HomeMy WebLinkAbout2205C CCO 04.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER DRY CREEK BRIDGE REPLACEMENT ON CHANGE ORDER NO. 4 BURROUGH VALLEY ROAD, BURROUGH VALLEY ROAD, JANUARY 12, 2024 JUST EAST OF TOLLHOUSE ROAD PAGE 1 OF 2 FEDERAL PROJECT NUMBER: BRLS-5942(245) CONTRACT NO. 22-05-C TO: AGEE CONSTRUCTION CORPORATION: You are hereby directed to make the herein described changes from the plans and specifications or do the following described work not included in the plans and specifications on this contract. Because of the proposed change, 36—WORKING DAYS will be granted to the allotted contract time. The revised date of completion for the First Order of Work is February 23, 2024. PART I: INCREASE/DECREASE ITEMS AT UNIT PRICES Item quantities in the Bid Book and subsequent change orders are estimates only. This part adjusts item quantities to the actual quantities used. The final pay items adjustments are a result of expediting the roadway transitions' construction necessary for the school buses and public traffic to pass through the project site. Increased Items: Item Total Total No. Description Unit Quantity Price Amount % °� 18 Rain Event Action Plan EA 5.00 $500.00 $2,500.00 100.00 100.00 38 Class 2 Aggregate Base (CY)— CY 211.00 $187.00 $39,457.00 29.31 29.31 Final Pay Item TOTAL INCREASE: $41,957.00 Decreased Items: Item Total Total No. Description Unit Quantity Price Amount °1/0) o(� 33 Import Borrow (CY) — Final Pay CY 211.00 $60.50 $12,765.50 5.21 5.21 Item TOTAL DECREASE: $12,765.50 TOTAL COST PART I: $29,191.50 INCREASE TOTAL TIME EXTENSION PART I: ZERO (0)—WORKING DAYS PART II: GRANT A TIME EXTENSION Grant a time extension of 36-working days to the "First Order of Work" due to an environmental quarantine delay (2 days), an environmental suspension delay (8 days), and Pile Mitigation delays (26 days). The 26 working days'time extension being granted for pile mitigation delays is an agreed resolve to the claim on behalf of Mahaffey Drilling Company, no additional compensation will be made for this claim. _Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree, if _Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be _Business Office noted above,and perform all services necessary for the work above specified,and will accept as full payment _Board of Supervisors _Const. Management therefore the prices shown above. RE/Arch. _Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER DRY CREEK BRIDGE REPLACEMENT ON CHANGE ORDER NO. 4 BURROUGH VALLEY ROAD, BURROUGH VALLEY ROAD, JANUARY 12, 2024 JUST EAST OF TOLLHOUSE ROAD PAGE 2 OF 2 FEDERAL PROJECT NUMBER: BRLS-5942(245) CONTRACT NO. 22-05-C The time extensions shall apply according to Section 8-1.07B, "Time Adjustments," of the Special Provisions. TOTAL COST PART II: $0.00 (NO COST) TOTAL TIME EXTENSION PART II: 36—WORKING DAYS NET COST THIS CHANGE ORDER: $29,191.50 INCREASE NET TIME EXTENSION THIS CHANGE ORDER: 36—WORKING DAYS James Drews, Resident Engineer APPROVAL RECOMMENDED: AGEE CONSTRUCTION CORPORATION Contractor Mandeep S. Sekhon, PE Construction Engineer By APPROVED BY: ly signed by Steve White Title Chief Estimator Steve White Datlea12024 01.23 09:13:05-08 00' Steven E. White, Director Accepted Date. Jan 17, 2024 Public Works and Planning Date: _Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if _Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be _Business office Board of Supervisors noted above,and perform all services necessary for the work above specified,and will accept as full payment _ _Const.Management therefore the prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified.