HomeMy WebLinkAbout2214C CCO 09.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 09 AMERICAN AVENUE TO MISSION STREET MAY 18, 2023 CONTRACT NO. 22-14-C PAGE 1 OF 3 TO: YARBS GRADING AND PAVING INC.: Make the following changes to the plans and specifications or do work not in the plans and specifications for this contract. Because of the change(s), ZERO (0) -WORKING DAYS will be added to the contract timeline. PART I: REVISE PROJECT PLANS IN KINGSBURG REGION This change was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, replace plan sheets 5, 20, 21, 55, and 56 with the attached revised sheets 5A, 20A, 21A, 55A, and 56A in the Kingsburg region. These plan sheets are being revised to widen the northbound outside shoulder in order to install a Midwest Guard Railing System between sta. 118+00 and 122+00. The revisions shown on the revised sheets are blocked out for clarification. The following bid items were increased due to these revisions: Increased Items: Item Total TOTAL No. Description Unit Quantity Price Amount % °� 33 Place Hot Mix Asphalt Dike LF 140.00 $9.00 $1,260.00 22.58 22.58 (Type A) 76 Midwest Guardrail System LF 375.00 $30.00 $11,250.00 13.52 (63.00) (Wood Post) 77 Strengthened Midwest Guardrail LF 75.00 $185.00 $13,875.00 182.93 182.93 System 78 End Anchor Assembly(Type EA 1.00 $1,300.00 $1,300.00 2.13 (55.55) SFT) 79 Alternative Flared Terminal EA 1.00 $3,800.00 $3,800.00 2.13 (55.55) System TOTAL INCREASE: $31,485.00 The revisions also included construction of approximately 45 cubic yards of additional embankment and placement of 1,043 square feet of hydro-mulch, compensation for this work will be made as extra work at an agreed lumpsum price of$34,996.50, according to Section 9-1.03, "Payment Scope," of the project. This amount will be paid through Bid Item No. 3, Supplemental Work,with no net increase to the contract. These changes did not impact the critical path for the project, therefore, granting additional contract time was not warranted. TOTAL COST PART I: A $31,485.00 INCREASE TOTAL TIME EXTENSION PART I: ZERO (0) -WORKING DAYS Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,if _Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. _Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 09 AMERICAN AVENUE TO MISSION STREET MAY 18, 2023 CONTRACT NO. 22-14-C PAGE 2 OF 3 PART II: REVISE PROJECT PLANS IN FOWLER REGION This change was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, replace plan sheets 28, 39A, 40, 41, 42, 43, 46, 48, 50, 51A, 54B, 55A, and 59 with the attached revised sheets 28A, 39B, 40A, 41A, 42A, 43A, 46A, 48A, 50A, 51B, 54C, 55B, and 59A in the Fowler region. These plan sheets mainly revised the finish