Loading...
HomeMy WebLinkAbout2205C CCO 01.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER DRY CREEK BRIDGE REPLACEMENT ON CHANGE ORDER NO. 1 BURROUGH VALLEY ROAD JULY 28, 2023 BURROUGH VALLEY ROAD, JUST EAST OF TOLLHOUSE ROAD PAGE 1 OF 1 FEDERAL PROJECT NUMBER: BRLS-5942(245) CONTRACT NO. 22-05-C TO: AGEE CONSTRUCTION CORPORATION: Make the following changes to the plans and specifications or do work not in the plans and specifications for this contract. Because of the change(s), ZERO (0) -WORKING DAYS will be added to the contract time. CONSTRUCT A CAST-IN-PLACE CONCRETE CULVERT IN LIEU OF A PRECAST CONCRETE CULVERT This change was requested by the contractor. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, construct a cast-in-place reinforced concrete culvert in lieu of a precast reinforced concrete culvert on Tollhouse Road. Construct culvert per Standard Plan D81 with the same inlet, outlet and length dimensions as shown on the plans. Provide all required submittals and shop drawings, including a false work plan for review and approval. Construct the new culvert in two phases, allowing the traffic to always pass through the project site. Perform the work according to the applicable sections of the Standard Specifications and Special Provisions. This change is being made at no additional cost. No additional time will be granted for this change. Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if Auditor this proposal is approved,that we will provide all equipment, furnish all materials,except as may otherwise be _Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors _Const.Management therefore the prices shown above. RE _Design Division If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. DRY CREEK BRIDGE REPLACEMENT ON CHANGE ORDER NO. 1 BURROUGH VALLEY ROAD JULY 28, 2023 BURROUGH VALLEY ROAD, JUST EAST OF TOLLHOUSE ROAD PAGE 2 OF 2 FEDERAL PROJECT NUMBER: BRLS-5942(245) CONTRACT NO. 22-05-C NET COST THIS CHANGE ORDER: $0.00 (NO COST) NET TIME EXTENSION THIS CHANGE ORDER: ZERO (0) -WORKING DAYS QR James Drew, Resident Engineer N 04 APPROVAL RECOMMENDED: � r h C.Harrell,P.E. q�C V ` Joseph C. Harrell, PE OF CpyC Supervising Engineer, Design Division AGEE CONSTRUCTION CORPORATION Contractor Mandeep S. Sekhon, PE Construction Engineer By APPROVED BY: Digitally signed by Steve White Steve W h i lG Chief Estimator Date:2023.08.03 15 46 06 Title -07'00' Steven E. White, Director Jul 31 2023 Public Works and Planning Accepted Date: � Date: _Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if Auditor this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors therefore the prices shown above. _Const.Management RE Design Division If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified.