of the slots must be smooth with no sharp edges. For Type E detector loops, saw the slots such that the sides are vertical. Wash the slots clean using water and blow dry them with compressed air to remove all moisture and debris. Identify the start of the conductor. Waterproof the ends of a Type 2 loop conductor before installing it in the conduit to prevent moisture from entering the cable. Install the loop conductor in the slots and lead-in saw cuts using a 3/16-to 1/4-inch-thick wood paddle. Hold the conductors in place at the bottom of the slot with wood paddles during placement of the sealant. Page 164 of 183 Wind adjacent loops on the same sensor unit channel in opposite directions. Twist the conductors for each loop into a pair consisting of a minimum of 2 turns per foot before placing them in the lead-in saw cut and the conduit leading to the pull box. Do not install more than 2 twisted pairs of conductors per lead-in saw cut. Provide 5 feet of slack in the pull box. Test each loop for continuity, circuit resistance, and insulation resistance before filling the slots with sealant. Remove excess sealant from the adjacent road surface before it sets. Do not use solvents to remove the excess. Identify the loop conductor pair in the pull box, marking the start with the letter S and the end with the letter F. Band conductors in pairs by lane in the pull box adjacent to the loops and in the cabinet. Identify each pair with the detector designation and loop number. Install the conductors in a compacted layer of HMA immediately below the uppermost layer if more than one layer will be placed. Install the loop conductors before placing the uppermost layer of HMA. Fill the slot with a sealant flush to the surface. Install the conductors in the existing pavement if one layer of HMA is to be placed. Install the loop conductors before placing the layer of HMA. Fill the slot with a sealant flush to the surface. 87-1.03V(3) Preformed Inductive Loop Detectors Construct a preformed inductive loop detector consisting of 4 turns in the loop and a lead-in conductor pair twisted at least 2 turns per foot all encased in conduit and sealed to prevent water penetration.The detector must be 6-foot square unless shown otherwise. Construct the loop detector using a minimum 3/8-inch Schedule 40 or Schedule 80 PVC or polypropylene conduit and no. 16 or larger conductor with Type THWN or TFFN insulation. In new roadways, place the detector in the base course with the top of the conduit flush with the top of the base. Cover with HMA or concrete pavement. Protect the detector from damage before and during pavement placement. In new reinforced concrete bridge decks, secure the detector to the top of the uppermost layer of reinforcing steel using nylon wire ties. Hold the detector parallel to the bridge deck using PVC or polypropylene spacers where necessary. Place conduit for lead-in conductors between the uppermost 2 layers of reinforcing steel. Do not install detectors in existing bridge decks unless authorized. Install a detector in existing pavement before placement of concrete or HMA as follows: 1. Saw cut slots at least 1-1/4 inches wide into the existing pavement. 2. Place the detector in the slots. The top of the conduit must be at least 2 inches below the top of the pavement. 3. Test each loop circuit for continuity, circuit resistance, and insulation resistance. 4. Fill saw cuts with elastomeric or hot melt rubberized asphalt sealant for asphalt concrete pavement and with epoxy sealant or hot melt rubberized asphalt sealant for concrete pavement. 87-1.03W Sealants 87-1.03W(1) General Reserved 87-1.03W(2) Elastomeric Sealant Apply an elastomeric sealant with a pressure feed applicator. 87-1.03W(3) Asphaltic Emulsion Sealant Asphaltic emulsion sealant must: Page 165 of 183 1. Be used for filling slots in asphalt concrete pavement of a maximum width of 5/8 inch 2. Not be used on concrete pavement or where the slope causes the material to run from the slot 3. Be thinned under the manufacturer's instructions 4. Be placed when the air temperature is at least 45 degrees F 87-1.03W(4) Hot-Melt Rubberized Asphalt Sealant Melt the sealant in a jacketed, double-boiler-type, melting unit. The temperature of the heat transfer medium must not exceed 475 degrees F. Apply the sealant with a pressure feed applicator or a pour pot when the surface temperature of the pavement is greater than 40 degrees F. 87-1.03X Reserved 87-1.03Y Transformers Installing a transformer includes placing the transformer inside a pull box, a cabinet, or an enclosure. Wire the transformer for the appropriate voltage. Ground the secondary circuit of the transformer as specified in the NEC. 87-1.03Z Reserved 87-1.04 PAYMENT Not Used 87-2 LIGHTING SYSTEMS 87-2.01 GENERAL 87-2.01A Summary Section 87-2 includes specifications for constructing lighting systems. Lighting system includes: 1. Foundations 2. Pull boxes 3. Conduit 4. Conductors 5. Standards 6. Luminaires 7. Service equipment enclosure 8. Photoelectric control 9. Fuse splice connectors 10. High mast lighting assemblies The components of a lighting system are shown on the project plans. 87-2.01 B Definitions Reserved 87-2.01C Submittals Submit a certificate of compliance and test data for the high mast lighting luminaires. 87-2.01D Quality Assurance Reserved 87-2.02 MATERIALS 87-2.02A General Reserved Page 166 of 183 87-2.0213 High Mast Lighting Assemblies A high mast lighting assembly includes the foundation, pole, lowering device system, luminaires, and control pedestal. Each luminaire in a high mast lighting assembly must include a housing, an optical system, and a ballast. The housing must be made of aluminum. A painted or powder-coated housing for a high mast lighting luminaire must be able to withstand a 1,000- hour salt spray test as specified in ASTM B117. The optical system, consisting of the reflector, refractor or lens, lamp socket, and lamp, must be in a sealed chamber. The chamber must be sealed by a gasket between the reflector and refractor or lens and a gasket between the reflector and lamp socket. The chamber must have a separate filter or filtering gasket for flow of air. An asymmetrical luminaire must have a refractor or reflector that is rotatable 360 degrees around a vertical axis to orient the distribution of light. The luminaire must have a slip fitter for mounting on a 2-inch horizontal pipe tenon and must be adjustable±3 degrees from the axis of the tenon. The reflector must have a specular surface made of silvered glass or aluminum protected by either an anodized finish or a silicate film.The reflector must be shaped such that a minimum of light is reflected through the arc tube of the lamp. The refractor and lens must be made of heat-resistant glass. The lamp socket must be a porcelain-enclosed, mogul-multiple type. The shell must contain integral lamp grips to ensure electrical contact under conditions of normal vibrations.The socket must be rated for 1,500 W, 600 V(ac)and 4,000 V(ac)pulse for a 400 W lamp and 5,000 V(ac) pulse for a 1,000 W lamp. The luminaire must have a dual fuse holder for 2 fuses rated at 5 A, 480 V(ac).The fuses must be 13/32 inch by 1-1/2 inches, standard midget ferrule type with a nontime-delay feature. The lamps must be vertical burning, protected from undue vibration, and prevented from backing out of the socket by a stainless steel clamp attached to the luminaire. A 1,000 W metal halide lamp must have an initial output of 100,000 lumens and an average rated life of 12,000 hours based on 10 hours per start. A 400 W high-pressure sodium lamp must have an initial output of 50,000 lumens.A 1,000 W high- pressure sodium lamp must have an initial output of 140,000 lumens. The ballast for the luminaire must be a regulator type and have a core and coils, capacitors, and starting aid. Ballast must be: 1. Mounted within a weatherproof housing that integrally attaches to the top of a luminaire support bracket and lamp support assembly 2. Readily removable without removing the luminaire from the bracket arm 3. Electrically connected to the optical assembly by a prewired quick disconnect The ballast for a metal halide luminaire must comply with luminaire manufacturer's specifications. The wattage regulation spread at any lamp voltage,from nominal through the life of the lamp, must vary no more than 22 percent for a 1,000 W lamp and a±10 percent input voltage variation. The ballast's starting line current must be less than its operating current. 87-2.02C Soffit and Wall-Mounted Luminaires 87-2.02C(1) General Soffit and wall-mounted luminaires must be weatherproof and corrosion resistant. Page 167 of 183 Each luminaire must include a 70 W high-pressure sodium lamp with a minimum average rated life of 24,000 hours. The lamp socket must be positioned such that the light center of the lamp is located within 1/2 inch of the designed light center of the luminaire. Luminaire wiring must be SFF-2. Flush-mounted soffit luminaire must have: 1. Metal body with two 1-inch-minimum conduit hubs and a means of anchoring the body into the concrete 2. Prismatic refractor made of heat-resistant polycarbonate: 2.1. Mounted in a door frame 2.2. With the street side identified 3. Aluminum reflector with a specular anodized finish 4. Ballast located either within the housing or in a ceiling pull box if shown 5. Lamp socket The door frame assembly must be hinged, gasketed, and secured to the luminaire body with at least 3 machine screws. A pendant soffit luminaire must be enclosed and gasketed and have an aluminum finish. Luminaire must have: 1. Aluminum reflector with a specular anodized finish 2. Refractor made of heat-resistant polycarbonate 3. Optical assembly that is hinged and latched for lamp access and a device to prevent dropping 4. Ballast designed for operation in a raintight enclosure 5. Galvanized metal box with a gasketed cover, 2 captive screws, and 2 chains to prevent dropping and for luminaire mounting Wall-mounted luminaire must have: 1. Cast metal body 2. Prismatic refractor: 2.1. Made of glass 2.2. Mounted in a door frame 3. Aluminum reflector with a specular anodized finish 4. Integral ballast 5. Lamp socket 6. Gasket between the refractor and the body 7. At least 2 mounting bolts of minimum 5/16-inch diameter A cast aluminum body of a luminaire to be cast into or mounted against concrete must have a thick coat of alkali-resistant bituminous paint on all surfaces to be in contact with the concrete. 87-2.02C(2) High-Pressure Sodium Lamp Ballasts 87-2.02C(2)(a) General A high-pressure sodium lamp ballast must operate the lamp for its rated wattage. Starting aids for a ballast must be interchangeable between ballasts of the same wattage and manufacturer without adjustment. The ballast must be provided with a heat-generating component to serve as a heat sink.The capacitor must be placed at the maximum practicable distance from the heat-generating components or thermally shielded to limit the case temperature to 75 degrees C. The transformer and inductor must be resin impregnated for protection against moisture. Capacitors, except for those in starting aids, must be metal cased and hermetically sealed. The ballast must have a power factor of 90 percent or greater. Page 168 of 183 For the nominal input voltage and lamp voltage,the ballast design center must not vary more than 7.5 percent from the rated lamp wattage. 87-2.02C(2)(b) Regulator-Type Ballasts A regulator-type ballast must be designed such that a capacitance variance of±6 percent does not cause more than±8 percent variation in the lamp wattage regulation. The ballast must have a current crest factor not exceeding 1.8 for an input voltage variation of±10 percent. The lamp wattage regulation spread for a lag-type ballast must not vary by more than 18 percent for±10 percent input voltage variations.The primary and secondary windings must be electrically isolated. The lamp wattage regulation spread for a constant-wattage, autoregulator, lead-type ballast must not vary by more than 30 percent for±10 percent input voltage variations. 87-2.02C(2)(c) Nonregulator-Type Ballasts A nonregulator-type ballast must have a current crest factor not exceeding 1.8 for an input voltage variation of±5 percent. The lamp wattage regulation spread for an autotransformer or high reactance type ballast must not vary by more than 25 percent for±5 percent input voltage variations. 87-2.03 CONSTRUCTION 87-2.03A General Set the foundations for standards such that the mast arm is perpendicular to the centerline of the roadway. Tighten the cap screws of the luminaire's clamping bracket to 10 ft-lb for LED and low-pressure luminaires. Label the month and year of the installation inside the luminaire housing's door. Perform the conductor and operational tests for the system. 87-2.03B High Mast Lighting Assemblies Mount and connect the luminaires to the accessory support ring. Aim the asymmetrical luminaire to orient the distribution of light. 87-2.03C Soffit and Wall-Mounted Luminaires For a flush-mounted soffit luminaire: 1. Prevent concrete from getting into the housing during pouring of the concrete for the structure 2. Install the luminaire with the axis vertical and the street side of the refractor oriented as indicated 3. Locate the luminaire to provide a minimum 2-foot clearance from the inside surface of the girders and 1-foot clearance from the near face of the diaphragm 4. Install the bridge soffit and ceiling pull box over the same lane For a pendant soffit luminaire: 1. Cast in place the inserts for the no. 8 pull box during concrete placement for a new structure 2. Drill holes for expansion anchors to support the no. 8 pull box on existing structures 3. Bond the suspension conduit and luminaire to the pull box For a wall-mounted luminaire, provide: 1. Extension junction box or ring on a new structure 2. 4 external mounting taps on an existing structure Place the soffits or wall-mounted luminaires in operation as soon as practicable after the falsework has been removed from the structure. Page 169 of 183 If the Engineer orders soffit or wall-mounted luminaires to be activated before permanent power service is available, installing and removing the temporary power service is change order work. 87-2.04 PAYMENT Not Used 87-3 SIGN ILLUMINATION SYSTEMS 87-3.01 GENERAL 87-3.01A Summary Section 87-3 includes specifications for constructing sign illumination systems. Sign illumination system includes: 1. Foundations 2. Pull boxes 3. Conduit 4. Conductors 5. Sign lighting fixtures 6. Enclosure for the disconnect circuit breaker 7. Service equipment enclosure 8. Photoelectric control The components of a sign illumination system are shown on the project plans. 87-3.0113 Definitions Reserved 87-3.01C Submittals Submit the manufacturer's test data for the induction sign-lighting fixtures. 87-3.01 D Quality Assurance Reserved 87-3.02 MATERIALS An induction sign-lighting fixture must include a housing with a door, reflector, refractor or lens, lamp, socket assembly, power coupler, high-frequency generator,fuse block, and fuses. The fixture must comply with the isofootcandle curves as shown. Fixture must weigh no more than 44 lb, be rated for 87 W at 120/240 V(ac), and have a mounting assembly made of one of the following materials: 1. Cast aluminum 2. Hot-dip galvanized steel plate 3. Galvanized steel plate finished with one of the following: 3.1. Polymeric coating 3.2. Same finish used for the housing Housing must: 1. Be corrosion resistant and suitable for wet locations 2. Be above the top of the mounting rails at a maximum height of 12 inches 3. Have weep holes Door must: 1. Hold a refractor or lens 2. Open without the use of special tools 3. Have a locking position at 50 degrees minimum from the plane of the door opening 4. Be hinged to the housing on the side of the fixture away from the sign panel 5. Have 2 captive latch bolts or other latching device Page 170 of 183 When the door is opened, it must lock in the 50 degrees position when an 85 mph, 3-second wind-gust load strikes the door from either side. The housing and door must be manufactured of sheet or cast aluminum and have a gray powder coat or polyester paint finish. The sheet aluminum must comply with ASTM B209 or B209M for 5052-H32 aluminum sheet. External bolts, screws, hinges, hinge pins, and door closure devices must be corrosion resistant. The housing and door must be gasketed. The thickness of the gasket must be a minimum of 1/4 inch. Reflector must not be attached to the outside of the housing and must be: 1. Made of a single piece of aluminum with a specular finish 2. Protected with an electrochemically applied anodized finish or a chemically applied silicate film 3. Designed to drain condensation away from it 4. Secured to the housing with a minimum of 2 screws 5. Removable without removing any fixture parts Refractor or lens must have a smooth exterior and must be manufactured from the materials shown in the following table: Refractor and Lens Material Requirements Component Material Flat lens Heat-resistant glass Convex lens Heat-resistant,high-impact-resistant tempered glass Refractor Borosilicate heat-resistant glass The refractor and convex lens must be designed or shielded such that no luminance is visible if the fixture is approached directly from the rear and viewed from below. If a shield is used, it must be an integral part of the door casting. Lamp must: 1. Be an 85 W induction type with a fluorescent, phosphor-coated, interior wall 2. Have a minimum 70 percent light output of its original lumen output after 60,000 hours of operation 3. Have a minimum color-rendering index of 80 4. Be rated at a color temperature of 4,000K 5. Be removable with common hand tools The lamp socket must be rated for 1,500 W and 600 V(ac)and be a porcelain-enclosed mogul type with a shell that contains integral lamp grips to ensure electrical contact under normal vibration conditions. The shell and center contact must be made of nickel-plated brass.The center contact must be spring loaded. The power coupler must be removable with common hand tools. High-frequency generator must: 1. Start and operate lamps at an ambient temperature of-25 degrees C or greater for the rated life of the lamp 2. Operate continuously at ambient air temperatures from -25 to 55 degrees C without a reduction in the generator life 3. Have a design life of at least 100,000 hours at 55 degrees C 4. Have an output frequency of 2.65 MHz± 10 percent 5. Have radio frequency interference that complies with 47 CFR 18 regulations regarding harmful interference 6. Have a power factor greater than 90 percent and total harmonic distortion less than 10 percent The high frequency generator must be mounted such that the fixture can be used as a heat sink and be replaceable with common hand tools. Page 171 of 183 Each fixture must include a barrier-type fuse block for terminating field connections. Fuse block must: 1. Be rated 600 V(ac) 2. Have box terminals 3. Be secured to the housing and accessible without removal of any fixture parts 4. Be mounted to leave a minimum of 1/2 inch of air space from the sidewalls of the housing 5. Be designed for easy removal of fuses with a fuse puller The fixture's fuses must be 13/32-inch-diameter, 1-1/2-inch-long ferrule type and UL listed or NRTL certified. For a 120 V(ac)fixture, only the ungrounded conductor must be fused and a solid connection must be provided between the grounded conductor and the high frequency generator. The fixture must be permanently marked with the manufacturer's brand name,trademark, model number, serial number, and date of manufacture on the inside and outside on the housing. The same information must be marked on the package. If a wire guard is used, it must be made of a minimum 1/4-inch-diameter galvanized steel wire. The wires must be spaced to prevent rocks larger than 1-1/2-inch diameter from passing through the guard. The guard must be either hot-dip galvanized or electroplated zinc-coated as specified in ASTM B633, service condition SC4, with a clear chromate dip treatment. 87-3.03 CONSTRUCTION Perform the conductor and operational tests for the system. 87-3.04 PAYMENT Not Used 87-4 SIGNAL AND LIGHTING SYSTEMS 87-4.01 GENERAL 87-4.01A Summary Section 87-4 includes specifications for constructing signal and lighting systems. Signal and lighting system includes: 1. Foundations 2. Pull boxes 3. Conduit 4. Conductors 5. Cables 6. Standards 7. Signal heads 8. Internally illuminated street name signs 9. Service equipment enclosure 10. Department-furnished controller assembly 11. Detectors 12. Telephone demarcation cabinet 13. Accessible pedestrian signals 14. Push button assemblies 15. Pedestrian signal heads 16. Luminaires 17. Photoelectric control 18. Fuse splice connectors 19. Battery backup system 20. Flashing beacons 21. Flashing beacon control assembly The components of a signal and lighting system are shown on the project plans. 87-4.01 B Definitions Reserved Page 172 of 183 87-4.01C Submittals Submit shop drawings showing the message for each internally illuminated street sign, including the size of letters, symbols, and arrows. 87-4.01 D Quality Assurance 87-4.011)(1) General Reserved 87-4.01 D(2) Quality Control 87-4.01 D(2)(a) General Reserved 87-4.011)(2)(b) Battery Backup System Notify the Engineer 48 hours before testing the battery backup system. Test the system in the presence of the Engineer by turning off the power to the signal system at the service equipment enclosure.The signal system must run continuously for 30 minutes. If the battery backup system fails, correct the problem and retest the system for another 30 minutes.After successful completion of the test,turn the power on for the signal system. 87-4.02 MATERIALS 87-4.02A General Reserved 87-4.02B Battery Backup System A battery backup system includes the cabinet, batteries, and the Department-furnished electronics assembly. The electronics assembly includes the inverter/charger unit, power transfer relay, and the battery harness. 87-4.02C Internally Illuminated Street Name Signs An internally illuminated street name sign includes housing, brackets, sign panels, gaskets, ballast, lampholder,terminal blocks,conductors,and fuses. An internally illuminated street sign must be designed and constructed to prevent deformation or failure when subjected to an 85 mph, 3-second wind-gust load as specified in the AASHTO publication, "Standard Specifications for Structural Supports of Highway Signs, Luminaires and Traffic Signals." Sign must: 1. Be Types A or B 2. Have galvanized or cadmium-plated ferrous parts 3. Have screened weep holes 4. Have fasteners, screws, and hardware made of passive stainless steel,Type 302 or 304, or aluminum Type 6060-T6 5. Operate at a temperature from -20 to 74 degrees C Photoelectric unit sockets are not allowed. The housing must be constructed to resist torsional twist and warp. The housing must be designed such that opening or removing the panels provides access to the interior of the sign for lamp, ballast, and fuse replacement. The top and bottom of the sign must be manufactured from formed or extruded aluminum and attached to formed or cast aluminum end fittings.The top, bottom, and end fittings must form a sealed housing. For a Type A sign, both sides of the sign must be hinged at the top to allow installation or removal of the sign panel. For a Type B sign, the sign panel must be slide mounted into the housing. Page 173 of 183 The top of the housing must have 2 free-swinging mounting brackets. Each bracket must be vertically adjustable for leveling the sign to either a straight or curved mast arm.The bracket assembly must allow the lighting fixture to swing perpendicular to the sign panel. The reflectors must be formed aluminum and have an acrylic, baked-white-enamel surface with a minimum reflectance of 0.85. Sign panel must be translucent, high-impact-resistant, and made of one of the following plastic materials: 1. Glass-fiber-reinforced,acrylated resin 2. Polycarbonate resin 3. Cellulose acetate butyrate The sign panel must be designed not to crack or shatter if a 1-inch-diameter steel ball weighing 2.4 ounces is dropped from a height of 8.5 feet above the sign panel to any point on the panel. For this test, the sign panel must be lying in a horizontal position and supported within its frame. The sign panel's surface must be evenly illuminated.The brightness measurements for the letters must be a minimum of 150 foot-lamberts, average.The letter-to-background brightness ratio must be from 10:1 to 20:1. The background luminance must not vary by more than 40 percent from the average background brightness measurement. The luminance of letters, symbols, and arrows must not vary by more than 20 percent from their average brightness measurement. The sign panel's white or green color must not fade or darken if exposed to an accelerated test of UV light equivalent to 2 years of outdoor exposure. The sign panel's legend, symbols, arrows, and border on each face must be white on a green background.The background must comply with color no. 14109 of FED-STD-595. The message must appear on both sides of the sign and be protected from UV radiation. The letters must be 8-inch upper case and 6-inch lower case, series E. A Type A sign must have a closed-cell, sponge-neoprene gasket installed between the sign panel frame to prevent the entry of water. The gasket must be uniform and even textured. The sign ballast must be a high-power-factor type for outdoor operation from 110 to 125 V(ac)and 60 Hz and must comply with ANSI C82.1 and C82.2. The ballast for a Type A sign must be rated at 200 mA. The ballast for a Type B sign must be rated at 430 mA. Sign lampholder must: 1. Be the spring-loaded type 2. Have silver-coated contacts and waterproofed entrance leads 3. Have a heat-resistant, circular cross section with a partially recessed neoprene ring Removal of the lamp from the socket must de-energize the primary of the ballast. The springs for the lampholders must not be a part of the current-carrying circuit. The sign's wiring connections must terminate on a molded, phenolic, barrier-type, terminal block rated at 15 A, 1,000 V(ac). The connections must have a white, integral, waterproof marking strip.The terminal screws must not be smaller than a no. 10. The terminal block must be insulated from the fixture to provide protection from the line-to-ground flashover voltage. A sectionalized terminal block must have an integral barrier on each side and must allow rigid mounting and alignment. Fixture's conductors must: 1. Be stranded copper wire with a minimum thermoplastic insulation of 28 mils Page 174 of 183 2. Be rated at 1,000 V(ac)and for use up to 90 degrees C 3. Be a minimum of no. 16 4. Match the color coding of the ballast leads 5. Be secured with spring cross straps, installed 12 inches apart or less in the chassis or fixture Stranded copper conductors connected to screw-type terminals must terminate in crimp-type ring connectors. No splicing is allowed within the fixture. The sign's fuse must be the Type 3AG, miniature, slow-blow type. The fuse holder must be a panel-mounting type with a threaded or bayonet knob that grips the fuse tightly for extraction. Each ballast must have a separate fuse. 87-4.03 CONSTRUCTION 87-4.03A General Set the foundations for standards such that the mast arm is perpendicular to the centerline of the roadway. Tighten the cap screws of the luminaire's clamping bracket to 10 ft-lb for LED and low-pressure luminaires. Label the month and year of the installation inside the luminaire housing's door. Perform the conductor and operational tests for the system. 87-4.0313 Battery Backup System Cabinets Install the battery backup system cabinet to the right of the Model 332L cabinet. If installation on the right side is not feasible, obtain authorization for installation on the left side. Provide access for power conductors between the cabinets using: 1. 2"nylon-insulated, steel chase nipple 2. 2"steel sealing locknut 3. 2"nylon-insulated, steel bushing Remove the jumper between the terminals labeled BBS-1 and BBS-2 in the 5 position terminal block in the controller cabinet before connecting the Department-furnished electronics assembly. 87-4.03C Internally Illuminated Street Name Signs Mount the internally illuminated street name sign to the signal mast arm using the adjustable brackets. Connect the conductors to the terminal blocks in the signal head mounting terminal block. 87-4.04 PAYMENT Not Used 87-5 RAMP METERING SYSTEMS 87-5.01 GENERAL Section 87-5 includes specifications for constructing ramp metering systems. Ramp metering system includes: 1. Foundations 2. Pull boxes 3. Conduit 4. Conductors 5. Standards 6. Signal heads 7. Service equipment enclosure 8. Department-furnished controller assembly Page 175 of 183 9. Detectors 10. Telephone demarcation cabinet The components of a ramp metering system are shown on the project plans. 87-5.02 MATERIALS Not Used 87-5.03 CONSTRUCTION Connect the field wiring to the terminal blocks in the controller cabinet.The Engineer provides you a list of field conductor terminations for each controller cabinet. Perform the conductor and operational tests for the system. 87-5.04 PAYMENT Not Used 87-6 TRAFFIC MONITORING STATION SYSTEMS 87-6.01 GENERAL Section 87-6 includes specifications for constructing traffic monitoring station systems. Traffic monitoring station system includes: 1. Foundations 2. Pull boxes 3. Conduit 4. Cables 5. Conductors 6. Service equipment enclosure 7. Controller cabinet 8. Detectors 9. Telephone demarcation cabinet The components of a traffic monitoring station system are shown on the project plans. 87-6.02 MATERIALS Not Used 87-6.03 CONSTRUCTION Connect the field wiring to the terminal blocks in the controller cabinet.The Engineer provides you a list of field conductor terminations for the controller cabinet. Perform the conductor and operational tests for the system. 87-6.04 PAYMENT Not Used 87-7 FLASHING BEACON SYSTEMS 87-7.01 GENERAL Section 87-7 includes specifications for constructing flashing beacon systems. Flashing beacon system includes: 1. Foundations 2. Pull boxes 3. Conduit 4. Conductors 5. Standards 6. Service equipment enclosure 7. Signal heads 8. Flashing beacon control assembly Page 176 of 183 The components of a flashing beacon system are shown on the project plans. The flash rate for the flashing beacon must comply with chapter 4L, "Flashing Beacons,"of the California MUTCD. The flashing beacon must allow alternating flashing wig-wag operation. The flashing beacon must have a separate flasher unit installed in the flashing beacon control assembly. 87-7.02 MATERIALS Flashing beacon control assembly must: 1. Have a NEMA 3R enclosure with a dead front panel and a hasp with a 7/16-inch hole for a padlock. The enclosure must have one of the following finishes: 1.1. Powder coating. 1.2. Hot-dip galvanized coating. 1.3. Factory-applied, rust-resistant prime coat and finish coat. 2. Have barrier-type terminal blocks rated for 25 A, 600 V(ac), made of molded phenolic or nylon material and have plated-brass screw terminals and integral marking strips. 3. Include a solid state flasher complying with section 8 of NEMA standards publication no. TS 1 for 10 A, dual circuits. 87-7.03 CONSTRUCTION Perform the conductor and operational tests for the system. 87-7.04 PAYMENT Not Used 87-8-87-11 RESERVED 87-12 CHANGEABLE MESSAGE SIGN SYSTEMS 87-12.01 GENERAL Section 87-12 includes specifications for constructing changeable message sign systems. Changeable message sign system includes: 1. Foundations 2. Pull boxes 3. Conduit 4. Conductors 5. Service equipment enclosure 6. Department-furnished controller cabinet 7. Department-furnished changeable message sign 8. Department-furnished wiring harness 9. Service equipment enclosure 10. Sign disconnect The components of a changeable message sign system are shown on the project plans. 87-12.02 MATERIALS Not Used 87-12.03 CONSTRUCTION Install the changeable message sign. Connect the field wiring to the terminal blocks in the sign assembly and controller cabinet. The Engineer provides you a list of field conductor terminations for each sign cabinet and controller cabinet. The Department maintains the sign assemblies. Page 177 of 183 87-12.04 PAYMENT Not Used 87-13-87-17 RESERVED 87-18 INTERCONNECTION CONDUIT AND CABLE 87-18.01 GENERAL Section 87-18 includes specifications for constructing interconnection conduit and cable. Interconnection conduit and cable includes: 1. Pull boxes 2. Conduit 3. Signal interconnect cables The components of an interconnection conduit and cable are shown. 87-18.02 MATERIALS Not Used 87-18.03 CONSTRUCTION Test the signal interconnect cable. Connect the signal interconnect cable to the terminal block in the controller cabinets.The Engineer provides you a list of terminations for each controller cabinet. 87-18.04 PAYMENT Not Used 87-19 RESERVED 87-20 TEMPORARY ELECTRICAL SYSTEMS 87-20.01 GENERAL Section 87-20 includes specifications for providing temporary electrical systems. Obtain the Department's authorization for the type of temporary electrical system and its installation method. A temporary system must operate on a continuous, 24-hour basis. 87-20.02 MATERIALS 87-20.02A General Material and equipment may be new or used. The components of a temporary system are shown on the project plans. If you use Type OF-B cable, the minimum conductor size must be no. 12. 87-20.0213 Temporary Flashing Beacon Systems A temporary flashing beacon system consists of a flashing beacon system,wood post, generator, and photovoltaic system. The system must comply with the specifications for a flashing beacon system in section 87-7, except it may be mounted on a wood post or a trailer. 87-20.02C Temporary Lighting Systems A temporary lighting system consists of a lighting system, generator, and wood poles. The system must comply with the specifications for a lighting system in section 87-2, except it may be mounted on a wood pole or a trailer. Page 178 of 183 87-20.02D Temporary Signal Systems A temporary signal system consists of a signal and lighting system,wood poles and posts, and a generator. System must comply with the specifications for a signal and lighting system in section 87-4, except: 1. Signal heads may be mounted on a wood pole, mast arm,tether wire, or a trailer 2. Flashing beacons may be mounted on a wood post, or a trailer 87-20.03 CONSTRUCTION 87-20.03A General Provide electrical and telecommunication services for temporary systems. Do not use existing services unless authorized. Provide power for the temporary electrical systems under section 12-3.33, except you may use a photovoltaic system for the temporary flashing beacon system. Install conductors and cables in a conduit, suspended from wood poles at least 25 feet above the roadway, or use direct burial conductors and cables. You may saw slots across paved areas for burial conductors and cables. Install conduit outside the paved area at a minimum of 12 inches below grade for Type 1 and 2 conduit and at a minimum of 18 inches below grade for Type 3 conduit. Install direct burial conductors and cables outside the paved area at a minimum depth of 24 inches below grade. Place the portions of the conductors installed on the face of wood poles in either Type 1, 2, or 3 conduit between the point 10 feet above grade at the pole and the pull box. The conduit between the pole and the pull box must be buried at a depth of at least 18 inches below grade. Place conductors across structures in a Type 1, 2, or 3 conduit. Attach the conduit to the outside face of the railing. Mount the photoelectric unit at the top of the standard or wood post. You may abandon in place conductors and cables in sawed slots or in conduit installed below the ground surface. 87-20.0313 Temporary Flashing Beacon Systems Install a fused-splice connector in the pull box adjacent to each flashing beacon. Wherever conductors are run overhead, install the splice connector in the line side outside of the control assembly. 87-20.03C Temporary Lighting Systems Wherever conductors are run overhead, install the fuse splice connectors in the line side before entering the mast arm. 87-20.031) Temporary Signal Systems You may splice conductors that run to a terminal compartment or a signal head on a pole to the through conductors of the same phase in a pull box adjacent to the pole. Do not splice conductors or cables except in a pull box or in a NEMA 3R enclosure. The Department provides the timing for the temporary signal. Maintain the temporary signal except for the Department-furnished controller assembly. 87-20.04 PAYMENT Not Used Page 179 of 183 87-21 EXISTING ELECTRICAL SYSTEMS 87-21.01 GENERAL Section 87-21 includes general specifications for performing work on existing electrical systems. 87-21.02 MATERIALS Not Used 87-21.03 CONSTRUCTION 87-21.03A General You may abandon unused underground conduit after pulling out all conductors and removing conduit terminations from the pull boxes. If standards are to be salvaged, remove: 1. All components 2. Mast arms from the standards 3. Luminaires, signal heads, and signal mounting assemblies from the standards and mast arms If the existing material is unsatisfactory for reuse and the Engineer orders you to replace it with new material, replacing the existing material with new material is change order work. If the removed electrical equipment is to be reinstalled, supply all materials and equipment, including signal mounting assemblies, anchor bolts, nuts, washers, and concrete, needed to complete the new installation. 87-21.0313 Maintaining Existing Electrical Systems 87-21.03B(1) General Maintain the existing electrical system in working order during the progress of the work. Conduct your operations to avoid damage to the elements of the systems. 87-21.03B(2) Maintaining Existing Traffic Management System Elements During Construction Section 87-21.02B(2)applies if a bid item for maintaining existing traffic management system elements during construction is shown on the Bid Item List. Traffic management system elements include: 1. Ramp metering system 2. Traffic monitoring stations 3. Microwave vehicle detection system 4. Changeable message sign system 5. Extinguishable message sign system 6. Highway advisory radio system 7. Closed circuit television camera system 8. Roadway weather information system Obtain authorization at least 72 hours before interrupting communication between an existing system and the traffic management center. If the Engineer notifies you that an existing system is not fully operational due to your activities, repair or replace the system within 72 hours. If the system cannot be fixed within 72 hours or it is located on a structure, provide a temporary system within 24 hours until the system can be fixed. Perform a functional test of the system in the presence of the Engineer. If you fail to perform the necessary repair or replacement work,the Department may perform the repair or replacement work and deduct the cost. If you damage an existing fiber optic cable, install a new cable such that the length of cable slack is the same as before the damage, measured from an original splice point or termination. All splices must be made using the fusion method. You may interrupt the operation of traffic monitoring stations: 1. For 60 days if another operational traffic monitoring station is located within 3 miles Page 180 of 183 2. For 15 days if another operational traffic monitoring station is located more than 3 miles away If a traffic monitoring station must be interrupted for longer periods than specified, provide a temporary detection system. Obtain the Department's authorization for the type of temporary system and its installation method. 87-21.03C Modifying Existing Electrical Systems Modify electrical systems as shown. 87-21.03D Removing Existing Electrical Systems The components to be removed are shown on the project plans. 87-21.04 PAYMENT Not Used AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA DIVISION XI MATERIALS 90 CONCRETE 07-15-16 Replace Method 1 in the 4th paragraph of section 90-1.01 D(5)(a)with: 07-15-16 Method 2 Replace section 90-9 with: 07-15-16 90-9 RETURNED PLASTIC CONCRETE 90-9.01 GENERAL 90-9.01A Summary Section 90-9 includes specifications for incorporating returned plastic concrete(RPC) into concrete. RPC must be used only where the specifications allow its use. Do not use RPC in pavement or structural concrete. 90-9.01 B Definitions returned plastic concrete(RPC): Excess concrete that is returned to a concrete plant in a plastic state and that has not attained initial set. hydration stabilizing admixture(HSA): Extended set retarding admixture that controls and predictably reduces the hydration rate of the cementitious material. 90-9.01C Submittals Submit the following with the weighmaster certificate: 1. Weight or volume of RPC 2. Type, brand, and dosage of HSA 3. Time of adding HSA 4. Copy of the original weighmaster certificate for the RPC 5. Temperature of RPC When requested, submit the HSA manufacturer's instructions, including dosage tables. 90-9.01D Quality Assurance The material plant producing concrete containing RPC must be authorized under the MPQP. Page 181 of 183 For volumetric proportioning of RPC: 1. The volumetric container must be imprinted with manufacturer's name, model number, serial number, the as-calibrated volume and date of the last calibration. Cross sectional dimensions of the container must remain the same as those during its calibration. 2. The device must be re-calibrated monthly and at any time when the container shape has been deformed from its original condition or there is evidence of material build-up on the inside of the device. 3. The device must be held in a level condition during filling. Fill the device to the measure or strike-off line. Each measurement must be filled to within 1.0% of the device as-calibrated volume. 4. The device interior must be cleaned after each measurement to maintain a zero condition. For weight proportioning, proportion RPC with a weigh hopper attached to the plant at a position which allows the addition of the RPC to the mixer truck with the conventional PCC ingredients. The plant process controller must control the proportioning of RPC to within 1.0% of its target weight. 90-9.02 MATERIALS 90-9.02A General The quantity of RPC added to the concrete must not exceed 15 percent. The cementitious material content of the RPC must be at least that specified for the concrete that allows the use of RPC. Water must not be added to the RPC after batching, including in the truck mixer. Use HSA for controlling and reducing the hydration rate of RPC. Incorporate RPC by mixing into the concrete before arriving at the jobsite. 90-9.0213 Returned Plastic Concrete The RPC must not exceed 100 degrees F at anytime. If HSA is not used, RPC must be incorporated into the concrete before attaining initial set or within 4 hours after batching of RPC, whichever is earlier. If HSA is used: 1. Add HSA to RPC within 4 hours after original batching. 2. Measure and record the time, dosage of HSA, and temperature of RPC when HSA is added. 3. Mix the RPC under the HSA manufacturer's instructions after adding HSA or at least 30 revolutions, whichever is greater. 4. Incorporate RPC into the concrete within 4 hours after adding HSA. RPC must not contain: 1. Accelerating admixture 2. Fiber 3. Pigment 4. Lightweight aggregate 5. Previously returned RPC 6. Any ingredient incompatible with the resultant concrete 90-9.02C Hydration Stabilizing Admixture HSA must comply with ASTM C494 admixture Type B or Type D. HSA must have a proven history of specifically maintaining and extending both plasticity and set. HSA dosage must comply with the manufacturer's instructions. 90-9.02D Production Proportion concrete containing RPC under section 90-2.02E. Page 182 of 183 Proportion RPC by weight or by volume. 90-9.03 CONSTRUCTION Not Used 90-9.04 PAYMENT Not Used AAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAAA 92 ASPHALT BINDERS 04-15-16 04-15-16 Replace the 4th paragraph of section 92-1.0213 with: Crumb rubber modifier used must be on the Authorized Materials List for crumb rubber modifier. Production equipment for PG modified asphalt binder with crumb rubber modifier must be authorized under the Department's MPQP. Crumb rubber must be derived from waste tires described in Pub Res Code§42703 and must be free from contaminants including fabric, metal, minerals, and other nonrubber substances. nnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn 96 GEOSYNTHETICS 01-15-16 Replace product name,manufacturing source, and date of manufacture in the 2nd sentence of the 1 st paragraph of section 96-1.01 D with: 01-15-16 manufacturing source code Page 183 of 183 ID OOK FOWLER AVE & OLIVE AVE INTERSECTION IMPROVEMENTS FEDERAL PROJECT NUMBER: CML-5942(293) BUDGET / ACCOUNT: 4510 / 7370 co � 1856 O FRESH Department of Public Works and Planning CONTRACT NUMBER 23-04-C BID BOOK TABLE OF CONTENTS FOWLER AVE & OLIVE AVE INTERSECTION IMPROVEMENTS CONTRACT NUMBER 23-04-C PROPOSAL TITLE NUMBER NOT APPLICABLE INSTRUCTIONS FOR COMPLETING THE BID BOOK 1 PROPOSAL TO THE BOARD OF SUPERVISORS OF THE COUNTY OF FRESNO 2 BID ITEM LIST/BID SHEET 3 EVALUATION OF BID ITEM LIST 4 BID SECURITY 5 NONCOLLUSION DECLARATION 6 PUBLIC CONTRACT CODE SECTION 10285.1 STATEMENT 7 PUBLIC CONTRACT CODE SECTION 10162 QUESTIONNAIRE AND PUBLIC CONTRACT CODE 10232 STATEMENT 8 SUBCONTRACTORS CERTIFICATION WITH REGARD TO THE PERFORMANCE OF PREVIOUS CONTRACTS 9 OR SUBCONTRACTS SUBJECT TO THE EQUAL OPPORTUNITY CLAUSE AND THE FILING OF REQUIRED REPORTS 10 TITLE 49,CODE OF FEDERAL REGULATIONS,PART 29 DEBARMENT AND SUSPENSION CERTIFICATION 11 NONLOBBYING CERTIFICATION FOR FEDERAL-AID CONTRACTS 12(A)-12(B) DISCLOSURE OF LOBBYING ACTIVITIES 13(A)-13(B) EXHIBIT 15-G LOCAL AGENCY BIDDER DBE COMMITMENT(CONSTRUCTION CONTRACTS) 14(A)-14(C) EXHIBIT 15-H DBE INFORMATION-GOOD FAITH EFFORTS 15(A)-15(B) EXHIBIT 12-B BIDDER'S LIST OF SUBCONTRACTORS 16 OPT OUT OF PAYMENT ADJUSTMENTS FOR PRICE INDEX FLUCTUATIONS 17 GUARANTY 18 TITLE 13,CALIFORNIA CODE OF REGULATIONS§2449(1)GENERAL REQUIREMENTS FOR IN-USE OFF-ROAD DIESEL-FUELED FLEETS INSTRUCTIONS FOR COMPLETING THE BID BOOK FOR FEDERAL AID PROJECTS General Complete forms in the Bid Book. Submit an electronic bid online at http://www.BidExpress.com (Section 2-1.33D)or submit a hardcopy bid: 1. Under sealed cover addressed to the Department and labeled with the name of the bidder, the name of the project and the statement'Do Not Open Until The Time Of Bid Opening.' 2. Marked as a bid 3. Identifying the contract number and the bid opening date Certain bid forms must be submitted with the bid and properly executed. Certain other forms and information must be submitted either with the bid or within the prescribed period after bid opening as specified elsewhere in these special provisions. Failure to submit the forms and information as specified results in a nonresponsive bid. If an agent other than the authorized corporation officer or a partnership member signs the bid, file a Power of Attorney with the Department either before opening bids or with the bid. Otherwise, the bid may be nonresponsive. Bid Item List and Bid Comparison Submit a bid based on the bid item quantities the Department shows on the Bid Item List. Bids will be evaluated and the low bidder determined as indicated in the Notice to Bidders. Bid Document Completion Proposal items are identified by title and by the word "Proposal"followed by the number assigned to the proposal item in question. Proposal items are included in the Bid Book. Proposal to the Board of Supervisors of Fresno County—Proposal 1 Provided for information. Bid Proposal Sheet— Proposal 2 One or more sheet(s) or list(s) upon which the bidder completes the bid. Fill out completely including a unit price and total for each unit price-based item and a total for each lump sum item. Do not make any additions such as "plus tax", "plus freight", or conditions such as "less 2% if paid by 15th". Use ink or typewriter for paper bids. Evaluation of Bid Proposal Sheet—Proposal 3 Describes how inconsistences and irregularities are evaluated and corrected when Design Services reviews the Bid Item List. Bid Security and Signature— Proposal 4 Submit one of the following forms of bidder's security equal to at least 10 percent of the bid: • Cash • Cashier's check • Certified check • Signed bidder's bond by an admitted surety insurer Indicate type of bid security provided. • Cash—Acceptable but not recommended. Cash is deposited in a clearing account and is returned to bidders by County warrant. This process may take several weeks. • Cashier's or Certified Checks. This type of security is held until the bid is no longer under consideration. If submitted by a potential awardee, they will be returned when the contract is fully executed by the bidder and bonds and insurance have been approved. • Bid Bonds - Must be signed by the bidder and by the attorney-in-fact for the bonding company. Provide notarized signature of attorney-in-fact accompanied by bonding company's affidavit authorizing attorney- in-fact to execute bonds. An unsigned bid bond will be cause for rejection. Bonding companies may provide their own bid bond forms. Proposal 4 must be completed by the bidder and submitted with their bid. Acknowledge Addenda Provide contractor's license information. State business name and if business is a: • Corporation - list officers • Partnership - list partners • Joint Venture- list members; if members are corporations or partnerships, list their officers or partners. • Individual - list Owner's name and firm name style Signature of Bidder-the following lists types of companies and corresponding authorized signers. • Corporation - by an officer • Partnership - by a partner • Joint Venture- by a member • Individual - by the Owner If signature is by a Branch Manager, Estimator, Agent, etc., the bid must be accompanied by a power of attorney authorizing the individual to sign the bid in question or to sign bids more generally, otherwise the bid may be rejected. • Business Address- Firm's Street Address • Mailing Address- P.O. Box or Street Address • Complete, sign, and return with bid. INSTRUCTIONS FOR COMPLETING THE BID BOOK FOR FEDERAL AID PROJECTS:Page 2 of 4 Noncollusion Declaration—Proposal 5 Must be completed, signed, and returned with bid. Public Contract Code Section 10285.1 Statement— Proposal 6 Select"has" or"has not" in accordance with instructions on form, return with completed for with bid. Note that signing the bid constitutes signing this statement. Public Contract Code Section 10162 Questionnaire And Public Contract Code 10232 Statement— Proposal 7 Select"yes" or"no" accordance with instructions on form, include explanation if"yes" is selected. Return completed form with bid. Note that signing the bid constitutes signing this questionnaire and statement. Subcontractors— Proposal 8 Sheet(s)or spaces where upon which bidders list subcontractors. List each subcontractor to perform work in an amount in excess of 1/2 of 1 percent of the total bid or$10,000, whichever is greater(Pub Cont Code § 4100 et seq.). The Subcontractor List submitted with the bid must show the name, location of business, work portions to be performed, and the contractor's license number for each subcontractor listed. • Use subcontractor's business name style as registered with the License Board. • Specify the city in which the subcontractor's business is located and the state if other than California. • Description of the work to be performed by the subcontractor. Indicate with bid item numbers from the bid item list and/or work descriptions similar to those on bid item list. • List license number for each subcontractor. Upon request from Design Services, provide the following additional information within 24 hours of bid opening if not included on the Subcontractor List submitted with the bid: • Complete physical address for each subcontractor listed. • Percentage of the total bid or dollar amount associated with each subcontractor listed. • Department of Industrial Relations registration number Certification With Regard To The Performance Of Previous Contracts Or Subcontracts Subject To The Equal Opportunity Clause And The Filing Of Required Reports— Proposal 9 For a Federal-aid contract, complete, sign, and return with bid. Certification of proposed subcontractors is the responsibility of the Bidder and must be provided to the County upon request. Title 49, Code of Federal Regulations, Part 29 Debarment And Suspension Certification— Proposal 10 For a Federal-aid contract, complete, sign, and return with bid. Certification of proposed subcontractors is the responsibility of the Bidder and must be provided to the County upon request. Non-lobbying Certification for Federal-Aid Contracts—Proposal 11 For a Federal-aid contract, complete, sign, and return with bid. Disclosure of Lobbying Activities— Proposal 12(a)through Proposal 12(b) For a Federal-aid contract, complete, sign, and return with bid. Exhibit 15-G Local Agency Bidder DBE Commitment (Construction Contracts)— Proposal 13(a)through Proposal 13(b) For a Federal-aid contract, bidders must complete and submit so that it is received by Design Services, no later than 4:00 PM on the fifth (5th) calendar day after the bid opening if not submitted with the bid. INSTRUCTIONS FOR COMPLETING THE BID BOOK FOR FEDERAL AID PROJECTS:Page 3 of 4 Exhibit 15-H DBE Information—Good Faith Efforts—Proposal 14(a) through Proposal 14(c) - For a Federal-aid contract, if you did not meet the DBE goal, bidders must complete and submit so that it is received by Design Services no later than 4:00 PM on the fifth (5th) calendar day after the bid opening if not submitted with the bid. Exhibit 12-B Bidder's List of Subcontractor(DBE and Non-DBE)— Proposal 15(a)through Proposal 15(b) For a Federal-aid contract, bidders must submit so that it is received by Design Services, no later than 4:00 PM on the fifth (51h) calendar day after the bid opening if not submitted with the bid. Fill out as completely as possible. Opt Out of Payment Adjustments for Price Index Fluctuations— Proposal 16 You may opt out of the payment adjustments for price index fluctuations specified in section 9-1.07. To opt out, submit a completed Opt Out of Payment Adjustments for Price Index Fluctuations form with your bid. Guaranty—Proposal 17 Does not need to be signed with the bid. Part of the contract which must be signed by the contractor when contract is executed. Title 13, California Code of Regulations §2449(i) General Requirements for In-Use Off-Road Diesel- Fueled Fleets— Proposal 18 Contractors, if applicable, must submit valid Certificates of Reported Compliance with their bid. Subcontractor certificates will be due no later than 4:00 PM on the fifth (51h) calendar day after the bid opening if not submitted with the bid. INSTRUCTIONS FOR COMPLETING THE BID BOOK FOR FEDERAL AID PROJECTS:Page 4 of 4 PROPOSAL TO THE BOARD OF SUPERVISORS OF THE COUNTY OF FRESNO hereinafter called the Owner FOWLER AVE & OLIVE AVE INTERSECTION IMPROVEMENTS FEDERAL PROJECT NUMBER: CML-5942(293) The work embraced herein shall be done in accordance with the 2015 Standard Specifications and with the 2015 Standard Plans, of the State of California, Department of Transportation insofar as the same may apply and in accordance with these special provisions. Except to the extent that they may conflict with these special provisions, revised Standard Specifications apply to the extent included in the section entitled "Project Details" of the book entitled "Specifications." The work to be done is shown on a set of Plans, Department File No. 11302, entitled: "Fowler Ave & Olive Ave Intersection Improvements". The undersigned, as bidder, declares that the only persons, or parties interested in this proposal as principals are those named herein, that this proposal is made without collusion with any other person, firm or corporation; that they have carefully examined the location of the proposed work, the annexed proposed form of contract, and the plans therein referred to; and they propose and agrees if this proposal is accepted, that they will contract with the Owner to provide all necessary machinery, tools, apparatus and other means of construction, and to do all the work and furnish all the materials specified in the contract in the manner and time therein prescribed, and according to the requirements of the Engineer as therein set forth, and that they will take in full payment therefor the following unit prices, to-wit: Proposal 1 Contract Number 23-04-C General Info Total: $2,529,711.00 Number Description 23-04-C Fowler Ave & Olive Ave Intersection Improvements Deadline The work to be done consists, in general, of installing a new traffic signal, reconstructing 02/08/2024 02:00 PM PST the pavement, and widening the intersection of Fowler Avenue and Olive Avenue. The work will also include signing, striping, and pavement marking. Two new drain inlets with Vendor storm drain pipe are included as part of the work. The contractor is responsible for Avison Construction, Inc. coordination with utility companies, the City of Fresno, and the Fresno Municipal Flood Control District. Submitted The DBE Contract Goal is 22 percent. 02/08/2024 01:46 PM PST Signed by Federal Project Number: CML-5942(293) Curtis Short Account Holder Allows zero unit prices and labor Curtis Short Yes Opened Allows negative unit prices and labor 02/08/2024 02:17 PM PST Yes By jgeddert@fresnocountyca.gov Page 1 of 34 02/08/2024 Attachment List Project Website RFC form, bid opening details, any Supplemental Information including RFC responses, prebid conference information, etc. Specifications (10 MB) Specifications (10 MB) Plans (38 MB) Plans (38 MB) Addendum 1 Addendum 1 Addendum 1 - Plan Sheets (16MB) Addendum 1 - Plan Sheets (16MB) Page 2 of 34 02/08/2024 Proposal to the County of Fresno - Proposal 1 The work embraced herein shall be done in accordance with the 2015 Standard Specifications and with the 2015 Standard Plans, of the State of California, Department of Transportation insofar as the same may apply and in accordance with these special provisions. Except to the extent that they may conflict with these special provisions, revised Standard Specifications apply to the extent included in the section entitled "Project Details" of the book entitled "Specifications." The work to be done is shown on a set of Plans, Department File No. 11302, entitled: "Fowler Ave & Olive Ave Intersection Improvements". The undersigned, as bidder, declares that the only persons, or parties interested in this proposal as principals are those named herein, that this proposal is made without collusion with any other person, firm or corporation; that they have carefully examined the location of the proposed work, the annexed proposed form of contract, and the plans therein referred to; and they propose and agree if this proposal is accepted, that they will contract with the Owner to provide all necessary machinery, tools, apparatus and other means of construction, and to do all the work and furnish all the materials specified in the contract in the manner and time therein prescribed, and according to the requirements of the Engineer as therein set forth, and that they will take in full payment therefor the following unit prices, to- wit: Page 3 of 34 02/08/2024 Bid Item List - Proposal 2A $2,529,711.00 Item F, Quantity Unit Item Description Item Price Extension No. S 1 N/ 80,000 $ Supplemental Work (Payment Adjustment for Price Index $1.00 $80,000.00 A Fluctuations) 2 AN/ 2 EA Construction Project Information Sign $2,000.00 $4,000.00 3 AN/ 1 LS Traffic Control System $50,000.00 $50,000.00 4 AN/ 6 EA Portable Changeable Message Sign $4,000.00 $24,000.00 5 AN/ 1 LS Job Site Management $5,000.00 $5,000.00 6 N/ 1 LS Prepare & Implement Storm Water Pollution Prevention $5,000.00 $5,000.00 A Plan 7 N/ 1,000 $ State Water Resources Control Board Notice of Intent $1.00 $1,000.00 A Filing Fee 8 AN/ 1 LS Storm Water Annual Report $100.00 $100.00 9 AN/ 1 LS Dust Control Plan $500.00 $500.00 10 AN/ 2 EA Salvage Drain Inlet to FMFCD $2,300.00 $4,600.00 11 AN/ 1 LS Remove & Dispose Light Fixtures $800.00 $800.00 12 AN/ 1 LS Remove & Dispose Storage Sheds $3,500.00 $3,500.00 13 AN/ 4 EA Remove & Dispose Sign Structure $100.00 $400.00 14 AN/ 43 LF Remove & Dispose Concrete Pipe $130.00 $5,590.00 15 AN/ 168 LF Remove & Dispose Wood Fence $6.00 $1,008.00 Total: $2,529,711.00 Page 4 of 34 02/08/2024 Item F, Quantity Unit Item Description Item Price Extension No. S 16 AN/ 744 LF Remove And Dispose Hog Wire Fence $3.00 $2,232.00 17 AN/ 1,015 LF Remove & Dispose Barbed Wire Fence $3.00 $3,045.00 18 AN/ 1 LS Remove & Dispose Of Underground Septic System $10,000.00 $10,000.00 19 AN/ 1 LS Clearing and Grubbing $25,000.00 $25,000.00 20 AN/ 15 EA Tree Removal $700.00 $10,500.00 21 F 9,539 CY Roadway Excavation - Final Pay Item $30.00 $286,170.00 22 F 2,693 CY Roadway Ditch Excavation - Final Pay Item $25.00 $67,325.00 23 F 50 CY Berm Construction - Final Pay Item $50.00 $2,500.00 24 AN/ 11 CY 3-Sack Concrete Slurry Backfill $250.00 $2,750.00 25 AN/ 1 LS Finishing Roadway $1,000.00 $1,000.00 26 F 4,250 CY Class 2 Aggregate Base - Final Pay Item $65.00 $276,250.00 27 AN/ 121 TON Hot Mix Asphalt (Type A 1/2" Grading) $104.00 $12,584.00 28 AN/ 6,800 TON Hot Mix Asphalt (Type A 3/4" Grading) $110.00 $748,000.00 29 AN/ 214 CY Shoulder Backing $50.00 $10,700.00 30 AN/ 1,670 LF Place Hot Mix Asphalt Dike (Type E) $10.00 $16,700.00 31 AN/ 262 LF Place Hot Mix Asphalt Dike (Type F) $8.00 $2,096.00 32 AN/ 800 SY Place Type A 1/2" Grading HMA (Miscellaneous Area) $18.00 $14,400.00 33 AN/ 8 TON Tack Coat $1,000.00 $8,000.00 Total: $2,529,711.00 Page 5 of 34 02/08/2024 Item F, Quantity Unit Item Description Item Price Extension No. S 34 AN/ 590 SY Cold Plane Asphalt Concrete Pavement $10.00 $5,900.00 35 AN/ 2 EA Install FMFCD Type "E" Drainage Inlet $7,300.00 $14,600.00 36 N/ 1 LS Miscellaneous Operations (Splice Exist SD, Cut Out $10,000.00 $10,000.00 A Manhole, etc) 37 N/ 140 LF 24-Inch Reinforced Concrete Pipe (Class III, Rubber $185.00 $25,900.00 A Gasket Joint) 38 AN/ 88 CY Small-Rock Slope Protection $265.00 $23,320.00 39 AN/ 7,200 SF Weed Barrier Fabric $0.25 $1,800.00 40 AN/ 20 LF Minor Concrete (Curb and Gutter) $130.00 $2,600.00 41 AN/ 23 SY Minor Concrete (Electrical Pad) $200.00 $4,600.00 42 AN/ 2 EA Install Manhole (Type A, Case 1) $11,000.00 $22,000.00 43 AN/ 3 EA Adjust Storm Drain Manhole Lids to Grade $2,400.00 $7,200.00 44 AN/ 1 EA Survey Monument (Type D) $1,200.00 $1,200.00 45 AN/ 9 EA Remove & Dispose Roadside Sign $100.00 $900.00 46 AN/ 1 EA Relocate Roadside Sign - One Post $100.00 $100.00 47 AN/ 23 EA Roadside Sign - One Post $735.00 $16,905.00 48 AN/ 190 LF Paint HMA Dike (White) $1.00 $190.00 49 AN/ 1,600 LF Thermoplastic Traffic Stripe (Detail 22) $4.00 $6,400.00 50 AN/ 2,750 LF Thermoplastic Traffic Stripe (Detail 29) $4.00 $11,000.00 Total: $2,529,711.00 Page 6 of 34 02/08/2024 Item F, Quantity Unit Item Description Item Price Extension No. S 51 AN/ 290 LF Thermoplastic Traffic Stripe (Detail 32) $4.00 $1,160.00 52 AN/ 1,050 LF Thermoplastic Traffic Stripe (Detail 38) $2.50 $2,625.00 53 AN/ 6,535 LF Thermoplastic Traffic Stripe (Detail 39) $2.00 $13,070.00 54 AN/ 46 EA Type G One Way Clear Retroflective Marker $7.00 $322.00 55 AN/ 385 LF Type D Two Way Yellow Retroflective Marker $7.00 $2,695.00 56 AN/ 180 LF Thermoplastic Pavement Markings (Limit Line) $3.00 $540.00 57 ANC 150 SF Thermoplastic) Pavement Markings (Left Turn Arrow Type $6.50 $975.00 58 ANC 120 SF Thermoplastic) Pavement Markings (Right Turn Arrow Type $6.75 $810.00 59 N/ 84 SF Thermoplastic Pavement Markings (Bike Lane Symbol with $6.75 $567.00 A Person and Bike Lane Arrow) 60 AN/ 252 SF Thermoplastic Pavement Marking Words (Signal Ahead) $3.50 $882.00 61 AN/ 32 EA Inductive Loop Detector $1,100.00 $35,200.00 62 AN/ 1 LS Traffic Signal & Lighting System $500,000.00 $500,000.00 63 AN/ 1 LS Mobilization $131,500.00 $131,500.00 Total: $2,529,711.00 Page 7 of 34 02/08/2024 Evaluation of Bid Item List - Proposal 3 Abbreviations used in the bid proposal sheet are identified in Section 1-1.06, "Abbreviations," of these special provisions. Bids are required for the entire work. Bids will be compared on the basis indicated in the Notice to Bidders. The bidder shall set forth for each unit basis item of work a unit price and a total for the item, and for each lump sum item a total for the item, all in clearly legible figures in the respective spaces provided for that purpose. In the case of unit basis items, the amount set forth under the "Item Total" column shall be the product of the unit price bid and the estimated quantity for the item. In case of discrepancy between the unit price and the total set forth for a unit basis item, the unit price shall prevail, except as provided in (a) or (b), as follows: (a) If the amount set forth as a unit price is unreadable or otherwise unclear, or is omitted, or is the same as the amount as the entry in the item total column, then the amount set forth in the item total column for the item shall prevail and shall be divided by the estimated quantity for the item and the price thus obtained shall be the unit price; (b) (Decimal Errors) If the product of the entered unit price and the estimated quantity is exactly off by a factor of ten, one hundred, etc., or one-tenth, or one-hundredth, etc. from the entered total, the discrepancy will be resolved by using the entered unit price or item total, whichever most closely approximates percentage-wise the unit price or item total in the Owner's Final Estimate of cost. If both the unit price and the item total are unreadable or otherwise unclear, or are omitted, the bid may be deemed irregular. Likewise, if the item total for a lump sum item is unreadable or otherwise unclear, or is omitted, the bid may be deemed irregular unless the project being bid has only a single item and a clear, readable total bid is provided. Symbols such as commas and dollar signs will be ignored and have no mathematical significance in establishing any unit price or item total or lump sums. Written unit prices, item totals and lump sums will be interpreted according to the number of digits and, if applicable, decimal placement. Cents symbols also have no significance in establishing any unit price or item total since all figures are assumed to be expressed in dollars and/or decimal fractions of a dollar. Bids on lump sum items shall be item totals only; if any unit price for a lump sum item is included in a bid and it differs from the item total, the items total shall prevail. The foregoing provisions for the resolution of specific irregularities cannot be so comprehensive as to cover every omission, inconsistency, error or other irregularity which may occur in a bid. Any situation not specifically provided for will be determined in the discretion of the Owner, and that discretion will be exercised in the manner deemed by the Owner to best protect the public interest in the prompt and economical completion of the work. The decision of the Owner respecting the amount of a bid, or the existence or treatment of an irregularity in a bid, shall be final. If this proposal shall be accepted and the undersigned shall fail to contract, as aforesaid, and to give the two bonds in the sums to be determined as aforesaid, with surety satisfactory to the Owner, within eight (8) days not including Saturdays, Sundays and legal holidays, after the bidder has received notice of award of the contract, the Owner, at its option, may determine that the bidder has abandoned the contract, and thereupon this proposal and the acceptance thereof shall be null and void, and the forfeiture of such security accompanying this proposal shall operate and the same shall be the property of the Owner. Page 8 of 34 02/08/2024 Bid Security - Proposal 4 Bond Percentage 10.00% Guarantee Method Cash, Cashier's Check, Certified Check, Paper Bid Bond Cash, Cashier's Check, Certified Check, Paper Bid Bond Confirmation * I have provided a Paper Bid Bond for the Bid Security Amount above prior to the solicitation deadline. You must either attach an electronic bid bond here or provide an original bid bond (or other form of bid security authorized by Public Contract Code Section 20129(a)) to the office location according to the instructions in the Notice to Bidders prior to the bid opening. Page 9 of 34 02/08/2024 Addendum Acknowledgement - Proposal 4 Bidders must acknowledge all addenda. The Bidder acknowledges receipt of the following ADDENDA: (Enter the number the Designer has assigned to each of the addenda that the Bidder is acknowledging) Type N/A if no addenda were issued. Click "+" to add additional fields. Addendum No. * 1 Dated 2/2/2024 Page 10 of 34 02/08/2024 Bidder Signature - Proposal 4 Business Name * Avison Construction, Inc. Note: If bidder or other interested person is a corporation, state legal name of corporation. If bidder is a co-partnership, state true name of firm. Type of Business Corporation - list Officers Business Owners and Officers Names Curtis Short - President Stephen Avila - Vice President Christopher Avila - CFO/Secretary Note: If bidder or other interested person is: • a corporation, list names of the president, secretary, treasurer and manager thereof • a partnership, list names of all individual co-partners composing firm. • an individual, state first and last name in full. Names of Owners and Key Employees Curtis Short - President Stephen Avila - Vice President Christopher Avila - CFO/Secretary Note: List majority owners of your firm. If multiple owners, list all. Also include anyone, including key employees, who are actively promoting the contract. (SB1439) Licensed in accordance with an act providing for the registration of Contractors: Class A, C31 Contractor License No. * Expires 823535 5/31/2025 Page 11 of 34 02/08/2024 DIR Registration Number 1000003258 Business Address 40434 Brickyard Dr., Madera, CA Zip Code 93636 Mailing Address 40434 Brickyard Dr., Madera, CA Zip Code 93636 Business Phone * Fax Number (559) 431-0317 (559) 431-0321 E-mail Address * cshort@avisoninc.com Signature of Bidder Curtis Short NOTE: If bidder is a corporation, the legal name of the corporation shall be set forth above together with the signature of the officer or officers authorized to sign contracts on behalf of the corporation; if bidder is a co-partnership, the true name of the firm shall be set forth above together with the signature of the partner or partners authorized to sign contracts on behalf of the co- partnership; and if bidder is an individual, bidder signature shall be placed above. If signature is by an agent, other than an officer of a corporation or a member of a partnership, a Power of Attorney must be on file with the Owner prior to opening bids or submitted with the bid; otherwise, the bid will be disregarded as irregular and unauthorized. Page 12 of 34 02/08/2024 Noncollusion Declaration - Proposal 5 TO BE EXECUTED BY BIDDER AND SUBMITTED WITH BID* The undersigned declares: I am the (Choose one of the following options): Owner If Corporate Officer please list Title: President of (Business Name): Avison Construction, Inc. the party making the foregoing bid. The bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation. The bid is genuine and not collusive or sham. The bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid. The bidder has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or refrain from bidding. The bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder. All statements contained in the bid are true. The bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, to any corporation, partnership, company, association, organization, bid depository, or to any member or agent thereof, and has not paid, and will not pay, any person or entity for that purpose. Any person executing this declaration on behalf of a bidder that is a corporation, partnership, joint venture, limited liability company, limited liability partnership, or any other entity, hereby represents that he or she has full power to execute, and does execute, this declaration on behalf of the bidder. I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct and that this declaration is executed on 2024, Date: * February 8, 2024 at City, State: Madera, CA Signature: Curtis Short (See Title 23 United States Code Section 112; Calif Public Contract Code Section 7106) Page 13 of 34 02/08/2024 *NOTE: Completing, signing, and returning the Non-Collusion Declaration is a required part of the Proposal. Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution. Page 14 of 34 02/08/2024 Public Contract Code - Proposal 6-7 Public Contract Code Section 10285.1 Statement - Proposal 6 In conformance with Public Contract Code Section 10285.1 (Chapter 376, Stats. 1985), the bidder hereby declares under penalty of perjury under the laws of the State of California that the bidder Choose an option: * Has not been convicted within the preceding three years of any offenses referred to in that section, including any charge of fraud, bribery, collusion, conspiracy, or any other act in violation of any state or Federal antitrust law in connection with the bidding upon, award of, or performance of, any public works contract, as defined in Public Contract Code Section 1101, with any public entity, as defined in Public Contract Code Section 1100, including the Regents of the University of California or the Trustees of the California State University. The term "bidder" is understood to include any partner, member, officer, director, responsible managing officer, or responsible managing employee thereof, as referred to in Section 10285.1. The above Statement is part of the Bid. Signing this Bid on the signature portion thereof shall also constitute signature of this Statement. Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution. Public Contract Code Section 10162 Questionnaire - Proposal 7 In conformance with Public Contract Code Section 10162, the Bidder shall complete, under penalty of perjury, the following questionnaire: Has the bidder, any officer of the bidder, or any employee of the bidder who has a proprietary interest in the bidder, ever been disqualified, removed, or otherwise prevented from bidding on, or completing a federal, state, or local government project because of a violation of law or a safety regulation? Choose an option: No If the answer is No, please type N/A. If the answer is Yes, explain the circumstances in the following space. N/A Public Contract Code Section 10232 Statement - Proposal 7 Page 15 of 34 02/08/2024 In conformance with Public Contract Code Section 10232, the Contractor hereby states under penalty of perjury, that no more than one final unappealable finding of contempt of court by a federal court has been issued against the Contractor within the immediately preceding two-years period because of the Contractor's failure to comply with an order of the National Labor Relations Board. Note: The above Statement and Questionnaire are part of the Bid. Signing this Bid on the signature portion thereof shall also constitute signature of this Statement and Questionnaire. Bidders are cautioned that making a false certification may subject the certifier to criminal prosecution. Page 16 of 34 02/08/2024 Subcontractors - Proposal 8(a) The following named subcontractor(s) will perform with labor, or otherwise render services to the general contractor in or about the construction of the work or improvement in an amount in excess of one-half of one percent of the total bid presented herewith. Please fill out as completely as possible when submitting your bid. Use subcontractor's business name style as registered with the License Board. Submission of subcontractor's name, location of business and description of work, California contractor's license number and public works contractor registration number issued pursuant to Section 1725.5 of the Labor Code, all are REQUIRED, by Section 4104 of the California Public Contract Code, to be submitted prior to bid opening. (The "location of business" must specify the city in which the subcontractor's business is located, and the state if other than California.) All other requested information shall be submitted, either with the bid or within 24 hours after bid opening. Please fill out as completely as possible when submitting your bid. Use subcontractor's business name style as registered with the License Board. FAILURE TO LIST SUBCONTRACTORS AS DIRECTED MAY RENDER THE BID NON-RESPONSIVE, OR MAY RESULT IN ASSESSMENT OF A PENALTY AGAINST THE BIDDER IN ACCORDANCE WITH SECTION 4110 OF THE CALIFORNIA PUBLIC CONTRACT CODE. Subcontractor: To add more subcontractor listings, click the "+" to add additional fields. Subcontractor: CVE Demolition Business Address 35500 South Welty Road, Vernalis, CA 95385 Class A, B, C21, C22 License No. 905631 DIR Registration No. 1000008301 Item No. or Description of Work demolition Dollar Amount: OR Percentage of Total Bid: 1% Email Address: chuckj@cvecorp.com Page 17 of 34 02/08/2024 Subcontractor: To add more subcontractor listings, click the "+" to add additional fields. 1 Subcontractor: * T&T Pavement Markings Business Address 3276 W. Sussex Way Class C 32 License No. 687921 DIR Registration No. 1000046338 Item No. or Description of Work Striping & Signs Dollar Amount: OR Percentage of Total Bid: 2% Email Address: tandtpavemark@gmail.com Subcontractor: To add more subcontractor listings, click the "+" to add additional fields. 2 Subcontractor: * Bill Nelson General Engineering Construction Business Address * 1099 E. Champlain Dr., Fresno, CA 93720 Class A License No. 692068 Page 18 of 34 02/08/2024 DIR Registration No. 1000003438 Item No. or Description of Work Underground Dollar Amount: OR Percentage of Total Bid: 3% Email Address: stacy@bngec.us Subcontractor: To add more subcontractor listings, click the "+" to add additional fields. 3 Subcontractor: C3 Electric Business Address 1770 E. Fallbrook, Fresno, CA 93720 Class C10 License No. 1076101 DIR Registration No. 1000773453 Item No. or Description of Work Electrical Dollar Amount: OR Percentage of Total Bid: 21% Email Address: estimating@c3electric.com Page 19 of 34 02/08/2024 Subcontractor: To add more subcontractor listings, click the "+" to add additional fields. 4 Subcontractor: * Statewide Safety Systems Business Address * 3049 S. Golden State Frontage Road, Fresno, CA 93725 Class A, C31, C32, C-61 License No. 975518 DIR Registration No. 1000001109 Item No. or Description of Work Traffic Control Dollar Amount: OR Percentage of Total Bid: 1% Email Address: dperkins@statewidess.com Page 20 of 34 02/08/2024 Subcontractors - Proposal 8(b) Optional: Vendor is not required to complete. Subcontractor: To add more subcontractor listings, click the "+" to add additional fields. Subcontractor: No bid Business Address No bid Class No bid License No. No bid DIR Registration No. No bid Item No. or Description of Work No bid Dollar Amount: OR Percentage of Total Bid: No bid No bid Email Address: No bid Page 21 of 34 02/08/2024 Subcontractors - Proposal 8(c) Optional: Vendor is not required to complete. Subcontractor: To add more subcontractor listings, click the "+" to add additional fields. Subcontractor: No bid Business Address No bid Class No bid License No. No bid DIR Registration No. No bid Item No. or Description of Work No bid Dollar Amount: OR Percentage of Total Bid: No bid No bid Email Address: No bid Page 22 of 34 02/08/2024 Certification With Regard To The Performance Of Previous Contracts Or Subcontracts Subject To The Equal Opportunity Clause And The Filing Of Required Reports - Proposal 9 The bidder or proposed subcontractor hereby certifies that they Please choose an option below have participated in a previous contract or subcontract subject to the equal opportunity clause, as required by Executive Orders 10925, 11114, or 11246, and that they Please select an option below have filed with the Joint Reporting Committee, the Director of the Office of Federal Contract Compliance, a Federal Government contracting or administering agency, or the former President's Committee on Equal Employment Opportunity, all reports due under the applicable filing requirements. Company * Avison Construction, Inc. By: * Curtis Short Title * President Date * February 8, 2024 NOTE: The above certification is required by the Equal Employment Opportunity Regulations of the Secretary of Labor (41 CFR 60-1.7(b) (1), and must be submitted by bidders and proposed subcontractors only in connection with contracts and subcontracts which are subject to the equal opportunity clause. Contracts and subcontracts which are exempt from the equal opportunity clause are set forth in 41 CFR 60-1.5. (Generally only contracts or subcontracts of $10,000 or under are exempt.) Currently, Standard Form 100 (EEO-1) is the only report required by the Executive Orders or their implementing regulations. Currently, Standard Form 100 (EEO-1) is the only report required by the Executive Orders or their implementing regulations. Proposed prime contractors and subcontractors who have participated in a previous contract or subcontract subject to the Executive Orders and have not filed the required reports should note that 41 CFR 60-1.7(b) (1) prevents the award of contracts Page 23 of 34 02/08/2024 and subcontracts unless such contractor submits a report covering the delinquent period or such other period specified by the Director, Office of Federal Contract Compliance, U. S. Department of Labor. Page 24 of 34 02/08/2024 Title 49, Code Of Federal Regulations, Part 29 - Debarment And Suspension Certification - Proposal 10 The bidder or proposed subcontractor under penalty of perjury, certifies that, except as noted below, he/she or any person associated therewith in the capacity of owner, partner, director, officer, manager: is not currently under suspension, debarment, voluntary exclusion, or determination of ineligibility by any federal agency; has not been suspended, debarred, voluntarily excluded or determined ineligible by any federal agency within the past 3 years; does not have a proposed debarment pending; and has not been indicted, convicted, or had a civil judgment rendered against it by a court of competent jurisdiction in any matter involving fraud or official misconduct within the past 3 years. If no exceptions enter "No Exceptions." If there are any exceptions to this certification, insert the exceptions in the following space: No Exceptions Exceptions will not necessarily result in denial of award, but will be considered in determining bidder responsibility. For any exception noted above, indicate below to whom it applies, initiating agency, and dates of action: Note: Providing false information may result in criminal prosecution or administrative sanctions. The above certification is part of the Proposal. Signing the Proposal on the signature portion thereof shall also constitute signature of this Certification. Page 25 of 34 02/08/2024 By my signature on this proposal, I certify, under penalty of perjury under the laws of the State of California and the United States of America, that the Title 23 United States Code, Section 112 Non-Collusion Declaration and the Title 49 Code of Federal Regulations, Part 29 Debarment and Suspension Certification are true and correct. Company * Avison Construction, Inc. By * Curtis Short Date * February 8, 2024 Title * President Page 26 of 34 02/08/2024 Nonlobbying Certification For Federal-Aid Contracts - Proposal 11 The prospective participant certifies, by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that:(1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with awarding of any cooperative agreement, and the extension, continuation, renewal, amendment, or INSTALLATION of any Federal contract, grant, loan, or cooperative agreement. (2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer of any Federal agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, "Disclosure of Lobbying Activities," in accordance with its instructions. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by Section 1352, Title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure. The prospective participant also agrees by submitting his or her bid or proposal that he or she shall require that the language of this certification be included in all lower tier subcontracts, which exceed $100,000 and that all such subrecipients shall certify and disclose accordingly. Bidder * Avison Construction, Inc. By * Curtis Short Date * February 8, 2024 Title * President Page 27 of 34 02/08/2024 Disclosure of Lobbying, DBE Forms, and Bidders List of Subcontractors - Proposal 12-15 OMB 0348-0046 Disclosure of Lobbying Activities - Proposal 12 (223 KB) Disclosure of Lobbying Activities Exhibit 15G Constructions Contract DBE Commitment - Proposal 13 (2.76 MB) LAPM Exhibit 15-G Construction Contract DBE Commitment Form Exhibit 15H Proposer Contractor Good Faith Efforts - Proposal 14 (730 KB) LAPM Exhibit 15-H DBE Information - Good Faith Effort Exhibit 12B Bidder's List of Subcontractors - Proposal 15 (564 KB) LAPM Exhibit 12-B Bidder's List of Subcontractors Page 28 of 34 02/08/2024 Opt Out of Payment Adjustments for Price Index Fluctuations - Proposal 16 Optional: Vendor is not required to complete. You may opt out of the payment adjustments for price index fluctuations as specified in Section 2-1.31, "OPT OUT OF PAYMENT ADJUSTMENTS FOR PRICE INDEX FLUCTUATIONS," of the special provisions. You can only elect to opt out of payment adjustments for price index fluctuations of if you complete this form and submit it with your bid. The individual signing this form must be duly authorized to sign a bid. By signing this form. I hereby opt out of the payment adjustments for price index fluctuations for the above-named rp oiect. Bidder: Avison Construction, Inc. Name (Printed): Curtis Short Signature: Curtis Short Title: * President Page 29 of 34 02/08/2024 (This guaranty shall be executed by the successful bidder in accordance with instructions in the special provisions. The bidder may execute the guaranty on this page at the time of submitting his bid.) GUARANTY To the Owner: County of Fresno CONTRACT NUMBER: 23-04-C The undersigned guarantees the construction and installation of the following work included in this project: ALL WORK Should any of the materials or equipment prove defective or should the work as a whole prove defective, due to faulty workmanship, material furnished or methods of installation, or should the work or any part thereof fail to operate properly as originally intended and in accordance with the plans and specifications, due to any of the above causes, all within twelve (12) months after date on which this contract is accepted by the Owner, the undersigned agrees to reimburse the Owner, upon demand, for its expenses incurred in restoring said work to the condition contemplated in said project, including the cost of any such equipment or materials replaced and the cost of removing and replacing any other work necessary to make such replacement or repairs, or, upon demand by the Owner, to replace any such material and to repair said work completely without cost to the Owner so that said work will function successfully as originally contemplated. The Owner shall have the unqualified option to make any needed replacement or repairs itself or to have such replacements or repairs done by the undersigned. In the event the Owner elects to have said work performed by the undersigned, the undersigned agrees that the repairs shall be made and such materials as are necessary shall be furnished and installed within a reasonable time after the receipt of demand from the Owner. Name (Printed): Curtis Short Signature: _gzv� Title: President Date: 4/18/2024 Contractor: Avison Construction, Inc. Proposal — 17 Contract Number 23-04-C California Code of Regulations: General Requirements for In-Use Off-Road Diesel-Fueled Fleets - Proposal 18 In conformance with Title 13 § 2449(i), bidders will be required to attach copies of valid Certificates of Reported Compliance for the fleet selected for the contract and their listed subcontractors. Between March 1 and June 1 of each year, a prime contractor must collect new valid Certificates of Reported Compliance for the current compliance year, as defined in section 2449(n), from all fleets that have an ongoing contract with the prime contractor as of March 1 of that year. Prime contractors must not write contracts to evade this requirement. Annual renewals must be provided to the Resident Engineer at least one week prior to the expiration date of the current certificate. https://ww2.arb.ca.gov/resources/fact-sheets/fact-sheet-contracting-requirements Choose one: Bidder's Certificate of Reported Compliance has been attached to the bid and listed subcontractors' certificates, where subject to this regulation, have been attached or will be submitted within five (5) calendar days of the bid opening. Bidder and listed subcontractors do not have a fleet subject to this regulation as outlined in Section 2449(i)(1)- (4). Page 32 of 34 02/08/2024 t a California Environmental Protection Agency Air Resources Board March 1, 2023 - CERTIFICATE OF REPORTED COMPLIANCE / IN-USE OFF-ROAD DIESEL-FUELED FLEETS REGULATION is issued to AVISON CONSTRUCTION,INC. This certificate indicates that the fleet listed above has reported off-road diesel vehicles to the California Air Resources Board and has certified they are in compliance with title 13 CCR, / section 2449. All applicable vehicles owned by the individual,company, or agency must be reported and labeled, as specified in Section 2449,with all possible completeness,else this certificate is null and void. Certificate expires 2/29/2024 Off-road Diesel Fleet Identification 3223 Sydney Vergis Chief,Mobile Source Control Division To verify the authenticity of this certificate,enter this number at California Air Resources Board http://www.arb.ca.gov/doors/compliance_certl.html ry Required Documents Name Omission Terms Submitted File I am not Exhibit 10Q Disclosure of Lobbying Activites - enclosing this Proposal 12 document Complete this form to disclose lobbying activities Submit disclosure if needed. because the pursuant to 31 U.S.C. 1352 omission terms have been met. I am not Exhibit 15-G Construction Contract DBE enclosing this Commitment - Proposal 13 Due by 4pm on the 5th calendar day after bid document Local Assistance Procedures Manual Exhibit because the 15-G Construction Contract DBE Commitment opening. omission terms Form have been met. I am not Exhibit 15-H Proposer/Contractor Good Faith enclosing this Effort - Proposal 14 If DBE Goal not met, submit with 15-G by 4pm document Local Assistance Procedures Manual Exhibit on the 5th calendar day after bid opening. because the 15-H DBE Information - Good Faith Effort omission terms have been met. I am not Exihibt 12B Bidder's List of Subcontractors - enclosing this Proposal 15 Due by 4pm on the 5th calendar day after bid document Local Assistance Procedures Manual Exhibit opening unless no subcontractors are listed on because the 12-B Bidder's List of Subcontractors bid. omission terms have been met. CARB Certification of Reported Compliance - Bidder Does not have a fleet subject to this regulation. CARB AVISON Valid CARB Certification of Reported Compliance 240229.pdf - Bidder I am not CARB Certification(s) of Reported Compliance - enclosing this Subcontractors Due by 4pm on the 5th calendar day after bid document Valid CARB Certification(s) of Reported opening or no listed subcontractors have a fleet because the Compliance - Subcontractors subject to this regulation. omission terms have been met. 6 Required Documents Page 33 of 34 02/08/2024 Additional Documents (Use if needed) Name Omission Terms Submitted File Optional: Vendor is not required to complete. Not Required Extra Space if needed Extra space not needed No bid Not Required Extra space not needed No bid Extra Space if needed Not Required Extra space not needed No bid Extra Space if needed 3 Required Documents Page 34 of 34 02/08/2024 Local Assistance Procedures Manual Exhibit 15-G Construction Contract DBE Commitment EXHIBIT 15-G CONSTRUCTION CONTRACT DBE COMMITMENT Supplemental Work items should be excluded from your Construction Contract DBE Commitment calculation. 1. Local Agency: County of Fresno 2.Contract DBE Goal: 22% 3. Project Description: Fowler Ave&Olive Ave Intersection Improvements 4. Project Location: Fresno,CA 5. Bidder's Name: Avison Construction,Inc. 6. Prime Certified DBE: ❑ 7. Bid Amount: $ 2,529,711.00 8.Total Dollar Amount for ALL Subcontractors: $ 719,635.00 9.Total Number of ALL Subcontractors: 5 10. Bid 12. DBE 14. DBE Item 11. Description of Work,Service,or Materials Certification 13. DBE Contact Information Dollar Number Supplied Number (Must be certified on the date bids are opened) Amount 22,23,27 Oflhaul roadway ex,Haul AB,Haul HMA 50607 Donald Miranda Trucking PO Box 12565,Fresno,CA 93776 $275,225.00 28,29,31 Local Agency to Complete this Section upon Execution of Award 21. Local Agency Contract Number: 23-04-C $ 275,225.00 15.TOTAL CLAIMED DBE PARTICIPATION 22. Federal-Aid Project Number: CML-5942(293) % 23. Bid Opening Date: February 8, 2024 24.Contract Award Date: March 19, 2024 IMPORTANT: Identify all DBE firms being claimed for credit, 25.Award Amount: $2 529,711.00 regardless of tier. Names of the First Tier DBE Subcontractors and their respective item(s)of work listed above must be consistent, where applicable with the names and items of the work in the Local Agency certifies that all DBE certifications are valid and information on "Subcontractor List"submitted with your bid.Written confirmation of this form is complete and accurate. each listed DAE i it Saga& M&&ks- 3/18/2024 02/09/2024 26. Local Agency Representative's Signature 27. Date 16. Preparer's Signature 17. Date Sarah Meeks (559) 767-1602 Curtis Short 559.431.0317 28. Local Agency Representative's Name 29. Phone 18. Preparer's Name 19. Phone Engineering Technician President 30. Local Agency Representative's Title 20.Preparer's Title DISTRIBUTION: 1.Original-Local Agency 2. Copy-Caltrans District Local Assistance Engineer(DLAE). Failure to submit to DLAE within 30 days of contract execution may result in de-obligation of federal funds on contract. 3. Include additional copy with award package. LPP 18-01 Page 1 of 3 January 2019 Proposal 13(a) Local Assistance Procedures Manual Exhibit 15-H Proposer/Contractor Good Faith Effort EXHIBIT 15-H: PROPOSER/CONTRACTOR GOOD FAITH EFFORTS Cost Proposal Due Date 02/08/2024 PE/CE Federal-aid Project No(s).CML-5942 (293) Bid Opening Date 02/08/2024 CON The County of Fresno established a Disadvantaged Business Enterprise (DBE)goal of _22% for this contract. The information provided herein shows the required good faith efforts to meet or exceed the DBE contract goal. Proposers or bidders submit the following information to document their good faith efforts within five (5) calendar days from cost proposal due date or bid opening. Proposers and bidders are recommended to submit the following information even if the Exhibit 10-01: Consultant Proposal DBE Commitments or Exhibit 15-G: Construction Contract DBE Commitment indicate that the proposer or bidder has met the DBE goal. This form protects the proposer's or bidder's eligibility for award of the contract if the administering agency determines that the bidder failed to meet the goal for various reasons, e.g., a DBE firm was not certified at bid opening, or the bidder made a mathematical error. The following items are listed in the Section entitled "Submission of DBE Commitment"of the Special Provisions, please attach additional sheets as needed: A. The names and dates of each publication in which a request for DBE participation for this project was placed by the bidder(please attach copies of advertisements or proofs of publication): Publications Dates of Advertisement DBE Good Faith (DBE Goodfaith.com) - Focus Ad Journal 01/10/2024 DBE Good Faith (DBE Goodfaith.com) -Trade Ad Journal 01/10/2024 X & Lindkedln 01/10/2024 B. The names and dates of written notices sent to certified DBEs soliciting bids for this project and the dates and methods used for following up initial solicitations to determine with certainty whether the DBEs were interested (please attach copies of solicitations, telephone records, fax confirmations, etc.): Names of DBEs Solicited Date of Initial Solicitation Follow Up Methods and Dates See Attached Log Proposal 14(a) Page 1 of 3 May 2020 Local Assistance Procedures Manual Exhibit 15-H Proposer/Contractor Good Faith Effort C. The items of work made available to DBE firms including those unbundled contract work items into economically feasible units to facilitate DBE participation. It is the bidder's responsibility to demonstrate that sufficient work to facilitate DBE participation in order to meet or exceed the DBE contract goal. Items of Proposer or Bidder Breakdown of Amount Percentage Work Normally Performs Item Items ($) Of (Y/N) Contract See Attachment B Pick 0.00% Pick 0.00% Pick 0.00% Pick 0.00% D. The names, addresses and phone numbers of rejected DBE firms, the reasons for the bidder's rejection of the DBEs, the firms selected for that work (please attach copies of quotes from the firms involved), and the price difference for each DBE if the selected firm is not a DBE: Names, addresses and phone numbers of rejected DBEs and the reasons for the bidder's rejection of the DBEs: no DBEs were rejected Names, addresses and phone numbers of firms selected for the work above: E. Efforts (e.g. in advertisements and solicitations) made to assist interested DBEs in obtaining information related to the plans, specifications and requirements for the work which was provided to DBEs: Avison Construction offered assistance to potential firms with any technical assistance or information related to the plans, specifications, and requirements for the work for which was provided through our advertisements or any phone calls/emails we received. Proposal 14(b) Page 2 of 3 May 2020 Local Assistance Procedures Manual Exhibit 15-H Proposer/Contractor Good Faith Effort F. Efforts (e.g. in advertisements and solicitations) made to assist interested DBEs in obtaining bonding, lines of credit or insurance, necessary equipment, supplies, materials, or related assistance or services, excluding supplies and equipment the DBE subcontractor purchases or leases from the prime contractor or its affiliate: Avison Construction offered to assist firms in obtaining bonding, lines of credit or insurance, materials, supplies, equipment, related or any requirements for the work which was provided. G. The names of agencies, organizations or groups contacted to provide assistance in contacting, recruiting and using DBE firms (please attach copies of requests to agencies and any responses received, i.e., lists, Internet page download, etc.): Name of Agency/Organization Method/Date of Contact Results https://californiaucp.dbesystem.com H. Any additional data to support a demonstration of good faith efforts: Proposal 14(c) Page 3 of 3 May 2020 Local Assistance Procedures Manual Exhibit 12-B Bidder's List of Subcontractors(DBE and Non-DBE) Exhibit 12-B: Bidder's List of Subcontractor (DBE and Non-DBE) - Part 1 As of March 1, 2015 Contractors (and sub-contractors) wishing to bid on public works contracts must be registered with the State Division of Industrial Relations and certified to bid on Public Works contracts. Please register at https://www.dir.ca.gov/Public-Works/Contractor- Reg istratio n.html.The local agency will verify registration of all contractors and subcontractors on public works projects at bid and thereafter annually to assure that yearly registration is maintained throughout the life of the project. In accordance with Title 49,Section 26.11 of the Code of Federal Regulations,and Section 4104 of the Public Contract Code of the State of California, as amended,the following information is required for each sub-contractorwho will perform work amounting to more than one half of one percent(0.5%) of the Total Base Bid or$10,000(whichever is greater). FEDERAL PROJECT NUMBER: Photocopy this form for additional firms. CML-5942(293) Subcontractor Name&Location Line Item&Description Subcontract Percentage of Contractor License Number DBE DBE Cent Number Annual Gross Receipts Amount Bid Item (Y/N) Subcontracted DIR Reg Number NAME <$1 million Site Demolition $35,540 1.40% 905631 N CVE Demolition 11,12,13,15,16,17,19,20 <$< million ion city,state < million 1000008301 Vernalis,CA Age of Firm in years NAME <$1 million 2-Funding Signs $25,010 0.98% 975518 N <$5 million y 3-Road Closure <$10million state < million 1000001109 Fresno,CA Age of Firm in years < mi ion Electrical Work $522,883 20.66% 1076101 N C3 Electric 61-62 < 5 million < million City,State 1000773453 <$15 million Fresno,CA Age of Firm i n years NAME <$1 million Striping and Signs $52,306 2.06% 687921 N T&T Pavement Markings 46-60 < 5 million mi ion City,State 1000046338 <$15 million Fresno,CA Age of Firm n years NAME <$1 million Underground Work $83,896 3.31% 692068 N Bill Nelson GEC 10,14,18,24,35-37,42,43 <$5 million <$10 million City,State < mi on 1000003438 Fresno,CA Age of Firm in years NAME <$1 million < mi ion <$10 million City,State < million Age of Firm in years < million < million <$10 million City,State < million Age of Firm in years NAME < 1 million <$5 million <$10 million Uily, ae mi ion Age of Firm in years < million <$5 million <$10 million City,State <$15 million Age of Firm in years Distribution—Original:Local Agency File;Copy:DLAE w/Award Package Proposal 15(a) September 2021 Local Assistance Procedures Manual Exhibit 12-B Bidder's List of Subcontractors(DBE and Non-DBE) Exhibit 12-B: Bidder's List of Subcontractor (DBE and Non-DBE) - Part 2 In accordance with Title 49, Section 26 of the Code of Federal Regulation s,the Bidder shall list all subcontractors who provided a q uote or bid but were notselected to participate as a subcontractor on this project. FEDERAL PROJECT NUMBER: Photocopy this form for additional firms. Subcontractor Name&Location Line Item&Description Subcontract Percentage of Contractor License Number DBE DBE Cent Number Annual Gross Receipts Amount Bid Item (Y/N) Subcontracted DIR Reg Number NAME < million Underground Work 94,025 458977 N <$5 million Haydon Construction 10,14,18,24,35-37,42,43 <F10million City,State < mi ion 1000016950 Fresno,CA Age of Firm in years < million Electrical 61-62 665,100 99849 N <$5 million A-C Electric <$10 million y, ae mi ion 1000000365 Fresno,CA Age of Firm i n years NAME < 1 million Electrical61-62 838,700 1003811 N < mi ion St.Francis Electric <$10 million State < mi ion 1000022208 San Leandro,CA Age of Firm in years < million Electrical61-62 708,000 749098 N < mi ion Madco Electric <$10 million City,State 1000004211 <$15 million Selma,CA Age of Firm in years NAME <$1 million Striping&Signs 51,239 854894 N < 5 million Specialized Pavement Marking 46-60 < million City,State 1000886659 <$15 million Goshen,CA Age of Firm in years NAME <$1 million Striping&Signs 90,190 374600 N < 5 m ion Chrisp Co 46-60 $ ill < mi ion City,State 1000000306 <$15 million Stockton,CA Age of Firm in YEars NAME <$1 million < million <$10 million City,State < 15million Age of Firm in YEars NAME <$1 million ii <$10 million City,State <$15 million Age of Firm in YEars NAME <$1 million < mi ion < mi ion City,State < million Age of Firm in I years Distribution—Original:Local Agency File;Copy:DLAE w/Award Package Proposal 15(b) Page 2 of 2 September 2021 AGREEMENT THIS AGREEMENT made at Fresno, in Fresno County, California, by and between Avison Construction, Inc. hereinafter called the Contractor, and the County of Fresno hereinafter called the Owner. WITNESSETH: That the Contractor and the Owner, for the consideration hereinafter named, agree as follows: ARTICLE I. The Contractor agrees to furnish all labor and materials, including tools, implements, and appliances required, but excluding such materials as are mentioned in the specifications to be furnished by the Owner, and to perform all the work in a good and workmanlike manner, free from any and all liens and claims of mechanics, materialmen, teamsters, subcontractors, artisans, machinists, and laborers required for: FOWLER AVE & OLIVE AVE INTERSECTION IMPROVEMENTS FEDERAL PROJECT NUMBER: CML-5942(293) CONTRACT NUMBER: 23-04-C All in strict compliance with the plans, drawings and specifications therefor prepared by the Owner, and other contract documents relating thereto. ARTICLE II. The Contractor and the Owner agree that the Notice to Bidders and Special Provisions, the Wage Scale (Prevailing Wages), the Plans and Drawings, Addenda and Bulletins thereto, and the Proposal (Bid Book) hereto attached, together with this Agreement, form the contract, and they are as fully a part of the contract as if hereto attached or herein repeated. All portions of the Standard Specifications of the State of California, Department of Transportation, dated 2015, which are not in conflict with this contract shall be deemed a part of the specifications as though fully therein set forth; provided, however, that revisions to the said Standard Specifications shall apply only to the extent, if any, included in the Project Details of these specifications or as otherwise incorporated directly herein. No part of said specifications which is in conflict with any portion of this agreement, or which is not actually descriptive of the work to be done thereunder, or of the manner in which said work is to be executed, shall be considered as any part of this agreement, but shall be utterly null and void. ARTICLE III. The Owner agrees to pay the Contractor in current funds for the performance of the contract the sum of TWO MILLION FIVE HUNDRED TWENTY NINE THOUSAND SEVEN HUNDRED ELEVEN DOLLARS AND 00/100 ($2,529,711.00) it being understood that said price is based upon the estimated quantities of materials to be used as set forth in the Proposal, except where provisions are made in the contract documents whereby the estimated quantities shall constitute the final quantity; that upon completion of the project the final contract prices shall be revised by change order, if necessary, to reflect the true quantities used at the stated unit price thereof as contained in the Contractor's Proposal hereto attached. Payments on account thereof will be made as set forth in the special provisions. ARTICLE IV. If the Contractor should be adjudged a bankrupt, or if he or she should make a general assignment for the benefit of his or her creditors, or if a receiver should be appointed on account of his or her insolvency, or if he or she or any of his or her subcontractors should persistently violate any of the provisions of the contract, or if he or she should persistently or repeatedly refuse or should fail, except in cases for which extension of time is provided, to supply enough properly skilled workmen or proper materials, or if he or she should fail to make prompt payment to subcontractors or for material or labor, or persistently disregard laws, ordinances or the instructions of the Engineer, then the Owner may, Contract Number 23-04-C upon certificate of the Engineer when sufficient cause exists to justify such action, serve written notice upon the Contractor and his surety of its intention to terminate the contract, and unless within five days after the serving of such notice, such violations shall cease and satisfactory arrangements for correction thereof be made, the contract shall, upon the expiration of said five days, cease and terminate. In the event of any such termination, the Owner shall immediately serve written notice thereof upon the surety and the Contractor, and the surety shall have the right to take over and perform the contract, provided, however, that if the surety within ten (10) days after the serving upon it of notice of termination does not give the Owner written notice of its intention to take over and perform the contract or does not commence performance thereof within the ten (10) days stated above from the date of the serving of such notice, the Owner may take over the work and prosecute the same to completion by contract or by any other method it may deem advisable, for the account and at the expense of the Contractor, and the Contractor and his surety shall be liable to the Owner for any excess cost occasioned the Owner thereby, and in such event the Owner may without liability for so doing, take possession of and utilize in completing the work such materials, appliances, plant and other property belonging to the Contractor as may be on the site of the work and necessary therefor. In such case the Contractor shall not be entitled to receive any further payment until the work is finished. If the unpaid balance of the contract price shall exceed the expenses of finishing the work, including compensation for additional managerial and administrative services, such excess shall be paid to the Contractor. If such expense shall exceed such unpaid balance, the Contractor shall pay the difference to the Owner. The expense incurred by the Owner, as herein provided and damage incurred through the Contractor's default, shall be certified by the Engineer. ARTICLE V. To the fullest extent permitted by law with respect to any work required to be done under this contract, the Contractor will indemnify and hold harmless the COUNTY OF FRESNO, STATE OF CALIFORNIA, UNITED STATES OF AMERICA, CONSULTANTS and all other participating public agencies,whether or not said agencies are named herein,who have jurisdiction within the areas in which the work is to be performed, and all officers and employees of the Owner, the County, the State, the United States and said other participating agencies, from any and all costs and expenses, attorney fees and court costs, damages, liabilities, claims and losses occurring or resulting to COUNTY in connection with the performance, or failure to perform, by CONTRACTOR, its officers, agents or employees under this Agreement, and from any and all costs and expenses, attorney fees and court costs, damages, liabilities, claims and losses occurring or resulting to any person, firm or corporation who may be injured or damaged by the performance, or failure to perform, of CONTRACTOR, its officers, agents or employees under this Agreement. In addition, CONTRACTOR agrees to indemnify COUNTY for Federal, State of California and/or local audit exceptions resulting from non-compliance herein on the part of CONTRACTOR. CONTRACTOR agrees to indemnify, save, hold harmless, and at COUNTY'S request, defend the COUNTY, its officers, agents, and employees from any and all costs and expenses, damages, liabilities, claims, and losses occurring or resulting to COUNTY in connection with the performance, or failure to perform, by CONTRACTOR, its officers, agents, or employees under this Agreement, and from any and all costs and expenses, damages, liabilities, claims, and losses occurring or resulting to any person, firm, or corporation who may be injured or damaged by the performance, or failure to perform, of CONTRACTOR, its officers, agents, or employees under this Agreement. The Certificate of Insurance shall be issued in duplicate, to the COUNTY OF FRESNO, CITY OF FRESNO, FRESNO METROPOLITAN FLOOD CONTROL DISTRICT, and all other participating agencies, whether or not said agencies are named herein, who contribute to the cost of the work or have jurisdiction over areas in which the work is to be performed and all officers and employees of said agencies while acting within the course and scope of their duties and responsibilities. In the event CONTRACTOR fails to keep in effect at all times insurance coverage as herein provided, the COUNTY may, in addition to other remedies it may have, suspend or terminate this Agreement upon the occurrence of such event. Contract Number 23-04-C All policies shall be with admitted insurers licensed to do business in the State of California. Insurance purchased shall be purchased from companies possessing a current AM Best Company rating of A FSC VII or better. Without limiting the COUNTY'S right to obtain indemnification from CONTRACTOR or any third parties, CONTRACTOR, at its sole expense, shall maintain in full force and effect, the following insurance policies or a program of self-insurance, including but not limited to, an insurance pooling arrangement or Joint Powers Agreement (JPA) throughout the term of the Agreement: A. Commercial General Liability Commercial General Liability Insurance with limits not less than those shown in the following table: Liability Insurance Requirements Total bid For each Aggregate for products/completed General b Umbrella or c occurrencea operation aggregate excess liability <_ $1,000,000 $1,000,000 $2,000,000 $2,000,000 $5,000,000 > $1,000,000 <_ $10,000,000 $1,000,000 $2,000,000 $2,000,000 $10,000,000 > $10,000,000 $25,000,000 $2,000,000 $2,000,000 $4,000,000 $15,000,000 > $25,000,000 $2,000,000 $2,000,000 $4,000,000 $25,000,000 'Combined single limit for bodily injury and property damage. bThis limit must apply separately to your work under this Contract. °The umbrella or excess policy must contain a clause stating that it takes effect (drops down) in the event the primary limits are impaired or exhausted. This policy shall be issued on a per occurrence basis. COUNTY may require specific coverages including completed operations, products liability, contractual liability, Explosion-Collapse-Underground, fire legal liability, or any other liability insurance deemed necessary because of the of the nature of this contract. Such Commercial General Liability insurance shall name the County of Fresno, its officers, agents, and employees, individually and collectively, as additional insured, but only insofar as the operations under this Agreement are concerned. Such coverage for additional insured shall apply as primary insurance and any other insurance, or self-insurance, maintained by COUNTY, its officers, agents and employees shall be excess only and not contributing with insurance provided under CONTRACTOR's policies herein. This insurance shall not be cancelled or changed without a minimum of thirty (30)days advance written notice given to COUNTY. CONTRACTOR shall obtain endorsements to the Commercial General Liability insurance policy naming COUNTY as an additional insured and providing for a thirty (30) day prior written notice of cancellation or change in terms or coverage. Within eight (8) days from date CONTRACTOR executes this Agreement, CONTRACTOR shall provide certificates of insurance and endorsement as stated above for all of the foregoing policies, as required herein, to the County of Fresno, or to designservices(a)fresnocountyca.gov, stating that such insurance coverages have been obtained and are in full force; that the County of Fresno, its officers, agents and employees will not be responsible for an premiums on the policies; that such Commercial General Liability insurance names the County of Fresno, its officers, agents, and employees, individually and collectively, as additional insured, but only insofar as the operations under this Agreement are concerned; that such coverage for additional insured shall apply as primary insurance an any other insurance, or self- insurance shall not be cancelled or changed without a minimum of thirty (30) days advance, written notice given to COUNTY. Contract Number 23-04-C CONTRACTOR shall obtain endorsements to the Commercial General Liability insurance naming the County of Fresno, its officers, agents, and employees, individually and collectively, as additional insured, but only insofar as the operations under this Agreement are concerned. Such coverage for additional insured shall apply as primary insurance and any other insurance, or self-insurance, maintained by COUNTY, its officers, agents, and employees shall be excess only and not contributing with insurance provided under CONTRACTOR'S policies herein. This insurance shall not be cancelled or changed without a minimum or thirty (30) days advance written notice given to COUNTY. B. Automobile Liability Comprehensive Automobile Liability Insurance with limits of not less than One Million Dollars ($1,000,000) per accident for bodily injury and property damage. Coverage should include owned and non-owned vehicles used in connection with this Agreement and all applicable endorsements. C. Professional Liability If CONTRACTOR is a licensed professional or employs professional staff, (e.g., Architect, Engineer, Surveyor, etc.) in providing services, Professional Liability Insurance with limits of not less than One Million Dollars ($1,000,000.00) per occurrence, Three Million Dollars ($3,000,000.00) annual aggregate with a provision for 3 year tail coverage. D. Worker's Compensation A policy of Worker's Compensation insurance as may be required by the California Labor Code. ARTICLE VI. Contractor represents that he has secured the payment of Worker's Compensation in compliance with the provisions of the Labor Code of the State of California and during the performance of the work contemplated herein will continue so to comply with said provisions of said Code. Contractor shall supply the Owner with certificates of insurance, in duplicate, evidencing that Worker's Compensation Insurance is in effect and providing that the Owner will receive ten days notice of cancellation. If Contractor self-insures Worker's Compensation, Certificate of Consent to Self-insure should be provided the Owner. ARTICLE VII. The Contractor shall forthwith furnish in duplicate, a faithful performance bond in an amount equal to 100% of the contract price and a payment bond in an amount equal to 100% of the contract price, both bonds to be written by a surety company acceptable to the Owner and in the form prescribed by law. The payment bond shall contain provisions such that if the Contractor or his subcontractors shall fail to pay (a) amounts due under the Unemployment Insurance Code with respect to work performed under the contract, or (b) any amounts required to be deducted, withheld and paid over to the Employment Development Department and to the Franchise Tax Board from the wages of the employees of the Contractor and subcontractors pursuant to Section 13020 of the Unemployment Insurance Code with respect to such work and labor, then the surety will pay these amounts. In case suit is brought upon the payment bond, the surety will pay a reasonable attorney's fee to be fixed by the court. ARTICLE VIII. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Except as provided in Labor Code section 1725.5(f), no contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Except as provided in Labor Code section 1725.5(f), no contractor or subcontractor may be awarded a contract for public work on a public works project or engage in the performance of work on any public Contract Number 23-04-C works project unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. Contractor shall comply with all applicable laws and regulations relating to wages and employment, including all requirements imposed by the California Department of Industrial Relations (DIR). Contractor shall cooperate with County to furnish timely all information necessary for County's completion of the form required to be submitted by County when registering the Project on the DIR website; and County thereafter shall provide to Contractor the "Project ID Number" assigned by DIR in order to facilitate Contactor's submission to DIR of its certified payrolls for the Project, in the manner required and using such form as may be prescribed by DIR, in accordance with the provisions of Labor Code section 1771.4(a)(3). ARTICLE IX: Governing Law—Venue for any action arising out of or relating to this Agreement shall be in Fresno County, California. This Agreement shall be governed by the laws of the State of California. ARTICLE X: USE OF UNITED STATES FLAG VESSELS: The Contractor agrees: (1) To utilize privately owned United States-flag commercial vessels to ship at least 50 percent of the gross tonnage (computed separately for dry bulk carriers, dry cargo liners, and tankers) involved, whenever shipping any equipment. material, or commodities pursuant to this contract, to the extent such vessels are available at fair and reasonable rates for United States-flag commercial vessels. "(2) To furnish within 20 days following the date of loading for shipments originating within the United States or within 30 working days following the date of loading for shipments originating outside the United States. a legible copy of a rated, 'on-board' commercial ocean bill-of-lading in English for each shipment of cargo described in paragraph (1) of this section to both the Contracting Officer (through the prime contractor in the case of subcontractor bills-of-lading) and to the Division of National Cargo, Office of Market Development, Maritime Administration, Washington, DC 20590. "(3) To insert the substance of the provisions of this clause in all subcontracts issued pursuant to this contract. ARTICLE XI: REQUIRED CONTRACT PROVISIONS FOR FEDERAL-AID CONSTRUCTION CONTRACTS The provisions of the Exhibit 12-G Required Federal-Aid Contract Language including the provisions of Form FHWA 1273 is hereby physically attached, unmodified as a part of this contract (Exhibit A). The provisions of Form 1273 applies to federal-aid contracts and all work performed by subcontracts and subsequent lower-tier subcontracts and is required to be physically included in each executed contract. Form 1273 of Exhibit A must be physically inserted, unmodified in its entirety, into all subcontracts, except for purchase orders, rental agreements and other agreements for supplies or services entered into as a result of this contract. ARTICLE XII: MINIMUM FEDERAL WAGE RATES The Minimum Federal Wage Rates Determination is hereby physically attached, in conformance with federal 10-day rule as a part of this contract(Exhibit B). This wage rate determination applies to federal-aid contracts and all work performed exceeding $2000 by subcontracts and subsequent lower-tier subcontracts and is required to be physically included in each executed contract. Contract Number 23-04-C This Contract, 23-04-C, was awarded by the Board of Supervisors on March 19, 2024. It has been reviewed by the Department of Public Works and Planning and is in proper order for signature of the Chairman of the Board of Supervisors. IN WITNESS WHEREOF, they have executed this Agreement this 9th day of April , 2024 Avison Construction, Inc. COUNTY OF FRESNO (CONTRACTO ) (OWNER) By By Curtis Short Nathan Magsig, Chairman of the Board of Supervisors of the County of Fresno Title President ATTEST: Bernice E. Seidel Clerk of the Board of Supervisors County of Fresno, State of California By Deputy Contract Number 23-04-C Exhibit A Required Federal-Aid Contract Language From LAPM Exhibit 12-G REQUIRED FEDERAL-AID CONTRACT LANGUAGE (Based on the Local Assistance Procedures Manual Exhibit 12-G: For Local Assistance Construction Projects— November 2022) The following language must be incorporated into all Local Assistance Federal-aid construction contracts. The following language, with minor edits,was taken from the Code of Federal Regulations. MAINTAIN RECORDS AND SUBMIT REPORTS DOCUMENTING YOUR PERFORMANCE UNDER THIS SECTION TABLE OF CONTENTS REQUIRED FEDERAL-AID CONTRACT LANGUAGE................................................................................................1 MAINTAIN RECORDS AND SUBMIT REPORTS DOCUMENTING YOUR PERFORMANCE UNDER THIS SECTION ................................................................................................................................................................1 1. DISADVANTAGED BUSINESS ENTERPRISES (DBE) ........................................................................................2 A. Nondiscrimination Statement.................................................................................................................3 B. Contract Assurance.................................................................................................................................3 C. Prompt Progress Payment......................................................................................................................3 D. Prompt Payment of Withheld Funds to Subcontractors.......................................................................3 E. Termination and Substitution of DBE Subcontractors.........................................................................4 F. Commitment and Utilization...................................................................................................................5 G. DBE RUNNING TALLY OF ATTAINMENTS.............................................................................................5 2. BID OPENING ........................................................................................................................................................6 3. BID RIGGING.........................................................................................................................................................6 4. CONTRACT AWARD.............................................................................................................................................6 5. CONTRACTOR LICENSE......................................................................................................................................6 6. CHANGED CONDITIONS.......................................................................................................................................6 A. Differing Site Conditions.........................................................................................................................6 B. Suspensions of Work Ordered by the Engineer....................................................................................6 C. Significant Changes in the Character of Work......................................................................................7 7. BEGINNING OF WORK, TIME OF COMPLETION AND LIQUIDATED DAMAGES............................................7 8. BUY AMERICA.......................................................................................................................................................7 9. QUALITY ASSURANCE.........................................................................................................................................8 10. PROMPT PAYMENT FROM THE AGENCY TO THE CONTRACTORS...............................................................8 11. FORM FHWA-1273 REQUIRED CONTRACT PROVISIONS FEDERAL-AID CONTRACTS................................8 REQUIRED CONTRACT PROVISIONS FEDERAL-AID CONSTRUCTION CONTRACTS .......................................9 12. FEMALE AND MINORITY GOALS ......................................................................................................................21 13. TITLE VI ASSURANCES......................................................................................................................................22 14. FEDERAL TRAINEE PROGRAM.........................................................................................................................25 15. PROHIBITION OF CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE EQUIPMENT AND SERVICES............................................................................................................................................................26 Page 1 of 26 February 2023 Required Federal-Aid Contract Language From LAPM Exhibit 12-G 1. DISADVANTAGED BUSINESS ENTERPRISES (DBE) The contractor, subrecipient or subcontractor shall take necessary and reasonable steps to ensure that DBEs have opportunity to participate in the contract(49 CFR 26). To ensure equal participation of DBEs provided in 49 CFR 26.5, the Agency (County of Fresno Department of Public Works and Planning) shows a contract goal for DBEs. The prime contractor shall make work available to DBEs and select work parts consistent with available DBE subcontractors and suppliers. The prime contractor shall meet the DBE goal shown elsewhere in these special provisions or demonstrate that they made adequate good faith efforts to meet this goal. It is the prime contractor's responsibility to verify that the DBE firm is certified as a DBE on the date of bid opening by using the California Unified Certification Program (CUCP)database and possesses the most specific available North American Industry Classification System (NAICS)codes and Work Code applicable to the type of work the firm will perform on the contract. Additionally, the prime contractor is responsible to document this verification by printing out the CUCP data for each DBE firm. A list of DBEs certified by the CUCP can be found at: https://dot.ca.gov/programs/civil-rights/dbe-search. All DBE participation will count toward the California Department of Transportation's federally mandated statewide overall DBE goal. Credit for materials or supplies the prime contractor purchases from DBEs counts towards the goal in the following manner: • 100 percent counts if the materials or supplies are obtained from a DBE manufacturer. • 60 percent counts if the materials or supplies are obtained from a DBE regular dealer. • Only fees, commissions, and charges for assistance in the procurement and delivery of materials or supplies count if obtained from a DBE that is neither a manufacturer nor regular dealer. 