HomeMy WebLinkAboutD-22-194 21-07-SW CCO 01.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER AMERICAN AVENUE DISPOSAL SITE CHANGE ORDER NO. 1 PHASE I WASTE RELOCATION JUNE 26, 2023 18950 W AMERICAN AVE, KERMAN, CA 93630 PAGE 1 OF 2 CONTRACT NO. 21-07-SW TO: SUKUT CONSTRUCTION, LLC: Make the following changes to the Plans and Specifications or do work not included in the Plans and Specifications for this contract. Because of the change(s), 20 -WORKING DAYS will be added to the contract time. The completion date is October 3, 2023. EXCAVATE AND ROUGH GRADE FUTURE MODULES 9 AND 10— EXTRA WORK This change was proposed by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, excavate approximately 414,000 cubic yards of native soil from Phase III Modules 9 and 10 area and rough grade side slopes and subgrade per the attached drawing, as directed by the engineer. Place the excavated soil in the Stockpile Area 2 shown on the Project Plans, as directed by the engineer. Perform work according to the applicable sections of the Project Specifications and/or Standard Specifications. Compensation for this work will be made as extra work at an agreed unit price of$3.74 per cubic yards according to Section 9-1.03, "Payment Scope," of the Project Specifications. This agreed unit price includes compensation for all labor, equipment, incidentals, overhead costs, mark ups and profits, no additional compensation will be made thereafter. Measurements for payment will be made by drone surveys of the final excavated and graded surface of Modules 9 and 10. An initial surface for the proposed excavation areas was surveyed on June 7, 2023, see attached drawing. An estimated compensation for this extra work is $1,548,360, the actual compensation will be determined upon completing the final drone surveys. The actual compensation amount will be paid through Bid Item No.1, Supplemental Work, with no net increase to the contract. A 20-working days'time extension will be granted for this work. Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,if Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be _Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors therefore the prices shown above. _Const.Management RE/Arch. _Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER AMERICAN AVENUE DISPOSAL SITE CHANGE ORDER NO. 1 PHASE I WASTE RELOCATION JUNE 26, 2023 18950 W AMERICAN AVE, KERMAN, CA 93630 PAGE 2 OF 2 CONTRACT NO. 21-07-SW NET COST THIS CHANGE ORDER: $0.00 (PAID IN BID ITEM NO. 1) NET TIME EXTENSION THIS CHANGE ORDER: 20 -WORKING DAYS O6� 5: Oleg Savelyev, Resident Engineer APPROVAL RECOMMENDED: SUKUT CONSTRUCTION, LLC Contractor MANDEEP S. SEKHON, PE Construction Engineer By: Thomas Wadden(Jun 30,2023 13:44 PDT) APPROVED BY: Steve `VV„ h ite Digitally signed by Steve White Date:2023.07.05 10:51:35 Title: Project Manager Steve G -07'00' STEVEN E. WHITE, Director Accepted Date. Jun 30 2023 Public Works and Planning Date: Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,if Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be _Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. U 2 � � U 4 y Q H M � N o z 0 o= i �n 1 J 3 > I IX One,--� �f a x 2 8 8 ti � ` 1 2 YY Y U a ao = 2 z m � y o � 2 3 m � Q h � N o e� a � a a �s 0 t a c8 � e I m E 1 Qh i I e ! III i II I I Il � li I i 0 I� 4 e a o to m '�I (� p -- — ___. _ .... mown / H .._. 40Pr81 i q i h &8 Y 1 J � U � a 3 g o