HomeMy WebLinkAbout2214C CCO 23.pdf COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 23
AMERICAN AVENUE TO MISSION STREET FEBUARY 20, 2024
CONTRACT NO. 22-14-C PAGE 1 OF 4
TO: YARBS GRADING AND PAVING INC
Make the following changes to the plans and specifications or do work not in the plans and specifications
for this contract. Because of the change(s), ZERO(0) -WORKING DAYS will be added to the contract
timeline.
PART 1: REPLACE PLAN SHEETS IN SELMA REGION TO REVISE STRIPING ON FRONT STREET,
AND TO REVISE CURB RAMP GRADES AT FRONT STREET AND NORTH STREET
INTERSECTION
This was requested by the engineer.
In accordance with Section 4-1.05, "Changes and Extra Work,"of the Standard Specifications, replace Plan
Sheets 67A, 107A, and 113 with the attached revised sheets 67B, 107B, and 113A in the Selma region.
These plans revised the striping locations on Front Street between sta. 336+40 and sta. 354+25, and
revised the curb ramp at the northwest corner of North Street and Front Street. These revisions did not
change the payable quantities; therefore, these revisions are being made at no additional cost.
These revisions did not impact the critical path for the project,therefore, granting additional contract time is
not warranted.
TOTAL COST PART I: $0.00(NO COST)
TOTAL TIME EXTENSION PART 1: ZERO(0)-WORKING DAYS
PART II: REMOVE EXISITNG AGGREGATE BASE MATERIAL FROM THE MEDIAN LANDSCAPE
AREAS AT THOMPSON AVENUE INTERSECTION—EXTRA WORK
This extra work was requested by the engineer.
In accordance with Section 4-1.05, "Changes and Extra Work,"of the Standard Specifications,
remove and dispose existing aggregate base (AB) material in the median landscape areas at the
Whitson Street and Thompson Avenue intersection, between Sta. 316+15 and 317+00, and Sta.
319+15 and 320+60 (Selma region) as extra work. This work includes removing and hauling off the
existing AB materials and placing and grading the excess native material available on the jobsite.
Compensation for this work will be made as extra work at force account according to Section 9-1.03,
"Payment Scope,"of the Special Provisions.Total compensation for this work resulted in $4,223.93,
this amount will be paid as extra work.
This extra work did not impact the critical path for the project, therefore, granting additional contract time
was not warranted.
Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,if
_auditor Controller this proposal is approved,that we will provide all equipment,fumish all materials,except as may otherwise be
_Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment
_Board of Supervisors therefore the prices shown above.
_Const.Management
_RE/arch.
_Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 23
AMERICAN AVENUE TO MISSION STREET FEBUARY 20, 2024
CONTRACT NO. 22-14-C PAGE 2 OF 4
TOTAL COST PART II: A $4,223.93 INCREASE
TOTAL TIME EXTENSION PART 11: ZERO(0)—WORKING DAYS
PART III: REMOVE AND DISPOSE EXISTING ASPHALT PAVEMENT FROM LANDSCAPE AREAS
AT WHITSON STREET AND FRONT STREET INTERSECTION—EXTRA WORK
This extra work was requested by the engineer.
In accordance with Section 4-1,05, "Changes and Extra Work," of the Standard Specifications,
remove and dispose existing asphalt pavement from the landscape areas at the Whitson Street and
Front Street intersection, in the northbound outside shoulder, between approximate sta. 269+40 and
271+25. Compensation for this work will be made as extra work at force account according to
Section 9-1.03, "Payment Scope," of the Special Provisions. Total compensation for this work
resulted in$1,810.00, this amount will be paid as extra work.
This extra work did not impact the critical path for the project,therefore, granting additional contract time
was not warranted.
TOTAL COST PART III: A $1,810.00 INCREASE
TOTAL TIME EXTENSION PART III: ZERO(0)—WORKING DAYS
PART IV: REMOVE ABANDONED UTILITY POLE BASE FROM THE SUBGRADE AT 8T"STREET
AND FRESNO STREET INTERSECTION—EXTRA WORK
This extra work was requested by the engineer.
In accordance with Section 4-1.05,"Changes and Extra Work,"of the Standard Specifications,
remove and dispose buried under wooden pole base at the southwest corner of 8ih Street and
Fresno Street. Backfill and compact the excavated area using native materials available onsite to 6-
inch below the subgrade. Place 6-inch hot mix asphalt materials plug to match the subgrade prior to
paving the final asphalt pavement layer in this area. Compensation for this work will be made as
extra work at force account according to Section 9-1.03, "Payment Scope,"of the Special
Provisions. Total compensation for this work resulted in $1,668.78, this amount will be paid as extra
work.
This extra work did not impact the critical path for the project,therefore, granting additional contract time
was not warranted.
TOTAL COST PART IV: A$1,668.78 INCREASE
TOTAL TIME EXTENSION PART iV: ZERO(0)—WORKING DAYS
—Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,If
—Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials, except as may otherwise be
—Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment
Board of Supervisors_Const.Management therefore the prices shown above.
RE/Arch.
_Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 23
AMERICAN AVENUE TO MISSION STREET FEBUARY 20, 2024
CONTRACT NO. 22-14-C PAGE 3 OF 4
PART V: INCREASE/DECREASE BID ITEMS AT UNIT PRICES
This change was proposed by the engineer.
Item quantities in the Bid Book are estimates only. This part adjusts item quantities to the actual quantities
utilized.
Increased Items:
Item Total TOTAL
No. Description Unit Quantity (a), Price Amount
76 Midwest Guardrail System CF 71 $30.00 $2,130.00 2.26 (62.17)
(Wood Post)
78 End Anchor Assembly(Type SFT) EA 1 $1,300.00 $1,300.00 2.08 (54.63)
79 Alternative Flared Terminal EA 1 $3,800.00 $3,800.00 2.08 (54.63)
System
TOTAL INCREASES: $7,230.00
TOTAL COST PART V: A$7,230.00 INCREASE
TOTAL TIME EXTENSION PART V: ZERO(0)-WORKING DAYS
—Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,If
—Auditor controiier this proposal Is approved,that we will provide all equipment,furnish all materials,except as may otherwise be
—Business Office. noted above,and perform all services necessary for the work above specified,and will accept as full payment
Board of Supervisors
Const.Management therefore the prices shown above.
RE/Arch.
Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 23
AMERICAN AVENUE TO MISSION STREET FEBUARY 20, 2024
CONTRACT NO. 22-14-C PAGE 4 OF 4
NET COST THIS CHANGE ORDER: A $14,932.71 INCREASE
NET TIME EXTENSION THIS CHANGE ORDER: ZERO (0) -WORKING DAYS
LARue Goossen(Feb 20,2024 iG:20 PST)
LaRue Goossen, Resident Engineer
tA,PPROVAL RECOMMENDED:
YARBS GRADING AND PAVING INC.
f j �-��-
Contractor Mandeep S. Sekhon, PE
TM YGVbY-0 ffLh Construction Engineer
By Troy Yar rough(Feb 21,202 10:02 PST) APPROVED BY:
Digitally signed by Steve White
Title President Steve White Oa'Date:
2024.03.0715:43:54
Steven E. White, Director
Accepted Date:
Feb 21, 2024 Public Works and Planning
Date:
Nathan Magsig, Chairman
Board of Supervisors
Date:
_Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,If
_Auditor Controller this proposal Is approved,that we will provide all equipment,furnish all materials, except as may otherwise be
_Business Office noted above,and perform all services necessary for the work above specified,and will accept as full payment
_Board of Supervisors P P p y
_Const.Management therefore the prices shown above.
_RE/Arch.
_Design If the Contractor does not sign acceptance of this order,his attention Is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
WH
is R MR
Ill R1,
Raw AMA a
z �
z -
Yy
e
YOAB 93S xrNc rTs YMI 1ptyR pS�L56 ry 9id�N7j� � � „
1- 1
I i I }I+
• I � a wa
U
Z
N
4W
R �
—Imp zu
vo
as �I
� o
a
•1 II 1� �z �,
I a
I � • I o
.,
• I I
1 I � r+rtl57'M�N
,� R ,y, .I y 2233 ��p�pe•rpMMIOD�
A504 -IV ,wl,r'j nq•.n
a�S'ty T� •yroyow
M rvevs M°r+rM
u
AM#M OVIOPC rtS.4fd!MUVX A-SS IEW=a4+NYC rig]N!!M7 Mom{
7sr � .121
g
M- t a
o �Z
*ti
_ a
= 1 w
A
a 0 m
U
<0
' 0
1 p I a
a
•
y Xr
it
■Y
o
o
w
o:
e
a3
e
AAoer MS O940K rrS MM 9.UYI( j€
wr asn rsavaamwiav w�r'»rr�rrr•wr'srsa«wn�r•r a«aiovrn+ma•vv rrraoiw�w�w..+�nnuw