Loading...
HomeMy WebLinkAboutAgreement A-15-094 with Willdan Engineering, Inc..pdf1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 AGREEMENT NO.15-094 AGREEMENT THIS AGREEMENT is made and entered intothis JOth day of March ,2015,byand between the COUNTY OF FRESNO,a Politicai Subdivision of the State of California,hereinafter referred to as "COUNTY",and WilldanEngineering, Inc.whose address is 2014 Tulare Street, Suite 515,Fresno,CA 93721,hereinafter referred to as "CONTRACTOR". WITNESSETH: WHEREAS,the COUNTY has issued a Request for Proposal (RFP),attached hereto and incorporated herein by reference as Exhibit "A"forBuilding Plan Checking and Inspection Services;and WHEREAS,the CONTRACTOR submitted a Response to the RFP attached hereto as Exhibit "B"and incorporated by this reference;and WHEREAS,the COUNTY has evaluated the Contractor's response to RFP and has determined that the Contractor is qualified and capable of performing the work specified in RFP. NOW,THEREFORE,the parties agree as follows: 1.OBLIGATIONS OF THE CONTRACTOR A.The CONTRACTOR shall provide Residential and Non-Residential Plan Checking Services and Inspection Services work on an as needed basis to reduce or eliminate delays, pursuant to work as assigned by COUNTY.Services shall consist of the review of plans and documents and inspection of construction for compliance with the California Code of Regulations, Title24,County of Fresno Ordinance Code Title 15 (California Building, Fire, Mechanical, Plumbing,and Electrical Codes,et.al.),Disabled Access Requirements,and related workforthe Department of Public Works and Planning,Development Services Division.These Services are to be provided only when requested by the COUNTY. B.The CONTRACTOR agrees to perform the above Services as stated in the Request for Proposal (Exhibit "A")and CONSULTANT response to the RFP (Exhibit "B"). -1- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 2 OBLIGATIONS OF THE COUNTY A.The COUNTY will be represented underthetermsofthe Agreement by its Chief Building Inspector. B.COUNTY shall,to the extent reasonable and practical,assist and cooperate with CONTRACTOR in the performance of the CONTRACTOR'S services described in this Agreement.Such cooperation and assistance shall include,but not necessarily be limited to:(i) providing one set ofplansand documents tothe CONTRACTOR atthe COUNTY Office;(ii) obtaining from the applicant,thenecessary items to allow plan checking tobe completed expeditiously,such as completeplans,calculations and name and telephone number of applicant; (iii)conducting zoning review with a list of zoning andother related information tobe incorporated into the Plan Checking Letter to applicant;(iv)providing CONTRACTOR copiesof COUNTY Ordinances that modify the standard regulations of review;(v)collect Plan Checking Fee from applicant;and (vi)provide applicant with plans,Correction Letter or modification of approval. 3.TERM This Agreement shall become effectiveon the 10th day of March,2015 and shallterminate on the 9th day of March,2016 unless extended in writing bythe Director ofthe Department of Public Works and Planning orhis/herdesignee.In noevent shallthe termofthis Agreement including extensions,exceed three years from the date of execution. 4-TERMINATION A Non-Allocation of Funds - The terms ofthis Agreement, and the services to be provided thereunder, are contingenton the approvaloffunds bythe appropriating government agency. Should sufficient funds not be allocated, the services provided may be modified,orthis Agreementterminated,at any timeby giving the CONTRACTOR thirty (30)days advance written notice. B.Breach of Contract - The COUNTY may immediately suspend or terminate this Agreement in whole or in part,where in the determination of the COUNTY there is: 1)An illegal or improper use of funds; 2) Afailure to comply withany term of this Agreement; 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 3) A substantially incorrect or incomplete report submitted to the COUNTY; 4)Improperly performed service. In no event shall any payment by the COUNTY constitute a waiver by the COUNTY of any breach of this Agreement or any default which may then exist on the part of the CONTRACTOR.Neither shall such payment impair or prejudice any remedy available to the COUNTY with respect to the breach or default.The COUNTY shall have the right to demand of the CONTRACTOR the repayment to the COUNTY of any funds disbursed to the CONTRACTOR under this Agreement,which in the judgment of the COUNTY were not expended in accordance with the terms of this Agreement.The CONTRACTOR shall promptly refund any such funds upon demand. C.Without Cause -Under circumstances other than those set forth above,this Agreement may be terminated by COUNTYupon the giving of thirty(30)days advance written notice of an intention to terminate to CONTRACTOR. 5.COMPENSATION/INVOICING COUNTY agrees to pay CONTRACTOR and CONTRACTOR agrees to receive compensation as described in Exhibit "C".For requested Plan Checking services, CONTRACTOR shall be paid a fee or percentage of the Plan Review Fee collected by COUNTY fromthe applicant as described in Exhibit "C".The amount of any such Plan Review Fee is determined by COUNTY according to Section 2502 ofthe County of Fresno Master Schedule of Fees,Charges,and Recovered Costs as outlined in Exhibit "D".CONTRACTORshall submit monthly invoices as agreed to between COUNTYand CONTRACTOR. Inno event shall services performed under this Agreement be in excess of $100,000.00 per year fromthe execution ofthis agreement.COUNTY'S compensation of CONTRACTOR will be based entirely on plan check and building inspection activity level and assignment by COUNTY to CONTRACTOR.CONTRACTOR is not entitled to a minimum amount of compensation under this Agreement.It is understood that all expenses incidental to CONTRACTOR'S performanceof services under this Agreement shall be borne by CONTRACTOR.Upon receipt of a proper -3- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 invoice,the COUNTY Department of Public Works and Planning will take a maximum often (10) working days to review,approve,and submit it tothe COUNTY Auditor-Controller/Treasurer-Tax Collector. Payment will be issued to CONSULTANT within forty-five (45)calendar days of the date the Auditor-Controller/Treasurer-Tax Collector receives the approved invoice. 6 INDEPENDENT CONTRACTOR In performance ofthe work,duties and obligations assumed by CONTRACTOR under this Agreement,it is mutually understood and agreed that CONTRACTOR,including any and all of the CONTRACTOR'S officers,agents,and employees will at all times be acting and performing as an independent contractor,and shall act in an independent capacity and not asan officer,agent, servant,employee,joint venturer,partner,orassociateofthe COUNTY.Furthermore,COUNTY shall have no right to control or supervise or direct the manner or method by which CONTRACTOR shall perform its work and function.However,COUNTY shall retain the right to administer this Agreement soas to verify that CONTRACTOR is performing its obligations in accordance with the terms and conditions thereof. CONTRACTOR and COUNTY shall comply with all applicable provisions ofthe law andthe rulesand regulations,if any,of governmental authorities having jurisdiction over matters the subject thereof. Because of its status asan independent contractor,CONTRACTOR shall have absolutely no right to employment rights and benefits available to COUNTY employees.CONTRACTOR shall be solely liable and responsible for providing to,oron behalf of,its employees all legally-required employee benefits.In addition,CONTRACTOR shall be solely responsible and save COUNTY harmless from all matters relating to payment of CONTRACTOR'S employees, including compliance with Social Security withholding and all other regulations governing such matters.It is acknowledged that during the term ofthis Agreement,CONTRACTOR may be providing servicestoothers unrelated tothe COUNTY ortothis Agreement. -4- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 7.MODIFICATION Any matters ofthis Agreement may be modified fromtime to time bythe written consent of allthe parties without, in any way, affectingthe remainder. 8-NON-ASSIGNMENT Neither party shall assign,transfer or sub-contract this Agreement northeir rightsor duties under thisAgreement without the prior written consent ofthe other party. 9-HOLD HARMLESS CONTRACTOR agrees to indemnify,save,hold harmless,and at COUNTY'S request, defend the COUNTY,its officers,agents, and employees from any and allcosts andexpenses, damages,liabilities,claims, and losses occumng or resultingto COUNTY inconnection with the performance, or failure to perform,by CONTRACTOR,its officers,agents, or employees under this Agreement, and fromany and allcosts and expenses,damages,liabilities,claims,and losses occurring or resultingto any person,firm,or corporation who may be injuredor damaged bythe performance, or failure to perform,of CONTRACTOR,its officers,agents, or employees underthis Agreement. 10.INSURANCE Without limiting the COUNTY'S right to obtain indemnification from CONTRACTOR orany third parties,CONTRACTOR, at its sole expense,shall maintain in full force and effect, the following insurance policies or a program of self-insurance,includingbut not limited to, an insurance pooling arrangement or Joint Powers Agreement (JPA) throughout the termofthe Agreement: A-Commercial General Liability Commercial General Liability Insurance with limits of not less than One Million Dollars ($1,000,000.00)per occurrence and an annual aggregate of Two Million Dollars ($2,000,000.00). This policy shall be issued on a per occurrence basis.COUNTY mayrequire specific coverages including completed operations,products liability,contractual liability, -5- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Explosion-Collapse-Underground, firelegal liability or any other liability insurance deemed necessary because of the nature of this Agreement. B-Automobile Liability Comprehensive Automobile Liability Insurance with limits for bodily injury ofnotless than Two Hundred Fifty Thousand Dollars ($250,000.00)per person,Five Hundred Thousand Dollars($500,000.00) per accident and forproperty damages ofnotless than Fifty Thousand Dollars($50,000.00), or such coverage witha combined single limit of Five HundredThousand Dollars ($500,000.00). Coverage should includeowned and non-ownedvehicles used inconnection with this Agreement. C Professional Liability If CONTRACTOR employs licensed professional staff, (e.g., Ph.D.,R.N.,L.C.S.W, M.F.C.C.) in providing services,Professional Liability Insurance with limits of not less than One Million Dollars ($1,000,000.00)per claim,Three Million Dollars($3,000,000.00) annual aggregate. D.Worker's Compensation A policyofWorker's Compensation Insurance as may be required bythe California Labor Code. CONTRACTOR shall obtain endorsements to the Commercial General Liability Insurance naming the County of Fresno,its officers,agents,and employees,individually and collectively,as additional insured, but only insofar as the operations under this Agreement are concerned.Such coverage for additional insured shall apply as primary insurance and any other insurance,or self-insurance,maintained by COUNTY,itsofficers,agents and employees shall be excess only and not contributing with insurance provided under CONTRACTOR'S policies herein. This insurance shall not be cancelled or changed without a minimum of thirty(30)days advance written notice given to COUNTY. Within thirty (30)days from the date CONTRACTOR signs and executes this Agreement,CONTRACTOR shall provide Certificates of Insurance and Endorsements as stated above for all of the foregoing policies,as required herein,to the County of Fresno,Department of 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Public Works and Planning,Director,2220 Tulare Street,6th Floor,Fresno,CA 93721,stating that such insurancecoverage has been obtained and is in full force;thatthe County of Fresno,its officers,agents and employees will notbe responsible forany premiums on the policies;thatsuch Commercial General Liability Insurancenames the CountyofFresno, its officers,agents and employees,individually and collectively,as additionalinsured, but onlyinsofar as the operations under this Agreement are concerned;that such coverage foradditionalinsured shallapply as primary insurance and any other insurance,or serf-insurance,maintained by COUNTY,its officers,agents and employees, shall be excess onlyand not contributing with insurance provided under CONTRACTOR'Spolicies herein; and that this insurance shall not be cancelled or changed withouta minimum ofthirty(30) days advance,written notice given to COUNTY. Inthe event CONTRACTORfailsto keep ineffect at alltimes insurance coverage as herein provided, the COUNTY may, inadditionto other remedies it may have,suspend or terminate this Agreement upon the occurrence of such event. All policies shall be issued by admitted insurers licensed to do business in the State of California,and such insurance shall be purchased from companies possessing a current A.M. Best,Inc.rating of A FSC VII or better. 