HomeMy WebLinkAbout2214C CCO 17 Revised 9-13-23.pdf COUNTY OFFRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 17 AMERICAN AVENUE TO MISSION STREET SEPTEMBER 13, 2023 CONTRACT NO. 22-14-C PAGE 1 OF 5 TO: YARBS GRADING AND PAVING, INC.: Make the following changes to the plans and specifications or do work not in the plans and specifications for this contract. Because of the change(s), ZERO (0) -WORKING DAYS will be added to the contract timeline. PART I: REPLACE PLAN SHEETS IN SELMA REGION TO REVISE STRUCTURAL SECTION This change was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, replace Plan Sheets 3A and 13 with the attached revised Plan Sheets 3B and 13A in the Selma region. These revised plan sheets replace the crack and seat treatment for the existing concrete pavement with the modified rubblization "occasional spalling"; replace the rubberized hot mix asphalt with the conventional hot mix asphalt (HMA); eliminate SAMI (stress absorbing membrane interlayer); and add a 0.12 to 0.15-foot thick HMA leveling course utilizing '/-inch mix for the southbound lanes between sta. 196+91 and sta. 256+81. Perform all work in accordance with the applicable sections of the Standard Specifications, Special Provisions, and the attached rubblization "occasional spalling" Specifications. Use a rubber-tired compactor for seating/rolling efforts required for the rubblization treatment. Compensation for the work associated with rubblization will be made at an agreed unit price of$4.75/SY plus 10-percent mark-ups for the general contractor, according to Section 9-1.03, "Payment Scope," of the Special Provisions. The estimated area for the rubblization treatment is 15,530 SY, resulting in a total compensation of $81,144.25 (includes mark-ups). The additional rolling/seating shall be performed at the agreed price of$3,444 for a total cost of$84,588.25 which will be paid through Bid Item No. 3, Supplemental Work, with no net increase to the contract. Affected quantities of Bid Item Nos. 27, 29, 30, 31, 38, and 161 will be adjusted at the unit bid prices according to Section 9-1.03, "Payment Scope," of the Special Provisions. Increased Items: Item Total TOTAL No. Description Unit Quantity Price Amount °� f% 29 Hot Mix Asphalt (Type A) TON 3,170.00 $103.00 $326,510.00 3.24 68.80 38 Cold Plane Asphalt Concrete SY 1,200.00 $2.20 $2,640.00 0.50 (2.19) Pavement 161 Hot Mix Asphalt (Type A) '/" TON 2,176.00 $105.00 $228,480.00 84.32 (87.52) TOTAL INCREASES: $557,630.00 _Contractor We,the above signed contractor, have considered the change proposed and hereby agree, if this proposal is Auditor Controller approved,that we will provide all equipment,furnish all materials, except as may otherwise be noted above, Business office and perform all services necessary for the work above specified, and will accept as full payment therefore the Board of Supervisors Const.Management prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 17 AMERICAN AVENUE TO MISSION STREET SEPTEMBER 13, 2023 CONTRACT NO. 22-14-C PAGE 2 OF 5 Decreased Items: Item Total TOTAL No. Description Unit Quantity Price Amount 31 Stress Absorbing Membrane SY 23,108.00 $6.30 $145,580.40 (10.56) (9.82) I nterlayer TOTAL DECREASES: $145,580.40 Eliminated Items: Item Total TOTAL No. Description Unit Quantity Price Amount (°� ° 27 Crack and Seat SY 15,575.22 $1.70 $26,477.87 (100.00) (100.00) 30 Rubberized Hot Mix Asphalt TON 3,170.00 $188.00 $595,960.00 (100.00) (100.00) TOTAL DECREASES: $622,437.87 This change did not impact the critical path for the project, therefore, granting additional contract time was not warranted. TOTAL COST PART I: A $210,388.27 DECREASE TOTAL TIME EXTENSION PART I: ZERO (0) -WORKING DAYS PART II: REPLACE PLAN SHEETS IN KINGSBURG REGION TO REVISE STRUCTURAL SECTION This change was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, replace Plan Sheets 3, 12, 13A, 14, and 15C with the attached revised sheets 3A, 12A, 13B, 14A, and 15D in the Kingsburg region. These revised plan sheets eliminate the SAMI and increase the depth of the cold plane and HMA overlay from 0.25-foot to 0.40 foot between Sierra Street and Mission Street (sta. 12+99 and sta. 51+53). Compensation adjustment for the increased or decreased quantity of pertaining Bid Item Nos. 29, 31, 32, and 38 will be made at the unit bid prices according to Section 9-1.03, "Payment Scope," of the Special Provisions. Increased Items: Item Total TOTAL No. Description Unit Quantity CED Price Amount °� °� 29 Hot Mix Asphalt (Type A) TON 2,009.00 $103.00 $206,927.00 1.99 72.17 32 Tack Coat TON 6.00 $600.00 $3,600.00 4.62 4.62 38 Cold Plane Asphalt Concrete SY 19,205.00 $2.20 $42,251.00 7.96 5.59 Pavement Contractor We,the above signed contractor, have considered the change proposed and hereby agree, if this proposal is Auditor Controller approved,that we will provide all equipment,furnish all materials, except as may otherwise be noted above, Business office and perform all services necessary for the work above specified,and will accept as full payment therefore the Board of Supervisors _Const.Management prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 17 AMERICAN AVENUE TO MISSION STREET SEPTEMBER 13, 2023 CONTRACT NO. 22-14-C PAGE 3 OF 5 TOTAL INCREASES: $252,778.00 Decreased Items: Item Total TOTAL No. Description Unit Quantity Price Amount (0/0) o� 31 Stress Absorbing Membrane SY 19,205.00 $6.30 $120,991.50 (9.81) (18.67) Interlayer TOTAL DECREASES: $120,991.50 This change did not impact the critical path for the project, therefore, granting additional contract time was not warranted. TOTAL COST PART II: A $131,786.50 INCREASE TOTAL TIME EXTENSION PART II: ZERO (0) -WORKING DAYS r�� ne+rr� PLAN' u SHEET nn w �u vrur+c 1 lm� M� G!Ou PART III. REPLACE PLAN SHEET 93 WITH THE REVISED PLAN' SHEE I 93A IN K11VUSDUPCU P[EUIUN FOR STREETLIGHTS REVISIONS This change was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, replace Plan Sheet 93 with the attached revised Plan Sheet 93A in the Kingsburg region. The revised plan sheet eliminates one of the streetlights and re-aligns several streetlights which were in conflict the existing underground utilities. Compensation adjustment for the pertaining Bid Item Nos. 100 and 112 will be made at the unit bid prices according to Section 9-1.03, "Payment Scope," of the Special Provisions. Decreased Items: Item Total TOTAL No. Description Unit Quantity Price Amount °� 01 /0) 100 Street Lighting — Foundations — EA 1.00 $2,100.00 $2,100.00 (1.56) (1.56) 15TS Poles 112 Street Lighting — Poles— 15TS EA 1.00 $4,800.00 $4,800.00 (2.44) (2.44) TOTAL DECREASES: $6,900.00 TOTAL COST PART III: A $6,900.00 DECREASE TOTAL TIME EXTENSION PART III: ZERO (0) -WORKING DAYS Contractor We,the above signed contractor, have considered the change proposed and hereby agree, if this proposal is Auditor Controller approved,that we will provide all equipment,furnish all materials, except as may otherwise be noted above, Business office and perform all services necessary for the work above specified, and will accept as full payment therefore the Board of Supervisors _Const.Management prices Shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 17 AMERICAN AVENUE TO MISSION STREET SEPTEMBER 13, 2023 CONTRACT NO. 22-14-C PAGE 4 OF 5 PART IV: REPLACE PLAN SHEETS IN FOWLER REGION FOR THE STREETLIGHTS REVISIONS This change was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, replace Plan Sheets 115A, 116, and 117 with the attached revised sheets 11513, 116A, and 117A in the Fowler region. These revised plan sheets realign several streetlights in the Fowler region which were in conflict with the existing underground utilities. The revisions shown on the revised sheets are blocked out for clarification. These revisions are being made at no additional cost. This change did not impact the critical path for the project, therefore, granting additional contract time was not warranted. TOTAL COST PART IV: $0.00 (NO COST) TOTAL TIME EXTENSION PART IV: ZERO (0) -WORKING DAYS PART V: COMPENSATE THE CONTRACTOR FOR INSTALLING 18-INCH CMP EXTENSIONS IN THE SELMA REGION This compensation adjustment was requested by the contractor. In accordance with Section 4-1.05, "Changes and Extra Work" of the Standard Specifications, compensate the contractor for extending the existing 18-inch CMP, 25 feet to the north and 20 feet to the south, in the median area between sta. 380+00 and sta. 381+00 in the Selma region. This work includes furnishing and installing the 16GA 18-inch galvanized CMP extensions as shown on the plans. Compensation for this work will be made at an agreed Iumpsum price of$12,757.45 according to Section 9-1.03, "Payment Scope," of the project. This amount includes compensation for all labor, equipment, materials, incidentals, markups, and profit for the above referenced work, no additional compensation will be made. This amount will be paid through Bid Item No. 3, Supplemental Work, with no net increase to the contract. This change did not impact the critical path for the project, therefore, granting additional contract time was not warranted. TOTAL COST PART V: $0.00 (PAID IN BID ITEM NO. 3) TOTAL TIME EXTENSION PART V: ZERO (0) -WORKING DAYS Contractor We,the above signed contractor, have considered the change proposed and hereby agree, if this proposal is Auditor Controller approved,that we will provide all equipment,furnish all materials,except as may otherwise be noted above, Business office and perform all services necessary for the work above specified, and will accept as full payment therefore the Board of Supervisors Const.Management prices Shown above. _RE/Arch. Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 17 AMERICAN AVENUE TO MISSION STREET SEPTEMBER 13, 2023 CONTRACT NO. 22-14-C PAGE 5 OF 5 NET COST THIS CHANGE ORDER: A $85,501.77 DECREASE NET TIME EXTENSION THIS CHANGE ORDER: ZERO (0) -WORKING DAYS Richard Stockwell, Resident Engineer APPROVAL RECOMMENDED: YARBS GRADING AND PAVING, INC. Contractor Mandeep S. Sekhon, PE Trot, Ywbrogt h Construction Engineer By Troy Yar rough(Sep 14,202 09:05 PDT) APPROVED BY: Bernard Digitally signed by Bernard Jimenez President Jimenez Date:24-07'00' Title 15:58:40700 Steven E. White, Director Sep 14,2023 Public Works and Planning Accepted Date: Date: _Contractor We,the above signed contractor, have considered the change proposed and hereby agree, if this proposal is Auditor Controller approved,that we will provide all equipment,furnish all materials,except as may otherwise be noted above, Business office and perform all services necessary for the work above specified, and will accept as full payment therefore the _Board of Supervisors _Const.Management prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. Antigo Construction Family of Companies 0 CONSTRUCTION INC. INTERNATIONAL INC. MHB BREAKERS LTD Modified Rubblization Specification February, 2022 Description (1)This section describes modified rubblization and the rolling and seating of existing concrete pavement to create a stable construction platform for a pavement overlay either with or without an intermediate base layer. General (1) Use a self-contained, self-propelled multi-head breaker. Use 10-ton or heavier rollers and roll at 6 feet per second or slower. Run vibratory rollers at an engineer-approved frequency and amplitude.A roller pass is defined as down and back in the same path. (2) Before rubblizing, saw full-depth joints and completely sever load transfer devices to isolate the rub- blized area from areas not to be rubblized. Saw jointed pavements at an existing transverse joint. Do not damage adjacent pavement during rubblization. Repair damage to the adjacent pavement caused by con- tractor operations as the engineer directs. Modified Rubblization (1) Fracture the concrete full-depth and uniformly across the pavement width.The engineer will designate one of the two subcategories of modified rubblization as described below. Modified Rubblization -significant spalling Achieve 12-inch minus size pieces at the surface,significant surface spalling,and a surface appearance that ranges from smooth to pulverized. 75%of the pieces at the bottom of the slab shall be 15-inch minus in size. The pavement surface should look similar to the surface in the following two pictures: Fill Modified Rubblization - significant spalling 1 � t - M y �'.r'r�, :�,s ,� 'd �,1 � ¢yr.E-. x '✓��� ��d F.. {•'�a � i _" - ;-�.Y' s I c eA Modified Rubblization - significant spalling Modified Rubblization -occasional spalling Achieve 12-inch to 18-inch sized pieces identified with clearly visible cracks at the surface.Occasional sur- face spalling may occur.The pavement surface will typically look similar to the surface in the following two pictures: e - Modified Rubblization - occasional spalling 2 r PW Modified Rubblization - occasional spalling (2)The engineer may direct or allow larger maximum piece dimensions if existing pavement or subgrade conditions require larger pieces in order to create a stable construction platform. (3) Do not damage pipes,valve boxes, manholes,and other fixtures. Repair any damage that occurs as the engineer directs. (4) Remove any reinforcing steel exposed at the surface by cutting below the surface and disposing of the steel. Do not remove unexposed reinforcing steel. Rolling/seating (1) Roll the rubblized area using two passes with a vibratory steel roller.The engineer may adjust the number of passes to achieve the desired seating and stability. (2) Remove loose asphaltic patching material,joint fillers,expansion material,or other similar materials from the compacted surface.Also remove pavement or patches that have a maximum dimension greater than or equal to 6 inches that are either not well seated or are projecting more than one inch above the surface. Dispose of removed material. (3) If paving with no intermediate base layer, roll the entire surface additionally, unless the engineer directs or allows otherwise,as follows: 1. One pass with a pneumatic-tired roller. 2. One pass with a vibratory steel roller. 3 Measurement (1)The owner will measure Modified Rubblization by the square yard acceptably completed. Payment (1)The owner will pay for the measured quantity at the contract unit price under the following bid item: DESCRIPTION UNIT Modified Rubblization SY (2) Payment is full compensation for rubblizing; removing exposed steel; rolling;disposing of removed mate- rial and repairing damage to pipes,fixtures,and the adjacent pavement. (3)The owner will pay separately for sawing under a Sawing Concrete bid item. NOTE.This specification is a modification of a Wisconsin DOT standard specification,Section 335 Rubblized Pavement.This specification was created byAntigo Construction,Inc.to assist those interested in specifying modified rubblization. 4 What can Antigo do for you? In addition to providing quotations and answering any questions you may have, Antigo is prepared to provide a wide range of information on concrete pavement rubblizing, cracking/ breaking & seating, and breaking for removal. Examples of available materials are videos of various breaking processes and project scenarios, lists of owner and contractor contacts familiar with Antigo's capabilities, long-range pavement performance surveys, rubblizing and cracking/breaking & seating specifications, and project histories. Antigo's experienced staff is always available to provide consultation to owners, engineers, and contractors as they plan concrete pavement rehabilitation and reconstruction projects. Antigo Construction Family of Companies Corporate Office Western Division Address: Antigo Construction, Inc. Address: Antigo Construction, Inc. 2520 Clermont St 1973 Commerce Ave Antigo, Wisconsin 54409 Boise, Idaho 83705 Phone: +1715-627-2222 Phone: +1208-345-1790 Fax: +1715-623-7073 Fax: +1208-342-0173 Email: ac@antigoconstruction.com Email: west@antigoconstruction.com International In the UK and Ireland Contact Person: Joseph A. Grainger, Vice President Address: Antigo MHB Breakers Ltd and General Manager Unit 114 Boston House Address: Antigo International Inc. Grove Business Park 2520 Clermont St Wantage, Oxfordshire OX12 9FF Antigo, Wisconsin 54409 United Kingdom Phone: +1 312-805-4388 Phone: +44 (0)1235 869021 Email: ai@antigoconstruction.com Fax: +44 (0)1235 869022 Email: amb@antigoconstruction.com NOTES.' GSB-SB2' GS6-NB2" (E) LINE LINE (E) UPRR 1. FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF Rev 63.5' 35.5, 41' R/W �• TRACKS WAY ENGINEERING AT THE DISTRICT OFFICE. EP 2. DIMENSIONS OF THE STRUCTURAL SECTIONS ARE 36� EP SUBJECT TO TOLERANCES SPECIFIED IN THE E)CONC (E)CONC STANDARD SPECIFICATIONS uAR EDGE 2a t EDG AP VAR VAR VAR �p 4' VAR EP '-8 -11 0'-1 22'-27 30'-32' J. FOR CURB TYPE AND LIMITS, SEE LAYOUT SHEETS. HP E)EP rJ'HPJHp (E) 1 S 4. COMPACT SUBGRADE TO 95Z RELATIVE COMPACTION TO 6 B MATCH Exist 2 6 5% 5, 4 z -E 4 1 5$ MATCH Exist 2 5% OG ' 2.5 FEET BELOW PAVEMENT SURFACE OR 0.5 FEET OG _ ___ BELOW SUBGRADE SURFACE, WHICHEVER IS GREATER. ---------------- �--- ---- ------------------ , -- -----------{- }- - PROPOSED MGS `_--------------_-_-_-_ _-_-_-a Y M, -------------------�-- 5. FOR DITCH FLOW LINE INFORMATION AND LIMITS, SEE 11 11 5 9 DRAINAGE SHEETS' GOLDEN STATE BOULEVARD 6. FOR PAVEMENT AREAS NOT SHOWN, SEE CONSTRUCTION DETAIL SHEETS FOR PAVEMENT SECTIONS. " " x x GSB-SB2 LINE GSB-NB2 LINE 7. FOR LOCATION OF GUARDRAIL, SEE LAYOUT SHEETS STA 228 -0.251 TO 256+81.08 8. PAVEMENT EDGE TREATMENTS FOR OVERLAYS SHALL BE NTS GSB SB2' GSB NB2' c IN ACCORDANCE WITH CALTRANS STD PLAN P75/P76. (E) UNE UNE (E) UPRR y R 43.5' 1 41' R1W 50' r PACKS h EP 24't 30' EP R EXISTING SECTIONS ABBREVIATIONS HP HP �i 2.5"HMA AB AGGREGATE BASE TOEREMAIN� 3 SAW (E)E 3 c 8"PCC BOW BACK OF WALK tl 4 t 1'sA C&G CURB AND GUTTER X 8 WJ 1 MATCH Exist 4 MATCH Exist 2 - --- o C,G&SW CURB, GUTTER, AND SIDEWALK � z 4;1 5% S% fr- '� f�__"- --------------------- - a O2 8"PCC CIPR COLD IN PLACE RECYCLING ---------------------------- MAX- - - - --------- -2 ____- ------ CONC CONCRETE g 5 { 9 O3 6"-10"HMA (E),Exist EXISTING EP EDGE OF PAVEMENT 5"-9"HMA FDR FULL DEPTH RECLAMATION GOLDEN STATE BOULEVARD GOLDEN STATE BOULEVARD ® FOW FACE OF WALK 4'-8"PCC HMA HOT MIX ASPHALT GSB—SB2" LINE 'GSB-NB2" LINE HP HINGE POINT STA 251+94.06 TO 256+81.08 STA 248+73.81 TO 256+81.08 O5 13"17"HMA LIP LIP OF GUTTER MAX MAXIMUM NTS NTS © XX"HMA MED MEDIAN GSB-SB2' GS9-N62" MGS MIDWEST GUARDRAIL SYSTEM (E) UNE UNE (E) UPRR NIS NOT TO PROPOSED SECTIONS OG ORIGINAALSCALE GRADE R/w 63.5' 35.5' 41' R/W 50• TRACKS PCC PORTLARUBBERIZED CEMENT CONCRETE VAR 24 t 275 t a VAR VAR MILL HMA RHMA-G RUBBERIZED HOT MIX ASPHALT-GAP GRADED £P eTw . EP EP EP �1 RUBBILIZATION PCC R/W RIGHT OF WAY HP 6'-8 30'-32' 9'-11' 0.12'-0.16' HMA LEVELING SAMI-R STRESS ABSORBING MEMBRANE INTERLAYER 3' E)EP HP COURSE 0.20'HMA TYPE A SAW SAWCUT J'HP 3'HP 1'SAW 0.25' GRIND SW SIDEWALK 6 6 Z 5Z 5% 4 - a SAMI-R/0.25'HMA (TYPE A) TFC TOP FACE OF CURB 0G 5% 0C 1 MATCH Exist 1 MATCH Exist 2 - UPRR PACIFIC RAILROAD --------- ---- - s:a-a:>� _ ------------- -- 4�-4'- - - GRIND VAR VARIES MqX M/x --�-- ----------------------� ---------------- --------, 1WY ----- k � 0.55'HMA (TYPE A) 10 10 ROPOSED MGS 9 �-------------------- UNION pI 0.65'FDR 0.75'AB (CLASS Il) � GOLDEN STATE BOULEVARDI 0.45'HMA (TYPE A) o 0.65'AB (CLASS li) "GSB-SB2" LINE / 'GSB-NB2" LINE STA 196+91.16 TO 228+03.25 �LI EB2� 0.30'PCC (E) UPRR © NTS 41' Rom' 50' TRACKS p �7 0.70'HMA (TYPE A) VAR EP VAR ® RUBBLIZATION PCC EP 30't-32't HP9'-11' ¢ 0.12'-0.16'HMA LEVELING e 3' COURSE 0.20 HMA TYPE A 3 HP� 4 f 0.50'HMA (TYPE A) 5% 4 0.65'AB (CLASS ll) --___ - MATCH Exist 2 5—X� OG v 0.20' GRIND PROPOSED MGS 4--------------- --------- f---- y �' -- -------- to 0.12'-0.16'HMA LEVELING 3 GOURSE/o.2o' HMA (TYPE A) GOLDEN STATE BOULEVARD 0. ' GRIND � 1 f 0.1212'-0.16'HMA LEVELING m COURSE 0.20' HMA TYPE A GSB—NB2" LINE 0.12 SAMI' GRIND 0.30'HMA (TYPE A) STA 196+91.16 TO 218+98.76 NTS V DATE RECORD DRAWING k PROJECT- PHASE 1 DEPARTMENT OF PUBLIC WORKSAND PLANNING DESIGNED: CYNTHIA HORNER i1t7H# RESIDENT ENGINEER DATE ' V� DRAWN: ERIK CHIN raa# GOLDEN STATE CORRIDOR-ECONOMIC DEVELOPMENT TYPICAL SECTIONS g CHECKED: EDNORIEGA tan# / " e AND INFRASTRUCTURE IMPROVEMENTS ; MARK THOMAS SUPERVISING ENGINEER DATE "P e FOR RIGHT OF WAY DATA AND ACCURATE ACCESS DETERMINATION,SEE DOCUMENTS IN THE DEPARTMENT OF PUBLIC WORKS AND PLANNING. CALL BEFORE YOU DIG F OF C SELMA REGION 91 l F O R N� DRAWING NO. X-1 SHEET NO. 313 TOTAL 172 4 NOTES CONSTRUCTION NOTES LEGEND 1) SEE CONSTRUCTION DETAILS FOR DETAILED �1 CONSTRUCT 6"CURB & GUTTER PER CITY OF SELMA CONSTRUCT HMA DIKE (TYPE A) PER CALTRANS STD Exist RIGHT OF WAY GRIND/SAMI—R/HMA OVERLAY—SEE 'X"SHEETS GRADING AND LAYOUT INFORMATION STD PLANS ST-2 PLAN A878 OR CD"SHEETS FOR PAVEMENT SECTION 2)ALL STATION OFFSETS TO EP UNLESS 0 —— Prop RIGHT OF WAY CONSTRUCT SIDEWALK PER CITY OF SELMA STD PLANS 10 REMOVE EXIST CURB RUBBLIZATION PCC/HMA LEVELING COURSE/HMA OTHERWISE NOTED ST-1 11 REMOVE EXIST CURB AND GUTTER —————————— SAWCUT OVERLAY—SEE X"SHEETS FOR PAVEMENT SECTION 3) CONTRACTOR TO INSTALL SIDEWALK AND 0 CONSTRUCT COMMERCIAL DRIVEWAY PER CITY OF SELMA -------- GRADE BREAK SLURRY SEAL CURB TO MEET MINIMUM DISTANCE UPRR STD PLANS ST-6 OR ST-7, AS APPLICABLE 12 REMOVE EXIST SIDEWALK, CURB, AND GUTTER REQUIREMENTS FROM CENTERLINE OF TRACK NEW PAVEMENT — SEE X"OR 0.33'PCCP CONCRETE SIDEWALK ® CONSTRUCT 8"MEDIAN CURB PER CITY OF SELMA STD 13 CONSTRUCT 2' CURB OPENING IN CURB AND GUTTER CD"SHEETS FOR PAVEMENT PLANS ST-2 PER CURB BREAK DETAIL ON CD-30 SECTION 0 CONSTRUCT 6"STANDARD CURB PER CITY OF SELMA 14 CONSTRUCT 2'MEDIAN CURB OPENING PER DETAIL REMOVE TREE STD PLANS ST-2 ON CD-30 ® MEDIAN NOSE TREATMENT PER CD-30. SEE PLANTING REPLACE STONE MASONRY IN KIND CONSTRUCT CURB RAMP PER CITY OF SELMA STD PLAN 15 REMOVE FENCE/BARRIER PLANS FOR ADDITIONAL °e © ST-3 THROUGH ST-5. SEE CONSTRUCTION DETAIL INFORMATION SHEETS FOR GRADING INFORMATION 16 CONSTRUCT DETECTABLE WARNING SURFACE PER ® GRIND/HMA LEVELING COURSE LOOSE BALLAST 7 INSTALL MIDWEST GUARDRAIL SYSTEM PER DETAIL ON DETAIL ON SHEET CD-31 FOR INFORMATION ONLY — SEE SHEET C0-31 AND HMA OVERLAY—SEE X" 17 CONSTRUCT MEDIAN CURB TRANSITION TO EDGE OF SHEETS FOR PAVEMENT SECTION PHASE 2 FOR DESIGN (BY OTHERS) i � ® CONSTRUCT CONCRETE VALLEY GUTTER PER CITY OF PAVEMENT PER DETAIL ON CD-31 REMOVE BASE& SURFACE SELMA STD PLAN ST-9 6 O REMOVE 0 NDER REMOVE OLEANDER �p BUSHES RE VE OL ER BUSHES g + p USHES ��— GSB—SB2"+40.76 5.50 Rt 7 L=125' © C12 4 � N M OL E R VEVfA SH W B S N4 ' 4 — 7+00 19 + 199t 00+00 201+00 202+00 �, 203+80- --Mz%B4fBB•-•,•• W wi GOLDEN STATE BLVD o MI 198+00 199+00 200+00 2014-00 _ 202+00 71 55` 203+00 204+00 CSB—NB2 95.85 0'Lt � GSB—NB2" +46.09 5.00'Lt —NB2" +45.37 5.00'Lt (E)R/W = 5' C'® ❑7 L=37.5' � = -331 CSB—NB2"+ 1.09 31.00 Rt +19.p 5B29149, 33.00'Rt ❑7 L= 37.3' REMOVE OLD S — "7 L=37.5' ❑7 L=87.5' a ^I J SEE GOLDEN STATE BOULEVARD — CITY OF SELMA KINGSBURG PROJECT FOR DESIGN G GOLDEN STATE BLVD SCALE: 1"= 40' 310 VSB uu ell 310 V 305 305 4 g 300 300 tgs F Oi$ 295 — 295 193+00 194+00 195+00 196+00 197+00 198+00 199+00 200+00 201+00 202+00 203+00 204+00 "GSB-02"AND "GSB-NB2" LINE PROFILES VERT SCALE. 1"= 5, HORZ SCALE- 1"= 40' V DATE RECORD DRAWING k PROJECT- PHASE 1 T�� DEPARTMENT OF PUBLIC WORKSAND PLANNING DESIGNED: CYNTHIA HORNER i1pH# RESIDENT ENGINEER DATE 'DRAWN: ERIK CHIN raKra � � � GOLDEN STATE CORRIDOR-ECONOMIC DEVELOPMENTLAYOUT CHECKED: ED KCHINNORIE A nano / A AND INFRASTRUCTURE IMPROVEMENTS MARK THOMAS SUPERVISING ENGINEER DATE L <FOR RIGHT OF WAY DATA AND ACCURATE ACCESS DETERMINATION,SEE DOCUMENTS IN THE DEPARTMENT OF PUBLIC WORKS AND PLANNING. CALL BEFORE YOU DIG OF CW SELMA REGIONDRAWING NO. L-1 SHEET NO. 13A TOTAL 172 4 NOTES: 1. FOR ACCURATE RIGHT OF WAY DATA, CONTACT RIGHT OF WAY ENGINEERING AT THE COUNTY OFFICE. 2. DIMENSIONS OF THE STRUCTURAL SECTIONS ARE CSB-CL1' SUBJECT TO TOLERANCES SPECIFIED IN THE Exist LINE ExistW TRACKS UPRR R STANDARD SPECIFICATIONS. RAY VAR VAR Rev 50• 40'-45' 35'-40' 3. FOR CURB/DIKE LIMITS, SEE PLAN AND PROFILE SHEETS. Z 4. SUPERELEVA77ON AS SHOWN OR AS DIRECTED BY THE Bow B. FOw TFc V,� SAW VAR 17' SAW B• EP VAR ENGINEER. Sw 'S 10'-19' 6'-15' 10-141' W V AR 10 HP W 5. COMPACT SUBGRADE TO 957 RELATIVE COMPACTION TO 3. 2.5 FEET BELOW PAVEMENT SURFACE OR 0.5 FEET MAX c BELOW SUBGRADE SURFACE, WHICHEVER IS GREATER. OG 15 3 X VAR- uAR 1 VA- 1 4 OG ___�__ --► _ __ __ ___ ___ _ ________ __ __ _ __ >•q•F-�: __-__-___-- 6. FOR DITCH FLOW LINE INFORMATION, SEE DRAINAGE ------ —_-_ _ ---------- SHEETS. 4" 7 - -- ----- --- --------- -`-------------------- M Exist C&G TO BE REMOI�£D--' 7. FOR PAVEMENT AREAS NOT SHOWN, SEE CONSTRUCTION 4'THICK cor/cRETE EMOVE CONCRETE BASE REMOVE CONCRETE BASE DETAIL SHEETS FOR PAVEMENT SECTIONS. C&G PER COK STD ST-2 Exist Exist MATCH MATCH Exist 8. TAPERED NOTCHED WEDGE TO BE CONSTRUCTED BETWEEN BOW 9 t TFC VAR yAR £P ADJACENT LANES WHERE PROPOSED HMA LIFT IS GREATER 34'-77 t 25'-3o't m THAN 0.15'PER CALTRANS STD PLAN P70. 5' 1 1 1 1 y 1 t 9. PAVEMENT EDGE TREATMENTS FOR OVERLAYS SHALL BE IN --- ---T _ -- --- --� ----- - SIMPSON STREET VAR �' ACCORDANCE WITH CALTRANS STD PLAN P75. ---------------_ -_--_-_-_-_-_-_-_-_-__-_-_------ p Exist SW TO R£MAINJ -------- ---------------- EXISTING SECTIONS � 'GSB—CL 1" LINE � -------J Ex;sr C&G m R£M41 STA 52+62.20 TO 60+94.58 4 sSPc"cMA SIMPSON STREET NTS SIMPSON STREET `o "GSB—CL I" LINE o 1"-2"HMA GSB—CL 1" LINE STA 52+62.20 TO 54+30.64 4 2 s"PCC STA 52+62.20 TO 53+34.12 NTS NTS 7"HMA 3'-6"CTB 'csB-CLI" 7'-8"PCC Exist LINE Exist UPRR R/W VAR 40 R1W 50' TRACKS 04 8'-&5"PCC 40'46' Exist Exist Exist Exist Exist BOW 5't 7C 23'.t 7FC 7 f 7 t 23f TFC 10'11 HMA PROPOSED SECTIONS ABBREVIATIONS 0.18' HMA BOW BACK OF WALK 13 1 13 1 OG - ❑1 0.30' CIPR C&G CURB AND GUTTER ____________ -----___-----_ V� CIPR COLD IN PLACE RECYCLING ` ----,__-_--,_ _,T----------------- - 0.20' GRIND COK CITY OF KINGSBURG / L---_------- _______r �_ ______ -------- s Exist SW TO REMAINJ ------------ ----- -I _ __-- �2 0.20' HMA OVERLAY CTB CEMENT TREATED BASE r 7 e T � �£xist C&G SAMI-R (E),Exist EXISTING Exist C&G TO REMAIN Q. EP EDGE OF PAVEMENT To REMAIN MATCH L MATCH A 0.45' HMA HMA HOT MIX ASPHALT - - - - - k 1.05'AGGREGATE BASE (CLASS ll) HP HINGE POINT SIMPSON STREET .' LIP LIP OF GUTTER 0.45' HMA NTS NOT TO SCALE QI 0.95'AGGREGATE BASE (CLASS //) OG ORIGINAL GRADE Exist 'GSB—CL I" LINE PCC PORTLAND CEMENT CONCRETE Rom' STA 12+99.78 TO 51+53.18 Exist UPRR • 0.45' HMA R/W RIGHT OF WAY MCKS 0 0.65'AGGREGATE BASE (CLASS lQ SAMI-R STRESS ABSORBING MEMBRANE INTERLAYER NTS - R/W o REINFORCEMENT BOW TFC moist moist 50' SAW SAWCUT © 0.55' HMA SW SIDEWALK Exist Exist 0.95'AGGREGATE BASE (CLASS ll) TFC TOP FACE OF CURB 5 f VAR TFC TFC Y UPRR UNION PACIFIC RAILROAD 21 t-23't 231 tO'f ❑7 0.25' HMA VAR VARIES 0.25' GRIND 0.40' GRIND 2 ® 0.25' HMA 13 0.40'HMA 1 SAMI-R OG a ------------- ------- ---------� -- '--I--=- 0.18' HMA OVERLAY _ ______; 1 oG o ` -------------------- e 9 EXIST SW TO REMAIN) - ---------- -- i----------- / Exist C&G 70 REMAIN 1 -k: `---------- --------� Exist C&G TO REMAIN e t0 0.33' PCC { 0.20' GRIND SIMPSON STREET SIMPSON STREET 11 CRACK AND SEAT EXISTING CONCRETE 0.20' HMA 'GSB—CL 1" LINE "GSB—CL 1" LINE SAMI-R STA 29+41.27 TO 32+25.53 STA 30+76.22 TO 34+36.73 12 0.50' HMA NTs 3 0.65'AGGREGATE BASE (CLASS 11) NTS DATE RECORD DRAWING k PROJECT-PHASE 1 �tyGSBp� DEPARTMENT OF PUBLIC WORKS AND PLANNING g DESIGNED: CYNTHIA HORNER RESIDENT ENGINEER DATE , + a A GOLDEN STATE CORRIDOR-ECONOMIC DEVELOPMENT �" TYPICAL SECTIONS DRAWN: ERIK CHIN CHECKED: EDGAR NORIEGA / • s AND INFRASTRUCTURE IMPROVEMENTS ^ MARK THOMAS SUPERVISING ENGINEER DATE t FOR RIGHT OF WAY DATA AND ACCURATE ACCESS DETERMINATION,SEE DOCUMENTS IN THE DEPARTMENT OF PUBLIC WORKS AND PLANNING. CALL BEFORE YOU DIG 7E CF CN1 � KINGSBURG REGION •``�l'"�R DRAWING NO. X-1 SHEET NO. 3A TOTAL 108 4 CONSTRUCTION NOTES LEGEND NOTES 1❑ CONSTRUCT 6"CURB & GUTTER PER f0 NOT USED (PHASE 2) 18 NOT USED (PHASE 2) Exist RIGHT OF WAY CIPRI OVERLAY — SEE X"SHEETS FOR 1) SEE CONSTRUCTION DETAILS FOR DETAILED CITY OF KINGSBURG STD PLANS ST-24 GRADING AND LAYOUT INFORMATION. 11 NOT USED (PHASE 2) 19 CONSTRUCT HMA DIKE(TYPE D) PER — RAILROAD CENTERLINE THICKNESS ❑2 CONSTRUCT SIDEWALK PER CITY OF CALTRANS STD PLAN A87B 0.33' PCCP CONCRETE TRAIL/SIDEWALK 2)ALL STATION OFFSETS TO EP UNLESS KINGSBURG STD PLANS ST 24 12 CONSTRUCT MODIFIED CURB FACE SCUPPER —— ———— — Prop ICE OTHERWISE NOTED. ❑3 CONSTRUCT COMMERCIAL DRIVEWAY PER DETAIL ON CD-21 ® CONSTRUCT HMA DIKE(TYPE A) PER CRACK AND SEAT PCCP WITH 3AMI—R 3) SEE CONSTRUCTION DETAILS FOR LAYOUT PER CITY OF KINGSBURG STD PLANS CALTRANS STD PLAN A87B -- SAWCUT AND 0.20' GRIND/OVERLAY 13 NOT USED (PHASE 2) INFORMATION FOR FENCING LIMITS NOT SHOWN. ST-26 21 CONSTRUCT MODIFIED COMMERCIAL DRIVE MGS 4 NOT USED (PHASE 2) APPROACH PER DETAIL ON SHEET CD-21 0.20' GRIND WITH SA LAY 1 4)ALL STATION AND OFFSET CALLOU7S ON THIS 4 CONSTRUCT 8"MEDIAN CURB PER NEW PAVEMENT — SEE X"OR GD"SHEETS AND 0.20'HMA OVERLAY SHEET ARE IN REFERENCE TO THE GSB—CL 1" W CITY OF KINGSBURG STD PLANS ST-9 15 NOT USED (PHASE 2) © CONSTRUCT 6"CURB (TYPE Al-6) PER FOR PAVEMENT SECTION DRIVEWAY NEW PAVEMENT — SEE LINE UNLESS OTHERWISE NOTED. CALTRANS STD PLANS A87A CD"SHEETS FOR PAVEMENT SECTION ❑5 CONSTRUCT CLASS I TRAIL PER DETAIL 16 NOT USED (PHASE 2) MEDIAN NOSE TREATMENT PER CITY OF 5)THE CONTRACTOR SHALL BE RESPONSIBLE FOR ON SHEET CD-20 © NOT USED (PHASE 2) KINGSBURG STD ST 9 CONTACTING THE RESPECTIVE UTILITY TRUNCATED DOMES COMPANIES 48 HOURS PRIOR TO WORKING © CONSTRUCT CURB ROMP PER 17 CONSTRUCT DETECTABLE WARNING SURFACE, � 0.25'HMA AND SAMI—R (GRIND 0.25) � AROUND ANY OF THEIR UNDERGROUND CON37RUC770N DETAIL SHEETS PER DETAIL ON CD-19 ® NOT USED (PHASE 2) U77LI77ES FOR VERIFICA77ON AT 7HE SITE OF F71 INSTALL MIDWEST GUARDRAIL PER © NOT USED (PHASE 2) � � � 0.18'HMA AND SAMI—R AGGREGATE BASE ANY POSSIBLE CONFLICTS WITH THE PROPOSED IMPROVEMEN75 SHOWN ON THESE PLANS. DETAIL ON SHEET CD-19 REMOVE BASE AND SURFACE ® NOT USED (PHASE 2) `/9 REMOVE TREE 6 REMOVE ALL DIRT DEBRIS FROM EXISTING y ® REMOVE EXIST CURB AND GUTTER PAVEMENT TRANSITION PER / )CURB AND DIKES WITHIN THE PROJECT LIMITS. q t51.55 49,$9'Lt TFC © CONSTRUCT PAVEMENT TRANSITION ON DETAIL ON CD-21 9 REMOVE EXIST CURB CD-21 of BEG 1❑ 2❑® ® FOR INFORMATION ONLY— SEE CONFORM TO Exist C&G PHASE 2 FOR DESIGN (BY OTHERS) CALTRANS STANDARD PLAN SHEET p I V IL +71.65 29.89' Lt 7FC W END 1 2 8 ® 0.40' GRIND AND 0.40' HMA 2 CONFORM TO Exist C&G eO 6 x I " p x (E)R/W C ~ (E)RIN ? N •p O O p O O o 0 0 o000 0 o O O o 0 0 o O O o 00 O O o e0 o O Oo 0o p o O W 13 N tz h E)R (E)R W REMOVE OLEANDER REA�SVE OLEANDER + REMOVE OLEANDER T REMOVE OLEANDER REMOVE OLEANDER REMOVE OLEANDER BUSHES BUSHES BUSHES BUSHES BUSHES BUSHES — — — — — — — — — — FOR E"INFO a CITY OF KINGSBURG FOR INFORMATION ONLY — <E)R/W SEE PHASE 2 FOR DESIGN cc SIMPSON STREET o (BY OTHERS) SCALE.- 1"= 40' 305 305 I N 300 — 300 295 x 295 F 290 290 13+DO 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 "GSB-CLI" LINE PROFILE VERT SCALE.- 1"= 5, HORZ SCALE.- 1" = 40' V DATE RECORD DRAWING PROJECT-PHASE 1 Gsn DEPARTMENT OF PUBLIC WORKS AND PLANNING DESIGNED: CYNTHIA HORNER RESIDENT ENGINEER DATE , �" • „ GOLDEN STATE CORRIDOR-ECONOMIC DEVELOPMENT I LAYOUT DRAWN: ERIK CHIN ■ ■ • B w AND INFRASTRUCTURE IMPROVEMENTS CHECKED: EDGAR NORIEGA MARK THOMAS SUPERVISING ENGINEER DATE �P L �� C, t FOR RIGHT OF WAY DATA AND ACCURATE ACCESS DETERMINATION,SEE DOCUMENTS IN THE DEPARTMENT OF PUBLIC WORKS AND PLANNING. CALL BEFORE YOU DIG CND KINGSBURG REGION FOR DRAWING NO. L-1 SHEET NO. 12A TOTAL 108 4 W 2 2 W GSB—CL1"+22.88 700'Lt BC TFC 0 GSB—CL 1" +32.22 31.15' Lt BC TFC GSB—CL 1" +22.88 3.50'Lt EC TFC EG 1❑ 2❑ GSB—CL 1"+00.83 7.00' Lt AP TFC ONFORM TO Exist C&G GSB—CL 1" +90.81 6.95'Lt TFC GSB—CL 1" t43.49 41.31'Lt EC TFC END®❑9 END Ll J 121181FOR INFORMATION ONLY - CONFORM TO Exist CURB CONFORM TO Exist C&G SEE PHASE 2 FOR DESIG GSB—CL 1"t85.81 47.45'Lt BC TFC (� GSB—CL 1" +10.04 49.58'Lt EC TFC GSB—CL 1"+58.59 35'Lt EC TFC �, (BY OTHERS) w END❑i � $ BEG 1❑ 2❑ 8 0. CONFORM TO Exist C&G to CONFORM TO Exist C&G GSB—CL1 +36.74 28.26'Lt N / GSB—CL 1"+99.39 30. TFC t G GSB—C 1" �2 © GSB— L 1" t90.15 30.29' Lt BC C W SB—CL 1" .12 Lt BEG 1❑ 2 p 8❑ j E R GSB C 1 Lt OR]LFTOfExist C&G CONFORM TO Exist C ()� k (E)R/W —— — — ,J q S ocl oo O w W h W W o " O b h n2 cn M REMOVE OLEANDER REMOVE OLEANDER EMOVE OLEANDER BUSHES (E).. GSB—CL1 (E� 2 REMOVE OLEANDER BUSHES o BUSHES BUSHES REMOVE OL BUSHES REMOVE OLEANDER GSB—CL1" t25.83 27.86' REMOVE OLEANDER EANDER v GSB—CL 1" t29.38 2.DO'Rt PRC TFC BUSHES �� BUSHES v PGSB—CL 1" +99.81 703'Rt I TFC GSB—CL 1" t41.27 27.98' CONFORM TO Exist CURB UPR DR"INFO REMOVE OLEANDER BUSHES SHEET L-18 F (E)R/W i a a bl 4 J CITY OF KINGSBURG _ SIMPSON STREET SCALE.- 1" = 40' 305 co 305 [N j W GSB CL 1"OG 300 300 `� 5 W _ W 295 N, 295 290 290 m 25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 "GSB-CLI" LINE PROFILE VERT SCALE.- 1"= 5, HORZ SCALE.: I" = 40' C01 DATE RECORD DRAWING k PROJECT-PHASE 1 �tyGsn- DEPARTMENT OF PUBLIC WORKS AND PLANNING g DESIGNED: CYNTHIA HORNER RESIDENT ENGINEER DATE a A DRAWN: ERIK CHIN GOLDEN STATE CORRIDOR-ECONOMIC DEVELOPMENT LAYOUT � CHECKED: EDGAR NORIEGA / • B AND INFRASTRUCTURE IMPROVEMENTS ° MARK THOMAS SUPERVISING ENGINEER DATE �? L � - F' t FOR RIGHT OF WAY DATA AND ACCURATE ACCESS DETERMINATION,SEE DOCUMENTS IN THE DEPARTMENT OF PUBLIC WORKS AND PLANNING. CALL BEFORE YOU DIG 7E CF CND � KINGSBURG REGION ``�l'"0 DRAWING NO. L-2 SHEET NO. 13B TOTAL 10$ 4 W 2 2 W O t GSB-CL 1" +54.76 48.05'Lt BC TFC BEGOO® CONFORM la-dst C&G f 'GSB-CL I"+74.39L 3. ,END Llj L,?j8 x' w CONFORFa ra rx M TO Exi C �' W # W O W o•o • o p p O O o O O O O o O O p G, oo oto p a O o W O O O o b O o (E)TFC E TFC REMOVE OLEANDER REMOVE OLEANDER r REMOVE OLEANDER BUSHES BUSHES REMOVE OLEANDER REMOVE OLEANDER REMOVE OLEANDER BUSHES V BUSHES BUSHES BUSHES ti CITY OF KINGSBURG SIMPSON STREET SCALE 1" = 40' J cc 310 h a 310 4 N �7 e 305 305 W W GSB-CL1 OG y 300 -- 300 295 295 37+00 38+00 39+00 40+00 41+00 42+00 43+00 44+00 45+00 46+00 47+00 48+00 "GSB-CLI" LINE PROFILE VERT SCALE.- 1"= 5, HORZ SCALE.: 1" = 40' u DATE RECORD DRAWING t k PROJECT-PHASE 1 �tyGSBp� DEPARTMENT OF PUBLIC WORKS AND PLANNING g DESIGNED: CYNTHIA HORNER RESIDENT ENGINEER DATE a A DRAWN: ERIK CHIN GOLDEN STATE CORRIDOR-ECONOMIC DEVELOPMENT LAYOUT � CHECKED: EDGAR NORIEGA / • B AND INFRASTRUCTURE IMPROVEMENTS ^ MARK THOMAS SUPERVISING ENGINEER DATE t FOR RIGHT OF WAV DATA AND ACCURATE ACCESS DETERMINATION,SEE DOCUMENTS IN THE DEPARTMENT OF PUBLIC WORKS AND PLANNING. CALL BEFORE YOU DIG 7E CF CND � KINGSBURG REGION ``�l'"0 DRAWING NO. L-3 SHEET NO. 14A TOTAL 10$ 4 NOTES:FOR THIS SHEET ONLY s-5 1) ALL STATION CALLOUTS REFERENCE THE GSB-CL 1" LINE UNLESS 1. NO ABOVE GROUND WORK SHALL BE PERFORMED UNTIL PULL BOX AND ANY ADJACENT LOOPS DAMAGED DURING 11. ANY BROKEN/DAMAGED PULL BOXES SHALL BE REPLACED. LIMITLINE A NOTED OTHERWISE. THE CONTRACTOR HAS ALL MATERIALS ON HAND TO THE REPLACEMENT AS SHOWN IN DETAIL A. INSTALL COMPLETE THAT PARTICULAR DETECTOR CIRCUIT. ADDITIONAL DETECTOR LEAD-IN CABLE AS REQUIRED BY 12. ALL PULL BOXES SHALL HAVE LOCKING LIDS. TRAFFIC 10' 26' 2) WORK SHALL BE DONE IN ACCORDANCE WITH THE 2018 EDITION STATE THE PROPOSED LOOP LAYOUT. RATED LIDS SHALL BE WELDED CLOSED AFTER FINAL OF CALIFORNIA DEPARTMENT OF TRANSPORTATION STANDARD PLANS AND 2. ALL EXISTING TRAFFIC SIGNAL AND LIGHTING FACILITIES, INSPECTION. 2� SPECIFICATIONS AND THE LATEST CALTRANS ADOPTED EDITION OF THE INCLUDING CABINETS, STANDARDS, PULL BOXES, CONDUITS 6. SAW-CUT LOOP DETECTOR SLOTS TO ALLOW A MINIMUM ES-5 AND LOOP DETECTORS, ARE SHOWN IN THEIR OF 2 INCHES OF SEALANT ABOVE THE TOP OF THE D CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (CA-MUTCD). APPROXIMATE LOCATIONS. AFTER ALL UNDERGROUND UPPERMOST LOOP WIRE IN THE SLOT. 13. ALL UNUSED CONDUCTORS SHALL BE REMOVED. UTILITIES ARE LOCATED, THE CONTRACTOR SHALL MARK TYPE D AND A LOOP DETECTOR DETAIL 3) RAILROAD FLASHERS HAVE BEEN VERIFIED IN THE FIELD THEY ARE 2' THE FINAL LOCATIONS OF THE LOOP DETECTORS SHOWN 7 DETECTOR CABLES SHALL NOT BE SPLICED BETWEEN THE 14• CONTRACTOR IS REQUIRED TO LOCATE CALTRAN S Z MIN FROM FACE OF CURB PER CA-MUTCD FIG. 8C-1. TO BE REPLACED AND NOTIFY THE ENGINEER AT LEAST ELECTRICAL FACILITIES. FACILITIES MUST BE PROTECTED CONTROLLER CABINET AND THE PULL BOX ADJACENT TO NTS TWO (2) WORKING DAYS PRIOR TO COMMENCING WORK TO THE DETECTOR LEAD-IN. IN PLACE. lF IN THE OPINION OF THE ENGINEER ANY I W POINT TABLE VERIFY THE MARKED LOCATIONS. FACILITIES INCLUDING LOOP DETECTORS ARE DAMAGED BY 8. SEAL CONDUIT WITH AN APPROVED DUCT SEAL AFTER ALL THE CONTRACTOR'S OPERATIONS, THE FACILITY MUST BE 3. c REPAIRED OR REPLACED AS DETERMINED BY THE POINT# STATION NOTE J. CONTRACTOR SHALL ARRANGE WITH UTILITY COMPANIES CONDUCTORS HAVE BEEN INSTALLED. ENGINEER. FOR ALL REQUIRED UTILITY REALLOCATIONS, INCLUDING BEG 9�® OVERHEAD CONFLICTS. 3 r za• 1 +47.21, 48.82'Rt BC 9. SEALANT FOR FILLING THE SAWCUT LOOPS SLOTS SHALL 15. ALL EXCAVATION IN CALTRANS RIGHT-OF-WAY MUST BE CONFORM TO Exist DIKE BE HOT-MELT RUBBERIZED ASPHALT SEALANT PER STATE +55.01 42.56' Lt PLATED AT THE END OF EACH SHIFT PLATING SHALL BE 2 +50.39, 53.95'Rt END❑9® 4. LOOP DETECTORS NOT SHOWN TO BE REMOVED MUST BE OF CALIFORNIA SPECIFICATIONS OR ELASTOMERIC SEALANT IN ACCORDANCE WITH THE REQUIREMENTS OF THE STATE BEG PROTECTED IN PLACE AND REMAIN OPERATIONAL. 3M, BLACK 5000. 3 +52.90, 59.39'Rt BEG 9 STANDARD SPECIFICATIONS FOR PUBLIC SAFETY AND +78lw 16 25.00'Lt B• �® MAINTAINING TRAFFIC. +40.44 25.00' Lt END 9 5. REPLACE IN THEIR ENTIRETY EXISTING LOOP CONDUCTORS 10. ALL PULL BOXES ACCESSED BY CONTRACTOR SHALL BE 3" 4 +54.78, 65.09"Rt EC CONFORM TO Exist DIKE DAMAGED IN THE PERFORMANCE OF THIS WORK 3❑(30'DRIVEWAY) B•• CLEANED OF ALL DIRT AND DEBRIS, ANY CRACKS .44, 2 00'Lt Lt TFC BICYCLE LOOP Rm INCLUDING THE CONDUCTORS LEADING TO THE ADJACENT GROUTED, AND ALL CONDUITS DUCT SEALED. q 5 +74.70, 29.51' Rt BC BEG�2 09© +80.44 25.00'Lt 129❑ © 1CONFORM TO Exist CURB 3❑(30' DRIVEWAY)t06.69 74.53'Lt DETECTOR SYMBOL +34.45 25.00'Lt6 +82.63, 52.78'Rt EC END 2 9 +80.34 46.85' Lt ❑3 (30'DRIVEWAY) CONFORM TO Exist CURB +12.37, 83,52"Lt ❑3 (23"DRIVEWAY)PROTECT IN PLACE EXIST BEG❑1 2❑® +33.60 4313'Lt NTS +21.52 24.14'Rt +95.82 25.00'Lt TFC VEHICLE LOOP DETECTORS COFORM TO Exist C&G BEGE l ] 9� 82 25.00'Lt 12C FORM TO Exist CURBCONFORM TO Exist CURB0'DRIVEWAY) �`ES-5 � 0�6 74 +19.82 23. TFCEND 9❑ O2D PROTECT IN P f lST 7. 25.00'Lt TFC 12 CONFORM TO Exist CUVEHICLE LOOP D ORS +36.83 2 0t03.18 1' t +75. 2 25. Lt TFC END® +89.57 25.00'Lt t3235 BEG 2 +86.67 38.18'Lt +37.32 25.00' 12 8'Sµ ❑3 (30'DRIVEWAY) I - -- -- B - o - 6 3❑ (E)R/W D (SEE ORNNAG S 0 I (35'DRIVEWAY) ko N 10 SW Q� 171 "4)66.00 24.62'Lt pY - - - - - - - - - - 61- 0 52+00 < JS 5 . 0 7✓9L 4+00 17 55+00 0 56+00 j ^ GSB-CLt LINE 58+00 59 0 4 60+00 0 714.15' o + +29.46 2704'Rt (E)EP - - - - - -s7�-u�-uz-ru�-u�-u�- -raaz7 - - - - - -�T -�T�-v -vim-� - - -v - ----- + 0 2 5 l ' - __ - - - _-- -C- =hC- - -C = -C- --C - -C_ - -C- - -C- _C- - -C_ -c- _C 25.18 39.33iORt 1 6 6 ES-5 ES-5 +30.64 25.00'Rt E EP 8' EP (E)R/W M00/Fl LLEl�6UTFER ,•,_ +35.44 DO'Rt REPLACE IN KIND SIGNAL 17 6 D A CONFORM TO Exist SEE CD-20 � GSB-CL 1" +86.47 PI REPLACE IN KIND SIGNAL F ( ) CONDUIT AND MA ECTOTERS y � FOR ADVANCED DETECTORS � `'�P CONDUIT AND MAGNETMETERS MODIFIED VALLEY GUTTER a h 4 6 +58.83 30.57'Rt 06.69 74.. Lt EC TFC FOR ADVANCED DETECTORS SEE C - ti I � U REMOVE OLEANDER -4 BUSHES mI ° CITY OF KINGSRURG eusHEs , PROTECT IN PLACE EXIST SIMPSON STREET u ti m o 0 0 0 7 VEHICLE LOOP DETECTORS SCALE.' 1"= 40' 310 310 V V S 305 y 305 y 300 300 2951 1 1 1295 m 49+00 50+00 51+00 52+00 53+00 54+00 55+00 56+00 57+00 58+00 59+00 60+00 "GSB-CL1" PROFILE VERT SCALE.- I'= 5, HORZ SCALE: 1' = 40' V DATE RECORD DRAWING ' +t PROJECT-PHASE 1 GSB DEPARTMENT OF PUBLIC WORKS AND PLANNING DESIGNED: CYNTHIA HORNER RESIDENT ENGINEER DATE , �" • „ IN DRAWN: ERIK HIN GOLDEN STATE CORRIDOR-ECONOMIC DEVELOPMENT LAYOUT C I ■ ■ • B w AND INFRASTRUCTURE IMPROVEMENTS CHECKED: EDGAR NORIEGA MARK THOMAS SUPERVISING ENGINEER DATE ,P L �� C, t FOR RIGHT OF WAY DATA AND ACCURATE ACCESS DETERMINATION,SEE DOCUMENTS IN THE DEPARTMENT OF PUBLIC WORKS AND PLANNING. CALL BEFORE YOU DIG CND KINGSBURG REGION •``�l'"0 DRAWING NO. L-0 SHEET NO. 15D TOTAL 10$ 4 W 2 U 2 U W J O \ _ U i 170' 175' 215' 260' 185' 160' W W R� w s -_ 8 0 N 5 R/W — 5 w� m lei — h W 4 ROPOSED EQUIPMENT 3 5 b G _ W o W TO BE REMOVED 5 R/W N w & W e, O Ba —Bs BB_G— B m ¢ Z 4J 67+00 68+00 G W+ G G Z ~O G G G G G G G G G G G 1696 G G G G G G G EXISTING STREET Fo —FO—FO ro ro ro ro FOFo FO FO—FO Fo Fo J H ———————T——— 7 T ——LIGHT TO REMAI — R/ N-T—— —T— ——— — ——— —— —— —— T——— —— T — 7 ———r ——— ——————— Tt oFO— S — FO W Fo — Fo —— FO FO — FO —— — FO —— — Fo —— -/T— ———FO —T—Fo Fq— FO ° — FO` —— Fo — Fo -o / —.a — F° —— FO c� G G G G G G G�iG� Is ON S G G G G G G�G G G G G G G R W G G G Q 3 a h a 0 U R/w 155' 168' 168' 168' 168' POLE PLACEMENT LOCATION o \ POLE LOCATION R/W / R W / Der W w BI SIMPSON ST STA 62+04.95,28,02'L 5 5 c c c s B2 SMPSON ST 5fA 63.. � m / _ —-—-—- b STA 64+20.10,26,55'L w� s _ - O ` O az O ss+essert m - - « -� O EllB4 SIMPSON ST h O / 81+00 82+00 a+0 STA 66+80.42,23.54'L Lu I / J V SIMPSO CT — \ -- 35 SIMPSON ST STA 68+40.45:28.11'L o / SIMPSON _—— B6 SIMPSON ST STA 70+25.22,25,62'L 0� 82+00 83+00 -c 00 —+ +— —— —— — � —— 79+Q� ——�D+oo —— — — JIL W_9-0-8-w B/ SIMPSON ST STA 71+95.40,29.06'L W FO FO — F _FO ��Fo� ro ro ro v Z O FO FO- FO FO—FO T T T T T TT -- -- -- SIMPSON ST STA 73+65.41,36.95'L S J T ---T — —T-- T---��_—Fo ---'--- T -- — _=TT--_L---T= T =Zll -- -- -- �I = G °-R/W ro F FO—FO O G G R/W FO—FO ro O O G °-R/W � 89 SIMPSON ST STA 75+39.83,47J5'L W U a Q 3I6 SIMPSON ST STA 76+94.30,74.70'L 0 - - - - - - - - - - - - - - — By SIMPSON ST STA 78+62.60,62.78'L UPRR B12 SIMPSON ST STA 80+30.57,68.70'L o B13 SIMPSON ST STA 81+97.15,68.57'L )4;51 0 0 c 0 U 0 m Ii 0 0 40' 80, o SCALE:1"=40' h DATE RECORD DRAWING PROJECT GsB DEPARTMENT OF PUBLIC WORKSAND PLANNING ° JJBTRAFFIC a Q �' DESIGNED: J.BENAVIDES 08/09/2023 RESIDENT ENGINEER DATE a`" c,�IS �'C~ o DRAWN: C.SANCHEZ 08/09/2023 ou S - �A GOLDEN STATE CORRIDOR-ECONOMIC DEVELOPMENT . GOLDEN STATE BLVD 516 W.SHAW AVE.,STE.103 �" a: i . * AND INFRASTRUCTURE IMPROVEMENTS STREET LIGHTING N CHECKED: J.RIOS 08/09/2023 FRESNO,CA 93704 SUPERVISING ENGIN ER v DATE �j� iv PHONE:559 570-8991 QFOR RIGHT OF WAV DATA AND ACCURATE ACCESS DETERMINATION,SEE DOCUMENTS IN THE DEPARTMENT OF PUBLIC WORKS AND PLANNING. CALL BEFORE YOU DIG EMAIL:of @JLBt.ffl wm �(F tl11F� KINGSBURG REGION `9LIF0 DRAWING NO. E-2 SHEET NO. 93A TOTAL 108 x SEE DETAIL B TO LEFT Q FOR POINT OF SERVICE—� J 10- o2 Q �J -- GG �`G �\ N . Io R/W -- — — — — 0 160' T t w 160' w— w 140' N w — 180' c c w�2752, _ ----- ----- w w w145 160, 165' 165' N 5 co 0 N ' 8TH ST w ® FO FO 1 Fo o J FO FO LLJ FO 1 0 FO FO FO R FO FO FO QO W 1 1 FO F F FO 0 FO F _ _ FO F- FO FO F ° FO Fjon 1 w 12 F0 vo F° ° Fo ao F0 ro F0 F° °0 _ o ��a�� Cl __ 1 FO F FO f0 f0 �0� ''^^ ) 1 Gi W W fo Cy ---- ---- r1 W W I F 3 o GOLDEN STATE BLVD `^' sn+oo 572+00 s 5 s S 567+00 s s 566+OOS 569+00 \ 570+00 F WI LLJ S s 5 565+00 s 566+00 Q. Z 5 s 5 563+00 564+00 WI 562+00 Z +00 J W ———————————————————— U —— ~ ii °` m -- — -- -- — -- -- -- R/W -- — < -- -- —_ — -- — -- -- RAW /W Q. v 0 v D 0 U C, O O rn POLE PLACEMENT LOCATION o EXISITNG PGqi Oj ❑ POLE LOCATION DIRECTION 102' p_ R/W O CJ O iOh� /W —1 65' Gl GOLDEN STATE BLVD STA 568+65.10,62.47'L N/A W _— p p — G G G o Gz GOLDENSTATEBLVD STA567+19.49,55.97'L N/A ['1381c G3 GOLDENSTATEBLVD STA565+58.99,56.03'L N/A160' 146' Sr.S63.. .�G4 GOLDEN STATE BLVD N/A pTH JT Fo o Fo STA 563+78.59,55.99'L FO 0 F0 FO FO FO FOFO FO FO F0 FO F FO e° LLJ G5 GOLDEN STATE BLVD STA562+39.78,55.76'L N/A Fo Fo Foro— — Fo® Fo 0 o_F� =`=_ Fo Fo FoFoFo � W G6 GOLDEN STATE BLVD STA 560+79.61,56.95'L N/A ro Fo r• _"__-___" 2 = R. 1 2 _ --lV — ------ cn v 6 H1 GOLDEN STATE BLVDTAT N/A p 1 "' ————��-v v ——————— [i 20s] ' w T 510+ 4.936.30'L - Q F � N �I 5 H GOLDEN STATE BLVD40' N A w 2.0' STA 571+90.23,57.63'L w 40' H3 GOLDEN STATE BLVD fT"L�" �' N/A U' GOLDEN STATE BC.VD sn+oo F 580+00 581+00 a I T 5 3+ .^3 5 . 574+00 575+00 F i 578+00 576+00 Ll v 573+00 ° 5 H4 GOLDEN STATE BLVD N/A w L12�7� ——— Z 'A STA 575+20.09,62.86'L — — — o C_•S-6 b 12 H6 GOLDEN STATE BLVD STA 576+59.72,61.89' b N/A Z —— ——— — — 12 1 J POINT OF SERVICE DETAIL B J s- 12 _ Sr.W8. T ■ ■ ■ ■ ■ ■ ■ ■ ■ _ o NO SCALE H6 GOLDEN STATE BLVDSTA 578+19.53,65.78'L N/A U f — t__-- -_ — R/W_ / 1 4. O USA I$ GOLDEN STATE BLVD STA 580+87.90,56.85'R N/A W R W ° KNOW WHAT'S BELOW 18 GOLDEN STATE BLVD STA580+67.47,61.34'L N/A 12 BEFORE YOU DIG, CALL 1 —800-227-2600 0 40' 80, o SCALE: 1" = 40' m v DATE RECORD DRAWING ■ 6EB5, PROJECT DEPARTMENT OF PUBLIC WORKS AND PLANNING AB TRAFFIC 15 DESIGNED: J.BENAVIDES 08/04/2023 RESIDENT ENGINEER DATE , _ .4, i' DRAWN: C.AYALA-MAGANA 08/04/2023 No.0 sz GOLDEN STATE CORRIDOR-ECONOMIC DEVELOPMENT GOLDEN STAVE BLVD 516 W.SHAWAVE.,8TE.103 ou 08/04/2023 * E.P:°, AND INFRASTRUCTURE IMPROVEMENTS r ' a STREET LIGHTING N CHECKED: J.RIOS 08/04/2023 FREBNO,CA 93704 SUPERVISING ENGINEER DATE sr c,v ti PHONE:(559)570-8991 976. ` 1 7 FOR RIGHT OF WAY DATA AND ACCURATE ACCESS DETERMINATION,SEE DOCUMENTS IN THE DEPARTMENT OF PUBLIC WORKS AND PLANNING. CALL BEFORE YOU DIG EMAIL:info@JLBtraf o.mm CKf FOWLER REGION DRAWING NO. E-6 SHEET NO. 115B TOTAL 143 Q ® 7Z ° 165, 125` 150' 88' 0_ r ;iA ° R/W IS o ss� so' so' so' so' R/W R/W — R/W O b Z b b 29;T d N 8T�/ Lst - C30I SEE DETAIL C BELO //�-77 �7 i 35 34 C 33 32% 3�% - FOR POINT OF SERVICE OY ? Q Q 17 CB 5 N Fo a M I FO I`FO I FC/ FO 0 F FO GO FO FO FO F W FO 0 Fo FO FO 0 FO FO FO FO FO FO FO FO 5 �0 J FO FOF FO 0 FO ,ly FO 0 FO FO FO FO FO FO FO FO FOF 5 0 F \ F 0 N FOFO F �F.O ==— _ ——�=0— FO FO 0 FO FO F FO FO a FO FO _ — 1 C FO N W X V 18 O to Z 1 1 1 1 1 N �� 0 ——— ———————————————————— m N _ W Q 140' 140' 140' ❑ �o { 140' 140' ( o❑ s y 140' '40' ) ) �� �) sso+oo s91+oo e92+oo i L� saz+o0 j �-j ssa+o0 `) sSa+O`) 585+00 586+00 567+00 +00 569+00 a W rr^^ J 4 k 4 O J XIC M 1 ® R/W— Fiq j — 1 -- ® -- 1 -- R/W —® --1 -- x --1 R/W ® R/W W OLD TE BL VD r Of � I v Fo 3 I Q. 13 2 / 18 0 a F FO FO F0�—F FO O 130' 130' \' 150' — 4s' 1 35' / POLE PLACEMENT LOCATION rn R/W R/W // o —_ _—_—_— — — -- ro 14 I POLE LOCATION DIRECTION rn o W W Fo—� F ro 12 Fq Fo 1 '^^ GO STA 590+17,01,60.45 GOLDEN STATE BLVD 'L N/A <S(XXX; Tom/ �+TXXx; 588 8/r/ / Q s s K J3 GOLDEN STATE BLVD N/A W STA 588+52.42,59.96'L `w 1 ril 12 J ,_.586.. (> o Fo 0 0 0 o ro o 0 o W _ 5(E) - - JQ GOLDEN STATE BLV STA 586+92.45,60.47'L N/A FO GO Kq� FO FO FO FO FO FO FO—gam—FO c 0 KI FO =0 FO FO FO FO FO—� FO (n CB 5 15 J5 GOLDEN STATE BLVD STA 585+42.45,6413i L N/A o O 5 Fo ® W STA 592 + 62.58, 59.69' L 54583 "'i'�"" c , , 1 . , , , 1 1 1 1 `.. N J5 GOLDEN STATE BLVD STA 583+92.52,62.91'L N/A W ` O J7 GOLDEN STATE BLVD N/A o° N 13a' 130' 1307 130' 30' 22T = STA582+32.48,61.63'L STREET LIGHT CONNECTION - DETAIL C O W NO SCALE K1 GOLDEN STATE BLVD STA 595+36.84,65,14'L N/A CD 599+00 600+00 601+00 602+00 J POLE PLACEMENT LOCATION Kz GOLDEN STATE BLVD STA 596+67.33,65.42'L N/A w LLJ F = Z POLE LOCATION DIRECTION K3 GOLDEN STATE BLVD STA 597+97.35,65.21'L N/A — —— —— ———————————— — a 11 GOLDENSTATEBLVD STA590+66.00,57.85'R N/A Ka GOLDEN STATE BLVD STA599+47.80,64.97'L N/A _ -—-—- y -—- —-—- -—L— —-�- T. —_— �_ Iz GOLDEN STATE BLVD STA 589+26.39,57.63'R N/A K5 GOLDEN STATE BLVD L N/A o -- -- -- -- --- —;T7 -- STA600+92.77,64.72'L X —— —— ® /W —— —1a 9ooc x)ac R/W �r.�,,,.,,,„�.�,�, c GOLDEN STATE BLVD STA 587+86.68,56,66'R N A K GOLDEN STATE BLVD -.. --- T N/A 3 / 6 STA 602+28.26,60.76'L - IQ GOLDEN STATE BLVD STA 586+47.12,57.11'R N/A L1 GOLDEN STATE BLVD STA 595+22.11,58.03'R N/A rn 0 0 1, GOLDEN STATE BLVD STA 585+07.54,57.42'R N/A Lz GOLDEN STATE BLVD STA 596+51.99,57.65'R N/A o USA KNOW WHAT'S BELOW 6 GOLDEN STATE BLVD STA 583+67.66,56.69'R N/A L 3 GOLDEN STATE BLVD STA 597+81.87,57.66'R N/A 17 GOLDEN STATE BLVD STA 582+27.84,56,43'R N/A La GOLDEN STATE BLVD STA 599+11.92,56.74'R N/A BEFORE YOU DIG, CALL p 40' 80' 11 GOLDEN STATE BLVD STA591+42.05,59.94'L N/A L5 GOLDEN STATE BLVD STA 600+41.48,58.56'R N/A 1 —800-227-2600 o SCALE: 1" = 40' m v DATE RECORD DRAWING JLB TRAFFIC ESS, PROJECT DEPARTMENT OF PUBLIC WORKS AND PLANNING��15 ct DESIGNED: J.BENAVIDES 08/04/2023 RESIDENT ENGINEER DATE DRAWN: C.AYALA-MAGANA 08/04/2023 No.0 sz GOLDEN STATE CORRIDOR-ECONOMIC DEVELOPMENT GOLDEN STAVE BLVD 516 W.SHAWAVE.,STE.103 ou 08/04/2023 * E.P:a, +�* AND INFRASTRUCTURE IMPROVEMENTS r ' a STREET LIGHTING N CHECKED: J.RIOS 08/04/2023 FRESNO,CA 93704 SUPERVISING ENGINEER DATE sr c,V ti PHONE:(559)57M991 Q FOR RIGHT OF WAY DATA AND ACCURATE ACCESS DETERMINATION,SEE DOCUMENTS IN THE DEPARTMENT OF PUBLIC WORKS AND PLANNING. CALL BEFORE YOU DIG EMAIL:info@j BV2HIC.wm FOWLER REGION DRAWING NO. E-7 SHEET NO. 116A TOTAL 143 x a Q i2_2_83 165' 135' 150' 150' 150' 15 1 0 = = e o 150' 150' f' R/W ° /W R/W R/W —3N° 3W G G { I i4 —a-3o-3 G c w w w w w 8TH ST 397 w C1395 b �1396, 8TH STREET w 9 s w In J W FO FO FO FO 0 F FO FO FO FO FO FO FO FO F0 FO Lv FO FO f0 FO 0 FO 0 FO FO FO FO FO FO FO FO 0 FO FO FO—Fo FO FO O M = FO FO FO FO FO FO F FO FO N _ — FO ——— F _ — FO — FO w 0 FO FO FO FO FO FO FO FO FO — 60 _ — 0 FO FO 0 rr O FG y� W — ——— — ————— ———— ————— ————— — —— X � � W - `4^ 2 v ... m cn 1 �— 2 1 1 1 1 --- 1 w o I 60' 150' 150' 150' 60' 30' 50' (n Cl = � { a W z 3Ld 603+00 604+00 605+00 606+00 607+00 608+00 609+00 610+00 611+00 612+0 613+00 614+00 z J Z 2 � J U ——— 2 Q 12 12 12 H a12 L' --- ----- ----- -- -- --- --_— -- --- --_- --- - -- r-- 12— R/W -- — 12 -- — — R/W ® 2 1 -- , 1 1 R/W 1 12I 1. � 1 II� GOLDEN STATE BL G Of IFo G G G FO G TO G L? L0 FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO I LW `b R w —_—T—__—T— POLE PLACEMENT LOCATION o T——— �� 20 POLE LOCATION DIRECTION 0 150' S0' 149' — b \ i — X IT M, GOLDEN STATE BLVD STA 618+75.92 59 52�{ N/A Qj G G c R. �<YY / w w ww W ---T_ /w \ J 7 M2 GOLDEN STATE BLVD STA 617+27.00,57.06'L N/A 1 V TH ST i1394: \ w w Gw / ro Fo F Fo F Fo T_,.: w ww SEE DETAIL D TO RIGHT w M GOLDEN STATE BLVD - N/A FOR POINT OF SERVICE 12 i CB 3 STA 615+77.16,65.31i L 2 0 / M GOLDEN STATE BLV { N/A F o 0 0 0 -- — —T----T—--- — -- A 19 21 4 STA614+2100,64.55'L FO _� FO FO FO FO FO 3 d -—- -—- ►h--� Fo o ro o o N o F. 1 ✓o o o' 22 / M5 GOLDEN STATE BLVD STA 612+7 8.4065 0{ N/A Q FO F FO ��iFQ, ——— Fo FO FO /.p 1 7 / — 12 6(E)—- - M6 GOLDEN STATE BLVD STA 611+28.35,62.57'L N/A v LLJW 1 1 1 ~ �J CB 22 - 6(E) ----_—__- o (n —— ___ M7 GOLDEN STATE BLVD STA 609+78.34,62.71'L N/A 150' 150 _15T —— / 25 A 620 + 78.62, 68.0T L c Mg GOLDEN STATE BLVD _... -_ N/A STA 608+28.30,57.12'L LLJo / 12 A w Z 61s+oo sls+oo 67 M9 GOLDEN STATE BLVD STA 606+7839,5 N/A r J 618+00 -� +00 23 6 60 STREET LIGHT CONNECTION — DETAIL D � ——— —� NO SCALE N1 GOLDEN STATE BLVD STA 617+13.98,59.64'R N/A CB NZ GOLDEN STATE BLVD STA615+63.41,57.97'R N/A \% N3 GOLDEN STATE BLVD STA 614+12.84,57.74'R N/A Q_ 0 1 R/W ® — —— ® R/W 1 19 F Fo FA-6H I fi?46 53 3'siZ / / N4 GOLDEN STATE BLVD STA 612+82.46,57.35'R N/A GOLDEN STATE BLVD OM / 24 G /^ R/W ® N5 GOLDEN STATE BLV STA611+22.13,57.57'R N/A D s 24 a oG SEE DETAIL E TO RIGHT rn FOR PULL BOX LOCATION ° Fo M 12 N6 GOLDEN STATE BLVD STA 609+62.32,57.63'R N/A F / 25 POLE PLACEMENT LOCATION N7 GOLDEN STATE BLVD STA 608+12.56,57.51'R N/A USA POLE LOCATION DIRECTION A) GOLDEN STATE BLVD STA 620+58.81,64.39'L N/A KNOW WHAT'S BELOW o 19 o K7 GOLDEN STATE BLVD STA 603+93.33,58.95'L N/A O GOLDEN STATE BLVD STA 618+71.06,48.55'R N/A BEFORE YOU DIG, T 95' CALL PULL BOX LOCATION— DETAIL E K8 GOLDEN STATE BLVD - - T N/A O GOLDEN STATE BLVD STA 618+20.79,75.19'R N/A 1 —800-227-2600 0 40 So' NO SCALE STA605+28.34,58.88'L o SCALE: 1" = 40' m v DATE RECORD DRAWING ■ SµDFES3,p,- PROJECT DEPARTMENT OF PUBLIC WORKS AND PLANNING ct ABTRAFFIC DESIGNED: J.BENAVIDES 08/11/2023 RESIDENT ENGINEER DATE , DRAWN: C.AYALA-MAGANA 08/11/2023 No.0 sz GOLDEN STATE CORRIDOR-ECONOMIC DEVELOPMENT c GOLDEN STAVE BLVD 516 W.SHAWAVE.,8TE.103 ou 08/11/2023 * B.P:a, +�* AND INFRASTRUCTURE IMPROVEMENTS r a STREET LIGHTING N CHECKED: J.RIOS 08/11/2023 FRESNO,CA 93704 SUPERVISING ENGINEER DATE sr c,v ti PHONE:(559)570-8991 ` 1 Q FOR RIGHT OF WAY DATA AND ACCURATE ACCESS DETERMINATION,SEE DOCUMENTS IN THE DEPARTMENT OF PUBLIC WORKS AND PLANNING. CALL BEFORE YOU DIG EMAIL:in}0@JLBlraf o.wm CK1 FOWLER REGION DRAWING NO. E-8 SHEET NO. 117A TOTAL 143 [YARB grading paving P.O.Box87 Fowler,CA. 93625 Phone(559)834-4818 Fax(559)834-4897 www.yarbsgradingandpaving.com License#964071 DIR#1000004120 August 8th, 2023 Owner: Fresno County Project: Golden State Boulevard Phase 1 Attn: Richard Stockwell Subject: CCO Request— 18" CM Richard, Here is our proposal to install 50 LF of 18" CMP. 1. Haydon Quote $ 11,597.68 2. Yarbs 10% Markup $ 1,159.77 TOTAL PROPOSAL $ 12,757.45 See attached breakdown of costs from Haydon Construction. Let me know if you have any questions. Jim Leppo Estimator H f� Construction f�IncGeneral Engineering Contractors i LB ydoiJ nsts uctjoJi Iii c P/pmg me Central Valley Since 1964 2019 N.Gateway Blvd.Suite#200 Union Member Contractor Fresno,Ca 93727 Local 3 r LaDomrs Local Z94 Office:(559)251-5522 CSLB#458977/Exp. 07/31/2024 Email:dkrepp@jlaydonconst.com SBA# 1162580 /DIR# 1000016950 Federal Tax ID#77-0032290 Cost Proposal Customer., Yarbs Grading&Paving Install 50 LF of 18"CMP Pipe/Install 25 LF on Each End of Existing CMP Contact: Jim Leppo/Laurie O'Brian Date: We will provide and cover the 18"Pipe Extensions with Base Rock as there Phone: 824-4818 8/7/23 is NO Excess Backfill Material to use to Cover the New Pipe Extensions at Email: the location. # Materials Quantity Unit Price Extra Work Contract Work 1 2 Core Main-18"CMP Pipe with Connection Band/20'Pipe Joints 60 $34 62 $2,077.20 3 Core Main-18"Connection Bands 2 $81 42 $162,84 4 Core Main-Freight 1 $400.00 $400.00 5 Vulcan-Base Rock Material for 18"CMP Pipe Backfill(Tons) 50 $21.00 $1,050.00 6 Materials Sub-Total $3,690.04 Fresno Co.Sales Tax @ 8.00% $295 20 Sub-Total Including Sales Tax $3,985.24 O&P/Mark Up @ 10% $398 52 Total Materials: $4,383.77 Equipment Hours Hourly Rate Extra Work Contract Work Foreman Truck 12 $45 00 $540.00 J0410D 12 $58 25 $699.00 4000 Gal Water Truck 4 $75 00 $300.00 Truck&End Dump Trailer(Haul Ag Base) 2 $105.00 $210.00 Equipment Sub-Total $1,749.00 O&P/Mark Up @ 10% $174 90 Total Equipment. $1,923.90 Labor(1Hr Each)to Assemble Hydrant Check Valve&Bury As. Hours Hourly Rate' Exba Work Contract Work Foreman 12 $116 00 $1,392 00 Operator-410 Backhoe 12 $102 65 $1,231 60 Operator-Truck&End Dump Trailer 2 $102.65 $205 30 Laborer 12 $82.50 $990.00 Laborer 12 $82 50 $990 00 Labor Sub-Total $4,809.10 Sub-Total Including Labor&Burdon $4,809.10 O&P/Mark Up @ 10% $480.91 'Hourly Rate includes union benefits such as Health Insurance&Pension Total Labor. $5,290.01 Extra Work Total: $11,597.68 Contract Work Total: Total Cost: $11,597.68 CORE : Bid Proposal for CMP PIPE HAYDON CONSTRUCTION Core&Main Job Location: kingsburg, CA 5364 S.Villa Ave Bid Date:08/07/2023 Fresno, CA 93725 Core&Main 3061052 Phone: 559-834-1040 Seq# Qty Description Units Price Ext Price DUE TO CURRENT SUPPLY CHAIN DISRUPTIONS, MATERIALS ARE SUBJECT TO PRICING AT TIME OF SHIPMENT. MATERIAL AVAILABILITY AND TIMELINESS OF SHIPMENTS CANNOT BE GUARANTEED.THIS TERM SUPERSEDES ALL OTHER CONTRACTUAL PROVISIONS. 10 60 18 16GA CMP GALV CORR PIPE 20' EA 34.62 2,077.20 20 2 18 GALV CMP DIMPLE BAND EA 81.42 162.84 30 1 FREIGHT EA 400.00 400.00 Sub Total 2,640.04 Tax 236.94 Total 2,876.98 UNLESS OTHERWISE SPECIFIED HEREIN,PRICES QUOTED ARE VALID IF ACCEPTED BY CUSTOMER AND PRODUCTS ARE RELEASED BY CUSTOMER FOR MANUFACTURE WITHIN THIRTY(30)CALENDAR DAYS FROM THE DATE OF THIS QUOTATION.CORE&MAIN LP RESERVES THE RIGHT TO INCREASE PRICES TO ADDRESS FACTORS,INCLUDING BUT NOT LIMITED TO,GOVERNMENT REGULATIONS, TARIFFS,TRANSPORTATION,FUEL AND RAW MATERIAL COSTS. DELIVERY WILL COMMENCE BASED UPON MANUFACTURER LEAD TIMES.ANY MATERIAL DELIVERIES DELAYED BEYOND MANUFACTURER LEAD TIMES MAY BE SUBJECT TO PRICE INCREASES AND/OR APPLICABLE STORAGE FEES.THIS BID PROPOSAL IS CONTINGENT UPON BUYER'S ACCEPTANCE OF SELLER'S TERMS AND CONDITIONS OF SALE,AS MODIFIED FROM TIME TO TIME,WHICH CAN BE FOUND AT: https://coreandmain.com/TandC/ 08/07/2023-3:44 PM Actual taxes may vary Page 2 of 2 CD cn o ° _ 31° �� _ < N O W Z D j pT< D r a 5 m � .•r � m 0 O m S 0)1n ° c ° ° rn m D aCm o ru CD N 10 w to o 7 0 t0 (D 10 0 C— Q A o° � Z V' 3�n O n 3 < 0) < o a C)° o O O C o m � z N o� m J m i ill N < N D N ry N ° 3. _ ° fn 2 W m �'lop -i C) N C1 d C) r A c Qc� C M C7 FF a c m CDm O O� pOm3 -i � � � m m m<o� v v, w z z z z z z r =N--. C)�2 N•17-1Tv+ _ z a�°— rOD v D000= CD m � � � o � � o m`mom OWE a Z��W� o N <Qv w A < n In FpN �XZ � ZZya0CD Z < _ _ co o g N w �L"0 >Mmm� Vi D D W Z iO Z1 n � < � < � < � v N z° ° � C � � Dx W owi�fDAN� D T N -n N -n N .;a c 2 00 D M rCAMMM Zcr m m m c Mr Z (nTcnn O c -4 m 0 m � ncnZO.. � 0 D o A r o 0 cn -4 ZZZ M o N °m Cl) W D 0 x � D D D Z z _ co < O � m m m Z C) o m o m o <m Cn 0 Z Q O �� 3 C = w ' co ' m D o D o 3 D 1 m m (D 0 a W. � � � � � � � _ z < —v T ° T ° T ° C) 0 DEN m " CDs m 'c o z 32 < 0 0) Q.m m m c hco > Q° w � r 000 — rn , co O y '-I N vDi ni O O W O 01 O W O <.rn m o�i o�i Z m o 0 0 0 o M Q5D n = _ _ Z M _ a �° � =T, on 9A (7 CD M v M —3D 0 03 D (o m o o a) �0 o- r c 0 oF— i o Q � � y �3 < Z a A� Dim aoN 00 v0O _ _ t° z � ' lG O 0 mm co m C) A v Cn c° �I W 0 n co cT O o D L71N m Pi N { Cn ? � 19 O �.ri CL Um N A w Ao -n G) O,. CT m C: Ef) M C)w w m c O m r =-40N� on C) �< cn m n V D < �_ y cn O O O Z M m n y CO G K O N r X m V m (D o 0 0o O O cif 3 n N _ CA N r O� W v m O 0 A cn � y . < m O O O O am CD C) D D D a = r r r — O T o " m -1 0 _O O O o M 0 X 0 n n O r r r co �, _� m m m m D 0 z m a D C � ° D O x 0 z O O m O o m O _ _ _ o (n o 0 0 2 O O A D O ` O Q1 W UI A N °E�j ,< cn c00 QI W v CA c0 c0 0 o 0 o n <� = N V c0 N w m o = O tTl O 01 N 0 CD m N• W W N c!1 >_ °cn � N 67 0 p CD N Q) O l< Z �C�i Q V C A Z �(D CDw 0 cW.� c m 5' cJl