49 CFR 26.55 defines"manufacturer"and "regular dealer." The prime contractor receives credit towards the goal if they employ a DBE trucking company that performs a commercially useful function as defined in 49 CFR 26.55(d) as follows: • The DBE must be responsible for the management and supervision of the entire trucking operation for which it is responsible on a particular contract, and there cannot be a contrived arrangement for the purpose of meeting DBE goals. • The DBE must itself own and operate at least one fully licensed, insured, and operational truck used on the contract. • The DBE receives credit for the total value of the transportation services it provides on the Contract using trucks it owns, insures, and operates using drivers it employs. • The DBE may lease trucks from another DBE firm, including an owner-operator who is certified as a DBE. The DBE who leases trucks from another DBE receives credit for the total value of the transportation services the lessee DBE provides on the Contract. • The DBE may also lease trucks from a non-DBE firm, including from an owner-operator. The DBE that leases trucks equipped with drivers from a non-DBE is entitled to credit for the total value of transportation services provided by non-DBE leased trucks equipped with drivers not to exceed the value of transportation services on the contract provided by DBE-owned trucks or leased trucks with DBE employee drivers. Additional participation by non-DBE owned trucks equipped with drivers receives credit only for the fee or commission it receives as a result of the lease arrangement. • The DBE may lease trucks without drivers from a non-DBE truck leasing company. If the DBE leases trucks from a non-DBE truck leasing company and uses its own employees as drivers, it is entitled to credit for the total value of these hauling services. • A lease must indicate that the DBE has exclusive use of and control over the truck. This does not preclude the leased truck from working for others during the term of the lease with the consent of the DBE, so long as the lease gives the DBE absolute priority for use of the leased truck. Leased trucks must display the name and identification number of the DBE. Page 2 of 26 February 2023 Required Federal-Aid Contract Language From LAPM Exhibit 12-G A. Nondiscrimination Statement The contractor, subrecipient or subcontractor will never exclude any person from participation in, deny any person the benefits of, or otherwise discriminate against anyone in connection with the award and performance of any contract covered by 49 CFR 26 on the basis of race, color, sex, or national origin. In administering the Local Agency (County of Fresno Department of Public Works and Planning) components of the DBE Program Plan, the contractor, subrecipient or subcontractor will not, directly, or through contractual or other arrangements, use criteria or methods of administration that have the effect of defeating or substantially impairing accomplishment of the objectives of the DBE Program Plan with respect to individuals of a particular race, color, sex, or national origin. B. Contract Assurance Under 49 CFR 26.13(b): The contractor, subrecipient or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The contractor shall carry out applicable requirements of 49 CFR 26 in the award and administration of federal-aid contracts. Failure by the contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as the recipient deems appropriate, which may include, but is not limited to: (1) Withholding monthly progress payments; (2) Assessing sanctions; (3) Liquidated damages; and/or (4) Disqualifying the contractor from future bidding as non-responsible. C. Prompt Progress Payment The prime contractor or subcontractor shall pay to any subcontractor, not later than seven days after receipt of each progress payment, unless otherwise agreed to in writing, the respective amounts allowed the contractor on account of the work performed by the subcontractors, to the extent of each subcontractor's interest therein. In the event that there is a good faith dispute over all or any portion of the amount due on a progress payment from the prime contractor or subcontractor to a subcontractor, the prime contractor or subcontractor may withhold no more than 150 percent of the disputed amount. Any violation of this requirement shall constitute a cause for disciplinary action and shall subject the licensee to a penalty, payable to the subcontractor, of 2 percent of the amount due per month for every month that payment is not made. In any action for the collection of funds wrongfully withheld, the prevailing party shall be entitled to his or her attorney's fees and costs. The sanctions authorized under this requirement shall be separate from, and in addition to, all other remedies, either civil, administrative, or criminal. This clause applies to both DBE and non- DBE subcontractors. D. Prompt Payment of Withheld Funds to Subcontractors The Agency may hold retainage from the prime contractor and shall make prompt and regular incremental acceptances of portions, as determined by the Agency, of the contract work, and pay retainage to the prime contractor based on these acceptances. The Agency shall designate one of the methods below in the contract to ensure prompt and full payment of any retainage kept by the prime contractor or subcontractor to a subcontractor. The Agency shall include either Method 1, Method 2, or Method 3 below and delete the other two. Method 3: The Agency shall hold retainage from the prime contractor and shall make prompt and regular incremental acceptances of portions, as determined by the Agency of the contract work and pay retainage to the prime contractor based on these acceptances. The prime contractor or subcontractor shall return all monies withheld in retention from all subcontractors within seven (7)days after receiving payment for work satisfactorily completed and accepted including incremental acceptances of portions of the contract work by the Agency. Any delay or postponement of payment may take place only for good cause and with the Agency's prior written approval. Any violation of these provisions shall subject the violating prime contractor or subcontractor to the penalties, sanctions, and other remedies specified in Section 7108.5 of the California Business and Professions Code and Section 10262 of the California Public Contract Code. This requirement shall not be construed to limit or impair any contractual, administrative or judicial remedies otherwise available to the contractor or subcontractor in the event of a dispute involving late payment or nonpayment by the contractor; deficient Page 3 of 26 February 2023 Required Federal-Aid Contract Language From LAPM Exhibit 12-G subcontractor performance and/or noncompliance by a subcontractor. This clause applies to both DBE and non- DBE subcontractors. Any violation of these provisions of Prompt Progress Payment and Prompt Payment of Withheld Funds to Subcontractors shall subject the violating prime contractor or subcontractor to the penalties, sanctions and other remedies specified therein. These requirements shall not be construed to limit or impair any contractual, administrative, or judicial remedies otherwise available to the prime contractor or subcontractor in the event of a dispute involving late payment or nonpayment by the prime contractor, deficient subcontract performance, or noncompliance by a subcontractor. E. Termination and Substitution of DBE Subcontractors The prime contractor shall utilize the specific DBEs listed to perform the work and supply the materials for which each is listed unless the contractor obtains the Agency's written consent. The prime contractor shall not terminate or substitute a listed DBE for convenience and perform the work with their own forces or obtain materials from other sources without prior written authorization from the Agency. Unless the Agency's prior written consent is provided, the contractor shall not be entitled to any payment for work or material unless it is performed or supplied by the listed DBE on the Exhibit 15-G Construction Contract DBE Commitment form, included in the Bid. The Agency authorizes a request to use other forces or sources of materials if the bidder shows any of the following justifications: 1. Listed DBE fails or refuses to execute a written contract based on plans and specifications for the project. 2. The Local Agency stipulated that a bond is a condition of executing the subcontract and the listed DBE fails to meet the Local Agency's bond requirements. 3. Work requires a contractor's license and listed DBE does not have a valid license under Contractors License Law. 4. Listed DBE fails or refuses to perform the work or furnish the listed materials (failing or refusing to perform is not an allowable reason to remove a DBE if the failure or refusal is a result of bad faith or discrimination). 5. Listed DBE's work is unsatisfactory and not in compliance with the contract. 6. Listed DBE is ineligible to work on the project because of suspension or debarment. 7. Listed DBE becomes bankrupt or insolvent. 8. Listed DBE voluntarily withdraws with written notice from the Contract 9. Listed DBE is ineligible to receive credit for the type of work required. 10. Listed DBE owner dies or becomes disabled resulting in the inability to perform the work on the Contract. 11. The Agency determines other documented good cause. The prime contractor shall notify the original DBE of the intent to use other forces or material sources and provide the reasons, allowing the DBE 5 days to respond to the notice and advise the prime contractor and the Agency of the reasons why the use of other forces or sources of materials should not occur. The prime contractor's request to use other forces or material sources must include: 1. One or more of the reasons listed in the preceding paragraph. 2. Notices from the prime contractor to the DBE regarding the request. 3. Notices from the DBEs to the prime contractor regarding the request. If the Agency authorizes the termination or substitution of a listed DBE, the prime contractor must make good faith efforts to find another DBE to substitute for the original DBE. The substitute DBE must(1) perform at least the same amount of work as the original DBE under the contract to the extent needed to meet or exceed the DBE goal, and (2) be certified as a DBE with the most specific available NAICS codes and work codes applicable to the type of work the DBE will perform on the contract at the time of the prime contractor's request Page 4 of 26 February 2023 Required Federal-Aid Contract Language From LAPM Exhibit 12-G for substitution. The prime contractor shall submit their documentation of good faith efforts within 7 days of their request for authorization of the substitution. The Agency may authorize a 7-day extension of this submittal period at the prime contractor's request. More guidance can be found at 49 CFR 26 app A regarding evaluation of good faith efforts to meet the DBE goal. F. Commitment and Utilization Note: In the Agency's reports of DBE participation to Caltrans, the Agency must display both commitments and attainments. The Agency's DBE program must include a monitoring and enforcement mechanism to ensure that DBE commitments reconcile to DBE utilization. The bidder shall submit the Exhibit 15-G Construction Contract DBE Commitment, included in the Bid book. This exhibit is the bidder's DBE commitment form. If the form is not submitted with the bid, the bidder must remove the form from the Bid book before submitting their bid. The bidder shall complete and sign Exhibit 15-G Construction Contract DBE Commitment included in the contract documents regardless of whether DBE participation is reported. The bidder shall provide written confirmation from each DBE that the DBE is participating in the Contract. A copy of a DBE's quote serves as written confirmation. If a DBE is participating as a joint venture partner, the bidder shall submit a copy of the joint venture agreement. If the DBE Commitment form, Exhibit 15-G, is not submitted with the bid, it must be completed and submitted by all bidders to the Agency within five (5) days of bid opening. If the bidder does not submit the DBE Commitment form within the specified time, the Agency will find the bidder's bid nonresponsive. The prime contractor shall use each DBE subcontractor as listed on Exhibit 12-B Bidder's List of Subcontractors (DBE and Non-DBE), and Exhibit 15-G Construction Contract DBE Commitment form unless they receive authorization for a substitution. The Agency shall request the prime contractor to: 1. Notify the Resident Engineer or Inspector of any changes to its anticipated DBE participation 2. Provide this notification before starting the affected work 3. Maintain records including: • Name and business address of each 1 st-tier subcontractor • Name and business address of each DBE subcontractor, DBE vendor, and DBEtrucking company, regardless of tier • Date of payment and total amount paid to each business (see Exhibit 9-F Monthly Disadvantaged Business Enterprise Payment) If the prime contractor is a DBE contractor, they shall include the date of work performed by their own forces and the corresponding value of the work. Before the 15th of each month, the prime contractor shall submit a Monthly DBE Trucking Verification (LAPM Exhibit 16-Z1)form. If a DBE is decertified before completing its work, the DBE must notify the prime contractor in writing of the decertification date. If a business becomes a certified DBE before completing its work, the business must notify the prime contractor in writing of the certification date. The prime contractor shall submit the notifications. Upon work completion, the prime contractor shall complete a Disadvantaged Business Enterprises (DBE)Certification Status Change, Exhibit 17-0, form and submit the form within 30 days of contract acceptance. Upon work completion, the prime contractor shall complete Exhibit 17-F Final Report— Utilization of Disadvantaged Business Enterprises (DBE), First-Tier Subcontractors and submit it within 90 days of contract acceptance. The Agency will withhold $10,000 until the form is submitted. The Agency releases the withhold upon submission of the completed form. G. DBE RUNNING TALLY OF ATTAINMENTS After submitting an invoice for reimbursement that includes a payment to a DBE, but no later than the 10t" of the Page 5 of 26 February 2023 Required Federal-Aid Contract Language From LAPM Exhibit 12-G following month, the prime contractor/consultant shall complete and email the Exhibit 9- F: Disadvantaged Business Enterprise Running Tally of Payments to business.support.unit(o)dot.ca.gov with a copy to the Agency. 2. BID OPENING The Agency publicly opens and reads bids at the time and place shown on the Notice to Contractors. 3. BID RIGGING The U.S. Department of Transportation (DOT) provides a toll-free hotline to report bid rigging activities. Use the hotline to report bid rigging, bidder collusion, and other fraudulent activities. The hotline number is (800)424- 9071. The service is available 24 hours 7 days a week and is confidential and anonymous. The hotline is part of the DOT's effort to identify and investigate highway construction contract fraud and abuse and is operated under the direction of the DOT Inspector General. 4. CONTRACT AWARD If the Agency awards the contract, the award is made to the lowest responsible and responsive bidder. 5. CONTRACTOR LICENSE The Contractor must be properly licensed as a contractor from contract award through Contract acceptance (Public Contract Code §10164). 6. CHANGED CONDITIONS A. Differing Site Conditions 1. During the progress of the work, if subsurface or latent physical conditions are encountered at the site differing materially from those indicated in the contract or if unknown physical conditions of an unusual nature, differing materially from those ordinarily encountered and generally recognized as inherent in the work provided for in the contract, are encountered at the site, the party discovering such conditions shall promptly notify the other party in writing of the specific differing conditions before the site is disturbed and before the affected work is performed. 2. Upon written notification, the engineer will investigate the conditions, and if it is determined that the conditions materially differ and cause an increase or decrease in the cost or time required for the performance of any work under the contract, an adjustment, excluding anticipated profits, will be made and the contract modified in writing accordingly. The engineer will notify the contractor of the determination whether or not an adjustment of the contract is warranted. 3. No contract adjustment which results in a benefit to the contractor will be allowed unless the contractor has provided the required written notice. 4. No contract adjustment will be allowed under this clause for any effects caused on unchanged work. [This provision may be omitted by the Local Agency, at their option.] B. Suspensions of Work Ordered by the Engineer 1. If the performance of all or any portion of the work is suspended or delayed by the engineer in writing for an unreasonable period of time (not originally anticipated, customary, or inherent to the construction industry)and the contractor believes that additional compensation and/or contract time is due as a result of such suspension or delay, the contractor shall submit to the engineer in writing a request for adjustment within 7 calendar days of receipt of the notice to resume work. The request shall set forth the reasons and support for such adjustment. 2. Upon receipt, the engineer will evaluate the contractor's request. If the engineer agrees that the cost and/or time required for the performance of the contract has increased as a result of such suspension and the suspension was caused by conditions beyond the control of and not the fault of the contractor, its suppliers, or subcontractors at any approved tier, and not caused by weather, the engineer will make an adjustment (excluding profit)and modify the contract in writing accordingly. The contractor will be notified of the engineer's determination whether or not an adjustment of the contract is warranted. 3. No contract adjustment will be allowed unless the contractor has submitted the request for adjustment within the time prescribed. Page 6 of 26 February 2023 Required Federal-Aid Contract Language From LAPM Exhibit 12-G 4. No contract adjustment will be allowed under this clause to the extent that performance would have been suspended or delayed by any other cause, or for which an adjustment is provided or excluded under any other term or condition of this contract. C. Significant Changes in the Character of Work 1. The engineer reserves the right to make, in writing, at any time during the work, such changes in quantities and such alterations in the work as are necessary to satisfactorily complete the project. Such changes in quantities and alterations shall not invalidate the contract nor release the surety, and the contractor agrees to perform the work as altered. 2. If the alterations or changes in quantities significantly change the character of the work under the contract,whether such alterations or changes are in themselves significant changes to the character of the work or by affecting other work cause such other work to become significantly different in character, an adjustment, excluding anticipated profit, will be made to the contract. The basis for the adjustment shall be agreed upon prior to the performance of the work. If a basis cannot be agreed upon, then an adjustment will be made either for or against the contractor in such amount as the engineer may determine to be fair and equitable. 3. If the alterations or changes in quantities do not significantly change the character of the work to be performed under the contract, the altered work will be paid for as provided elsewhere in the contract. 4. The term"significant change"shall be construed to apply only to the following circumstances: • When the character of the work as altered differs materially in kind or nature from that involved or included in the original proposed construction; or • When a major item of work, as defined elsewhere in the contract, is increased in excess of 125 percent or decreased below 75 percent of the original contract quantity. Any allowance for an increase in quantity shall apply only to that portion in excess of 125 percent of original contract item quantity, or in case of a decrease below 75 percent, to the actual amount of work performed. 7. BEGINNING OF WORK, TIME OF COMPLETION AND LIQUIDATED DAMAGES Not used. See Specifications Section 8-1.04. 8. BUY AMERICA Buy America Requirements apply to steel and iron, manufactured products, and construction materials permanently incorporated into the project. Steel and Iron Materials All steel and iron materials must be melted and manufactured in the United States except: 1. Foreign pig iron and processed, pelletized, and reduced iron ore may be used in the domestic production of the steel and iron materials [60 Fed Reg 15478 (03/24/1995)]; 2. If the total combined cost of the materials produced outside the United States does not exceed the greater of 0.1 percent of the total contract amount or$2,500, materials produced outside the United States may be used if authorized. Furnish steel and iron materials to be incorporated into the work with certificates of compliance and certified mill test reports. Mill test reports must indicate where the steel and iron were melted and manufactured. All melting and manufacturing processes for these materials, including an application of a coating, must occur in the United States. Coating includes all processes that protect or enhance the value of the material to which the coating is applied. Manufactured Products Iron and steel used in precast concrete manufactured products must meet the requirements of the above section (Steel and Iron Materials) regardless of the amount used. Iron and steel used in other manufactured products must Page 7 of 26 February 2023 Required Federal-Aid Contract Language From LAPM Exhibit 12-G meet the requirements of the above section (Steel and Iron Materials) if the weight of steel and iron components constitute 90 percent or more of the total weight of the manufactured product. Construction Materials Buy America requirements apply to the following construction materials that are or consist primarily of: 1. Non-ferrous metals 2. Plastic and polymer-based products (including polyvinylchloride, composite building materials, and polymers used in fiber optic cables) 3. Glass(including optic glass) 4. Lumber 5. Drywall Where one or more of these construction materials have been combined by a manufacturer with other materials through a manufacturing process, Buy America requirements do not apply unless otherwise specified. Furnish construction materials to be incorporated into the work with certificates of compliance with each project delivery. Manufacturer's certificate of compliance must identify where the construction material was manufactured and attest specifically to Buy America compliance. All manufacturing processes for these materials must occur in the United States. Buy America requirements do not apply to the following: 1. Tools and construction equipment used in performing the work 2. Temporary work that is not incorporated into the finished project 9. QUALITY ASSURANCE The Local Agency uses a Quality Assurance Program (QAP)to ensure a material is produced to comply with the Contract. The Local Agency may examine the records and reports of tests the prime contractor performs if they are available at the job site. Schedule work to allow time for QAP. 10. PROMPT PAYMENT FROM THE AGENCY TO THE CONTRACTORS The Agency shall make any progress payment within 30 days after receipt of an undisputed and properly submitted payment request from a contractor on a construction contract. If the Agency fails to pay promptly, the Agency shall pay interest to the contractor, which accrues at the rate of 10 percent per annum on the principal amount of a money judgment remaining unsatisfied. Upon receipt of a payment request, the Agency shall act in accordance with both of the following: 1. Each payment request shall be reviewed by the Agency as soon as practicable after receipt for the purpose of determining that it is a proper payment request. 2. Any payment request determined not to be a proper payment request suitable for payment shall be returned to the contractor as soon as practicable, but not later than seven (7)days, after receipt. A request returned pursuant to this paragraph shall be accompanied by a document setting forth in writing the reasons why the payment request is not proper. 11. FORM FHWA-1273 REQUIRED CONTRACT PROVISIONS FEDERAL-AID CONTRACTS [The following 12 pages must be physically inserted into the contract without modification. Excluding ATTACHMENT A-EMPLOYMENT AND MATERIALS PREFERENCE FOR APPALACHIAN DEVELOPMENT HIGHWAY SYSTEM OR APPALACHIAN LOCAL ACCESS ROAD CONTRACTS] Page 8 of 26 February 2023 Local Assistance Procedures Manual Exhibit 12-G Required Federal-Aid Contract Language FHWA-1273-- Revised July 5, 2022 REQUIRED CONTRACT PROVISIONS FEDERAL-AID CONSTRUCTION CONTRACTS Page 9 of 26 February 2023 Exhibit A Local Assistance Procedures Manual Exhibit 12-G Required Federal-Aid Contract Language I. General II. Nondiscrimination 3.A breach of any of the stipulations contained in these III. Non-segregated Facilities Required Contract Provisions may be sufficient grounds for IV. Davis-Bacon and Related Act Provisions withholding of progress payments,withholding of final payment, V. Contract Work Hours and Safety Standards Act Provisions termination of the contract,suspension/debarment or any other VI. Subletting or Assigning the Contract action determined to be appropriate by the contracting agency VII. Safety:Accident Prevention and FHWA. Vill. False Statements Concerning Highway Projects IX. Implementation of Clean Air Act and Federal Water 4.Selection of Labor: During the performance of this contract, Pollution Control Act the contractor shall not use convict labor for any purpose within X. Certification Regarding Debarment,Suspension,Ineligibility the limits of a construction project on a Federal-aid highway and Voluntary Exclusion unless it is labor performed by convicts who are on parole, A. Certification Regarding Use of Contract Funds for Lobbying supervised release,or probation.23 U.S.C. 114(b).The term XII. Use of United States-Flag Vessels: Federal-aid highway does not include roadways functionally classified as local roads or rural minor collectors.23 U.S.C. ATTACHMENTS 101(a). A. Employment and Materials Preference for Appalachian II.NONDISCRIMINATION(23 CFR 230.107(a);23 CFR Part Development Highway System or Appalachian Local Access 230,Subpart A,Appendix A; EO 11246) Road Contracts(included in Appalachian contracts only) The provisions of this section related to 23 CFR Part 230, Subpart A,Appendix A are applicable to all Federal-aid I.GENERAL construction contracts and to all related construction subcontracts of$10,000 or more.The provisions of 23 CFR 1. Form FHWA-1273 must be physically incorporated in each Part 230 are not applicable to material supply,engineering, construction contract funded under title 23,United States Code, or architectural service contracts. as required in 23 CFR 633.102(b)(excluding emergency contracts solely intended for debris removal).The contractor(or In addition,the contractor and all subcontractors must comply subcontractor)must insert this form in each subcontract and with the following policies: Executive Order 11246,41 CFR Part further require its inclusion in all lower tier subcontracts 60,29 CFR Parts 1625-1627,23 U.S.C. 140, Section 504 of the (excluding purchase orders, rental agreements and other Rehabilitation Act of 1973,as amended(29 U.S.C. 794),Title VI agreements for supplies or services).23 CFR633.102(e). of the Civil Rights Act of 1964,as amended(42 U.S.C.2000d et seq.),and related regulations including 49 CFR Parts 21,26,and The applicable requirements of Form FHWA-1273 are 27;and 23 CFR Parts 200,230,and 633. incorporated by reference for work done under any purchase order, rental agreement or agreement for other services.The The contractor and all subcontractors must comply with:the prime contractor shall be responsible for compliance by any requirements of the Equal Opportunity Clause in 41 CFR 60- subcontractor,lower-tier subcontractor or service provider.23 1.4(b)and,for all construction contracts exceeding$10,000,the CFR 633.102(e). Standard Federal Equal Employment Opportunity Construction Form FHWA-1273 must be included in all Federal-aid design- Contract Specifications in 41 CFR 60-4.3. build contracts,in all subcontracts and in lower tier subcontracts Note:The U.S. Department of Labor has exclusive authority to (excluding subcontracts for design services, purchase orders, determine compliance with Executive Order 11246 and the rental agreements and other agreements for supplies or policies of the Secretary of Labor including 41 CFR Part 60,and services)in accordance with 23 CFR 633.102.The design- 29 CFR Parts 1625-1627.The contracting agency and the builder shall be responsible for compliance by any FHWA have the authority and the responsibility to ensure subcontractor, lower-tier subcontractor or service provider. compliance with 23 U.S.C. 140,Section 504 of the Rehabilitation Act of 1973,as amended (29 U.S.C.794), and Title VI of the Contracting agencies may reference Form FHWA-1273 in Civil Rights Act of 1964,as amended (42 U.S.C.2000d et seq.), solicitation-for-bids or request-for-proposals documents, and related regulations including 49 CFR Parts 21,26,and 27; however,the Form FHWA-1273 must be physically incorporated and 23 CFR Parts 200,230,and 633. (not referenced)in all contracts,subcontracts and lower-tier subcontracts(excluding purchase orders,rental agreements and The following provision is adopted from 23 CFR Part 230, other agreements for supplies or services related to a Subpart A,Appendix A,with appropriate revisions to conform to construction contract).23 CFR 633.102(b). the U.S. Department of Labor(US DOL)and FHWA 2.Subject to the applicability criteria noted in the following requirements. sections,these contract provisions shall apply to all work performed on the contract by the contractor's own organization and with the assistance of workers under the contractor's immediate superintendence and to all work performed on the contract by piecework,station work,or by subcontract.23 CFR 633.102(d). Page 10 of 26 February 2023 Local Assistance Procedures Manual Exhibit 12-G Required Federal-Aid Contract Language 1.Equal Employment Opportunity: Equal Employment d. Notices and posters setting forth the contractor's EEO policy will Opportunity(EEO)requirements not to discriminate and to take be placed in areas readily accessible to employees,applicants for affirmative action to assure equal opportunity as set forth under employment and potential employees. laws,executive orders,rules,regulations(see 28 CFR Part 35,29 CFR Part 1630,29 CFR Parts 1625-1627,41 CFR Part 60 and 49 e. The contractor's EEO policy and the procedures to implement CFR Part 27)and orders of the Secretary of Labor as modified by such policy will be brought to the attention of employees by means of the provisions prescribed herein,and imposed pursuant to 23 U.S.C. meetings,employee handbooks,or other appropriate means. 140,shall constitute the EEO and specific affirmative action standards for the contractor's project activities under this contract. 4.Recruitment:When advertising for employees,the contractor will The provisions of the Americans with Disabilities Act of 1990(42 include in all advertisements for employees the notation:"An Equal U.S.C. 12101 et seq.)set forth under 28 CFR Part 35 and 29 CFR Opportunity Employer."All such advertisements will be placed in Part 1630 are incorporated by reference in this contract. In the publications having a large circulation among minorities and women execution of this contract,the contractor agrees to comply with the in the area from which the project work force would normally be following minimum specific requirement activities of EEO: derived. a. The contractor will work with the contracting agency and the a. The contractor will,unless precluded by a valid bargaining Federal Government to ensure that it has made every good faith agreement,conduct systematic and direct recruitment through public effort to provide equal opportunity with respect to all of its terms and and private employee referral sources likely to yield qualified conditions of employment and in their review of activities under the minorities and women.To meet this requirement,the contractor will contract.23 CFR 230.409(g)(4)&(5). identify sources of potential minority group employees and establish with such identified sources procedures whereby minority and women b. The contractor will accept as its operating policy the following applicants may be referred to the contractor for employment statement: consideration. "It is the policy of this Company to assure that applicants are b. In the event the contractor has a valid bargaining agreement employed,and that employees are treated during employment, providing for exclusive hiring hall referrals,the contractor is expected without regard to their race,religion,sex,sexual orientation, to observe the provisions of that agreement to the extent that the gender identity,color,national origin,age or disability.Such system meets the contractor's compliance with EEO contract action shall include:employment,upgrading,demotion,or provisions.Where implementation of such an agreement has the transfer;recruitment or recruitment advertising;layoff or effect of discriminating against minorities or women,or obligates the termination;rates of pay or other forms of compensation;and contractor to do the same,such implementation violates Federal selection for training,including apprenticeship,pre- nondiscrimination provisions. apprenticeship,and/or on-the-job training." c. The contractor will encourage its present employees to refer 2.EEO Officer:The contractor will designate and make known to minorities and women as applicants for employment.Information and the contracting officers an EEO Officer who will have the procedures with regard to referring such applicants will be discussed responsibility for and must be capable of effectively administering with employees. and promoting an active EEO program and who must be assigned adequate authority and responsibility to do so. 5.Personnel Actions:Wages,working conditions,and employee 3.Dissemination of Policy:All members of the contractor's staff benefits shall be established and administered,and personnel actions who are authorized to hire,supervise,promote,and discharge of every type,including hiring,upgrading,promotion,transfer, employees,or who recommend such action or are substantially demotion,layoff,and termination,shall be taken without regard o race,color,religion,sex,sexual orientation,gender identity,national involved in such action,will be made fully cognizant of and will implement the contractor's EEO policy and contractual origin,age or disability.The following procedures shall be followed: responsibilities to provide EEO in each grade and classification of a. The contractor will conduct periodic inspections of project sites employment.To ensure that the above agreement will be met,the to ensure that working conditions and employee facilities do not following actions will be taken as a minimum: indicate discriminatory treatment of project site personnel. a. Periodic meetings of supervisory and personnel office b. The contractor will periodically evaluate the spread of wages employees will be conducted before the start of work and then not paid within each classification to determine any evidence of less often than once every six months,at which time the contractor's discriminatory wage practices. EEO policy and its implementation will be reviewed and explained. The meetings will be conducted by the EEO Officer or other knowledgeable company official. c. The contractor will periodically review selected personnel actions in depth to determine whether there is evidence of discrimination. b. All new supervisory or personnel office employees will be given Where evidence is found,the contractor will promptly take corrective a thorough indoctrination by the EEO Officer,covering all major action. If the review indicates that the discrimination may extend aspects of the contractor's EEO obligations within thirty days beyond the actions reviewed,such corrective action shall include all following their reporting for duty with the contractor. affected persons. c. All personnel who are engaged in direct recruitment for the d. The contractor will promptly investigate all complaints of alleged project will be instructed by the EEO Officer in the contractor's discrimination made to the contractor in connection with its procedures for locating and hiring minorities and women. obligations under this contract,will attempt to resolve such complaints,and will take appropriate corrective action within a reasonable time. If the investigation indicates that the discrimination may affect persons other than the complainant,such corrective action shall include such other persons.Upon completion of each investigation,the contractor will inform every complainant of all of their avenues of appeal. Page 11 of 26 February 2023 Local Assistance Procedures Manual Exhibit 12-G Required Federal-Aid Contract Language 6.Training and Promotion: 8.Reasonable Accommodation for Applicants/Employees with Disabilities: The contractor must be familiar with the requirements for a. The contractor will assist in locating,qualifying,and increasing and comply with the Americans with Disabilities Act and all rules and the skills of minorities and women who are applicants for regulations established thereunder.Employers must provide reasonable employment or current employees.Such efforts should be aimed at accommodation in all employment activities unless to do so would cause developing full journey level status employees in the type of trade or an undue hardship. job classification involved. 9.Selection of Subcontractors,Procurement of Materials and b. Consistent with the contractor's work force requirements and as Leasing of Equipment:The contractor shall not discriminate on the permissible under Federal and State regulations,the contractor shall grounds of race,color,religion,sex,sexual orientation,gender identity, make full use of training programs(i.e.,apprenticeship and on-the- national origin,age,or disability in the selection and retention of job training programs for the geographical area of contract subcontractors,including procurement of materials and leases of equipment.The contractor shall take all necessary and reasonable steps performance).In the event a special provision for training is provided to ensure nondiscrimination in the administration of this contract. under this contract,this subparagraph will be superseded as indicated in the special provision.The contracting agency may a. The contractor shall notify all potential subcontractors,suppliers,and reserve training positions for persons who receive welfare lessors of their EEO obligations under this contract. assistance in accordance with 23 U.S.C. 140(a). b. The contractor will use good faith efforts to ensure subcontractor c. The contractor will advise employees and applicants for compliance with their EEO obligations. employment of available training programs and entrance requirements for each. 10.Assurance Required: d. The contractor will periodically review the training and a. The requirements of 49 CFR Part 26 and the State DOT's promotion potential of employees who are minorities and women FHWA-approved Disadvantaged Business Enterprise(DBE)program and will encourage eligible employees to apply for such training and are incorporated by reference. promotion. b. The contractor,subrecipient or subcontractor shall not 7.Unions:If the contractor relies in whole or in part upon unions as discriminate on the basis of race,color,national origin,or sex in the a source of employees,the contractor will use good faith efforts to performance of this contract.The contractor shall carry out applicable obtain the cooperation of such unions to increase opportunities for requirements of 49 CFR part 26 in the award and administration of minorities and women.23 CFR 230.409.Actions by the contractor, DOT-assisted contracts. Failure by the contractor to carry out these either directly or through a contractor's association acting as agent, requirements is a material breach of this contract,which may result in will include the procedures set forth below: the termination of this contract or such other remedy as the recipient deems appropriate,which may include,but is not limited to: a. The contractor will use good faith efforts to develop,in cooperation with the unions,joint training programs aimed toward qualifying more (1)Withholding monthly progress payments; minorities and women for membership in the unions and increasing the skills of minorities and women so that they may qualify for higher paying (2)Assessing sanctions; employment. (3)Liquidated damages;and/or (4)Disqualifying the contractorfrom future bidding as non- b. The contractor will use good faith efforts to incorporate an EEO responsible. clause into each union agreement to the end that such union will be contractually bound to refer applicants without regard to their race,color, religion,sex,sexual orientation,gender identity,national origin,age,or c. The Title VI and nondiscrimination provisions of U.S.DOT Order disability. 1050.2A at Appendixes A and E are incorporated by reference.49 CFR Part 21. c. The contractor is to obtain information as to the referral practices and policies of the labor union except that to the extent such information 11.Records and Reports:The contractor shall keep such records is within the exclusive possession of the labor union and such labor as necessary to document compliance with the EEO requirements. union refuses to furnish such information to the contractor,the contractor Such records shall be retained for a period of three years following shall so certify to the contracting agency and shall set forth what efforts the date of the final payment to the contractor for all contract work have been made to obtain such information. and shall be available at reasonable times and places for inspection by authorized representatives of the contracting agency and the d. In the event the union is unable to provide the contractor with a FHWA. reasonable flow of referrals within the time limit set forth in the collective bargaining agreement,the contractor will,through independent a. The records kept by the contractor shall document the following: recruitment efforts,fill the employment vacancies without regard to race, color,religion,sex,sexual orientation,gender identity,national origin, (1)The number and work hours of minority and non-minority age,or disability;making full efforts to obtain qualified and/or qualifiable minorities and women.The failure of a union to provide sufficient group members and women employed in each work referrals(even though it is obligated to provide exclusive referrals classification on the project; under the terms of a collective bargaining agreement)does not (2)The progress and efforts being made in cooperation with relieve the contractor from the requirements of this paragraph.In the unions,when applicable,to increase employment opportunities event the union referral practice prevents the contractor from meeting the obligations pursuant to Executive Order 11246,as for minorities and women;and amended,and these special provisions,such contractor shall immediately notify the contracting agency. (3)The progress and efforts being made in locating,hiring, training,qualifying,and upgrading minorities and women. Page 12 of 26 February 2023 Local Assistance Procedures Manual Exhibit 12-G Required Federal-Aid Contract Language b. The contractors and subcontractors will submit an annual 1.Minimum wages(29 CFR 5.5) report to the contracting agency each July for the duration of the project indicating the number of minority,women,and non-minority a. All laborers and mechanics employed or working upon the site group employees currently engaged in each work classification of the work,will be paid unconditionally and not less often than once required by the contract work.This information is to be reported on a week,and without subsequent deduction or rebate on any account Form FHWA-1391.The staffing data should represent the project (except such payroll deductions as are permitted by regulations work force on board in all or any part of the last payroll period issued by the Secretary of Labor under the Copeland Act(29 CFR preceding the end of July.If on-the-job training is being required by part 3)),the full amount of wages and bona fide fringe benefits(or special provision,the contractor will be required to collect and report cash equivalents thereof)due at time of payment computed at rates training data.The employment data should reflect the work force on not less than those contained in the wage determination of the board during all or any part of the last payroll period preceding the Secretary of Labor which is attached hereto and made a part hereof, end of July. regardless of any contractual relationship which may be alleged to exist between the contractor and such laborers and mechanics. III.NONSEGREGATED FACILITIES Contributions made or costs reasonably anticipated for bona fide This provision is applicable to all Federal-aid construction contracts fringe benefits under section 1(b)(2)of the Davis-Bacon Act on behalf and to all related construction subcontracts of more than$10,000. of laborers or mechanics are considered wages paid to such laborers 41 CFR 60-1.5. or mechanics,subject to the provisions of paragraph 1.d.of this section;also,regular contributions made or costs incurred for more As prescribed by 41 CFR 60-1.8,the contractor must ensure that than a weekly period(but not less often than quarterly)under plans, facilities provided for employees are provided in such a manner that funds,or programs which cover the particular weekly period,are segregation on the basis of race,color,religion,sex,sexual deemed to be constructively made or incurred during such weekly orientation,gender identity,or national origin cannot result.The period.Such laborers and mechanics shall be paid the appropriate contractor may neither require such segregated use by written or wage rate and fringe benefits on the wage determination for the oral policies nor tolerate such use by employee custom.The classification of work actually performed,without regard to skill, contractor's obligation extends further to ensure that its employees except as provided in 29 CFR 5.5(a)(4).Laborers or mechanics are not assigned to perform their services at any location under the performing work in more than one classification may be contractor's control where the facilities are segregated.The term compensated at the rate specified for each classification for the time "facilities"includes waiting rooms,work areas,restaurants and other actually worked therein: Provided,That the employer's payroll eating areas,time clocks,restrooms,washrooms,locker rooms and records accurately set forth the time spent in each classification in other storage or dressing areas,parking lots,drinking fountains, which work is performed.The wage determination(including any recreation or entertainment areas,transportation,and housing additional classification and wage rates conformed under paragraph provided for employees.The contractor shall provide separate or 1.b.of this section)and the Davis-Bacon poster(WH-1321)shall be single-user restrooms and necessary dressing or sleeping areas to posted at all times by the contractor and its subcontractors at the site assure privacy between sexes. of the work in a prominent and accessible place where it can be easily seen by the workers. IV.DAVIS-BACON AND RELATED ACT PROVISIONS b. (1) The contracting officer shall require that any class of This section is applicable to all Federal-aid construction projects laborers or mechanics,including helpers,which is not listed in exceeding$2,000 and to all related subcontracts and lower-tier the wage determination and which is to be employed under the subcontracts(regardless of subcontract size),in accordance with 29 contract shall be classified in conformance with the wage CFR 5.5.The requirements apply to all projects located within the determination.The contracting officer shall approve an right-of-way of a roadway that is functionally classified as Federal- additional classification and wage rate and fringe benefits aid highway.23 U.S.C. 113.This excludes roadways functionally therefore only when the following criteria have been met: classified as local roads or rural minor collectors,which are exempt. 23 U.S.C. 101.Where applicable law requires that projects be (i)The work to be performed by the classification requested is treated as a project on a Federal-aid highway,the provisions of this not performed by a classification in the wage determination; subpart will apply regardless of the location of the project.Examples and include:Surface Transportation Block Grant Program projects (ii)The classification is utilized in the area by the construction funded under 23 U.S.C. 133[excluding recreational trails projects], industry;and the Nationally Significant Freight and Highway Projects funded (iii)The proposed wage rate,including any bona fide fringe under 23 U.S.C. 117,and National Highway Freight Program benefits,bears a reasonable relationship to the wage rates projects funded under 23 U.S.C. 167. contained in the wage determination. The following provisions are from the U.S.Department of Labor regulations in 29 CFR 5.5"Contract provisions and related matters' (2) If the contractor and the laborers and mechanics to be with minor revisions to conform to the FHWA-1273 format and employed in the classification(if known),or their FHWA program requirements. representatives,and the contracting officer agree on the classification and wage rate(including the amount designated for fringe benefits where appropriate),a report of the action taken shall be sent by the contracting officer to the Administrator of the Wage and Hour Division,U.S.Department of Labor, Washington,DC 20210.The Administrator,or an authorized representative,will approve,modify,or disapprove every additional classification action within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30-day period that additional time is necessary. Page 13 of 26 February 2023 Local Assistance Procedures Manual Exhibit 12-G Required Federal-Aid Contract Language (3) In the event the contractor,the laborers or mechanics to 3.Payrolls and basic records(29 CFR 5.5) be employed in the classification or their representatives, and the contracting officer do not agree on the proposed a. Payrolls and basic records relating thereto shall be maintained classification and wage rate(including the amount by the contractor during the course of the work and preserved for a designated for fringe benefits,where appropriate),the period of three years thereafter for all laborers and mechanics contracting officer shall refer the questions,including the working at the site of the work.Such records shall contain the name, views of all interested parties and the recommendation of the address,and social security number of each such worker,his or her contracting officer,to the Administrator for determination. correct classification,hourly rates of wages paid(including rates of The Administrator,or an authorized representative,will issue contributions or costs anticipated for bona fide fringe benefits or cash a determination within 30 days of receipt and so advise the equivalents thereof of the types described in section 1(b)(2)(B)of the contracting officer or will notify the contracting officer within Davis-Bacon Act),daily and weekly number of hours worked, the 30-day period that additional time is necessary. deductions made and actual wages paid.Whenever the Secretary of Labor has found under 29 CFR 5.5(a)(1)(iv)that the wages of any (4) The wage rate(including fringe benefits where laborer or mechanic include the amount of any costs reasonably appropriate)determined pursuant to paragraphs 1.b.(2)or anticipated in providing benefits under a plan or program described in 1.b.(3)of this section,shall be paid to all workers performing section 1(b)(2)(B)of the Davis-Bacon Act,the contractor shall work in the classification under this contract from the first maintain records which show that the commitment to provide such day on which work is performed in the classification. benefits is enforceable,that the plan or program is financially responsible,and that the plan or program has been communicated in c. Whenever the minimum wage rate prescribed in the contract for writing to the laborers or mechanics affected,and records which a class of laborers or mechanics includes a fringe benefit which is show the costs anticipated or the actual cost incurred in providing not expressed as an hourly rate,the contractor shall either pay the such benefits.Contractors employing apprentices or trainees under benefit as stated in the wage determination or shall pay another approved programs shall maintain written evidence of the registration bona fide fringe benefit or an hourly cash equivalent thereof. of apprenticeship programs and certification of trainee programs,the registration of the apprentices and trainees,and the ratios and wage d. If the contractor does not make payments to a trustee or other rates prescribed in the applicable programs. third person,the contractor may consider as part of the wages of any laborer or mechanic the amount of any costs reasonably b. (1) The contractor shall submit weekly for each week in which anticipated in providing bona fide fringe benefits under a plan or any contract work is performed a copy of all payrolls to the program, Provided,That the Secretary of Labor has found,upon the contracting agency.The payrolls submitted shall set out written request of the contractor,that the applicable standards of the accurately and completely all of the information required to be Davis-Bacon Act have been met.The Secretary of Labor may maintained under 29 CFR 5.5(a)(3)(i),except that full social require the contractor to set aside in a separate account assets for security numbers and home addresses shall not be included on the meeting of obligations under the plan or program. weekly transmittals. Instead the payrolls shall only need to include an individually identifying number for each employee 2.Withholding(29 CFR 5.5) (e.g.,the last four digits of the employee's social security number).The required weekly payroll information may be The contracting agency shall upon its own action or upon written submitted in any form desired.Optional Form WH-347 is request of an authorized representative of the Department of Labor, available for this purpose from the Wage and Hour Division Web withhold or cause to be withheld from the contractor under this site.The prime contractor is responsible for the submission of contract,or any other Federal contract with the same prime copies of payrolls by all subcontractors.Contractors and contractor,or any other federally-assisted contract subject to Davis- subcontractors shall maintain the full social security number and Bacon prevailing wage requirements,which is held by the same current address of each covered worker,and shall provide them prime contractor,so much of the accrued payments or advances as upon request to the contracting agency for transmission to the may be considered necessary to pay laborers and mechanics, State DOT,the FHWA or the Wage and Hour Division of the including apprentices,trainees,and helpers,employed by the Department of Labor for purposes of an investigation or audit of contractor or any subcontractor the full amount of wages required by compliance with prevailing wage requirements. It is not a the contract. In the event of failure to pay any laborer or mechanic, violation of this section for a prime contractor to require a including any apprentice,trainee,or helper,employed or working on subcontractor to provide addresses and social security numbers the site of the work,all or part of the wages required by the contract, to the prime contractor for its own records,without weekly the contracting agency may,after written notice to the contractor, submission to the contracting agency. take such action as may be necessary to cause the suspension of any further payment,advance,or guarantee of funds until such (2) Each payroll submitted shall be accompanied by a violations have ceased. "Statement of Compliance,"signed by the contractor or subcontractor or his or her agent who pays or supervises the payment of the persons employed under the contract and shall certify the following: (i)That the payroll for the payroll period contains the information required to be provided under 29 CFR 5.5(a)(3)(ii),the appropriate information is being maintained under 29 CFR 5.5(a)(3)(i),and that such information is correct and complete; (ii)That each laborer or mechanic(including each helper, apprentice,and trainee)employed on the contract during the payroll period has been paid the full weekly wages earned, without rebate,either directly or indirectly,and that no deductions have been made either directly or indirectly from the full wages earned,other than permissible deductions as set forth in 29 CFR part 3; Page 14 of 26 February 2023 Local Assistance Procedures Manual Exhibit 12-G Required Federal-Aid Contract Language (iii)That each laborer or mechanic has been paid not less Every apprentice must be paid at not less than the rate specified in than the applicable wage rates and fringe benefits or cash the registered program for the apprentice's level of progress, equivalents for the classification of work performed,as expressed as a percentage of the journeymen hourly rate specified in specified in the applicable wage determination incorporated the applicable wage determination.Apprentices shall be paid fringe into the contract. benefits in accordance with the provisions of the apprenticeship program. If the apprenticeship program does not specify fringe (3)The weekly submission of a properly executed certification benefits,apprentices must be paid the full amount of fringe benefits set forth on the reverse side of Optional Form WH-347 shall listed on the wage determination for the applicable classification.If satisfy the requirement for submission of the"Statement of the Administrator determines that a different practice prevails for the Compliance"required by paragraph 3.b.(2)of this section. applicable apprentice classification,fringes shall be paid in accordance with that determination. (4)The falsification of any of the above certifications may subject the contractor or subcontractor to civil or criminal In the event the Office of Apprenticeship Training,Employer and prosecution under 18 U.S.C. 1001 and 31 U.S.C.231. Labor Services,or a State Apprenticeship Agency recognized by the Office,withdraws approval of an apprenticeship program,the c. The contractor or subcontractor shall make the records required contractor will no longer be permitted to utilize apprentices at less under paragraph 3.a.of this section available for inspection, than the applicable predetermined rate for the work performed until copying,or transcription by authorized representatives of the an acceptable program is approved. contracting agency,the State DOT,the FHWA,or the Department of Labor,and shall permit such representatives to interview employees b. Trainees(programs of the USDOL). during working hours on the job. If the contractor or subcontractor fails to submit the required records or to make them available,the Except as provided in 29 CFR 5.16,trainees will not be permitted to FHWA may,after written notice to the contractor,the contracting work at less than the predetermined rate for the work performed agency or the State DOT,take such action as may be necessary to unless they are employed pursuant to and individually registered in a cause the suspension of any further payment,advance,or program which has received prior approval,evidenced by formal guarantee of funds. Furthermore,failure to submit the required certification by the U.S.Department of Labor,Employment and records upon request or to make such records available may be Training Administration. grounds for debarment action pursuant to 29 CFR 5.12. The ratio of trainees to journeymen on the job site shall not be 4.Apprentices and trainees(29 CFR 5.5) greater than permitted under the plan approved by the Employment and Training Administration. a. Apprentices(programs of the USDOL). Every trainee must be paid at not less than the rate specified in the Apprentices will be permitted to work at less than the predetermined approved program for the trainee's level of progress,expressed as a rate for the work they performed when they are employed pursuant percentage of the journeyman hourly rate specified in the applicable to and individually registered in a bona fide apprenticeship program wage determination.Trainees shall be paid fringe benefits in registered with the U.S.Department of Labor,Employment and accordance with the provisions of the trainee program. If the trainee Training Administration,Office of Apprenticeship Training,Employer program does not mention fringe benefits,trainees shall be paid the and Labor Services,or with a State Apprenticeship Agency full amount of fringe benefits listed on the wage determination unless recognized by the Office,or if a person is employed in his or her first the Administrator of the Wage and Hour Division determines that 90 days of probationary employment as an apprentice in such an there is an apprenticeship program associated with the apprenticeship program,who is not individually registered in the corresponding journeyman wage rate on the wage determination program,but who has been certified by the Office of Apprenticeship which provides for less than full fringe benefits for apprentices.Any Training,Employer and Labor Services or a State Apprenticeship employee listed on the payroll at a trainee rate who is not registered Agency(where appropriate)to be eligible for probationary and participating in a training plan approved by the Employment and employment as an apprentice. Training Administration shall be paid not less than the applicable wage rate on the wage determination for the classification of work The allowable ratio of apprentices to journeymen on the job site in actually performed. In addition,any trainee performing work on the any craft classification shall not be greater than the ratio permitted to job site in excess of the ratio permitted under the registered program the contractor as to the entire work force under the registered shall be paid not less than the applicable wage rate on the wage program.Any worker listed on a payroll at an apprentice wage rate, determination for the work actually performed. who is not registered or otherwise employed as stated above,shall be paid not less than the applicable wage rate on the wage In the event the Employment and Training Administration withdraws determination for the classification of work actually performed. In approval of a training program,the contractor will no longer be addition,any apprentice performing work on the job site in excess of permitted to utilize trainees at less than the applicable predetermined the ratio permitted under the registered program shall be paid not rate for the work performed until an acceptable program is approved. less than the applicable wage rate on the wage determination for the work actually performed.Where a contractor is performing c. Equal employment opportunity.The utilization of apprentices, construction on a project in a locality other than that in which its trainees and journeymen under this part shall be in conformity with program is registered,the ratios and wage rates(expressed in the equal employment opportunity requirements of Executive Order percentages of the journeyman's hourly rate)specified in the 11246,as amended,and 29 CFR part 30. contractor's or subcontractor's registered program shall be observed. Page 15 of 26 February 2023 Local Assistance Procedures Manual Exhibit 12-G Required Federal-Aid Contract Language d. Apprentices and Trainees(programs of the U.S.DOT). V.CONTRACT WORK HOURS AND SAFETY STANDARDS ACT Apprentices and trainees working under apprenticeship and skill Pursuant to 29 CFR 5.5(b),the following clauses apply to any training programs which have been certified by the Secretary of Federal-aid construction contract in an amount in excess of$100,000 Transportation as promoting EEO in connection with Federal-aid and subject to the overtime provisions of the Contract Work Hours highway construction programs are not subject to the requirements and Safety Standards Act.These clauses shall be inserted in addition of paragraph 4 of this Section IV.23 CFR 230.111(e)(2).The to the clauses required by 29 CFR 5.5(a)or 29 CFR 4.6.As used in straight time hourly wage rates for apprentices and trainees under this paragraph,the terms laborers and mechanics include watchmen such programs will be established by the particular programs.The and guards. ratio of apprentices and trainees to journeymen shall not be greater 1.Overtime requirements.No contractor or subcontractor than permitted by the terms of the particular program. contracting for any part of the contract work which may require or 5.Compliance with Copeland Act requirements.The contractor involve the employment of laborers or mechanics shall require or shall comply with the requirements of 29 CFR part 3,which are permit any such laborer or mechanic in any workweek in which he or incorporated by reference in this contract as provided in 29 CFR 5.5. she is employed on such work to work in excess of forty hours in such workweek unless such laborer or mechanic receives compensation at 6.Subcontracts.The contractor or subcontractor shall insert Form a rate not less than one and one-half times the basic rate of pay for all FHWA-1273 in any subcontracts and also require the hours worked in excess of forty hours in such workweek.29 CFR 5.5. subcontractors to include Form FHWA-1273 in any lower tier 2.Violation;liability for unpaid wages;liquidated damages.In the subcontracts.The prime contractor shall be responsible for the event of any violation of the clause set forth in paragraph 1 of this compliance by any subcontractor or lower tier subcontractor with all section,the contractor and any subcontractor responsible therefor the contract clauses in 29 CFR 5.5. shall be liable for the unpaid wages.In addition,such contractor and 7.Contract termination:debarment.A breach of the contract subcontractor shall be liable to the United States(in the case of work clauses in 29 CFR 5.5 may be grounds for termination of the done under contract for the District of Columbia or a territory,to such contract,and for debarment as a contractor and a subcontractor as District or to such territory),for liquidated damages.Such liquidated provided in 29 CFR 5.12. damages shall be computed with respect to each individual laborer or mechanic,including watchmen and guards,employed in violation of 8.Compliance with Davis-Bacon and Related Act the clause set forth in paragraph 1 of this section,in the sum currently requirements.All rulings and interpretations of the Davis-Bacon provided in 29 CFR 5.5(b)(2)*for each calendar day on which such and Related Acts contained in 29 CFR parts 1,3,and 5 are herein individual was required or permitted to work in excess of the standard incorporated by reference in this contract as provided in 29 CFR 5.5. workweek of forty hours without payment of the overtime wages required by the clause set forth in paragraph 1 of this section.29 CFR 9.Disputes concerning labor standards.As provided in 29 CFR 5.5. 5.5,disputes arising out of the labor standards provisions of this *$27 as of January 23,2019(See 84 FIR 213-01,218)as may be contract shall not be subject to the general disputes clause of this adjusted annually by the Department of Labor;pursuant to the contract.Such disputes shall be resolved in accordance with the Federal Civil Penalties Inflation Adjustment Act of 1990). procedures of the Department of Labor set forth in 29 CFR parts 5, 6,and 7.Disputes within the meaning of this clause include disputes 3.Withholding for unpaid wages and liquidated damages.The between the contractor(or any of its subcontractors)and the FHWA or the contacting agency shall upon its own action or upon contracting agency,the U.S.Department of Labor,or the employees written request of an authorized representative of the Department of or their representatives. Labor withhold or cause to be withheld,from any moneys payable on 10.Certification of eligibility(29 CFR 5.5) account of work performed by the contractor or subcontractor under any such contract or any other Federal contract with the same prime a. By entering into this contract,the contractor certifies that contractor,or any other federally-assisted contract subject to the neither it(nor he or she)nor any person or firm who has an interest Contract Work Hours and Safety Standards Act,which is held by the in the contractor's firm is a person or firm ineligible to be awarded same prime contractor,such sums as may be determined to be Government contracts by virtue of section 3(a)of the Davis-Bacon necessary to satisfy any liabilities of such contractor or subcontractor Act or 29 CFR 5.12(a)(1). for unpaid wages and liquidated damages as provided in the clause set forth in paragraph 2 of this section.29 CFR 5.5. b. No part of this contract shall be subcontracted to any person or 4.Subcontracts.The contractor or subcontractor shall insert in any firm ineligible for award of a Government contract by virtue of subcontracts the clauses set forth in paragraphs 1 through 4 of this section 3(a)of the Davis-Bacon Act or 29 CFR 5.12(a)(1). section and also a clause requiring the subcontractors to include c. The penalty for making false statements is prescribed in the these clauses in any lower tier subcontracts.The prime contractor U.S.Criminal Code, 18 U.S.C. 1001. shall be responsible for compliance by any subcontractor or lower tier subcontractor with the clauses set forth in paragraphs 1 through 4 of this section.29 CFR 5.5. Page 16 of 26 February 2023 Local Assistance Procedures Manual Exhibit 12-G Required Federal-Aid Contract Language VI.SUBLETTING OR ASSIGNING THE CONTRACT 5.The 30-percent self-performance requirement of paragraph(1)is not This provision is applicable to all Federal-aid construction contracts applicable to design-build contracts;however,contracting agencies on the National Highway System pursuant to 23 CFR 635.116. may establish their own self-performance requirements.23 CFR 635.116(d). 1.The contractor shall perform with its own organization contract work amounting to not less than 30 percent(or a greater percentage VII.SAFETY:ACCIDENT PREVENTION if specified elsewhere in the contract)of the total original contract price,excluding any specialty items designated by the contracting This provision is applicable to all Federal-aid construction contracts agency.Specialty items may be performed by subcontract and the and to all related subcontracts. amount of any such specialty items performed may be deducted from the total original contract price before computing the amount of 1.In the performance of this contract the contractor shall comply with work required to be performed by the contractor's own organization all applicable Federal,State,and local laws governing safety,health, (23 CFR 635.116). and sanitation(23 CFR Part 635).The contractor shall provide all safeguards,safety devices and protective equipment and take any a. The term"perform work with its own organization"in paragraph other needed actions as it determines,or as the contracting officer 1 of Section A refers to workers employed or leased by the prime may determine,to be reasonably necessary to protect the life and contractor,and equipment owned or rented by the prime contractor, health of employees on the job and the safety of the public and to with or without operators.Such term does not include employees or protect property in connection with the performance of the work equipment of a subcontractor or lower tier subcontractor,agents of covered by the contract.23 CFR 635.108. the prime contractor,or any other assignees.The term may include payments for the costs of hiring leased employees from an 2.It is a condition of this contract,and shall be made a condition of employee leasing firm meeting all relevant Federal and State each subcontract,which the contractor enters into pursuant to this regulatory requirements.Leased employees may only be included in contract,that the contractor and any subcontractor shall not permit this term if the prime contractor meets all of the following conditions: any employee,in performance of the contract,to work in surroundings (based on longstanding interpretation) or under conditions which are unsanitary,hazardous or dangerous to his/her health or safety,as determined under construction safety and (1)the prime contractor maintains control over the supervision of health standards(29 CFR Part 1926)promulgated by the Secretary of the day-to-day activities of the leased employees; Labor,in accordance with Section 107 of the Contract Work Hours and Safety Standards Act(40 U.S.C.3704).29 CFR 1926.10. (2)the prime contractor remains responsible for the quality of the work of the leased employees; 3.Pursuant to 29 CFR 1926.3,it is a condition of this contract that the Secretary of Labor or authorized representative thereof,shall have (3)the prime contractor retains all power to accept or exclude right of entry to any site of contract performance to inspect or individual employees from work on the project;and investigate the matter of compliance with the construction safety and health standards and to carry out the duties of the Secretary under (4)the prime contractor remains ultimately responsible for the Section 107 of the Contract Work Hours and Safety Standards Act(40 payment of predetermined minimum wages,the submission of U.S.C.3704). payrolls,statements of compliance and all other Federal regulatory requirements. VIII.FALSE STATEMENTS CONCERNING HIGHWAY PROJECTS b. "Specialty Items"shall be construed to be limited to work that This provision is applicable to all Federal-aid construction contracts requires highly specialized knowledge,abilities,or equipment not and to all related subcontracts. ordinarily available in the type of contracting organizations qualified and expected to bid or propose on the contract as a whole and in In order to assure high quality and durable construction in conformity general are to be limited to minor components of the overall with approved plans and specifications and a high degree of reliability contract.23 CFR 635.102. on statements and representations made by engineers,contractors, suppliers,and workers on Federal-aid highway projects,it is essential 2.Pursuant to 23 CFR 635.116(a),the contract amount upon which that all persons concerned with the project perform their functions as the requirements set forth in paragraph(1)of Section A is carefully,thoroughly,and honestly as possible.Willful falsification, computed includes the cost of material and manufactured products distortion,or misrepresentation with respect to any facts related to the which are to be purchased or produced by the contractor under the project is a violation of Federal law.To prevent any misunderstanding contract provisions. regarding the seriousness of these and similar acts,Form FHWA-1022 shall be posted on each Federal-aid highway project(23 CFR Part 3.Pursuant to 23 CFR 635.116(c),the contractor shall furnish(a)a 635)in one or more places where it is readily available to all persons competent superintendent or supervisor who is employed by the concerned with the project: firm,has full authority to direct performance of the work in accordance with the contract requirements,and is in charge of all 18 U.S.C. 1020 reads as follows: construction operations(regardless of who performs the work)and (b)such other of its own organizational resources(supervision, "Whoever,being an officer,agent,or employee of the United States, management,and engineering services)as the contracting officer or of any State or Territory,or whoever,whether a person, determines is necessary to assure the performance of the contract. association,firm,or corporation,knowingly makes any false statement,false representation,or false report as to the character, 4.No portion of the contract shall be sublet,assigned or otherwise quality,quantity,or cost of the material used or to be used,or the disposed of except with the written consent of the contracting officer,or quantity or quality of the work performed or to be performed,or the authorized representative,and such consent when given shall not be cost thereof in connection with the submission of plans,maps, construed to relieve the contractor of any responsibility for the fulfillment specifications,contracts,or costs of construction on any highway or of the contract.Written consent will be given only after the contracting related project submitted for approval to the Secretary of agency has assured that each subcontract is evidenced in writing and Transportation;or that it contains all pertinent provisions and requirements of the prime contract.(based on long-standing interpretation of 23 CFR 635.116). Page 17 of 26 February 2023 Local Assistance Procedures Manual Exhibit 12-G Required Federal-Aid Contract Language Whoever knowingly makes any false statement,false c. The certification in this clause is a material representation of fact representation,false report or false claim with respect to the upon which reliance was placed when the contracting agency character,quality,quantity,or cost of any work performed or to be determined to enter into this transaction. If it is later determined that the performed,or materials furnished or to be furnished,in connection prospective participant knowingly rendered an erroneous certification,in with the construction of any highway or related project approved addition to other remedies available to the Federal Government,the by the Secretary of Transportation;or contracting agency may terminate this transaction for cause of default.2 CFR 180.325. Whoever knowingly makes any false statement or false representation as to material fact in any statement,certificate,or d. The prospective first tier participant shall provide immediate written report submitted pursuant to provisions of the Federal-aid Roads notice to the contracting agency to whom this proposal is submitted if Act approved July 11, 1916,(39 Stat.355),as amended and any time the prospective first tier participant learns that its certification supplemented; was erroneous when submitted or has become erroneous by reason of changed circumstances.2 CFR 180.345 and 180.350. Shall be fined under this title or imprisoned not more than 5 years or both." e. The terms"covered transaction,""debarred,""suspended," "ineligible,""participant,""person,""principal,"and"voluntarily excluded," IX.IMPLEMENTATION OF CLEAN AIR ACT AND FEDERAL as used in this clause,are defined in 2 CFR Parts 180,Subpart I, WATER POLLUTION CONTROL ACT(42 U.S.C.7606;2 CFR 180.900-180.1020,and 1200."First Tier Covered Transactions"refers to 200.88;EO 11738) any covered transaction between a recipient or subrecipient of Federal funds and a participant(such as the prime or general contract)."Lower This provision is applicable to all Federal-aid construction Tier Covered Transactions"refers to any covered transaction under a contracts in excess of$150,000 and to all related subcontracts.48 First Tier Covered Transaction(such as subcontracts)."First Tier CFR 2.101;2 CFR 200.326. Participant"refers to the participant who has entered into a covered transaction with a recipient or subrecipient of Federal funds(such as the By submission of this bid/proposal or the execution of this contract prime or general contractor)."Lower Tier Participant"refers any or subcontract,as appropriate,the bidder,proposer, Federal-aid participant who has entered into a covered transaction with a First Tier construction contractor,subcontractor,supplier,or vendor agrees Participant or other Lower Tier Participants(such as subcontractors and to comply with all applicable standards,orders or regulations suppliers). issued pursuant to the Clean Air Act(42 U.S.C.7401-7671q)and the Federal Water Pollution Control Act,as amended(33 U.S.C. f. The prospective first tier participant agrees by submitting this 1251-1387).Violations must be reported to the Federal Highway proposal that,should the proposed covered transaction be entered into, Administration and the Regional Office of the Environmental it shall not knowingly enter into any lower tier covered transaction with a Protection Agency.2 CFR Part 200,Appendix II. person who is debarred,suspended,declared ineligible,or voluntarily excluded from participation in this covered transaction,unless authorized The contractor agrees to include or cause to be included the by the department or agency entering into this transaction.2 CFR requirements of this Section in every subcontract,and further 180.330. agrees to take such action as the contracting agency may direct as a means of enforcing such requirements.2 CFR 200.326. g. The prospective first tier participant further agrees by submitting this proposal that it will include the clause titled"Certification Regarding X.CERTIFICATION REGARDING DEBARMENT,SUSPENSION, Debarment,Suspension, Ineligibility and Voluntary Exclusion-Lower Tier INELIGIBILITY AND VOLUNTARY EXCLUSION Covered Transactions,"provided by the department or contracting agency,entering into this covered transaction,without modification,in all This provision is applicable to all Federal-aid construction lower tier covered transactions and in all solicitations for lower tier contracts,design-build contracts,subcontracts,lower-tier covered transactions exceeding the$25,000 threshold.2 CFR 180.220 subcontracts,purchase orders,lease agreements,consultant and 180.300. contracts or any other covered transaction requiring FHWA approval or that is estimated to cost$25,000 or more—as defined h. A participant in a covered transaction may rely upon a certification in 2 CFR Parts 180 and 1200.2 CFR 180.220 and 1200.220. of a prospective participant in a lower tier covered transaction that is not debarred,suspended,ineligible,or voluntarily excluded from the covered transaction,unless it knows that the certification is erroneous.2 CFR . Instructions for Certification—First Tier Participants: 180.300; 180.320,and 180.325.A participant is responsible for ensuring a. By signing and submitting this proposal,the prospective first that its principals are not suspended,debarred,or otherwise ineligible to tier participant is providing the certification set out below. participate in covered transactions.2 CFR 180.335.To verify the eligibility of its principals,as well as the eligibility of any lower tier b. The inability of a person to provide the certification set out prospective participants,each participant may,but is not required to, below will not necessarily result in denial of participation in this check the System for Award Management website covered transaction.The prospective first tier participant shall (https://www.sam.gov/).2 CFR 180.300, 180.320,and 180.325. submit an explanation of why it cannot provide the certification set i. Nothing contained in the foregoing shall be construed to require the out below.The certification or explanation will be considered in establishment of a system of records in order to render in good faith the connection with the department or agency's determination whether certification required by this clause.The knowledge and information of to enter into this transaction.However,failure of the prospective the prospective participant is not required to exceed that which is first tier participant to furnish a certification or an explanation shall normally possessed by a prudent person in the ordinary course of disqualify such a person from participation in this transaction.2 business dealings. CFR 180.320. Page 18 of 26 February 2023 Local Assistance Procedures Manual Exhibit 12-G Required Federal-Aid Contract Language j. Except for transactions authorized under paragraph(f)of these b. The certification in this clause is a material representation of fact instructions,if a participant in a covered transaction knowingly upon which reliance was placed when this transaction was entered enters into a lower tier covered transaction with a person who is into. If it is later determined that the prospective lower tier participant suspended,debarred,ineligible,or voluntarily excluded from knowingly rendered an erroneous certification,in addition to other participation in this transaction,in addition to other remedies remedies available to the Federal Government,the department,or available to the Federal Government,the department or agency agency with which this transaction originated may pursue available may terminate this transaction for cause or default.2 CFR 180.325. remedies,including suspension and/or debarment. c. The prospective lower tier participant shall provide immediate written notice to the person to which this proposal is submitted if at any time the prospective lower tier participant learns that its 2. Certification Regarding Debarment,Suspension,Ineligibility certification was erroneous by reason of changed circumstances.2 and Voluntary Exclusion—First Tier Participants: CFR 180.365. a. The prospective first tier participant certifies to the best of its d. The terms"covered transaction,""debarred,""suspended," knowledge and belief,that it and its principals: "ineligible,""participant,""person,""principal,"and"voluntarily excluded,"as used in this clause,are defined in 2 CFR Parts 180, (1)Are not presently debarred,suspended,proposed for Subpart I, 180.900—180.1020,and 1200.You may contact the debarment,declared ineligible,or voluntarily excluded from person to which this proposal is submitted for assistance in obtaining participating in covered transactions by any Federal department a copy of those regulations."First Tier Covered Transactions"refers or agency,2 CFR 180.335;. to any covered transaction between a recipient or subrecipient of Federal funds and a participant(such as the prime or general (2)Have not within a three-year period preceding this proposal contract)."Lower Tier Covered Transactions"refers to any covered been convicted of or had a civil judgment rendered against them transaction under a First Tier Covered Transaction(such as for commission of fraud or a criminal offense in connection with subcontracts)."First Tier Participant'refers to the participant who has obtaining,attempting to obtain,or performing a public(Federal, entered into a covered transaction with a recipient or subrecipient of State,or local)transaction or contract under a public transaction; Federal funds(such as the prime or general contractor)."Lower Tier violation of Federal or State antitrust statutes or commission of Participant'refers any participant who has entered into a covered embezzlement,theft,forgery,bribery,falsification or destruction transaction with a First Tier Participant or other Lower Tier of records,making false statements,or receiving stolen property, Participants(such as subcontractors and suppliers). 2 CFR 180.800; (3)Are not presently indicted for or otherwise criminally or civilly e. The prospective lower tier participant agrees by submitting this charged by a governmental entity(Federal,State or local)with proposal that,should the proposed covered transaction be entered commission of any of the offenses enumerated in paragraph into,it shall not knowingly enter into any lower tier covered (a)(2)of this certification,2 CFR 180.700 and 180.800;and transaction with a person who is debarred,suspended,declared ineligible,or voluntarily excluded from participation in this covered (4)Have not within a three-year period preceding this transaction,unless authorized by the department or agency with application/proposal had one or more public transactions which this transaction originated.2 CFR 1200.220 and 1200.332. (Federal,State or local)terminated for cause or default.2 CFR f. The prospective lower tier participant further agrees by 180.335(d). submitting this proposal that it will include this clause titled (5)Are not a corporation that has been convicted of a felony "Certification Regarding Debarment,Suspension,Ineligibility and violation under any Federal law within the two-year period Voluntary Exclusion-Lower Tier Covered Transaction,"without preceding this proposal(USDOT Order 4200.6 implementing modification,in all lower tier covered transactions and in all appropriations act requirements);and solicitations for lower tier covered transactions exceeding the $25,000 threshold.2 CFR 180.220 and 1200.220. (6)Are not a corporation with any unpaid Federal tax liability that has been assessed,for which all judicial and administrative g. A participant in a covered transaction may rely upon a remedies have been exhausted,or have lapsed,and that is not certification of a prospective participant in a lower tier covered being paid in a timely manner pursuant to an agreement with the transaction that is not debarred,suspended,ineligible,or voluntarily authority responsible for collecting the tax liability(USDOT Order excluded from the covered transaction,unless it knows that the 4200.6 implementing appropriations act requirements). certification is erroneous.A participant is responsible for ensuring that its principals are not suspended,debarred,or otherwise b. Where the prospective participant is unable to certify to any of ineligible to participate in covered transactions.To verify the eligibility the statements in this certification,such prospective participant of its principals,as well as the eligibility of any lower tier prospective should attach an explanation to this proposal.2 CFR 180.335 and participants,each participant may,but is not required to,check the 180.340. System for Award Management website(https://www.sam.gov/), which is compiled by the General Services Administration.2 CFR 180.300, 180.320, 180.330,and 180.335. 3. Instructions for Certification-Lower Tier Participants: h. Nothing contained in the foregoing shall be construed to require (Applicable to all subcontracts,purchase orders,and other lower tier establishment of a system of records in order to render in good faith transactions requiring prior FHWA approval or estimated to cost the certification required by this clause.The knowledge and $25,000 or more-2 CFR Parts 180 and 1200).2 CFR 180.220 and information of participant is not required to exceed that which is 1200.220. normally possessed by a prudent person in the ordinary course of business dealings. a. By signing and submitting this proposal,the prospective lower tier participant is providing the certification set out below. Page 19 of 26 February 2023 Local Assistance Procedures Manual Exhibit 12-G Required Federal-Aid Contract Language i. Except for transactions authorized under paragraph a of these 2.This certification is a material representation of fact upon which instructions,if a participant in a covered transaction knowingly reliance was placed when this transaction was made or entered into. enters into a lower tier covered transaction with a person who is Submission of this certification is a prerequisite for making or suspended,debarred,ineligible,or voluntarily excluded from entering into this transaction imposed by 31 U.S.C. 1352.Any person participation in this transaction,in addition to other remedies who fails to file the required certification shall be subject to a civil available to the Federal Government,the department or agency with penalty of not less than$10,000 and not more than$100,000 for which this transaction originated may pursue available remedies, each such failure. including suspension and/or debarment.2 CFR 180.325. 3.The prospective participant also agrees by submitting its bid or • •** proposal that the participant shall require that the language of this certification be included in all lower tier subcontracts,which exceed Certification Regarding Debarment,Suspension,Ineligibility and $100,000 and that all such recipients shall certify and disclose Voluntary Exclusion--Lower Tier Participants: accordingly. 1. The prospective lower tier participant certifies,by submission of XII.USE OF UNITED STATES-FLAG VESSELS: this proposal,that neither it nor its principals: This provision is applicable to all Federal-aid construction contracts, (a)is presently debarred,suspended,proposed for debarment, design-build contracts,subcontracts,lower-tier subcontracts, declared ineligible,or voluntarily excluded from participating in purchase orders,lease agreements,or any other covered covered transactions by any Federal department or agency,2 transaction.46 CFR Part 381. CFR 180.355; This requirement applies to material or equipment that is acquired for (b)is a corporation that has been convicted of a felony violation a specific Federal-aid highway project.46 CFR 381.7.It is not under any Federal law within the two-year period preceding this applicable to goods or materials that come into inventories proposal(USDOT Order 4200.6 implementing appropriations act independent of an FHWA funded-contract. requirements);and When oceanic shipments(or shipments across the Great Lakes)are (c)is a corporation with any unpaid Federal tax liability that has necessary for materials or equipment acquired for a specific Federal- been assessed,for which all judicial and administrative remedies aid construction project,the bidder,proposer,contractor, have been exhausted,or have lapsed,and that is not being paid subcontractor,or vendor agrees: in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability.(USDOT Order 4200.6 1.To utilize privately owned United States-flag commercial vessels implementing appropriations act requirements) to ship at least 50 percent of the gross tonnage(computed separately for dry bulk carriers,dry cargo liners,and tankers) 2. Where the prospective lower tier participant is unable to certify to involved,whenever shipping any equipment,material,or any of the statements in this certification,such prospective commodities pursuant to this contract,to the extent such vessels are participant should attach an explanation to this proposal. available at fair and reasonable rates for United States-flag commercial vessels.46 CFR 381.7. 2.To furnish within 20 days following the date of loading for XI.CERTIFICATION REGARDING USE OF CONTRACT FUNDS shipments originating within the United States or within 30 working FOR LOBBYING days following the date of loading for shipments originating outside the United States,a legible copy of a rated,'on-board'commercial This provision is applicable to all Federal-aid construction contracts ocean bill-of-lading in English for each shipment of cargo described and to all related subcontracts which exceed$100,000.49 CFR Part in paragraph(b)(1)of this section to both the Contracting Officer 20,App.A. (through the prime contractor in the case of subcontractor bills-of- lading)and to the Office of Cargo and Commercial Sealift(MAR- 1.The prospective participant certifies,by signing and submitting this 620),Maritime Administration,Washington,DC 20590.(MARAD bid or proposal,to the best of his or her knowledge and belief,that: requires copies of the ocean carrier's(master)bills of lading,certified onboard,dated,with rates and charges.These bills of lading may a. No Federal appropriated funds have been paid or will be paid,by contain business sensitive information and therefore may be or on behalf of the undersigned,to any person for influencing or submitted directly to MARAD by the Ocean Transportation attempting to influence an officer or employee of any Federal agency, Intermediary on behalf of the contractor).46 CFR 381.7. a Member of Congress,an officer or employee of Congress,or an employee of a Member of Congress in connection with the awarding of any Federal contract,the making of any Federal grant,the making of any Federal loan,the entering into of any cooperative agreement,and the extension,continuation,renewal,amendment,or modification of any Federal contract,grant,loan,or cooperative agreement. b. If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any Federal agency,a Member of Congress,an officer or employee of Congress,or an employee of a Member of Congress in connection with this Federal contract,grant, loan,or cooperative agreement,the undersigned shall complete and submit Standard Form-LLL,"Disclosure Form to Report Lobbying,"in accordance with its instructions. Page 20 of 26 February 2023 Local Assistance Procedures Manual Exhibit 12-G Required Federal-Aid Contract Language 12. FEMALE AND MINORITY GOALS To comply with Section II, "Nondiscrimination," of"Required Contract Provisions Federal-Aid Construction Contracts,"the following are for female and minority utilization goals for Federal-aid construction contracts and subcontracts that exceed $10,000: The nationwide goal for female utilization is 6.9 percent. The goals for minority utilization (45 Fed Reg 65984(10/3/1980))are as follows: MINORITY UTILIZATION GOALS Economic Goal Area (Percent) Redding CA: 174 Non-SMSA(Standard Metropolitan Statistical Area)Counties: 6.8 CA Lassen; CA Modoc; CA Plumas; CA Shasta; CA Siskiyou; CA Tehama Eureka, CA 175 Non-SMSA Counties: 6.6 CA Del Norte; CA Humboldt; CA Trinity San Francisco-Oakland-San Jose,CA: SMSA Counties: 7120 Salinas-Seaside-Monterey, CA 28.9 CA Monterey 7360 San Francisco-Oakland 25.6 CA Alameda; CA Contra Costa; CA Marin; CA San Francisco; CA San Mateo 7400 San Jose, CA 19.6 176 CA Santa Clara, CA 7485 Santa Cruz,CA 14.9 CA Santa Cruz 7500 Santa Rosa 9.1 CA Sonoma 8720 Vallejo-Fairfield-Napa, CA 17.1 CA Napa; CA Solano Non-SMSA Counties: 23.2 CA Lake; CA Mendocino; CA San Benito Sacramento, CA: SMSA Counties: 177 6920 Sacramento, CA 16.1 CA Placer; CA Sacramento;CA Yolo Non-SMSA Counties 14.3 CA Butte; CA Colusa; CA El Dorado; CA Glenn; CA Nevada; CA Sierra; CA Sutter; CA Yuba Stockton-Modesto, CA: SMSA Counties: 5170 Modesto, CA 12.3 178 CA Stanislaus 8120 Stockton, CA 24.3 CA San Joaquin Non-SMSA Counties 19.8 CA Alpine; CA Amador; CA Calaveras; CA Mariposa; CA Merced; CA Tuolumne Fresno-Bakersfield, CA SMSA Counties: 179 0680 Bakersfield, CA 19.1 CA Kern 2840 Fresno, CA 26.1 Page 21 of 26 February 2023 Local Assistance Procedures Manual Exhibit 12-G Required Federal-Aid Contract Language CA Fresno Non-SMSA Counties: 23.6 CA Kings; CA Madera; CA Tulare Los Angeles, CA: SMSA Counties: 0360 Anaheim-Santa Ana-Garden Grove, CA 11.9 CA Orange 4480 Los Angeles-Long Beach, CA 28.3 CA Los Angeles 21.5 180 6000 Oxnard-Simi Valley-Ventura,CA CA Ventura 19.0 6780 Riverside-San Bernardino-Ontario, CA CA Riverside; CA San Bernardino 19.7 7480 Santa Barbara-Santa Maria-Lompoc, CA CA Santa Barbara 24.6 Non-SMSA Counties CA Inyo; CA Mono; CA San Luis Obispo San Diego, CA: SMSA Counties 7320 San Diego,CA 16.9 181 CA San Diego Non-SMSA Counties 18.2 CA Imperial For the last full week of July during which work is performed under the contract, the prime contractor and each non material-supplier subcontractor with a subcontract of$10,000 or more must complete Form FHWA PR-1391 (Appendix C to 23 CFR 230). Submit the forms by August 15. 13. TITLE VI ASSURANCES The U.S. Department of Transportation Order No.1050.2A requires all federal-aid Department of Transportation contracts between an agency and a contractor to contain Appendix A and E.Appendix B only requires inclusion if the contract impacts deeds effecting or recording the transfer of real property, structures, or improvements thereon, or granting interest therein. Appendices C and D only require inclusion if the contract impacts deeds, licenses, leases, permits, or similar instruments entered into by the recipient. APPENDIX A During the performance of this Agreement, the contractor,for itself, its assignees and successors in interest(hereinafter collectively referred to as CONTRACTOR) agrees as follows: a. Compliance with Regulations: CONTRACTOR shall comply with the regulations relative to nondiscrimination in federally assisted programs of the Department of Transportation, Title 49, Code of Federal Regulations, Part 21, as they may be amended from time to time, (hereinafter referred to as the REGULATIONS),which are herein incorporated by reference and made a part of this agreement. b. Nondiscrimination: CONTRACTOR, with regard to the work performed by it during the AGREEMENT, shall not discriminate on the grounds of race, color, sex, national origin, religion, age, or disability in the selection and retention of sub-applicants, including procurements of materials and leases of equipment. CONTRACTOR shall not participate either directly or indirectly in the discrimination prohibited by Section 21.5 of the Regulations, including employment practices when the agreement covers a program set forth in Appendix B of the Regulations. c. Solicitations for Sub-agreements, Including Procurements of Materials and Equipment: In all solicitations either by competitive bidding or negotiation made by CONTRACTOR for work to be performed under a Sub-agreement, including procurements of materials or leases of equipment, Page 22 of 26 February 2023 Local Assistance Procedures Manual Exhibit 12-G Required Federal-Aid Contract Language each potential sub-applicant or supplier shall be notified by CONTRACTOR of the CONTRACTOR'S obligations under this Agreement and the Regulations relative to nondiscrimination on the grounds of race, color, or national origin. d. Information and Reports: CONTRACTOR shall provide all information and reports required by the Regulations, or directives issued pursuant thereto, and shall permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by the recipient or FHWA to be pertinent to ascertain compliance with such Regulations or directives. Where any information required of CONTRACTOR is in the exclusive possession of another who fails or refuses to furnish this information, CONTRACTOR shall so certify to the recipient or FHWA as appropriate, and shall set forth what efforts CONTRACTOR has made to obtain the information. e. Sanctions for Noncompliance: In the event of CONTRACTOR's noncompliance with the nondiscrimination provisions of this agreement, the recipient shall impose such agreement sanctions as it or the FHWA may determine to be appropriate, including, but not limited to: i. withholding of payments to CONTRACTOR under the Agreement within a reasonable period of time, not to exceed 90 days; and/or ii. cancellation, termination or suspension of the Agreement, in whole or in part. f. Incorporation of Provisions: CONTRACTOR shall include the provisions of paragraphs (1) through (6) in every sub-agreement, including procurements of materials and leases of equipment, unless exempt by the Regulations, or directives issued pursuant thereto. CONTRACTOR shall take such action with respect to any sub-agreement or procurement as the recipient or FHWA may direct as a means of enforcing such provisions including sanctions for noncompliance, provided, however, that, in the event CONTRACTOR becomes involved in, or is threatened with, litigation with a sub-applicant or supplier as a result of such direction, CONTRACTOR may request the recipient enter into such litigation to protect the interests of the State, and, in addition, CONTRACTOR may request the United States to enter into such litigation to protect the interests of the United States. APPENDIX E During the performance of this contract, the contractor, for itself, its assignees, and successors in interest (hereinafter referred to as the "contractor")agrees to comply with the following non-discrimination statutes and authorities, including, but not limited to: Pertinent Non-Discrimination Authorities: • Title VI of the Civil Rights Act of 1964 (42 U.S.C. §2000d et seq., 78 stat. 252), prohibits discrimination on the basis of race, color, national origin); and 49 CFR Part 21. • The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, (42 U.S.C. § 4601), (prohibits unfair treatment of persons displaced or whose property has been acquired because of Federal or Federal-aid programs and projects); • Federal-Aid Highway Act of 1973, (23 U.S.C. §324 et seq.), prohibits discrimination on the basis of sex; • Section 504 of the Rehabilitation Act of 1973, (29 U.S.C. § 794 et seq.), as amended, (prohibits discrimination on the basis of disability); and 49 CR Part 27; • The Age Discrimination Act of 1975, as amended, (42 U.S.C. §6101 et seq.), prohibits discrimination on the basis of age); • Airport and Airway Improvement Act of 1982, (49 U.S.C. §471, Section 47123), as amended, (prohibits discrimination based on race, creed, color, national origin, or sex); • The Civil Rights Restoration Act of 1987, (PL 100-209), (Broadened the scope, coverage and applicability of Title VI of the Civil Rights Act of 1964, The Age Discrimination Act of 1975 and Section 504 of the Rehabilitation Act of 1973, by expanding the definition of the terms"programs or activities"to include all of the programs or activities of the Federal-aid recipients, sub-recipients and contractors, whether such programs or activities are Federally funded or not); Page 23 of 26 February 2023 Local Assistance Procedures Manual Exhibit 12-G Required Federal-Aid Contract Language • Titles II and III of the Americans with Disabilities Act, which prohibit discrimination of the basis of disability in the operation of public entities, public and private transportation systems, places of public accommodation, and certain testing entities (42 U.S.C. §§ 12131 — 12189) as implemented by Department of Transportation regulations 49 C.F.R. parts 37 and 38; • The Federal Aviation Administration's Non-discrimination statute (49 U.S.C. §47123)(prohibits discrimination on the basis of race, color, national origin, and sex); • Executive Order 12898, Federal Actions to Address Environmental Justice in Minority Populations and Low-Income Populations, which ensures discrimination against minority populations by discouraging programs, policies, and activities with disproportionately high and adverse human health or environmental effects on minority and low-income populations; • Executive Order 13166, Improving Access to Services for Persons with Limited English Proficiency, and resulting agency guidance, national origin discrimination includes discrimination because of limited English proficiency(LEP). To ensure compliance with Title VI, you must take reasonable steps to ensure that LEP persons have meaningful access to your programs (70 Fed. Reg. at 74087 to 74100); • Title IX of the Education Amendments of 1972, as amended,which prohibits you from discriminating because of sex in education programs or activities (20 U.S.C. 1681 et seq). Page 24 of 26 February 2023 Local Assistance Procedures Manual Exhibit 12-G Required Federal-Aid Contract Language Federal Trainee Program Special Provisions (to be used when applicable) 14. FEDERAL TRAINEE PROGRAM For the Federal training program,the number of trainees or apprentices is listed on the Notice to Bidders. This section applies if a number of trainees or apprentices is specified in the special provisions. As part of the prime contractor's equal opportunity affirmative action program, provide on-the-job training to develop full journeymen in the types of trades or job classifications involved. The prime contractor has primary responsibility for meeting this training requirement. If the prime contractor subcontracts a contract part, they shall determine how many trainees or apprentices are to be trained by the subcontractor. Include these training requirements in each subcontract. Where feasible, 25 percent of apprentices or trainees in each occupation must be in their 1 st year of apprenticeship or training. Distribute the number of apprentices or trainees among the work classifications on the basis of the prime contractor's needs and the availability of journeymen in the various classifications within a reasonable recruitment area. Before starting work, the prime contractor shall submit to the County of Fresno. 1. Number of apprentices or trainees to be trained for each classification 2. Training program to be used 3. Training starting date for each classification The prime contractor shall obtain the County of Fresno's approval for this submitted information before the prime contractor starts work. The County of Fresno credits the prime contractor for each apprentice or trainee the prime contractor employs on the job who is currently enrolled or becomes enrolled in an approved program. The primary objective of this section is to train and upgrade minorities and women toward journeyman status. The prime contractor shall make every effort to enroll minority and women apprentices or trainees, such as conducting systematic and direct recruitment through public and private sources likely to yield minority and women apprentices or trainees, to the extent they are available within a reasonable recruitment area and show that they have made the efforts. In making these efforts, the prime contractor shall not discriminate against any applicant for training. The prime contractor shall not employ as an apprentice or trainee an employee: 1. In any classification in which the employee has successfully completed a training course leading to journeyman status or in which the employee has been employed as a journeyman 2. Who is not registered in a program approved by the US Department of Labor, Bureau of Apprenticeship and Training The prime contractor shall ask the employee if the employee has successfully completed a training course leading to journeyman status or has been employed as a journeyman. The prime contractor's records must show the employee's answers to the questions. In the training program, the prime contractor shall establish the minimum length and training type for each classification. The County of Fresno and FHWA approves a program if one of the following is met: 1. It is calculated to: • Meet the equal employment opportunity responsibilities • Qualify the average apprentice or trainee for journeyman status in the classification involved by the end of the training period 2. It is registered with the U.S. Department of Labor, Bureau of Apprenticeship and Training, and it is administered in a way consistent with the equal employment responsibilities of Federal-aid highway construction contracts Page 25 of 26 February 2023 Local Assistance Procedures Manual Exhibit 12-G Required Federal-Aid Contract Language The prime contractor shall obtain the State's approval for their training program before they start work involving the classification covered by the program. The prime contractor shall provide training in the construction crafts, not in clerk-typist or secretarial-type positions. Training is allowed in lower level management positions such as office engineers, estimators, and timekeepers if the training is oriented toward construction applications. Training is allowed in the laborer classification if significant and meaningful training is provided and approved by the division office. Off-site training is allowed if the training is an integral part of an approved training program and does not make up a significant part of the overall training. The County of Fresno reimburses the prime contractor 80 cents per hour of training given an employee on this contract under an approved training program: 1. For on-site training 2. For off-site training if the apprentice or trainee is currently employed on a Federal-aid project and prime contractor does at least one of the following: a. Contribute to the cost of the training b. Provide the instruction to the apprentice or trainee c. Pay the apprentice's or trainee's wages during the off-site training period 3. If the prime contractor complies with this section. Each apprentice or trainee must: 1. Begin training on the project as soon as feasible after the start of work involving the apprentice's or trainee's skill 2. Remain on the project as long as training opportunities exist in the apprentice's or trainee's work classification or until the apprentice or trainee has completed the training program The prime contractor shall furnish the apprentice or trainee with a copy of the program that the prime contractor will comply with in providing the training. 15. PROHIBITION OF CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE EQUIPMENT AND SERVICES In response to significant national security concerns, the agency shall check the prohibited vendor list before making any telecommunications and video surveillance purchase because recipients and subrecipients of federal funds are prohibited from obligating or expending loan or grant funds to: • Procure or obtain; • Extend or renew a contract to procure or obtain; or • Enter into a contract (or extend or renew a contract)to procure or obtain equipment, services, or systems that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. The prohibited vendors(and their subsidiaries or affiliates)are: • Huawei Technologies Company; • ZTE Corporation; • Hytera Communications Corporation; • Hangzhou Hikvision Digital Technology Company; • Dahua Technology Company; and • Subsidiaries or affiliates of the above-mentioned companies. In implementing the prohibition, the agency administering loan, grant, or subsidy programs shall prioritize available funding and technical support to assist affected businesses, institutions and organizations as is reasonably necessary for those affected entities to transition from covered communications equipment and services, to procure replacement equipment and services, and to ensure that communications service to users and customers is sustained. The contractors should furnish telecommunications and video surveillance equipment with a certificate of compliance. The certificate must state telecommunications and video surveillance equipment was not procured or obtained from manufacturers identified in the above list. Page 26 of 26 February 2023 Exhibit B 3/19/24,8:22 AM SAM.gov "General Decision Number: CA20240018 01/26/2024 Superseded General Decision Number: CA20230018 State: California Construction Types: Building, Heavy (Heavy and Dredging) and Highway Counties: Alameda, Calaveras, Contra Costa, Fresno, Kings, Madera, Mariposa, Merced, Monterey, San Benito, San Francisco, San Joaquin, San Mateo, Santa Clara, Santa Cruz, Stanislaus and Tuolumne Counties in California. BUILDING CONSTRUCTION PROJECTS; DREDGING PROJECTS (does not include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does not include water well drilling); HIGHWAY CONSTRUCTION PROJECTS Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658. Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1). JIf the contract is entered Executive Order 14026 linto on or after January 30, generally applies to the 12022, or the contract is contract. renewed or extended (e.g., an The contractor must pay loption is exercised) on or all covered workers at after January 30, 2022: least $17.20 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in 2024. JIf the contract was awarded onl . Executive Order 13658 for between January 1, 2015 andl generally applies to the 13anuary 29, 2022, and the contract. contract is not renewed or The contractor must pay alll lextended on or after January covered workers at least 1 130, 2022: 1 $12.90 per hour (or the applicable wage rate listed) on this wage determination, 1 if it is higher) for all hours spent performing on that contract in 2024. 1 1 1 1 The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request. Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts. Modification Number Publication Date 0 01/05/2024 1 01/12/2024 2 01/19/2024 3 01/26/2024 https://sam.gov/wage-determination/CA20240018/3 1/63 3/19/24,8:22 AM SAM.gov ASBE0016-004 01/01/2021 AREA 1: CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, SANTA CRUZ, STANISLAUS & TOULMNE COUNTIES AREA 2: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO & SANTA CLARA COUNTIES Rates Fringes Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not) Area 1......................$ 30.45 10.60 Area 2......................$ 36.53 9.27 ---------------------------------------------------------------- ASBE0016-008 02/01/2023 AREA 1: ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA, & SANTA CRUZ AREA 2: CALAVERAS, COLUSA, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS, & TUOLUMNE Rates Fringes Asbestos Workers/Insulator (Includes the application of all insulating materials, Protective Coverings, Coatings, and Finishes to all types of mechanical systems) Area 1......................$ 80.91 23.82 Area 2......................$ 62.26 23.82 ---------------------------------------------------------------- BOIL0549-001 01/01/2021 AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO & SANTA CLARA COUNTIES AREA 2: REMAINING COUNTIES Rates Fringes BOILERMAKER Area 1........... ...........$ 49.62 41.27 Area 2......................$ 45.60 38.99 ---------------------------------------------------------------- BRCA0003-001 08/01/2022 Rates Fringes MARBLE FINISHER..................$ 39.20 18.31 ---------------------------------------------------------------- BRCA0003-003 08/01/2022 Rates Fringes MARBLE MASON.......... ...........$ 56.98 28.54 ---------------------------------------------------------------- BRCA0003-005 05/01/2022 https://sam.gov/wage-determination/CA20240018/3 2/63 3/19/24,8:22 AM SAM.gov Rates Fringes BRICKLAYER ( 1) Fresno, Kings, Madera, Mariposa, Merced....$ 47.88 23.29 ( 7) San Francisco, San Mateo.......................$ 53.69 26.03 ( 8) Alameda, Contra Costa, San Benito, Santa Clara............ ...........$ 53.61 23.81 ( 9) Calaveras, San Joaquin, Stanislaus, Toulumne....................$ 45.12 21.55 (16) Monterey, Santa Cruz...$ 50.78 25.42 ---------------------------------------------------------------- BRCA0003-008 07/01/2022 Rates Fringes TERRAZZO FINISHER................$ 41.93 18.98 TERRAZZO WORKER/SETTER...........$ 56.84 27.53 ---------------------------------------------------------------- BRCA0003-011 04/01/2022 AREA 1: Alameda, Contra Costa, Monterey, San Benito, San Francisco, San Mateo, Santa Clara, Santa Cruz AREA 2: Calaveras, San Joaquin, Stanislaus, Tuolumne AREA 3: Fresno, Kings, Madera, Mariposa, Merced Rates Fringes TILE FINISHER Area 1......................$ 33.86 17.54 Area 2......................$ 30.90 17.67 Area 3........... ...........$ 29.89 16.80 Tile Layer Area 1......................$ 55.41 20.50 Area 2......................$ 50.66 20.40 Area 3........... ...........$ 45.76 19.92 ---------------------------------------------------------------- CARP0022-001 07/01/2023 San Francisco County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 60.39 33.52 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 60.54 33.52 Journeyman Carpenter........$ 60.39 33.52 Millwright..................$ 60.49 35.11 ---------------------------------------------------------------- CARP0034-001 07/01/2021 Rates Fringes Diver Assistant Tender, ROV Tender/Technician...........$ 54.10 34.69 Diver standby...............$ 60.51 34.69 Diver Tender................$ 59.51 34.69 Diver wet........ ...........$ 103.62 34.69 Manifold Operator (mixed gas)........................$ 64.51 34.69 Manifold Operator (Standby).$ 59.51 34.69 https://sam.gov/wage-determination/CA20240018/3 3/63 3/19/24,8:22 AM SAM.gov DEPTH PAY (Surface Diving): 050 to 100 ft $2.00 per foot 101 to 150 ft $3.00 per foot 151 to 220 ft $4.00 per foot 221 ft.-deeper $5.00 per foot SATURATION DIVING: The standby rate shall apply until saturation starts. The saturation diving rate applies when divers are under pressure continuously until work task and decompression are complete. The diver rate shall be paid for all saturation hours. DIVING IN ENCLOSURES: Where it is necessary for Divers to enter pipes or tunnels, or other enclosures where there is no vertical ascent, the following premium shall be paid: Distance traveled from entrance 26 feet to 300 feet: $1.00 per foot. When it is necessary for a diver to enter any pipe, tunnel or other enclosure less than 48"" in height, the premium will be $1.00 per foot. WORK IN COMBINATION OF CLASSIFICATIONS: Employees working in any combination of classifications within the diving crew (except dive supervisor) in a shift are paid in the classification with the highest rate for that shift. ---------------------------------------------------------------- CARP0034-003 07/01/2021 Rates Fringes Piledriver............ ...........$ 54.10 34.69 ---------------------------------------------------------------- CARP0035-007 07/01/2020 AREA 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa Clara counties AREA 2: Monterey, San Benito, Santa Cruz Counties AREA 3: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, San Joaquin, Stanislaus, Tuolumne Counties Rates Fringes Modular Furniture Installer Area 1 Installer..................$ 28.76 22.53 Lead Installer.............$ 32.21 23.03 Master Installer...........$ 36.43 23.03 Area 2 Installer..................$ 26.11 22.53 Lead Installer.............$ 29.08 23.03 Master Installer...........$ 32.71 23.03 Area 3 Installer..................$ 25.16 22.53 Lead Installer.............$ 27.96 23.03 Master Installer...........$ 31.38 23.03 ---------------------------------------------------------------- CARP0035-008 08/01/2020 AREA 1: Alameda, Contra Costa, San Francisco, San Mateo, Santa Clara counties AREA 2: Monterey, San Benito, Santa Cruz Counties AREA 3: San Joaquin AREA 4: Calaveras, Fresno, Kings, Madera, Mariposa, Merced, Stanislaus, Tuolumne Counties https://sam.gov/wage-determination/CA20240018/3 4/63 3/19/24,8:22 AM SAM.gov Rates Fringes Drywall Installers/Lathers: Area 1......................$ 52.65 31.26 Area 2........... ...........$ 46.77 31.26 Area 3......................$ 47.27 31.26 Area 4......................$ 45.92 31.26 Drywall Stocker/Scrapper Area 1........... ...........$ 26.33 18.22 Area 2......................$ 23.39 18.22 Area 3......................$ 23.64 18.22 Area 4......................$ 22.97 18.22 ---------------------------------------------------------------- CARP0152-001 07/01/2020 Contra Costa County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 52.80 30.82 Journeyman Carpenter........$ 52.65 30.82 Millwright..................$ 52.75 32.41 ---------------------------------------------------------------- CARP0152-002 07/01/2020 San Joaquin County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 46.92 30.82 Journeyman Carpenter........$ 46.77 30.82 Millwright..................$ 49.27 32.41 ---------------------------------------------------------------- CARP0152-004 07/01/2020 Calaveras, Mariposa, Merced, Stanislaus and Tuolumne Counties Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 52.65 30.82 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer............ ...........$ 45.57 30.82 Journeyman Carpenter........$ 45.42 30.82 Millwright..................$ 47.92 32.41 ---------------------------------------------------------------- CARP0217-001 07/01/2023 San Mateo County Rates Fringes Carpenters Bridge Builder/Highway Carpenter........ ...........$ 60.39 33.52 https://sam.gov/wage-determination/CA20240018/3 5/63 3/19/24,8:22 AM SAM.gov Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 60.54 33.52 Journeyman Carpenter........$ 60.39 33.52 Millwright..................$ 60.49 35.11 ---------------------------------------------------------------- CARP0405-001 07/01/2021 Santa Clara County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 55.00 31.49 Journeyman Carpenter........$ 54.85 31.49 Millwright..................$ 54.95 33.08 ---------------------------------------------------------------- CARP0405-002 07/01/2021 San Benito County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 49.12 31.49 Journeyman Carpenter........$ 48.97 31.49 Millwright..................$ 51.47 33.08 ---------------------------------------------------------------- CARP0505-001 07/01/2021 Santa Cruz County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 49.12 31.49 Journeyman Carpenter........$ 48.97 31.49 Millwright....... ...........$ 51.47 33.08 ---------------------------------------------------------------- CARP0605-001 07/01/2021 Monterey County Rates Fringes Carpenters Bridge Builder/Highway Carpenter........ ...........$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 49.12 31.49 Journeyman Carpenter........$ 48.97 31.49 https://sam.gov/wage-determination/CA20240018/3 6/63 3/19/24,8:22 AM SAM.gov Millwright..................$ 51.47 33.08 ---------------------------------------------------------------- CARP0701-001 07/01/2021 Fresno and Madera Counties Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 47.77 31.49 Journeyman Carpenter........$ 47.62 31.49 Millwright....... ...........$ 50.12 33.08 ---------------------------------------------------------------- CARP0713-001 07/01/2021 Alameda County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 55.00 31.49 Journeyman Carpenter........$ 54.85 31.49 Millwright..................$ 54.95 33.08 ---------------------------------------------------------------- CARP1109-001 07/01/2021 Kings County Rates Fringes Carpenters Bridge Builder/Highway Carpenter...................$ 54.85 31.49 Hardwood Floorlayer, Shingler, Power Saw Operator, Steel Scaffold & Steel Shoring Erector, Saw Filer.......................$ 47.77 31.49 Journeyman Carpenter........$ 47.62 31.49 Millwright..................$ 50.12 33.08 ---------------------------------------------------------------- * ELEC0006-004 11/01/2023 SAN FRANCISCO COUNTY Rates Fringes Sound & Communications Installer...................$ 51.68 3%+24.65 Technician..................$ 59.43 3%+24.65 SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety https://sam.gov/wage-determination/CA20240018/3 7/63 3/19/24,8:22 AM SAM.gov systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems. FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician. ---------------------------------------------------------------- ELEC0006-007 06/01/2023 SAN FRANCISCO COUNTY Rates Fringes ELECTRICIAN......................$ 88.25 3%+42.315 ---------------------------------------------------------------- ELECO100-002 09/01/2023 FRESNO, KINGS, AND MADERA COUNTIES Rates Fringes ELECTRICIAN........... ...........$ 44.50 28.09 ---------------------------------------------------------------- ELECO100-005 12/01/2023 FRESNO, KINGS, MADERA Rates Fringes Communications System Installer...................$ 42.48 27.42 Technician..................$ 48.85 27.42 SCOPE OF WORK Includes the installation testing, service and maintenance, of the following systems which utilize the transmission and/or transference of voice, sound, vision and digital for commercial, education, security and entertainment purposes for the following: TV monitoring and surveillance, background-foreground music, intercom and telephone interconnect, inventory control systems, microwave transmission, multi-media, multiplex, nurse call system, radio page, school intercom and sound, burglar alarms, and low voltage master clock systems. A. SOUND AND VOICE TRANSMISSION/TRANSFERENCE SYSTEMS Background foreground music, Intercom and telephone interconnect systems, Telephone systems Nurse call systems, Radio page systems, School intercom and sound systems, Burglar alarm systems, Low voltage, master clock systems, Multi-media/multiplex systems, Sound and musical entertainment systems, RF systems, Antennas and Wave Guide, B. FIRE ALARM SYSTEMS Installation, wire pulling and testing C. TELEVISION AND VIDEO SYSTEMS Television monitoring and surveillance systems Video security systems, Video entertainment systems, Video educational systems, Microwave transmission systems, CATV and CCTV D. SECURITY SYSTEMS Perimeter security systems Vibration sensor systems Card access systems Access control systems, Sonar/infrared monitoring equipment E. COMMUNICATIONS SYSTEMS THAT TRANSMIT OR RECEIVE INFORMATION AND/OR CONTROL SYSTEMS THAT ARE INTRINSIC TO THE ABOVE LISTED SYSTEMS SCADA (Supervisory Control and Data Acquisition) PCM (Pulse Code Modulation) Inventory Control Systems, Digital Data Systems Broadband and https://sam.gov/wage-determination/CA20240018/3 8/63 3/19/24,8:22 AM SAM.gov Baseband and Carriers Point of Sale Systems, VSAT Data Systems Data Communication Systems RF and Remote Control Systems, Fiber Optic Data Systems WORK EXCLUDED Raceway systems are not covered (excluding Ladder-Rack for the purpose of the above listed systems). Chases and/or nipples (not to exceed 10 feet) may be installed on open wiring systems. Energy management systems. SCADA (Supervisory Control and Data Acquisition) when not intrinsic to the above listed systems (in the scope). Fire alarm systems when installed in raceways (including wire and cable pulling) shall be performed at the electrician wage rate, when either of the following two (2) conditions apply: 1. The project involves new or major remodel building trades construction. 2. The conductors for the fire alarm system are installed in conduit. ---------------------------------------------------------------- ELECO234-001 12/26/2022 MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES Rates Fringes ELECTRICIAN Zone A......................$ 60.91 29.43 Zone B......................$ 67.00 29.61 Zone A: All of Santa Cruz, Monterey, and San Benito Counties within 25 air miles of Highway 1 and Dolan Road in Moss Landing, and an area extending 5 miles east and west of Highway 101 South to the San Luis Obispo County Line Zone B: Any area outside of Zone A ---------------------------------------------------------------- ELECO234-003 12/01/2021 MONTEREY, SAN BENITO, AND SANTA CRUZ COUNTIES Rates Fringes Sound & Communications Installer........ ...........$ 47.93 24.09 Technician..................$ 55.12 24.30 SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems. FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician. ---------------------------------------------------------------- ELEC0302-001 02/27/2023 CONTRA COSTA COUNTY https://sam.gov/wage-determination/CA20240018/3 9/63 3/19/24,8:22 AM SAM.gov Rates Fringes CABLE SPLICER....................$ 68.92 32.67 ELECTRICIAN......................$ 61.26 32.44 ---------------------------------------------------------------- ELEC0302-003 12/01/2023 CONTRA COSTA COUNTY Rates Fringes Sound & Communications Installer........ ...........$ 48.44 27.60 Technician..................$ 55.71 27.82 SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems. FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician. ---------------------------------------------------------------- ELEC0332-001 06/01/2023 SANTA CLARA COUNTY Rates Fringes CABLE SPLICER......... ...........$ 95.65 44.42 ELECTRICIAN......................