elevations as the improvements are being constructed and revised the grades for concrete curb. The revisions shown on the revised sheets are blocked out for clarification. These revisions are being made at no additional cost. These changes did not impact the critical path for the project,therefore, granting additional contract time was not warranted. TOTAL COST PART II: $0.00 (NO COST) TOTAL TIME EXTENSION PART II: ZERO (0)-WORKING DAYS PART III: REVISE PROJECT PLAN IN FOWLER REGION This change was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work" of the Standard Specifications, replace Plan Sheet 44A with the attached revised Plan Sheet 44B in the Fowler region in order to revise the reconstruction area. The revisions shown on the revised sheet are blocked out for clarification. The following bid items were increased or decreased due to these revisions: Increased Items: Item Total TOTAL No. Description Unit Quantity Price Amount % °� 23 Roadway Excavation (F) CY 88.00 $37.00 $3,256.00 0.37 1.79 25 Aggregate Base (Class II) (F) CY 61.00 $44.00 $2,684.00 0.48 3.96 29 Hot Mix Asphalt(Type A) TON 39.00 $103.00 $4,017.00 0.07 (1,63) TOTAL INCREASE: $9,957.00 Decreased Items: Item Total TOTAL No. Description Unit Quantity Price Amount NO °� 39 Cold In-Place Recycling SY 252.00 $11.00 $2,772.00 (0.10) (0.24) _Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,if _Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be _Business Office noted above, and perform all services necessary for the work above specified,and will accept as full payment _Board of Supervisors _const.Management therefore the prices shown above. RE/Arch. _Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 09 AMERICAN AVENUE TO MISSION STREET MAY 18, 2023 CONTRACT NO. 22-14-C PAGE 3 OF 3 TOTAL DECREASE: $2,772.00 These changes did not impact the critical path for the project, therefore, granting additional contract time was not warranted. TOTAL COST PART III: A$7,186.00 INCREASE TOTAL TIME EXTENSION PART III: ZERO (0) -WORKING DAYS NET COST THIS CHANGE ORDER: $38,670.00 INCREASE NET TIME EXTENSION THIS CHANGE ORDER: ZERO (0) -WORKING DAYS 1 &G�al �StOGkweu _ I CAI Richard Stockwell(May 22.2023 07:52 PDTI Richard Stockwell, Resident Engineer W EDCAR A. NORIEGA APPROVAL RECOMMENDED: No. 61555 Exp, 6 30 23 qjF CIVIL ��P Ed Noriega, PE OF CNil Engineer of Record, Mark Thomas YARBS GRADING AND PAVING, INC. 0" U0� "L, Contractor Mandeep S. Sekhon, PE Construction Engineer 7-tow Yadzny ly By Troy rbrough(May 22,2t 315:36PDT) APPROVED BY: h } Digitally signed by Steve White President Steve White 1 I e Date:2023.05.25 10:50:47 Title -07'00' Steven E. White, Director May 22 2023 Public Works and Planning Accepted Date: � Date: Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree, if _Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be _Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment _Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. _Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. 