Loading...
HomeMy WebLinkAbout19-S-04 CCO 077.pdf *e/, �t,� County of Fresno Department of Public Works and Planning Development Services&Capital Projects Division Steven E.White,Director PROJECT MANAGEMENT CONSTRUCTION CHANGE ORDER REQUEST This Document is for Fresno County Internal Use Only Project: Fresno County Sheriff Area 2 Substation Contract No.: 19-S-04 Date: 8/1/2022 Contractor: Klassen Corporation Architect: Roger Davidson Change Order No.: CCO#077 Construction Contract Dollar Amount(as awarded on 08/10/20) $11,364,500.00 Change Order Allowance: $568,225.00 Director's Change Order Limit: $210,000.00 Contract Time(Calendar Days): 322 Construction Start Date: 11/09/20 Original Construction Completion Date: 9126/21 Change Order Scope of Work: PG&E is requiring a 2"conduit with a 6x6x6 Nema3R can on the exterior of the building with a pull line. Attachment(s): CO Coversheet,PCO Proposal and support documents Net Additive Change Order Dollar Amount: $901.93 Net Additive Calendar Days: �p Net Deductive Change Order Dollar Amount: $0.00 Net Deductive Calendar Days: Total Change Order Dollar Amount To Date $370,343.88 Adjusted Contract Dollar Amount: $11,734,843.88 Total Adjusted Calendar Days To Date: g0 Director's Change Order Limit Balance: -$160,343.88 Adjusted Construction Completion Date: 12/15/21 AR6fy%R,fOy Reviewed: Roger Davidson d—d—(ft,1,2G22 13.20,o„ Architect Reviewed: LaRue Goossen G OSSe",p"Q,,P,,,,spo„ Project Manager Reviewed: Mandeep S. Sekhon N� 5 Construction Manager Reviewed: William M. Kettler Division Manager Approved: Steven E. White stewen,i-wlife Dir nor Approved: Brian Pacheco Board of Supervisors Chairman Approval Date: SEP n 1 ?V2 Scan and forward Director Approved Copy to: CAO Paul Nerland Sheriff's Office Thomas Trester PWP Business Office Jamie Sylvester Staff Analyst Linda Guerra F CO�� County of Fresno t �`5 Department of Public Works and Planning O a9 O Development Services&Capital Projects Division ES� Steven E.White,Director CONTRACT CHANGE ORDER Project: Fresno County Sheriff Area 2 Substation Contract No.: 19-S-04 Date: 8/1/2022 Contractor: Klassen Corporation 2021 Westwind Drive Bakersfield,California 93301 (661)324-3900 Change Order No.: CCO#077 Construction Contract Dollar Amount(as awarded on 08/10/20): $11,364,500.00 Original Construction Completion Date: 09/26/21 CCO#077 is hereby approved by the County. Change Order Scope of Work: PG&E is requiring a 2"conduit with a 6x6x6 Nema3R can on the exterior of the building with a pull line. Attachment: CO Coversheet,PCO Proposal and support documents Net Additive Change Order Dollar Amount: $901.93 Net Additive Calendar Days: �p Net Deductive Change Order Dollar Amount: Net Deductive Calendar Days: �0 Total Change Order Dollar Amount To Date: $370,343.88 Adjusted Contract Dollar Amount: $11,734,843.88 Total Adjusted Calendar Days To Date: 80 Adjusted Construction Completion Date: 00� n 12/15/21 LaRue Goossen LaRue Goossen(Aug 1,202211:19 PDT) Project Manager Signature Date: Aug 1, 2022 By signing acceptance of this Change Order,the Contractor shall agree to the following 1.Provide all equipment,material,labor and services required to complete the Scope of Work specified in this Change Order. 2. The revised adjusted Contract dollar amount and time extension shown in this Change Order as payment in full. In the event the Contractor does not sign acceptance of this Change Order,Provisions under the Agreement 16-S-05, Article VI shall apply. l ed�ar1re Accepted By., K/assen Corporation Rod Paine(Aug 1,2022 11:34 PDT) Authorized Signature Date: Aug 1, 2022 When completed by the Contractor, please scan and return Hard Copies and Color PDF copy to: Linda Guerra,Staff Analyst Fresno County Department of Public Works and Planning,Development Services&Capital Projects Division 2220 Tulare Street,Eighth Floor Fresno,CA. 93721 CHANGE ORDER SUMMARY Project Sheriff Substation App. DVWW1JN=$) 1,11Z. Credit Rejected Pending Adj. Days Description CCO 001 8/30/2021 $685.00 0 Water board-SMARTS fee CCO 002 $91,000.00 5 Revised site grades CCO 003 8/30/2021 $0.00 2 Rain delays CCO 004 8/30/2021 $0.00 2 Rain delays CCO 005 8/30/2021 $0.00 13 Rain delays CCO 006 8/30/2021 $6,870.55 5 Storage BLDG drain elevation CCO 007 8/30/2021 $1,745.00 3 Substation floor sink install CCO 008 8/30/2021 $7,614.33 5 Operable partition wall FTG GGO 009 - N/A CCO 010 8/30/2021 $89,889.80 0 Block wall for fencing CCO 011 $572,775.76 0 Storage Bldg.electric CCO 012 $32,245.91 0 Substation electrical CCO 013 $112,372.79 0 Electrical plan update CCO 014 $7,444.00 0 Blockout revised data room CCO 015 $14,657.00 0 Additional work in large data room CCO 016 8/30/2021 -$161,500.00 0 Delete Large Canopy CCO 017 $7,563.80 0 Mechanical hangers CCO 018 9/16/2021 $0.00 0 Date adjustments CCO 019 9/21/2021 $2,884.00 0 Folding Wall Revisions CCO 020 12/14/2021 $2,794.26 0 Fab.&Install metal sill flashing CCO 021 11/16/2021 $3,399.23 0 Install Wedge Anchors at Exterior Wall CCO 022 - N/A CCO 023 12/14/2021 $3,093.25 0 Plumbing alterations per ASI 2&3 CCO 024 12/14/2021 $795.79 0 Revised Architecturals CCO 025 11/22/2021 $8,355.00 0 Install Overflow pipe minus penetration of gutter CCO 026 $0.00 56 Metal Building Delay#1 CCO 027 12/29/2021 $4,486.63 0 Fur out West Exterior Wall CCO 028 12/29/2021 $2,097.75 0 Hardware changes from rev.in dwgs.ASI 7 CCO 029 $12,487.64 1 Reroute 2.5"and 3"fire mains per RFI 64 CCO 030 $71,190.79 0 Overhead door material price increase CCO 031 12/29/2021 $10,008.10 0 Ceramic tile alterations CCO 032 12/29/2021 $6,806.50 0 Add.Recessed TV and Databoxes CCO 033 1/19/2022 $3,212.39 0 Tower Closure Strips CCO 034 12/29/2021 $3,261.63 0 Provide power&connection to(5)hand dryers CCO 034.1 $1,784.20 0 Provide power&connection to(5)hand dryers r2 CCO 034.2 7/5/2022 $1,784.20 0 Provide power&connection to(5)hand dryers r3 CCO 035 12/29/2021 -$5,345.00 0 ASI to omit interior stone veneer and finish gyp board CCO 036 $38,224.99 0 Alternate Sectional Doors CCO 037 - N/A CCO 038 6/28/2022 28 Extended site rain/mud delays CCO 039 - N/A CCO 040 1/18/2022 $5,557.64 0 Lighting for Sheriff Star CCO 041 $267,768.79 0 Data Rack Revisions CCO 041.5 6/20/2022 $66,691.06 15 Switchgear to 2000/Data Center Revisions CCO 042 $7,334.25 0 Additional sunshade CCO 043 3/30/2022 $3,633.89 0 Supply and Install"B"metal angle CCO 044 2/16/2022 $3,352.40 0 Electrical for TV boxes CCO 045 0 N/A CCO 045.3 7/25/2022 $57,595.32 0 Extra work at force acc.for June CCO 046 4/25/2022 $9,397.07 0 Submittal changes-Door hardware CCO 047 3/8/2022 $3,082.34 0 Additional metal studs per new arch drawings CCO 048 $53,421.75 - CE#068-Rule 16 CCO 048.1 6/10/2022 $44,855.53 0 CE#068-Rule 16 CCO 049 6/20/2022 $11,371.85 0 Install block wall CCO 050 3/30/2022 $14,385.40 0 Tower and Entry Fascia Revision CCO 051 4/8/2022 $4,459.67 0 Added circuits to IDU Units CCO 052 - N/A CCO 053 - N/A CCO 054 4/20/2022 -$114.65 0 Delete Waste Dispensers&Add Hand Dryers CCO 055 $71,905.65 0 Delayed lighting package order-ASI#03 CCO 056 6/28/2022 -$473.00 0 Memorial CMY wall alteration CCO 057 4/22/2022 $3,054.20 0 Power&Connection to plumbing fixtures TP-1 CCO 058 6/28/2022 $308.85 0 Circulating pump power CCO 059 - N/A CCO 060 - N/A CCO 061 $13,898.70 0 ASI 04-21-2022-01 Tower revisions CCO 062 $8,108.54 - N/A CCO 063 5/3/2022 $1,079.04 0 Install 6 footing sleeves CCO 064 - N/A CCO 065 - N/A CCO 066 5/24/2022 $837.38 0 Cleanout relocation by TEV transformer CCO 067 5/3/2022 $1,052.06 0 Additional CMU at removed gate CCO 068 $75,413.07 6 N/A CCO 068.1 $75,413.07 7 Courtyard Revisions CCO 068.2 7/25/2022 $61,502.69 6 Courtyard Revisions CCO 069 6/17/2022 $5,468.33 1 Enlarged mechanical pad CCO 070 - N/A CCO 070.1 7/5/2022 $2,946.78 0 Electrical room lighting CCO 071.1 7/25/2022 $17,372.89 0 Underground conduits CCO 072 - N/A CCO 073 7/27/2022 $14,985.54 0 Install(14)bollards per PG&E pad CCO 073.1 $7,691.90 0 Install(7)bollards per PG&E pad CCO 074 - N/A CCO 074.1 7/26/2022 $22,094.02 0 Storage BLDG structural pour back CCO 075 - N/A CCO 076 - N/A CCCO 077 _ 8/1/2022 $901.93 0 I PG&E Metering Conduit CCO 078 - N/A CCO 079 - N/A CCO 080 - N/A Totals $537,776.53 -$167,432.65 $1,440,748.36 $79,947.00 80 K PCCO #077 Klassen corporation Klassen Corporation Project:05-3-20035-Fresno County Sheriff Sub 2021 Westwind Dr 1129 North Armstrong Avenue Bakersfield,California 93301 Fresno, California 93727 Phone:(661)324-3000 Phone: Fax: (661)324-3900 Fax: Prime Contract Change Order #077: PG&E Metering Conduit CONTRACT COMPANY: Fresno Co.Dept of Public Works CONTRACT FOR: 05-3-20035 :Fresno County Sheriff Sub Prime 2220 Tulare Street,8th FI Contract Fresno,California 93721 DATE CREATED: 7/29/2022 CREATED BY: Emma Smith(KLASSEN CORPORATION) CONTRACT STATUS: Pending-In Review REVISION: 0 CHANGE REASON: SCHEDULE IMPACT: TOTAL AMOUNT: $ 901.93 DESCRIPTION: CE#114-PG&E Metering Conduit Description: 1.PG&E is requiring a 2"conduit with a 6x6x6 Nema3R can on the exterior of the building with a pull line. ATTACHMENTS: CO#021 PGE Metering Conduits.pdf POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: PCO# I Title Schedule Impact Amount 077 1 PG&E Metering Conduit 901.93 TOTAL: $901.93 CHANGE ORDER LINE ITEMS: PCO#077:PG&E Metering Conduit # Cost Code Description Type Amount PG&E is requiring a 2"conduit with a 6x6x6 Nema3R can on the exterior of the ?6-?00-Electrical Subcontractor $802.44 building with a pull line. Subtotal: $802.44 Fee:10.00%Applies to all line item types. 80.24 Insurance:1.40%Applies to all line item types. 11.23 Bond:1.00%Applies to all line item types. 8.02 Grand Total: $901.93 The original(Contract Sum) $ 11,364,500.00 Net change by previously authorized PCCO $495,187.87 The contract sum prior to this PCCO was $ 11,859,687.87 The contract sum would be changed by this PCCO in the amount of $ 901.93 The new contract sum including this PCCO will be $ 11,860,589.80 The contract time will not be changed by this PCCO Klassen Corporation Fresno Co.Dept of Public Works 2220 Tulare Street,8th FI Fresno California 93721 SIGNATURE DATE SIGNATURE DATE Klassen Corporation page 1 of 1 Printed On:7/29/2022 10:12 AM Electrical PowerSource ELECTRICAL 5796 S Elm Ave Fresno, CA 93706 559-268-2861 N = LI CENSE N UMBER 696663 Change Order #021 PG&E Metering Conduit BILL TO INVOICE# Klassen Corp. DATE 07.21.2022 2021 Westwind Dr. TERMS Due on receipt Bakersfield, Ca 93301 559-342-3000 DESCRIPTION AMOUNT Labor Hours: 4.31 hr. $346.83 Estimating: .5hr. $37.50 Project Management: .5hr $37.50 Total: $421.83 Description: 1. PG&E is requiring a 2" conduit with a 6x6x6 Nema3R can on the exterior of the building with a pull line. Material: $307.66 1. 2" EMT 2. 2" EMT Connectors 3. 2" EMT Couplings 4. 2" EMT strut straps 5. 6x6x6 NEMA 3R can 6. Deep strut 7. '/2" Pull line Exclusions: - Standard exclusions per original scope letter. - PG&E Monitoring Device and Installation. - PG&E Monitoring. Total: $729.49 Overhead/Profit 10%: $72.95 Total Cost: $802.44 7/21/2022 7:54:59 AM Electrical Power Source Inc. Page 1 Phone:559-268-2861 Fax:559-233-2414 Fresno County Substation :CO#021 PG&E Metering conduit Totals(Detailed)-Bid Summary: Default Job Number CO300-24 Bid Date 6/23/2020 Bid Time 7:43:00 AM Square Footage 0 Material Totals Division Total Factor Extended 01 Raceway, Fittings&Boxes $271.86 0.00% $271.86 07 Misc 13.09 0.00% 13.09 Total $284.95 $284.95 Sales Tax(7.97%) $22.71 Total Material $307.66 Labor Hours Division Total Factor Extended 01 Raceway, Fittings&Boxes 3.41 0.00% 3.41 07 Misc 0.90 0.00% 0.90 Total 4.31 4.31 Labor Rates Category %of Total Hours Base Rate Burden Burden% Extended Journeyman 80.000 3.448 $83.11 0.00 0.000 $286.56 4th year apprentice 2nd semester 20.000 0.862 69.93 0.00 0.000 60.28 Total 100.000 4.310 x $80.47 (average of labor rate w/burden)_ $346.84 Non-Productive Labor Description Hours Rate Factor Extended Estimating 0.50 $75.00 0.00% $37.50 Project Manager 0.50 75.00 0.00% 37.50 Total $75.00 Total Labor (5.31 hours) $421.83 Job Subtotal(Prime Cost) $729.49 Overhead(10.00%) 72.95 Profit(0.00%) 0.00 Job Total $802.44 7/21/2022 7:54:59 AM Electrical Power Source Inc. Page 2 Phone:559-268-2861 