Loading...
HomeMy WebLinkAbout2214C CCO 11.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 11 AMERICAN AVENUE TO MISSION STREET JUNE 9, 2023 CONTRACT NO. 22-14-C PAGE 1 OF 2 TO: YARBS GRADING AND PAVING, INC.: Make the following changes to the plans and specifications or do work not in the plans and specifications for this contract. Because of the change(s), ZERO (0) -WORKING DAYS will be added to the contract timeline. REVISE PROJECT PLANS IN FOWLER REGION This change was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, replace plan sheets 22, 23, 46A, and 47 with the attached revised plan sheets 22A, 23A, 46C, and 47A in the Fowler region. These plan sheets are being revised to eliminate shoulder reconstruction at various locations within the Fowler region. The revisions shown on the revised sheets are blocked out for clarification. The following bid items were increased or decreased due to these revisions: Decreased Items: Item Total TOTAL No. Description Unit Quantity Price Amount o� o� 25 Aggregate Base (Class II) (F) CY 40.00 $44.00 $1,760.00 (0.31) 5.76 29 Hot Mix Asphalt(Type A) TON 15.00 103.00 1,545.00 (0.03) (1.17) 41 Remove Concrete Pavement CY 66.00 30.00 1,980.00 (1.89) (1.89) and Base (F) TOTAL DECREASE: $5,285.00 Increased Items: Item Total TOTAL No. Description Unit Quantit Price Amount °� 38 Cold Plane Asphalt Concrete SY 10.00 $2.20 $22.00 0.00 (2.13) Pavement 39 Cold In-Place Recycling SY 156.00 11.00 1,716.00 0.06 (0.49) TOTAL INCREASE: $1,738.00 These changes did not impact the critical path for the project, therefore, granting additional contract time was not warranted. _Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,If _Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business Office noted above,and perform all services necessary for the work above specified,and will accept as full payment _Board of supervisors therefore the prices shown above. _Const.Management RE/Arch. _Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 11 AMERICAN AVENUE TO MISSION STREET JUNE 9, 2023 CONTRACT NO. 22-14-C PAGE 2 OF 2 NET COST THIS CHANGE ORDER: $3,647.00 DECREASE NET TIME EXTENSION THIS CHANGE ORDER: ZERO (0) -WORKING DAYS Richard Stockwell, Resident Engineer APPROVAL RECOMMENDED: YARBS GRADING AND PAVING, INC. Contractor Mandeep S. Sekhon, PE Thy `��'�i `�/ �/ Construction Engineer ah By TroyYY rou h(Jun 20,2-h :09 PDT) APPROVED BY: Steve ` „ h ite Digitally signed by Steve White Title President Steve G V\V/ �i Date:2023.06.22 16:22:31 Steven E. White, Director Jun 20 2023 Public Works and Planning Accepted Date: , Date: _Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree, if _Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business Office noted above,and perform all services necessary for the work above specified,and will accept as full payment _Board of supervisors therefore the prices shown above. _Const.Management _RE/Arch. _Design If the Contractor does not sign acceptance of this order, his attention Is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. n n 9 C� Tr-7"YRS sus 0D.099 its&W WIM _ 11-7 t99N8 M am MLYN g I , CM I I a w a QN 0 y o a t a w g g O a Z< � Ijq,� � I I a �-z � z � I � - a� +tI � , I • � � � as $ � I ��^ I11 � os Lu 1 I y ih� mN p s o a 0-7 091M I4C.7hTl K'xLYNN 0-7 J"m M..M7 MMYN III LCPI9 PPOd/BI/P3LIo L09d -LIIITIII IPCY IIIIIIIII�A/•�MWLI4PMP1�1 IPb I/NMYMMOOO�PMTM/II M kO T.J-T d73Hs IM OS+sus YLS=7 H.7lYX Sr-7 zam w 20 RUYR 7 � y I o IS HJY1d 1 - I ON Lu (L m I w 12. n gU`� QyQy tl @S � � o ,tr ^I W U III I I I ° z Z "..� ix I I I ! aIEI � I + 8 —or-7 I5%Hs"s OS+J94 YJs 9XJ7 H]JYF 0[-7 dffiS 935 3Hf!X3{YX MM03 Ws, r� em/X/D41Yo low -►ITI771I-aeY eVMV-f MNgleoYol lv l9o-lar-waooa«....�rHtre v � 7 a J N � � • � y a a3 O Z 0 p � Jff N0778 AS 08+484 YJS DO 1MYN Z tiJ U IL I J m $ I z W U> + 0 U W w I $ w g� I 0 � Wz FZ oz 2W $ a �,�^, �• .: O 11 m c 5e as os*ars its axn H.um I � 8 8 I � h ohm H a"a+ N� � 3 g + x "i O SStt q � 3 I 4-RJ J3�(5.&YS 09+ers rrs.Ynm Fsxern — — s a �\ N9M 9AORY 9HS O91994 r!S aNR HOSYH wr�rov raorroimara iou �vw-rsor�aa-rr w��...w�..�wi-r..�r.rix«wiw.a�w.w r..+rro-rwrrtmw a..a,rwar� ! \ � / § c , _._m__m_a_ \�,_— ,ema� 72 \ � o m ` ` 7 § || « ; � ( , \§ \ ! \ � . n�.. . k - ' § 0k § § §§ ! |/ \ ! e2 Q | ^0 � !¥ � § , § , , | _ � k � ; | | ! ■ | &° | 8-0_s_Q__a_ �--—_.e_a_ . . , § ! | | I | | | � | § °