11.AUDITS AND INSPECTIONS: The CONTRACTOR shall at any time during business hours,and as often as the COUNTY may deem necessary,make available to the COUNTY for examination all of its records and data with respect to the matters covered by this Agreement.The CONTRACTOR shall, upon request by the COUNTY,permit the COUNTY to audit and inspect allof such records and data necessary to ensure CONTRACTOR'S compliance with the terms of this Agreement. If this Agreement exceeds Ten Thousand Dollars ($10,000.00),CONTRACTOR shall be subject to the examination and audit of the Auditor General for a period of three (3)years after final payment under Agreement (Government Code Section 8546.7). -7- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 12.NOTICES: The persons and their addresses having authorityto give and receive notices under this Agreement include the following: COUNTY OF FRESNO CONTRACTOR Jeff Janes,Chief Building Inspector Doug Wilson,Principal Project Manager Department of PublicWorks &Planning Willdan Engineering 2220 Tulare Street,6th Floor 2014 Tulare Street,Suite 515 Fresno,CA 93721 Fresno,CA 93721 Anyand all notices between the COUNTY and the CONTRACTOR providedforor permitted under this Agreement or by law shall be in writing and shall be deemed duly served when personally delivered to one of the parties,or in lieuof such personal services,when deposited inthe United States Mail,postage prepaid,addressed to such party. 13.GOVERNING LAW Venue forany action arising out of or related to this Agreement shall only be in Fresno County,California. The rights and obligations of the parties and all interpretation and performance of this Agreement shall be governed in all respects by the laws of the State of California. _14.DISCLOSURE OF SELF-DEALING TRANSACTIONS This provision is only applicable if the CONTRACTOR is operating as a corporation (a for-profit or non-profit corporation)or ifduring the term of the agreement,the CONTRACTOR changes its status to operate as a corporation. Members of the CONTRACTOR'S Board of Directors shall disclose any self- dealing transactions that they are a party to while CONTRACTOR is providing goods or performing services under this agreement.A self-dealing transaction shall mean a transaction to which the CONTRACTOR is a party and in which one or more of its directors has a material -8- 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 financial interest.Members of the Board of Directors shall disclose any self-dealing transactions that they are a party to by completing and signing a Self-Dealing Transaction Disclosure Form,attached hereto as Exhibit "E"and incorporated herein by reference,and submitting it to the COUNTY prior to commencing with the self-dealing transaction or immediately thereafter. 15.ENTIRE AGREEMENT This Agreement constitutes the entire Agreement between the CONTRACTORand COUNTY with respect to the subject matter hereof and supersedes all previous Agreement negotiations,proposals,commitments,writings,advertisements,publications, and understanding of any nature whatsoever unless expressly included inthis Agreement. In the event of any inconsistency in interpreting the documents which constitute this Agreement, the inconsistency shall be resolved by giving precedence inthe following order of priority:(1)the text ofthis Agreement (excluding Exhibit "A",the COUNTYS Request forProposal); (2)Exhibit "B",the CONTRACTOR'S proposal in response thereto;and (3) Exhibit"C",CONTRACTOR'S compensation as stated in CONTRACTOR'S response to the COUNTYS Request forProposal. // // // // // // // // // // // 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 // // // // IN WITNESS WHEREOF,the parties hereto have executed thisAgreement as ofthe day and year first hereinabove written CONTRACTOR (Authorized Signature) Print Name &Title ,;/^s J6SPH^pijJrfy C«f><.bu.Je.Z^o S?n h^n«rj,n-rC*\^AL^& Mailing Address DATE-rzg. •i^- li ^ois APPROVED AS TOXEGAIEORM Countv Counsel FOR ACCOUNTING USE ONLY: ORG No.: Account No.: Req.No.: 43600200 7295 4361100021 NTY OF FRESNO M LVm Chairman, Board of Supervisors ATTEST: BERNICE E. SEIDEL, Clerk Board of Supervisors By_ DATE: ^Sj^JtCXm^ Deputy MAR 10 2015 REVIEWED &RECOMMENDED FOR APPROVAL Department Head's Signature APPROVED AS TO ACCOUNTING FORM LtMc {i Auditor-C6ntroller«Treasurer-Tax Collector FCMC 06/11 G:V4360Devs&Pln\ADMIN\BOARD\Board ltems\2015\3-10-15\Plan Check and Building Inspection Services\Agreement Wlildandoc -10- EXHIBIT A County of Fresno DEPARTMENT OF PUBLIC WORKS AND PLANNING ALAN WEAVER DIRECTOR REQUEST FOR PROPOSAL The County of Fresno is soliciting bids for services of a qualified Building Plans Checker(s) to check residential, industrial and commercial building plans and a Building lnspector(s) to inspect residential, industrial, commercial, and agricultural projects. SUBMITTAL: ADDRESSED TO: MAILING AND DELIVERY SERVICE ADDRESS: MARK ENVELOPE: INQUIRIES: ISSUANCE DATE: Four (4) copies must be received on or before: Tuesday, December 30,2014,4:00 p.m. Jeff Janes, Chief Building Inspector Fresno County Department of Public Works and Planning Development Services Division 2220 Tulare Street, Sixth Floor Fresno, CA 93721-2104 PROPOSAL-"Plan Check and Building Inspection Services" Direct questions or requested clarifications about the Request for Proposal (RFP) documents to Jeff Janes, Chief Building Inspector, at (559) 600-4232, or fax (559) 600- 4200, or by emailing jjanes@co.fresno.ca.us at the Department of Public Works and Planning, Development Services Division, County of Fresno. The Development Services Division offices are located at 2220 Tulare Street, southwest corner of Tulare and "M" Street, Suite A, Street Level, Fresno, CA 93721. Wednesday, December 17, 2014 DEVELOPMENT SERVICES DIVISION 2220 Tulare Street, Sixth Floor I Fresno, California 93721 I Phone (559} 600-44971600-45401600-40221 FAX 600-4200 Equal Employment Opportunity • Affirmative Action • Disabled Employer ARTICLE I. II. Ill. EXHIBIT A EXHIBIT B TABLE OF CONTENTS DESCRIPTION PAGE NO. SCOPE OF SERVICES ............................................................. 3 PROPOSAL CONTENT AND ORGANIZATION ........................ 7 PROPOSAL EVALUATION AND SELECTION ...................... 10 EXHIBITS FEE SCHEDULE TITLE 15-BUILDING AND CONSTRUCTION ORDINANCE CHAPTERS 15.04-15.28 AND 15.60 COUNTY OF FRESNO REQUEST FOR PROPOSAL I. SCOPE OF SERVICES The County will contract with up to four multidisciplinary firms to provide professional plan checking and building inspection services in support of the Building & Safety Section functions at the direction of the Chief Building Inspector or his designee. These services are only to be provided when required by the County of Fresno and will consist of a total of four (4) separate contracts. Two (2) contracts for eight hundred and fifty thousand dollars ($850,000.00) annually and two (2) contracts for one hundred thousand dollars annually ($100,000.00). At the County's option, the plan review may be performed in whole or in part by using one of the different packages defined below. The fee for packages "A" through "E" may be set up as a percentage of the fee received by the County for plan review for the given project based on the current adopted fee schedule. The maximum fee shall not exceed 65% of the plan review fee received by the County for the whole building review. Where a partial review is requested by the County, the maximum fee shall not exceed 40% of the plan review fee received by the County for both structural and nonstructural review. Proposals shall include fee break downs in each of the following categories and, other than hourly fees, shall include the costs of the initial review and all subsequent reviews. Plan reviews and inspections are to include enforcement of all applicable Federal, State, and Local regulations and policies. A) Plan Check "Packages" a. Plan Review Package "A" Complete structural and non-structural commercial building plan review b. Plan Review Package "B" Complete non-structural commercial building plan review c. Plan Review Package "C" Complete structural commercial building plan review d. Plan Review Package "D" Complete residential building plan review e. Plan Review Package "E" Complete structural residential building plan review f. Plan Review Package "F" Hourly fee for non-structural plan review services g. Plan Review Package "G" Hourly fee for structural plan review services h. Building Inspection Package "H" Hourly fee for commercial and/or residential building inspection services Page3 COUNTY OF FRESNO REQUEST FOR PROPOSAL i. Plan Review Package "I" Hourly fee for site improvement inspection services j. Plan Review Package "J" Hourly fee for permit processing services No additional fees shall be charged to the County for completion of the work in any of the packages listed (other than approved hourly fees, where applicable), including, but not limited to, pick up, delivery, mileage, shipping, meetings, phone calls, and other materials, labor and handling. B) Availability 1. The Consultant shall perform the plan review services required to obtain approval of each project for the percentage of fee proposed. Prior approval by the County is required for any and all charges proposed in addition to the percentage agreed to in the Plan Review Package. Prior approval by the County is required for any and all charges proposed for deferred submittals and revisions that may occur on projects reviewed by the Consultant. 2. The response time for the Consultant to return a list of comments to the County or provide approval to the County for all plan review projects from the day of authorization by the County is ten (1 0) business days on the first review and five (5) business days on subsequent reviews. If the list of comments or approval is returned to the County in one (1) to five (5) business days in excess oftheduedate, a 10% reduction in cost to the County shall be provided. If the response time of five (5) to ten (1 0) business days is in excess of the due date, the plan review shall be completed at 50% reduction to the County. Anything in excess of 10 days shall be completed at no cost to the County. The Consultant shall notify the County at least two (2) business days in advance if the plans will not be completed within the stipulated time frame. The response time for more complex projects as determined by the County may be negotiable. 3. List a "typical" notification time required for the Consultant to provide inspection staff for the County. 4. Indicate the availability of the Consultant's personnel assigned to the plan check to attend a meeting at the County to address questions or discuss issues with County staff, design team and/or construction team that may arise on a project at no additional cost to the County for projects paid on percentage. Meetings may occur prior to permit submittal, during the review process and after permit issuance and typically will not exceed two hours for each meeting. Page 4 COUNTY OF FRESNO REQUEST FOR PROPOSAL 5. Indicate the availability of Consultant's representative to attend bi-monthly plan review and/or inspection related meetings at the County at no additional cost to the County. Estimate meeting duration of two hours. 6. Indicate the availability of the Consultant's staff to discuss projects and technical data via phone or other means with the County's staff, design team and/or construction team at no additional cost to the County for plan reviews paid on percentage. 7. Indicate processing times and costs for plan reviews that the County may require to be expedited. Typically, an expedited review would be one half of the normal response time listed in 8-2 above. 8. Describe the capability of your firm to provide electronic plan reviews and indicate if there are any reductions in the Consultant's plan review costs if this service is utilized. Provide a brief description and flow chart of how this process is accomplished. 9. Indicate your ability to provide third-party plan reviews/inspections by allowing an applicant to provide payment directly to the Consultant for Consultant's portion of the plan review fee or inspection costs. Also submit samples of any forms that may be utilized for this procedure. C) Statement of Work Upon award of a contract, the Consultant shall perform plan review services and/or field inspection services. Plan Review Services: Plan review shall be performed at the Consultant's offices unless specific arrangements are made with the County. 1 . Consultant shall assign personnel who are professionally qualified to perform commercial and/or residential construction document plan check and shall be International Code Council (ICC) certified plans examiners. 2. Consultant shall designate one individual as the responsible contact for all communications between the County and Consultant for the life of the contract and, in the event the contact changes, notify County immediately. 3. Consultant shall furnish assigned personnel with all necessary materials, resources and training to conduct plan review and inspection services, including a current copy of applicable County amendments, policies, procedures and forms. Page 5 COUNTY OF FRESNO REQUEST FOR PROPOSAL 4. Plan review approval shall not be recommended to the County until ALL code compliance issues are resolved to the best of Consultant's knowledge and all permit issuance requirements of the County of Fresno are satisfied. Consultant shall contact County if there are questions. 5. Consultant shall respond within one business day upon each notification that a plan check is authorized. · 6. Consultant shall pick up all documents to be reviewed from the County of Fresno, Public Works and Planning, Development Services Division located at 2220 Tulare Street, Suite A, Fresno, CA. Stated plan review turnaround times will begin the next business day after the Consultant has been notified by the County. Consultant shall conduct each plan review in a timely manner and within time-frame guidelines established by the County. Refer to B-2. Upon completion of each plan review, the Consultant shall return the reviewed documents to the County and provide an electronic and hard copy of the plan review comments in the format designated by the County. Upon completion of the plan review where approval of the documents is recommended, the Consultant shall provide (2) complete sets of all final review documents annotated as approved to the County of Fresno. 7. Plan review comment letters shall be completed in the format provided by the County. 8. Code interpretations are subject to final review and approval by the County Building Official. All plan review comments completed by the consultant are subject to the review by the County. 9. Consultant shall be available within one business day to respond to questions from the County that may be generated during field inspection for each authorized plan check that is subsequently issued a permit for construction. Permit Processing Services: 1. All permit processing and counter services shall be performed at the County office and under the direction of County staff. 2. Consultant shall assign personnel who are professionally qualified to perform permit processing and counter services. All on-site materials, resources, tools and County policy training shall be supplied by the County. Page 6 COUNTY OF FRESNO REQUEST FOR PROPOSAL Field Inspection Services: 1. All field inspection shall be performed through the County of Fresno Development Services Division and under the direction of County staff. 2. Consultant shall assign personnel who are professionally qualified to perform commercial and/or residential construction inspection and shall be ICC certified as building inspectors. All vehicles, safety apparel, communication devices, materials, resources, tools, and training shall be supplied by the Consultant. 3. County shall provide County-specific policy training and provide any necessary County maps, forms, and data entry training. 4. List a "typical" notification time required for the Consultant to provide inspection staff for the County. 5. Projects under construction by permit from the County shall be inspected for compliance per the California Code of Regulations-Title 24, Parts 1-12, and Fresno County Title 15 (Building and Construction Ordinance). II. PROPOSAL CONTENT AND ORGANIZATION Proposals should be limited to specific discussion of the elements outlined in this RFP. The intent of this RFP is to encourage responses which meet the stated requirements, and which propose the best methods to accomplish the work within a stated budget. The organization of the proposal should follow the general outline below. Each proposal should consist of four (4) copies of the technical proposal. A. Transmittal Letter 1. The transmittal letter shall include the name, title, address, phone number, and original signature of an individual with authority to negotiate on behalf of and to contractually bind the consulting firm, and who may be contacted during the period of proposal evaluation. Only one transmittal letter need be prepared to accompany all copies of the technical and cost proposals. B. Table of Contents 1. Provide a list of sections in the proposal and the associated page numbers. C. Scope of Work 1. Provide the scope of work information in a format such that it can be pulled out of the RFP and inserted into the contract as a schedule and include the cost for each package in a table format. If necessary, discuss reasons for any revisions to the Page 7 COUNTY OF FRESNO REQUEST FOR PROPOSAL requirements as described and provide sufficient detail for any modified approach, methods, and tasks. D. Project Deliverables 1. The deliverables shall be consistent with Section I of this proposal. This shall include a summary of the Project Deliverables with schedule. Provide the project deliverables with schedule in a format that can be pulled out of the RFP and inserted into the contract as a schedule. If necessary, discuss reasons for any revisions to the requirements or sample contract as described and provide sufficient detail for any modified approach, methods, and tasks or terminology. E. Consultant and Sub-Consultant Staff-Qualifications & Experience 1. This section shall describe the qualifications and experience of each professional who will participate in the project, including a resume for each member of the project team. A project manager must be designated, and an organizational chart showing the manager and all project staff must be included. A matrix or organization chart shall be included, indicating the effort, either in percentage of the total project or in person-hours, which will be contributed by each professional during each phase or task making up the project. Key personnel who are included in the proposal must be committed for the duration of the contract. Any substitutions or changes to the project team must be brought to the attention of the County and approved. If a sub- consultant will be used, the proposing Consultant shall include a letter from the sub- consultant committing to perform at least the work shown for the sub-contracting professional in the above-described matrix. F. Consultant Qualifications and References 1. This section shall describe the nature and outcome of projects previously conducted by the Consultant which are related to the work described within the RFP. Descriptions shall include client contact names, address, phone numbers, email addresses, descriptions of the type of work performed, approximate dates on which the work was completed, and professional staff who performed the work. If a sub- Consultant is proposed, two to three similar qualifications and references shall be provided for all sub-Consultants. G. Cost Information 1. Develop the cost as described in Section I of this proposal. Provide the cost information in a format that it can be pulled out of the RFP and inserted into the contract as a schedule and include the scope of work for each package in a table format. If necessary, discuss reasons for any revisions to the requirements as described and provide sufficient detail for any modified approach, methods, and tasks. Page 8 COUNTY OF FRESNO REQUEST FOR PROPOSAL H. Invoicing 1. Invoices shall include the County's Application Number, Address of Project, Project Name and the amount billed for each project. If the project was performed on an hourly basis, the invoice shall include each person's name, title, hourly rate, and hours being billed to the County. 2. Where applicable, when the first review is completed and returned to the County, each project shall be accompanied by a Fee Calculation Sheet indicating the amount that will be billed to the County and a breakdown of the associated costs. I. Insurance Coverage 1. Plan check and building inspection Consultant will be required to have the following insurance coverage: (a) Commercial General Liability Commercial General Liability Insurance with limits of not less than one million dollars ($1 ,000,000.00) per occurrence and an annual aggregate of two million dollars ($2,000,000.00). This policy shall be issued on a per occurrence basis. County may require specific coverage including completed operations, product liability, contractual liability, explosion-collapse- underground, fire and legal liability, or any other liability insurance deemed necessary because of the nature of the contract. b) Automobile Liability Comprehensive automobile liability insurance with limits for bodily injury of not less than two hundred fifty thousand dollars ($250,000.00) per person, five hundred thousand dollars ($500,000.00) per accident and for property damages of not less than fifty thousand dollars ($50,000.00), or such coverage with a combined single limit of five hundred thousand dollars ($500,000.00). Coverage should include owned and non- owned vehicles used in connection with this Agreement. c) Professional Liability If Contractor employs licensed professional staff, (e.g., Ph.D., R.N., L.C.S.W., M.F.C.C.) in providing services, professional liability insurance with limits of not less than one million dollars ($1 ,000,000.00) per occurrence, three million dollars ($3,000,000.00) annual aggregate. Page 9 COUNTY OF FRESNO REQUEST FOR PROPOSAL d) Worker's Compensation A policy of Worker's Compensation insurance as may be required by the California Labor Code. Ill. PROPOSAL EVALUATION AND SELECTION A project Selection Committee will be formed to evaluate the proposals and select one or more consultants. The Selection Committee will consist of members from the Department of Public Works and Planning and may include a representative knowledgeable in plan check and building inspection services from outside the community. Consulting firms will be requested to interview with the Selection Committee as a part of the evaluation process. PROPOSAL SCHEDULE {TENTATIVE) Proposals due to County of Fresno Finalist interviews and fee proposal Finalist negotiations complete Finalist returns signed contract Board of Supervisors hearing to consider contract Notice to proceed issued Tuesday, December 30, 2014, 4:00p.m. Wednesday, January 14, 2015 Wednesday, January 21, 2015 Wednesday, January 28, 2015 Tuesday, February 24, 2015 Friday, February 27, 2015 The above schedule is tentative and partially dependent upon the size of the contract. Contracts totaling $100,000 or more require Fresno County Board of Supervisor approval. The firms' fee proposals will be opened only after the Selection Committee has completed all of the interviews and considered each of the firms' qualifications. The Selection Committee will consider the fee proposal in its final deliberations. The Selection Committee will consider the following recommended experience in its evaluation of proposals (not necessarily listed in order of importance). Proposals will be compared based upon a combination of factors, and a contract or contracts will be awarded based upon the recommendation of the panel's evaluation of the factors. More than one contract may be awarded. The factors to be considered are: • Professional qualifications of the personnel proposed to perform the work. • Prior experience of the Consultant in providing plan check or inspection services to the County and to other