Loading...
HomeMy WebLinkAbout2015C CCO 07.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER JAMES BYPASS BRIDGE REPLACEMENTS ON MANNING AVENUE CHANGE ORDER NO. 07 3 MILES EAST OF COLORADO AVENUE AUGUST 31, 2022 FEDERAL AID NUMBER: BRLS-5942(233) PAGE 1 OF 2 CONTRACT NO. 20-15-C TO: VIKING CONSTRUCTION COMPANY, INC.: Make the following changes to the plans and specifications or do work not in the plans and specifications for this contract. Because of the change(s), ZERO (0) -WORKING DAYS will be added to the contract. INSTALL RUMBLE STRIPS This change was requested by the engineer. According to Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, install rumble strips per 2018 Standard Plan A40B, from Sta. 27+68.53 to Sta.44+43.60 Left and Sta. 28+08.08 to Sta. 44+43.60 Right. The rumble strips shall be placed 8"from edge line delineation to edge of indent and continuous between the stationing listed above, minus the bridge backwall only. Compensation for this work will be made as extra work at an agreed lumpsum price $27,946.40, according to Section 9-1.03, "Payment Scope," of the Special Provisions. This agreed lumpsum price includes compensation for mobilization, demobilization, installation and removal of traffic control including flaggers and pilot car if needed, grinding of the rumble strips, removal of the grindings, street sweeping, fog seal material and application, any and all markups with no additional compensation beyond the agreed price as set forth. This work will be done during the suspension period, so granting additional contract time was not warranted. Contractor We,the above signed contractor,have given careful consideration to the change proposed and hereby agree, if _Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment Board of Supervisors _Const.Management therefore the prices shown above. RE/Arch. Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER JAMES BYPASS BRIDGE REPLACEMENTS ON MANNING AVENUE CHANGE ORDER NO. 07 3 MILES EAST OF COLORADO AVENUE AUGUST 31, 2022 FEDERAL AID NUMBER: BRLS-5942(233) PAGE 2 OF 2 CONTRACT NO. 20-15-C NET COST THIS CHANGE ORDER: A $27,946.40 INCREASE NET TIME EXTENSION THIS CHANGE ORDER: ZERO (0) -WORKING DAYS A&h&dStoMmIeLl Richard Stockwell(SeD 1.2022 09:47 PDT) Richard Stockwell, Resident Engineer APPROVAL RECOMMENDED: VIKING CONSTRUCTION COMPANY, INC. Contractor Mandeep S. Sekhon, PE Construction Engineer z2f� By Try Cernons(Sep 16,202214:12 PDT) APPROVED BY: Digitally signed by Steve White Vice President Steve White Date:2022.09.1915:49:21 Title -07'00' Steven E. White, Director Accepted Date: Sep 16 2022 Public Works and Planning � Date: Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if _Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be —Business Office noted above,and perform all services necessary for the work above specified,and will accept as full payment _Board of Supervisors_Const.Management therefore the prices shown above. RE/Arch. _Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified.