HomeMy WebLinkAbout2214C CCO 24.pdf COUNTY OfFRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE / CHANGE ORDER NO. 24 /\k8ER|CAN AVENUE TO MISSION STREET MARCH 21. 2O24 CONTRACT NO. 22-14-C PAGE 1OF4 TO: YARBS GRADING AND PAVING, INC.: Make the following changes to the plans and specifications or do work not in the plans and specifications for this contract. Because of the ohange(u), will be added to the contract timeline. PART{: INCREASE ITEMS AT UNIT BID PRICES This change was proposed by the engineer. Quantities in the Bid Book are estimates only. This part adjusts items tn the actual quantities used. Items:Increased Item Total TOTAL No. Description UnitQuantity Price AmountM) P/6) 17 Adjust Utility Box boGrade EA 4.00 $1000.00 $4.000.00 44.44 30.00 29 Hot Mix Asphalt(Type A) TON 2.099.30 103.00 216.227.90 1.95 83.17 34 Place Hot Mix Asphalt Dike LF 5.00 9.00 45.00 11.11 11.11 (TypaD) 35 P/000 Hot Mix Asphalt Dike LF 6.00 9.00 54�00 4.29 4.28 (TypmE) 38 Cold Plane Asphalt Concrete 8Y 8.409.99 220 18.501.88 2.76 28.75 Pavement 55 Remove Headwall EA 1.0 5.000.00 5.800.00 50.00 50.00 85 &YinorCunonaba-D/ivewoy 8Y 247.08 72.00 17.700.48 30.66 33.30 83 Yellow 2-Cuot Paint Traffic LF 22.533.00 0.60 13.518.80 90.13 00.13 Ethping(21.22.24.2S.2S.31.32) 83 4"White Thermoplastic Traffic LF 40`178.00 0.80 32.142.40 172.44 172.44 Striping (12. 27B) 84 4^Yellow Thermoplastic Striping LF 18.637.00 1.20 22.244.40 83.13 83.13 (21.25.27.35A) 133 Wood Mulch CY 58.39 60.00 3.503.40 8.06 2.81 157 Shoulder Backing STA 509.00 70.00 35.630.00 37.88 37.99 161 Hot Mix Asphalt(Type A)l6^ TON 157.23 105.00 16.509.15 2.33 -81.85 TOTAL INCREASES: $385.168.51 TOTAL COST PART|: $386,168'61 |NCREASE TOTAL TIME EXTENSION PART|: ZERO(0)'WORKING DAYS _m"tracto' We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,n -Auditor Controller this nmv sa//sannm,eu matnoomvmwueu/enu/nmvnt mmaxanma�,/a/, exovtas may vmem,/ebe -Business Office nvmxao`"e,onunenm,�ao^e�/cesnocessanm,t,e���"»o"psveuneu'on�°mocenta,mnvavm,� mm�nrs"�°u"n - ��m"�.w""o=me"^ there ore RE/Arch. De sign If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and riling a written protest within the time therein ,necm,o. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE 1 CHANGE ORDER NO. 24 AMERICAN AVENUE TO MISSION STREET MARCH 21,2024 CONTRACT NO, 22-14-C PAGE 2 OF 4 PART Ik CONSTRUCT HOT MIX ASPHALT DOWN-DRAINS IN KINGSBURG REGION—EXTRA WORK This extra work was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work,"of the Standard Specifications, construct hot mix asphalt down-drains under the metal beam guard railing(northbound), between approximate sta. 118+00 and 122+00, in the Kingsburg region. Perform all work according to Section 39-2.01 C(9), "Miscellaneous Areas, Dikes, & Berms,"of the Special Provisions, as directed by the engineer. Compensation for this work will be made as extra work at force account according to Section 9-1.03, "Payment Scope,"of the Special Provisions.Total compensation for this work resulted in $5,831.19, this amount will be paid as extra work. This extra work did not impact the critical path for the project, therefore, granting additional contract time was not warranted. TOTAL COST PART II: $6,831.19 TOTAL TIME EXTENSION PART II: ZERO(0)-WORKING DAYS PART III: RE-GRADE DIRT MEDIAN ALONG THE NEWLY CONSTRUCTED LEFT TURN POCKET AT THE SOUTH VAN HORN AVENUE INTERSECTION TO ENHANCE DRAINAGE-EXTRA WORK This change was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work,"of the Standard Specifications, re-grade the dirt median along the left turn pocket at the South Van Horn Avenue intersection (Selma region)to the grades shown on the attached revised Plan Sheet 72B (replace plan sheet 72A with revised sheet 72B). Perform all work according to Section 19, "Earthwork,"of the Standard Specifications and/or the Special Provisions. Compensation for this work will be made as extra work at force account according to Section 9-1.03, "Payment Scope,"of the Special Provisions. Total compensation for this work resulted in $4,721.55, this amount will be paid as extra work. This extra work did not impact the critical path for the project, therefore, granting additional contract time was not warranted. TOTAL COST PART lih $4,721.55 INCREASE TOTAL TIME EXTENSION PART III: ZERO(0)-WORKING DAYS PART IV: EXTEND DRIVEWAY MATCH POINT AT THE PARKING LOT NEAR THE 1ST STREET AND WHITSON STREET INTERSECTION—EXTRA WORK This extra work was requested by the engineer. _Contractor g We,the above signed contractor,have given careful consideration to the change proposed and hereby a ree,if _Auditor Controller p p y 9 this l i _Business office proposal approved,that we will provide all equipment,Furnish all materials,except as may otherwise be _Board of supervisors noted above,and perform all services necessary for the work above specified,and will accept as full payment _Const.Management therefore the prices shown above. _RE/A, th. .—Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 24 AMERICAN AVENUE TO MISSION STREET MARCH 21, 2024 CONTRACT NO. 22-14-C PAGE 3 OF 4 In accordance with Section 4-1,05, "Changes and Extra Work,"of the Standard Specifications,extend the driveway approach to the parking lot near the I"Street and Whitson Street intersection, on the eastside, by approximately 3 feet to flatten the driveway slope. This work includes saw cutting the existing pavement at the new match point, removing and disposing the asphalt pavement, re-grading and compacting the subgrade, and paving back the driveway approach using Type A Y-Inch Hot Mix Asphalt. Perform all work according to various applicable sections of the Standard Specifications and/or Special Provisions. Compensation for this work will be made as extra work at force account according to Section 9-1.03, "Payment Scope,"of the Special Provisions.Total compensation for this work resulted in$2,732.56,this amount will be paid as extra work. This extra work did not impact the critical path for the project,therefore, granting additional contract time was not warranted. TOTAL COST PART IV: $2,732.56 INCREASE TOTAL TIME EXTENSION PART IV: ZERO(0) -WORKING DAYS PART V: SAWCUT EXISTING ASPHALT PAVEMENT AT THE RIGHT-OF-WAY,ALONG AT THE PARKING LOT AND PREPARE SUBGRADE BETWEEN McCALL AVENUE AND TODD STREET-EXTRA WORK This extra work was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work,"of the Standard Specifications, sawcut existing asphalt pavement at the match point in parking area and prepare subgrade to pave back the area behind the newly constructed concrete curb. Remove and dispose the old asphalt pavement. Perform all work according to various applicable sections of the Standard Specifications and/or Special Provisions. Compensation for this work will be made as extra work at force account according to Section 9-1.03, "Payment Scope,"of the Special Provisions. Total compensation for this work resulted in $3,535.98,this amount will be paid as extra work. This extra work did not impact the critical path for the project,therefore, granting additional contract time was not warranted. TOTAL COST PART V: $3,535.98 INCREASE NET TIME EXTENSION PART V: ZERO (0)-WORKING DAYS PART VI: RESTORE LANDSCAPE AND REPAIR IRRIGATION SYSTEM AT THE KINGSBURG VETERINARY CLINIC(KINGSBURG REGION)—EXTRA WORK This compensation adjustment was requested by the contractor. In accordance with Section 4-1.05, "Changes and Extra Work,"of the Standard Specifications, restore Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,if _Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be _Business Office Board of Supervisors noted above,and perform all services necessary for the work above specified,and will accept as full payment _ Const.Management therefore the prices shown above. _RE/Arch. _Design If the Contractor does not sign acceptance of this order,his attention Is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 24 AMERICAN AVENUE TO MISSION STREET MARCH 21, 2024 CONTRACT NO. 22-14-C PAGE 4 OF 4 landscape and repair irrigation sprinklers at the Kingsburg Veterinary Clinic (Kingsburg region). This work includes repairing several irrigation sprinklers, grading and storing lawn, and replacing the damaged shrubs. Perform all work according to Sections 20, "Landscape,"of the Standard Specifications and/or Special Provisions. Compensation for this work will be made at an agreed lumpsum price of$3,080 according to Section 9-1.03, "Payment Scope,"of the Special Provisions. This amount includes compensation for all labor, equipment, materials, incidentals, markups, and profit for the above referenced work, no additional compensation will be made. This amount will be paid as extra work. This extra work did not impact the critical path for the project, therefore, granting additional contract time was not warranted. TOTAL COST PART VI: $3,080.00 INCREASE NET TIME EXTENSION PART VI: ZERO (0)-WORKING DAYS NET COST THIS CHANGE ORDER: A$405,069.79 INCREASE NET TIME EXTENSION THIS CHANGE ORDER: ZERO(0) -WORKING DAYS a—zlo LARtie Goossen(Aar 22.202.115:00 PDT) LaRue Goossen, Resident Engineer APPROVAL RECOMMENDED: YARBS GRADING AND PAVING, INC. Contractor Mandeep S. Sekhon, PE Construction Engineer TYoli YuybYowGt By Troy YarITFough(Mar 22,70z 5:15PDT) APPROVED BY: }p p h } Digitally signed by Steve White President Steve W I e Date:2024.03.26 14:13:24 Title -07'00' Steven E. White, Director Accepted Date: M a r 22, 2024 Public Works and Planning Date: Nathan Magsig, Chairman Board of Supervisors Date: We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,if _Contractor this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be _Auditor Controller noted above,and perform all services necessary for the work above specified,and will accept as full payment _Business Office therefore the prices shown above. _Board of Supervisors Con't _RE/Arch.anagement If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the _Design specifications as to proceeding with the ordered work and riling a written protest within the time therein specified. 0 Gam = o \ GS -SB2"+80.20 39.00'Lt GSB-SB2" +40.11 39.38' Lt GSB-SB2" +89.00 39.12' Lt 0 (E)R/W FL Elev 304.1 y� FL Elev 304.47 (E)RIW FL Elev 304.34 ��_7•- X7_ _-_X >7- - GSB-NB2" +00.00 + A FL Elev 305.67 _ -- -- _ -- - --y__y-- -- o %gg6LtG FL Elev 302.11FL Elev 303.2 t � GSB-NB2" +18.47�20.00'Lt N C GSB-SB2"UNE o WQ 1 0 219+00 220+00 221+00 222+00 27___ 224+00 225+00 226+00 227+00 228 + -- -- -- -- N F - h i 217+00 218+00 L7 C 219+00 220+00 221+00 222+00 223+00 224+00 225+00 226+00 227+00 228+ 0 N GOLDEN STATE BLVD � o � a GSB-1`182"+00.00 39.00'Rt GB (E)R/W \ d FL Elev 303.80 , F __GSB A182 f4 -Nar+�Prnr 38 7[Rt G T. 5� H FL Elev 303.00 FL Elev 304.00 GSB-NB2" +69.24 37.87'Rt A GSB-N82"+42.50 39.00'Rt G FL Elev 303.85 q FL Elev 301.89 n � DITCH GSB-NB2"+25.54 39.00'Rt A GSB-NB2" +62.07 37.26'Rt A FL Elev 302.39 FL Elev 303.77 EP 3, HP FL "GSB-NB2"+86.81 37.76'R "GSB-NB2" +16.00 38.60' Rt G HP 3, EP FL Elev 304.57 FL Elev 303.73 GSB-NB2" +96.81 37.97'R 5% FL Elev 303.71 CITY OF SELMA GSB-NB2"+2FL Elev8303.67 GOLDEN STATE BLVD Mnx FOR INFORMATION ONLY SCALE.- 1" = 40' SEE PHASE 2 FOR DESIGN SECTION C-C (BY OTHERS) NTS FOR INFORMATION ONLY - SEE PHAS 2 FO DESIGN e (BY OT y GSB-S " +911 38.80'Lt 'GSB-SB2" +08.55 39.33'Lt / $I FL Elev FL Elev 303.83 0 I I R © A x __x_ W W y y GSB-S82"UNE vwi 232+00 233+00 234+00 235+00 236+00 + F GOLDEN STATE BLVD GSB-NB2'UNE w 2 9+00 230+00 231+00 232+00 233+00 234+00 235+00 236+00 237+00 238+00 239+00 240+00 e x _ -- -- --�--� -- -- -- -- - --�-- _ - x a © (£)R/W SB-NB2" t00.00 37.49'Rt GB GSB-NB2" +16.11 38.00' GSB-NB2" +47.05. 38.33' Rt �'GSB-N 38.50' Rt FL Elev 303.21 FL Elev 303.12 FL Elev 303.10 FL Elev 303.09 GSB-NB2" 4-51.03 37.34'Rt o FL Elev 303.21 FL Elev 303.75 FL Elev 30313 GSB-1`182" +88.69 38.06' Rt AP GSB-NB2"+00.00 38.02'Rt GB FL Elev 303.59 FL Elev 30353 10 O m V DATE RECORD DRAWING ai PROJECT- PHASE 1 T/"' DEPARTMENT OFPUBLIC WORKSAND PLANNING DESIGNED: CYNTHIA HORNER #### RESIDENT ENGINEER DATE ' GOLDEN STATE CORRIDOR-ECONOMIC DEVELOPMENT DRAINAGE PLAN DRAWN: EDNORIN ■ ■ « B AND INFRASTRUCTURE IMPROVEMENTS CHECKED: ED NORIEGA #ti## � MARK THOMAS SUPERVISING ENGINEER DATE � L g�FOR RIGHT OF WAY DATA AND ACCURATE ACCESS DETERMINATION,SEE DOCUMENTS IN THE DEPARTMENT OF PUBLIC WORKS AND PLANNING CALL BEFORE YOU DIGCAULSELMA REGION DRAWING NO. D-2 SHEET NO. 72B TOTAL 172 4