jurisdictions. • Availability of the Consultant to perform necessary services upon demand. Page 10 COUNTY OF FRESNO REQUEST FOR PROPOSAL • Location of Consultant's offices providing services. • Availability of one individual from the Consultant to be the contact person for the County on all projects. • Other factors the panel may determine as relevant to the ability of the applicant to perform the required services. Consultant Qualifications: Applicant shall demonstrate that they possess the following minimum qualifications or equivalent as determined by the City: International Code Council (ICC) Certified Plans Examiner Licensed professional engineer Certified Access Specialist (CASp) ICC Certified Building Inspector combinations ICC Certified Building Permit Technician Current valid State of California driver's license Page 11 EXHIBIT 8 County of FRESNQ SCOPE OF WORK/DELIVERABLES Willdan staff is capable of responding to the County's needs quickly and responsibly. BUilDING PIAN REVIEW SERVICES Willdan Engineering presently provides Building and Safety services to a number of municipalities and jurisdictions throughout Central, Northern and Southern California. In this capacity, we provide a full range of services including plan review, permit issuance, inspection, code enforcement, counter technician and Building Official services. We service client needs from an occasional overload plan review to staffing an entire Building Division. Willdan has gained a great deal of municipal insight and expertise in serving our extensive clientele over the years We have performed plan review and inspection on projects ranging from single family residential additions to complex high rise towers {including hotels and casinos), parking structures, medical facilities and industrial centers. Willdan's plans examiners are ICC certified plans examiners, CASp certified, licensed architects, and/or registered engineers. Willdan's experience and strength in building and safety encompasses the complete range of technical disciplines, that is, structural engineering plan check, fire-life safety, electrical, plumbing and mechanical codes, the Title 24 codes, as well as local amendments to the adopted codes. We have extensive experience with the California Green Building Standards Code. Willdan staff attends classe~ and seminars on a regular basis to maintain an up-to-date comprehension of all code requirements at no expense to our clients. All building plam will be examined for compliance with the County's adopted version of the California Building Code, California Residential Code, Green Building Standards Code, California Mechanical Code, California Plumbing Code, California Electrical Code, and the Accessibility, Nbise and Energy Conservation requirements as mandated by State Title 24 and all applicable County Ordinances. Plan review for Disabled Access Compliance will include a review of precise grading plans. All plan check will include compliance with code requirements as well as an overview of the application package for other applicable requirements such as approvals from other local agencies and districts and coordination with other County departments All plan review will comply with the County's directives, codes and policies. Plan check will include a review of any or all of the following design elements as determined by the County: • Architectural • Electrical • Fire/life-safety • Energy Conservation Regulations (Title 24) • Plumbing • Disabled Access Regulations (CBC) • Mechanical • Green Building Standards • Structural • CASp County of Fresno County of fRESNO Willdan will notify each applicant with two complete typewritten plan check letters which outline the documents reviewed, instructions to the applicant regarding the processing of documents, and a listing of plan check comments. The plan check comments will refer to appropriate sheets, details or calculation pages and the code section of concern. Comments shall specify the apparent code violation. At the County's discretion, plan check comments, plans and documents will be returned directly to the designers until such time as plans are approved. Wifldan staff will pick up plans from the County or will provide delivery service at no additional cost to the County. We will supply the County with plan bags and shipping labels. Our plan checkers will schedule meetings during work hours to discuss and clarify plan check issues with designers, owners and contractors. Resolutions of code issues may also be accomplished by telephone, email, or meetings prior to resubmitting corrected plans and documents. Turn-Around Schedule This schedule is applicable for all types of construction and can be adjusted to serve the in the most efficient manner. Expedited plan check will be provided at the request of the County. ··- TV PI; OF PROJECT . INITIAL PLAN CHECK ·S~BSEQUENT PLAN CHECKS Full Plan Review Eight ·-ten working days Five working days Expedited Plan Review Five-seven working days Four working c;Jays County of Fresno County of FRESNQ ELECTRONIC PLAN REVIEW Willdan has the ability to provide plan review services electronically, at no additional cost to the County or applicants. No additional computer software or hardware is required, only an Internet connection is necessary. Services are provided at the request of the applicant or the agency we serve. Submittals are accepted in PDF format. Willdan will review plans and can transmit the electronic redhned plans back to the applicant or designer as directed, electronically along with the plan review comment sheet. This service allows for collaboration between the County, designer and plans examiner to facilitate a complete understanding of plan review comments and can reduce shipping, printing and time for plan review processing for the applicant. Below is an example of a red lined plan as reviewed in electronic format. County of Fresno County of FRESNO INSPECTION SERVICES Our inspectors are ICC certified and fully experienced to perform residential, commercial and industrial inspections for compliance to the approved plans and related documents. The inspections will be performed in accordance with the County's adopted version of the California Building Code, California Residential Code, Green Building Standards Code, California Mechanical Code, California Plumbing Code, California Electrical Code, and the State and Federal regulations for Accessibility, Noise and Energy Conservation, California Fire Code and provisions ofTitle 19 and NFPA. Inspection staff will be available to meet with County staff, builders, developers, and citizens to provide assistance and resolve any inspection issues that may arise. Inspectors shall attend and participate in required meetings with other County inspection and plan review staff, property owners, contractors and/or design professionals. Inspectors will review the permit package to verify that the on·site condition is consistent with the appropriate records for square footage, setbacks, heights, and other requirements that may be applicable. Inspectors will comply with the County's procedures for reporting inspection results, use County inspection correction forms, make appropriate entries onto the permit documents, and follow County procedures prior to finalizing a building permit. Willdan will verify that all inspection records, including daily records of what was inspected which will. be recorded on the job card, and permit copy entered into the County's Building and Safety computer system. We will employ such techniques as necessary to minimize delays to builders and provide helpful advice and counsel to builders, owners, engineers and architects as to enhance the orderly flow of the construction process, yet maintaining an effective level of enforcement Inspectors shall ensure that any construction changes are documented and approved by appropriate County staff. CASp SERVICES Willdan can provide CASp certified inspectors to the County as required by Senate Bill No. 1608, specifically CHAPTER 549 which reads as follows: (d) (1) Commencing July 1, 2010, a local agency shall employ or retain at least one building inspector who is a certified access speciaNst. The certified access specialist shall provide consultation to the local agency, permit applicants, and members of the public on compliance with state construction-related accessibility standards with respect to inspections of a place of public accommodation that relate to permitting, plan checks, or new construction, including, but not limited to, inspections relating to tenant improvements that may impact access. If a loco/ agency employs or retains two or more certified access specialists to comply with this subdivision, at least one-half of the certified access specialists shall be building inspectors who ore certified access specialists. ... A./WfllOAN I ·w Eng1neenng County of Fresno EXHIBIT C County of Inrecognitionofthe Countyof Fresno's historicpreference to calculatefees in house,Willdan has reduced the fee structure accordingly. !l*l^^^*0liV/l®l^WBa») •':i»ffiJ»lt-4*---if"a jjU'O ail?iii'li'l-iHyi^ir.i^irrtni^Wi:!\>Mt &&&&! '-"•••fj.jMt ifji>rii"jii<'i,-t ^iiii5(W>;if:jj.iwi mmi', ^S'l'lDll^-K-J-ilJW'Ur.l jflhlr -<-4»}Wv ,'3$ity«U*&-iMjniiM <--Ml»fM>Hpj i«lr-i'IM'Wi' •ir.=,):,:J:,-''<. Ij.'Wcr^tAi*ft*E •i""1 -if'.<(.*<..(':)jku N,^»r^v I I'-iMfr]*' l:CHi'\''t--)--H«r vrnll'IK^-i ;|ilf/*.J «-j-il;I=Illi(:liiT|l-fjI^a!ll Iftrftep '"' )&%offee collected 38%of fee collected 38%of fee collected 63%of fee collected 38%of fee collected $110 per hour $130 per hour $ 95 per hour $ 95perhour $ 55 per hour Allinvoices shall be submitted with the County's required information delineated therein This includes: S Application Number S Project Address S Project Name S Project Amount Billed S Plan Review Staff Name /•Plan Review Staff Title S HourlyRate (ifbilledhourly) S Number of Hours (ifbilledhourly) S Fee Calculation Sheet (ifapplicable) WILLDAN Engineering Countyof Fresno EXHIBIT D MASTER SCHEDULE OF FEES, CHARGES, AND RECOVERED COSTS SECTION 2500 -DEVELOPMENT SERVICES YEAR EFFECTIVE %OF FEE DESCRIPTION INCREASE ADOPTED DATE COST REFERENCE 2501. Building Construction Permits 2007-08 01/04/08 <100% Ord. #07-048 Incl. 1. Minimum Charge $148.00 8.63% Dept. 2. Other -The following tables of Costs construction valuation shall be Only used to calculate building permit fees: (to determine fee, multiply footage by appropriate valuation as listed by building type, then refer to valuation schedule for fee amount) TOTAL VALUATION $1 -$4,000 $148.00 8.63% $4,001 -$25,000 $148.00 for the first $4,000.00 8.63% plus $16.75 for each additional 8.63% $1,000.00 or fraction thereof, to and including $25,000.00 $25,001 -$50,000 $499.75 for the first $25,000.00 8.63% Plus $10.50 for each additional 8.63% $1,000.00 or fraction thereof, to and including $50,000.00 $50,001-$100,000 $762.25 for the first $50,000.00 8.63% plus $7.50 for each additional 8.63% $1,000.00 or fraction thereof, to and including $100,000.00 $100,001 -$500,000 $1,137.25 for the first $100,000.00 8.63% plus $5.00 for each additional 8.63% $1,000.00 or fraction thereof, to and including $500,000.00 $500,001 and Up $3,137.25 for the first 8.63% $500,000.00 plus $3.50 for 8.63% each additional $1,000.00 or fraction thereof • Rounded to nearest $0.50 for amounts less than $500.00 and rounded to nearest $1.00 for amounts $500.00 and greater. 4110/2013 1 of 36 MASTER SCHEDULE OF FEES, CHARGES, AND RECOVERED COSTS SECTION 2500 -DEVELOPMENT SERVICES YEAR FEE DESCRIPTION INCREASE ADOPTED (CONTINUED) TABLE OF CONSTRUCTION VALUATION 2008-09 Occupancy and Type 1. Apartment Houses: (R-2): Type IAoriiA $121.00 Type V-Masonry, VA IIA $94.00 Type IIIB $103.00 Type V-Wood Frame or liB & VB $89.00 Type !A-Basement Garage $53.00 2. Banks, Medical Offices & Offices (B): Type lA or IIA $143.00 Type lilA or IV $124.00 Type IIIB $119.00 Type IIAorVA $109.00 Type liB or VB $104.00 3. Churches, Funeral Homes and Crypts (A, B): Type lA or IIA $171.00 Type lilA or IV $153.00 Type IIIB $148.00 Type llA or VA $138.00 Type liB or VB $133.00 4. Dwellings and Day Care Centers (With Occupancy Load of 6 or Less: (R-3) For other types of construction, use apartment house valuations. Type V Masonry or IIA $117.00 Type V Wood Frame or liB $97.00 Basements Finished $30.00 Unfinished $20.00 • Rounded to nearest $0.50 for amounts less than $500.00 and rounded to nearest $1.00 for amounts $500.00 and greater 4/10/2013 2 of 36 · EFFECTIVE %OF DATE COST REFERENCE 02/17/09 100% Ord. #09-003 MASTER SCHEDULE OF FEES, CHARGES, AND RECOVERED COSTS SECTION 2500-DEVELOPMENT SERVICES YEAR FEE DESCRIPTION INCREASE ADOPTED (CONTINUED) 2008-09 5. Hotels and Motels: {R-1) Type IAoriiA $147.00 Type lilA or IV $131.00 Type IIIB $128.00 TypeVAoriiA $119.00 Type VAorVB $114.00 6. Industrial Plants, Dehydrators & Cold Storage Plants: {S) Type lA or IIA $84.00 Type liB {Stock) $80.00 Type lilA or IIIB $72.00 Type VA $60.00 Type VB $55.00 9. Private Garages, Residential Accessory Structures: {U) Wood Frame Type VB $38.00 Masonry Type Ill $47.00 Frame Patios Type VB $23.00 Add for Screening $8.00 • Rounded to nearest $0.50 for amounts Jess than $500.00 and rounded to nearest $1.00 for amounts $500.00 and greater 4/10/2013 3 of 36 · EFFECTIVE %OF DATE COST REFERENCE 02/17/09 100% Ord. #09-003 MASTER SCHEDULE OF FEES, CHARGES, AND RECOVERED COSTS SECTION 2500-DEVELOPMENT SERVICES YEAR EFFECTIVE %OF FEE DESCRIPTION INCREASE ADOPTED DATE COST REFERENCE (CONTINUED) 2008-09 02/17/09 100% Ord. #09-003 10. Public Garages, Service Stations, Fire Stations & Farm Shops (S-3, S-4): Type IAoriiA $68.00 Type liB $43.00 Type lilA $58.00 Type IIIB $54.00 Type VA $46.00 11. Restaurants, Assembly and Club Bldgs. (A, B): Type lA or IIA $141.00 Type lilA or IVB $128.00 TypeiiiB $125.00 Type VA $116.00 Type VB $113.00 12. Stores, Barber and Beauty Shops: (B, M) Type IAoriiA $104.00 Type lilA or IVB $94.00 Type IIIB $88.00 Type VA $78.00 Type VB $75.00 13. Schools, Pre-Schools, and Day Care Ctrs. (w/ Occupancy Load More Than 6: (E-3) Type lA or IIA $158.00 Type lilA or IVB $142.00 Type IIIB $134.00 Type VA $125.00 Type VB $120.00 • Rounded to nearest $0.50 for amounts less than $500.00 and rounded to nearest $1.00 for amounts $500.00 and greater. 4110/2013 4 of 36 MASTER SCHEDULE OF FEES, CHARGES, AND RECOVERED COSTS SECTION 2500 -DEVELOPMENT SERVICES YEAR EFFECTIVE %OF FEE DESCRIPTION INCREASE ADOPTED DATE COST REFERENCE (CONTINUED) 2008-09 02/17/09 100% Ord. #09-003 15. Theaters: (A) Type IAoriiA $168.00 Type lilA $155.00 TypeiiiB $145.00 Type VA $135.00 Type VB $130.00 16. Warehouses & Packing Sheds: (S-1,S-2 & F-2) Type I or IIA $58.00 Type VA $53.00 Type liB or VB $48.00 Type lilA $66.00 Type IIIB $61.00 Tilt-up $48.00 17. Metal Roof Structures: liB Residential Patio $16.00 Cover & Carport (U) Add for Screening $6.00 Commercial Structures $20.00 Add for Enclosures $11.00 18. Signs (U): Wood Frame & Supports VB $11.00 Steel Frame & Supports $23.00 Neon & Lighted Signs $23.00 Steel Columns to Signs $56.00 (Frame/Lineal foot) 19. Miscellaneous: Swimming Pools $53.00 Fences (Over 6' High) $34.00 per lineal foot Cattle Shelters (Open) $11.00 Dairy Barns $36.00 • Rounded to nearest $0.50 for amounts less than $500.00 and rounded to nearest $1.00 for amounts $500.00 and greater. 4110/2013 5 of 36 MASTER SCHEDULE OF FEES, CHARGES, AND RECOVERED COSTS SECTION 2500 -DEVELOPMENT SERVICES YEAR EFFECTIVE %OF FEE DESCRIPTION INCREASE ADOPTED DATE COST REFERENCE (CONTINUED) 2008-09 02/17/09 100% Ord. #09-003 Agriculture Storage and $28.00 Enclosed Animal Shelters Pole Barns $14.00 Structure (Open) Pole Barns $17.00 Structure (Closed) Loading Docks $14.00 Wood Decks $12.00 Fire Sprinklers $3.00 Other To be determined by Building official NOTE: N -Indicates no fire requirement. 2502. Plan Review Fees 2007-08 01/04/08 100% Ord. #07-048 1. Plan review for single 65% of building permit family & duplex dwellings fee 2. Plan review fee for all 65% of building permit other structures fee 3. Plan review for 25% of permit fee mechanical, electrical and/or plumbing 4. Signs requiring engineering 65% of permit fee calculations 5. Incomplete or changed plans $72.50 per hour 8.63% 2007-08 01/04/08 100% Ord. #07-048 requiring additional plan (One hour minimum charge) review 6. Overtime for rush plan $72.50 per hour 8.63% 2007-08 01/04/08 100% Ord. #07-Q48 review-in addition to standard (Two hour minimum per trade) review fees. 7. Standard Plan 8.63% 2007-08 01/04/08 100% Ord. #07-Q48 8. Reversed Plans $99 per hour 8.63% 2007-08 01/04/08 100% Ord. #07-Q48 (three hour min. charge) 9. Deferred Plan Submittals $110.00 per hour 8.63% 2007-08 01/04/08 100% Ord. #07-048 10. Plan review backcheck $62.50 per hour 2007-08 01/04/08 100% Ord. #07-048 in excess of two backchecks (two hour min. charge) 2503. Energy Conservation Surcharge 2007-08 10/12/06 100% Ord. #06-018 Plan review on all new construction subject to State of Calif. Energy Conservation Requirements • Rounded to nearest $0.50 for amounts less than $500.00 and rounded to nearest $1.00 for amounts $500.00 and greater. 4110/2013 6 of 36 MASTER SCHEDULE OF FEES, CHARGES, AND RECOVERED COSTS SECTION 2500 -DEVELOPMENT SERVICES YEAR EFFECTIVE %OF FEE DESCRIPTION INCREASE ADOPTED DATE COST REFERENCE (CONTINUED) 2504. Fee for Work Without Permit 2007-08 01/04/08 100% Ord. #07 -Q48 Work commenced prior to Fee as stipulated in Title 15 issuance of building permits Section 15.04.080(d) ($143.00 minimum charge) 5.27% 2505. Consolidated Permit Fee 2007-08 01/04/08 100% Ord. #07-048 All required permits for each Building, Plumbing, Mechanical building or structure obtained and Electrical permits reduced on one application form by5% 2506. Special Services Fees 2007-08 01/04/08 100% Ord. #07-Q48 1. Change of occupancy $287.00 per structure 5.27% classification 2. Inspection beyond one $139.00 per inspection 5.27% reinspection (Work not ready for 1st inspection) 3. Special service to modify $70.00 per hour 5.27% permit application (One hour minimum charge) 4. Temporary Occupancy Permit $62.00 5.27% 5. Inspections request by permittee $70.00 per hour or fraction 5.27% to be made other than between thereof hours of 8:00 AM and 4:00 PM (4 hours minimum charge) (overtime inspection) 6. Phone, Fax & E-mail Permits $20 additional 5.27% 7. Processing application $148.50 additional 5.27% for an agreement on exempt structures under provisions of Section 15.04.130 • Rounded to nearest $0.50 for amounts less than $500.00 and rounded to nearest $1.00 for amounts $500.00 and greater. 4/10/2013 7 of 36 MASTER SCHEDULE OF FEES, CHARGES, AND RECOVERED COSTS SECTION 2500 -DEVELOPMENT SERVICES YEAR EFFECTIVE o/o OF FEE DESCRIPTION INCREASE ADOPTED DATE COST REFERENCE (CONTINUED) 2007-08 01/04/08 100% Ord. #07-048 8. Permanent records of project $19.00 for first sheet 5.27% drawings required by State $4.25 each additional 5.27% law to be maintained by sheet Building Official 9. Inspection on electrical sign $62 additional 5.27% not bearing an Underwriters' Label 10. Variance from flood proofing $237.50 5.27% requirements of Fresno County Ordinance No. 616, adopted June 23, 1981 11. Flood map information related $42.00 5.27% to Federal Emergency Mgmt Agency (FEMA) flood insurance rate information 12. Research records and provide $14.50 plus printing costs 5.27% information for existing permits, plans, septic and other related records 13. Review deeds and other $74.25 5.27% related documents for legality of parcels prior to issurance of permits 14. Written conformation of $42.00 5.27% zoning to determine that a proposed use will be allowed 15. Service fee for zoning $5.75 each 5.27% ordinance excerpts • Rounded to nearest $0.50 for amounts less than $500.00 and rounded to nearest $1.00 for amounts $500.00 and greater. 4/10/2013 8 of 36 MASTER SCHEDULE OF FEES, CHARGES, AND RECOVERED COSTS SECTION 2500 -DEVELOPMENT SERVICES YEAR EFFECTIVE %OF FEE DESCRIPTION INCREASE ADOPTED DATE COST REFERENCE {CONTINUED) 2007-08 01/04/08 100% Ord. #07-048 16. Re-roofing of existing buildings including pre-roof inspection a. Single family residential $179. 00/structure 5.27% b. All other structures $179.00 for first 5,000 sq. ft 5.27% plus $145.50 for each additional 5.27% 5,000 sq. ft or fraction thereof per structure 17. Damage Investigation $93.00 each 5.27% 18. Processing fee for collection $17.50 each 5.27% and distribution of a fee for others 19. Flood certificate $78.25 per certificate 5.27% 20. Projects located in State $39.00 per structure 5.27% Responsibility Areas 21. Installation of private swimming pool or spa includes structural, plumbing and electrical a. lnground Pool or Spa $455.50 5.27% b. lnground Pool/Spa Combination $500.00 5.27% c. Above ground Pool or Spa $136.50 5.27% d. Add for Gas Heat $136.50 5.27% 22. Natural Hazard Disclosure $78.00 per parcel 5.27% Information 23. Account Administration $8.00 per transaction 5.27% 24. Workers Comp. Insurance $7.50 per transaction 5.27% Administration 25. Determination of Merger $212.00 5.27% With Appeal {add) $141.50 5.27% • Rounded to nearest $0.50 for amounts less than $500.00 and rounded to nearest $1.00 for amounts $500.00 and greater. 4/10/2013 9 of 36 MASTER SCHEDULE OF FEES, CHARGES, AND RECOVERED COSTS SECTION 2500 -DEVELOPMENT SERVICES YEAR EFFECTIVE %OF FEE DESCRIPTION INCREASE ADOPTED DATE COST REFERENCE (CONTINUED) 2507. Relocation Permit Fees 2007-08 01/04/08 100% Ord. #07-048 1. Building permit, relocated Twice standard fee for work structures described in permit 2. Investigation permit a. Inside Fresno County $299.00 per structure 5.27% b. Outside Fresno County $299.00 per structure 5.27% + $.48.5 mi./per structure +$70.00 hr./per structure 5.27% 2508. Wrecking or Demolition Fees 2007-08 01/04/08 100% Ord. # 07-048 1. Single family residential $116.00 per structure 5.27% structures 2. All other structures a. First story-to 5,000 sq ft $116.00 per structure 5.27% b. Each additional 1,000 sq ft $22.00 per structure 5.27% c. Each story above 1/2 of fee for 1st story 3. Septic System not associated $113.25 per structure 5.27% with the demolition of a structure. • Rounded to nearest $0.50 for amounts Jess than $500.00 and rounded to nearest $1.00 for amounts $500.00 and greater. 4110/2013 10 of 36 MASTER SCHEDULE OF FEES, CHARGES, AND RECOVERED COSTS SECTION 2500 -DEVELOPMENT SERVICES YEAR FEE DESCRIPTION INCREASE ADOPTED (CONTINUED) 2509. Mobile Home Occupancy and Accessory Structures, Mobile Home Parks, Special Occupancy Trailer and Recreation Vehicle Parks, and Campground Fees 1. Penni! issuance $38.00 5.27% 2007-08 2. inspection beyond one $139.00 per reinspection 5.27% 2007-08 reinspection 3. Lot preparation for Mobile $237.50 per mobile home 5.27% 2007-08 Home, RV, and Commercial Coach (Does not include private septic system) 4. Installation of Mobile Home $187.50 per site 5.27% 2007-08 5. Septic System for Mobile Home, $148.50 per system 5.27% 2007-08 RV and Commercial Coach 6. Accessory structures including Fees as set forth for 2007-08 Cabanas, Ramadas & Garages Conventional construction 2510. Mechanical Code Fees 2007-08 1. Issuing each penni! $38.00 5.27% 2. Replacement, repair or installation of each heating appliance or flue vent $38.00 5.27% 3. Exhaust Hoods a. Installation of a $38.00 5.27% gravity system ventilation duct with or without hood screens in a commercial or institutional facility, not serving a commercial kitchen • Rounded to nearest $0.50 for amounts less than $500.00 and rounded to nearest $1.00 for amounts $500 00 and greater 4110/2013 11 of 36 · · EFFECTIVE %OF DATE COST REFERENCE 01/04/08 100% Ord. #07-048 01/04/08 100% Ord. #07-048 01/04/08 100% Ord. #07-048 01/04/08 100% Ord. #07-048 01/04/08 100% Ord. #07-048 01/04/08 100% Ord. #07-048 01/04/08 100% Ord. #07-048 MASTER SCHEDULE OF FEES, CHARGES, AND RECOVERED COSTS SECTION 2500 -DEVELOPMENT SERVICES YEAR FEE DESCRIPTION INCREASE ADOPTED (CONTINUED) 2007-08 b. Installation of a ventilation duct with a forced air (mechanical) system including hood duct in a commercial, industrial, institutional or related facility 1. Each system under 4,000 $38.00 5.27% C.F.M. 2. Each system over 4,000 $48.00 5.27% C.F.M. 4. Installation of a gas piping system a. 1 to 5 outlets $29.00 5.27% b. For each additional outlet $5.25 5.27% 5. All fireplaces and $72.50 each 5.27% each appliance or smoke stack governed by Code, not classed as a specific heating appliance 6. Comfort Cooling Installations: a. Each comfort cooling $11.75 5.27% window unit b. Each comfort cooling $38.00 5.27% system less than 7 tons c. Each comfort cooling $52.00 5.27% system 7 tons to 14 tons • Rounded to nearest $0.50 for amounts less than $500.00 and rounded to nearest $1.00 for amounts $500 00 and greater 4110/2013 12 of 36 · · EFFECTIVE %OF DATE COST REFERENCE 01/04/08 100% Ord. #07-048 MASTER SCHEDULE OF FEES, CHARGES, AND RECOVERED COSTS SECTION 2500 -DEVELOPMENT SERVICES YEAR EFFECTIVE %OF FEE DESCRIPTION INCREASE ADOPTED DATE COST REFERENCE (CONTINUED) 2007-08 01/04/08 100% Ord. #07-048 d. Each comfort cooling $86.00 5.27% system over 14 tons e. Each comfort cooling gas $38.00 5.27"/o absorption system to 130,000 BTU f. Each comfort cooling gas $52.00 5.27% absorption system 130,000 BTU to 370,000 BTU input g. Each comfort cooling gas $86.00 5.27% absorption system 370,001 and greater, each unit h. Comfort cooling & heating duct system 1) Single Story-floor area a. 0 to 4,000 sq. ft. $29.00 5.27% b. Over 4,000 sq. ft. $58.00 5.27% 2) Multi-story, per floor $29.00 5.27% 7. Mechanical installation a. New construction or complete remodel of single or multi-family dwellings, {fee includes duct work, registers, heating and cooling equipment but not metal fireplaces, gas piping or fireplaces). • Rounded to nearest $0.50 for amounts less than $500.00 and rounded to nearest $1.00 for amounts $500.00 and greater. 4/10/2013 13 of 36 MASTER SCHEDULE OF FEES, CHARGES, AND RECOVERED COSTS SECTION 2500 -DEVELOPMENT SERVICES YEAR EFFECTIVE %OF FEE DESCRIPTION INCREASE ADOPTED DATE COST REFERENCE (CONTINUED) 2007-08 01/04/08 100% Ord. #07-048 1. 0 to 750 sq. ft. of area $23.00/dwelling unit 5.27% of construction 2. 751 to 1,500 sq. ft. of $52.00/dwelling unit 5.27% area of construction 3. 1,501 to 2,500 sq. ft. of $80.00/dwelling unit 5.27% area of construction 4. Over 2501 sq. ft. of area, $5.25/dwelling 5.27% for each additional 500 sq. ft. or fraction thereof, add to above ?b. Motel units without kitchen 75% of fee schedule 2007-08 01/04/08 100% Ord. #07-048 facilities 2510 (?a) 8. Evaporative Coolers 2007-08 01/04/08 100% Ord. #07 -048 a. Each separate cooling tower $51.00 5.27% b. Evaporative coolers $51.00 5.27% 9. Special service for $70.00 per hour 5.27% investigation to determine (One hour minimum charge} compliance of a system with the code requirements or to effect a correction or repair to an existing system not covered by a specific schedule. 10. Minimum Fees: 2007-08 01/04/08 100% Ord. #07-048 a. The minimum mechanical $61.00 5.27% permit fee b. The minimum mechanical permit $116.00 5.27% fee for all structures to be relocated • Rounded to nearest $0.50 for amounts less than $500.00 and rounded to nearest $1.00 for amounts $500.00 and greater. 4110/2013 14 of 36 MASTER SCHEDULE OF FEES, CHARGES, AND RECOVERED COSTS SECTION 2500 -DEVELOPMENT SERVICES YEAR EFFECTIVE %OF FEE DESCRIPTION FEE AMOUNT ADOPTED DATE COST REFERENCE (CONTINUED) 2511. Electrical Code Fees 2007-08 10/12/06 100% Ord. #06-018 1. Electrical installations a. New construction or complete remodel 2007-08 01/04/08 100% Ord. #07-048 of single or multi-family dwellings (fee includes all wiring, outlets, fixtures, one 200 amp max. main service and one 200 amp max. sub panel.) 1) 0 -750 sq. ft. $110.50 per dwelling unit 2007-08 01/04/08 100% Ore!. #07-048 2) 751 -1,000 sq. ft. $139.00 per dwelling unit 2007-08 01/04/08 100% Ore!. #07-048 3) 1 ,001 - 1 ,500 sq. ft. $199.50 per dwelling unit 2007-08 01/04/08 100% Ord. #07-048 4) 1,501 -2,000 sq. ft. $257.50 per dwelling unit 2007-08 01/04/08 100% Ord. #07-048 5) 2,001 -2,500 sq. ft. $315.50 per dwelling unit 2007-08 01/04/08 100% Ord. #07-048 6) 2,501 -3,000 sq. ft. $373.00 per dwelling unit 2007-08 01/04/08 100% Ord. #07-048 7) Each additional 500 sq.ft. $33.25 per dwelling unit2 2007-08 01/04/08 100% Ore!. #07-048 b. Motel units without 75% of fee schedule 2511 (1a) 2007-08 01/04/08 100% Ore!. #07-048 kitchen facilities 2. Issuing permits $38.00 each 2007-08 01/04/08 100% Ord. #07-048 3. Wiring outlets $1.60 each 2007-08 01/04/08 100% Ord. #07-048 4. Each circuit $12.00 each 2007-08 01/04/08 100% Ord. #07-048 (remodel work only) 5. Each motor 2007-08 01/04/08 100% Ord. #07-048 a. 0-1 HP $12.00 each b. Over 1 HP -5 HP $33.50 each c. Over 5 HP -30 HP $42.00 each d. Over 30 HP -50 HP $64.00 each e. Over 50 HP-100 HP $104.00 each f. Over 100 HP-150 HP $161.50 each g. Over 150 HP $161.50 each+ $57.00 for each 50HP or fraction thereof over 150 HP •Rounded to nearest $0.50 for amounts less than $500.00 and rounded to nearest $1.00 for amounts $500.00 and greater. 4110/2013 15 of 36 MASTER SCHEDULE OF FEES, CHARGES, AND RECOVERED COSTS SECTION 2500 -DEVELOPMENT SERVICES YEAR EFFECTIVE FEE DESCRIPTION FEE AMOUNT ADOPTED DATE (CONTINUED) 6. Each transformer: 2007-08 01/04/08 a. 0-1 KVA $12.00 each b. Over 1 KVA -5 KVA $33.00 each c. Over 5 KVA-30 KVA $42.00 each d. Over 30 KVA-50 KVA $64.00 each e. Over 50 KVA -100 KVA $104.00 each f. Over 100 KVA-200 KVA $161.50 each g. Over200 KVA $161.50ea + $57.00 for each 200 KVA or fraction thereof over200 KVA 7. Each agricultural pump or wind $116.00 each 2007-08 01/04/08 machine motor (minimum fee) 8. Moving of motors 75% of fee required 2007-08 01/04/08 for new equipment 9. Each exterior lighting standard 2007-08 01/04/08 a. First 4 standards $23.00 each b. Over 4 standards $14.50 each 1 0. Each range, dishwasher, waste $20.25 each 2007-08 01/04/08 disposal, water heater, heater, dryer, or welder installation or other single outlet circuit 11. Temporary lights in building $38.00 each 2007-08 01/04/08 in the course of construction or undergoing repairs or similar use *Rounded to nearest $0.50 for amounts less than $500.00 and rounded to nearest $1.00 for amounts $500.00 and greater. 4/10/2013 16 of 36 %OF COST REFERENCE 100% Ord. #07-048 100% Ord. #07-048 100% Ord. #07-048 100% Ord. #07-048 100% Ord. #07-048 100% Ord. #07-048 MASTER SCHEDULE OF FEES, CHARGES, AND RECOVERED COSTS SECTION 2500 -DEVELOPMENT SERVICES YEAR EFFECTIVE FEE DESCRIPTION FEE AMOUNT ADOPTED DATE (CONTINUED) 12. Incandescent electric sign or 2007-08 01/04/08 outline lighting of luminous gas type with: a. 1 to 4 transformers $62.50 each b. additional transformers $6.00 each 13. Luminous gas type fixture $12.00 each 2007-08 01/04/08 with transformer (except fluorescent type) 14. X-ray unit and its $62.50 each 2007-08 01/04/08 appurtenances 15. Service and/or sub-panel: 2007-08 01/04/08 a. For 0 -200 amps $29.00 each b. For 201 -400 amps $96.00 each c. For 401 -600 amps $148.50 each d. 601 amps to 1600 amps $295.50 each e. Over 1600 amps $295.50 each + $29.00 for each 200amps of fraction thereof over 1600amps ea 16. Time Clock $12.00 each 2007-08 01/04/08 17. Electric valve $5.50 each 2007-08 01/04/08 18. Inspection of any electrical $71.50 per hour 2007-08 01/04/08 equipment where no fee is (One hour minimum charge) herein prescribed, for the time consumed. •Rounded to nearest $0.50 for amounts less than $500.00 and rounded to nearest $1.00 for amounts $500.00 and greater. 4110/2013 17 of 36 %OF COST REFERENCE 100% Ord. #07-048 100% Ord. #07-048 100% Ord. #07-048 100% Ord. #07-048 100% Ord. #07-048 100% Ord. #07-048 100% Ord. #07-048 MASTER SCHEDULE OF FEES, CHARGES, AND RECOVERED COSTS SECTION 2500 -DEVELOPMENT SERVICES YEAR EFFECTIVE %OF FEE DESCRIPTION FEE AMOUNT ADOPTED DATE COST REFERENCE (CONTINUED) 19.Minlmum fees: 2007-08 01/04/08 100% Ord. #07-048 a. Minimum electrical permit fee $58.50 minimum fee b. Minimum electrical permit $97.00 minimum fee for all structures to be relocated c. Electrical permit fee, $116.50 minimum agricultural pump or wind motor 2512. Plumbing Code Fees 2007-08 01/04/08 100% Ord. #07-048 1. Alteration, repair or addition $71.50 each of a drain or waste line 2. Pre-sewer inspection $71.50 each 3. Change in existing septic $90.50 each installation tanks by the addition of drainfields or seepage pits or to replace septic tanks. 4. Conversion of a single family $124.50 per structure dwelling from liquid petroleum gas to natural gas 5. Certification of an on-site $148.5 each sewage disposal system 6. Gas appliance or vent $38.00 each 7. Gas Piping Systems a. Gas piping system other $29.00 each system than on-site mains. First 5 outlets. b. Each additional outlet $5.50 each 8. Inspection of any plumbing, $71.50 each which no fee is prescribed •Rounded to nearest $0.50 for amounts less than $500.00 and rounded to nearest $1.00 for amounts $500.00 and greater. 4110/2013 18 of 36 MASTER SCHEDULE OF FEES, CHARGES, AND RECOVERED COSTS SECTION 2500 -DEVELOPMENT SERVICES YEAR EFFECTIVE %OF FEE DESCRIPTION FEE AMOUNT ADOPTED DATE COST REFERENCE (CONTINUED) 2007-08 01/04/08 100% Ord. #07-048 9. Installation of any gas device: (poultry operations only) a. Gas piping system $58.50 each b. Gas devices: 1. 1st 5 devices $12.00 each 2. Additional devices $5.50 each 10. Issuing permit $38.00 each 11. Backflow Prevention a. Lawn sprinkler system for $58.50 each single family dwellings in which a backflow protective device or devices are installed b. All other backflow devices $29.00 each 12. Minimum Fees: a. Minimum plumbing permit fee $58.50 each b. Minimum plumbing permit fee $97.00 each for all structures to be relocated minimum fee 13. Plumbing installations a. New construction or complete remodel of single or multi-family dwellings up to 3 bathrooms. (Includes structure, gas, water, waste and miscellaneous piping systems and all plumbing fixtures.) 1. One bathroom $179.00 per dwelling unit 2. Two bathrooms $238.50 per dwelling unit 3. Three bathrooms $262.50 per dwelling unit Each additional fixture $29.00 per bathroom fixture over 3 bathrooms b. Motel Units without Kitchen 75% of schedule 2512 (13a) 2007-08 10/12/06 100% Ord. #06-018 Facilities •Rounded to nearest $0.50 for amounts less than $500.00 and rounded to nearest $1.00 for amounts $500.00 and greater. 4110/2013 19 of 36 MASTER SCHEDULE OF FEES, CHARGES, AND RECOVERED COSTS SECTION 2500 -DEVELOPMENT SERVICES YEAR EFFECTIVE %OF FEE DESCRIPTION FEE AMOUNT ADOPTED DATE COST REFERENCE (CONTINUED) 14. On-site piping. Includes 2007-08 01/04/08 100% Ord. #07-048 sewer, water, gas. a. First 1 00 feet $89.00 b. Each additional 1 00 ft. $5.50 15. On-site sewer manhole $116.00 each 16. Plumbing fixture or set of $29.00 each fixtures on 1 trap including water drainage piping and backflow protection 17. Rainwater system (Roof drain) $20.00 each 18. Septic Systems a. Septic tank installation $148.50 each including seepage pits or drainfields b. Test hole inspection with $62.00/inspection septic tank permit c. Test hole inspection and $96.00/inspection maintenance of records when building or septic permits not taken out d. Small lot inspection $62.00 per inspection 19. Water piping system on-site mains. a. First 5 outlets $29.00 each system b. Each additional outlet $5.50 each •Rounded to nearest $0.50 for amounts less than $500.00 and rounded to nearest $1.00 for amounts $500.00 and greater. 4110/2013 20 of 36 MASTER SCHEDULE OF FEES, CHARGES, AND RECOVERED COSTS SECTION 2500 -DEVELOPMENT SERVICES YEAR EFFECTIVE %OF FEE DESCRIPTION FEE AMOUNT ADOPTED DATE COST REFERENCE (CONTINUED) 2514. Refunds 2007-Q8 100% Ord.# 92-013 If construction has not commenced, a refund of 80% of the permit fee will be allowed where the permit is canceled at the request of the permittee, within 180 days from date of issue. No permit fee will be refunded I for any permit which has expired. When the plan review service has been performed, no refund will be made of the plan review fee. All requests for refund must include a statement in writing containing the reasons for the request. 2515. Water Pump Test 1. Water Pump Test Fee $212.00 each 2007-08 01/04/08 100% Ord. #07-048 2. 11-H Hydro Study Test Review $267.00 each 2008-09 02/17/09 100% Ord #09-003 2550. Land Development Permits and Processing 2007-08 01/04/08 100% Ord. #07-048 1. Amendment application with $7,552.00 each concurrent misc. D.R.A. 2. Amendment application with concurrent CUP a. Unclassified CUP $12,240.00 each b. Classified CUP $8,501.00 each 3. Amendment application with $7,008.00 each concurrent residential D.R.A. •Rounded to nearest $0.50 for amounts less than $500.00 and rounded to nearest $1.00 for amounts $500.00 and greater. 4110/2013 21 of 36 MASTER SCHEDULE OF FEES, CHARGES, AND RECOVERED COSTS SECTION 2500 -DEVELOPMENT SERVICES YEAR EFFECTIVE %OF FEE DESCRIPTION FEE AMOUNT ADOPTED DATE COST REFERENCE (CONTINUED) 2007-08 01/04/08 100% Ord. #07-048 4. Amendment to text $7,326.00 each 5. Conditional Use Permit (CUP) a. Unclassified $9,123.00 each b. Classified $4,569.00 each c. Revision 25% of the CUP Fee 2007-08 01/04/08 100% Ord. #07-048 6. Conditional Use Permit 2007-08 01/04/08 100% Ord. #07-048 application with concurrent variance a. Unclassified CUP 1 . w/Ciass I VAR $10,724.00 each 2. w/Ciass II VAR $12,152.00 each b. Classified CUP 1 . w/Ciass I VAR $6,169.00 each 2. w/Ciass II VAR $8,327.00 each 7. Continuance of noticed $477.00 each public hearing 8. Director Review and Approval (ORA) a. Residential ORA includes day $1,570.00 each care facilities (in-home), home beauty shops, and other uses secondary to residential use b. Misc. ORA includes commercial, $2,660.00 each industrial and all other applications subject to ORA c. Revision 25% of the ORA Fee 2007-08 100% Ord.