HomeMy WebLinkAbout2207C CCO 01.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER WEST PARK PEDESTRIAN PATHWAY CHANGE ORDER NO. 1 GROVE AVENUE FROM PROSPECT TO VALENTINE AVENUES AND SEPTEMBER 1, 2023 VALENTINE AVENUE FROM GROVE AVENUE TO WEST PARK PAGE 1 OF 5 SCHOOL CROSSING FEDERAL PROJECT NUMBER: ATPSB1L-5942(301) CONTRACT NO. 22-07-C TO: BUSH ENGINEERING, INC.: Make the following changes to the plans and specifications or do work not included in the plans and specifications for this contract. Because of the change(s), ZERO (0) -WORKING DAYS will be added to the contract time. PART I: REVISE PATHWAY PROFILE GRADES ALONG VALENTINE AVENUE — EXTRA WORK This change was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work" of the Standard Specifications, revise pathway profile grades along Valentine Avenue between sta. 7+20 and sta. 9+80. This change requires placing, grading, and compacting approximately 25 CY for fill to raise to profile grades as shown on the revised Plan Sheet L1. Use native surplus materials for this work. Perform all working according to Section 19, "Earthwork," of the Standard Specifications and Special Provisions. Compensation for this work will be made as extra work at force account according to Section 9-1.03, "Payment Scope," of the Special Provisions. Total compensation for this work resulted in $2,342.51, this amount will be paid as extra work. This extra work did not impact the critical path for the project, therefore, granting additional contract time was not warranted. TOTAL COST PART I: A $2,342.51 INCREASE TOTAL TIME EXTENSION PART I: ZERO (0) -WORKING DAYS PART II: INSTALL TRUNCATED DOME PANELS OVER CONCRETE FOOTING — EXTRA WORK This change was requested by the engineer. According to Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, install truncated domes over a 6-inch concrete slab in lieu of the asphalt pavement at various locations shown on the plans. Perform all work according to the various sections of the Standard Specifications and Special Provisions. Compensation for this work will be made as extra work at force account according to Section 9-1.03, "Payment Scope," of the Special Provisions. Total compensation for this work resulted in $15,008.67, this amount will be paid as extra work. This extra work did not impact the critical path for the project, therefore, granting additional contract time was not warranted. TOTAL COST PART II: A $15,008.67 INCREASE TOTAL TIME EXTENSION PART II: ZERO (0) -WORKING DAYS Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree, if Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business office noted above, and perform all services necessary for the work above specified,and will accept as full payment _Board of Supervisors _Const.management therefore the prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER WEST PARK PEDESTRIAN PATHWAY CHANGE ORDER NO. 1 GROVE AVENUE FROM PROSPECT TO VALENTINE AVENUES AND SEPTEMBER 1, 2023 VALENTINE AVENUE FROM GROVE AVENUE TO WEST PARK PAGE 2 OF 5 SCHOOL CROSSING FEDERAL PROJECT NUMBER: ATPSB1L-5942(301) CONTRACT NO. 22-07-C PART III: PLACE 6-INCH CLASS 2 AGGREGATE BASE LAYER AT ADDITIONAL LOCATIONS— EXTRA WORK This change was requested by the engineer. According to Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, furnish and place 6- inch Class 2 Aggregate Base layer (approximately 10 CY) at the intersection of Annadale and Valentine Avenues and driveway approaches along Valentine Avenue at sta. 13+44 and sta. 22+22. Perform all work according to Section 26, "Aggregate Bases," of the Standard Specifications. Compensation for this work will be made at the unit bid price for Bid Item No. 13, Class 2 Aggregate Base (F) according to Section 9-1.03, "Payment Scope," of the Special Provisions, resulted in an increase of$3,800. Increased Items: Item Total TOTAL No. Description Unit Quantity Price Amount (0/0) °\/0) 13 Class 2 Aggregate Base (F) CY 10.00 $380.00 $3,800.00 76.92 76.92 This change did not impact the critical path for the project, therefore, granting additional contract time was not warranted. TOTAL COST PART III: A $3,800 INCREASE TOTAL TIME EXTENSION PART III: ZERO (0) -WORKING DAYS PART IV: INSTALL 8-INCH STEEL PIPE, CONSTRUCT ADDITIONAL HMA DIKE, AND EXCAVATE/GRADE DRAINAGE DITCHES— EXTRA WROK This change was requested by the engineer. According to Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, install approximately 26 LF of 8-inch metal pipe, install approximately 5.5 LF of hot mix asphalt (HMA) dike, and excavate/grade approximately 150 LF of a drainage ditch between sta. 20+21 and sta. 21+71, along the northside of North Avenue as shown on the attached Plan Sheet C-3. Also grade/excavate approximately 640 LF of a drainage ditch between sta. 10+10 and sta. 16+50 along the west side of Valentine Avenue, as shown on the attached Plan Sheets C-3, L1, and L2. Perform all work according to the various sections of the Standard Specifications and Special Provisions. Compensation for this work will be made as extra work at force account according to Section 9-1.03, "Payment Scope," of the Special Provisions. Total compensation for this work resulted in $22,283.87, this amount will be paid as extra work. This change did not impact the critical path for the project, therefore, granting additional contract time was not warranted. Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree, if Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business Office noted above,and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER WEST PARK PEDESTRIAN PATHWAY CHANGE ORDER NO. 1 GROVE AVENUE FROM PROSPECT TO VALENTINE AVENUES AND SEPTEMBER 1, 2023 VALENTINE AVENUE FROM GROVE AVENUE TO WEST PARK PAGE 3 OF 5 SCHOOL CROSSING FEDERAL PROJECT NUMBER: ATPSB1L-5942(301) CONTRACT NO. 22-07-C TOTAL COST PART IV: A $22,283.87 INCREASE TOTAL TIME EXTENSION PART IV: ZERO (0) -WORKING DAYS PART V: ADJUST COMPENSATION FOR THE CALIFORNIA STATEWIDE CRUDE OIL PRICE INDEX FLUCTUATION This compensation adjustment was requested by the engineer. Adjust compensate per the methods established in the Standard Specifications and Special Provisions Section 9-1.07 for fluctuations greater than or less than five percent in the California Statewide Crude Oil Price Index for the month the material was placed, when compared to the index published for the month of the bid opening. The California Statewide Crude Oil Price Index for the bid opening month, October 2022, was 497.40. The index was 446.1 in May 2023, which applies to the Pay Estimate No. 5 for the quantity of asphalt in the HMA. The asphalt content in the1/2-inch HMA mix from the Calaveras Materials, Inc. plant was 5.07 percent. The percent was reduced to 4.29 percent to account for the 15 percent reclaimed asphalt pavement (RAP). The adjustment applies to 582 tons of 1/2-inch HMA placed in May 2023. The asphalt content in the 3/8-inch HMA dike mix from Vulcan-Ashlan plant was 6.40 percent. The adjustment applies to 11.96 tons of 3/8-inch HMA placed in May 2023. The total adjustment compensation for price index fluctuation is being made at an agreed price in accordance with Section 9-1.03, "Payment Scope" of the Special Provisions, resulting in a decrease of $736.17. This amount will be deducted from the monies due to the contractor. This change did not impact the critical path for the project, so additional contract time was not warranted. TOTAL COST PART V: A $736.17 DECREASE TOTAL TIME EXTENSION PART V: ZERO (0) -WORKING DAYS PART VI: INCREASE/DECREASE/ELIMINATE ITEMS AT UNIT PRICES Item quantities in the Bid Book and subsequent change orders are estimates only. This part adjusts item quantities to the actual quantities used. Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree, if Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be _Business Office noted above,and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER WEST PARK PEDESTRIAN PATHWAY CHANGE ORDER NO. 1 GROVE AVENUE FROM PROSPECT TO VALENTINE AVENUES AND SEPTEMBER 1, 2023 VALENTINE AVENUE FROM GROVE AVENUE TO WEST PARK PAGE 4 OF 5 SCHOOL CROSSING FEDERAL PROJECT NUMBER: ATPSB1L-5942(301) CONTRACT NO. 22-07-C Increased Items: Item Total TOTAL No. Description Unit Quantity Price Amount (0/� o� 7 SWRCB Notice of Intent Filing $ 152.00 $ 1.00 $ 152.00 30.40 30.40 Fee 14 Hot Mix Asphalt (Type A) (1/2" TON 74.82 143.00 10,699.26 12.86 12.86 Grading) 15 Place Hot Mix Asphalt Dike LF 13.00 49.00 637.00 6.47 6.47 (Type D) 16 Place Hot Mix Asphalt SQYD 149.00 46.00 6,854.00 141.90 141.90 (Miscellaneous Area) 24 Thermoplastic Crosswalk and SQYD 51.00 8.00 408.00 6.88 6.88 Pavement Marking 26 Paint Dike (2-Coat) LF 13.00 3.00 39.00 6.47 6.47 TOTAL INCREASE: $18,789.26 Decreased Items: Item Total TOTAL No. Description Unit Quantity Price Amount ) 23 Roadside Sign -One Post EA 3.0 $ 398.00 $ 1,194.00 17.65 17.65 TOTAL DECREASE: $1,194.00 Eliminated Items: Item Total TOTAL No. Description Unit Quantity Price Amount C/o) 2 Supplemental Work(Payment $ 15,000.00 $ 1.00 $ 15,000.00 100.00 100.00 Adjustments for Price Index Fluctuations) 17 Detectable Warning Surface SQFT 175.00 40.00 $7,000.00 100.00 100.00 TOTAL DECREASE: $22,000.00 This change did not impact the critical path for the project, so granting additional contract time was not warranted. Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree, if Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business office noted above, and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors _Const.management therefore the prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER WEST PARK PEDESTRIAN PATHWAY CHANGE ORDER NO. 1 GROVE AVENUE FROM PROSPECT TO VALENTINE AVENUES AND SEPTEMBER 1, 2023 VALENTINE AVENUE FROM GROVE AVENUE TO WEST PARK PAGE 5 OF 5 SCHOOL CROSSING FEDERAL PROJECT NUMBER: ATPSB1L-5942(301) CONTRACT NO. 22-07-C TOTAL COST PART VI: A $4,404.74 DECREASE TOTAL TIME EXTENSION PART VI: ZERO (0) -WORKING DAYS NET COST THIS CHANGE ORDER: A$38,294.14 INCREASE NET TIME EXTENSION THIS CHANGE ORDER: ZERO (0) -WORKING DAYS Jason Ahumada, Resident Engineer APPROVAL RECOMMENDED: BUSH.ENGINEERING. INC. Contractor Mandeep S. Sekhon, PE Construction Engineer B '� �UV���A(J0. APPROVED BY: Digitally signed by Steve White �r ems- rn� Steve White Date:2023.09.0714:30:32 Title t G,/ -0700' Steven E. White, Director Public Works and Planning Accepted Date: �— Date: Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,if _Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be _Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment Board of supervisors therefore the prices shown above. _Const.Management RE/Arch. _Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. NOTES: EXIST CURB AND GUTTER 1. ALL WORK CONSTRUCTED SHALL BE COMPLETED IN COMPLIANCE WITH CURRENT ADA STANDARDS. HMA DIKE (TYPE A) 2. THE WALKWAY SHALL PROVIDE A CONTINUOUS AND UNOBSTRUCTED PATH-OF-TRAVEL FOR PEDESTRIANS WITH 8" STEEL PIPE DISABILITIES IN ACCORDANCE WITH CURRENT ADA STANDARDS. EXIST FENCE 3 MAINTAIN A MINIMUM 36"WALKWAY CLEAR WIDTH AROUND OBSTRUCTIONS. INV ELEV = 256.15 4. UTILITY BOXES AND LIDS MUST MAINTAIN LESS THAN 1/4'" a VERTICAL CHANGE WITHIN ACCESSIBLE WALKWAY. DITCH FIT Var HP 4,00' EEPT - 5. NATIVE SOIL TO BE COMPACTED TO 95%WITHIN 3 FEET OF 3.55' TO 7.13' ALL NEW PAVEMENT.NATIVE SOIL OUTSIDE 3 FEET TO BE a COMPACTED 90%. OG TT 6. CONTRACTOR TO VERIFY LOCATION OF ALL UTILITIES T BEFORE PERFORMING WORK. 5.009 __ __ ____ zoo' �o.so'I 1.00' I 1.00' I_ 1.00' _ q;1 ro EXIST FL ELEV = 256.37 FG 1 00' SECTION A-A DETAIL A-6 NO SCALE SCALE: 1"=1' W N a z "N" 21+84.63 27.95' L LZLI INV Elev 256.15 J x256 491 _ EXIST FFW 8" STEEL PIPE EXIST TBW EXIST CURB & GUTTER PROTECT EXIST WATER VALVE IN PLACE "N" 21+84.98 28.88' L Elev 256.90 "N" 21+59.17 23.52' L END HMA DIKE (TYPE A) 0 PROTECT EXIST UTILITY POLE IN PLACE INV Elev 256.11 57 57 ofij56 23 CONFORM TO EXIST "N" 20+43 03 22.77' L "N" 21+87.11 28. 5' L, CNL FL Elev 256 00 Elev 256.57 "N" 20+21.36 22.81' L EXIST FENCE CONFORM TO EXIS BEGIN CONFORM TO EXIST DITCH FL CUT FILL c� .904 x 257 172 257 402 DITCH FL (H CNL \I HMA DIKE (TYPE A) x 257.265 r - 0 0 0 x2577510 G<25Z530 0 x257. 0 2 ��4 . 0 "N" 21+84.91 .53�4@,5 CNL _ x 7. 1 Elev 256.87 --y 0 CONFORM TO E IST(n x2569085 � �57. x 257 252 x 257126 x 257 356 T 256.966 21+83.04 23.74' "N" 21+5917 22.52' L x25 .3 Elev 256.89 z5�-2Ta^ 2 11 .506 �' x 57 3 7 BEGIN HMA DIKE (TYPE A) CONFORM TO EXIST x 257 496 x 257.583 HP "N" 21+71.36 22.49' L EXIST EP <257674 A FL Elev 256.99 PROTECT EXIST UNDERGROUND TELEPHONE °N"LINE N 89'59'21" END DITCH FL 20+00 21+00 22t00 22+44 „ ,, -I -I 2 _ 243.88'-,, -I �x T.$38 -I x257.792 NORTH AVENUE N4, Sec,25 T.14 R.19 Fd. FCBCM DN.6" DETAIL A-5 SCALE: 1"=10' DATE RECORD DRAWING SCALE Ess/ PROJECT �, co DEPARTMENT OF PUBLIC WORKS AND PLANNING DESIGNED: S VANG 12/20/2021 RESIDENT ENGINEER DATE H DRAWN: M.MORILLAS 12/20/2021 Dewberry drake gan dk I No. 709 WEST PARK SIDEWALK PROJECT CONSTRUCTION DETAILS CHECKED: G.GROSS 12/20/2021 NO SCALE K Exp.6/30/23 m'54 � FOR RIGHT OF WAY DATA AND ACCURATE ACCESS DETERMINATION,SEE DOCUMENTS IN THE DEPARTMENT OF PUBLIC WORKS AND PLANNING lF�YGAV � ROAD NO. BRIDGE NO. FRFis� DRAWING NO. 11313 SHEET NO. C-3 TOTAL 35 NOTES: 1. UTILITIES SHOWN ARE APPROXIMATE. "VP" 7+41.49 14.1 4' L, EP 'VP" 7+52 14 14.05' L, P Elev 258.00 Elev 258.04 2. ALL STATION/OFFSETCALLOUTS ARE TO WEST PARK ELEMENTARY SCHOOL 4�_ THE FEW OF WALKWAY UNLESS OTHERWISE 'VP" 7+40 99 12.00' L VP" 7+54.64 12.00' L NOTED. Elev 258.50 Elev 257 96 END HMA DIKE TRANSITION 3. FOR DETAILS NOT SHOWN REFER TO END HMA DIKE TRANSITIO 'VP" 9+96.56 250' L PROTECT EXISTING CONSTRUCTION DETAIL SHEETS. END HMA DIKE (TYPE D) HMA DIKE (TYPE D) El- 258.34 UTILITY POLE 4. CONTRACTOR TO PROTECT ALL UTILITY "VP" 7+38.99 12 00' L 2 00% (TYPE A)CT DRIVEWAY POLES AND ANCHORS IN PLACE. Elev 258.46 EXIST R/W 5. DETECTABLE WARNING SURFACE SHALL TRANSITION EXTEND THE FULL WIDTH AND T DEPTH OF _ "VP" 7+70 4 .00' L THE LANDING PER CALTRANS STANDARD ucarF"= uc R/W R/W R/W PLAN A88A. - 2.00% BEGIN HMA DIK TRANSITION OHT -------- -------- OHT ------_- 6. CONTRACTOR TO PROTECT ALL EXISTING CNL "VP" 7+7316 1 .88' L, CNL 9+8000 250' L ---- ---- PROPERTY OWNER IMPROVEMENTS Elev 258.22 INCLUDING BUT NOT LIMITED TO,FENCES, 'VP" 7+20.49 1 6T 7' L, CNL Elev 258 13 HP MAILBOXES,ETC. CONFORM TO EXIT END WALKWAY CROSS Elev 257.98 CUT/FILL FFW SLOPE TRANSITION CONFORM TO EXIST VP" 7+73.14 13.88' L, EP EXIST EP VALENTINE AVE 7. CONTRACTOR TO MATCH AND CONFORM TO :___7 Elev 9958.09 'VP" 9+70.00 2.50' L "VP" 10+99.28 250' L S S i S S S _ Elev 258.15 EXISTING DRIVEWAYS. o Elev 258.21 r 8. CONSTRUCT HMA DIKE(TYPE D)PER _-_-_-_-_ 0.38% _ M °J EXIST EP CONSTRUCT DRIVEWAY (TYPE A) _ BEGIN WALKWAY CROSS o, -- - ---- _ _ ___ SLOPE TRANSITION CALTRANS STANDARD PLANS.PLACE 2"OF + f - - -- ----- - - ----- ----- - ------- MISC.HMA BELOW DIKE. T� a. � ��� - -LINEG.r DITCH FL- _ G G ALENTIN G -V----------- ATH 9 COMPLETED ALL WORK ON COMPLIANCE WITH CURRENT NSTRUCTED SHALL BE S E51lla + OHE o G G G 9i f 0_.47. f - ADA STANDARDS. -- ----------------- - --------� ---- 10. THE WALKWAY SHALL PROVIDE A Elev 257.90 "VP" 7+72 64 12 00' L 9+70.00 PI ��iv 20.00 I CONTINUOUS AND UNOBSTRUCTED BEGIN HMA DIKE (TYPE D) Elev 258 06 TBW PATH-OF-TRAVEL FOR PEDESTRIANS WITH EXIST R/W BEGIN HMA DIKE TRANSITION END HMA DIKE TRANSITION HP m DISABILITIES IN ACCORDANCE TO CURRENT "VP" 7+22.99 12.00' L END HMA DIKE (TYPE D) CUT/FILL N 5'12'57" W ADA STANDARDS. Elev 258.40 "VP" 7+73.1 4 2.50' L 10.05 9+80.05 PI J 11. MAINTAIN A MINIMUM 36"WALKWAY CLEAR END HMA DIKE TRANSITION Elev 257.89 WIDTH AROUND OBSTRUCTIONS. "VP" 7+20 49 0 00 BEGIN HP Lu Z_ 12. UTILITY BOXES AND LIDS MUST MAINTAIN Elev 257.69 "VP" 7+73.14 2.50' R, TBW n 0 J LESS THAN 1/W DIKE VERTICAL CHANGE WITHIN BEGIN CONSTRUCTION HMA DI 2 ACCESSIBLE WALKWAY. BEGIN HMA WALKWAY (TYPE D) ElevBEG 2 57.80 HP BEGIN HP � "VP" 7+20.49 2.50' R, TBW Q Elev 257.65 "VP" 7+52 64 12 00' L PLAN BEGIN HP Elev 258 00 CONFORM TO EXIST BEGIN HMA DIKE (TYPE D) p LEGEND "VP" 7+41.48 2.50' R, TBW BEGIN HMA DIKE TRANSITION + Elev 257.71 "VP" 7+52.14 2.50' R, TBW DETECTABLE WARNING SURFACE Elev 257.75 Q V) 275 275 270 270 265 265 D N M N O oo OWN ON ON rN u)N O ON NN ON N N l0> > > > +W PIS }W +W +W +LJ +W } +- + +W 260 260 +0.08% +0.61% .84% +0.67. -2.307 - 2.21. +0. 3% -2.527 255 255 OG 250 250 7+00 7+50 8+00 8+50 9+00 9+50 10+00 10+50 11+00 11+50 PROFILE DATE RECORD DRAWING SCALE Q�QRo�Lss/ PROJECT �, coU DEPARTMENT OF PUBLIC WORKS AND PLANNING DESIGNED: S.VANG 12/20/2021 RESIDENT ENGINEER DATE 4 PLAN AND PROFILE No 70950 WEST PARK SIDEWALK PROJECT DRAWN: M.MORILLAS 12/20/2021 HORIZ 0 10, 20' j Dewberry drake aglan Ex .6/30/23 CHECKED: G.GROSS ,vzo/zoz, VERT 0 2.5' 5' PcIVIL n�g�o VALENTINE AVE STA 7+00.00 TO STA 11+50.00 FOR RIGHT OF WAY DATA AND ACCURATE ACCESS DETERMINATION,SEE DOCUMENTS IN THE DEPARTMENT OF PUBLIC WORKS AND PLANNING TF OF CP, ROAD NO. BRIDGE NO. FR DRAWING NO. 11313 SHEET NO. L-1 TOTAL 35 PROTECT EXISTING UTILITY POLE PROTECT EXISTING UTILITY POLE PROTECT EXISTING PROTECT IN PLACE CUT/FILL N UTILITY POLE EXIST R/W MAILBOXES � o R/W R/W R/W R/W R/W R/W R/W R/W R/W ++T- --- 0H --------bFfl`---- - _ OFtT----- 9I+F -OHS -- - - - ------p�---- - -------- -----— ----------------- C "VP" 12+01.01 2.50' L - EL M Elev 258.01 "VP" 13+16.11 2.50' L m - o_ a a a CONSTRUCT DRIVEWAY (TYPE A) p VALENTINE AVE DITCH FL co EXIST EP i. u1 a 1 Elev 258.21 a N - m m . CONSTRUCT DRIVEWAY o n a P vco a vmi + (TYPE B) n CUT/FILL HP + EXIST EP + + o N 11 FFW - �o li- —� — — — 6 — — — — — — — — — c — —_ c c ------------- - c He c _ G — — — — — — — — — — — — — — — _ — — — — — — — — — — — ----- RW W - ----R/W------ ----R/W----------- -----------RTW-------_- 777-- J TBW 14+99.98 PI '2 N 1.38'05" E `J1, HP 25.00' a LLJ z rn N 11.4817• E 13+54.78 PI CUT/FILL EXIST R/W 10204817" E Z J 10.20' J 2 H Q CD o PLAN V) 275 275 270 270 265 ,� lo n 265 o o Q m o 's N +W + +W + +W +W +W W OG 260 260 1.66 +027% -1 99% + .16% +1.95% +0.40% -2.30 +018% PG 255 255 250 250 11+- 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 PROFILE DATE RECORD DRAWING SCALE Q�QROFEssi PROJECT �, coU DEPARTMENT OF PUBLIC WORKS AND PLANNING DESIGNED: S.VANG 1212012021 RESIDENT ENGINEER DATE � `I, �°C' PLAN AND PROFILE DRAWN: M.MORILLAS 12/20/2021 HORIZ 0 10, 21' ;, Dewberrydrake a Ian No 70950 WEST PARK SIDEWALK PROJECT ra g Exp.6/30/23 n gal VALENTINE AVE STA 11+50.00 TO STA 16+50.00 CHECKED: G.GROSS 1 2/2 012 0 21 VERT 0 2.5' 5' CIVIL 3 Off' tiO FOR RIGHT OF WAY DATA AND ACCURATE ACCESS DETERMINATION,SEE DOCUMENTS IN THE DEPARTMENT OF PUBLIC WORKS AND PLANNING TF OF \11' ROAD NO. BRIDGE NO. FRFis DRAWING NO. 11313 SHEET NO. L-2 TOTAL 35