HomeMy WebLinkAbout2015C CCO 10-Revised.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER JAMES BYPASS BRIDGE REPLACEMENTS ON MANNING CHANGE ORDER NO. 10— REVISED AVENUE, 3 MILES EAST OF COLORADO AVENUE JANUARY 4, 2024 FEDERAL AID NUMBER: BRLS-5942(233) PAGE 1 OF 2 CONTRACT NO. 20-15-C TO: VIKING CONSTRUCTION COMPANY, INC.: Make the following changes to the plans and specifications or do work not in the plans and specifications for this contract. Because of the change(s), 18 -WORKING DAYS will be added to the Third Order of Work- Permanent Erosion Control Establishment. PART I: INCREASE/DECREASE/ELIMINATE ITEMS AT UNIT PRICES This change was proposed by the engineer. Item quantities in the Bid Book and subsequent change orders are estimates only. This part adjusts item quantities to the actual quantities used. Decreased Items: Item Total TOTAL No. Description Unit Quantity Price Amount (0/0 (0/6) 10 Permanent Erosion Control EA 1.00 $3,000.00 $3,000.00 (8.33) (8.33) Establishment Inspection Day TOTAL DECREASE: $3,000.00 Eliminated Items: Item Total TOTAL No. Description Unit Quantity Price Amount (0/0) ( 21 Treated Wood Waste LB 4,775.00 $1.00 $4,775.00 (100.00) (100.00) (Guardrail) TOTAL DECREASE: $4,775.00 This change did not impact the critical path for the project, so granting additional contract time was not warranted. TOTAL COST PART I: A $7,775.00 DECREASE TOTAL TIME EXTENSION PART I: ZERO (0) -WORKING DAYS PART II: GRANT A TIME EXTENSION Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. _Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER JAMES BYPASS BRIDGE REPLACEMENTS ON MANNING CHANGE ORDER NO. 10—REVISED AVENUE, 3 MILES EAST OF COLORADO AVENUE JANUARY 4, 2024 FEDERAL AID NUMBER: BRLS-5942(233) PAGE 2 OF 2 CONTRACT NO. 20-15-C This change was requested by the contractor. Grant the contractor an 18-working days' time extension to the Third Order of Work— Permanent Erosion Control Establishment, according to Section 8-1.07B, "Time Adjustments," of the Special Provisions. TOTAL COST PART II: $0.00 (NO COST) TOTAL TIME EXTENSION PART II: 18 -WORKING DAYS NET COST THIS CHANGE ORDER: A $7,775.00 DECREASE NET TIME EXTENSION THIS CHANGE ORDER: 18 -WORKING DAYS � s.C', - Richard Stockwell, Resident Engineer APPROVAL RECOMMENDED: VIKING CONSTRUCTION COMPANY, INC. Contractor Mandeep S. Sekhon, PE Construction Engineer By Troy Clem s(Jan 11,202410:53 PST) APPROVED BY: Digitally signed by Steve Wh Vice President Steve White D tle:2024.01.1113:09:57 Title -08'00' Steven E. White, Director Accepted Date: Jan 11 2024 Public Works and Planning , Date: Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,if Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. _Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified.