HomeMy WebLinkAboutYarbs Grading and Paving Inc. - 22-14-C CCO 13.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 13 AMERICAN AVENUE TO MISSION STREET JUNE 28, 2023 CONTRACT NO. 22-14-C PAGE 1 OF 3 TO: YARBS GRADING AND PAVING, INC.: Make the following changes to the plans and specifications or do work not in the plans and specifications for this contract. Because of the change(s), ZERO (0) -WORKING DAYS will be added to the contract timeline. PART I: COMPENSATE FOR THE RELOCATION OF TWO WATER SERVICES IN FOWLER REGION— SUPPLEMENTAL WORK This change was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work" of the Standard Specifications, compensate the contractor for relocating two existing water services behind the new proposed curb and gutter at sta. 493+85 and 495+75. Compensation for this work will be made as extra work at force account according to Section 9-1.03, "Payment Scope," of the Special Provisions. Total compensation for this work resulted in $8,036.78, this amount will be paid through Bid Item No. 3, Supplemental Work with no net increase to the contract. This supplemental work did not impact the critical path for the project, therefore, granting additional contract time was not warranted. TOTAL COST PART I: $0.00 (PAID IN BID ITEM NO. 3) TOTAL TIME EXTENSION PART I: ZERO (0) -WORKING DAYS PART II: REVISE PROJECT PLANS IN KINGSBURG REGION TO REALIGN CONCRETE CURB This change was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, replace Plan Sheet 37E with the attached revised Plan Sheet 37G in the Kingsburg region. This revised plan sheet realigns the concrete curb for the northern curb-return at the Laurel Street intersection. The revisions shown on the revised sheet are blocked out for clarification. These revisions are being made at no additional cost. These revisions did not impact the critical path for the project, therefore, granting additional contract time was not warranted. TOTAL COST PART II: $0.00 (NO COST) TOTAL TIME EXTENSION PART II: ZERO (0) -WORKING DAYS PART III: REVISE PROJECT PLANS IN FOWLER REGION TO REALIGN THE STREET LIGHTS This change was requested by the engineer. Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment _Board of Supervisors therefore the prices shown above. _Const.Management RE/Arch. Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 13 AMERICAN AVENUE TO MISSION STREET JUNE 28, 2023 CONTRACT NO. 22-14-C PAGE 2 OF 3 In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, replace Plan Sheet 115 with the attached revised Sheet 115A in the Fowler region. This revised plan sheet realigns six (6) streetlights between approximate sta. 563+78 and 581+22. The revisions shown on the revised sheet are clouded for clarification. These revisions are being made at no additional cost. These revisions did not impact the critical path for the project, therefore, granting additional contract time was not warranted. TOTAL COST PART III: $0.00 (NO COST) TOTAL TIME EXTENSION PART III: ZERO (0) -WORKING DAYS PART IV: REVISE PROJECT PLANS IN KINGSBURG REGION TO ADD ADDITIONAL DRIVEWAYS This change was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, replace Plan Sheets 38C and 39A with the attached revised Plan Sheets 38D and 39B in the Kingsburg region. These revised plans sheets add two additional driveway approaches at sta. 66+50 and 71+46. The revisions shown on the revised sheets are blocked out for clarification. The following bid items were increased due to these revisions: Increased Items: Item Total TOTAL No. Description Unit Quantity Price Amount (0/6) o\/0) 23 Roadway Excavation (F) CY 28.00 $37.00 $1,036.00 0.11 3.89 25 Aggregate Base (Class II) (F) CY 15.00 $44.00 $660.00 0.12 5.88 29 Hot Mix Asphalt (Type A) TON 20.00 $103.00 $2,060.00 0.02 64.63 65 Minor Concrete— Driveway SY 16.00 $72.00 $1,152.00 2.03 2.03 70 Remove Concrete Curb and LF 75.00 $3.50 $262.50 1.49 1.49 Gutter TOTAL INCREASE: $5,170.50 These revisions did not impact the critical path for the project, therefore, granting additional contract time was not warranted. TOTAL COST PART IV: A $5,170.50 INCREASE TOTAL TIME EXTENSION PART IV: ZERO (0) -WORKING DAYS Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,if _Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be _Business Office noted above,and perform all services necessary for the work above specified,and will accept as full payment _Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 13 AMERICAN AVENUE TO MISSION STREET JUNE 28, 2023 CONTRACT NO. 22-14-C PAGE 3 OF 3 NET COST THIS CHANGE ORDER: A $5,170.60 INCREASE NET TIME EXTENSION THIS CHANGE ORDER: ZERO (0) -WORKING DAYS Richard Stockwell, Resident Engineer APPROVAL RECOMMENDED: YARBS GRADING AND PAVING, INC. Contractor Mandeep S. Sekhon, PE Construction Engineer T/-O� Yayblw—h By Troy Ydrbrough(Jun 29,2k310:55PDT) APPROVED BY: Digitally signed by Steve White Title President Steve White Date:2023.07.05 10:53:16-07'00' Steven E. White, Director Jun 29 2023 Public Works and Planning Accepted Date: , Date: Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,if Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. 2 a Pv' 4 O '< mre WO +� I II III m 0 ru a l 1 S j d o A o V in f �a I I �� II � " y<► G°� S+I a ccRR I I mm ro W>O m n LEI! En VI I 2. Ell- 0 O~ £ W O 1� S te I ' I I � J WW I' --- of a .LT29JS MDV7 ! O as W d Gn K' Ss• gx z --71' 4i . Ir IF z9-0.cavrs.z+s os+es res aL[nr + a r v A11'Iltll KOdRY/YLYO lOId Wltl/Q?{W-W-IIOY�MIYY�rUr y cM�M9�Nf1IXlv�1�I�OlM/fJO9IXp#!/OOJ�WI17(lY! li31 HO1108 33S - 3 3Nn Hom - 133HS 33S - ! 3Nl Hom U Q o w z x z w o F- I I o O co 171 1 TI J e x/a eVa 1SHob 3d s el : fJ so an unn I - •I I I ° I 1 I-i W¢0 0 I �o 0, O� Sii I t ' e l I W W ry g El jl a i I I n Y $ I a o u 9 om _it 'I I I i + II ibis w z 1 I I I I i Za O 1 yy �_€ir �a2� 1HOIa dOl 33S - 3 3NIl HOM 8 V i I e N \rl I I 9 9EEE � - 0 g Ss ,, 3f co 00 o C La10 -- _ m aI 9, II I�' Ali i MIa N OLLJ N 3W mQQ a Zm I $ £-3 133HS 335 - 0 3NI'1 Htl3a8 bh i S-m J371S MS 00+OZ VJS 9NJ1=VM z 8 o _ C fW as g �ni-2 �. ^WRY Uo U ti (D L StR r i 8 �I I Y 7r f-- C] fP- lzQQa" g� cp�'ym w p� W 00 r 8 as 10 z� b pS O— 10 l hI I oFv H K 0 W 0n - R a wz z z< O r � 8�-�+�� j II 1 n� 3 I a � " U V I hN LU it 12 ���.�•////. i ��'•— Jjn1 i '� A10�\ gN�' � u ' y�x=W� Y 09�n YJS sxn MUM W G W O ZN� "r W�Mjv. \ , ^ oz ) j § § ! ltd � o E 2 ) Ice ■ _ /) " - ° ) (\ § § §§ § _ E-- �\ k e ■@ � ZI � ) § � / §) �) ] � ■ \ p o- ® ' o z I I � ] | � E----, i n _ � �; ■». ; ) ° [ w§0_ §§ dJ _ �e { \ --- 44 2k§ $r ! | � t _ z < _ i q OR /~ I_r_,e mH.UYN (§ § ( § | ) �