HomeMy WebLinkAbout2015C CCO 01 - signed.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER JAMES BYPASS BRIDGE REPLACEMENTS ON MANNING AVENUE CHANGE ORDER NO. 01 3 MILES EAST OF COLORADO AVENUE JUNE 23, 2021 FEDERAL AID NUMBER: BRLS-5942(233) PAGE 1 OF 1 CONTRACT NO. 20-15-C TO: VIKING CONSTRUCTION COMPANY, INC.: Make the following changes to the plans and specifications or do work not in the plans and specifications for this contract. Because of the change(s), ZERO (0) WORKING DAYS will be added to the contract time. REVISE BID ITEM NO. 4 "PREPARE WATER POLLUTION CONTROL PROGRAM" In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, revise Bid Item No 4, "Water Pollution Control Plan," (WPCP) to comply with requirements of the Storm Water Pollution Prevention Plan (SWPPP), in compliant with the requirements of Section 13, "Water Pollution Control," of the Standard Specifications and Special Provisions. Compensation for the extra work resulted with this change will made an agreed additional price of$2,690 (in addition to unit bid price of Bid Item No. 4), according to Section 9, "Payment Scope," of the Special Provisions. This additional price includes $1,400 for preparing the SWPPP document, $750 for filing two (anticipated) Annual Reports ($375 per report), $270 for filling the Notice of Intent (NOI), and $270 for filling the Notice of Termination (NOT). The NOI fee will be compensated at the actual cost, to be covered in a subsequent change order. All other items regarding the revision from a WPCP to a SWPPP are covered in the Project Specifications and Standard Specifications, which are required to be adhered to, with no additional compensation. This work did not impact the critical path for the project, so granting additional contract time was not warranted. NET COST THIS CHANGE ORDER: $2,690 INCREASE NET TIME EXTENSION THIS CHANGE ORDER: ZERO WORKING DAYS %GGI�G�c��OG`fGt/GGG Richard Stockwell(Jun 24,202111:46 PDT) Richard Stockwell, Resident Engineer APPROVAL RECOMMENDED: VIKING CONSTRUCTION COMPANY INC. Contractor Mandeep Sekhon, PE Interim Construction Engineer By Troy C emons(Jun 24,202114:21 PDT) APPROVED BY: Vice President Sfe✓en E whrl-e Title Steven E White(Jun 24,202116:39 PDT) Steven E. White, Director Jun 24, 2021 Public Works and Planning Accepted Date. Date: Jun 24, 2021 Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree, if Auditor Controller this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be Business office noted above,and perform all services necessary for the work above specified,and will accept as full payment Board Const.Management therefor the prices shown above. _ RE/Arch. Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified.