HomeMy WebLinkAbout2015C CCO 06.pdf COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
JAMES BYPASS BRIDGE REPLACEMENTS ON MANNING AVENUE CHANGE ORDER NO. 06
3 MILES EAST OF COLORADO AVENUE JUNE 8, 2022
FEDERAL AID NUMBER: BRLS-5942(233) PAGE 1 OF 2
CONTRACT NO. 20-15-C
TO: VIKING CONSTRUCTION COMPANY, INC.:
Make the following changes to the plans and specifications or do work not in the plans and specifications for
this contract. Because of the change(s), ZERO (0) -WORKING DAYS will be added to the contract time.
MODIFY BEARING SEAT ELEVATIONS
This change was requested by the Engineer.
In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, revise the
bearing seat elevations (shown on the attachment to the Contract Change Order No.3) with the attached
sheets. This change increases the Bid Item No. 51, Furnish Polyester Concrete Overlay (F) quantity by 873.20
cubic feet. Compensation for the increased quantity of the polyester concrete overlay will be made at the unit
bid price according to Section 9-1.03, "Payment Scope," of the project Special Provisions. This change
resulted in an increase of$71,602.40.
Increased Item:
Item Total Total
No. Quantity Unit o) Description Price Amount %
51 873.20 CF 33.58 Furnish Polyester Concrete $82.00 $71,602.40 33.58
Overlay (F)
This change did not impact the critical path or the road closure timeline of the project, therefore, no additional
time will be granted.
Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if
Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be
Business office Board noted above,and perform all services necessary for the work above specified,and will accept as full payment
_
_Const.management therefor the prices shown above.
RE/Arch.
Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
JAMES BYPASS BRIDGE REPLACEMENTS ON MANNING AVENUE CHANGE ORDER NO. 06
3 MILES EAST OF COLORADO AVENUE JUNE 8, 2022
FEDERAL AID NUMBER: BRLS-5942(233) PAGE 2 OF 2
CONTRACT NO. 20-15-C
NET COST THIS CHANGE ORDER: A $71,602.40 INCREASE
NET TIME EXTENSION THIS CHANGE ORDER: ZERO (0) -WORKING DAYS
A&AW-W S60(1(141aa
Richard Stockwell(Jun 9,2022 18:12 PDT)
Richard Stockwell, Resident Engineer
a�No.C80424 1p
OF cFJ
APPROVAL RECOMMENDED:
q-
Joseph C. Harrell, PE
Supervising Engineer, Design Division
VIKING CONSTRUCTION COMPANY, INC.
Contractor Mandeep S. Sekhon, PE
Interim Construction Engineer
By Troy enlons(Jun21,202209:25PDT) APPROVED BY:
Digitally signed by Steve White
Steve White
Date:2022.06.21 11:58:06
Title
Vice President - 0
Steven E. White, Director
Accepted Date.
Jun 21 2022 Public Works and Planning
Date:
_Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if
Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be
Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment
_Board
_Const.Management therefor the prices shown above.
RE/Arch.
Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the
specifications as to proceeding with the ordered work and filing a written protest within the time therein
specified.
ary
gn o
.3A A,3
nm e9 �
r ya S II ;, m oSg
G4
n3a as
x x
x x �
x � X
� X x
1 N
$Ty 9VO 3`b X 3mmm°� JLNaq
.lF �;n �$o'U$$ mrr VUNN my
rv_. g'6 a OIl II 11 V roA mC�
R'S X mQ�m< aR.V mN
N do
mqqqO �
i
X '�
n
LO
N W O
0
o
to X
X co N
N r
O O
oav m72
_cc, Ci(7cj `
I'7 Cl)V`
000 `Ooo iy
X I r Q Q
t U° O O ILL
LL F-F- i
Lo X
CD L`]
m
Y
N _ u
O Cl)00 N O O a E
N E
d O N `
CD
� v O �. N p O m�
d /� O 'm OD O 00 c� N
i6` as Na N 00
co O C C — O r 0 o o °
ma �
d r 0 0 a0 0 0 00 U'O O D C
a m u C9 O O QQ a0 C COIN - -o - s
CD O O U' c`1 N `E
o LL F- LL F-F- O 0 0 0 0 < <_
W e & co
LL F- F- n ri : vi
o
z�
Qo
�� �� LO
X a
CD <n 0 Z of
O 7 o
, O) p0
O °v �
N-O
o
X
a0a 00
"� ' O O
.,t ` =vCNMU Na
OON -p
N
r O _ N
QQ UN CO
a 0
LL FO}OLL - 0
m Q Q
LL 0O
LL J i
LLF F-
x
N
m X CO
X O
41 o i
�, N o O r
�? � a a
U=N L1 m
� � I f6 m C C
X j O 1 X >'>''O m U
N co
r aLLC7[llf/l
NN �
a�a Z,a
L17 'O LO
mac MC
�� N
X W O O 0 0 X
Q Q Q Q
LLLL I—F- LLLL F-F-
O
n
Girder
Deflection AS BUILT AS BUILT Prepour AS BUILT AS BUILT Prepour ASBUILT ASBUILT Prepour
barrier+ top of Bearing Poly Poly top of Bearing Poly Poly top of Bearing Poly Poly
Station Girder Poly FG girder Seat Elev thickness Grade FG girder Seat Elev thickness Grade FG girder Seat Elev thickness Grade
Camber LT EP LT LT EP Cr EP LT EP CL CL CL CL CL RT EP LT RT EP RT EP RT EP
BB 423265 183.05 19294 180.53 0.21 183.05 183.35 182.82 180.52 0.53 183.35 183.05 182.84 180.51 0.21 183.05
Mid Span 4265.03 0.03 182.97 182.87 0.13 183.00 183.27 182.85 0.45 183.30 182.97 182.87 0.13 183.00
EB 4297.4 182.89 182.66 180.35 0.23 182.89 183.19 182.66 180.36 0.53 183.19 182.89 182.65 180.35 0.24 18289
BB-Mid 430.2334
Mid-EB 438.4283
Total Poly 868.6617 SF
Girder
Deflection AS BUILT AS BUILT FG using AS BUILT AS BUILT AS BUILT AS BUILT
barrier+ top of Bearing Poly Prepour shown top of Bearing Poly Prepour Poly top of Bearing Poly Prepour
Station Girder Poly FG girder Seat Elev thickness Poly Grade grades girder Seat Elev thickness Grade FG girder Seat Elev thickness Poly Grade
Camber LT EP LT IT EP LT LT CL CL CL CL CL RT EP RT EP RT EP RT EP RT EP
BB 2868.57 0 182.80 182.59 180.36 0.21 182.80 183.18 182.63 180.35 0.55 183.18 182.95 182.69 180.44 0.26 182.95
Mid span 1 2893.82 0.01 182.89 182.74 0.16 182.90 183.27 182.75 0.52 183.28 183.04 182.88 0.17 183.05
CL Pier 2 2919.07 0 182.98 182.80 180.53 0.18 182.98 183.36 282.79 180.56 0.57 183.36 183.13 182.91 180.70 0.22 183.13
Mid Span:2955.07 0.04 183.11 182.99 0.16 183.15 183.49 183.05 0.48 183.53 183.26 183.07 0.23 183.30
CL Pier 2991.07 0 183.25 183.01 180.79 0.24 183.25 183.63 183.09 180.84 0.54 183.63 183.40 183.15 180.92 0.25 183.40
Mid Span:3016.32 0.01 183.34 183.16 0.19 183.35 183.72 183.24 0.49 183.73 183.49 183.30 0.20 183.50
EB 3041.57 0 183.44 183.25 180.95 0.19 183.44 183.82 183.32 181.03 0.50 183.82 183.59 183.38 181.08 0.21 183.59
BB-mid 376.453828
mid-Pier2 372.618984
Pier2-mid 527.61375
mid-Pier3 533.08125
Pier3-mid 376.453828
mid-EB 354.723047
WB Poly 2540.94469 CF
EB Poly 6 CF
Total Poly 3409.60641 CF Actual placed quantity:3,473.20 CF(per tags)
)
Bid Item 2,600.DD CF Pay actual quantity:3,473.20 CF
Difference $66,387.73 Increase