HomeMy WebLinkAbout2210M CCO 02.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER BPMP DECK TREATMENTS CHANGE ORDER NO. 02 VARIOUS LOCATIONS IN FRESNO COUNTY JUNE 8, 2023 CONTRACT NO. 22-10-M PAGE 1 OF 4 TO: T.P.A CONSTRUCTION, INC.: Make the following change(s) to the plans and specifications or do work not in the plans and specifications for this contract. Because of the change(s), 69 -WORKING DAYS will be added to the contract time. PART I: INCREASE/DECREASE/ELIMINATE ITEMS AT UNIT BID PRICES This change was proposed by the engineer. Quantities in the Bid Book are estimates only. This part adjusts items to the actual quantities used. Increased Items: Item Total TOTAL No. Description Unit Quantity Price Amount (0/.) o� 6 Furnish Bridge Deck GAL 62.00 $68.00 $4,216.00 19.62 19.62 Methacrylate Resin Treatment 8 Furnish Polyester Concrete CF 289.30 96.00 27,772.80 38.57 38.57 Overlay 10 Rapid Setting Concrete (Patch) CF 8.00 100.00 800.00 5.16 38.14 11 Remove Unsound Concrete CF 8.00 100.00 800.00 5.16 38.14 TOTAL INCREASE: $33,588.80 Decreased Items: Item Total TOTAL No. Description Unit Quantity Price Amount NO O 9 Place Polyester Concrete SF 37.00 $18.50 $684.50 (0.42) (0.42) Overlay 13 Remove Asphalt Concrete SF 2,940.00 3.00 8,820.00 (31.42) (31.42) Surfacing 14 Cold Plane Asphalt Concrete SQYD 64.40 61.00 3,928.40 (20.13) (20.13) Pavement TOTAL DECREASE: $13,432.90 Eliminated Items: Item Total TOTAL No. Description Unit Quantity Price Amount NO NO 16 Remove Pavement Marker EA 68.00 $2.00 $136.00 (100.00) (100.00) Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree, if _Auditor this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business office noted above, and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors _Const.management therefore the prices shown above. _RE/Arch. Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER BPMP DECK TREATMENTS CHANGE ORDER NO. 02 VARIOUS LOCATIONS IN FRESNO COUNTY JUNE 8, 2023 CONTRACT NO. 22-10-M PAGE 2 OF 4 17 Nonreflective White Marker EA 60.00 10.00 600.00 (100.00) (100.00) (Type A) 18 Thermoplastic Traffic Stripe LF 386.00 21.50 8,299.00 (100.00) (100.00) (Detail 5) 19 Thermoplastic Traffic Stripe LF 150.00 52.00 7,800.00 (100.00) (100.00) (Detail 21) 20 Thermoplastic Traffic Stripe LF 86.00 35.00 3,010.00 (100.00) (100.00) (Detail 22) 21 Retroreflective Pavement EA 8.00 15.00 120.00 (100.00) (100.00) Markers (Type D) TOTAL DECREASE: $19,965.00 TOTAL COST PART I: A $190.90 INCREASE TOTAL TIME EXTENSION PART I: ZERO (0) -WORKING DAYS PART II: ADJUST COMPENSATION FOR TRAFFIC CONTROL ASSOCIATED WITH ADDITIONAL UNSOUND CONCRETE AT FAIRFAX AVENUE BRIDGE— EXTRA WORK This request was made by the contractor. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, adjust compensation for the traffic control associated with the additional unsound concrete work performed at the Fairfax Avenue bridge. Compensation for the removal and patch-back of the unsound concrete was paid through Bid Items Nos. 10 and 11. Compensation for the associated temporary traffic control will be made as extra work at Force Account according to Section 9-1.03, "Payment Scope," of the Special Provisions. Compensation for the additional traffic control resulted in $1681.68. Also, compensation for the additional mobilization will be made as extra work at an agreed lumpsum price of$450 according to Section 9-1.03, "Payment Scope,"of the Special Provisions. Total compensation adjustment resulted in $2,131.68. This compensation adjustment did not impact the critical path for the project, therefore, granting additional contract time was not warranted. TOTAL COST PART II: A $2,131.68 INCREASE TOTAL TIME EXTENSION PART II: ZERO (0) -WORKING DAYS PART III: GRIND PAVEMENT TAPERS AT FAIRFAX AVENUE BRIDGE— EXTRA WORK This change was requested by the Engineer. Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree, if _Auditor this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business office noted above, and perform all services necessary for the work above specified,and will accept as full payment _Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. _Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER BPMP DECK TREATMENTS CHANGE ORDER NO. 02 VARIOUS LOCATIONS IN FRESNO COUNTY JUNE 8, 2023 CONTRACT NO. 22-10-M PAGE 3 OF 4 In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, grind approximately 37 feet of the asphalt pavement on both sides of the bridge on Fairfax Avenue in order to transition existing pavement to the proposed polyester concrete grade. Compensation for this work will be made at an agreed lump sum price of$5,700, in accordance with Section 9-1.03, "Payment Scope," of the Special Provisions. This price includes compensation of all labor, materials, equipment, overhead costs, markups, and incidentals for performing this work, no additional compensation will be allowed. This compensation adjustment did not impact the critical path for the project, therefore, granting additional contract time was not warranted. TOTAL COST PART III: A $5,700.00 INCREASE TOTAL TIME EXTENSION PART III: ZERO (0) -WORKING DAYS PART IV: GRIND MATCH POINTS AND PAVE BACK BRIDGE APPROACHES ON FAIRFAX AVENUE— EXTRA WORK This change was requested by the Engineer. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, grind match points to 0.12-feet depth on both sides of the bridge and at the match points to the existing pavement, and pave back approximately 37 feet of the bridge approaches on Fairfax Avenue. Use the previously approved mix design for the hot mix asphalt. Compensation for this work will be made at an agreed lump sum price of $24,000, in accordance with Section 9-1.03, "Payment Scope," of the Special Provisions. This price includes compensation of all labor, materials, equipment, overhead costs, markups, and incidentals for performing this work, no additional compensation will be allowed. This compensation adjustment did not impact the critical path for the project, therefore, granting additional contract time was not warranted. TOTAL COST PART IV: A $24,000.00 INCREASE TOTAL TIME EXTENSION PART IV: ZERO (0) -WORKING DAYS PART V: GRANT A TIME EXTENSION This time extension was requested by the contractor. According to Section 8-1.0713, "Time Adjustments," of the Special Provisions, grant a 69-working days' time extension to the allotted contract time due to the unsuitable (cold)weather conditions for the placement of the polyester concrete overlay between December 27, 2022, and March 2, 2023. TOTAL COST PART V: $0.00 (NO COST) TOTAL TIME EXTENSION PART V: 69 -WORKING DAYS Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,if _Auditor this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business Office noted above, and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER BPMP DECK TREATMENTS CHANGE ORDER NO. 02 VARIOUS LOCATIONS IN FRESNO COUNTY JUNE 8, 2023 CONTRACT NO. 22-10-M PAGE 4 OF 4 NET COST THIS CHANGE ORDER: A $32,022.58 INCREASE NET TIME EXTENSION THIS CHANGE ORDER: 69 -WORKING DAYS a--zZadin— LARue Goossen(Jun 8,2023 14:47 PDT) LaRue Goossen, Resident Engineer APPROVAL RECOMMENDED: T.P.A CONSTRUCTION, INC. �4�.�� Contractor Mandeep S. Sekhon, PE Construction Engineer M&afi 7Tiukati2va By Anastasia Tyukayeva(Mn 8,2023 5:22 PDT) APPROVED BY: Construction Administrator Digitally signed by Steve White Title Steve White Date:2023.06.14 09:03:08 -07r00' Jun 8 2023 Steven E. White, Director Accepted Date: Public Works and Planning Date: Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree, if Auditor this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be _Business Office noted above,and perform all services necessary for the work above specified,and will accept as full payment _Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. _Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified.