HomeMy WebLinkAbout22-14-C CCO 08.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 08 AMERICAN AVENUE TO MISSION STREET APRIL 24, 2023 CONTRACT NO. 22-14-C PAGE 1 OF 3 TO: YARBS GRADING AND PAVING, INC.: Make the following changes to the plans and specifications or do work not in the plans and specifications for this contract. Because of the change(s), ZERO (0) -WORKING DAYS will be added to the contract timeline. PART I: REVISE PROJECT PLANS IN KINGSBURG REGION This change was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, replace Plan Sheet 48 with the attached revised Plan Sheet 48A in the Kingsburg Region in order to adjust grades to address cross traffic and drainage concern at the Amber Street median. The revisions shown on the revised sheet are blocked out for clarification. The following bid item was increased due to these revisions: Increased Items: Item Total TOTAL No. Description Unit Quantity Price Amount NO °(O 25 Aggregate Base (Class II) (F) CY 13.25 $44.00 $583.00 0.11 2.47 TOTAL INCREASE: $583.00 These changes did not impact the critical path for the project, therefore, granting additional contract time was not warranted. TOTAL COST PART 1: A $683.00 INCREASE TOTAL TIME EXTENSION PART I: ZERO (0) -WORKING DAYS PART II: REVISE FOWLER REGION RECONSTRUCTION AREA BETWEEN GSB-SB5 STA. 666+79.63 AND STA. 682+00 This change was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, revise the match point and cross slope for the reconstruction area between GSB-SB5 Sta. 666+79.63 and Sta. 682+00 in the Fowler Region by shifting the sawcut line approx. 1.5-foot LT to the existing high point of the roadway. The new portion of the southbound inside lane shall be constructed at a 1.5% cross slope from match point to edge of travel way (ETW), then -5% cross slope from ETW to the edge of pavement (EP). The following bid items were increased or decreased due to these revisions: Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment _Board of Supervisors _Const.management therefore the prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 08 AMERICAN AVENUE TO MISSION STREET APRIL 24, 2023 CONTRACT NO. 22-14-C PAGE 2 OF 3 Increased Items: Item Total TOTAL No. Description Unit Quantity Price Amount o� °� 23 Roadway Excavation (F) CY 135.00 $ 37.00 $4,995.00 0.57 1.28 25 Aggregate Base (Class II) (F) CY 90.00 44.00 3,960.00 0.72 3.20 29 Hot Mix Asphalt (Type A) TON 63.00 103.00 6,489.00 0.11 (1.70) TOTAL INCREASE: $15,444.00 Decreased Items: Item Total TOTAL No. Description Unit Quantity Price Amount o� °� 39 Cold In-Place Recycling SY 245.00 $11.00 $2,695.00 (0.10) (0.10) TOTAL DECREASE: $2,695.00 These changes did not impact the critical path for the project, therefore, granting additional contract time was not warranted. TOTAL COST PART II: A $12,749.00 INCREASE TOTAL TIME EXTENSION PART II: ZERO (0) -WORKING DAYS PART III: REVISE PROJECT PLANS IN FOWLER REGION This change was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, replace Plan Sheets 37 and 58 with the attached revised Plan Sheets 37A and 58A in the Fowler Region to correct the match point of the pavement widening to the existing pavement at the Jefferson Avenue intersection. The revisions shown on these revised sheets are blocked out for clarification. The following bid items were increased or decreased due to these revisions: Increased Items: Item Total TOTAL No. Description Unit Quantity Price Amount °1/0) (°� 23 Roadway Excavation (F) CY 31.00 $37.00 $1,147.00 0.13 1.41 25 Aggregate Base (Class II) (F) CY 18.00 44.00 792.00 0.25 3.36 TOTAL INCREASE: $1,939.00 Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if _Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be _Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment _Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 08 AMERICAN AVENUE TO MISSION STREET APRIL 24, 2023 CONTRACT NO. 22-14-C PAGE 3 OF 3 Decreased Items: Item Total TOTAL No. Description Unit Quantity Price Amount (0/6) °� 39 Cold In-Place Recycling SY 97.00 $11.00 $1,067.00 (0.04) (0.14) TOTAL DECREASE: $1,067.00 These changes did not impact the critical path for the project, therefore, granting additional contract time was not warranted. TOTAL COST PART III: A $872.00 INCREASE TOTAL TIME EXTENSION PART III: ZERO (0) -WORKING DAYS NET COST THIS CHANGE ORDER: $14,204.00 INCREASE NET TIME EXTENSION THIS CHANGE ORDER: ZERO (0) -WORKING DAYS kiG&1(stockweu Richard Stockwell(Apr 25,2023 08:45 PDT) Richard Stockwell, Resident Engineer APPROVAL RECOMMENDED: YARBS GRADING AND PAVING, INC. 0 �- Contractor Mandeep S. Sekhon, PE Construction Engineer By Troy rbrough(Apr 25,2 311:18PDT) APPROVED BY: h } Digitally signed by Steve White President Steve W I 1 I le Date:2023.04.28 14:29:00 Title -07'00' Steven E. White, Director Accepted Date: AP r 25 2023 Public Works and Planning � Date: Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree, if _Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment _Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. z a J LLI W 4' 0 3 3 Z 4 U O � U a � o � z 0 U Q -un d0'm8 13="S 00'W.Ivr 7S Mo=W ,a i I I�<�<<<•, g tiY e3 Iz lw > 4 Z a o Q a w w << I ;<<< o u i x. a Fi a w 121 <<c<<<,� 1 O�. o �I o IR I im I � O o 9 z $ $ n $ $ wmm Uoar teas rs ao os+zer ers.vim tntvn m a � NNW an � n n 3 Vd \ ! ) ; \ / . ( § ! § ) ( o m �¥�� __U__ee m a_ � \ ) \ � & ease % ww Ow 6 % at ; tea z ! ( [ ( E ! G - - - ) \ \ ) \ § ) A - ; - § \\ . � / e§ .) E §; - \< G i � .- ' � \ ] |/ § ! ( CD ! U, - � - --—_am_a_ § f § ! § ! ! n r } � 90-7= s_ � W-7 mw aw I=rmt I 7 � I I a . \ Ai - \ C5 kr k \ ] . / & j} m /. / ^ \ / (k * \ a m § o \ ( e L � a 9 _ I /» | - \� \( � � ` � � ; � ■ ! � ! _ __e_a_ ;