Loading...
HomeMy WebLinkAbout2015C CCO 02.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER JAMES BYPASS BRIDGE REPLACEMENTS ON MANNING AVENUE CHANGE ORDER NO. 02 3 MILES EAST OF COLORADO AVENUE JULY 29, 2021 FEDERAL AID NUMBER: BRLS-5942(233) PAGE 1 OF 2 CONTRACT NO. 20-15-C TO: VIKING CONSTRUCTION COMPANY, INC.: Make the following changes to the plans and specifications or do work not in the plans and specifications for this contract. Because of the change(s), Zero (0)WORKING DAYS will be added to the contract time. PART I: REVISE PLAN SHEETS S-8 (18)AND S-20(30) —EXTRA WORK According to Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, replace Plan Sheets S-8 (18) and S-20 (30) with the revised sheets (attached). These plans sheets were revised to increase the prestressing requirements from 3,170 to 5,980 kips for the bridge on the west channel (Sheet S-8(18), Bridge No. 42C0691), and to decrease the prestressing requirements from 3,170 to 2,200 kips for the bridge on the east channel (Sheet S-20(30), Bridge No. 42C0692)). The revisions are clouded as identified under the "Prestressing Notes". These revisions are being performed as extra work at an agreed lumpsum price $19,558.00, according to Section 9-1.03, "Payment Scope," of the Special Provisions. This agreed lumpsum price includes compensation for all additional material, engineering, placement, prestressing, overhead costs, and profits as required by the revised plan sheets; no additional compensation will be made for this work. This work did not impact the critical path for the project, so granting additional contract time was not warranted. TOTAL COST PART I: $19,558 INCREASE TOTAL TIME EXTENSION PART I: ZERO (0) WORKING DAYS PART II: COMPENSATE FOR FILING THE NOTICE OF INTENT (NOI) - EXTRA WORK Compensate the Contractor for the actual expense for filing the Notice of Intent (NOI) with the California State Water Resources Control Board. Filing of the NOI became pertinent when it was determined that this requires a Storm Water Pollution Prevention Plan (SWPPP) in lieu a Water Pollution Control Program (WPCP). The Contractor paid $509 as the NOI filing fee, this amount will be reimbursed to the Contractor as extra work. This work did not impact the critical path for the project, so granting additional contract time was not warranted. TOTAL COST PART II: $509 INCREASE TOTAL TIME EXTENSION PART II: ZERO (0)WORKING DAYS NET COST THIS CHANGE ORDER: $20,067 INCREASE NET TIME EXTENSION THIS CHANGE ORDER: ZERO (0)WORKING DAYS _Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business office noted above, and perform all services necessary for the work above specified, and will accept as full payment Board Cons'.Management therefor the prices shown above. _ _RE/Arch. Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER JAMES BYPASS BRIDGE REPLACEMENTS ON MANNING AVENUE CHANGE ORDER NO. 02 3 MILES EAST OF COLORADO AVENUE JULY 29, 2021 FEDERAL AID NUMBER: BRLS-5942(233) PAGE 2 OF 2 CONTRACT NO. 20-15-C Z%Mpa'CStOG�fW Richard Stockwell(Jul29,202110:32 PDT) Richard Stockwell, Resident Engineer APPROVAL RECOMMENDED: VIKING CONSTRUCTION COMPANY, INC. Contractor Mandeep S. Sekhon, PE Interim Construction Engineer � c4ft~ By Troy Ciemons(Aug 19,202113:04PDT) APPROVED BY: Vice President Ste✓en E whif,< Title Steven E White(Aug 19,2021 14:00 PDT) Steven E. White, Director Accepted Date: _Aug 19, 2021 Public Works and Planning Date: Aug 19, 2021 Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if _Auditor Controller this proposal is approved,that we will provide all equipment,furnish ail materials,except as may otherwise be _Business Office noted above,and perform all services necessary for the work above specified, and will accept as full payment _Board Const.Management therefor the prices shown above. _ RE/Arch. _Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. r ® a ij E u •e - 5 °i ° ° ` °m o�C Ld E.0 n 04 o ��-_ ° °a II _g ..` J g X El u ° a s f uods i� m a ¢ °E° o E n vat Y s E m n 3 "n«n `o�°>' $� E ` m a o D E rn II n N r uod" o c - - o yUEcoo W° a __ Bw iw z �m `-"Eo �� I m - �`a c a�..: u o> c_ u�o io nR om a a`�.. m°no ¢ o«w2 c°� ®E ci°u° w..,o oN C m S w o�pp aFd o° Y a" `s a D F � F ww z� zz Qw u c r U W Z o a Q� a m ° N A as w0 0' 76- -� ®I Qm e g ae I - m F.� I ro N 6 Eo I: Y, wa Pm L o ��_ / °n ri J In \V/ I °rn ZI a>I o !l.. I �-•l OO 00� I J mdNx i -�11 !j W�I� rnw`�n° oil h d F' O E $ _ Ii I /�!!ll/ �d ° yiUCd } ° it LTC C U - _ I lV Z a ww 9 0 all �E His.. _ I I m e I �n airn n 31 .. aI 1 - z `y z - E « o i 'g- oc ° E « <e — 3t o mE Ew a mar o U- o c n "w c- «�' Ea gv x s -o oa j� to c a:oc u cII o"EU :Ea raw _Y - ° n p O g g c�°�° m �9 a Ea = E V; 3 a�u wm ou t van a'ooi ww" « oOm -W °_" a'Z p uods i,� rn c i°��ac E c = c o '4� a� a ' �SEco a W z o wEc V cE -�aoo� oa m �Ea m = o ° c MA °-E c915 UO- o� a a`c,- m°no a o9 va r, ®E cicm 'Y a a o p u uods r� V = N a .i c vi m r m o3 Yay N `o w -I!d o v r o le ® J W W m- Z M n Z Z g Q W - \ 2> \ UQ mR j i°n3I-E=' Hm 83i o\ _° N Z a \ 3Z d N 03c m uj uj U2a" W I <m l..' Q m r . I I: I `o I I E.�,iYFEeyr. E. «wa ` o � L Tr U L' Z pE L " $ c \ ~ Z o cis F.� I ..�-.l O I o g `2 I II N a.E N ` L-Y d W -75aN L.. U�M °cn;n m r Io m 1`n•%- +! �I l I � �o •L. tl I Ljj � z I ° l I F- I Ir oc N2 a L I I w� � I: z� r I U o a, o 6 I N Q U _ - � I \ U a uiw f -° s L—�-E IN o v ° Y o m • � I °I 0 o fA H a Vrn [ti