HomeMy WebLinkAbout2220C CCO 01.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER DRY CREEK ON BURROUGH VALLEY ROAD TREE REMOVAL CHANGE ORDER NO. 1 BURROUGH VALLEY ROAD, JUST EAST OF TOLLHOUSE ROAD FEBRUARY 23, 2023 FEDERAL PROJECT NUMBER: BRLS-5942(245) PAGE 1 OF 2 CONTRACT NO. 22-20-C TO: JULIAN TREE CARE, INC.: Make the following changes to the plans and specifications or do work not included in the plans and specifications for this contract. Because of the change(s), ZERO (0) -WORKING DAYS will be added to the contract time. The contract completion date is February 9, 2023. INCREASE/DECREASE/ELIMINATE ITEMS AT UNIT PRICES: Item quantities in the Bid Book and subsequent change orders are estimates only. This part adjusts item quantities to the actual quantities used. Increased Items: Item Total No. Description Unit Quantity Unit Price Amount °6. 8 Remove Trees (equal or less than EA 1.00 $300.00 $300.00 4.76 1.0 LF DBH) TOTAL INCREASE: $300.00 Eliminated Items: Item Total No. Description Unit Quantity Unit Price Amount °� 4 Temporary Fencing (Type ESA) LF 200.00 $6.50 $1,300.00 100.00 TOTAL DECREASE: $1,300.00 Since you did not incur any costs associated with these items, no payment will be made for these bid items. This work did not impact the critical path for the project, therefore, granting additional contract time was not warranted. Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if _Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business Office noted above,and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER DRY CREEK ON BURROUGH VALLEY ROAD TREE REMOVAL CHANGE ORDER NO. 1 BURROUGH VALLEY ROAD, JUST EAST OF TOLLHOUSE ROAD FEBRUARY 23, 2023 FEDERAL PROJECT NUMBER: BRLS-5942(245) PAGE 2 OF 2 CONTRACT NO. 22-20-C NET COST THIS CHANGE ORDER: $1,000.00 DECREASE NET TIME EXTENSION THIS CHANGE ORDER: ZERO (0) -WORKING DAYS James Drews, Resident Engineer APPROVAL RECOMMENDED: JULIAN TREE CARE. INC. - U Contractor Mandeep S. Sekhon, PE Construction Engineer �7"G z TO Cave AM By Julian Tree Care Inc.(Feb 23,2023 13:18 PST) APPROVED BY: Steve W h I tQ Digitally signed by Steve White �i �i �i Date:2023.02.27 10:19:44 0 Title CEO 8,00, Steven E. White, Director Accepted Date: Feb 23 2023 Public Works and Planning , Date: Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. LETTER OF TRANSMITTAL - C.C.O. NO. 1 FEBRUARY 23, 2023 TO: STEVEN E. WHITE, DIRECTOR DRY CREEK ON BURROUGH VALLEY ROAD PUBLIC WORKS AND PLANNING TREE REMOVAL — BURROUGH VALLEY ROAD, JUST EAST OF TOLLHOUSE ROAD FEDERAL PROJECT NO: BRLS-5942(245) CONTRACT NO. 22-20-C ATTN: MANDEEP S. SEKHON CONSTRUCTION ENGINEER FROM: JAMES DREWS, Resident Engineer STATUS OF FUNDS: Contract Items $ 29,315.00 Original Allotment $ 32,246.50 Dept. Furnished Materials $ 0.00 Supplemental Allotment $ 0.00 Previous CCO's $ 0.00 Total Allotment $ 32,246.50 This CCO $ (1,000.00) Obligated Funds $ 28,315.00 Total Obligated Funds $ 28,315.00 Unobligated Balance $ 3,931.50 DIRECTOR'S LIMIT to sign change orders is: $2,931.50 DESCRIPTION: Increase/decrease/eliminate items at unit prices. WHY: The bid quantities in the Bid Book are estimates only. This change order reflects the actual quantities used for the construction of the above referenced project. Bid Item No. 4 —Temporary Fencing (Type ESA)was eliminated in its entirety in accordance with Section 9-1.06D, "Eliminated Items," of the Standard Specifications. The contractor incurred no costs relating to this bid item, therefore, in accordance with the above referenced section, no compensation or partial compensation will be made to the contractor for eliminating this bid item. Bid Item No. 4 is being eliminated in its entirety at the full bid price, resulting in a decrease of$1,300. All other changes in the item quantities are minor and within the normal deviations for this type of construction. HOW: Item quantities were increased, decreased, or eliminated at unit prices per Section 9-1.06, "Changed Quantity Payment Adjustments," of the Standard Specifications, resulted in a $1000 decrease. LETTER OF TRANSMITTAL - C.C.O. NO. 1 FEBRUARY 23, 2023 COST: $1,000.00 Decrease NET COST THIS CHANGE ORDER: $1,000 DECREASE NET TIME EXTENSION THIS CHANGE ORDER: ZERO (0) —WORKING DAYS