Loading...
HomeMy WebLinkAbout2214C CCO 07.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 07 AMERICAN AVENUE TO MISSION STREET APRIL 24, 2023 CONTRACT NO. 22-14-C PAGE 1 OF 3 TO: YARBS GRADING AND PAVING, INC.: Make the following changes to the plans and specifications or do work not in the plans and specifications for this contract. Because of the change(s), ZERO (0) -WORKING DAYS will be added to the contract timeline. PART I: REVISE PROJECT PLANS IN KINGSBURG REGION This change was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, replace Plan Sheet 47 with the attached revised Plan Sheet 47A in order to revise the structural section for the turn lanes and the median paving from 1.0-foot hot mix asphalt (HMA) to 0.55-foot HMA over 1.30-foot aggregate base (AB). The revisions shown on the revised plan Sheet 47A are blocked out for clarification. The following bid items are being increased or decreased due to these revisions: Decreased Items: Item Total TOTAL No. Description Unit Quantity Price Amount (0/0) 29 Hot Mix Asphalt (Type A) TON 228.00 $103.00 $23,484.00 0.39 (1.81) TOTAL DECREASE: $23,484.00 Increased Items: Item Total TOTAL No. Description Unit Quantity Price Amount (0/6) No) 23 Roadway Excavation (F) CY 206.00 $37.00 $7,622.00 0.87 0.71 25 Aggregate Base (Class II) (F) CY 315.00 44.00 13,860.00 2.59 2.36 TOTAL INCREASE: $21,482.00 These changes did not impact the critical path for the project, therefore, granting additional contract time was not warranted. TOTAL COST PART I: A $2,002.00 DECREASE TOTAL TIME EXTENSION PART I: ZERO (0) -WORKING DAYS PART II: COMPENSATE FOR ADDITIONAL POTHOLING TO INVESTIGATE AN EXISTING UTILITY FOR STORM DRAIN INSTALLATION —SUPPLEMENTAL WORK This compensation adjustment was requested by the contractor. Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment _Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 07 AMERICAN AVENUE TO MISSION STREET APRIL 24, 2023 CONTRACT NO. 22-14-C PAGE 2 OF 3 Adjust compensation for the additional work for potholing and verifying an existing 6-inch transite waterline at sta. 60+84, 15.00' Lt, for the installation of a redesigned storm drain, in accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications. This work included potholing, hot tapping into the waterline, and backfilling. This compensation adjustment will be made as extra work at force account according to Section 9-1.03, "Payment Scope," of the Special Provisions. Total compensation for this work resulted in $2,007.90, this amount will be paid through Bid Item No. 3, Supplemental Work with no net increase to the contract. This change did not impact the critical path for the project, therefore, granting additional contract time was not warranted. TOTAL COST PART II: $0.00 (PAID IN BID ITEM NO. 3) TOTAL TIME EXTENSION PART II: ZERO (0) -WORKING DAYS PART III: COMPENSATE FOR REMOVAL OF AN EXISTING IRRIGTION SYSTEM—EXTRA WORK This compensation adjustment was requested by the contractor. Adjust compensation for the additional work for removing and disposing existing irrigation system for the HMA trail alignment between Stroud Avenue and Sta. 95+06, in accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications. This work included cutting, removing/disposing, and capping of the existing irrigation system. This compensation adjustment will be made as extra work at Force Account according to Section 9-1.03, "Payment Scope," of the Special Provisions. Total compensation for this work resulted in $619.59, this amount will be paid through Bid Item No. 3, Supplemental Work with no net increase to the contract. This change did not impact the critical path for the project, therefore, granting additional contract time was not warranted. TOTAL COST PART III: $0.00 (PAID IN BID ITEM NO. 3) TOTAL TIME EXTENSION PART III: ZERO (0) -WORKING DAYS PART IV: REVISE PROJECT PLANS IN KINGSBURG, SELMA, AND FOWLER REGIONS This change was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, replace Plan Sheet 11A with the attached revised Plan Sheet 11 B for the Kingsburg Region, replace Plan Sheet 12A with the attached revised Plan Sheet 12B for the Selma Region, replace Plan Sheet 12A with the attached revised Plan Sheet 12B for the Fowler Region. The above referenced plan sheets were revised to incorporate vertical information for the control points. These changes are being made at no additional cost. Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,if Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER GOLDEN STATE BOULEVARD PHASE I CHANGE ORDER NO. 07 AMERICAN AVENUE TO MISSION STREET APRIL 24, 2023 CONTRACT NO. 22-14-C PAGE 3 OF 3 These changes did not impact the critical path for the project, therefore, granting additional contract time was not warranted. TOTAL COST PART IV: $0.00 (NO COST) TOTAL TIME EXTENSION PART IV: ZERO (0) -WORKING DAYS NET COST THIS CHANGE ORDER: $2,002.00 DECREASE NET TIME EXTENSION THIS CHANGE ORDER: ZERO (0) -WORKING DAYS 1&GIw(sS ockweu Richard Stockwell(Apr 24,2023 13:10 PDT) Richard Stockwell, Resident Engineer APPROVAL RECOMMENDED: YARBS GRADING AND PAVING, INC. Contractor Mandeep S. Sekhon, PE Construction Engineer 7-raw 22,-�GL By Troy rbrough(Apr25,2 311:16PDT) APPROVED BY: Steve h }p Digitally signed by Steve White President S teve W I I I tG Date:2023.04.28 14:28:19 Title President Steven E. White, Director Accepted Date: Apr 25 2023 Public Works and Planning � Date: Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,if _Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment _Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. z ^ I Q yy55 Z � ❑ 1u U ^ o , 1 S � s,n H n w << zor 3' WF w 20 Z a i r�<<<<< •, m 0w IL 1 rc a 0Q F° i NJ C7 � � z �, � I ■ Y a LJ [hill CC I '$ Coco` Z It RI / i < a 0 h � 8 a •I ii � � 6 6 w � r w✓.rnw trxnnv.ra icu ..nu-«waw,«-.,e�....e,•.waa,.w..n.,....lwra�.a.w n.,rsa-,axaaoa..»n„u.. z z a � e 0 y O 3 O U � m U � a w b x 4 O CL K 00 a 4 r" OO b0 " aaaaeeaeaaaeaae RN O N h N N N h N N N N h N N N N jZ O Q Za = 02 H uj WLL 9M, W R 8 za ti : m g w n n 8 R m n h a $ ; tie ^n ; R R N NNN � �'v � NN � Nw .�•. N $ � � � R .�. NBN' N8N' �8N' g8N' ,5�, �. .�'. �NBN' Y` � '�N � e� s B b b b tl $ 2� it i( it Po tl "� tl b m o ca to b b o it V b b i1 M 3 U 3 � � 3 3 3I i 3 3w 3 3 3 $ s o N Q n n ^a R g N � A N � bb C q $ h � � � n �g � � h N � � q � T � $ � � � h a N ^ ■ O= a s o� c � " 8 ` 5 � if e s r wr srrra ccociuret ra lov cau rxi�a ea-asou«.vn�.�.oi.c.�rt•nu».nwni.alw wv�so-aaarsow....� Hors z z a z a � e 0 H � o z 3 0 U U � CL oyo U � � q O z b � "a i x i k k k k x x i x k i z O CL _ w ~ 'Q T :R h z ry A M1 O _ p O " �V ' O " ^ N N b i2Z, A Q n6mo .^.. 88 '3w8i, `n, oe � � '�" e =' r'omao '.° HgAB meo Y�yy. ouff N of F p N N N N ^h N N h N W Z O � Oa 22 22 22 2 22 hh hh ZE 4 -0I b �`1 it b tl s M it AS � � �3 4 �3 3 � � y � U zzzz W LL w ;z obi h h 3i h On ik h a _ m $ :1 O O h w eaaaaeaaaaaa aaaZ? zM aaa � aaaa a I ■ x IN E'Ra ^ a � � a � aaaoao � o1AR goe � RR �� a a _ ;z o ti o z h e ^ e 3 G3 8 b 8 w O p N ti. M •S �i ti a r: tu q x '" � aa "aaaaaebaa � eaaaaaaea & a � � � � � � � � � � �aa N N h N N N N F h N h wr aura rsosiur�ro lou a�v�s-sxax�u�rsou••Nnr.war a Rwa�u..vnooro��rnro�w iso-vaaweoa ww�rwri i a QJ h 0 C � 3 O yN U a w m m m W a O � k k i Of 14 b b b b b cmi � � cmi m ¢ � V b F h b i1 b b b b b m b b ca v3 " bbb b y x b i i i i i § r g a 1� o. A r^N` •`- N n h 0 O _ h O m h N e12 f^o n ` � � " aaaeaea aeaa ea ae IM I OO a W w o 0 a 22 a coi E $ Y W W W W m $ b b b AS b wLL � £ w o ti °' 3 'm S m m ro o � n w n •'- H So 3 .v R 3 � �n ^ 3 =' ^n o y z Z _ - w C - m0 of � N q � � q N •� A ` ^' A a N g � N ^ (off $ Zi n o� n F N N gym' ��' o^ •' `� O $ ,' .: N OO' ti �'i 6 � h o '" eaaeaaeaaaeae � � � aae "aea" eaaaaa. abaa � a � a ■Y ."mod o o R 'mS^ m ti i8 \ 8¢ aaaaag � RogRoos "s a ai x i 6x k x x x x x x k k x g V b e o m w h vg, w n N .° n .m'. ^ z n m $ n a S n $ n n' 3 R K 91 a ;1 ` : : 2 ti H : b ^ - a n i " �aa aaabaaaaaaaaaaaaaeae ;Z't 44 i h , ^ .� g I R �$ RJR� oO_ � O N O •• h_ h ^ m R R b_ n_ Om C N N ii Xi I N N gi & � gi h N Ri h N N gi Ki h N h h �tl � Xi h Ri S a a a i P ¢ r wr nr�ro�ssxiuntrl tou mild KTH�JTN IIDY rNd1�WrI•i wN�I1NW41Wr�I�Mq 1�(f III9pp-IMIW 1MMt1/!II