HomeMy WebLinkAboutYarbs Grading and Paving Inc. - 22-14-C CCO 13.pdf COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 13
AMERICAN AVENUE TO MISSION STREET JUNE 28, 2023
CONTRACT NO. 22-14-C PAGE 1 OF 3
TO: YARBS GRADING AND PAVING, INC.:
Make the following changes to the plans and specifications or do work not in the plans and specifications for
this contract. Because of the change(s), ZERO (0) -WORKING DAYS will be added to the contract timeline.
PART I: COMPENSATE FOR THE RELOCATION OF TWO WATER SERVICES IN FOWLER REGION—
SUPPLEMENTAL WORK
This change was requested by the engineer.
In accordance with Section 4-1.05, "Changes and Extra Work" of the Standard Specifications,
compensate the contractor for relocating two existing water services behind the new proposed curb and
gutter at sta. 493+85 and 495+75. Compensation for this work will be made as extra work at force
account according to Section 9-1.03, "Payment Scope," of the Special Provisions. Total compensation
for this work resulted in $8,036.78, this amount will be paid through Bid Item No. 3, Supplemental Work
with no net increase to the contract.
This supplemental work did not impact the critical path for the project, therefore, granting additional contract
time was not warranted.
TOTAL COST PART I: $0.00 (PAID IN BID ITEM NO. 3)
TOTAL TIME EXTENSION PART I: ZERO (0) -WORKING DAYS
PART II: REVISE PROJECT PLANS IN KINGSBURG REGION TO REALIGN CONCRETE CURB
This change was requested by the engineer.
In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, replace Plan
Sheet 37E with the attached revised Plan Sheet 37G in the Kingsburg region. This revised plan sheet realigns
the concrete curb for the northern curb-return at the Laurel Street intersection. The revisions shown on the
revised sheet are blocked out for clarification. These revisions are being made at no additional cost.
These revisions did not impact the critical path for the project, therefore, granting additional contract time was
not warranted.
TOTAL COST PART II: $0.00 (NO COST)
TOTAL TIME EXTENSION PART II: ZERO (0) -WORKING DAYS
PART III: REVISE PROJECT PLANS IN FOWLER REGION TO REALIGN THE STREET LIGHTS
This change was requested by the engineer.
Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if
Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be
Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment
_Board of Supervisors therefore the prices shown above.
_Const.Management
RE/Arch.
Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 13
AMERICAN AVENUE TO MISSION STREET JUNE 28, 2023
CONTRACT NO. 22-14-C PAGE 2 OF 3
In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, replace Plan
Sheet 115 with the attached revised Sheet 115A in the Fowler region. This revised plan sheet realigns six (6)
streetlights between approximate sta. 563+78 and 581+22. The revisions shown on the revised sheet are
clouded for clarification. These revisions are being made at no additional cost.
These revisions did not impact the critical path for the project, therefore, granting additional contract time was
not warranted.
TOTAL COST PART III: $0.00 (NO COST)
TOTAL TIME EXTENSION PART III: ZERO (0) -WORKING DAYS
PART IV: REVISE PROJECT PLANS IN KINGSBURG REGION TO ADD ADDITIONAL DRIVEWAYS
This change was requested by the engineer.
In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, replace Plan
Sheets 38C and 39A with the attached revised Plan Sheets 38D and 39B in the Kingsburg region. These
revised plans sheets add two additional driveway approaches at sta. 66+50 and 71+46. The revisions shown
on the revised sheets are blocked out for clarification. The following bid items were increased due to these
revisions:
Increased Items:
Item Total TOTAL
No. Description Unit Quantity Price Amount (0/6) o\/0)
23 Roadway Excavation (F) CY 28.00 $37.00 $1,036.00 0.11 3.89
25 Aggregate Base (Class II) (F) CY 15.00 $44.00 $660.00 0.12 5.88
29 Hot Mix Asphalt (Type A) TON 20.00 $103.00 $2,060.00 0.02 64.63
65 Minor Concrete— Driveway SY 16.00 $72.00 $1,152.00 2.03 2.03
70 Remove Concrete Curb and LF 75.00 $3.50 $262.50 1.49 1.49
Gutter
TOTAL INCREASE: $5,170.50
These revisions did not impact the critical path for the project, therefore, granting additional contract time was
not warranted.
TOTAL COST PART IV: A $5,170.50 INCREASE
TOTAL TIME EXTENSION PART IV: ZERO (0) -WORKING DAYS
Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,if
_Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be
_Business Office noted above,and perform all services necessary for the work above specified,and will accept as full payment
_Board of Supervisors
_Const.Management therefore the prices shown above.
RE/Arch.
Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 13
AMERICAN AVENUE TO MISSION STREET JUNE 28, 2023
CONTRACT NO. 22-14-C PAGE 3 OF 3
NET COST THIS CHANGE ORDER: A $5,170.60 INCREASE
NET TIME EXTENSION THIS CHANGE ORDER: ZERO (0) -WORKING DAYS
Richard Stockwell, Resident Engineer
APPROVAL RECOMMENDED:
YARBS GRADING AND PAVING, INC.
Contractor Mandeep S. Sekhon, PE
Construction Engineer
T/-O� Yayblw—h
By Troy Ydrbrough(Jun 29,2k310:55PDT) APPROVED BY:
Digitally signed by Steve White
Title
President Steve White Date:2023.07.05 10:53:16-07'00'
Steven E. White, Director
Jun 29 2023 Public Works and Planning
Accepted Date: ,
Date:
Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,if
Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be
Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment
Board of Supervisors
_Const.Management therefore the prices shown above.
RE/Arch.
Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
2 a Pv' 4
O '< mre
WO
+� I II III m 0 ru
a l 1 S j d o A o
V
in
f �a I I �� II � " y<► G°�
S+I a
ccRR I I mm ro W>O m
n
LEI!
En
VI I 2.
Ell-
0 O~ £
W O
1� S
te
I
' I
I � J
WW
I' ---
of
a
.LT29JS MDV7 ! O as W d
Gn
K' Ss• gx z
--71'
4i .
Ir
IF
z9-0.cavrs.z+s os+es res aL[nr + a
r v A11'Iltll KOdRY/YLYO lOId Wltl/Q?{W-W-IIOY�MIYY�rUr y cM�M9�Nf1IXlv�1�I�OlM/fJO9IXp#!/OOJ�WI17(lY!
li31 HO1108 33S - 3 3Nn Hom - 133HS 33S - ! 3Nl Hom
U
Q o
w z
x
z w
o F-
I I o O co
171
1 TI J
e
x/a eVa
1SHob 3d s el :
fJ so
an unn I - •I I I ° I 1 I-i W¢0 0
I �o
0,
O�
Sii I t ' e l I W W
ry
g El jl a i I I n Y $ I a o u 9
om
_it 'I I I i + II ibis w z
1 I I I I i Za
O
1 yy
�_€ir
�a2�
1HOIa dOl 33S - 3 3NIl HOM 8
V i I e N
\rl I I 9 9EEE � -
0
g Ss ,, 3f
co
00 o C La10
-- _ m aI
9, II I�' Ali i MIa N OLLJ
N
3W mQQ
a Zm I $
£-3 133HS 335 - 0 3NI'1 Htl3a8 bh
i
S-m J371S MS 00+OZ VJS 9NJ1=VM z 8
o _ C
fW as g �ni-2 �. ^WRY Uo U
ti
(D
L
StR
r i 8
�I I Y 7r f--
C] fP-
lzQQa" g� cp�'ym
w
p�
W 00
r 8 as 10 z� b
pS O—
10
l hI I oFv H K 0
W 0n
-
R a wz
z
z<
O
r �
8�-�+�� j
II 1 n� 3 I
a � "
U V I hN
LU
it
12
���.�•////. i ��'•— Jjn1 i '� A10�\ gN�' � u ' y�x=W� Y
09�n YJS sxn MUM
W G W
O ZN�
"r W�Mjv.
\ ,
^ oz )
j § § ! ltd � o E
2 )
Ice
■
_ /)
"
-
° ) (\ §
§ §§ §
_ E-- �\ k e ■@ �
ZI
�
)
§ �
/ §)
�) ] � ■ \ p o-
® ' o
z I I
� ] | �
E----, i n _
� �; ■». ;
) °
[ w§0_
§§
dJ
_ �e {
\ --- 44
2k§ $r ! | �
t _ z < _ i q
OR
/~ I_r_,e mH.UYN
(§ § (
§ | ) �