Loading...
HomeMy WebLinkAbout22-21-C CCO 01.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER RMO YARD AREA 8 CHANGE ORDER NO. 01 FENCE RECONSTRUCTION APRIL18, 2023 CONTRACT NO. 22-21-C PAGE 1 OF 2 TO: YUKON FENCE COMPANY, INC.: Make the following changes to the plans and specifications or do work not in the plans and specifications for this contract. Because of the change(s), ZERO (0) -WORKING DAYS will be added to the contract time. INCREASE/DECREASE ITEMS AT UNIT BID PRICES: This change was proposed the engineer. Item quantities in the Bid Book and subsequent change orders are estimates only. This part adjusts item quantities to the actual quantities used. Decreased Items: Item Total Total No. Description Unit Quantity Price Amount (0/6) o� 3 FID Permit Fees $ 170.00 $1.00 $170.00 17.00 17.00 4 Remove and Dispose Existing LF 1,003.00 1.00 1,003.00 54.22 54.22 Fence Along Perimeter 6 Install 6' High Chainlink Fence LF 21.00 28.00 588.00 0.92 0.92 with 3 Strands of Barbed Wire, Posts on Concrete Foundation and Appurtenances per Plan TOTAL DECREASE: $1,761.00 This change did not impact the critical path of the project schedule, therefore, granting additional time was not warranted. Contractor We the above signed contractor,have considered the change proposed and hereby agree,if this proposal is Auditor approved,that we will provide all equipment,furnish all materials,except as may otherwise be noted above, Business office and perform all services necessary for the work above specified,and will accept as full payment therefore the Board of Supervisors _Const.Management prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER RMO YARD AREA 8 CHANGE ORDER NO. 01 FENCE RECONSTRUCTION APRIL18, 2023 CONTRACT NO. 22-21-C PAGE 2 OF 2 NET COST THIS CHANGE ORDER: $1,761.00 DECREASE NET TIME EXTENSION THIS CHANGE ORDER: ZERO (0) -WORKING DAYS .P�6utyS�escGuc,�.eey Robert Hendrickson, Resident Engineer APPROVAL RECOMMENDED: YUKON FENCE COMPANY, INC. Contractor Mandeep S. Sekhon, PE TOttitttit� slwl�lOhJ Construction Engineer By Tommy Simi ions(Apr 18,2023 10:59 PDT) APPROVED BY: Project Manager }p p White +p Digitally signed by Steve White Title Steve ite Date:2023.04.1914:05:33 -07'00' Apr 18 2023 Steven E. White, Director Accepted Date: Public Works and Planning Date: Contractor We the above signed contractor,have considered the change proposed and hereby agree,if this proposal is Auditor approved,that we will provide all equipment,furnish all materials,except as may otherwise be noted above, Business Office and perform all services necessary for the work above specified,and will accept as full payment therefore the Board of Supervisors _Const.Management prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified.