Loading...
HomeMy WebLinkAboutP-20-225 Adjustment VMC-05.pdf co County of Fresno INTERNAL SERVICES DEPARTMENT 0� 1$56 ti0 Facilities • Fleet•Graphics• Purchasing •Security•Technology ORES MASTER AGREEMENT ADJUSTMENT NUMBER FIVE (5) Master Agreement Number: P-20-225 February 8, 2024 Vulcan Materials Company 11599 Old Friant Road Fresno, CA 93619 Contract Number P-20-225 covering Asphalt, Concrete, and Aggregate Materials is adjusted as follows: The County of Fresno hereby accepts your price increase notice dated October 24, 2023 to be effective January 1, 2024, in accordance with the terms and conditions of our Contract Number P-20-225 and Revised Attachment"A". All orders placed prior to January 1, 2024 will be priced in accordance with current contract pricing. Electronic Signatures. The parties agree that this Agreement may be executed by electronic signature as provided in this section. A. An "electronic signature" means any symbol or process intended by an individual signing this Agreement to represent their signature, including but not limited to (1) a digital signature; (2) a faxed version of an original handwritten signature; or(3)an electronically scanned and transmitted (for example by PDF document) of a handwritten signature. B. Each electronic signature affixed or attached to this Agreement(1) is deemed equivalent to a valid original handwritten signature of the person signing this Agreement for all purposes, including but not limited to evidentiary proof in any administrative or judicial proceeding, and (2) has the same force and effect as the valid original handwritten signature of that person. C. The provisions of this section satisfy the requirements of Civil Code section 1633.5, subdivision (b), in the Uniform Electronic Transaction Act (Civil Code, Division 3, Part 2, Title 2.5, beginning with section 1633.1). D. Each party using a digital signature represents that it has undertaken and satisfied the requirements of Government Code section 16.5, subdivision (a), paragraphs (1)through (5), and agrees that each other party may rely upon that representation. This Agreement is not conditioned upon the parties conducting the transactions under it by electronic means and either party may sign this Agreement with an original handwritten signature. Please acknowledge your acceptance by returning all pages of this letter to my office via email or USPS. 333 W. Pontiac Way,Clovis,CA 93612/(559)600-7110 The County of Fresno is an Equal Employment Opportunity Employer CONTRACT NO. P-20-225 Page 2 February 8, 2024 If you have any questions, please contact Susan Walker, Purchasing Technician, at(559) 600-7110 or email suwalker(abfresnocountyca.gov. FOR THE COUNTY OF FRESNO Digitally signed by Manuel M. Manuel M. Vilanova Vilanova Date:2024.02.16 12:31:05-08'00' Manuel Vilanova Deputy Director, ISD 333 W. Pontiac Way Clovis, CA 93612 MV:slw P-20-225 Adjustment#VMC-05.docx CONTRACT NO. P-20-225 Page 3 February 8, 2024 CONTRACTOR TO COMPLETE: Company: C,�'• D 3ln, V *�.c� ��lr? MGy .i' u.�S �Q ' Type of Entity: [S Individual Q Limited Liability Company [ Sole Proprietorship Limited Liability Partnership Corporation General Partnership Signature Z Print Name and Title Date !Signature _ Print Name and Title Date k,2De .E'• r�s �,�c 3�l Address City State Zip TELEPHONE NUMBER FAX NUMBER -MAILADDRESS ACCOUNTING USE ONLY ORG No.: 45104514 Account No.: 7260 Requisition No.: 5142400105 (2/2023) P-20-225 Agjuslmenl JlVMC-05.doc� CONTRACT NO.P-20-225 Page 1 of 2 02/08/2024 VULCAN MATERIALS CO.REVISED ATTACHMENT"A" Part A: Slow Cure (SC)Asphalt Concrete Item Description Previous Unit Price New 1/1/2024 Price Per Perton Ton 1 3/8 SC-800 $ 88.00 $ 90.00 2 3/8 SC-3000 $ 88.00 $ 90.00 3 ENVIRONMENTAL FEE $10.00 per load $10.00 per load PART B: Performance Graded (PG)Asphalt Concrete Previous Unit Price New 1/1/2024 Price Per Item Description Per ton Ton 1 PG 64-10, 3/4 Max $ 71.00 $ 73.00 2 PG 64-10, 1/2 Max $ 71.00 $ 73.00 3 PG 64-10, 3/8 Max $ 73.00 $ 75.00 4 PG 64-10 ST 1/2 MM $ 71.00 $ 73.00 5 PG 64-10, ST 3/8 Max $ 73.00 $ 75.00 6 PG 64-10 Sheet Mix $ 79.00 $ 81.00 7 PG 70-10,3/4 Max $ 72.00 $ 74.00 8 PG 70-10, 1/2 Max $ 72.00 $ 74.00 9 PG 70-10, 3/8 Max $ 79.00 $ 81.00 10 PG 64-28, 3/4 Max $ 86.00 $ 88.00 11 PG 64-28, 1/2 Max $ 90.00 $ 92.00 12 PG 64-28, 3/8 Max $ 86.00 $ 88.00 13 PG 64-16, 3/4 Max $ 75.00 $ 77.00 14 PG 64-16, 1/2 Max $ 75.00 $ 77.00 15 PG 64-16, 3/8 Max $ 76.00 $ 78.00 16 ST 1/2 HMA Type A $ 71.00 $ 73.00 17 1/2 HMA Commercial $ 70.00 $ 72.00 18 1/2 HMA 64-101115 $ 71.00 $ 73.00 19 3/4 HMA 64-10R15LASB $ 86.00 $ 88.00 20 ST 1/2 HMA 64-10 Warm Mix $ 81.00 $ 83.00 21 ST 3/4 64-10 Warm Mix $ 81.00 $ 83.00 22 ENVIRONMENTAL FEE $10.00-per load $10.00 PER LOAD PART C:Various Aggregate Material Item Description Previous Unit Price New 1/1/2024 Price Per Per ton ' Ton 1 Native Base Rock $ 15.00 $17.00 CONTRACT NO.P-20-225 Page 2 of 2 02/08/2024 VULCAN MATERIALS CO.REVISED ATTACHMENT"A" PART C: Various Aggregate Material Item Description Previous UnitNew Unit Price Per Ton FACILITY LOCATION - Price Per ton SANGER AGG Native Base Rock $ 15.00 $ 17.00 SANGER AGG #67-3/4 Crush $ 23.00 $ 25.00 SANGER AGG 1 1/21N Crush $ 23.00 $ 25.00 SANGER AGG Fill Sand $ 11.00 $ 13.00 SANGER AGG Washed Plaster Sand $ 22.00 $ 24.00 SANGER AGG MFG Sand $ 11.00 $ 11.00 AUSTIN QUARRY Native Base Rock $ 15.00 $ 15.00 AUSTIN QUARRY Sub-base $ 12.00 $ 12.00 AUSTIN QUARRY 3/4 Crush $ 19.00 $ 19.00 AUSTIN QUARRY Rock Dust/DG $ 15.00 $ 15.00 AUSTIN QUARRY Rip Rap 2x4 $ 35.00 $ 35.00 AUSTIN QUARRY Non Spec Rip Rap 4"+ $ 35.00 $ 35.00 LOS BANOS AGG INative Base Rock $ 15.00 $ 17.00