HomeMy WebLinkAbout22-14-C CCO 15.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 15 AMERICAN AVENUE TO MISSION STREET JULY 12, 2023 CONTRACT NO. 22-14-C PAGE 1 OF 4 TO: YARBS GRADING AND PAVING, INC.: Make the following changes to the plans and specifications or do work not in the plans and specifications for this contract. Because of the change(s), ZERO (0) -WORKING DAYS will be added to the contract timeline. PART I: REPLACE PLAN SHEET NO. 92 IN KINGSBURG REGION This change was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, replace Plan Sheet 92 with the attached revised Plan Sheet 92A in the Kingsburg region. This revised plan sheet changes locations of several streetlights between Sierra and Laurel Avenues, specifically poles A1, A2, A3, A4, and A5. The revisions shown on the revised sheet are blocked out for clarification. These revisions are being made at no additional cost. These revisions did not impact the critical path for the project, therefore, granting additional contract time was not warranted. TOTAL COST PART I: $0.00 (NO COST) TOTAL TIME EXTENSION PART I: ZERO (0) -WORKING DAYS PART II: REVISE ROADWAY STRUCTURAL SECTIONS AND PROPOSED IMPROVEMENT AREAS IN SELMA REGION This change was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work" of the Standard Specifications, replace Plan Sheets 40, 41, 42, 43, 44 and 45 with the attached revised sheets 40A, 41A, 42A, 43A, 44A and 45A in the Selma region. These revised plan sheets revise structural sections and proposed improvements on the southbound lanes between Park Street and Mountain View Avenue. The revisions shown on the revised sheets are blocked out for clarification. The following bid items were increased or decreased due to these revisions: Increased Items: Item Total TOTAL No. Description Unit Quantity Price Amount (0/0) of i0) 23 Roadway Excavation (F) CY 315.00 $37.00 $11,655.00 1.28 5.22 25 Aggregate Base (Class II) (F) CY 86.00 44.00 3,784.00 0.67 6.58 30 Rubberized Hot Mix Asphalt TON 1,000.00 188.00 188,000.00 46.08 46.08 31 Stress Absorbing Membrane SY 6,250.00 6.30 39,375.00 2.94 0.83 Interlayer Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if _Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be _Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment _Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. _Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 15 AMERICAN AVENUE TO MISSION STREET JULY 12, 2023 CONTRACT NO. 22-14-C PAGE 2 OF 4 TOTAL INCREASE: $242,814.00 Decreased Items: Item Total TOTAL No. Description Unit Quantity Price Amount (0/6) o� 29 Hot Mix Asphalt (Type A) TON 675.00 $103.00 $69,525.00 (0.69) 63.51 38 Cold Plane Asphalt Concrete SY 1,360.00 2.20 2,992.00 (0.56) (2.68) Pavement TOTAL DECREASE: $72,517.00 These changes did not impact the critical path for the project, therefore, granting additional contract time was not warranted. TOTAL COST PART II: A $170,297.00 INCREASE TOTAL TIME EXTENSION PART II: ZERO (0) -WORKING DAYS PART III: REPLACE PLAN SHEETS IN FOWLER REGION This change was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, replace Plan Sheets 101, 102, and 103 with the attached revised sheet 101A, 102A, and 103A in the Fowler region. The revised plan sheets correct the traffic striping in the region. The revisions shown on the revised sheets are blocked out for clarification. These revisions are being made at no additional cost. These revisions did not impact the critical path for the project, therefore, granting additional contract time was not warranted. TOTAL COST PART III: $0.00 (NO COST) TOTAL TIME EXTENSION PART III: ZERO (0) -WORKING DAYS PART IV: COMPENSATE THE CONTRACTOR FOR REMOVING THE IN-PAVEMENT FLASHING LIGHTS -SUPPLEMENTAL WORK This supplemental work was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work" of the Standard Specifications, compensate the contractor for removing the in-pavement flashing lights in the Kingsburg region. Compensation for this work will be made as extra work at force account according to Section 9-1.03, Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree, if _Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 15 AMERICAN AVENUE TO MISSION STREET JULY 12, 2023 CONTRACT NO. 22-14-C PAGE 3 OF 4 "Payment Scope," of the Special Provisions. Total compensation for this work resulted in $790.88, this amount will be paid through Bid Item No. 3, Supplemental Work with no net increase to the contract. This supplemental work did not impact the critical path for the project, therefore, granting additional contract TOTAL COST PART IV: $0.00 (PAID IN BID ITEM NO. 3) TOTAL TIME EXTENSION PART IV: ZERO (0) -WORKING DAYS PART V: ADD CONTRACT TIME FOR FIRST ORDER OF WORK - SUBMITTALS This change was requested by the contractor. Grant a time extension of 94 working days to the "First Order of Work, Submittals" due to additional time required to provide submittal review responses. This time extension is being granted according to Section 8-1.04C(1), "First Order of Work, Submittals," of the Special Provisions. TOTAL COST PART V: $0.00 (NO COST) TOTAL TIME EXTENSION PART V: 94 -WORKING DAYS (FIRST ORDER OF WORK, SUBMITTALS) _Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree, if Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 15 AMERICAN AVENUE TO MISSION STREET JULY 12, 2023 CONTRACT NO. 22-14-C PAGE 4 OF 4 NET COST THIS CHANGE ORDER: A $170,297.00 INCREASE NET TIME EXTENSION THIS CHANGE ORDER: 94 -WORKING DAYS (FIRST ORDER OF WORK, SUBMITTALS) Richard Stockwell, Resident Engineer APPROVAL RECOMMENDED: YARBS GRADING AND PAVING, INC. Contractor Mandeep S. Sekhon, PE Construction Engineer T1-0 r Yaj-bYowlG By Troy Y brough(Jul13,20 10:02PDT) APPROVED BY: h }p Digitally signed by Steve White President Steve W I 1 I a Date:2023.07.14 12:55:23 Title President Steven E. White, Director Accepted Date: J u 113 2023 Public Works and Planning , Date: Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors therefore the rites shown above. _Const.Management p RE/Arch. Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. U 2 `z a a a mz w t- a o rX g Ul J (n 7 w w ZO <gw o g y O Ir W ga g Oaf Z-3 133HS 33S - tl 3NIl H31tlW W S CD=s'a � e I I i C) Ess 1 � c P _ „ y_I `0 83 i 31 N z MAJ I ri <s V m O rn w" I I•� � o III!-_ I it zo a UW 3 wof ou w� 0s I r I 1 oa 1 J uW z _ I w r.l I I I j a s o 8 a oo �II ' i ) r I cc w s I „ a o A a a • FI IQ � ow/I❑ tl S � � s I. IIJ W.YS 1 1 1/Y. 1 1UW u 1, ,Y- ,.tl . + - .Y 1 W u'u 1 1 l� i�J�l l� 1 - J u•�!6 1 1 a •M:IO Z_RJ J3376 33S 00+BSL YJS SM7 AWY/f 0 \ CJ U ` 3 N $ • _A0739 33S 00+=YJS 3M!HXVM oIm I i �N W % T I ii `7 2x IN i 2 W In y oa m uIL w u ow w N Wz N T •_ .& � �\ oz '$ �U •N 'A g W aal W R x I Q Y vl N -' ggg W I !� g z� t I a ! I' a a z «� o < LU I QQ Y 5 b 3A09Y.w 00+GM YLS I ICALM a qw Yi OIL /b lYpLf[LOLR1/Y31YO 101d I�YTI-DWiPJTY71DY IIRf1�If-1�IarylglwflGW�1�Mq M/BTICppMf00��IMTNIY/ z _ C-0 J33HS 3Y5 09+6CZ YJS afm MLYN _ 7 0 z g F � n I / •� a� y Of LJ i 8 I I i z Ames MY os+s¢US=7 MMYnr 5-1 20 ;� II o ka I y Aa F K� j by H wSE w O7 u� e g I m W° W =/ 9 � ao / zzi 9 0 u o o ¢ 0 i W Y g 0CIO R •a Q ; - � a C7 u O� N N O % oym g. h I ag O a� a Y �. o I L eg i g w a i I O W. .1 I /� •� h w _ I� /�' a +� � tz LA �— r-a.1 tMtrS.ems on+6Z2 vts 3H7 jntvn anoer ass or+ssz its arm xunr 3'+� we usr[[sas/Ys/Yltro tots 4n�-smiaYsr7rou.wn.rs•r.e/w�wwnavra�+i�a/v aaosaaiMow�nrxt ri AoM azs os+srz its.rrn7 rrunr r-CO mars aas os+rn vts am eunr Ul co a f- g s a is �$ �e a a?X ° z `J FA � O � � our la - �g w m o 51 ^ O�'.� •i I t �l w 'o N h b z (a Z a ON o ou w o¢ �dN 'ash 'r 'Y >N Ell �� gg.a o a $� a 0w I hO N I I. N Iz g ry p w off-�- a< � s� I •I I• #�� �i � � � 0-0 MYRY aas os+eez vts arm murn seder Z=MY os+M its awr IEUY i s s all --low �vv-�m-rm�a-aou••wn•�•i-r�P•n•+ws�am•�idnw r•w rro-aaartea��annuri z Aam MY 99+99Z YLS JM7 LWYN 9-0.erns MY 99+2W W=7 BUYN W ILI W o P a m � i I i 7" R p r + I R k lad i # O Re, U a •z � a � ./ � ® 0 �I ��6 I nz i � C za vt 8. l w O a @ }- � 7 jz .,i og 1T $I a a. o w a lbr a 0 00 s a.' a aciz s 0 N c°�< LL y it FO t '• 4 — C R i J 2 g 7 :gI �� 7i � I a I �� •� � g � �I � 1 g gx' j' P�l a Ya aW& Gn IS ar v�Wy i KAI al W x a a $e a g I e R a vi e a1 a qi Y( aPr- .a k ri AL 01 C I �� i a s a � I � a I ■ x.a � a � � I•z• �� _ -�I. h � k ■■ ry w i 9-M 13.0LS MW 99410 YJS=7 rDtm a �, Anaa � aeb ;j~ ' s, •, a n . m m � w w o a n :' sI - _ Yq ss fey E 9A08Y MM 99+999 YLS ZW7 MIM E 6 +m III r19C1 CIOL/tUWLY0l0V Y�GJI"lOY{W ZJ/—!M4�MA�I•i/M�dI1NMf100Y�1M"q/T/I1p90lpiY00p�NYI((11 p¢ � N a q �r z N '•� - N h z 0 q ## # u 9- / a $ ff y• �.. oKC �C Y+CS d W 0 :0, a a wIz Z (FTa� I•.1� .,Pt � 6 e0 I I it d'o MAL I �? fio eg�. I q � I ■ L :ar ea I a o w ee >g e 1•i b b � 1 W 1 1 N N I < 5 d Y-OJ 133H5 399 09+29Z YLS 3M7 NJ1YJ( m ar wa io'�r�ssarrairuroiov syTy-aPJtPJTY-f90LL�A/IANf•=bP�tll�l�N=IOQYJI�MO Rf/I8D-CppilfOW�M�'N/Y1 i i c y $ _ a N : 3 $ ❑a h g w ' ti 6 !' C 1'f K Rf o 90 a � 8 wl m - w3 z �mna no a w r 1 hh �O Mow \' q ° zi 0ow w wl � n Z U w O m o 0 �I 4 • $ L-OJ17�r5 43S OS+�Yf.S •�x q w •- ` I U o '9i a � •1��•I ^^i�• �S r'n•Ih S R� o t�i cw�h nip V�\ W• •�•Yf�� K _.. r "�� L � • • jai^^f - �W VW.• ' I r ■� BLS-aaal r _Iv ICJ f _IW' 12 0. �� Wli / - / ^+ 4 � „ A 7 Cal ` 1 0 � ❑� � I / 21p 2C s ° I A m 8 Q m � � 53���� • � i /nay, � OS+LSZ Y1S 3AP7 K'1LYT u IJtlip� M{L"Yff tLlL/NiLYR 10)d JYO1d 0{QfIW"JN BJOY Y••Ydl�!•ia+f�Yl•i�NJIQT'�IW.q MdI!!-JpW4Y+00��MTIl1Id z rinse sss 09+u9 res sour MUM _ Z-ss mms sss o9+re9 its=7 MIM ? to .ems a. :.J •� j I � o- d ® I I macs oNs I 3 p a _ ^� cs. ZIII I I A Z J336LS H.9V3d W R W w z zfr RI I 11 O W f ow I ® � �� I� ; •h �W� = of 00 I 4Q KH S a om ts. YLtj� •-� ��I 1 I n ���� Zp I W ➢irk�a 7 •�� I � �_ I �� ram' •,�',�'� � '�aa � 9 o- I I z U � - - I w ■ I I ;. �� 7 I � I � � , ■ F I '. I a i W i I L I = 5-55 J3%HS SYS 09+091 vw am e. rm sAOer s95 OS+ZLS YiS 3A07 rturx S wa scas aariw�a�m road wu rsrira-cr-asou»»n�wr-r.a»n.lw�laanl.nw�»v sro-nww�weoa»»anrxtr� z I073B 33S 09+069 VIS 3M7 UaWr 0-£S LMN W 09*900 rl5 W7 MUM Z Ala x I eZ u y a . I z z �q � � •'��o I � A a z of j I —ars•�a � x� I o � z ® ra ,7398'IS St w •n coO� oQo•ne asp L* _ U ol o0 0 KN a 03 I ¢N -�, Sit o� �_ k DO vyoq S o00 ate Y I I I . 7aja s lam I I I �••-rJ t� A arr z � � A � v 0 € g �% i I I 0 �73uIs � 3MID70ju I I � � �� i I j I •ti- K 9-SS MMS MY 09-M ecS.W7 MUM 3A09V M 09+969 rIS 3a7 H.WV7P � e Mlro9 Ldal/D/131YO 101e wH-nsan-rr-�mu«wn.y.o�-e Rwnv..rriaani+f«awv aso-naa,�dew nnrtri z 09+0= Mm AWE, 6-SS L=US 09+ZE9 YJS 3167 RUM z - b � � S ozr 9 * + o li G � cn g rrr _ �nr-•"�a ..a - i � z T-1 ter+ O M 1 f ar Q N m y,Q 1 6r 1 1 I -[n O Z �w $ I p vWib"rp - _•-e� _ w �.N w EO N Za O� 8 M1 a ww F l « � errs-cn U ou o w O¢ I I wZ z a w 0 zrr I C ' F . •S I S II FW � I tt I a � SIB o � I I I I I i . x c� 2 �� a � s O O I w O �� e T. =o w p ao zo— I f�ym E� Q � I G w w a L-9S 33S 094909 M SM7 MEW 3AOBY 335 Osf029 YJS•7p7 7f,, lu lu rre-saw�-Hari