Fax:559-233-2414 Fresno County Substation :CO#021 PG&E Metering conduit Totals(Detailed)-Bid Summary: Default Actual Bid Price $802.44 Material to Direct Labor ratio: 0.47 Prime Cost per square foot $0.00 Job Total per square foot $0.00 Actual Bid Price per square ft $0.00 Labor cost per square foot $0.00 Labor hours per square foot 0.00 Gross Profit% 9.09 Gross Profit$ $72.95 Net Profit% 0.00 7/21/2022 7:55:29 AM Page 1 Fresno County Substation :CO#021 PG&E Metering conduit Item# Description Quantity Price Ext Price Labor Ext Labor 1461 2"Set Screw Steel Insul Throat Conn 2.00 5,696.88 C 113.94 0.25 E 0.50 1005 2"EMT 10.00 812.69 C 81.27 8.00 C 0.80 6481 6x6x6"Screw Cover Pull Box-Nema 3R 1.00 43.30 E 43.30 1.23 E 1.23 1561 2"Set Screw Steel Cplg 2.00 1,308.05 C 26.16 0.24 E 0.48 6644 Unistrut(Deep) 1.00 1,115.04 C 11.15 20.00 C 0.20 2340 2"Unistrut Strap 2.00 359.31 C 7.19 20.00 C 0.40 3111 1/2"Pull Line 10.50 184.54 M 1.94 17.50 M 0.18 6650 Cut 12 Gauge 1-5/8x1-5/8 Channel(labor) 2.00 0.00 E 0.00 0.26 E 0.52 1 1 2 1 3 1 1 - 10 1 11 1 12 1 13 1 14 1 15 b17 1 18 1 19 1 20 Key Notes o P O O O p rs+ rs+ rs+ 0 Is Is Is Is 1s _ 1. 4 C.PRIMARY PER PG&E RULE 16 DOCS. R r.+ _ _ J41 3LA 7_____ _____ - - - - - - - - - - - - - - - 2. PG&E STANDARD CONCRETE PAD. SET MIN. 36" r,; FROM CMU WALL AND MIN 60' FROM FACE OF _______________ _________________ CURB. � P- �_ -� � �---_ 61017 r3 C. 3. (7)5"C.SECONDAV PER PG&E RULE 16 DOCS. p I 4. PAD MOUNTED, FREESTANDING ELECTRICAL I I ❑ EQUIPMENT. REFER TO POWER SINGLE LINE DIAGRAM, SHEET E1.1, FOR ADDITIONAL UNDERGROUND RUNS NOT SHOWN HERE. SEE ALSO DETAIL H13/E1.2. Q t FUTURE it 5 I OWNER FURNISHED,EMERGENCY GENERATOR CONTRACTOR INSTALLED: LLED:STUB CONDUITS INTO B1017 AND B1730 BOXES FOR FUTURE CONNECTIONS.VERIFY LOCATIONS 51 WITHFUTURE OWNER. SHADE I 51 \ '2LC' 6. 1-1/4"C.TO FUTURE ATS LOCATION. CANOPY I ° 2LD' o 0 0 0 0 0 0 0 0 0 0 o e o e o ° 7. 1-1/4"C.TO FUTURE GENERATOR MONITOR PANEL p ° LOCATION. p I I I I I I I I I I I I I I- I- 8. FUTURE GENERATOR FEEDERS PER POWER SINGLE LINE DIAGRAM. 9. TRANSFORMER PRIMARY AND SECONDARY PER LEGEND i ° i POWER SINGLE LINE DIAGRAM. 11. B1324 H/20 PULLBOX WITH BOLT-DOWN STEEL LID. HOMERUN(3)2"C.TO PANEL 3LA WITH PULL LINES H RED=Deleted items from bid drawings i STORAGE BUILDING D FOR FUTURE EV CHARGER STATIONS N BLACK=No Change ° ° 2"C.,1-1/2"C.o-� [2* PROVIDE UNDERGROUND CONDUITS FOR GREEN=New items,or modified text ° I to existing items ° I DIAGRAM,SHEETEI 2. LL / �\ O21 ST L LIDS.X WITH SPRING-ASSIST BOLT DOWN// � I ° � STEEL LIDS. _ \`�`\ \\�t I 22 H2O RATED PULLBOX WITH BOLT-DOWN STEEL LID, __ 1 2"C., I ° _ �` `1 ` SIZE INDICATED B2436 1 'PP2' \� 1 1- ° I - - O `� ��� `� L-J ° M 1-1/2"C PP2 -----\--------�f I ° `� ° 23 4"C. FROM SWITCHBOARD SS-H FOR FUTURE M n , `� SOLAR. 51 24. (4)2"C.&(4)1-1/2"C.FROM PANEL 3HA FOR FUTURE '2LB' ° SITE POWER. \\ PP2 2LA' ` 5`�\ ° ° 25. SITE CONDUITS,QTY.AND SIZE INDICATED. 3LA-6 26. "SOLAR DISCONNECT"400A FUSED DISCONNECT PP2 I PER PG&E RULESAL L _ Z'C..1-1- / 27. 4"C.FROM PV DISCONNECT FOR FUTURE SOLAR. L g rs ° ------ I ,MS, 28. (2)21-C.SPARE FROM SB-H. I Q ° ezaas ° ° ° ° I ATs' 2"emit conduit with a I 29. SEE ENLARGED ELECTRICAL&IT BUILDING PLANS \ I 4 'SB-L 6x6x6 nerl Can A1/E1.3 AND F1/E1.3. \\ I SB-H' 31. FUTURE POWER PEDESTAL.PROVIDE 1-1/2"C.TO PANEL3HA. \ 1A'2H 80 3 \\ 2HM'' 32. VC.FOR FUTURE OUTLET CIRCUIT. 33. B1013 H/20 VAULT.STUB CONDUITS AT INTERIOR K \I J-LTJ-L� J-LTJ-L� J-LTJ_L� J_1 51� FOR FUTURE USE. 7\7 (2) 'C.,(2)1-1/2"C, ° `,.'�. \ FUTURE 150kVA TRANSFORMER "TEV" WITH O ' h 34 'TSB-L' 3LA-1,3,5 \ PRIMARY DISCONNECT FOR EV CHARGER � \ STATIONS. PROVIDE CONDUIT FROM PANEL 3HA O ;° ° ° 21 ,3 A, O 2 PER AIIE7.1 ° ° 'DB-1 H' 6 D 35. FUTURE 600A PANELBOARD'EV'LOCATION ° -1HEL' �•�/ 5° FUTURE ° ° I ° DB-1L Oj 36. CHRISTY N9 PULLBOX FOR FUTURE EV DUAL J SHADE - I 23 VEHICLE CHARGER. HOMERUN TO PANEL EV J ° ° CANOPIES LOCATION WITH 1"C. (4)T C..(2)2"C. ° 41. INSTALL GATE OPERATOR AND EXIT-, SHADOW-, ° I AND REVERSE-LOOPS IN ASPHALT PER (� MANUFACTURER INSTRUCTIONS. PROVIDE 2#8, ° Y I ° 1#8G.FEEDER FROM PANEL 3LA THRU 1-1/2"C. FUTURE PANEL/CABINET.SEE Al/El 1. IT 52. CHRISTY N9 PULLBOX WITH(5)1-112"C.TO FUTURE PANEL HM LOCATION(FOR FUTURE CONDENSING H UNITS). (1)4"c (2)2"C.,1-1/2"C 12�///I ° ayLlI \ 5 53. CHRISTY N9 PULLBOX WITH(2)1-1/2"Q TO PANEL \ 3LA FOR FUTURE SHERIFF'S MEMORIAL.CONFIRM EXACT LOCATION WITH ARCHITECT. `ate®P1 ,® I° 5 2 C P+1©_0 /// I ° I 54. B1013 HI20 RATED VAULT AND 1"C.TO PP2 FOR ° 1_____- FUTURE CAMERA ELECTRONICS ENCLOSURE. J- TTTTI ____= _ �' ° UTILIZE SAME VAULT FOR KEYNOTE 41,SHEET E2.2. I G 25 1-1/2"C. i G 31'PP1' / i 21 1} PP, 2„c�'�P I ° BSTA I ® /Ppi C. \ PP1 4 �� \\ I 2"C.,1-1/2' S Q�OFESS I al i � 15 ° I 11 y Hardin-Davidson F $ 'I 3 E1785 Engineering F 356 Pollasky Ave. �2' C7R1CP Suite 200 9T Clovis,CA 93612 OF CAo1 559.323.4995 tail D, -.1ardin-davidson.com AR CHITECT Gw�s�D RUq�x>>�G Nal Roge Davidson A.I A.,Architect Note: These drawings are clarifications to 0 ° ° ° ° �\ ' e y� •� �, Caleomia Ucensed Architect No C27818 p4' �' Ren 10-31-2021 \`--r 2 C. .Z Fresno County Departhent of Public Works F ASI-01-18-2022-01 in response to RFI# 81 0 ° ° ° ° * -2,818 * �oT a�ee5,e1,EIghN Floor L ° ° 1 I \\ I y� I N REN 10-31-21 Q. Fresno,Callfohn 9371 ° ° \ AR F FO4 -h it nd.id.h@.fresh.came 9�, Telephone(559)600d477 34"TEV" OF CAV1 a FUTURE ° ° I -EV" SHADE JI CANOPIES ° ° I ° _ _ _ __--- J Project: Sheriff Area 2 Sub-Station p O ° ° r I 1 36 36 e e e e e e e e e e 111129 N.Armstrong Ave.,Ave.,Fresno,CA D APN:310-133-04,-05,and-06 I 7 ISSUE DATE:1.14 2022 PROJECT NO:T80293/19003.03 FILENAME 19074-7_Elen_N-Bid Ph 1 SheetCo Content: POWER SITE ASI - 01-18-2022-01.01 CANCEL ASI #1 P1 Departmentr - ------ ------ Fresno County e e e e 0 e e iPublic Works and Planning oCapital ProjectsrC a B B1730 i ° i 3LA-4 a1 D t 0 Fresno, -California- .. O�AR$5�O 3LA-9 d L L 0 m 5 1-1/2"C. 3 =1 Sheet No. W ° e e e e e e e e e eXi e e e e e e e e a A ❑ E2 1 = Al Power Site Plan n nSoele V-2'-" rv�� 1 .. 4 1 5 1 6 1 7 1 8 1 9 110 1" _ ., 14 ., 16 117 1 18 1 Plotted on:1 14 2022