HomeMy WebLinkAbout2214C CCO 22.pdf COUNTY OFFRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE | CHANGE ORDER NO. 22 AK8ER|CAN AVENUE TO MISSION STREET JANUARY17. 2O24 CONTRACT NO. 22-14-C PAGE 1OF3 TO: YARBS GRADING AND PAVING, INC.: Make the following changes to the plans and specifications ordnvxorknotinthap|onaendepaoifiuetone for this contract. Because of the ohmnge(o)' will be added to the contract timeline. PARTl: REPLACE THE DAMAGED TRAFFIC SENSOR LOOPS—EX[RA WORK This extra work was requested bythe engineer. |n accordance with Section 4-1.05. "Changes and Extra VVork.^ of the Standard Soaoifirmtimno. replace o total of two (2)Type E damaged loops on northbound Golden State Boulevard at Mountain View intersection (approximate Sta. 189+00, Kingsburg region); a total of 12 Type D and 16 Type E loops at Whitson Street and Second Street intersection (approximate Sta. 288+00 to 289+00, Selma region), and two (2) Type E loops on southbound Golden State Boulevard at Merced Street intersection (approximate Sta. 597+50, Fowler region) as extra work. This work includes saw cutting the pavement to form grooves, cleaning and drying the grooves and surfaces, placing wire and sealant, and splicing the wires into the traffic signal systems. Perform all work according to the applicable sections of the Standard Specifications, Special Provisions, and/or any other Gpaoifioatinnmincluded in the contract documents. Utilize previously approved materials for the traffic sensor loops. Compensation for this work will be made at a lumpsum ognaedphmeVf$89.2OO. a000ndinAto8eobon9-1.D3. ^PaymentSoope." ofthe8peoia| Proviaimnn. Thie agreed lumpsum price includes compensation for all labor, equipment, materials,tools, incidentals, markups, and profit, no additional compensation will be made. This amount will be paid as extra work. This extra work did not impact the critical path for the project, tharafore. grenUngadditiona| uontnanttirne was not warranted. TOTAL COST PAFT|: $89,200.00 INCREASE TOTAL TIME EXTENSION PART 1: ZERO(0) -WORKING DAYS PART If: REMOVE EX|SITNG STAMPED CONCRETE FROM THE MEDIAN AREAS AT THOK8PSON AVENUE INTERSECTION—EXTRA WORK This extra work was requested by the engineer. |n accordance with Section 4-1.O5. "Changes and Extra VVorh." ofthe Standard Specifications, remove and dispose existing stamped concrete in the median areas at Whitson Street and Thompson Avenue intersection, between Sta. 31O+15 and 317+80. and Sta. 31G+G5 and 318+15ao extra work. This work includes saw cutting the stamped concrete at the median concrete curb edge and removing and disposing the concrete out of the project|irnite. pedorn} mUvvorhecnordinQto8ecUon15-1.D3B. "RennovingConorete.^ —Contractor wemvabove�nneumm o, cm� ca reful consideration m vnm hereby agree,Au Contractor m/�nmvvsa/uavnmveumatwo*mnmvmpvoenv/vmontmm/sxanma�na/sexo^�as may vm— �� ��uo'��'»m� mmm�sone�/�� noted muaovve.anupe� ,�axsew/osnecess,�m,mew�kabove snecmeu.an�wmauz»t asmxyment - m"st.ma"age"en^ therefore the prices shown above. xnArch. oaw" zf the Contractor does not sign acceptance vr this order,his attention/s directed m the requirements mthe specifications as to proceeding with the ordered work and filing a written protest within the time therein vvruocd. COUNTY 0FFRESWQ CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE ( CHANGE ORDER NO. 22 AK8ER{CAN AVENUE TO MISSION STREET JANUARY17. 2O24 CONTRACT NO. 22'14-C PAGE 2DF3 of the Standard Specifications. Compensation for this work will be made at a lumpsum agreed price of $7,368, according to Section 9-1.03, "Payment Scope," of the Special Provisions. This agreed lumpsum price includes compensation for all labor, equipment, materials, tools, incidentals, markups, and profit, no additional compensation will be made. This amount will be paid as extra work. This extra work did not impact the critical path for the project, therofoma. gnanbngodditinna| contnmotVme was not warranted. TOTAL COST PART U: $7,368.00kNCRiEASE TOTAL TIME EXTENSION PART II: ZERO(Q)—WORKING DAYS PART|I|c COMPENSATE THE CONTRACTOR FOR PLACING THE THERMOPLASTIC TRAFFIC STRIPING, DETAIL 39 AND 39A—EXTRA WORK This compensation adjustment was requested bv the contractor. In accordance with Section 4-1.05, "Changes and Extra Work,"of the Standard Specifications, compensate the contractor for placing the thermoplastic striping; 22,397 LF of combined Detail 39 and Detail 39A, in the Selma region, as extra work. This compensation adjustment is being made because this work was shown on the Plans, but no bid items were provided, Perform all work according to Section 84, "Markings," of the Standard Specifications and Special Provisions. Compensation for this work will be made at a lumpsum agreed price of$27.1OO.37' according to Section 8-1.0D. "Payment 8copm." of the Special Provisions. This agreed |unnpounn price includes compensation for all |obor, equipmnant, nlaterio|o, too|m, incidentals, markups, and profit, no additional compensation will be made. This amount will be paid as extra work. This extra work did not impact the critical path for the project, therefone' grontingmddiUona| oordrac1time was not warranted. TOTAL COST PART 1U: $27,100'37 INCREASE TOTAL TIME EXTENSION PART IU: ZERO(0)'W]RKUNG DAYS _m"uocto, We,the above signed contractor,have given careful consideration m the change proposed and hereby agree,n —Auditor Controller m�nmnvs,//�a u that ~mnmvmeaoeqv/nmen� m,ms�anma,e��.excevtasmavvmem/seue Business Office � ��m�mv,s"��x",o nv�uabove,and nexu,moose�/cesnoossa�m,mework above w,euneu,and wmvoent^smxpayment _mnst.Management therefore the prices shown above. RE/Arch. _v�/u" If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 22 AMERICAN AVENUE TO MISSION STREET JANUARY 17, 2024 CONTRACT NO. 22-14-C PAGE 3 OF 3 NET COST THIS CHANGE ORDER: $123,668.37 INCREASE NET TIME EXTENSION THIS CHANGE ORDER: ZERO (0) -WORKING DAYS LARue Goossen(Jan 18,202-1 14:18 PST) LaRue Goossen, Resident Engineer APPROVAL RECOMMENDED: YARBS GRADING AND PAVING, INC. Contractor Mandeep S. Sekhon, PE Construction Engineer Tke Yatblw—h By Troy Yar rouph(Jan25.202 152PST) APPROVED BY: Digitally signed by Steve Whit President Steve WhIt}eDatee2024.01.30 Title 15:32:31-08'00' Steven E. White, Director Accepted Date: Jan 25 2024 Public Works and Planning , Date: Nathan Magsig, Chairman Board of Supervisors Date: Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,if Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be _Buslness Office noted above,and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. _Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified.