HomeMy WebLinkAbout2214C CCO 20.pdf COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 20
AMERICAN AVENUE TO MISSION STREET NOVEMBER 3, 2023
CONTRACT NO. 22-14-C PAGE 1 OF 3
TO: YARBS GRADING AND PAVING, INC.:
Make the following changes to the plans and specifications or do work not in the plans and specifications for
this contract. Because of the change(s), ZERO (0) -WORKING DAYS will be added to the contract timeline.
PART I: REPLACE DAMAGED CONSOLIDATED IRRIGATION DISTRICT'S (CID) IRRIGATION
PIPELINE AT STA. 189+25 AND DAMAGED ROADWAY— EXTRA WORK
This change was requested by the engineer.
In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, replace CID's
damaged irrigation pipeline (two pipes) at sta. 189+25 (Golden State Boulevard) and damaged adjacent
roadway as extra work. Perform all work according to the applicable sections of the Project Specifications,
Standard Specifications, and CID Standards. The replacement of the CID's pipes extends approximately 15-
feet in the railroad right-of-way. Since this work was considered as emergency work, per CID staff, no permit
was needed from the railroad company. Compensation for this work will be made as extra work at force
account according to Section 9-1.03, "Payment Scope," of the Special Provisions. Total compensation for this
work resulted in $76,900.30, this amount will be extra work.
This change did not impact the critical path for the project, therefore, granting additional contract time was not
warranted.
TOTAL COST PART I: A $76,900.30 INCREASE
TOTAL TIME EXTENSION PART I: ZERO (0) -WORKING DAYS
PART II: REPLACE PLAN SHEET 56B IN SELMA REGION TO CORRECT THE CONCRETE CURB AND
GUTTER GRADES AT THE MATCH POINTS
This change was requested by the engineer.
In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, replace Plan
Sheet 56B with the attached revised Plan Sheet 56C in the Selma region. This revised plan sheet revises the
curb and gutter (approximately 350 linear feet) grades at the match points along southbound Golden State
Boulevard between sta. 348+00 and 351+50. This revision is being made at no additional cost.
This change did not impact the critical path for the project, therefore, granting additional contract time was not
warranted.
TOTAL COST PART II: $0.00 (NO COST)
TOTAL TIME EXTENSION PART II: ZERO (0) -WORKING DAYS
_Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if
Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be
Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment
_Board of Supervisors
_Const.Management therefore the prices shown above.
RE/Arch.
_Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 20
AMERICAN AVENUE TO MISSION STREET NOVEMBER 3, 2023
CONTRACT NO. 22-14-C PAGE 2 OF 3
PART III: BALANCE BID ITEMS AT UNIT PRICES
This change was requested by the engineer.
Increase/decrease quantities at the unit bid prices:
Increased Items:
Item Total TOTAL
No. Description Unit Quantity Price Amount (
161 Hot Mix Asphalt (Type A) '/2" TON 2,000.00 $105.00 $210,000.00 42.05 (82.27)
TOTAL INCREASES: $210,000.00
Decreased Items:
Item Total TOTAL
No. Description Unit Quantity Price Amount
2 Compensation for Adjustment $ 100,000.00 $1.00 $100,000.00 (40.00) (40.00)
for Price Fluctuations
TOTAL DECREASES: $100,000.00
This change did not impact the critical path for the project, therefore, granting additional contract time was not
warranted.
TOTAL COST PART III: A $110,000.00 INCREASE
TOTAL TIME EXTENSION PART III: ZERO (0) -WORKING DAYS
Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree, if
_Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be
_Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment
Board of Supervisors
_Const.Management therefore the prices shown above.
RE/Arch.
_Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 20
AMERICAN AVENUE TO MISSION STREET NOVEMBER 3, 2023
CONTRACT NO. 22-14-C PAGE 3 OF 3
NET COST THIS CHANGE ORDER: $186,900.30 INCREASE
NET TIME EXTENSION THIS CHANGE ORDER: ZERO (0) -WORKING DAYS
1&C1&4.,1—/5'taCAXIC&
Richard Stockwell, Resident Engineer
APPROVAL RECOMMENDED:
YARBS GRADING AND PAVING, INC. � 0 ' —
Contractor Mandeep S. Sekhon, PE
Construction Engineer
Tl-n YWWW—h
By Troy Yar rough(Nov13,202 09:53PST) APPROVED BY:
Digitally signed by Steve White
Title President Steve White ate:2023.11.1416:10:56
Steven E. White, Director
Accepted Date:
Nov 13 2023 Public Works and Planning
,
Date:
Contractor We, the above signed contractor, have given careful consideration to the change proposed and hereby agree, if
_Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be
_Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment
Board of Supervisors
_Const.Management therefore the prices shown above.
RE/Arch.
Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
i
,
i
SHEET CD-18SHEET CD-1
------------------------------------------------
It �� SAW 3137
Lt PRC -------------------------------------------
W b� DETAIL "A" DETAIL B-CL2'+48.56 . -GS8-CL2- �L31 GSB-GLT +675$,9.6 GSB-GLT +5295 Lt ir4.11 W13 GSB-GL2 +4T.99 0.6 ;t1 FCC
GSB-CL2'+9Z31 0.50'Lt AP �g_CL2•+50.00,350'Rt G - EP 3f344 4 1.3R 5 0.75'AB GSB-CL2'+5295,9.53 Lt GSB-CL2 +00. 13.45 Lt -------------_--------EP-3133 - ----_
S SAW 31336
Iy TC 31391 TC 14.33 SAW 313.7
y GSB-CL2"+03.84,3.50'Rt BC ,�Q 313.24 OSB-CL2"+4B.56,350'Rt BC _ __ - -- -- �_T_ _ __ EP 313.66
u TC 31d98 _ _ _�- T-_ GSB-CL2-+OQ.00,9.45'Lt
TC 31399 9 - �-I- -" ---- --
EP 313.32 EP 31331 3 1.3$
GSB-CL2"LINE os$ 2sX OS$ - -- - -- TC 31
- --- -- - -- -- -- EP 313.
390 L #UU 342+00 - -
WHITSON ST 343+00
344400 1.5X
• 1.7R GSB-CL2'+50.00 3.50'Rt GB __ __ - - SV
iii... GSB-CL2'+94.09 9.70'Rt AP __ ----
17
. --
1 TC 3138T GSB-CL2'+34.24 16.96'Rt BC
9 J1320 ,.\ TC 31395
p GSB-CL2'+02.64 9.25'Rt FCC ` 1.-5%
TC 313.9J GSB-CL2"+42.47 iZ50'Rt EC 1 GSB-CL2'+34.2 20.96'Rt BC GSB-CL2•+5295 2.67'Rt
R ' EP 31389 SAW 31322 TC 314.07 I - q
p
N
31340
GSB C A+0.64 GS8-CL2"+14.03'Rt GSB CL2 E - _ - 52.9 SAW. J.34
W3321 SAW 31315 _ +
> GSB-CL2'+98.11 15.98 R
')(E�R/W X x x� f FL 31. -- SAW 31334
O CURVETABLE CURVETABLE CURVETABLE __ _ - X Q (] '+98.11 6.52•Rt P 20R
_ GSB-CL2•+89.20'`, - _ Q
el CURVE RADIUS DELTA TANGENT LENGTH CURVE•f RADIUS DELTA TANGENT LENGTH CURVE/j1862.00'
DELTA TANGENT LENGTH -- _ W .1 �x Q 1C J13+4 V
x EP 31348
1 J.00' 156J4'01" 14.47' 8.20` 12 30.00' 80'21'47" 25.34' 42.08' 20 736'19" 130.47• 260.56 WHITSON ST - "+4.7 6. X GSB-CL2'+42.99 15.36'Rt
AB 312.9 �-_ X SAW 31J35 8
2 100.00" 23'2559" 20.74' 40.90" 13 1998.00" 5'13'03" 9395' 18Z78' 21 43195• 74.11' 148.14• CONFORM - GSB-CL2"+3359 4 i
SCALE.- 1" = 20' Gse-cc1 4-51.66 42.1 Lr ce
3 200.00' 12'25'40" 21.78' 43.38` 14 1880.00` 2J24b3" J89.24' 76Z63' 22 8'1524• 134.40' 268.JJ' 1 GSB-CL2"+66.09 63 8 tLtL -�� SAW 312,
FL 31280 ---------
AB 312.8 ��__�53-X_
4 300.00' 14'40'46" 38.64` 76.86' 15 1915.00` 2J24'03" J96.59' 782.13' GSB-CL2'+05.26 43.28'Lt AP GB GSB-CL2'+48.73 42.36'Lt CONFORM GSB-CL2'+35.81 46.82'�f `
T 31. TC J12.8 GSB-CL2"+69.09 42.00
5 196300• 21'09'01" 366.48' 724.63' 16 2010.00' 21'43'5J" 385.82' 762.J6' FL 313.01 GSB-CL2' 4234'Lt 312.80 C i GSB-CL2'+36. 6 45.99 Rt BC
it
6 ,86200' 6'40'55" 108.70' 21 115' 17 209.49' 12-2549' 22.81' 45.45' GSB-CL2"+05.40 JJ28'Lt SAW 313.26 FL 312.5 TC 312.ft
1 CSB-CL2"+66.09 42.00 Lt FL 312Bf
7 7963.00' 21'09'01' 366.48' 724.63' 18 209.47' 12'26'14' 22.82' 45.47' GSB-CL2'+19.J7 53. 'Lt A TIC it CONFORM TO 372t EP
GSB-CL2'+00.55 4331'Lt GSB-CL2'+50.00 4302'Lt AB 312.9 GSB-CL2'+46.09 6368 Lt - + 7. Rt AP
1 1C 3134 G5
8
-CL2"+07.46 FL J1253
8 30.00' 23'5535" 6.36' 12.53' 19 50.00' 46'24'33" 21.43' 40.50' FL 31301 fL 31296 AB 3130E AB 312.9E S4W t EC
CONFORM TO xfst -- - -CONFORM
CONFORM 'r,SB_ •+48.98 4329'Rt EC GB
9 196300' S3720" 96.39.4B• 19262' GSB-CL2'+2B.76 8dT Lt PRC - ;___
x GSB-CL2'+00.37 33.31'Lt AP GSB-CL2'+19.35 4257 7C 31327
TC 314. FL J72.77
f0 30., 79'S1'15" 2511' 41.B1' GSB-C(2"+90.71 12.85'Lt EP 313.41 - fL 312.B7 ---- 0.3J'AB
SAW 313 0.55'HMA ------- -
11 iB6200• 93929 157.19• 313.63• GSB-CL2"+90.71 8.85•Lt PCC GSB-' '+29.48 126T Lt 0.75•AB 13 GSB-CL2'+16.41, 42.59 Ct GB GSB C(2"+4609
TC 314.1 TC 312.9
14
SAW 3 .45 i.
p EP J7345 FL J72.88 4.2X FL J12.58 FL J72.4
GSB-CL2"+90.81 '1ta.., - " GSB-CL2"+43 Lt
r- -TC�14. EP 31341 -
-- £P J7342 - - - - -
TC J1308 + '
C ---- 1 B SAW 312.7
V _ --------------- -CL2'+92.30 ff.52' t BC GSB-CL2"+64d 1250]Lt 5.6X -- - - 4
TC-113SAW 31333 5'0 4.7R
EP Ill 1 GSB-CL2'+64.36, 8.50'L
GSB-CL2"+ 90 6.51'Rt- TC J1J.94 -L2"+16.4/ 42.5'Lt _ -+ 11.6' t -- --- -- - - -- --
I TC J139 EP 31327 1 W JiJ.07 --
q 0.55•HMA EP 313.29 0.9X 1.OR 1.SX ® 2 0.33'AB 00' --- -- --- --
V _ _ _ -- +89.02 Z06'Lt fC 3 QO'Lt 23$
m F I -075`AB - - _ _ 7-- r"�j x _ - - - "� "- -- - -- - -- -- - -- TC XJ.72 W 31292 GSB-CL2'+14.85 11.00'Lt BC ---
W 9 _ _ _ _ _ __ __ __ __ __ __7-�__>__ _ .
_�-{ ��-Z �� .---�-5__ __ _
GSB CL2'+4309
EP 313.05 �
R=1' - CL2"+-- 32 00'Lt V
• _ - -- --- - -- R=1.6' _ GSB_C --7-- __ SAW 312.84 GSB-CL2"+14.$5 Z00'It BC
_ .4
• - - ,� GSB CL2'+29.4B 9.53'Rt 11 0.55•HMA M -^"""`� TC J13.47 _7 -J--T:.`-- 1 5
1.3$ r -31�'e9 - -- 348+00 12s2 �W
f P
J46+0
' L2"+99.3 13.00'Rt EC
-F r ------ - +29.96
h .,-✓ ...21 \ J 0.5$ 1 4X W i - -- CL2'+B8.02 3Z00'Rt
_ _- - -- - GSB-CL2"+4.70, 37.40-Rt BC --
-`-""- GSB-CL2'+8J96 9.87'Rt PRC SAW 312.83
-- -" -" "- TC 31395 G B-CL2'+60.49 37.34`Rt 0.5$
GSB-CL2"+78.92 5.91•Rt EC
SAW 3129 £P 31328 SAW 31282 _
R GSB-CL2'+47.00 4219'Rt GSB-CL2'+8J96 1J8T Rt 4.SX SAW 3125 31239 G$B-C(2"+2Z79 3Z00'Rt - -_ _ _
Z x SAW 3129ff 35% W 1 ____
__"___ ___ ___ _ _______^-, _ _-____ _
-- _ GSB CL -__
I 50$ -_ _ _ _ _ _ _ _ - -- _ _ _ __41 FL 312.J0 0-33?AHMA
B W 31.57 SHEET CD 1
2 +0377 2 II
q F TC 313.27 0.55'HMA - - - ____ i DETAIL"C° I F
g _ FL 312.60 0.75'AB GSB-CL2'+59.17 40.91'Rt CB ---4.6X -�
S - - - - TC 312.6E -- - - _______--__
GS8-CL2"+47.00 4219'Rt GB - - FL J1218 GSB-CL2'+98.94 40.99'Rt EC 4.JX _ ------ _____
&+ TC 313.14 10 TC 312.6E TC 31279 ' - -- - - ---
e 0.55'HMA FL 31264 12 FL 312.60 (E)R/W TC 31229
0.75'AB
O GSB-CL2'+75.92 41.94'Rt GB -- -- -- -- +06.79 66.63'Rt B-CL2'+11.OB 9.00'Rt BC
£ T 9 0.45'HMA x x x_ -- __ H94 312.71 ' IC 31335
z - x. x- x >. -CONFORM EP 312.68
GSB-CL2'+78.97 4L9 ' 0.65'AB -x - -_x-- 1.4
- - 1 GSB-CL2'+11.08 13.00'Rt BC
GSB-CL2- 24.9 41.00 X--
TC 312.78 7C 312.43
FL 312.70 FL 312.35 GSB1CL2'+71.25 41.00'Rt BC
WHITSON ST GSB-GL2"+24.74 66.49'Rt TC 3250
GSB-CL2"+27.79 41.00'Rt GB
HMA 3126t fi 312.50
HMA 312.3E 3125E "= TC 31286 GSB-CL2'+88.02 41.00'Rt
CON SCALE.' 1 30' CONFORM GB
CONFORM TO Exist EP CONFORM 70 Exist EP FL 312.36 1C 31294
4 £P 312.44
V DATE RECORD DRAWING maul PROJECT- PHASE 1 DEPARTMENT OF PUBLIC WORKS AND PLANNING
g DESIGNED CYNTHIA HORNER MH7#I RESIDENT ENGINEER DATE
• GOLDEN STATE CORRIDOR-ECONOMIC DEVELOPMENT
4 DRAWN: ERIK CHIN 1r � � � CONSTRUCTION DETAILS
CHECKED: ED NORIEGA watt# / AND INFRASTRUCTURE IMPROVEMENTS ■ ,
MARK THOMAS SUPERVISING ENGINEER DATE
P
S A
FOR RIGHT OF WAY DATA AND ACCURATE ACCESSDETERMINATION,SEE DOCUMENTS IN THE DEPARTMENT OF PUBLIC WORKS AND PLANNING CALL BEFORE YOU DIG a` SELMA REGION lIFO'RN\ DRAWINGNO. CD-17 SHEET NO. 56C TOTAL 172
4