#94-015 •Rounded to nearest $0.50 for amounts less than $500.00 and rounded to nearest $1.00 for amounts $500.00 and greater. 4110/2013 22 of 36 MASTER SCHEDULE OF FEES, CHARGES, AND RECOVERED COSTS SECTION 2500 -DEVELOPMENT SERVICES YEAR EFFECTIVE o/oOF FEE DESCRIPTION FEE AMOUNT ADOPTED DATE COST REFERENCE (CONTINUED) 2007-08 01/04/08 100% Ord. #07-048 9. Minor Variance $1,613.00 each 1 0. Misc. ORA with concurrent variance a. Class I VAR $4,535.00 each b. Class II VAR $7,379.00 each 11. Pre-application report $924.00 each Fee paid for a pre-application report shall be deducted from the CUP, Variance or Amendment Application fee. 12. Residential ORA with concurrent variance a. ClassiVAR $3,990.00 each b. Class II VAR $6,835.00 each 13. Tentative tracts (TI) (Subdivision maps) a. First 40 lots $4,490.00 Base plus $457.oonot b. Next35 Jots $229.oonot c. Next75 Jots $116.oonot d. Next 150 lots $72.50 not e. Next 300 lots $61.00 not f. Over 600 lots $46.50not g. Revision 25% ofT.T. fee 14. Variance {VA) a. Class I: $3,204.00 each Deviations from the following standards: 1) Lot sizes, dimensions & frontage {except rural, residential and agricultural districts) •Rounded to nearest $0.50 for amounts less than $500.00 and rounded to nearest $1.00 for amounts $500.00 and greater. 4110/2013 23 of 36 MASTER SCHEDULE OF FEES, CHARGES, AND RECOVERED COSTS SECTION 2500 -DEVELOPMENT SERVICES YEAR EFFECTIVE %OF FEE DESCRIPTION FEE AMOUNT ADOPTED DATE COST REFERENCE (CONTINUED) 2007-08 01/04/08 100% Ord.#07-048 2) Setbacks (except tennis courts) 3) Fence and wall requirements in residential districts 4) Parking standards for single- family residential districts 5) Signs b. Class II: $6,049.00 each Deviations from the following standards. 1) Density standards 2) Swimming pool locations 3) Fence and wall requirements in non-residential districts 4) Tennis courts 5) Lighting 6) Parking in non-residential and multi-family districts 7) Building height 8) Lot coverage c. Revision 25% of the V.A. Fee 2007-08 100% Ord. #94-015 15. Subdivision exceptions $697.00 2007-08 01/04/08 100% Ord. #07 -048 •Rounded to nearest $0.50 for amounts less than $500.00 and rounded to nearest $1.00 for amounts $500.00 and greater. 4110/2013 24 of 36 MASTER SCHEDULE OF FEES, CHARGES, AND RECOVERED COSTS SECTION 2500 -DEVELOPMENT SERVICES YEAR EFFECTIVE %OF FEE DESCRIPTION FEE AMOUNT ADOPTED DATE COST REFERENCE (CONTINUED) 2007-08 01/04/08 100% Ord. #07-048 16. Processing misc. documents $243.50 (agreements, convenants and deferments) 17. Preliminary subdivision $1,830.00 18. Zoning division amendment (A.A.) $6,214.00 a. Revision 25% of the A.A. Fee 2007-08 100% Ord. #94-015 19.a. VA&CUP 25% of application fee 2007-08 100% Ord. #98-006 b. TT 25% of application fee 2007-08 100% Ord. #98-006 20.DELETED 2007-08 Ord. #96-006 21. Formation of new agriculture $374.00 2007-08 01/04/08 100% Ord. #07-048 preserves 22. Transmission line review per $7,739.00 Section 875 of Zoning Ordinance plus mailing costs 23. Mailing list preparation-misc. Actual cost 24. Requests for administrative $243.50 review of approved projects 25. Agricultural land a. Contracts $184.00 2007-08 01/04/08 100% Ord. #07-048 b. Cancellations $3,290.00 2007-08 01/04/08 100% Ord. #07-048 c. Revisions $374.00 2007-08 01/04/08 100% Ord. #07-048 26. Environmental Review $259.00 2007-08 01/04/08 100% Ord. #07-048 •Rounded to nearest $0.50 for amounts less than $500.00 and rounded to nearest $1.00 for amounts $500.00 and greater. 411012013 25 of 36 MASTER SCHEDULE OF FEES, CHARGES, AND RECOVERED COSTS SECTION 2500 -DEVELOPMENT SERVICES YEAR EFFECTIVE %OF FEE DESCRIPTION FEE AMOUNT ADOPTED DATE COST REFERENCE (CONTINUED) 2007-08 01/04/08 100% Ord. #07-048 27. Environmental Assessments (Initial Studies) a. Class I Assessments for (U) CUP's $5,151.00 and General Plan Amendments b. Class II Assessments for Amendments $3,901.00 Applications, (C) CUP's, Tentative Tracts, Amendments to Text, and Non- residential ORA's c. Class Ill Assessments for Residential $1,212.00 DRAs, Variances, Tentative Parcel Maps, Parcel Map Waivers and other projects not requiring land use clearance but subject to CEQA d. Revision 25% of fee 2007-08 100% Ord. #92-013 28. General plan conformity findings $860.00 2007-08 01/04/08 100% Ord. #07-048 29. Applicant request for continuance $142.50 2007-08 01/04/08 100% Ord. #07-048 30. Identical project resubmitted Actual costs (full fee when 2007-08 100% Ord. #95-015 after March 19, 1991, and within filed. Difference reimbursed one year initial submission or after actual costs determined.) reprocessed as a result of litigation. 31. Poultry Facility Permit $1,721.00 2007-08 01/04/08 100% Ord. #07-048 32. Appeal of Decision to the $508.00 2007-08 01/04/08 100% Ord. #07-048 Board of Supervisors or Planning Commission 33. Reclamation Plan $4,298.00 2007-08 01/04/08 100% Ord. #07-048 Overtime a. Analyst $85.00 per hour b. Clerical $52.50 per hour •Rounded to nearest $0.50 for amounts less than $500.00 and rounded to nearest $1.00 for amounts $500.00 and greater. 4110/2013 26 of 36 MASTER SCHEDULE OF FEES, CHARGES, AND RECOVERED COSTS SECTION 2500 -DEVELOPMENT SERVICES YEAR EFFECTIVE %OF FEE DESCRIPTION FEE AMOUNT ADOPTED DATE COST REFERENCE 34.Amendment to VA, CUP, DRA, & AA a. Modify condition(s) of approval 50% of current fee 2007-08 100% Ord. #98-006 b. Up to 50% expansion of the current 50% of current fee 2007-08 100% Ord. #98-006 use/activity within the existing application permit area 35. Land Use Permit Violations 35% Surcharge on 2007-08 10/12/06 100% Ord. #06-018 applicable application fee 36. Pre-Application Review $247.00 2007-08 01/04/08 100% Ord. #07-048 Fee to be credited if application filed within six months 37. Mitigation Compliance Monitoring $71.50 per hour 2007-08 01/04/08 100% Ord. #07-048 38. No Shoot and/or Dog Leash Law Area $1,635.00 2007-08 01/04/08 100% Ord. #07-048 DesiQnation •Rounded to nearest $0.50 for amounts less than $500.00 and rounded to nearest $1.00 for amounts $500.00 and greater. 4110/2013 27 of 36 MASTER SCHEDULE OF FEES, CHARGES, AND RECOVERED COSTS SECTION 2500-DEVELOPMENT SERVICES YEAR EFFECTIVE %OF FEE DESCRIPTION FEE AMOUNT ADOPTED DATE COST REFERENCE (CONTINUED) 2570. Development Engineering Permits and Processing 1. Tentative Parcel Map $1,562.00 base 2006-07 10/12/06 100% Ord. #06-018 plus $33.00/parcel a. Revision 25%ofFee 1993-94 100% Ord. #94-015 2. Tentative Parcel Map Waiver $1,158.00 base 2006-07 10/12/06 100% Ord. #06-018 plus $24.50/parcel a. Revision 25%ofFee 1993-94 100% Ord. #94-015 3. Property Line Adjustment $1,050.00 2006-07 10112/06 100% Ord. #06-018 a. Revision 25% of Fee 1993-94 100% Ord. #94-015 4. Pre-application for certificate of $1,158.00 base 2006-07 10112/06 100% Ord. #06-018 compliance plus $24.50/parcel a. Revision 25% of Fee 1993-94 100% Ord. #94-015 5. Pre-application for certi-$717.00 base 2006-07 10112/06 100% Ord. #06-018 ficate of compliance for plus $21.00/parcel Un-merger 7. Time extension for Tentative $320.00 2006-07 10/12/06 100% Ord. #06-018 Parcel Maps 8. Waiver Certificate $982.00 base 2006-07 10/12/06 100% Ord. #06-018 plus $74.50/parcel a. Revision 25% of Fee 1994-95 100% Ord. #94-Q15 Rounded to nearest $0.50 for amounts less than $500.00 and rounded to nearest $1.00 for amounts $500.00 and greater. 4110/2013 28of 36 MASTER SCHEDULE OF FEES, CHARGES, AND RECOVERED COSTS SECTION 2500-DEVELOPMENT SERVICES YEAR EFFECTIVE %OF FEE DESCRIPTION FEE AMOUNT ADOPTED DATE COST REFERENCE (CONTINUED) 9. Map checking fees a. Record of survey $543.00 initial map 2008.09 02/17/09 100% Ord. #09·003 plus $230.50/sheet over 2 sheets Plus Sr. Eng. Rate: $72.12/hr. (min. 2 hrs.) Back Check After Two b. Parcel map $4,292.00 base 2006-07 10112/06 100% Ord. #06-018 plus $127.00/parcel c. Final map $4,666.00 base 2006.07 10/12/06 100% Ord. #06-018 plus 1st 50 lots $233.00/lot Next 251ots $118.00/lot Over 75 lots $57.50 !lot d. Revisions 15% of Checking Fee 1995·96 100% Ord. #96..()06 e. Alternative fee for projects with 100% actual cost deposit equal to 1998-99 Ord. #98.006 estimated construction costs fees listed in 2570.9.C. greater than $5,000,000. 10.1mprovement plans-checking and inspection fees (based on estimated construction costs). a. Site plans $576.00 Base Plus 2006·07 10/12/06 100% Ord. #06·018 8% first $50,000 5% next $200,000 4% next $750,000 3% next $1,000,000 Checking Fee $576.00 Base plus 25% of total fee over $576.00 b. Other plans (maps, etc.) $5,824.00 Base plus 2006·07 10/12/06 100% Ord. #06-018 6.5% first $50,000 13% next $200,000 8% next $750,000 6% next $1,000,000 4% next $4,000,000 2% amount over $6,000,000 Checking Fee 35% of total fee 1994-95 100% Ord. #95-015 c. Alternative fee 100% actual costs* 1995-96 Ord. #96·016 for projects with estimated construe-Deposit equal to fees lion costs greater than $5,000,000 listed in 2570.10.B Note: Applicant may request that plan checking and inspection services be performed by qualified consultant under contract to County. Rounded to nearest $0.50 for amounts less than $500.00 and rounded to nearest $1.00 for amounts $500.00 and greater. 411012013 29of 36 MASTER SCHEDULE OF FEES, CHARGES, AND RECOVERED COSTS SECTION 2500-DEVELOPMENT SERVICES YEAR EFFECTIVE o/oOF FEE DESCRIPTION FEE AMOUNT ADOPTED DATE COST REFERENCE (CONTINUED) 11. Agreements for subdivision & site plan reviews (preparation & administration) a. All Projects .8 o/o est. canst. costs 1995-96 Ord. #96-016 b. Alternative fee 100% actual costs* 1995-96 Ord. #96-016 for projects with estimated construe-Deposit equal to fees !ion costs greater than $5,000,000 listed in 2570.11.A * Actual cost includes County staff and outside service costs plus the full range of current overhead charges and other costs including the cost of non-fee regulatory activities. 12. Re-filing of subdivision map $233.00 2006-07 10/12/06 100% Ord. #06-Q18 with clerk 13. Grading voucher $83.00 2006-Q7 10/12/06 100% Ord. #06-Q18 Rounded to nearest $0.50 tor amounts less than $500.00 and rounded to nearest $1.00 for amounts $500.00 and greater. 4110/2013 30of 36 MASTER SCHEDULE OF FEES, CHARGES, AND RECOVERED COSTS SECTION 2500-DEVELOPMENT SERVICES YEAR EFFECTIVE %OF FEE DESCRIPTION FEE AMOUNT ADOPTED DATE COST REFERENCE (CONTINUED) 14. Grading Plan -checking fee a. 50 cubic yards or less No fee b. 51 -100 cubic yards $352.00 2006-07 10/12/06 100% Ord. #06-018 c. 101 -1,000 cubic yards $416.00 2006-07 10/12/06 100% Ord. #06-018 d. 1,001 -10,000 cubic yards $467.00 2006-07 10112/06 100% Ord. #06-018 e. 10,001 -100,000 $467.00 for 1st 10,000 cubic yards 2006-07 10112/06 100% Ord. #06-018 cubic yards plus $118.00 each additional 10,000 cubic yards or fraction thereof f. 100,001-200,000 $1,529.00 for 1st 100,000 cubic 2006-07 10/12/06 100% Ord. #06-018 cubic yards yards plus $58.00 each additional 10,000 cubic yards orfraction thereof g. 200,001 cubic yards $2109.00 for 1st 200,000 cubic 2006-07 10/12/06 100% Ord. #06-018 yards plus $29.50 each additional 10,000 cubic yards or fraction thereof 15. Grading permit fees a. 50 cubic yards or less $352.00 2006-07 10/12/06 100% Ord. #06-018 b. 51 -100 cubic yards $416.00 2006-07 10112/06 100% Ord. #06-018 c. 101 -1,000 cubic yards $416.00 1st 100 cubic yards 2006-07 10112/06 100% Ord. #06-018 plus $59.50 each additional 100 cubic yards or fraction thereof Rounded to nearest $0.50 for amounts less than $500.00 and rounded to nearest $1.00 for amounts $500.00 and greater. 