8 5 R. q Z u � � w v N � o >o d o + x Ul� m MZ !x 7' O cm 6 tmIA m � ZOM ? C6 Op p Nm .wYd.xAz'w eseu x5 OY 11 07-7 LMS M 09.Wf V,S Zfa7 HalrR oT-7 ZMs.Y A07 HUM z I I 1� ? I < � F 3 � 0 W ;pM } C _ F oo .a * 00 OX 0 Q� 4 ir 0 H O z� II 0 Ell I� - I = I � U VI „ _ �; II h W I� W� n U b �I j+may z W - a I. Ow t �I W w 5 I of � I I II a I ry a I - � g w/w11/s RN/!/MIrO IOfI rwa+oN»a-ravu Mw1N�IMp y wMYnw�naoni+ww/R/m-rawa'no....snnuri 71-7 iMIY.zvs x+zsr rls.¢m 7rur1! ,yam z x 8 e m 4z II �o w E ofSO - y a 1 U �< � w w a V y m Q I I c7 i 3 ? � N �C-n w CIO �m I i � I Y I � _+T Is � II s I � z Y >, Wa � � � I ❑ � 2 N o � o 08 e 'm N N II IIIII� � I + N 8 I8 .II om 6-7 LMS.ems 09+0Zr-US sm Harm 6-7 Z2375.M ZN97 rr.7lYA 8 h h M Oi'D1Y CLOT/UI3l YO 10)d e�OW Ot!)-{Y IIOI{�Nlllwgtlgy{r/�y�4�NfIGpYJ1�hq IV wb/p�/NfIg1 eMy�TM{Y� z ro aas os+eor rLr aMt xunr r-a LMs ass os+ozr vLr DBJ xarnr Z a Y I I z w g I � z I J C I � 0 o a � s � t o , w a �w 2 U> el mO � m rn Za 2 09 4 ~ K m Z W 07o 2 O ¢¢ y �I a O. M �Q I L o� =n W I h c. I � l l I I I I� 1 3 im�g I �•' a ow WIt 2 LLI A � i I I I s = ge � I 4 Z-Q LMS 379 09+96 VJS aMl E]Lrw WOW My 09190T VJS AMI HXM x wr arrwa aaasiairlara tow -rwo-artinu•wn �Ynw.N��auniwX..owv rao-saa-xtow e+...Hari z r973s 339 os+zsr rJs sxn naLrLY s-a cY.vrs 93s os+YYr rJs srH7 xaLrn Z s a a 5 a € L Z d V iy g q y/C 4 wZ d C w C� opt 4 o, s D - ow I x oz +�$d z >x` W In $W I 22 I F � W e o h' W NW oLU ffi L I I 2W I W Y S-0 MRS 33S 09+0Zr rdS 3A77 HJJY)r 3A00r 3W 09+M YJS 3AY7 H2LY)r 5 � z 111'K'IHY fHHH/Hi/Y4r0 JH/J H�OiJ-ttrlH-tY-HSHI!��NtllOwrp�eyy+�PWI�I�WSIHHYJI✓MM NN!HYO-pMHl-Nt00�wwrn/r IH 8 U 1I-7 MWIS 23S 09+M W W7 X.7.LY/! 17-7 LM9 M DO HUYN h � c w I" W a n'` F w02 > •� + UO e�O uW2 a I 2 Za O '6 ob ¢r W op ; a ow F Z • 4l Z m W Za W S m t - x r�rr�T sty . a I V w 8 p nGn a o O 42� < b w i W wy—I, 8 � f c7 0 w w 5 U r y - .y I h b • mU \,� UUUN �, �Om WUW pwu S7 7�73XSauy aga YJS.Yh?!H.1LYlf %�'-L 9T-7 LMY 22Y.7A97 RMY1! 3 u B pi N NI I/YD'I ROlr1l/YIt IO lOL /.Vl/ll}lIT-pl-p9LL�R/1 1-i�MW19.gICYI.TI4.OPV NI/i0/NIJGW�..�MY111II z � s q � J C � W 2-0 l73!!S 33S 09+i93 YLS 9X17 XQ.LYI! z I 3 O Y 2 W a m$Q q cn h � �n V cif ru �� � p 1 � � * ¢ -j < •• U O 0 ❑ ❑� ❑ ❑ 0 0 ❑q 0 8 ae F ay � om n w� 0w U> w 0� z Q O v a °.a ao uFz a o C�1 1 + W ZW W q� a Pz i / a ddd �k x w g h � - 4 a b � � � rr oow+x erwiwiruro ions wv-p w-s�-�snu«.wi�ei•s..wrw.wnoar�.a.w wv�m-iarywew..w irx�ri ' - z ui o g AOzsa J3M W 04+8'Zf YJS 3N77 MUM e o��' y� ��` - m 4• ~ x. 8 • a A _ - Z °- ma owNockr vrs d 'ww E0 rra o�vaaNr rrsl Q y = 02 I- a 0w w m E LY O w •, m o� ___ _ - __ _- mmy a oz z m wa O 0 ' • * � h m �•i w m '� 0 • V $m +U ^ � i_ ^p^Y • p.o Pi a m 5-0.7 JJWS 33S O.9490 V.W 3N(I HaLYN �u'A' - I x * Y /./k O Q W �e 3 fll- UN o I � � � Wg� a�x . I•�� � m W q x m f2 i �y v z 8^ of F ti n a 8 o I` ' iti o I-OJ J3377S 335 OS+/gy YJS 3N17 HaLYT 3409Y J33HS 33S OB+ZLi YJS 3N77 HXYA S wr wisp aowwrury iow mow-wwao-araou..nn+a�oi-e.aer�N.nnavrm+nw wv rso-aaa-wao>..»•nnuri r-a�.c3.vs.�os+eer Y✓s 3Xfl Xacre z z 0. N r � J ti b h L' W 12 V ~ .Ld37 d0739 33S OS+rg6 Y,GS 3X17 X7lYA' 6 � � ', "G' Q N F ' Z OU 3 o e pp W X Uy W EO > < $a a �w 2 F of 3 R N x� 1 wLL wa 10 CD rl q p + + + W W I WO � o• g I � I O g I h h 4 F oz Oti C �. K.4X 0-0 JSR S 33S OS+BLP YIS 3M7=YN M9N 340AY 33S Os+rBr YIS ZW7 SJ.6Yl1 5 IIY pupil L101/N/YIf Yp 101/ d••OW-Ip}IO�-p IPo11�o'/tlVOYof-t�oId�Y1Y�oYd10OIJ1�/oW PNf IJtrMp-NFOW ovwMYN(1I cm r0733 33s os+zos r1s 3fd7'my" Z °z w b 3 0 $ h o g o a m N U I b b a of ~ 4 � O 8 � � j M m� EF w v I ou, �r $ m Eo Fu ;,�Ib < za ^ ' O� 7 F � - ;� + W S S-UJ LINE 33S 091909 W 3Hf7 H.7LYH F c ow �8i g ^QW a Fi ei vl Z' pi I W b mry •� � + I (7 I. 0 mti a W a S I W�� I �;' ■ x • � 8 8 8 8 1 . � Mm�*•'b in�' � 4 � p q i• O a n f ,1' yyp� ti LU $8 m * � U4 g E-OJ 133HS 2NS 09+90 M MW7 HJJM 1HON YAOHf 33S OS+gOS YJS W7 HJ1 YA A•M'IM�AOlIN/Y!!YO lOH -ISJiO p�pGLL�IY1wMH-f�MW1MNlIOT'�I�MW IbV IfD9JIpMUOpJ wwef�TM{II - 4 W °z J " w LM A0789"S OS+BIS US MY7 H.UYR w a p Z / \� h U O F- zy O owe ✓. ? �1 . I � U g r�'x, z b/ t•h �. + DO LN O K W Z ww za n' w�¢ a w o� 2 f ow iL KX\ % i< Q X /V / f'� ' 0 y u, � 4 jY +pta h o wO s 9-0 JMKT 33S 09+08S W.7A0'7 I al ff Q,w M I p Q / ram-/"r .A, OPu E 2CL OaE e�I� �w> 2 co v� IV 9 &AY JM6rdJf56l $ ° a Lu - �y , - K W y rag ZMS SYS 091W9 YJS ffR7 HXYA Vg e MOM BAOHY 9.YS OS+g(S YL SM7 MXWW ICY It'LOM QOl/W/LYU 10}� Wtd PW-10�-[Y IfDU NN/IwM•f-t AY/•YINMItIWIJ1�MW l�lf If0-DpW-NfOW eunylYll{II t h � z w e W 3 Z 4 can ror9e s9s os+sss YJd-9nm uuvn x l O �r a w f of 4 _ U j OW 09 ou 0. < Z p / a I � r p 3 �` a5 4-0 1EN 99S OS+gM.Y.W JAW HUYN /� � I ■ x W O Y Q u < K 4 > y a m 9 W W L-OO Lug 33S OS+ziS YJS 9M7 A.alYR \� JXO/9 UOGY 929 09+99S YJS VM7 HaZM IHY{MM{CdOd/dl/M1Y0 SOH d'•OStlTJ0.?tW-LY I801{���YtllM�ef-d bP�Y1�1�9d1YOI�1�Mb MMf YJ09p W-MIO�wY�IY11[II A07Y9 SYS 09+{9S YLS W7 H'ALYN f y o J S 3 Z ? + " 8 g n� W 3 off �e,+,.Di +e;., Y I 3�ti„mC8 <C o • ` Nh - ( W W 1 � - R 03�b a O ww 20 z con a O Z.5 m W �� o W g 0 a �� LL Q w. u, <o g+� zz 0 - m rig � a LZ d z g+ g 2 +' I +m p A(n tK I ti I O o J I — I FZ" m8 a a Q K U i g w cc •I� V I w 8 $ $ r YA081 193HS 33S(K+ygs YJS Mf ICAiYN - 3 I S 6-CO MH5 33S OS+SL9 YJS YH17 701M M OC•CMI Llpd/N/Y3LYa lOX O�pi/7tWLO�-CY 9CDIt L�NCI�Ma�-C wALYI�l�vC1U]YJI+Mq MMf IJD-➢pp-WGOJ�ITM{YI - W s h o m oPly= o z �,al � o 3 o Y U E!-PJ J=279 09+669 W W7 f X"f ,� U Uy M1 i U � Z ua I g Y, s w� ,fS 8MflI70lLf✓ o>w 20 OW as LU zi Con A.�R"9 44 2 N '02 "4^Uj 2p U O + nO tiI'iU U 5� ti. ct v ctW� rr-ro.rays sas os++s9 vis am aaarn of \ g / a \ U IM/YID4/AOLW/YLYY lOL WlI OGfiPJ-tY-pYU MnslM�ef-t✓�Id�Y1N�NdIWI�1�Mq Mf IdD-DOIYt-MYY��IA/1II z 11-0 LZi01S.895 019+Zl9 res avn rcum i out I � w U ZO I y U m I \ TF I ?4 p I wo I w o Wo �j p2 i s14 H b l� NW Wa ' Lis f j 2 Coco U goo 24 aw OKI , w ��... \� w ■ two 000 2 + a O I _ O m � N4 m �Q I W 1 8 i i i I c fill oYs a r nr xtsn nourn3aro lou r�ru-am-iw-ra-amu«.wi�ws-s.wa.aiu..rriaorm.a wnv rro-rar,wL«�+�nr LJ LT-0 LmS.ems oS+Z.Y YIS 3A77HIU„< z z I � � g N I a ❑ � ° z g o g LM Y0799 aaS 09+EE9 VIS M7 AMYX —ir 8 8 io� 4 • � QW o W � a � asl. , i � 8 � a a oa 09 ww � r � 00, o Oa s U QQ m O � K LL W LL Z r W l W 4$ } } • W 4 •. ^ U U Z wdo ^ �" W �7 •"b2 U Uy 0 4 W pp O • I O ( � W - � .�� �FFOr--�11 g W. k2 � 4 h > cd w Y � � o 7 I � I W z � n ^ I w = o�w u g 2 g j I I O } O I � & I g � .IXJM%AOYY SYS 09+EE9 YLS 967 H,7,LYR x S I1YL L9tl1 Ci%/%/13{Y0101d M/L-IitG}6pJ-[Y-I9DLL��YII�MeL.i+M�YIY�NJIOUY�IN�q elf llO-DpM-MiO�MMTNIII z 0. N z° J W � � ' y W o � � O 1 � ~ a•m° u j 7 mmx 0. F IM A07NE 9,79 091099 Y.LS SA07 Halff ce z � WO W J U i �> WW ou o y r�1 a o WW ',,� '. _ Q �y W Cm A. c Q I �zj_ ID + g s �p � 2� W •, �.I W�gi� � R{5 0 ¢ cn w hIN Y W b I � 8 a � w � •� � i '" • + z � h � $ $ I i ow 3 �91-0a L=SSE 09+Si9 Y✓S TNN XalYM 19'JRf 310HY SSS 09+099 Y1S"7 MaLff m y g w � i ' S /Y M•00'I f101/Of/141I0101/ �YII NOSpPJ-iY-pDLL���YI1MMoi-1�M�tlIN�+YBIPPYJIWMM NMl IfO-DpM�YMOJ+�117([II z W W L W G O W ��aa O � I H r a ON ow _50 W f Zm 2 ww � a � UK r W pj a Ky a �¢ z WZ W� FQ W� 2 Z Q Wrn O W � O C7 QO � Ob Con o- 4 a O U \\ U0 on 2 z z e ` e ' , U w mI A OO ` \ H `\\ 4 � W 4 w Q � I I un W � 5 I •sr. \\ W yy i y� W Y e � TiS wx r•ra or wr rzwaw Bras air�ra iau rrou-rra>-xai-er-ueu rwsi�+y-r�px�v.Mrioarn�tlnw nv�ro-raa-weoa....,ennrfuri tf97 ro79a.Q3s as+ers Yts.�7 Hurx ti o 2.. A-0 LY3H5 SYS 09-90 YLs 9N7 H.7LYH t ^ ry 1 � I z 2eiJ a I i 8 8 "zm � g8 8 oz ow W E¢ d O w ou OQ .. Q— n lk °Z o Am uz- W Ell l W R m3 �2 rA Q 8w s a I 0 + s � p a ,I m + + V Y o o a a �W� 8 8 o f ar w � I h 4-0�iTffifS 995 00+on W RV7 RDIVM L70N 9A09Y 399 09+6n YLS 9A77 H7.LY71 w o � g�g II Y MlMf'I WOi/p//YIYI lOL WH-IG4{W-IY-IIBUM�•IMe�•I�MIMNWIIWI�14�0/V 1116/EMIIffMD�NI1([Y/