HomeMy WebLinkAboutAgreement A-16-094 with City of Fresno.pdf1 IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the day
2 and year first herein above written.
3
4 CITY OF FRESNO:
5
6
7
8
9
APPROVEDASTOLEGALFORM
10 CITY ATTORNEY
11 BY: b ~ ~·~'-·(~
12 \
13
14
RAJ SINGH BADHESHA, DEPUTY
15 ATTEST: YVONNE SPENCE,CMC.
CITY CLERK
16
17 BY: __ ~=--·--:~~'---"'----' }L-"1~)_1 1,_
18 M;:.ii
19
20
21
22
23
24
25
26
27
28 0010/1100/4510/4985
7
COUNTY OF FRESNO
BY:L....__:t.-~ ~
ERNEST BUDDYMENES, CHAIRMAN
BOARD OF SUPERVISORS
REVIEWED AND RECOMMENDED FOR
APPROVAL
BY:~~~
ALAN WEAVER, DIRECTOR,
DEPARTMENT OF PUBLIC WORKS AND
PLANNING
APPROVED AS TO ACCOUNTING FORM
BY: ~-----
VICKI, CROW, C.P.A<.
AUDITOR-CONTROLLER!TREASURER-
T AX COLLECTOR
ATTEST:
BERNICE E. SEIDEL, Clerk
Boar . Supe~isors
\
EXHIBIT A
FRESNO COUNTY DEPARTMENT OF PUBLIC WORKS AND PLANNING
PROJECT COST ESTIMATE FOR GRANTLAND AVE AND SHAW AVE TRAFFIC SIGNALEXHIBIT A
ITEM
NO.
EST
QUANT
F/
S
UNIT
OF
MEAS
ITEM ITEM PRICE TOTAL PRICE
1 1 LS LEAD COMPLIANCE PLAN $2,000.00 $2,000
2 4 EA CONSTRUCTION PROJECT FUNDING SIGN $1,000.00 $4,000
3 1 LS TRAFFIC CONTROL SYSTEM $11,000.00 $11,000
4 1 LS JOB SITE MANAGEMENT $6,000.00 $6,000
5 1 LS PREPARE WATER POLLUTION CONTROL PROGRAM $4,500.00 $4,500
6 2290 LF REMOVE YELLOW PAINTED TRAFFIC STRIPE(HAZARDOUS WASTE)$12.00 $27,480
7 2540 LF REMOVE PAINTED TRAFFIC STRIPE $4.50 $11,430
8 300 SF REMOVE PAINTED PAVEMENT MARKING $10.00 $3,000
9 190 EA REMOVE PAVEMENT MARKER $1.00 $190
10 3 EA REMOVE ROADSIDE SIGN $50.00 $150
11 5 EA REMOVE ROADSIDE SIGN AND POST $150.00 $750
12 1 EA RELOCATE MAILBOX $150.00 $150
13 83 LF RELOCATE CHAIN LINK FENCE $30.00 $2,490
14 3 EA RELOCATE ROADSIDE SIGN $200.00 $600
15 2447 SY COLD PLANE ASPHALT CONCRETE PAVEMENT $10.00 $24,470
16 1 LS CLEARING AND GRUBBING $20,000.00 $20,000
17 1410 CY ROADWAY EXCAVATION $35.00 $49,350
18 1 LS FINISHING ROADWAY $2,000.00 $2,000
19 569 CY CLASS 2 AGGREGATE BASE $60.00 $34,140
20 1076 TN HOT MIX ASPHALT (TYPE A)$80.00 $86,080
21 3.2 TON TACK COAT $500.00 $1,600
22 2 EA ROADSIDE SIGN - ONE POST $250.00 $500
23 3 EA INSTALL ROADSIDE SIGN PANEL ON EXISTING POST $150.00 $450
24 4 EA INSTALL FRAMED SIGN PANEL(STREET NAME SIGN ON SIGNAL POLE)$800.00 $3,200
25 150 LF THERMOPLASTIC TRAFFIC STRIPE (12" WHITE)$5.00 $750
26 4100 LF THERMOPLASTIC TRAFFIC STRIPE (DETAIL 27B)$1.50 $6,150
27 2170 LF THERMOPLASTIC TRAFFIC STRIPE (DETAIL 22)$3.00 $6,510
28 910 LF THERMOPLASTIC TRAFFIC STRIPE (DETAIL 38)$3.00 $2,730
29 150 SF THERMOPLASTIC PAVEMENT MARKING (RETROREFLECTIVE) - TYPE IV ARROW $6.00 $900
30 128 SF THERMOPLASTIC PAVEMENT MARKING (RETROREFLECTIVE) - SIGNAL $6.00 $768
31 124 SF THERMOPLASTIC PAVEMENT MARKING (RETROREFLECTIVE) - AHEAD $6.00 $744
32 16 SF PAINT PAVEMENT MARKING (RETROREFLECTIVE) - BIKE LOOP SYMBOL $2.00 $32
33 41 EA PAVEMENT MARKER (RETROREFLECTIVE) - TYPE G $5.00 $205
34 191 EA PAVEMENT MARKER (RETROREFLECTIVE) - TYPE D $5.00 $955
35 1 LS TRAFFIC SIGNALS AND LIGHTING $262,000.00 $262,000
36 24 EA INDUCTIVE LOOP DETECTOR $400.00 $9,600
37 1 LS MOBILIZATION $10,000.00 $10,000
SUBTOTAL CONTRACT CONSTRUCTION $596,874
CONTINGENCY @ 10% OF SUBTOTAL $59,687
TOTAL CONTRACT CONSTRUCTION,CON $656,561 $458,106 $198,455 $148,842 $49,614 $44,652
PRELIMINARY ENGINEERING,PE @ 25% OF SUBTOTAL $164,140 $107,000 $57,140 $42,855 $14,285 $12,857
CONSTRUCTION ENGINEERING,CE @ 15% OF SUBTOTAL $98,484 $68,716 $29,768 $22,326 $7,442 $6,698
TOTAL PROJECT COST $919,186 $633,822 $285,364 $214,023 $71,341 $64,207
75.00%25.00%
90% EST. CITY
SHARE
FEDERAL
REIMB LOCAL MATCH COUNTY %EST. COUNTY
COST CITY %EST.CITY COST