HomeMy WebLinkAbout1908C CCO 03.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER AUBERRY ROAD/COPPER AVENUE CHANGE ORDER NO. 03 TRAFFIC SIGNAL INSTALLATION SEPTEMBER 23, 2022 FEDERAL PROJECT NUMBER: HSIPL-5942(241) PAGE 1 OF 2 CONTRACT NO. 19-08-C TO: AVISON CONSTRUCTION, INC.: Make the following change(s) to the plans and specifications or do work not in the plans and specifications for this contract. Because of the change(s), ZERO (0) -WORKING DAYS will be added to the contract time. REPLACE DAMAGED SIGNAL POLE AND FOOTING —ACCIDENTAL WORK This work was requested by the engineer. According to Section 5-1.39, "Damage Repair and Restoration," of the Standard Specifications, replace the damaged traffic signal pole and footing along the southside of Copper Avenue. Perform all work according to the Plans, and applicable sections of the Project Specifications and Standard Specifications. Compensation for this work will be made at an agreed price of$79,968.38 in accordance with the Section 9-1.03, "Payment Scope" of the Special Provisions. This agreed price was a result of a sidebar agreement/settlement between the contractor(Avison Construction, Inc.) and the public body's (responsible for the damages) insurance company (Progressive). Progressive issued a check, payable to the County of Fresno for the aforementioned amount. This check will be deposited into the project account as the supplemental allotment and contractor will be reimbursed for the full amount as extra work. This agreed price is the full and final compensation for this work, no additional compensation will be made thereafter. This work was performed during the suspension of the contract, therefore, granting additional time was not warranted. Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree, if Auditor this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. _Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER AUBERRY ROAD/COPPER AVENUE CHANGE ORDER NO. 03 TRAFFIC SIGNAL INSTALLATION SEPTEMBER 23, 2022 FEDERAL PROJECT NUMBER: HSIPL-5942(241) PAGE 2 OF 2 CONTRACT NO. 19-08-C NET COST THIS CHANGE ORDER: $79,968.38 INCREASE NET TIME EXTENSION THIS CHANGE ORDER: ZERO (0) -WORKING DAYS LARue Goossen(Sep 23,2022 12:51 PDT) LARUE GOOSSEN, Resident Engineer APPROVAL RECOMMENDED: AVISON CONSTRUCTION, INC. � �� Contractor MANDEEP S. SEKHON ,�obe�t67. Ngwwae Construction Engineer By: Robert J.Newman(Sep 26,2022 13:06 PDT) Steve White Vv„ h i to Digitally signed by Steve White Steve �i Date:2022.09.29 13:40:52 -07'00' Project Manager e r STEVEN E. WHITE, Director Title: Public Works and Planning Sep 26, 2022 Accepted Date: Date: Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree,if _Auditor this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be _Business office noted above, and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors _Const.Management therefore the prices shown above. _RE/Arch. _Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. LETTER OF TRANSMITTAL - C.C.O. NO. 3 SEPTEMBER 23, 2022 TO: STEVEN E. WHITE, DIRECTOR AUBERRY ROAD/COPPER AVENUE PUBLIC WORKS AND PLANNING TRAFFIC SIGNAL INSTALLATION FEDERAL PROJECT NUMBER: HSIPL-5942(241) CONTRACT NO. 19-08-C ATTN: MANDEEP S. SEKHON CONSTRUCTION ENGINEER FROM: LARue Goossen(Sep 23,)02211:16 PDT) LaRue Goossen, Resident Engineer STATUS OF FUNDS: Contract Items $ 786,169.00 Original Allotment $ 837,977.45 Dept. Furnished Materials $ 0.00 Supplemental Allotment $ 79,968.38 Previous CCO's $ 38,942.92 Total Allotment $ 917,945.83 This CCO $ 79,968.38 Obligated Funds $ 905,080.30 Total Obligated Funds $ 905,080.30 Unobligated Balance $ 12,865.53 DIRECTOR'S LIMIT to sign change orders is: 51,808.45 DESCRIPTION: Replace damaged pole and footing —accidental work. WHY: On April 14, 2022, a motorist ran through the intersection and hit the signal pole along the southside of Copper Avenue and damaged the pole and concrete footing. Therefore, it was necessary to replace the damaged pole and the footing. HOW: The contractor was directed to replace the damaged pole and footing according to Section 5- 1.39, "Damage Repair and Restoration," of the Standard Specifications. Compensation for this work will be made at an agreed price of$79,968.38 in accordance with the Section 9-1.03, "Payment Scope," of the Special Provisions. Since the project at the time of the accident was incomplete and was not accepted by the County, the contractor had the sole responsibility to protect the installed improvements. This agreed price was a result of a sidebar agreement/settlement (without any involvement by the County) between the contractor(Avison Construction, Inc.) and the public body's (responsible for the damages) insurance company (Progressive). Progressive issued a check, payable to the County of Fresno for the aforementioned amount. This check will be deposited into the project account as the supplemental allotment and contractor will be reimbursed for the full amount as extra work. COST: A$79,968.38 Increase NET COST THIS CHANGE ORDER: $79,968.38 INCREASE NET TIME EXTENSION THIS CHANGE ORDER: ZERO (0) -WORKING DAYS