HomeMy WebLinkAbout2020C CCO 06.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER AMERICAN AVENUE AND GOLDEN STATE BLVD CHANGE ORDER NO. 6 INTERSECTION IMPROVEMENTS MAY 11, 2022 CONTRACT NO. 20-20-C PAGE 1 OF 2 TO: AJ EXCAVATION INC: Make the following changes to the plans and specifications or do work not in the plans and specifications for this contract. Because of the change(s), 2-WORKING DAYS will be added to the contract time. BACKFILL AND GRADE DRAINAGE DITCH BETWEEN STA. 115+23 AND STA. 119+82 (AMERICAN AVENUE) - EXTRA WORK This change was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, backfill and grade the newly excavated drainage ditch along the northside of American Avenue between Sta. 115+23 and Sta. 119+82. Grade this area with a 4 to 1 slope and match to the original ground. Utilize surplus materials available on site for backfill. Perform all work according to Section 19, "Earthwork," of the Standard Specifications and/or Special Provisions, as directed by the Resident Engineer. Payment for this work will be made as extra work at an agreed lump sum price of$12,077.28 according to Section 9-1.03, "Payment Scope," of the Special Provisions. This price includes compensation of all labor, materials, equipment, overhead costs, markups, and incidentals for performing the work, no additional compensation will be made thereafter. This amount will be paid through Bid Item No. 2, Supplemental Work, with no net increase to the contract. Two working days will be added to the contract time for this work. Contractor We,the above signed contractor,have considered the change proposed and hereby agree,if this proposal is _Auditor Controller approved,that we will provide all equipment,furnish all materials,except as may otherwise be noted above, —Business office and perform all services necessary for the work above specified,and will accept as full payment therefore the _Board of Supervisors _Const.Management prices shown above. RE/Arch. _Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER AMERICAN AVENUE AND GOLDEN STATE BLVD CHANGE ORDER NO. 6 INTERSECTION IMPROVEMENTS MAY 11, 2022 CONTRACT NO. 20-20-C PAGE 2 OF 2 NET COST THIS CHANGE ORDER: $0.00 (PAID IN BID ITEM NO. 2) NET TIME EXTENSION THIS CHANGE ORDER: TWO (2) -WORKING DAYS ,P.o6o.:.tyS�au�uc.�aoz ROBERT HENDRICKSON, Resident Engineer APPROVAL RECOMMENDED: AJ EXCAVTION INC. Contractor MANDEEP S. SEKHON, PE Interim Construction Engineer By Alisa Emmett(May 16,202212:12 PDT) APPROVED BY: Digitally signed by Steve White President Steve White Date:2022.05.24 10:53:41 Title -07'00' STEVEN E. WHITE, Director Public Works and Planning May 16,2022 Accepted Date: Date: Contractor We,the above signed contractor,have considered the change proposed and hereby agree, if this proposal is Auditor Controller approved,that we will provide all equipment,furnish all materials,except as may otherwise be noted above, _Business office and perform all services necessary for the work above specified,and will accept as full payment therefore the Board of Supervisors _Const.Management prices shown above. RE/Arch. _Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified.