Loading...
HomeMy WebLinkAbout2205C CCO 02.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER DRY CREEK BRIDGE REPLACEMENT ON CHANGE ORDER NO. 2 BURROUGH VALLEY ROAD, BURROUGH VALLEY ROAD, SEPTEMBER 1, 2023 JUST EAST OF TOLLHOUSE ROAD PAGE 1 OF 3 FEDERAL PROJECT NUMBER: BRLS-5942(245) CONTRACT NO. 22-05-C TO: AGEE CONSTRUCTION CORPORATION: Make the following changes to the plans and specifications or do work not included in the plans and specifications for this contract. Because of the change(s), 19 -WORKING DAYS will be added to the contract time for the First Order of Work is December 22, 2023. PART I: INCREASE /DECREASE / ELIMINATE ITEMS AT UNIT PRICES: This change was requested by the contractor. Item quantities in the Bid Book and subsequent change orders are estimates only. This part adjusts item quantities to the actual quantities used. Increased Items: Item Total Total No. Description Unit Quantity Price Amount (0/0) °� 45 30" Cast-In-Drilled-Hole Concrete LF 5.00 $1,215.00 $6,075.00 15.63 15.63 Piling (Rock Socket) TOTAL INCREASE: $6,075 Decreased Items: Item Total Total No. Description Unit Quantity Price Amount °(/o 43 30" Cast-In-Drilled-Hole Concrete LF 5.00 $667.00 $3,335.00 11.36 11.36 Piling TOTAL DECREASE: $3,335 Eliminated Items: Item Total Total No. Description Unit Quantity Unit Price Amount °�/0) °l/VI 76 Cable Railing LF 98.00 $40.00 $3,920.00 100.00 100.00 Since you did not incur any costs associated with these items, no payment will be made for these bid items. _Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be _Business Office noted above,and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors _Const.management therefore the prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER DRY CREEK BRIDGE REPLACEMENT ON CHANGE ORDER NO. 2 BURROUGH VALLEY ROAD, BURROUGH VALLEY ROAD, SEPTEMBER 1, 2023 JUST EAST OF TOLLHOUSE ROAD PAGE 2 OF 3 FEDERAL PROJECT NUMBER: BRLS-5942(245) CONTRACT NO. 22-05-C This work did not impact the critical path for the project, therefore, granting additional contract time was not warranted. TOTAL DECREASE: $3,920 TOTAL COST PART I: $1,180.00 DECREASE TOTAL TIME EXTENSION PART I: ZERO (0) -WORKING DAYS PART II: GRANT A TIME EXTENSION: This time extension was requested by the contractor. Grant a time extension of 19 -working days to the "First Order of Work" due to suspension of project to assess environmental concerns relating to active bird nests and a sighted western pond turtle within the vicinity of the project limits. The time extensions shall apply according to Section 8-1.07B of the Special Provisions. TOTAL COST PART II: $0.00 (NO COST) TOTAL TIME EXTENSION PART II: 19 -WORKING DAYS _Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree, if Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. _Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER DRY CREEK BRIDGE REPLACEMENT ON CHANGE ORDER NO. 2 BURROUGH VALLEY ROAD, BURROUGH VALLEY ROAD, SEPTEMBER 1, 2023 JUST EAST OF TOLLHOUSE ROAD PAGE 3 OF 3 FEDERAL PROJECT NUMBER: BRLS-5942(245) CONTRACT NO. 22-05-C NET COST THIS CHANGE ORDER: A $1,180 DECREASE NET TIME EXTENSION THIS CHANGE ORDER: 19 -WORKING DAYS James Drews, Resident Engineer APPROVAL RECOMMENDED: AGEE CONSTRUCTION CORPORATION Contractor Mandeep S. Sekhon, PE Construction Engineer By � �• -- APPROVED BY: Digitally signed by Steve White Title Chief Estimator Steve White ate:2023.09.0711:53:51 Steven E. White, Director Accepted Date: Sep 5, 2023 Public Works and Planning Date: _Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree, if Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business Office noted above, and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified.