HomeMy WebLinkAbout22-14-C CCO 15.pdf COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 15
AMERICAN AVENUE TO MISSION STREET JULY 12, 2023
CONTRACT NO. 22-14-C PAGE 1 OF 4
TO: YARBS GRADING AND PAVING, INC.:
Make the following changes to the plans and specifications or do work not in the plans and specifications for
this contract. Because of the change(s), ZERO (0) -WORKING DAYS will be added to the contract timeline.
PART I: REPLACE PLAN SHEET NO. 92 IN KINGSBURG REGION
This change was requested by the engineer.
In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, replace Plan
Sheet 92 with the attached revised Plan Sheet 92A in the Kingsburg region. This revised plan sheet changes
locations of several streetlights between Sierra and Laurel Avenues, specifically poles A1, A2, A3, A4, and A5.
The revisions shown on the revised sheet are blocked out for clarification. These revisions are being made at
no additional cost.
These revisions did not impact the critical path for the project, therefore, granting additional contract time was
not warranted.
TOTAL COST PART I: $0.00 (NO COST)
TOTAL TIME EXTENSION PART I: ZERO (0) -WORKING DAYS
PART II: REVISE ROADWAY STRUCTURAL SECTIONS AND PROPOSED IMPROVEMENT AREAS IN
SELMA REGION
This change was requested by the engineer.
In accordance with Section 4-1.05, "Changes and Extra Work" of the Standard Specifications, replace Plan
Sheets 40, 41, 42, 43, 44 and 45 with the attached revised sheets 40A, 41A, 42A, 43A, 44A and 45A in the
Selma region. These revised plan sheets revise structural sections and proposed improvements on the
southbound lanes between Park Street and Mountain View Avenue. The revisions shown on the revised
sheets are blocked out for clarification. The following bid items were increased or decreased due to these
revisions:
Increased Items:
Item Total TOTAL
No. Description Unit Quantity Price Amount (0/0) of i0)
23 Roadway Excavation (F) CY 315.00 $37.00 $11,655.00 1.28 5.22
25 Aggregate Base (Class II) (F) CY 86.00 44.00 3,784.00 0.67 6.58
30 Rubberized Hot Mix Asphalt TON 1,000.00 188.00 188,000.00 46.08 46.08
31 Stress Absorbing Membrane SY 6,250.00 6.30 39,375.00 2.94 0.83
Interlayer
Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if
_Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be
_Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment
_Board of Supervisors
_Const.Management therefore the prices shown above.
RE/Arch.
_Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 15
AMERICAN AVENUE TO MISSION STREET JULY 12, 2023
CONTRACT NO. 22-14-C PAGE 2 OF 4
TOTAL INCREASE: $242,814.00
Decreased Items:
Item Total TOTAL
No. Description Unit Quantity Price Amount (0/6) o�
29 Hot Mix Asphalt (Type A) TON 675.00 $103.00 $69,525.00 (0.69) 63.51
38 Cold Plane Asphalt Concrete SY 1,360.00 2.20 2,992.00 (0.56) (2.68)
Pavement
TOTAL DECREASE: $72,517.00
These changes did not impact the critical path for the project, therefore, granting additional contract time was
not warranted.
TOTAL COST PART II: A $170,297.00 INCREASE
TOTAL TIME EXTENSION PART II: ZERO (0) -WORKING DAYS
PART III: REPLACE PLAN SHEETS IN FOWLER REGION
This change was requested by the engineer.
In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, replace Plan
Sheets 101, 102, and 103 with the attached revised sheet 101A, 102A, and 103A in the Fowler region. The
revised plan sheets correct the traffic striping in the region. The revisions shown on the revised sheets are
blocked out for clarification. These revisions are being made at no additional cost.
These revisions did not impact the critical path for the project, therefore, granting additional contract time was
not warranted.
TOTAL COST PART III: $0.00 (NO COST)
TOTAL TIME EXTENSION PART III: ZERO (0) -WORKING DAYS
PART IV: COMPENSATE THE CONTRACTOR FOR REMOVING THE IN-PAVEMENT FLASHING LIGHTS
-SUPPLEMENTAL WORK
This supplemental work was requested by the engineer.
In accordance with Section 4-1.05, "Changes and Extra Work" of the Standard Specifications,
compensate the contractor for removing the in-pavement flashing lights in the Kingsburg region.
Compensation for this work will be made as extra work at force account according to Section 9-1.03,
Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree, if
_Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be
Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment
Board of Supervisors
_Const.Management therefore the prices shown above.
RE/Arch.
Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 15
AMERICAN AVENUE TO MISSION STREET JULY 12, 2023
CONTRACT NO. 22-14-C PAGE 3 OF 4
"Payment Scope," of the Special Provisions. Total compensation for this work resulted in $790.88, this
amount will be paid through Bid Item No. 3, Supplemental Work with no net increase to the contract.
This supplemental work did not impact the critical path for the project, therefore, granting additional contract
TOTAL COST PART IV: $0.00 (PAID IN BID ITEM NO. 3)
TOTAL TIME EXTENSION PART IV: ZERO (0) -WORKING DAYS
PART V: ADD CONTRACT TIME FOR FIRST ORDER OF WORK - SUBMITTALS
This change was requested by the contractor.
Grant a time extension of 94 working days to the "First Order of Work, Submittals" due to additional time
required to provide submittal review responses. This time extension is being granted according to
Section 8-1.04C(1), "First Order of Work, Submittals," of the Special Provisions.
TOTAL COST PART V: $0.00 (NO COST)
TOTAL TIME EXTENSION PART V: 94 -WORKING DAYS (FIRST ORDER OF WORK, SUBMITTALS)
_Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree, if
Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be
Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment
Board of Supervisors
_Const.Management therefore the prices shown above.
RE/Arch.
Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 15
AMERICAN AVENUE TO MISSION STREET JULY 12, 2023
CONTRACT NO. 22-14-C PAGE 4 OF 4
NET COST THIS CHANGE ORDER: A $170,297.00 INCREASE
NET TIME EXTENSION THIS CHANGE ORDER: 94 -WORKING DAYS (FIRST ORDER OF WORK,
SUBMITTALS)
Richard Stockwell, Resident Engineer
APPROVAL RECOMMENDED:
YARBS GRADING AND PAVING, INC.
Contractor Mandeep S. Sekhon, PE
Construction Engineer
T1-0 r Yaj-bYowlG
By Troy Y brough(Jul13,20 10:02PDT) APPROVED BY:
h }p Digitally signed by Steve White
President Steve W I 1 I a Date:2023.07.14 12:55:23
Title President
Steven E. White, Director
Accepted Date:
J u 113 2023 Public Works and Planning
,
Date:
Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if
Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be
Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment
Board of Supervisors therefore the rites shown above.
_Const.Management p
RE/Arch.
Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
U
2
`z a
a
a
mz
w t- a
o rX g
Ul J
(n
7 w w
ZO <gw o g y O Ir
W ga g Oaf
Z-3 133HS 33S - tl 3NIl H31tlW W S CD=s'a �
e
I I i C) Ess 1 � c P
_ „
y_I `0 83 i
31
N
z
MAJ I ri <s V m
O rn
w"
I I•� � o
III!-_ I it zo
a
UW 3
wof ou
w�
0s
I r
I 1 oa
1 J uW
z _
I w
r.l I I I j a s o
8
a oo
�II '
i )
r I cc
w s
I „
a o
A a
a •
FI IQ � ow/I❑ tl
S
� � s
I. IIJ W.YS 1 1 1/Y. 1 1UW u 1, ,Y- ,.tl . + - .Y 1 W u'u 1 1 l� i�J�l l� 1 - J u•�!6 1 1 a •M:IO
Z_RJ J3376 33S 00+BSL YJS SM7 AWY/f
0 \ CJ U
` 3
N $ •
_A0739 33S 00+=YJS 3M!HXVM
oIm
I i �N
W % T
I ii `7
2x
IN i 2 W
In
y oa
m uIL w u
ow
w
N Wz
N
T •_ .& �
�\ oz
'$
�U •N 'A g W
aal W R x I Q Y
vl N -' ggg W I
!�
g
z� t I a !
I' a
a z
«� o <
LU
I
QQ Y 5
b
3A09Y.w 00+GM YLS I ICALM
a qw
Yi OIL /b lYpLf[LOLR1/Y31YO 101d I�YTI-DWiPJTY71DY IIRf1�If-1�IarylglwflGW�1�Mq M/BTICppMf00��IMTNIY/
z
_ C-0 J33HS 3Y5 09+6CZ YJS afm MLYN
_ 7
0
z g
F � n I / •� a� y Of
LJ
i 8
I
I i
z
Ames MY os+s¢US=7 MMYnr 5-1
20
;�
II o
ka
I
y Aa F K�
j by H wSE w O7 u�
e g I m
W°
W =/ 9 �
ao
/ zzi
9 0
u o o ¢
0
i
W Y g
0CIO
R •a Q ; - � a C7 u
O� N N O
%
oym
g. h
I ag O
a� a Y
�. o
I L eg i g w a
i I O
W. .1
I /� •� h w _ I� /�' a +� �
tz
LA
�—
r-a.1 tMtrS.ems on+6Z2 vts 3H7 jntvn anoer ass or+ssz its arm xunr
3'+� we usr[[sas/Ys/Yltro tots 4n�-smiaYsr7rou.wn.rs•r.e/w�wwnavra�+i�a/v aaosaaiMow�nrxt ri
AoM azs os+srz its.rrn7 rrunr r-CO mars aas os+rn vts am eunr
Ul
co
a
f-
g
s a is �$ �e a a?X ° z
`J
FA
� O
� � our
la
- �g w m
o 51 ^ O�'.� •i I t �l w 'o
N h b z
(a Z a
ON o
ou
w o¢
�dN 'ash 'r 'Y >N
Ell
�� gg.a o a
$� a 0w
I hO N I I. N
Iz
g ry p
w
off-�- a< � s� I •I I• #�� �i � � �
0-0 MYRY aas os+eez vts arm murn seder Z=MY os+M its awr IEUY i s s
all --low �vv-�m-rm�a-aou••wn•�•i-r�P•n•+ws�am•�idnw r•w rro-aaartea��annuri
z
Aam MY 99+99Z YLS JM7 LWYN 9-0.erns MY 99+2W W=7 BUYN
W
ILI
W o
P a
m �
i I i 7" R p
r + I R k lad i # O
Re, U a
•z � a � ./ � ® 0 �I ��6 I nz i � C
za
vt
8. l w
O
a @ }- � 7 jz
.,i
og
1T $I a a. o w a
lbr a 0
00 s
a.' a aciz s 0 N
c°�<
LL
y it FO
t '• 4 — C
R i J 2
g 7
:gI �� 7i � I a I �� •� � g � �I �
1 g gx' j' P�l a Ya aW&
Gn IS
ar v�Wy i KAI
al W x a
a $e a g I e R
a vi e
a1 a qi Y( aPr-
.a k
ri
AL
01
C
I �� i a s a � I � a I ■
x.a � a � � I•z• ��
_ -�I. h � k ■■ ry w
i
9-M 13.0LS MW 99410 YJS=7 rDtm a �,
Anaa � aeb ;j~ ' s,
•, a n . m m � w w o a n :' sI - _ Yq ss fey E
9A08Y MM 99+999 YLS ZW7 MIM E 6 +m
III r19C1 CIOL/tUWLY0l0V Y�GJI"lOY{W ZJ/—!M4�MA�I•i/M�dI1NMf100Y�1M"q/T/I1p90lpiY00p�NYI((11
p¢ �
N
a
q �r z
N '•� - N h z 0
q ## # u
9- / a $
ff y• �.. oKC �C Y+CS d W 0
:0,
a
a wIz
Z
(FTa� I•.1� .,Pt � 6
e0 I I it
d'o
MAL
I �? fio eg�. I q � I ■
L :ar ea I a
o
w
ee >g e
1•i b b � 1
W 1 1 N N I <
5
d
Y-OJ 133H5 399 09+29Z YLS 3M7 NJ1YJ(
m ar wa io'�r�ssarrairuroiov syTy-aPJtPJTY-f90LL�A/IANf•=bP�tll�l�N=IOQYJI�MO Rf/I8D-CppilfOW�M�'N/Y1
i
i c
y
$ _ a N : 3 $ ❑a h
g w ' ti 6 !'
C 1'f K Rf
o
90 a
� 8
wl
m -
w3
z
�mna no a
w
r 1 hh �O Mow
\' q °
zi
0ow
w
wl
� n Z
U w
O
m
o 0
�I 4
• $ L-OJ17�r5 43S OS+�Yf.S
•�x q w
•-
` I U o '9i a � •1��•I ^^i�• �S
r'n•Ih S R� o t�i cw�h nip V�\ W• •�•Yf�� K
_.. r "�� L � • • jai^^f - �W VW.• '
I r ■�
BLS-aaal
r _Iv
ICJ f _IW' 12 0. �� Wli / - / ^+ 4
� „ A 7 Cal ` 1 0 � ❑� �
I / 21p 2C s
° I A m 8
Q m � �
53���� • � i /nay, �
OS+LSZ Y1S 3AP7 K'1LYT u
IJtlip� M{L"Yff tLlL/NiLYR 10)d JYO1d 0{QfIW"JN BJOY Y••Ydl�!•ia+f�Yl•i�NJIQT'�IW.q MdI!!-JpW4Y+00��MTIl1Id
z
rinse sss 09+u9 res sour MUM _ Z-ss mms sss o9+re9 its=7 MIM ?
to
.ems a. :.J •� j I � o- d
® I I macs oNs I 3 p
a
_ ^�
cs. ZIII I I A
Z
J336LS H.9V3d W
R W w z
zfr RI I 11 O W f
ow
I ® � �� I� ; •h �W� = of
00
I 4Q KH S
a om
ts. YLtj� •-� ��I 1 I n ���� Zp
I W
➢irk�a 7 •�� I � �_
I �� ram' •,�',�'� � '�aa � 9 o-
I I z
U �
- -
I w
■
I I ;. �� 7 I � I � � , ■ F
I '.
I a i W i
I
L I =
5-55 J3%HS SYS 09+091 vw am e. rm sAOer s95 OS+ZLS YiS 3A07 rturx S
wa scas aariw�a�m road wu rsrira-cr-asou»»n�wr-r.a»n.lw�laanl.nw�»v sro-nww�weoa»»anrxtr�
z
I073B 33S 09+069 VIS 3M7 UaWr 0-£S LMN W 09*900 rl5 W7 MUM Z
Ala x I eZ
u y a
.
I z z
�q � � •'��o I � A a z
of j I —ars•�a � x� I o �
z ® ra ,7398'IS
St
w
•n coO�
oQo•ne asp L* _ U ol
o0
0 KN
a
03 I ¢N -�, Sit
o� �_
k DO
vyoq
S o00
ate Y
I
I I .
7aja s lam I
I I �••-rJ
t� A
arr
z
� �
A � v
0
€
g
�% i I
I 0
�73uIs �
3MID70ju I
I � �
�� i I j I •ti- K
9-SS MMS MY 09-M ecS.W7 MUM 3A09V M 09+969 rIS 3a7 H.WV7P
� e
Mlro9 Ldal/D/131YO 101e wH-nsan-rr-�mu«wn.y.o�-e Rwnv..rriaani+f«awv aso-naa,�dew nnrtri
z
09+0= Mm AWE, 6-SS L=US 09+ZE9 YJS 3167 RUM z -
b � �
S
ozr
9 * + o li
G � cn g
rrr _
�nr-•"�a ..a - i � z
T-1 ter+
O M
1 f
ar Q N m y,Q 1 6r 1 1 I -[n O Z
�w
$ I p vWib"rp - _•-e� _ w
�.N w EO
N Za
O� 8
M1 a ww
F l
« � errs-cn U ou o
w
O¢
I I wZ
z a
w
0
zrr I C
' F .
•S
I S II FW � I
tt
I a � SIB
o
� I I
I I I i . x
c�
2
�� a
� s
O O I w
O �� e
T.
=o w
p ao
zo—
I f�ym E� Q �
I G w w a
L-9S 33S 094909 M SM7 MEW 3AOBY 335 Osf029 YJS•7p7 7f,, lu
lu
rre-saw�-Hari