HomeMy WebLinkAbout2209C CCO 03.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER ASHLAN AVENUE AND PALM AVENUE CHANGE ORDER NO. 3 TRAFFIC SIGNAL AND ROAD IMPROVEMENTS JANUARY 3, 2024 FEDERAL PROJECT NO.: HSIPL-5942(294) PAGE 1 OF 1 CONTRACT NO. 22-09-C TO: BUSH ENGINEERING, INC.: Make the following changes to the plans and specifications or do work not in the plans and specifications for this contract. Because of the change(s), FIVE (5) -WORKING DAYS will be added to the contract time. GRANT A TIME EXTENSION This time extension was requested by the contractor. Grant a time extension of 5-working days according to Section 8-1.07B, "Time Adjustments," of the Special Provisions, due to the delays caused by revising the traffic signal pole J at the northeast corner and relocating (done by others) the conflicting fiber optic pull boxes at the northwest corner. No additional compensation will be made in conjunction with this time extension. NET COST THIS CHANGE ORDER: $0.00 (NO COST) NET TIME EXTENSION THIS CHANGE ORDER: FIVE (5) -WORKING DAYS Robert Hendrickson, Resident Engineer APPROVAL RECOMMENDED: BUSH ENGINEERING, INC. OAK �� Contractor Mandeep S. Sekhon, PE Construction Engineer �YoGlTtoh WGt22G2� By Brockton Wheeler(Jan 3,202413:23 PST) APPROVED BY: Steve White Q Digitally signed by Steve White Project Manager Steve ite Date:2024.01.0814:55:18 Title -08,00, Steven E. White, Director Accepted Date: Jan 3, 2024 Public Works and Planning Date: Contractor We,the above signed contractor, have considered the change proposed and hereby agree, if this proposal is _Auditor Controller approved,that we will provide all equipment, furnish all materials,except as may otherwise be noted above, _Business office and perform all services necessary for the work above specified,and will accept as full payment therefore the _Board of Supervisors _Const.Management prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified.