HomeMy WebLinkAboutP-20-225 Adjustment PCSPM-01.pdf co
ti �J County of Fresno
r INTERNAL SERVICES DEPARTMENT
Facilities•Fleet•Graphics• Purchasing •Security•Technology
WRVS
MASTER AGREEMENT
ADJUSTMENT NUMBER #PCSPM-01
Master Agreement Number: P-20-225
June 21, 2023
Papich Construction dba Sierra Pacific Materials
398 Sunrise Terrace
Arroyo Grande, CA 93420
Contract Number P-20-225 covering Asphalt, Concrete, and Aggregate Materials is adjusted as follows:
The County of Fresno hereby accepts your price increase notice received June 21, 2023, to be effective
July 1, 2023 in accordance with the terms and conditions of our Contract Number P-20-225 and Revised
Attachment"A". All orders placed prior to July 1, 2023 will be priced in accordance with current
contract pricing.
Electronic Signatures. The parties agree that this Agreement may be executed by electronic signature as
provided in this section.
A. An"electronic signature" means any symbol or process intended by an individual signing this
Agreement to represent their signature, including but not limited to(1) a digital signature; (2) a faxed
version of an original handwritten signature; or(3) an electronically scanned and transmitted (for
example by PDF document) of a handwritten signature.
B. Each electronic signature affixed or attached to this Agreement (1) is deemed equivalent to a valid
original handwritten signature of the person signing this Agreement for all purposes, including but not
limited to evidentiary proof in any administrative or judicial proceeding, and (2) has the same force
and effect as the valid original handwritten signature of that person.
C. The provisions of this section satisfy the requirements of Civil Code section 1633.5, subdivision (b), in
the Uniform Electronic Transaction Act(Civil Code, Division 3, Part 2, Title 2.5, beginning with section
1633.1).
D. Each party using a digital signature represents that it has undertaken and satisfied the requirements
of Government Code section 16.5, subdivision (a), paragraphs (1)through (5), and agrees that each
other party may rely upon that representation.
This Agreement is not conditioned upon the parties conducting the transactions under it by electronic
means and either party may sign this Agreement with an original handwritten signature.
Please acknowledge your acceptance by returning all pages of this letter to my office via email or USPS.
333 W.Pontiac Way,Clovis,CA 93612/(559)600-7110
*The County of Fresno is an Equal Employment Opportunity Employer
CONTRACT NO. P-20-225 Page 2
June 21, 2023
If you have any questions, please contact Susan Walker, Purchasing Technician, at(559)600-7111 or
email suwalker(cDfresnocountyca.gov.
FOR THE COUNTY OF FRESNO
Gary Cornuelle Digitally signed by Gary Cornuelle
Date:2023.06.26 09:02:53-07'00'
Gary E. Cornuelle
Purchasing Manager
333 W. Pontiac Way
Clovis, CA 93612
GEC:slw
P-20-225 Adjustment#PCSPM-0Ldocx
CONTRACT NO. P-20-225 Page 3
June 21, 2023
CONTRACTOR TO COMPLETE:
Company: Papich Construction dba Sierra Pacific Materials
Type of Entity:
❑ Individual ■❑ Limited Liability Company
[] Sole Proprietorship ❑ Limited Liability Partnership
❑ Corporation [] General Partnership
Signature
Cody Walters eneral Sales Operations Manager 6/22/23
Print Name and Title Date
/,/Y
Signature
Greg Saragas CF 6/22/23
Print Name and Title Date
398 Sunrise Terrace Arroyo Grande Ca 93420
Address City State Zip
805-473-3016 805-473-5596 cwalters@spmrock.com
TELEPHONE NUMBER FAX NUMBER E-MAILADDRESS
ACCOUNTING USE ONLY
ORG No.: 45104514
Account No.: 7260
Requisition No.: 5142300098
(2/2023)
P-20-225 Adjustment#PCSPM-0I.docx
CONTRACT NO. P-20-225 Page 4
June 21, 2023
Sierra Pacific Material's Revised Attachment "A"
Prices effective July 1, 2023
Slow Cure Asphalt Concrete
Product Description Old Price New Price
3/8" SC-800 $60.00 105.00
3/8" SC-3000 $60.00 105.00
Environmental Fee(Per Load) $15.00 $15.00
Performance Grade (PG)Asphalt Concrete
Product Description Old Price New Price
PG 64-10,'W' Max $50.00 $78.50
PG 64-10, %2" Max $51.00 $87.00
PG 64-10,3/8" Max $62.00 $93.00
PG 64-10,ST'/z" Max Medium $56.00 $110.00
PG 64-10,ST 3/8" Max $67.00 $110.00
PG 64-10,Sheet Mix $70.00 $102.00
PG 70-10,'/<" Max $50.00 $80.00
PG 70-10,'/2"Max $51.00 $90.00
PG 70-10, 3/8" Max $6100 $97.00
PG 64-28,'/4" Max $50.00 $95.00
PG 64-28, '/2"Max $51.00 $115.00
PG 64-28,3/8"Max $62.00 $120.00
PG 64-16,'/4" Max $50.00 $78.50
PG 64-16, %2"Max $51.00 $87.00
PG 64-16,3/8"Max $62.00 $93.00
ST'/2"HMA Type A $51.00 $110.00
'/2" HMA Commercial $55.00 $110.00
'/2"HMA 64-1OR15 $51.00 $87.00
3/4"HMA 64-1OR15LAS B $100.00 $80.00
Environmental Fee(Per Load) $15.00 $15.00
Aggregates
Product Description Old Price New Price
3/4"Max Aggregate Base,Class 2 $10.00 $15.50
Permeable Material Class 1, Type B $12.00 $20.00
Permeable Material Class 2 $12.00 $25.00
Concrete Sand $12.00 $20.00
Skid Sand (50%'%"Crushed Rock,50%Concrete Sand) $15.00 $18.50
Plaster Sand $15.00 $18.00
Pit Surge $8.00 $15.00
Crushed Rock $16.50 $18.50
P-20-225 Adjustment#PCSPM-01.docx
CONTRACT NO. P-20-225 Page 5
June 21, 2023
Cobble Stone, 6" Max, Cobble Stone 4"-6" $60.00 $65.00
Cobble Stone, 12" Max, Cobble Stone 6"-12" $60.00 $65.00
Snow Sand $15.00 $16.00
Rock Dust $17.50 $22.00
3/4"Caltrans Class 2 AB $10.00 $15.50
Environmental Fee(Per Load) $15.00 $15.00
P-20-225 Adjustment#PCSPM-0 Ldocx