411012013 31of 36 MASTER SCHEDULE OF FEES, CHARGES, AND RECOVERED COSTS SECTION 2500-DEVELOPMENT SERVICES YEAR EFFECTIVE %OF FEE DESCRIPTION FEE AMOUNT ADOPTED DATE COST REFERENCE (CONTINUED) d. 1,001 -10,000 cubic yards $951.50.00 1st 1,000 cubic yards 2006-07 10/12/06 100% Ord. #06-018 plus $46.50 each additional 1,000 cubic yards or fraction thereof e. 10,001-100,000 cubic yards $1,370.00 1st 10,000 cubic yards 2006-07 10/12/06 100% Ord. #06-018 plus $118.00 each additional 10,000 cubic yards or fraction thereof f. 100,001 and more cubic yards $2,432.00 1st 100,000 cubic yards 2006-07 10/12/06 100% Ord. #06-018 and up plus $58.00 each additional 10,000 cubic yards or fraction thereof g. Special grading permit (pre-inspection) $70.50 per hr (2 hr min.) 2006-07 10/12/06 100% Ord. #06-018 h. Final grading inspection beyond $70.50 per hr (2 hr min.) 2006-07 10/12/06 100% Ord. #06-018 one inspection 16. Site Plan review: 2006-07 10/12/06 100% Ord. #06-018 a. Commercial, institutional $3,516.00 base and non-residential uses, (less than one acre) mobile home park, and plus $1,758.00 per acre over industrial 1 acre, up to 6 acres, maximum charge $12,306.00 b. Multiple dwellings: 1) Up to 5 units $1,g42.00 2) 6 to 10 units $3,091.00 3) 11 or more units $3,921.00 plus $31.50 per unit c. Rear yard and excessive $705.00 each front yard encroachment d. Signs $1,052.00 each e. Site Plan Revision 35% of application fee 1994-95 100% Ord. #95-015 (Including minor deviation for sand and gravel operation) f. Site Plan Review Violation 35% of application fee 1994-gs 100% Ord. #95-015 g. Vesting Tentative Maps 2006-07 10/12/06 100% Ord. #06-018 (residential only) 1) Up to Slots $1,942.00 2) 6-10 lots $3,091.00 3) 11 plus lots $3,921.00 plus $20.50 /lot Rounded to nearest $0.50 for amounts tess than $500.00 and rounded to nearest $1.00 for amounts $500.00 and greater. 411012013 32of 36 MASTER SCHEDULE OF FEES, CHARGES, AND RECOVERED COSTS SECTION 2500-DEVELOPMENT SERVICES YEAR EFFECTIVE %OF FEE DESCRIPTION FEE AMOUNT ADOPTED DATE COST REFERENCE (CONTINUED) 17. Change of occupancy develop-Same as site Plan review 2006-07 10/12/06 100% Ord. #06-018 men! classification $3,516.00 base (less than one acre) plus $1,758.00 per acre over 1 acre, up to 6 acres, maximum charge $12,306.00 18. SMARA and Permit Inspection (yearly) $2,257.00 per site 2007-08 01/04/08 100% Ord. #07-048 19. SMARA and Permit Reinspection 2007-08 01/04/08 100% Ord. #07-048 a) Staff Analyst $96.50 b) Clerical $48.50 20. Legal parcel verification $49.50 each 2006-07 10/12/06 100% Ord. #06-018 21. Bench mark book $11.50 per book 22. Section corner $62.00 per book 23. Review of grading and drainage $175.50 per plan Plans referred to the County by Incorporated Cities 24. Maintain a geographical index of Fee equal to recorders fee * 2008-09 02/17/09 Ord #06-003 certificates of correction. for filing a map 25. Subdivision Agreement Extension $512.00 2006-07 10112/06 100% Ord. #06-018 26. Reinspection (Work Not Ready for First Inspection) $256.00 2006-07 10/12/06 100% Ord. #06-018 * Recorders Fee chances periodically. The current recorders fee is $4.00 for the first sheet and $2.00 for each additional sheet. Rounded to nearest $0.50 for amounts less than $500.00 and rounded to nearest $1.00 for amounts $500.00 and greater. 4110/2013 33of 36 MASTER SCHEDULE OF FEES, CHARGES, AND RECOVERED COSTS SECTION 2500-DEVELOPMENT SERVICES YEAR EFFECTIVE %OF FEE DESCRIPTION FEE AMOUNT ADOPTED DATE COST REFERENCE (CONTINUED) 27. Extension of Property Line $320.00 2006-07 10/12/06 100% Ord. #06-018 Adjustment (P.L.A.) 28. Overtime (2hr. minimum) 1994-95 100% Ord. #95-015 a. Analyst $53.50 2006-07 10112/06 100% Ord. #06-018 b. Planning & Map checking $53.50 2006-07 10112/06 100% Ord. #06-018 c. Clerical $32.50 2006-07 10/12/06 100% Ord. #06-018 2580. County Service Areas 1. Reimbursement to Fresno County Delete 1991-92 100% Ord. #92-013 for formation costs of C.S.A. No. 35 (road maintenance) 2. Formation or boundary change Maps, boundary description, costs of zones of benefit budget, and by-laws are to be prepared in CSA35 by applicants engineer/surveyor a. Zone of benefit $4,311.00 2007-08 12/04/07 100% Ord. #07-048 b. Boundary Change• $4,242.00 2007-08 12/04/07 Ord. #07-048 to zone of benefit (new subdivision) c. Other than new subdivisions A reimbursement agreement 2011-12 08/09/11 100% Ord. #11-007 {existing private road will be entered into for actual maintenance zones of benefit) costs. A deposit will be required based upon estimated cost d. Boundary Change• A reimbursement agreement 2011-12 08/09/11 100% Ord. #11-007 {other than new subdivision) will be entered into for actual costs. A deposit will be required based upon estimated cost 3. Formation or Boundary Change• A reimbursement agreement 2011-12 08/09/11 100% Ord. #11-007 of CSAs other than CSA 35 will be entered into for actual costs. A deposit will be required based upon estimated cost 4. State Processing Fees Latest schedule of fees established 2007-08 100% Ord. #92-013 by the State of California Board of Equalization in Government Code Section 54900 5. Request for use of public financing of Delete 1993-94 100% Ord. #94-015 private development projects 6. Improvement District Formation or A reimbursement agreement 2011-12 08/09/11 100% Ord. #11-007 Boundary Change• will be entered into for actual costs. A deposit will be required based upon estimated cost 7. Community Facilities District (Melo-Roos) A reimbursement agreement 2011-12 08/09/11 100% Ord. #11-007 Formation or Boundary Change will be entered into for actual costs. A deposit will be required Rounded to nearest $0.50 for amounts less than $500.00 and rounded to nearest $1.00 for amounrs $500.00 and greater. 4/1 0/2013 34of 36 MASTER SCHEDULE OF FEES, CHARGES, AND RECOVERED COSTS SECTION 2500-DEVELOPMENT SERVICES YEAR EFFECTIVE %OF FEE DESCRIPTION FEE AMOUNT ADOPTED DATE COST REFERENCE based upon estimated cost *Includes annexations, detachments, consolidations and dissolutions Rounded to nearest $0.50 for amounts less than $500.00 and rounded to nearest $1.00 for am.ounts $500.00 and greater. 4/10/2013 35of J6 MASTER SCHEDULE OF FEES, CHARGES, AND RECOVERED COSTS SECTION 2500-DEVELOPMENT SERVICES YEAR EFFECTIVE o/oOF FEE DESCRIPTION FEE AMOUNT ADOPTED DATE COST REFERENCE 2585. Health Department Land Use Review 2008-09 07/01/08 100% Ord.# 08-009 1. Conditional Use Permit $654.00 each 2. Director Review and Approval $432.00 each 3. Tentative Tracts $1.092.00 each 4. Variances $365.00 each 5. Zoning Division Amendment $383.00 each 6. Environmental Assessment $338.00 each 7 Tentative Parcel Map $305.00 each 8. Tentative Parcel Map Waiver $305.00 each 9. Pre-Application for Certificate of $305.00 each Compliance 10. Site Plan Review (Base) a. Commercial, Institutional $518.00 each (base) plus $260/acre and Non-Residential over 1 acre up to 6 acres (max. $1,816) b. Multiple Dwellings 1) Flat Rate $518.00 each 2007-08 07/01/07 100% Ord.# 05-006 11. General Plan Amendment $459.00 each 12. LAFCO Application $176.00 each 2586. Department of Agriculture Land Use Review 2012-13 01/10/12 100% Ord.# 12-016 1. Conditional Use Permit $51.00 each 2. Initial Study $42.00 each 3. Director Review and Approval $25.00 each 4. Tentative Tracts $25.00 each 5. Variances $34.00 each 6. Environmental Review $25.00 each 7 Tentative Parcel Map $34.00 each 8. Tentative Parcel Map Waiver $34.00 each 9. Pre-Application for Certificate of $25.00 each Compliance 2587. County Review of Other Agency's Application 2007-08 0% Ord.# 07-048 Fee shall be paid by the City referring the application or the applicanVdeveloper of the project. Rounded to nearest $0.50 for amounts tess than $500.00 and rounded to nearest $1.00 for amounts $500.00 and greater. 4/10/2013 36of 36 MASTER SCHEDULE OF FEES, CHARGES, AND RECOVERED COSTS SECTION 2500-DEVELOPMENT SERVICES YEAR EFFECTIVE %OF FEE DESCRIPTION FEE AMOUNT ADOPTED DATE COST REFERENCE 1. Environmental Assessments Delete 0% 2. DraftEIR Delete 0% 3. Notice of Preparation Delete 0% 4. Other (supplemental EIRs. Delete 0% Addendums, etc.) 5. Right-of-way Acquisition Delete 0% 6. Tentative Tracts Delete 0% 7. LAFCO Review Delete 0% Rounded to nearest $0.50 for amounts less than $500.00 and rounded to nearest $1.00 for amounts $500.00 and greater. 4/10/2013 37of 36 MASTER SCHEDULE OF FEES, CHARGES, AND RECOVERED COSTS SECTION 2500-DEVELOPMENT SERVICES YEAR EFFECTIVE %OF FEE DESCRIPTION FEE AMOUNT ADOPTED DATE COST REFERENCE 2590. Groundwater Transfer Permits and Processing 2005-06 08/12/05 100% Ord. #05-013 1. Groundwater Transfer Director Review $1 ,97 4.00 each and Approval 2. Processing Miscellaneous Documents $181.00 each 3. Environmental Review $192.00 each 4. Class II Environmental Assessments a. Groundwater Transfer ORA $2,895.00 each b. Environmental Impact Report (EIR) (Staff and/or Consultant) Actual Cost 5. Appeal of Director's Decision $377.00 each 2595. Publications 1. Dwelling House Guide $18.50 2005-06 08/12/05 100% Ord. #05-013 Rounded to nearest $0.50 for amounts less than $500.00 and rounded to nearest $1.00 for amounts $500.00 and greater. 4110/2013 38of 36 EXHIBIT E BIDDING OliCUMENTS SELF-DEALING TRANSACTION DISCLOSURE (FINANCIAL) Non-corporate bidders may disregard this section. Bidders shall complete a SELF-DEALING TRANSACTION DISCLOSURE FORM, provided herein, for each applicable corporate director of the bidding company. The signed form{s) shall be submitted as a part of the company's proposal or quotation. Complete the form and indicate "NONEn under part 3 when your company is a corporation and no directors are involved with a Self-Dealing Transaction. The form must be signed by an individual authorized to legally bind the corporation when no directors have a Self-Dealing Transaction. DISCLOSURE OF SELF-DEALING TRANSACTIONS: The following provision will be incorporated into ensuing agreements. It shall apply only when the CONTRACTOR is operating as a corporation (a for-profit or non-profit corporation) or if during the term of the agreement, CONTRACTOR changes its status to operate as a corporation. This provision is only applicable if the CONTRACTOR is operating as a corporation (a for-profit or non-profit corporation) or if during the term of this agreement, the CONTRACTOR changes its status to operate as a corporation. Members of the CONTRACTOR's Board of Directors shall disclose any self-dealing transactions that they are a party to while CONTRACTOR is providing goods or performing services under this agreement. A self-dealing transaction shall mean a transaction to which the CONTRACTOR is a party and in which one or more of its directors has a material financial interest. Members of the Board of Directors shall disclose any self-dealing transactions that they are a party to by completing and signing a Self-Dealing Transaction Disclosure Form (Exhibit #) and submitting it to the COUNTY prior to commencing with the self-dealing transaction or immediately thereafter. March 10. 2W5 County of Fresno Page P·l BIDDING DOCUMENTS SELF-DEALING TRANSACTION DISCLOSURE FORM INSTRUCTIONS In order to conduct business with the County of Fresno {hereinafter referred to as "County"), members of a contractor's board of directors (hereinafter referred to as "County Contractor"), must disclose any self-dealing transactions that they are a party to while providing goods, performing services, or both for the County. A self-dealing transaction is defined below: "A self-dealing transaction means a transaction to which the corporation is a party and which one or more of its directors has a material financial interest" The definition above will be utilized for purposes of completing the disclosure form. (1) Enter board member's name, job title {if applicable), and date this disclosure is being made. (2) Enter the board member's company/agency name and address. (3) Describe in detail the nature of the self-dealing transaction that is being disclosed to the County. At a minimum, include a description of the following: a. The name of the agency/company with which the corporation has the transaction; and b. The nature of the material financial interest in the Corporation's transaction that the board member has. (4) Describe in detail why the self-dealing transaction is appropriate based on applicable provisions of the Corporations Codes. (5) Form must be signed by the board member that is involved in the self-dealing transaction described in Sections (3) and (4). Form provided on following page. March ID. 2015 County of Fresno PageP·2 BIDDING DOCUMENTS SELF-DEALING TRANSACTION DISCLOSURE FORM (1) Company Board Member Information: Name: Date: Job Title: --------------------------------- (2) Company/Agency Name and Address: (3) Disclosure {Please describe the nature of the self-dealing transaction you are a party to) -------------·-- (4) Explain why this self-dealing transaction is consistent with the requirements of Corporations Code 5233 {a) ------------------------------------- --------------------------------------------------·----------- -·----------. ---- (5) Authorized Signature Signature: ---·--·-·-------------·-···-_________ , ____________________ _ Date: ----------- March Ill 2015 County of Fresno PageP·3