$ 83.17 44.045 FOOTNOTES: Work under compressed air or where gas masks are required, orwork on ladders, scaffolds, stacks, ""Bosun's chairs,"" or other structures and where the workers are not protected by permanent guard rails at a distance of 40 to 60 ft. from the ground or supporting structures: to be paid one and one-half times the straight-time rate of pay. Work on structures of 60 ft. or over (as described above): to be paid twice the straight-time rate of pay. ---------------------------------------------------------------- ELEC0332-003 12/01/2023 SANTA CLARA COUNTY Rates Fringes Sound & Communications Installer........ ...........$ 53.18 27.745 Technician..................$ 61.16 27.985 SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed https://sam.gov/wage-determination/CA20240018/3 10/63 3/19/24,8:22 AM SAM.gov in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems. FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician. ---------------------------------------------------------------- ELECO595-001 06/01/2023 ALAMEDA COUNTY Rates Fringes CABLE SPLICER....................$ 80.73 3%+42.87 ELECTRICIAN......................$ 70.20 3%+42.87 ---------------------------------------------------------------- ELEC0595-002 12/01/2022 CALAVERAS AND SAN JOAQUIN COUNTIES Rates Fringes CABLE SPLICER....................$ 53.34 7.75%+25.88 ELECTRICIAN (1) Tunnel work.............$ 46.67 7.75%+25.88 (2) All other work.........$ 44.45 7.75%+25.88 ---------------------------------------------------------------- ELECO595-006 12/01/2022 ALAMEDA COUNTY Rates Fringes Sound & Communications Installer...................$ 51.18 3%+23.90 Technician....... ...........$ 58.86 3%+23.90 SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems. FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician. ---------------------------------------------------------------- ELEC0595-008 12/01/2022 CALAVERAS AND SAN JOAQUIN COUNTIES https://sam.gov/wage-determination/CA20240018/3 11/63 3/19/24,8:22 AM SAM.gov Rates Fringes Communications System Installer...................$ 40.88 3%+23.90 Technician..................$ 47.01 3%+23.90 SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems. FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician. ---------------------------------------------------------------- ELEC0617-001 06/01/2023 SAN MATEO COUNTY Rates Fringes ELECTRICIAN......................$ 78.00 45.88 ---------------------------------------------------------------- * ELEC0617-003 12/01/2023 SAN MATEO COUNTY Rates Fringes Sound & Communications Installer...................$ 53.18 27.75 Technician....... ...........$ 61.16 27.98 SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems. FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician. ---------------------------------------------------------------- ELEC0684-001 06/01/2023 MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES https://sam.gov/wage-determination/CA20240018/3 12/63 3/19/24,8:22 AM SAM.gov Rates Fringes ELECTRICIAN......................$ 46.00 3%+27.68 CABLE SPLICER = 110% of Journeyman Electrician ---------------------------------------------------------------- ELEC0684-004 12/01/2022 MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES Rates Fringes Communications System Installer........ ...........$ 40.88 25.13 Technician..................$ 47.01 25.31 SCOPE OF WORK: Including any data system whose only function is to transmit or receive information; excluding all other data systems or multiple systems which include control function or power supply; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding fire alarm work when installed in raceways (including wire and cable pulling) and when performed on new or major remodel building projects or jobs for which the conductors for the fire alarm system are installed in conduit; excluding installation of raceway systems, line voltage work, industrial work, life-safety systems (all buildings having floors located more than 75' above the lowest floor level having building access); excluding energy management systems. FOOTNOTE: Fire alarm work when installed in raceways (including wire and cable pulling), on projects which involve new or major remodel building construction, for which the conductors for the fire alarm system are installed in the conduit, shall be performed by the inside electrician. ---------------------------------------------------------------- ELEC1245-001 06/01/2022 Rates Fringes LINE CONSTRUCTION (1) Lineman; Cable splicer..$ 64.40 22.58 (2) Equipment specialist (operates crawler tractors, commercial motor vehicles, backhoes, trenchers, cranes (50 tons and below), overhead & underground distribution line equipment).............$ 50.00 21.30 (3) Groundman.... ...........$ 38.23 20.89 (4) Powderman...............$ 51.87 18.79 HOLIDAYS: New Year's Day, M.L. King Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and day after Thanksgiving, Christmas Day ---------------------------------------------------------------- ELEV0008-001 01/01/2024 Rates Fringes ELEVATOR MECHANIC..... ...........$ 80.76 37.885+a+b FOOTNOTE: a. PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service. b. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day. https://sam.gov/wage-determination/CA20240018/3 13/63 3/19/24,8:22 AM SAM.gov ---------------------------------------------------------------- ENGIO003-001 06/28/2023 ""AREA 1"" WAGE RATES ARE LISTED BELOW ""AREA 2"" RECEIVES AN ADDITIONAL $2.00 PER HOUR ABOVE AREA 1 RATES. SEE AREA DEFINITIONS BELOW Rates Fringes OPERATOR: Power Equipment (AREA 1:) GROUP 1.....................$ 60.72 31.03 GROUP 2.......... ...........$ 59.19 31.03 GROUP 3.....................$ 57.71 31.03 GROUP 4.....................$ 56.33 31.03 GROUP 5.....................$ 55.06 31.03 GROUP 6.......... ...........$ 53.74 31.03 GROUP 7.....................$ 52.60 31.03 GROUP 8.....................$ 51.46 31.03 GROUP 8-A...................$ 49.25 31.03 OPERATOR: Power Equipment (Cranes and Attachments - AREA 1:) GROUP 1 Cranes.......... ...........$ 52.30 31.15 Oiler......................$ 43.79 31.15 Truck crane oiler..........$ 46.08 31.15 GROUP 2 Cranes.......... ...........$ 50.54 31.15 Oiler......................$ 42.83 31.15 Truck crane oiler..........$ 45.07 31.15 GROUP 3 Cranes.......... ...........$ 48.80 31.15 Hydraulic..................$ 44.44 31.15 Oiler......................$ 42.55 31.15 Truck crane oiler..........$ 44.83 31.15 GROUP 4 Cranes.....................$ 45.76 31.15 OPERATOR: Power Equipment (Piledriving - AREA 1:) GROUP 1 Lifting devices............$ 52.64 31.15 Oiler......................$ 43.38 31.15 Truck Crane Oiler..........$ 45.66 31.15 GROUP 2 Lifting devices............$ 50.82 31.15 Oiler......................$ 43.11 31.15 Truck Crane Oiler..........$ 45.41 31.15 GROUP 3 Lifting devices............$ 49.14 31.15 Oiler......................$ 42.89 31.15 Truck Crane Oiler..........$ 45.12 31.15 GROUP 4 Lifting devices............$ 47.37 31.15 GROUP 5 Lifting devices............$ 44.73 31.15 GROUP 6 Lifting devices............$ 42.50 31.15 OPERATOR: Power Equipment (Steel Erection - AREA 1:) GROUP 1 Cranes.....................$ 53.27 31.15 Oiler......................$ 43.72 31.15 Truck Crane Oiler..........$ 45.95 31.15 GROUP 2 Cranes.....................$ 51.50 31.15 Oiler......................$ 43.45 31.15 Truck Crane Oiler..........$ 45.73 31.15 GROUP 3 https://sam.gov/wage-determination/CA20240018/3 14/63 3/19/24,8:22 AM SAM.gov Cranes.....................$ 50.02 31.15 Hydraulic....... ...........$ 45.07 31.15 Oiler......................$ 43.23 31.15 Truck Crane Oiler..........$ 45.46 31.15 GROUP 4 Cranes.......... ...........$ 48.00 31.15 GROUP 5 Cranes.....................$ 46.70 31.15 OPERATOR: Power Equipment (Tunnel and Underground Work - AREA 1:) SHAFTS, STOPES, RAISES: GROUP 1....................$ 56.82 31.03 GROUP 1-A....... ...........$ 59.29 31.03 GROUP 2....................$ 55.56 31.03 GROUP 3....................$ 54.23 31.03 GROUP 4....................$ 53.09 31.03 GROUP 5......... ...........$ 51.95 31.03 UNDERGROUND: GROUP 1....................$ 56.72 31.03 GROUP 1-A..................$ 59.19 31.03 GROUP 2......... ...........$ 55.46 31.03 GROUP 3....................$ 54.13 31.03 GROUP 4....................$ 52.99 31.03 GROUP 5....................$ 51.85 31.03 FOOTNOTE: Work suspended by ropes or cables, or work on a Yo-Yo Cat: $.60 per hour additional. POWER EQUIPMENT OPERATOR CLASSIFICATIONS GROUP 1: Operator of helicopter (when used in erection work); Hydraulic excavator, 7 cu. yds. and over; Power shovels, over 7 cu. yds. GROUP 2: Highline cableway; Hydraulic excavator, 3-1/2 cu. yds. up to 7 cu. yds.; Licensed construction work boat operator, on site; Power blade operator (finish); Power shovels, over 1 cu. yd. up to and including 7 cu. yds. m.r.c. GROUP 3: Asphalt milling machine; Cable backhoe; Combination backhoe and loader over 3/4 cu. yds.; Continuous flight tie back machine assistant to engineer or mechanic; Crane mounted continuous flight tie back machine, tonnage to apply; Crane mounted drill attachment, tonnage to apply; Dozer, slope brd; Gradall; Hydraulic excavator, up to 3 1/2 cu. yds.; Loader 4 cu. yds. and over; Long reach excavator; Multiple engine scraper (when used as push pull); Power shovels, up to and including 1 cu. yd.; Pre-stress wire wrapping machine; Side boom cat, 572 or larger; Track loader 4 cu. yds. and over; Wheel excavator (up to and including 750 cu. yds. per hour) GROUP 4: Asphalt plant engineer/box person; Chicago boom; Combination backhoe and loader up to and including 3/4 cu. yd.; Concrete batch plant (wet or dry); Dozer and/or push cat; Pull- type elevating loader; Gradesetter, grade checker (GPS, mechanical or otherwise); Grooving and grinding machine; Heading shield operator; Heavy-duty drilling equipment, Hughes, LDH, Watson 3000 or similar; Heavy-duty repairperson and/or welder; Lime spreader; Loader under 4 cu. yds.; Lubrication and service engineer (mobile and grease rack); Mechanical finishers or spreader machine (asphalt, Barber-Greene and similar); Miller Formless M-9000 slope paver or similar; Portable crushing and screening plants; Power blade support; Roller operator, asphalt; Rubber-tired scraper, self-loading (paddle-wheels, etc.); Rubber- tired earthmoving equipment (scrapers); Slip form paver (concrete); Small tractor with drag; Soil stabilizer (P & H or equal); Spider plow and spider puller; Tubex pile rig; Unlicensed constuction work boat operator, on site; Timber skidder; Track loader up to 4 yds.; https://sam.gov/wage-determination/CA20240018/3 15/63 3/19/24,8:22 AM SAM.gov Tractor-drawn scraper; Tractor, compressor drill combination; Welder; Woods-Mixer (and other similar Pugmill equipment) GROUP 5: Cast-in-place pipe laying machine; Combination slusher and motor operator; Concrete conveyor or concrete pump, truck or equipment mounted; Concrete conveyor, building site; Concrete pump or pumperete gun; Drilling equipment, Watson 2000, Texoma 700 or similar; Drilling and boring machinery, horizontal (not to apply to waterliners, wagon drills or jackhammers); Concrete mixer/all; Person and/or material hoist; Mechanical finishers (concrete) (Clary, Johnson, Bidwell Bridge Deck or similar types); Mechanical burm, curb and/or curb and gutter machine, concrete or asphalt); Mine or shaft hoist; Portable crusher; Power jumbo operator (setting slip-forms, etc., in tunnels); Screed (automatic or manual); Self-propelled compactor with dozer; Tractor with boom D6 or smaller; Trenching machine, maximum digging capacity over 5 ft. depth; Vermeer T-600B rock cutter or similar GROUP 6: Armor-Coater (or similar); Ballast jack tamper; Boom- type backfilling machine; Assistant plant engineer; Bridge and/or gantry crane; Chemical grouting machine, truck-mounted; Chip spreading machine operator; Concrete saw (self-propelled unit on streets, highways, airports and canals); Deck engineer; Drilling equipment Texoma 600, Hughes 200 Series or similar up to and including 30 ft. m.r.c.; Drill doctor; Helicopter radio operator; Hydro-hammer or similar; Line master; Skidsteer loader, Bobcat larger than 743 series or similar (with attachments); Locomotive; Lull hi-lift or similar; Oiler, truck mounted equipment; Pavement breaker, truck-mounted, with compressor combination; Paving fabric installation and/or laying machine; Pipe bending machine (pipelines only); Pipe wrapping machine (tractor propelled and supported); Screed (except asphaltic concrete paving); Self- propelled pipeline wrapping machine; Tractor; Self-loading chipper; Concrete barrier moving machine GROUP 7: Ballast regulator; Boom truck or dual-purpose A-frame truck, non-rotating - under 15 tons; Cary lift or similar; Combination slurry mixer and/or cleaner; Drilling equipment, 20 ft. and under m.r.c.; Firetender (hot plant); Grouting machine operator; Highline cableway signalperson; Stationary belt loader (Kolman or similar); Lift slab machine (Vagtborg and similar types); Maginnes internal full slab vibrator; Material hoist (1 drum); Mechanical trench shield; Pavement breaker with or without compressor combination); Pipe cleaning machine (tractor propelled and supported); Post driver; Roller (except asphalt); Chip Seal; Self-propelled automatically applied concrete curing mahcine (on streets, highways, airports and canals); Self-propelled compactor (without dozer); Signalperson; Slip-form pumps (lifting device for concrete forms); Tie spacer; Tower mobile; Trenching machine, maximum digging capacity up to and including 5 ft. depth; Truck- type loader GROUP 8: Bit sharpener; Boiler tender; Box operator; Brakeperson; Combination mixer and compressor (shotcrete/gunite); Compressor operator; Deckhand; Fire tender; Forklift (under 20 ft.); Generator; Gunite/shotcrete equipment operator; Hydraulic monitor; Ken seal machine (or similar); Mixermobile; Oiler; Pump operator; Refrigeration plant; Reservoir-debris tug (self- propelled floating); Ross Carrier (construction site); Rotomist operator; Self-propelled tape machine; Shuttlecar; Self-propelled power sweeper operator (includes vacuum sweeper); Slusher operator; Surface heater; Switchperson; Tar pot firetender; Tugger hoist, single drum; Vacuum cooling plant; Welding machine (powered other than by electricity) GROUP 8-A: Elevator operator; Skidsteer loader-Bobcat 743 https:Hsam.gov/wage-determination/CA20240018/3 16/63 3/19/24,8:22 AM SAM.gov series or smaller, and similar (without attachments); Mini excavator under 25 H.P. (backhoe-trencher); Tub grinder wood chipper ---------------------------------------------------------- ALL CRANES AND ATTACHMENTS GROUP 1: Clamshell and dragline over 7 cu. yds.; Crane, over 100 tons; Derrick, over 100 tons; Derrick barge pedestal-mounted, over 100 tons; Self-propelled boom-type lifting device, over 100 tons GROUP 2: Clamshell and dragline over 1 cu. yd. up to and including 7 cu. yds.; Crane, over 45 tons up to and including 100 tons; Derrick barge, 100 tons and under; Self-propelled boom-type lifting device, over 45 tons; Tower crane GROUP 3: Clamshell and dragline up to and including 1 cu. yd.; Cranes 45 tons and under; Self-propelled boom-type lifting device 45 tons and under; GROUP 4: Boom Truck or dual purpose A-frame truck, non-rotating over 15 tons; Truck-mounted rotating telescopic boom type lifting device, Manitex or similar (boom truck) over 15 tons; Truck-mounted rotating telescopic boom type lifting device, Manitex or similar (boom truck) - under 15 tons; ----------------------------------------------------------- PILEDRIVERS GROUP 1: Derrick barge pedestal mounted over 100 tons; Clamshell over 7 cu. yds.; Self-propelled boom-type lifting device over 100 tons; Truck crane or crawler, land or barge mounted over 100 tons GROUP 2: Derrick barge pedestal mounted 45 tons to and including 100 tons; Clamshell up to and including 7 cu. yds.; Self-propelled boom-type lifting device over 45 tons; Truck crane or crawler, land or barge mounted, over 45 tons up to and including 100 tons; Fundex F-12 hydraulic pile rig GROUP 3: Derrick barge pedestal mounted under 45 tons; Self- propelled boom-type lifting device 45 tons and under; Skid/scow piledriver, any tonnage; Truck crane or crawler, land or barge mounted 45 tons and under GROUP 4: Assistant operator in lieu of assistant to engineer; Forklift, 10 tons and over; Heavy-duty repairperson/welder GROUP 5: Deck engineer GROUP 6: Deckhand; Fire tender ------------------------------------------------------------- STEEL ERECTORS GROUP 1: Crane over 100 tons; Derrick over 100 tons; Self- propelled boom-type lifting device over 100 tons GROUP 2: Crane over 45 tons to 100 tons; Derrick under 100 tons; Self-propelled boom-type lifting device over 45 tons to 100 tons; Tower crane GROUP 3: Crane, 45 tons and under; Self-propelled boom-type lifting device, 45 tons and under GROUP 4: Chicago boom; Forklift, 10 tons and over; Heavy-duty repair person/welder https://sam.gov/wage-determination/CA20240018/3 17/63 3/19/24,8:22 AM SAM.gov GROUP 5: Boom cat -------------------------------------------------------------- TUNNEL AND UNDERGROUND WORK GROUP 1-A: Tunnel bore machine operator, 20' diameter or more GROUP 1: Heading shield operator; Heavy-duty repairperson; Mucking machine (rubber tired, rail or track type); Raised bore operator (tunnels); Tunnel mole bore operator GROUP 2: Combination slusher and motor operator; Concrete pump or pumperete gun; Power jumbo operator GROUP 3: Drill doctor; Mine or shaft hoist GROUP 4: Combination slurry mixer cleaner; Grouting Machine operator; Motorman GROUP 5: Bit Sharpener; Brakeman; Combination mixer and compressor (gunite); Compressor operator; Oiler; Pump operator; Slusher operator ----------------------------------------------------------- AREA DESCRIPTIONS: POWER EQUIPMENT OPERATORS, CRANES AND ATTACHMENTS,TUNNEL AND UNDERGROUND [These areas do not apply to Piledrivers and Steel Erectors] AREA 1: ALAMEDA, CALAVERAS, CONTRA COSTA, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, TUOLUMNE AREA 2 -NOTED BELOW THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW: CALAVERAS COUNTY: Area 1: Remainder Area 2: Eastern Part FRESNO COUNTY: Area 1: Remainder Area 2: Eastern Part MADERA COUNTY: Area 1: Remainder Area 2: Eastern Part MARIPOSA COUNTY: Area 1: Remainder Area 2: Eastern Part MONTEREY COUNTY: Area 1: Remainder Area 2: Southwestern part TUOLUMNE COUNTY: Area 1: Remainder Area 2: Eastern Part ---------------------------------------------------------------- ENGIO003-008 08/01/2023 Rates Fringes Dredging: (DREDGING: CLAMSHELL & DIPPER DREDGING; HYDRAULIC SUCTION DREDGING:) https://sam.gov/wage-determination/CA20240018/3 18/63 3/19/24,8:22 AM SAM.gov AREA 1: (1) Leverman...............$ 57.95 37.55 (2) Dredge Dozer; Heavy duty repairman.............$ 52.99 37.55 (3) Booster Pump Operator; Deck Engineer; Deck mate; Dredge Tender; Winch Operator...................$ 51.87 37.55 (4) Bargeman; Deckhand; Fireman; Leveehand; Oiler..$ 48.57 37.55 AREA 2: (1) Leverman...............$ 59.95 37.55 (2) Dredge Dozer; Heavy duty repairman.............$ 54.99 37.55 (3) Booster Pump Operator; Deck Engineer; Deck mate; Dredge Tender; Winch Operator...................$ 53.87 37.55 (4) Bargeman; Deckhand; Fireman; Leveehand; Oiler..$ 50.57 37.55 AREA DESCRIPTIONS AREA 1: ALAMEDA,BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS, SUTTER, YOLO, AND YUBA COUNTIES AREA 2: MODOC COUNTY THE REMAINGING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW: ALPINE COUNTY: Area 1: Northernmost part Area 2: Remainder CALAVERAS COUNTY: Area 1: Remainder Area 2: Eastern part COLUSA COUNTY: Area 1: Eastern part Area 2: Remainder ELDORADO COUNTY: Area 1: North Central part Area 2: Remainder FRESNO COUNTY: Area 1: Remainder Area 2: Eastern part GLENN COUNTY: Area 1: Eastern part Area 2: Remainder LASSEN COUNTY: Area 1: Western part along the Southern portion of border with Shasta County Area 2: Remainder MADERA COUNTY: Area 1: Except Eastern part Area 2: Eastern part MARIPOSA COUNTY Area 1: Except Eastern part Area 2: Eastern part MONTERREY COUNTY Area 1: Except Southwestern part https://sam.gov/wage-determination/CA20240018/3 19/63 3/19/24,8:22 AM SAM.gov Area 2: Southwestern part NEVADA COUNTY: Area 1: All but the Northern portion along the border of Sierra County Area 2: Remainder PLACER COUNTY: Area 1: Al but the Central portion Area 2: Remainder PLUMAS COUNTY: Area 1: Western portion Area 2: Remainder SHASTA COUNTY: Area 1: All but the Northeastern corner Area 2: Remainder SIERRA COUNTY: Area 1: Western part Area 2: Remainder SISKIYOU COUNTY: Area 1: Central part Area 2: Remainder SONOMA COUNTY: Area 1: All but the Northwestern corner Area 2: Remainder TEHAMA COUNTY: Area 1: All but the Western border with Mendocino & Trinity Counties Area 2: Remainder TRINITY COUNTY: Area 1: East Central part and the Northeastern border with Shasta County Area 2: Remainder TUOLUMNE COUNTY: Area 1: Except Eastern part Area 2: Eastern part ---------------------------------------------------------------- ENGIO003-019 06/29/2020 SEE AREA DESCRIPTIONS BELOW Rates Fringes OPERATOR: Power Equipment (LANDSCAPE WORK ONLY) GROUP 1 AREA 1.....................$ 39.95 30.28 AREA 2.....................$ 41.95 30.28 GROUP 2 AREA 1.....................$ 36.35 30.28 AREA 2.....................$ 38.35 30.28 GROUP 3 AREA 1.......... ...........$ 31.74 30.28 AREA 2.......... ...........$ 33.74 30.28 GROUP DESCRIPTIONS: GROUP 1: Landscape Finish Grade Operator: All finish grade work regardless of equipment used, and all equipment with a rating more than 65 HP. GROUP 2: Landscape Operator up to 65 HP: All equipment with a manufacturer's rating of 65 HP or less except equipment covered by Group 1 or Group 3. The following equipment shall be included except when used for finish work as long https://sam.gov/wage-determination/CA20240018/3 20/63 3/19/24,8:22 AM SAM.gov as manufacturer's rating is 65 HP or less: A-Frame and Winch Truck, Backhoe, Forklift, Hydragraphic Seeder Machine, Roller, Rubber-Tired and Track Earthmoving Equipment, Skiploader, Straw Blowers, and Trencher 31 HP up to 65 HP. GROUP 3: Landscae Utility Operator: Small Rubber-Tired Tractor, Trencher Under 31 HP. AREA DESCRIPTIONS: AREA 1: ALAMEDA, BUTTE, CONTRA COSTA, KINGS, MARIN, MERCED, NAPA, SACRAMENTO, SAN BENITO, SAN FRANCISCO, SAN 7OAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, SOLANO, STANISLAUS, SUTTER, YOLO, AND YUBA COUNTIES AREA 2 - MODOC COUNTY THE REMAINING COUNTIES ARE SPLIT BETWEEN AREA 1 AND AREA 2 AS NOTED BELOW: ALPINE COUNTY: Area 1: Northernmost part Area 2: Remainder CALAVERAS COUNTY: Area 1: Except Eastern part Area 2: Eastern part COLUSA COUNTY: Area 1: Eastern part Area 2: Remainder DEL NORTE COUNTY: Area 1: Extreme Southwestern corner Area 2: Remainder ELDORADO COUNTY: Area 1: North Central part Area 2: Remainder FRESNO COUNTY Area 1: Except Eastern part Area 2: Eastern part GLENN COUNTY: Area 1: Eastern part Area 2: Remainder HUMBOLDT COUNTY: Area 1: Except Eastern and Southwestern parts Area 2: Remainder LAKE COUNTY: Area 1: Southern part Area 2: Remainder LASSEN COUNTY: Area 1: Western part along the Southern portion of border with Shasta County Area 2: Remainder MADERA COUNTY Area 1: Remainder Area 2: Eastern part MARIPOSA COUNTY Area 1: Remainder Area 2: Eastern part MENDOCINO COUNTY: Area 1: Central and Southeastern parts Area 2: Remainder https://sam.gov/wage-determination/CA20240018/3 21/63 3/19/24,8:22 AM SAM.gov MONTEREY COUNTY Area 1: Remainder Area 2: Southwestern part NEVADA COUNTY: Area 1: All but the Northern portion along the border of Sierra County Area 2: Remainder PLACER COUNTY: Area 1: All but the Central portion Area 2: Remainder PLUMAS COUNTY: Area 1: Western portion Area 2: Remainder SHASTA COUNTY: Area 1: All but the Northeastern corner Area 2: Remainder SIERRA COUNTY: Area 1: Western part Area 2: Remainder SISKIYOU COUNTY: Area 1: Central part Area 2: Remainder SONOMA COUNTY: Area 1: All but the Northwestern corner Area 2: Reaminder TEHAMA COUNTY: Area 1: All but the Western border with mendocino & Trinity Counties Area 2: Remainder TRINITY COUNTY: Area 1: East Central part and the Northeaster border with Shasta County Area 2: Remainder TULARE COUNTY; Area 1: Remainder Area 2: Eastern part TUOLUMNE COUNTY: Area 1: Remainder Area 2: Eastern Part ---------------------------------------------------------------- IRON0377-001 01/01/2024 ALAMEDA, CONTRA COSTA, SAN MATEO, SANTA CLARA COUNTIES Rates Fringes Ironworkers: Fence Erector...............$ 42.53 26.26 Ornamental, Reinforcing and Structural..............$ 52.08 34.90 PREMIUM PAY: $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB https://sam.gov/wage-determination/CA20240018/3 22/63 3/19/24,8:22 AM SAM.gov $4.00 additional per hour at the following locations: Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center $2.00 additional per hour at the following locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock ---------------------------------------------------------------- IRON0377-003 01/01/2024 SAN FRANCISCO CITY and COUNTY Rates Fringes Ironworkers: Fence Erector...............$ 42.53 26.26 Ornamental, Reinforcing and Structural... ...........$ 52.58 34.90 PREMIUM PAY: $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB $4.00 additional per hour at the following locations: Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center $2.00 additional per hour at the following locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock ---------------------------------------------------------------- IRON0433-005 01/01/2024 REMAINING COUNTIES Rates Fringes IRONWORKER Fence Erector.... ...........$ 42.53 26.26 Ornamental, Reinforcing and Structural..............$ 47.45 34.90 PREMIUM PAY: $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB $4.00 additional per hour at the following locations: Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yermo Marine Corps Logistics Center https://sam.gov/wage-determination/CA20240018/3 23/63 3/19/24,8:22 AM SAM.gov $2.00 additional per hour at the following locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock ---------------------------------------------------------------- LAB00067-006 06/26/2023 AREA ""1"" - ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO AND SANTA CLARA COUNTIES AREA ""2"" - CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, STANISLAUS, AND TUOLUMNE COUNTIES Rates Fringes LABORER (ASBESTOS/MOLD/LEAD LABORER) Area 1......................$ 36.50 28.34 Area 2........... ...........$ 35.50 28.34 ASBESTOS REMOVAL-SCOPE OF WORK: Site mobilization; initial site clean-up; site preparation; removal of asbestos-containing materials from walls and ceilings; or from pipes, boilers and mechanical systems only if they are being scrapped; encapsulation, enclosure and disposal of asbestos-containing materials by hand or with equipment or machinery; scaffolding; fabrication of temporary wooden barriers; and assembly of decontamination stations. ---------------------------------------------------------------- LAB00073-002 07/01/2023 CALAVERAS AND SAN IOAQUIN COUNTIES Rates Fringes LABORER (TRAFFIC CONTROL/LANE CLOSURE) Escort Driver, Flag Person..$ 36.26 27.30 Traffic Control Person I....$ 36.56 27.30 Traffic Control Person II...$ 34.06 27.30 TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage. TRAFFIC CONTROL PERSON II: Installation and removal of temporary/permanent signs, markers, delineators and crash cushions. ---------------------------------------------------------------- LAB00073-003 07/01/2023 SAN IOAQUIN COUNTY Rates Fringes LABORER Mason Tender-Brick..........$ 36.29 25.55 ---------------------------------------------------------------- LAB00073-005 06/26/2023 Rates Fringes Tunnel and Shaft Laborers: GROUP 1.....................$ 45.89 27.72 GROUP 2.....................$ 45.66 27.72 GROUP 3.......... ...........$ 45.41 27.72 GROUP 4.....................$ 44.96 27.72 GROUP 5.....................$ 44.42 27.72 Shotcrete Specialist........$ 46.41 27.72 https://sam.gov/wage-determination/CA20240018/3 24/63 3/19/24,8:22 AM SAM.gov TUNNEL AND SHAFT CLASSIFICATIONS GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen GROUP 2: Rodmen; Shaft work & raise (below actual or excavated ground level) GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High pressure nozzleman; Miner - tunnel, including top and bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method) GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman ---------------------------------------------------------------- LAB00073-007 06/26/2023 CALAVERAS AND SAN JOAQUIN COUNTIES Rates Fringes LABORER (CONSTRUCTION CRAFT LABORERS) Construction Specialist Group.......................$ 36.20 27.30 GROUP 1.......... ...........$ 35.50 27.30 GROUP 1-a...................$ 35.72 27.30 GROUP 1-c...................$ 35.55 27.30 GROUP 1-e...................$ 36.05 27.30 GROUP 1-f........ ...........$ 30.37 23.20 GROUP 2.....................$ 35.35 27.30 GROUP 3.....................$ 35.25 27.30 GROUP 4.....................$ 28.94 27.30 See groups 1-b and 1-d under laborer classifications. LABORER (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS) (1) New Construction........$ 35.25 27.30 (2) Establishment Warranty Period......................$ 28.94 27.30 LABORER (GUNITE) GROUP 1.......... ...........$ 36.46 27.30 GROUP 2.....................$ 35.96 27.30 GROUP 3.....................$ 35.37 27.30 GROUP 4.....................$ 35.25 27.30 LABORER (WRECKING) GROUP 1.....................$ 35.50 27.30 GROUP 2.....................$ 35.35 27.30 FOOTNOTES: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers entitled to receive the wage rate set forth in Group 1-a below. --------------------------------------------------------- LABORER CLASSIFICATIONS CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; https://sam.gov/wage-determination/CA20240018/3 25/63 3/19/24,8:22 AM SAM.gov Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes shal receive $5.00 per day above Group 1 wage rates. GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed. GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the https://sam.gov/wage-determination/CA20240018/3 26/63 3/19/24,8:22 AM SAM.gov depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception. GROUP 1-f: Wire winding machine in connection with guniting or shot crete GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only) GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material cleaner"" is to be utilized under the following conditions: A: at demolition site for the salvage of the material. B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job. C: for the cleaning of salvage material at the jobsite or temporary jobsite yard. The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"". -------------------------------------------------------- GUNITE LABORER CLASSIFICATIONS GROUP 1: Structural Nozzleman GROUP 2: Nozzleman, Gunman, Potman, Groundman GROUP 3: Reboundman GROUP 4: Gunite laborer ---------------------------------------------------------- WRECKING WORK LABORER CLASSIFICATIONS GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) GROUP 2: Semi-skilled wrecker (salvaging of other building materials) ---------------------------------------------------------------- LAB00073-009 07/01/2023 CALAVERAS AND SAN JOAQUIN COUNTIES https://sam.gov/wage-determination/CA20240018/3 27/63 3/19/24,8:22 AM SAM.gov Rates Fringes LABORER (Plaster Tender).........$ 39.77 28.54 Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LAB00261-003 07/01/2023 SAN FRANCISCO AND SAN MATEO COUNTIES Rates Fringes LABORER (TRAFFIC CONTROL/LANE CLOSURE) Escort Driver, Flag Person..$ 37.26 27.30 Traffic Control Person I....$ 37.56 27.30 Traffic Control Person II...$ 35.06 27.30 TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage. TRAFFIC CONTROL PERSON II: Installation and removal of temporary/permanent signs, markers, delineators and crash cushions. ---------------------------------------------------------------- LAB00261-005 06/26/2023 SAN FRANCISCO AND SAN MATEO COUNTIES Rates Fringes Tunnel and Shaft Laborers: GROUP 1.......... ...........$ 45.89 27.72 GROUP 2.....................$ 45.66 27.72 GROUP 3.....................$ 45.41 27.72 GROUP 4.....................$ 44.96 27.72 GROUP 5.....................$ 44.42 27.72 Shotcrete Specialist........$ 46.41 27.72 TUNNEL AND SHAFT CLASSIFICATIONS GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen GROUP 2: Rodmen; Shaft work & raise (below actual or excavated ground level) GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High pressure nozzleman; Miner - tunnel, including top and bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method) GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman ---------------------------------------------------------------- LAB00261-009 06/26/2023 SAN FRANCISCO, AND SAN MATEO COUNTIES Rates Fringes LABORER (CONSTRUCTION CRAFT https://sam.gov/wage-determination/CA20240018/3 28/63 3/19/24,8:22 AM SAM.gov LABORERS - AREA A:) Construction Specialist Group.......................$ 37.20 27.30 GROUP 1.....................$ 36.50 27.30 GROUP 1-a...................$ 36.72 27.30 GROUP 1-c........ ...........$ 36.55 27.30 GROUP 1-e...................$ 37.05 27.30 GROUP 1-f...................$ 31.37 23.20 GROUP 2.....................$ 36.35 27.30 GROUP 3.......... ...........$ 36.25 27.30 GROUP 4.....................$ 29.94 27.30 See groups 1-b and 1-d under laborer classifications. LABORER (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A:) (1) New Construction........$ 36.25 27.30 (2) Establishment Warranty Period........... ...........$ 29.94 27.30 LABORER (WRECKING - AREA A:) GROUP 1.....................$ 36.50 27.30 GROUP 2.....................$ 36.35 27.30 Laborers: (GUNITE - AREA A:) GROUP 1.....................$ 37.46 27.30 GROUP 2.....................$ 36.96 27.30 GROUP 3.....................$ 36.37 27.30 GROUP 4.......... ...........$ 36.25 27.30 FOOTNOTES: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers entitled to receive the wage rate set forth in Group 1-a below. --------------------------------------------------------- LABORER CLASSIFICATIONS CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete https://sam.gov/wage-determination/CA20240018/3 29/63 3/19/24,8:22 AM SAM.gov chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes shal receive $5.00 per day above Group 1 wage rates. GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed. GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception. GROUP 1-f: Wire winding machine in connection with guniting or shot crete GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only) GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and https://sam.gov/wage-determination/CA20240018/3 30/63 3/19/24,8:22 AM SAM.gov washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material cleaner"" is to be utilized under the following conditions: A: at demolition site for the salvage of the material. B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job. C: for the cleaning of salvage material at the jobsite or temporary jobsite yard. The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"". -------------------------------------------------------- GUNITE LABORER CLASSIFICATIONS GROUP 1: Structural Nozzleman GROUP 2: Nozzleman, Gunman, Potman, Groundman GROUP 3: Reboundman GROUP 4: Gunite laborer ---------------------------------------------------------- WRECKING WORK LABORER CLASSIFICATIONS GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) GROUP 2: Semi-skilled wrecker (salvaging of other building materials) ---------------------------------------------------------------- LAB00261-011 07/01/2023 SAN FRANCISCO AND SAN MATEO COUNTIES: Rates Fringes MASON TENDER, BRICK..............$ 37.05 27.45 FOOTNOTES: Underground work such as sewers, manholes, catch basins, sewer pipes, telephone conduits, tunnels and cut trenches: $5.00 per day additional. Work in live sewage: $2.50 per day additional. ---------------------------------------------------------------- LAB00261-014 07/01/2023 SAN FRANCISCO AND SAN MATEO COUNTIES: Rates Fringes PLASTER TENDER...................$ 41.93 30.32 Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LAB00270-003 07/01/2023 AREA A: SANTA CLARA AREA B: MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES Rates Fringes LABORER (TRAFFIC CONTROL/LANE CLOSURE) Escort Driver, Flag Person Area A.....................$ 37.26 27.30 Area B.......... ...........$ 36.26 27.30 https://sam.gov/wage-determination/CA20240018/3 31/63 3/19/24,8:22 AM SAM.gov Traffic Control Person I Area A.....................$ 37.56 27.30 Area B.....................$ 36.56 27.30 Traffic Control Person II Area A.....................$ 35.06 27.30 Area B.....................$ 34.06 27.30 TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage. TRAFFIC CONTROL PERSON II: Installation and removal of temporary/permanent signs, markers, delineators and crash cushions. ---------------------------------------------------------------- LAB00270-004 06/26/2023 MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES Rates Fringes Tunnel and Shaft Laborers: GROUP 1.....................$ 45.89 27.72 GROUP 2.....................$ 45.66 27.72 GROUP 3.....................$ 45.41 27.72 GROUP 4.......... ...........$ 44.96 27.72 GROUP 5.....................$ 44.42 27.72 Shotcrete Specialist........$ 46.41 27.72 TUNNEL AND SHAFT CLASSIFICATIONS GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen GROUP 2: Rodmen; Shaft work & raise (below actual or excavated ground level) GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High pressure nozzleman; Miner - tunnel, including top and bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method) GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman ---------------------------------------------------------------- LAB00270-005 07/01/2023 MONTEREY AND SAN BENITO COUNTIES Rates Fringes LABORER Mason Tender-Brick..........$ 36.29 25.55 ---------------------------------------------------------------- LAB00270-007 06/26/2023 MONTEREY, SAN BENITO AND SANTA CRUZ COUNTIES Rates Fringes LABORER (CONSTRUCTION CRAFT LABORERS - AREA B) Construction Specialist https://sam.gov/wage-determination/CA20240018/3 32/63 3/19/24,8:22 AM SAM.gov Group.......................$ 36.20 27.30 GROUP 1.......... ...........$ 35.50 27.30 GROUP 1-a...................$ 35.72 27.30 GROUP 1-c...................$ 35.55 27.30 GROUP 1-e...................$ 36.05 27.30 GROUP 1-f........ ...........$ 36.08 27.30 GROUP 2.....................$ 35.35 27.30 GROUP 3.....................$ 35.25 27.30 GROUP 4.....................$ 28.94 27.30 See groups 1-b and 1-d under laborer classifications. LABORER (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B) (1) New Construction........$ 35.25 27.30 (2) Establishment Warranty Period......................$ 28.94 27.30 LABORER (GUNITE - AREA B) GROUP 1.......... ...........$ 36.46 27.30 GROUP 2.....................$ 35.96 27.30 GROUP 3.....................$ 35.37 27.30 GROUP 4.....................$ 35.25 27.30 LABORER (WRECKING - AREA B) GROUP 1.....................$ 35.50 27.30 GROUP 2.....................$ 35.35 27.30 FOOTNOTES: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers entitled to receive the wage rate set forth in Group 1-a below. --------------------------------------------------------- LABORER CLASSIFICATIONS CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and https://sam.gov/wage-determination/CA20240018/3 33/63 3/19/24,8:22 AM SAM.gov rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes shal receive $5.00 per day above Group 1 wage rates. GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed. GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception. GROUP 1-f: Wire winding machine in connection with guniting or shot crete GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only) GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material https://sam.gov/wage-determination/CA20240018/3 34/63 3/19/24,8:22 AM SAM.gov cleaner"" is to be utilized under the following conditions: A: at demolition site for the salvage of the material. B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job. C: for the cleaning of salvage material at the jobsite or temporary jobsite yard. The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"". -------------------------------------------------------- GUNITE LABORER CLASSIFICATIONS GROUP 1: Structural Nozzleman GROUP 2: Nozzleman, Gunman, Potman, Groundman GROUP 3: Reboundman GROUP 4: Gunite laborer ---------------------------------------------------------- WRECKING WORK LABORER CLASSIFICATIONS GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) GROUP 2: Semi-skilled wrecker (salvaging of other building materials) ---------------------------------------------------------------- LAB00270-010 06/26/2023 SANTA CLARA COUNTY Rates Fringes LABORER (CONSTRUCTION CRAFT LABORERS - AREA A:) Construction Specialist Group.......................$ 37.20 27.30 GROUP 1.....................$ 36.50 27.30 GROUP 1-a........ ...........$ 36.72 27.30 GROUP 1-c...................$ 36.55 27.30 GROUP 1-e...................$ 37.05 27.30 GROUP 1-f...................$ 37.08 27.30 GROUP 2.......... ...........$ 36.35 27.30 GROUP 3.....................$ 36.25 27.30 GROUP 4.....................$ 29.94 27.30 See groups 1-b and 1-d under laborer classifications. LABORER (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A:) (1) New Construction........$ 36.25 27.30 (2) Establishment Warranty Period......................$ 29.94 27.30 LABORER (GUNITE - AREA A:) GROUP 1.....................$ 37.46 27.30 GROUP 2.....................$ 36.96 27.30 GROUP 3.....................$ 36.37 27.30 GROUP 4.....................$ 36.25 27.30 LABORER (WRECKING - AREA A:) GROUP 1.......... ...........$ 36.50 27.30 GROUP 2.....................$ 36.35 27.30 FOOTNOTES: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers entitled to receive the wage rate set forth in Group 1-a below. https://sam.gov/wage-determination/CA20240018/3 35/63 3/19/24,8:22 AM SAM.gov --------------------------------------------------------- LABORER CLASSIFICATIONS CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes shal receive $5.00 per day above Group 1 wage rates. GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to https://sam.gov/wage-determination/CA20240018/3 36/63 3/19/24,8:22 AM SAM.gov apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed. GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception. GROUP 1-f: Wire winding machine in connection with guniting or shot crete GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only) GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material cleaner"" is to be utilized under the following conditions: A: at demolition site for the salvage of the material. B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job. C: for the cleaning of salvage material at the jobsite or temporary jobsite yard. The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"". -------------------------------------------------------- GUNITE LABORER CLASSIFICATIONS GROUP 1: Structural Nozzleman GROUP 2: Nozzleman, Gunman, Potman, Groundman GROUP 3: Reboundman GROUP 4: Gunite laborer ---------------------------------------------------------- WRECKING WORK LABORER CLASSIFICATIONS GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) GROUP 2: Semi-skilled wrecker (salvaging of other building https://sam.gov/wage-determination/CA20240018/3 37/63 3/19/24,8:22 AM SAM.gov materials) ---------------------------------------------------------------- LAB00270-011 07/01/2023 MONTEREY, SAN BENITO, SANTA CRUZ, SANTA CLARA COUNTIES Rates Fringes LABORER (Plaster Tender).........$ 40.68 29.68 Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LAB00294-001 07/01/2023 FRESNO, KINGS AND MADERA COUNTIES Rates Fringes LABORER (Brick) Mason Tender-Brick..........$ 36.29 25.55 ---------------------------------------------------------------- LAB00294-002 07/01/2023 FRESNO, KINGS, AND MADERA COUNTIES Rates Fringes LABORER (TRAFFIC CONTROL/LANE CLOSURE) Escort Driver, Flag Person..$ 36.26 27.30 Traffic Control Person I....$ 36.56 27.30 Traffic Control Person II...$ 34.06 27.30 TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage. TRAFFIC CONTROL PERSON II: Installation and removal of temporary/permanent signs, markers, delineators and crash cushions. ---------------------------------------------------------------- LAB00294-005 06/26/2023 FRESNO, KINGS, AND MADERA COUNTIES Rates Fringes Tunnel and Shaft Laborers: GROUP 1.......... ...........$ 45.89 27.72 GROUP 2.....................$ 45.66 27.72 GROUP 3.....................$ 45.41 27.72 GROUP 4.....................$ 44.96 27.72 GROUP 5.....................$ 44.42 27.72 Shotcrete Specialist........$ 46.41 27.72 TUNNEL AND SHAFT CLASSIFICATIONS GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen GROUP 2: Rodmen; Shaft work & raise (below actual or excavated ground level) GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High pressure nozzleman; Miner - tunnel, including top and bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); https://sam.gov/wage-determination/CA20240018/3 38/63 3/19/24,8:22 AM SAM.gov Cable tender; Chuck tender; Powderman - primer house GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method) GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman ---------------------------------------------------------------- LAB00294-008 06/26/2023 FRESNO, KINGS, AND MADERA COUNTIES Rates Fringes LABORER (CONSTRUCTION CRAFT LABORERS - AREA B:) Construction Specialist Group.......................$ 36.20 27.30 GROUP 1.....................$ 35.50 27.30 GROUP 1-a...................$ 35.72 27.30 GROUP 1-c........ ...........$ 35.55 27.30 GROUP 1-e...................$ 36.05 27.30 GROUP 1-f...................$ 36.08 27.30 GROUP 2.....................$ 35.35 27.30 GROUP 3.......... ...........$ 35.25 27.30 GROUP 4.....................$ 28.94 27.30 See groups 1-b and 1-d under laborer classifications. LABORER (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B:) (1) New Construction........$ 35.25 27.30 (2) Establishment Warranty Period........... ...........$ 28.94 27.30 LABORER (GUNITE - AREA B:) GROUP 1.....................$ 36.46 27.30 GROUP 2.....................$ 35.96 27.30 GROUP 3.......... ...........$ 35.37 27.30 GROUP 4.....................$ 35.25 27.30 LABORER (WRECKING - AREA B:) GROUP 1.....................$ 35.50 27.30 GROUP 2.......... ...........$ 35.35 27.30 FOOTNOTES: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers entitled to receive the wage rate set forth in Group 1-a below. --------------------------------------------------------- LABORER CLASSIFICATIONS CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; https://sam.gov/wage-determination/CA20240018/3 39/63 3/19/24,8:22 AM SAM.gov Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes shal receive $5.00 per day above Group 1 wage rates. GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed. GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception. GROUP 1-f: Wire winding machine in connection with guniting or shot crete GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush https://sam.gov/wage-determination/CA20240018/3 40/63 3/19/24,8:22 AM SAM.gov shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only) GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material cleaner"" is to be utilized under the following conditions: A: at demolition site for the salvage of the material. B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job. C: for the cleaning of salvage material at the jobsite or temporary jobsite yard. The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"". -------------------------------------------------------- GUNITE LABORER CLASSIFICATIONS GROUP 1: Structural Nozzleman GROUP 2: Nozzleman, Gunman, Potman, Groundman GROUP 3: Reboundman GROUP 4: Gunite laborer ---------------------------------------------------------- WRECKING WORK LABORER CLASSIFICATIONS GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) GROUP 2: Semi-skilled wrecker (salvaging of other building materials) ---------------------------------------------------------------- LAB00294-010 07/01/2023 CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS & TUOLUMNE Rates Fringes Plasterer tender.................$ 39.77 28.54 Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LAB00294-011 07/01/2023 FRESNO, KINGS, AND MADERA COUNTIES Rates Fringes LABORER (Plaster Tender).........$ 39.77 28.54 Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- https://sam.gov/wage-determination/CA20240018/3 41/63 3/19/24,8:22 AM SAM.gov LAB00304-002 07/01/2023 ALAMEDA COUNTY Rates Fringes LABORER (TRAFFIC CONTROL/LANE CLOSURE) Escort Driver, Flag Person..$ 37.26 27.30 Traffic Control Person I....$ 37.56 27.30 Traffic Control Person II...$ 35.06 27.30 TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage. TRAFFIC CONTROL PERSON II: Installation and removal of temporary/permanent signs, markers, delineators and crash cushions. ---------------------------------------------------------------- LAB00304-003 06/26/2023 ALAMEDA COUNTY Rates Fringes Tunnel and Shaft Laborers: GROUP 1.....................$ 45.89 27.72 GROUP 2.....................$ 45.66 27.72 GROUP 3.......... ...........$ 45.41 27.72 GROUP 4.....................$ 44.96 27.72 GROUP 5.....................$ 44.42 27.72 Shotcrete Specialist........$ 46.41 27.72 TUNNEL AND SHAFT CLASSIFICATIONS GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen GROUP 2: Rodmen; Shaft work & raise (below actual or excavated ground level) GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High pressure nozzleman; Miner - tunnel, including top and bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method) GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman ---------------------------------------------------------------- LAB00304-004 06/26/2023 ALAMEDA COUNTY Rates Fringes LABORER (CONSTRUCTION CRAFT LABORERS - AREA A:) Construction Specialist Group............ ...........$ 37.20 27.30 GROUP 1.....................$ 36.50 27.30 GROUP 1-a...................$ 36.72 27.30 GROUP 1-c........ ...........$ 36.55 27.30 https://sam.gov/wage-determination/CA20240018/3 42/63 3/19/24,8:22 AM SAM.gov GROUP 1-e...................$ 37.05 27.30 GROUP 1-f........ ...........$ 37.08 27.30 GROUP 2.....................$ 36.35 27.30 GROUP 3.....................$ 36.25 27.30 GROUP 4.....................$ 29.94 27.30 See groups 1-b and 1-d under laborer classifications. LABORER (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA A:) (1) New Construction........$ 36.25 27.30 (2) Establishment Warranty Period......................$ 29.94 27.30 LABORER (GUNITE - AREA A:) GROUP 1.......... ...........$ 37.46 27.30 GROUP 2.....................$ 36.96 27.30 GROUP 3.....................$ 36.37 27.30 GROUP 4.....................$ 36.25 27.30 LABORER (WRECKING - AREA A:) GROUP 1.....................$ 36.50 27.30 GROUP 2.....................$ 36.35 27.30 FOOTNOTES: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers entitled to receive the wage rate set forth in Group 1-a below. --------------------------------------------------------- LABORER CLASSIFICATIONS CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker https://sam.gov/wage-determination/CA20240018/3 43/63 3/19/24,8:22 AM SAM.gov GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes shal receive $5.00 per day above Group 1 wage rates. GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed. GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception. GROUP 1-f: Wire winding machine in connection with guniting or shot crete GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; Jacking of pipe - under 12 inches GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; Jetting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only) GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material cleaner"" is to be utilized under the following conditions: A: at demolition site for the salvage of the material. B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job. https://sam.gov/wage-determination/CA20240018/3 44/63 3/19/24,8:22 AM SAM.gov C: for the cleaning of salvage material at the jobsite or temporary jobsite yard. The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"". -------------------------------------------------------- GUNITE LABORER CLASSIFICATIONS GROUP 1: Structural Nozzleman GROUP 2: Nozzleman, Gunman, Potman, Groundman GROUP 3: Reboundman GROUP 4: Gunite laborer ---------------------------------------------------------- WRECKING WORK LABORER CLASSIFICATIONS GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) GROUP 2: Semi-skilled wrecker (salvaging of other building materials) ---------------------------------------------------------------- LAB00304-005 07/01/2023 ALAMEDA COUNTY Rates Fringes Brick Tender.....................$ 37.05 27.45 FOOTNOTES: Work on jobs where heat-protective clothing is required: $2.00 per hour additional. Work at grinders: $.25 per hour additional. Manhole work: $2.00 per day additional. ---------------------------------------------------------------- LAB00304-008 07/01/2023 ALAMEDA AND CONTRA COSTA COUNTIES: Rates Fringes Plasterer tender...... ...........$ 41.93 30.32 Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LAB00324-002 07/01/2023 CONTRA COSTA COUNTY Rates Fringes LABORER (TRAFFIC CONTROL/LANE CLOSURE) Escort Driver, Flag Person..$ 37.26 27.30 Traffic Control Person I....$ 37.56 27.30 Traffic Control Person II...$ 35.06 27.30 TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage. TRAFFIC CONTROL PERSON II: Installation and removal of temporary/permanent signs, markers, delineators and crash cushions. ---------------------------------------------------------------- LAB00324-006 06/26/2023 https://sam.gov/wage-determination/CA20240018/3 45/63 3/19/24,8:22 AM SAM.gov CONTRA COSTA COUNTY Rates Fringes Tunnel and Shaft Laborers: GROUP 1.....................$ 45.89 27.72 GROUP 2.....................$ 45.66 27.72 GROUP 3.....................$ 45.41 27.72 GROUP 4.......... ...........$ 44.96 27.72 GROUP 5.....................$ 44.42 27.72 Shotcrete Specialist........$ 46.41 27.72 TUNNEL AND SHAFT CLASSIFICATIONS GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen GROUP 2: Rodmen; Shaft work & raise (below actual or excavated ground level) GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High pressure nozzleman; Miner - tunnel, including top and bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic Shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method) GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman ---------------------------------------------------------------- LAB00324-012 06/26/2023 CONTRA COSTA COUNTY Rates Fringes LABORER (CONSTRUCTION CRAFT LABORERS - AREA A:) Construction Specialist Group............ ...........$ 37.20 27.30 GROUP 1.....................$ 36.50 27.30 GROUP 1-a...................$ 36.72 27.30 GROUP 1-c...................$ 36.55 27.30 GROUP 1-e..... ... ...........$ 37.05 27.30 GROUP 1-f...................$ 37.08 27.30 GROUP 1-g...................$ 36.70 27.30 GROUP 2.....................$ 36.35 27.30 GROUP 3.....................$ 36.25 27.30 GROUP 4.....................$ 29.94 27.30 See groups 1-b and 1-d under laborer classifications. LABORER (GARDENERS, HORTICULURAL & LANDSCAPE LABORERS - AREA A:) (1) New Construction........$ 36.25 27.30 (2) Establishment Warranty Period........... ...........$ 29.94 27.30 LABORER (GUNITE - AREA A:) GROUP 1.....................$ 37.46 27.30 GROUP 2.....................$ 36.96 27.30 GROUP 3.......... ...........$ 36.37 27.30 GROUP 4.....................$ 36.25 27.30 LABORER (WRECKING - AREA A:) GROUP 1.....................$ 36.50 27.30 GROUP 2....... ... ...........$ 36.35 27.30 https://sam.gov/wage-determination/CA20240018/3 46/63 3/19/24,8:22 AM SAM.gov FOOTNOTES: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers entitled to receive the wage rate set forth in Group 1-a below. --------------------------------------------------------- LABORER CLASSIFICATIONS CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes shal receive $5.00 per day above Group 1 wage rates. GROUP 1-c: Burning and welding in connection with laborers' https://sam.gov/wage-determination/CA20240018/3 47/63 3/19/24,8:22 AM SAM.gov work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed. GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception. GROUP 1-f: Wire winding machine in connection with guniting or shot crete GROUP 1-g, CONTRA COSTA COUNTY: Pipelayer (including grade checking in connection with pipelaying); Caulker; Bander; Pipewrapper; Conduit layer; Plastic pipe layer; Pressure pipe tester; No joint pipe and stripping of same, including repair of voids; Precast manhole setters, cast in place manhole form setters GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; lacking of pipe - under 12 inches GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; letting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only) GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material cleaner"" is to be utilized under the following conditions: A: at demolition site for the salvage of the material. B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job. C: for the cleaning of salvage material at the jobsite or temporary jobsite yard. The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"". -------------------------------------------------------- GUNITE LABORER CLASSIFICATIONS GROUP 1: Structural Nozzleman https://sam.gov/wage-determination/CA20240018/3 48/63 3/19/24,8:22 AM SAM.gov GROUP 2: Nozzleman, Gunman, Potman, Groundman GROUP 3: Reboundman GROUP 4: Gunite laborer ---------------------------------------------------------- WRECKING WORK LABORER CLASSIFICATIONS GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) GROUP 2: Semi-skilled wrecker (salvaging of other building materials) GROUP 1-g, CONTRA COSTA COUNTY: Pipelayer (including grade checking in connection with pipelaying); Caulker; Bander; Pipewrapper; Conduit layer; Plastic pipe layer; Pressure pipe tester; No joint pipe and stripping of same, including repair of voids; Precast manhole setters, cast in place manhole form setters ---------------------------------------------------------------- LAB00324-014 07/01/2023 CONTRA COSTA COUNTY: Rates Fringes Brick Tender.....................$ 37.05 27.45 FOOTNOTES: Work on jobs where heat-protective clothing is required: $2.00 per hour additional. Work at grinders: $.25 per hour additional. Manhole work: $2.00 per day additional. ---------------------------------------------------------------- LAB00324-018 07/01/2023 ALAMEDA AND CONTRA COSTA COUNTIES: Rates Fringes Plasterer tender.................$ 41.93 30.32 Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LAB01130-002 07/01/2023 MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES Rates Fringes LABORER (TRAFFIC CONTROL/LANE CLOSURE) Escort Driver, Flag Person..$ 36.26 27.30 Traffic Control Person I....$ 36.56 27.30 Traffic Control Person II...$ 34.06 27.30 TRAFFIC CONTROL PERSON I: Layout of traffic control, crash cushions, construction area and roadside signage. TRAFFIC CONTROL PERSON II: Installation and removal of temporary/permanent signs, markers, delineators and crash cushions. ---------------------------------------------------------------- LAB01130-003 06/26/2023 MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES Rates Fringes https://sam.gov/wage-determination/CA20240018/3 49/63 3/19/24,8:22 AM SAM.gov Tunnel and Shaft Laborers: GROUP 1.......... ...........$ 45.89 27.72 GROUP 2.....................$ 45.66 27.72 GROUP 3.....................$ 45.41 27.72 GROUP 4.....................$ 44.96 27.72 GROUP 5.......... ...........$ 44.42 27.72 Shotcrete Specialist........$ 46.41 27.72 TUNNEL AND SHAFT CLASSIFICATIONS GROUP 1: Diamond driller; Groundmen; Gunite and shotcrete nozzlemen GROUP 2: Rodmen; Shaft work & raise (below actual or excavated ground level) GROUP 3: Bit grinder; Blaster, driller, powdermen, heading; Cherry pickermen - where car is lifted; Concrete finisher in tunnel; Concrete screedman; Grout pumpman and potman; Gunite & shotcrete gunman & potman; Headermen; High pressure nozzleman; Miner - tunnel, including top and bottom man on shaft and raise work; Nipper; Nozzleman on slick line; Sandblaster - potman, Robotic shotcrete Placer, Segment Erector, Tunnel Muck Hauler, Steel Form raiser and setter; Timberman, retimberman (wood or steel or substitute materials therefore); Tugger (for tunnel laborer work); Cable tender; Chuck tender; Powderman - primer house GROUP 4: Vibrator operator, pavement breaker; Bull gang - muckers, trackmen; Concrete crew - includes rodding and spreading, Dumpmen (any method) GROUP 5: Grout crew; Reboundman; Swamper/ Brakeman ---------------------------------------------------------------- LAB01130-005 07/01/2023 MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES Rates Fringes LABORER Mason Tender-Brick..........$ 36.29 25.55 ---------------------------------------------------------------- LAB01130-007 06/26/2023 MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE , COUNTIES Rates Fringes LABORER (CONSTRUCTION CRAFT LABORERS - AREA B:) Construction Specialist Group............ ...........$ 36.20 27.30 GROUP 1.....................$ 35.50 27.30 GROUP 1-a...................$ 35.72 27.30 GROUP 1-c...................$ 35.55 27.30 GROUP 1-e...................$ 36.05 27.30 GROUP 1-f...................$ 36.08 27.30 GROUP 2.....................$ 35.35 27.30 GROUP 3.....................$ 35.25 27.30 GROUP 4.......... ...........$ 28.94 27.30 See groups 1-b and 1-d under laborer classifications. LABORER (GARDENERS, HORTICULTURAL & LANDSCAPE LABORERS - AREA B:) (1) New Construction........$ 35.25 27.30 (2) Establishment Warranty Period......................$ 28.94 27.30 LABORER (GUNITE - AREA B:) GROUP 1.....................$ 36.46 27.30 GROUP 2.....................$ 35.96 27.30 GROUP 3.....................$ 35.37 27.30 GROUP 4....... ... ...........$ 35.25 27.30 https://sam.gov/wage-determination/CA20240018/3 50/63 3/19/24,8:22 AM SAM.gov LABORER (WRECKING - AREA B:) GROUP 1.......... ...........$ 35.50 27.30 GROUP 2.....................$ 35.35 27.30 FOOTNOTES: Laborers working off or with or from bos'n chairs, swinging scaffolds, belts shall receive $0.25 per hour above the applicable wage rate. This shall not apply to workers entitled to receive the wage rate set forth in Group 1-a below. --------------------------------------------------------- LABORER CLASSIFICATIONS CONSTRUCTION SPECIALIST GROUP: Asphalt ironer and raker; Chainsaw; Laser beam in connection with laborers' work; Cast-in- place manhole form setter; Pressure pipelayer; Davis trencher - 300 or similar type (and all small trenchers); Blaster; Diamond driller; Multiple unit drill; Hydraulic drill GROUP 1: Asphalt spreader boxes (all types); Barko, Wacker and similar type tampers; Buggymobile; Caulker, bander, pipewrapper, conduit layer, plastic pipelayer; Certified hazardous waste worker including Leade Abatement; Compactors of all types; Concrete and magnesite mixer, 1/2 yd. and under; Concrete pan work; Concrete sander; Concrete saw; Cribber and/or shoring; Cut granite curb setter; Dri-pak-it machine; Faller, logloader and bucker; Form raiser, slip forms; Green cutter; Headerboard, Hubsetter, aligner, by any method; High pressure blow pipe (1-1/2"" or over, 100 lbs. pressure/over); Hydro seeder and similar type; Jackhammer operator; Jacking of pipe over 12 inches; Jackson and similar type compactor; Kettle tender, pot and worker applying asphalt, lay-kold, creosote, lime, caustic and similar type materials (applying means applying, dipping or handling of such materials); Lagging, sheeting, whaling, bracing, trenchjacking, lagging hammer; Magnesite, epoxyresin, fiberglass, mastic worker (wet or dry); No joint pipe and stripping of same, including repair of voids; Pavement breaker and spader, including tool grinder; Perma curb; Pipelayer (including grade checking in connection with pipelaying); Precast-manhole setter; Pressure pipe tester; Post hole digger, air, gas and electric; Power broom sweeper; Power tampers of all types (except as shown in Group 2); Ram set gun and stud gun; Riprap stonepaver and rock-slinger, including placing of sacked concrete and/or sand (wet or dry) and gabions and similar type; Rotary scarifier or multiple head concrete chipping scarifier; Roto and Ditch Witch; Rototiller; Sandblaster, pot, gun, nozzle operators; Signalling and rigging; Tank cleaner; Tree climber; Turbo blaster; Vibrascreed, bull float in connection with laborers' work; Vibrator; Hazardous waste worker (lead removal); Asbestos and mold removal worker GROUP 1-a: Joy drill model TWM-2A; Gardner-Denver model DH143 and similar type drills; Track driller; Jack leg driller; Wagon driller; Mechanical drillers, all types regardless of type or method of power; Mechanical pipe layers, all types regardless of type or method of power; Blaster and powder; All work of loading, placing and blasting of all powder and explosives of whatever type regardless of method used for such loading and placing; High scalers (including drilling of same); Tree topper; Bit grinder GROUP 1-b: Sewer cleaners shall receive $4.00 per day above Group 1 wage rates. ""Sewer cleaner"" means any worker who handles or comes in contact with raw sewage in small diameter sewers. Those who work inside recently active, large diameter sewers, and all recently active sewer manholes shal receive $5.00 per day above Group 1 wage https://sam.gov/wage-determination/CA20240018/3 51/63 3/19/24,8:22 AM SAM.gov rates. GROUP 1-c: Burning and welding in connection with laborers' work; Synthetic thermoplastics and similar type welding GROUP 1-d: Maintenance and repair track and road beds. All employees performing work covered herein shall receive $ .25 per hour above their regular rate for all work performed on underground structures not specifically covered herein. This paragraph shall not be construed to apply to work below ground level in open cut. It shall apply to cut and cover work of subway construction after the temporary cover has been placed. GROUP 1-e: Work on and/or in bell hole footings and shafts thereof, and work on and in deep footings. (A deep footing is a hole 15 feet or more in depth.) In the event the depth of the footing is unknown at the commencement of excavation, and the final depth exceeds 15 feet, the deep footing wage rate would apply to all employees for each and every day worked on or in the excavation of the footing from the date of inception. GROUP 1-f: Wire winding machine in connection with guniting or shot crete GROUP 2: Asphalt shoveler; Cement dumper and handling dry cement or gypsum; Choke-setter and rigger (clearing work); Concrete bucket dumper and chute; Concrete chipping and grinding; Concrete laborer (wet or dry); Driller tender, chuck tender, nipper; Guinea chaser (stake), grout crew; High pressure nozzle, adductor; Hydraulic monitor (over 100 lbs. pressure); Loading and unloading, carrying and hauling of all rods and materials for use in reinforcing concrete construction; Pittsburgh chipper and similar type brush shredders; Sloper; Single foot, hand-held, pneumatic tamper; All pneumatic, air, gas and electric tools not listed in Groups 1 through 1-f; lacking of pipe - under 12 inches GROUP 3: Construction laborers, including bridge and general laborer; Dump, load spotter; Flag person; Fire watcher; Fence erector; Guardrail erector; Gardener, horticultural and landscape laborer; letting; Limber, brush loader and piler; Pavement marker (button setter); Maintenance, repair track and road beds; Streetcar and railroad construction track laborer; Temporary air and water lines, Victaulic or similar; Tool room attendant (jobsite only) GROUP 4: Final clean-up work of debris, grounds and building including but not limited to: street cleaner; cleaning and washing windows; brick cleaner (jobsite only); material cleaner (jobsite only). The classification ""material cleaner"" is to be utilized under the following conditions: A: at demolition site for the salvage of the material. B: at the conclusion of a job where the material is to be salvaged and stocked to be reused on another job. C: for the cleaning of salvage material at the jobsite or temporary jobsite yard. The material cleaner classification should not be used in the performance of ""form stripping, cleaning and oiling and moving to the next point of erection"". -------------------------------------------------------- GUNITE LABORER CLASSIFICATIONS GROUP 1: Structural Nozzleman GROUP 2: Nozzleman, Gunman, Potman, Groundman GROUP 3: Reboundman https://sam.gov/wage-determination/CA20240018/3 52/63 3/19/24,8:22 AM SAM.gov GROUP 4: Gunite laborer ---------------------------------------------------------- WRECKING WORK LABORER CLASSIFICATIONS GROUP 1: Skilled wrecker (removing and salvaging of sash, windows and materials) GROUP 2: Semi-skilled wrecker (salvaging of other building materials) ---------------------------------------------------------------- LAB01130-008 07/01/2023 CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS & TUOLUMNE Rates Fringes Plasterer tender...... ...........$ 39.77 28.54 Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- LAB01130-009 07/01/2023 MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES Rates Fringes LABORER (Plaster Tender).........$ 39.77 28.54 Work on a swing stage scaffold: $1.00 per hour additional. ---------------------------------------------------------------- PAIN0016-001 01/01/2023 ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN MATEO, SANTA CLARA, AND SANTA CRUZ COUNTIES Rates Fringes Painters:........................$ 47.42 27.28 PREMIUMS: EXOTIC MATERIALS - $1.25 additional per hour. SPRAY WORK: - $0.50 additional per hour. INDUSTRIAL PAINTING - $0.25 additional per hour [Work on industrial buildings used for the manufacture and processing of goods for sale or service; steel construction (bridges), stacks, towers, tanks, and similar structures] HIGH WORK: over 50 feet - $2.00 per hour additional 100 to 180 feet - $4.00 per hour additional Over 180 feet - $6.00 per houir additional ---------------------------------------------------------------- PAIN0016-003 07/01/2023 AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO & SANTA CLARA COUNTIES AREA 2: CALAVERAS, MARIPOA, MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, SANTA CRUZ, STANISLAUS & TUOLUMNE COUNTIES Rates Fringes Drywall Finisher/Taper AREA 1......................$ 60.41 31.34 AREA 2........... ...........$ 56.28 29.94 https://sam.gov/wage-determination/CA20240018/3 53/63 3/19/24,8:22 AM SAM.gov ---------------------------------------------------------------- PAIN0016-012 01/01/2023 ALAMEDA, CONTRA COSTA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SANTA CRUZ COUNTIES Rates Fringes SOFT FLOOR LAYER...... ...........$ 55.25 32.63 ---------------------------------------------------------------- PAIN0016-015 01/01/2023 CALAVERAS, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS & TUOLUMNE COUNTIES Rates Fringes PAINTER Brush.......................$ 38.23 22.05 FOOTNOTES: SPRAY/SANDBLAST: $0.50 additional per hour. EXOTIC MATERIALS: $1.25 additional per hour. HIGH TIME: Over 50 ft above ground or water level $2.00 additional per hour. 100 to 180 ft above ground or water level $4.00 additional per hour. Over 180 ft above ground or water level $6.00 additional per hour. ---------------------------------------------------------------- PAIN0016-022 01/01/2023 SAN FRANCISCO COUNTY Rates Fringes PAINTER............... ...........$ 51.04 27.28 ---------------------------------------------------------------- PAIN0169-001 01/01/2023 FRESNO, KINGS, MADERA, MARIPOSA AND MERCED COUNTIES: Rates Fringes GLAZIER............... ...........$ 44.33 28.88 ---------------------------------------------------------------- PAIN0169-005 01/01/2023 ALAMEDA CONTRA COSTA, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA & SANTA CRUZ COUNTIES Rates Fringes GLAZIER..........................$ 55.77 32.45 ---------------------------------------------------------------- PAIN0294-004 07/01/2023 FRESNO, KINGS AND MADERA COUNTIES Rates Fringes PAINTER Brush, Roller. 34.49 21.80 Drywall Finisher/Taper......$ 35.74 21.80 FOOTNOTE: Spray Painters & Paperhangers recive $1.00 additional per hour. Painters doing Drywall Patching receive $1.25 additional per hour. Lead Abaters & Sandblasters receive $1.50 additional per hour. High Time - over 30 feet (does not include work from a lift) $0.75 per hour additional. https://sam.gov/wage-determination/CA20240018/3 54/63 3/19/24,8:22 AM SAM.gov ---------------------------------------------------------------- PAIN0294-005 01/01/2023 FRESNO, KINGS & MADERA Rates Fringes SOFT FLOOR LAYER.................$ 38.53 23.19 ---------------------------------------------------------------- PAIN0767-001 01/01/2023 CALAVERAS, SAN JOAQUIN, STANISLAUS AND TUOLUMNE COUNTIES: Rates Fringes GLAZIER..........................$ 43.15 33.72 PAID HOLIDAYS: New Year's Day, Martin Luther King, Jr. Day, President's Day, Memorial Day, Independence Day, Labor Day, Veteran's Day, Thanksgiving Day, and Christmas Day. Employee required to wear a body harness shall receive $1.50 per hour above the basic hourly rate at any elevation. ---------------------------------------------------------------- PAIN1176-001 07/01/2022 HIGHWAY IMPROVEMENT Rates Fringes Parking Lot Striping/Highway Marking: GROUP 1.......... ...........$ 40.83 17.62 GROUP 2.....................$ 34.71 17.62 GROUP 3.....................$ 35.11 17.62 CLASSIFICATIONS GROUP 1: Striper: Layout and application of painted traffic stripes and marking; hot thermo plastic; tape, traffic stripes and markings GROUP 2: Gamecourt & Playground Installer GROUP 3: Protective Coating, Pavement Sealing ---------------------------------------------------------------- PAIN1237-003 01/01/2023 CALAVERAS; SAN JOAQUIN COUNTIES; STANISLAUS AND TUOLUMNE COUNTIES: Rates Fringes SOFT FLOOR LAYER.................$ 46.24 25.96 ---------------------------------------------------------------- PLAS0066-002 07/01/2019 ALAMEDA, CONTRA COSTA, SAN MATEO AND SAN FRANCISCO COUNTIES: Rates Fringes PLASTERER........................$ 42.41 30.73 ---------------------------------------------------------------- PLAS0300-001 07/01/2018 Rates Fringes PLASTERER AREA 188: Fresno...........$ 32.70 31.68 AREA 224: San Benito, Santa Clara, Santa Cruz.....$ 32.88 31.68 https://sam.gov/wage-determination/CA20240018/3 55/63 3/19/24,8:22 AM SAM.gov AREA 295: Calaveras & San Joaquin Couonties...........$ 32.70 31.68 AREA 337: Monterey County..$ 32.88 31.68 AREA 429: Mariposa, Merced, Stanislaus, Tuolumne Counties...........$ 32.70 31.68 ---------------------------------------------------------------- PLAS0300-005 07/01/2016 Rates Fringes CEMENT MASON/CONCRETE FINISHER...$ 32.15 23.27 ---------------------------------------------------------------- PLUM0038-001 07/01/2023 SAN FRANCISCO COUNTY Rates Fringes PLUMBER (Plumber, Steamfitter, Refrigeration Fitter)............... ...........$ 85.50 48.98 ---------------------------------------------------------------- PLUM0038-005 07/01/2022 SAN FRANCISCO COUNTY Rates Fringes Landscape/Irrigation Fitter (Underground/Utility Fitter).....$ 69.70 33.15 ---------------------------------------------------------------- PLUM0062-001 01/01/2024 MONTEREY AND SANTA CRUZ COUNTIES Rates Fringes PLUMBER & STEAMFITTER............$ 52.00 40.90 ---------------------------------------------------------------- PLUM0159-001 07/01/2023 CONTRA COSTA COUNTY Rates Fringes Plumber and steamfitter (1) Refrigeration...........$ 63.33 46.64 (2) All other work..........$ 62.12 45.24 ---------------------------------------------------------------- PLUM0246-001 01/01/2024 FRESNO, KINGS & MADERA COUNTIES Rates Fringes PLUMBER & STEAMFITTER............$ 48.85 40.09 ---------------------------------------------------------------- * PLUM0246-004 01/01/2017 FRESNO, MERCED & SAN JOAQUIN COUNIES Rates Fringes PLUMBER (PIPE TRADESMAN).........$ 13.00 ** 10.74 PIPE TRADESMAN SCOPE OF WORK: Installation of corrugated metal piping for drainage, as well as installation of corrugated metal piping for culverts in connection with storm sewers and drains; Grouting, dry packing and diapering of joints, holes or chases including paving over joints, in piping; Temporary piping for dirt work for building site preparation; Operating jack hammers, pavement breakers, chipping guns, concrete saws and spades https://sam.gov/wage-determination/CA20240018/3 56/63 3/19/24,8:22 AM SAM.gov to cut holes, chases and channels for piping systems; Digging, grading, backfilling and ground preparation for all types of pipe to all points of the jobsite; Ground preparation including ground leveling, layout and planting of shrubbery, trees and ground cover, including watering, mowing, edging, pruning and fertilizing, the breaking of concrete, digging, backfilling and tamping for the preparation and completion of all work in connection with lawn sprinkler and landscaping; Loading, unloading and distributing materials at jobsite; Putting away materials in storage bins in jobsite secure storage area; Demolition of piping and fixtures for remodeling and additions; Setting up and tearing down work benches, ladders and job shacks; Clean-up and sweeping of jobsite; Pipe wrapping and waterproofing where tar or similar material is applied for protection of buried piping; Flagman ---------------------------------------------------------------- PLUM0342-001 07/01/2023 ALAMEDA & CONTRA COSTA COUNTIES Rates Fringes PIPEFITTER CONTRA COSTA COUNTY.........$ 74.00 47.45 PLUMBER, PIPEFITTER, STEAMFITTER ALAMEDA COUNTY..............$ 74.00 47.45 ---------------------------------------------------------------- PLUM0355-004 07/01/2022 ALAMEDA, CALAVERAS, CONTRA COSTA, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, SAN MATEO, SANTA CLARA, SANTA CRUZ, STANISLAUS, AND TUOLUMNE COUNTIES: Rates Fringes Underground Utility Worker /Landscape Fitter...........$ 32.22 17.55 ---------------------------------------------------------------- PLUM0393-001 07/01/2021 SAN BENITO AND SANTA CLARA COUNTIES Rates Fringes PLUMBER/PIPEFITTER...............$ 68.76 46.63 ---------------------------------------------------------------- PLUM0442-001 01/01/2024 CALAVERAS, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS & TUOLUMNE COUNTIES Rates Fringes PLUMBER & STEAMFITTER............$ 52.90 36.39 ---------------------------------------------------------------- PLUM0467-001 07/01/2021 SAN MATEO COUNTY Rates Fringes Plumber/Pipefitter/Steamfitter...$ 73.10 38.61 ---------------------------------------------------------------- ROOF0027-002 01/01/2024 FRESNO, KINGS, AND MADERA COUNTIES Rates Fringes https://sam.gov/wage-determination/CA20240018/3 57/63 3/19/24,8:22 AM SAM.gov ROOFER...........................$ 42.51 16.11 FOOTNOTE: Work with pitch, pitch base of pitch impregnated products or any material containing coal tar pitch, on any building old or new, where both asphalt and pitchers are used in the application of a built-up roof or tear off: $2.00 per hour additional. ---------------------------------------------------------------- ROOF0040-002 08/01/2023 SAN FRANCISCO & SAN MATEO COUNTIES: Rates Fringes ROOFER...........................$ 52.43 22.19 ---------------------------------------------------------------- ROOF0081-001 08/01/2023 ALAMEDA AND CONTRA COSTA COUNTIES: Rates Fringes Roofer.......... ...... ...........$ 52.47 22.31 ---------------------------------------------------------------- ROOF0081-004 08/01/2023 CALAVERAS, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS AND TUOLUMNE COUNTIES: Rates Fringes ROOFER................ ...........$ 46.73 21.36 ---------------------------------------------------------------- ROOF0095-002 08/01/2023 MONTEREY, SAN BENITO, SANTA CLARA, AND SANTA CRUZ COUNTIES: Rates Fringes ROOFER Bitumastic, Enameler, Coal Tar, Pitch and Mastic worker......................$ 57.17 21.51 Journeyman....... ...........$ 53.17 21.51 Kettle person (2 kettles)...$ 55.17 21.51 ---------------------------------------------------------------- SFCA0483-001 01/01/2024 ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO AND SANTA CLARA COUNTIES: Rates Fringes SPRINKLER FITTER (FIRE)..........$ 74.63 38.51 ---------------------------------------------------------------- SFCA0669-011 01/01/2024 CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, MONTEREY, SAN BENITO, SAN JOAQUIN, SANTA CRUZ, STANISLAUS AND TUOLUMNE COUNTIES: Rates Fringes SPRINKLER FITTER.................$ 44.32 27.83 ---------------------------------------------------------------- SHEE0104-001 07/01/2020 AREA 1: ALAMEDA, CONTRA COSTA, SAN FRANCISCO, SAN MATEO, SANTA CLARA https://sam.gov/wage-determination/CA20240018/3 58/63 3/19/24,8:22 AM SAM.gov AREA 2: MONTEREY & SAN BENITO AREA 3: SANTA CRUZ Rates Fringes SHEET METAL WORKER AREA 1: Mechanical Contracts under $200,000.............$ 55.92 45.29 All Other Work.............$ 64.06 46.83 AREA 2......................$ 52.90 36.44 AREA 3........... ...........$ 55.16 34.18 ---------------------------------------------------------------- SHEE0104-003 07/01/2021 CALAVERAS AND SAN JOAQUIN COUNTIES: Rates Fringes SHEET METAL WORKER.... ...........$ 44.34 39.22 ---------------------------------------------------------------- SHEE0104-005 07/01/2021 MARIPOSA, MERCED, STANISLAUS AND TUOLUMNE COUNTIES: Rates Fringes SHEET METAL WORKER (Excluding metal deck and siding)...........$ 41.28 45.41 ---------------------------------------------------------------- SHEE0104-007 07/01/2021 FRESNO, KINGS, AND MADERA COUNTIES: Rates Fringes SHEET METAL WORKER...............$ 44.07 40.79 ---------------------------------------------------------------- SHEE0104-015 07/01/2020 ALAMEDA, CONTRA COSTA, MONTEREY, SAN BENITO, SAN FRANCISCO, SAN MATEO, SANTA CLARA AND SANTA CRUZ COUNTIES: Rates Fringes SHEET METAL WORKER (Metal Decking and Siding only).........$ 44.45 35.55 ---------------------------------------------------------------- SHEE0104-018 07/01/2020 CALAVERAS, FRESNO, KINGS, MADERA, MARIPOSA, MERCED, SAN JOAQUIN, STANISLAUS AND TUOLUMNE COUNTIES: Rates Fringes Sheet metal worker (Metal decking and siding only).........$ 44.45 35.55 ---------------------------------------------------------------- TEAM0094-001 07/01/2022 Rates Fringes Truck drivers: GROUP 1.....................$ 36.95 31.14 GROUP 2.....................$ 37.25 31.14 GROUP 3.......... ...........$ 37.55 31.14 GROUP 4.....................$ 37.90 31.14 GROUP 5.....................$ 38.25 31.14 FOOTNOTES: https://sam.gov/wage-determination/CA20240018/3 59/63 3/19/24,8:22 AM SAM.gov Articulated dump truck; Bulk cement spreader (with or without auger); Dumperete truck; Skid truck (debris box); Dry pre-batch concrete mix trucks; Dumpster or similar type; Slurry truck: Use dump truck yardage rate. Heater planer; Asphalt burner; Scarifier burner; Industrial lift truck (mechanical tailgate); Utility and clean-up truck: Use appropriate rate for the power unit or the equipment utilized. TRUCK DRIVER CLASSIFICATIONS GROUP 1: Dump trucks, under 6 yds.; Single unit flat rack (2- axle unit); Nipper truck (when flat rack truck is used appropriate flat rack shall apply); Concrete pump truck (when flat rack truck is used appropriate flat rack shall apply); Concrete pump machine; Fork lift and lift jitneys; Fuel and/or grease truck driver or fuel person; Snow buggy; Steam cleaning; Bus or personhaul driver; Escort or pilot car driver; Pickup truck; Teamster oiler/greaser and/or serviceperson; Hook tender (including loading and unloading); Team driver; Tool room attendant (refineries) GROUP 2: Dump trucks, 6 yds. and under 8 yds.; Transit mixers, through 10 yds.; Water trucks, under 7,000 gals.; Jetting trucks, under 7,000 gals.; Single-unit flat rack (3-axle unit); Highbed heavy duty transport; Scissor truck; Rubber-tired muck car (not self-loaded); Rubber-tired truck jumbo; Winch truck and ""A"" frame drivers; Combination winch truck with hoist; Road oil truck or bootperson; Buggymobile; Ross, Hyster and similar straddle carriers; Small rubber-tired tractor GROUP 3: Dump trucks, 8 yds. and including 24 yds.; Transit mixers, over 10 yds.; Water trucks, 7,000 gals. and over; Jetting trucks, 7,000 gals. and over; Vacuum trucks under 7500 gals. Trucks towing tilt bed or flat bed pull trailers; Lowbed heavy duty transport; Heavy duty transport tiller person; Self- propelled street sweeper with self-contained refuse bin; Boom truck - hydro-lift or Swedish type extension or retracting crane; P.B. or similar type self-loading truck; Tire repairperson; Combination bootperson and road oiler; Dry distribution truck (A bootperson when employed on such equipment, shall receive the rate specified for the classification of road oil trucks or bootperson); Ammonia nitrate distributor, driver and mixer; Snow Go and/or plow GROUP 4: Dump trucks, over 25 yds. and under 65 yds.; Water pulls - DW 10's, 20's, 21's and other similar equipment when pulling Aqua/pak or water tank trailers; Helicopter pilots (when transporting men and materials); Lowbedk Heavy Duty Transport up to including 7 axles; DW10's, 20's, 21's and other similar Cat type, Terra Cobra, LeTourneau Pulls, Tournorocker, Euclid and similar type equipment when pulling fuel and/or grease tank trailers or other miscellaneous trailers; Vacuum Trucks 7500 gals and over and truck repairman GROUP 5: Dump trucks, 65 yds. and over; Holland hauler; Low bed Heavy Duty Transport over 7 axles ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ---------------------------------------------------------------- ---------------------------------------------------------------- ** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($17.20) or 13658 ($12.90). Please see the Note at the top of the wage determination for more information. Please also note that the minimum wage requirements of Executive Order 14026 are not https://sam.gov/wage-determination/CA20240018/3 60/63 3/19/24,8:22 AM SAM.gov currently being enforced as to any contract or subcontract to which the states of Texas, Louisiana, or Mississippi, including their agencies, are a party. Note: Executive Order (ED) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts. Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)). ---------------------------------------------------------------- The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate). Union Rate Identifiers A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014. Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate. Survey Rate Identifiers Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 https:Hsam.gov/wage-determination/CA20240018/3 61/63 3/19/24,8:22 AM SAM.gov in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier. Survey wage rates are not updated and remain in effect until a new survey is conducted. Union Average Rate Identifiers Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier. A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: https://sam.gov/wage-determination/CA20240018/3 62/63 3/19/24,8:22 AM SAM.gov Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ---------------------------------------------------------------- ---------------------------------------------------------------- END OF GENERAL DECISION" https://sam.gov/wage-determination/CA20240018/3 63/63