AMERICAN AVENUE AND GOLDEN STATE BLVD CHANGE ORDER NO. 2
INTERSECTION IMPROVEMENTS NOVEMBER 9, 2021
CONTRACT NO. 20-20-C PAGE 1 OF 2
TO: A.J. EXCAVATION, INC.:
Make the following changes to the plans and specifications or do work not in the plans and specifications for
this contract. Because of the change(s), 20 WORKING DAYS will be added to the contract time. The revised
completion date is February 7, 2022.
INSTALL HDPE CONDUITS, STEEL CASING, AND PULL BOXES— EXTRA WORK
According to Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, install approximately
2,025 linear feet of 1.5-inch diameter(a total of eight, 5 mm thick smooth wall) HDPE conduits, two 6-inch
diameter Schedule 40 steel casing under the Union Pacific Railroad (total 124 linear feet), four 3 x 5 feet and
one 4 x 7 feet pull boxes with traffic rated lids at the locations/alignments shown on the attached Plan Sheet
No.1. Perform all work according to the applicable Sections of the Standards Specifications, Special
Provisions, attached Plan Sheet No. 1, and Standards Plans. Payment for this work will be made as extra work
at an agreed lump sum price of$247,307.50 according to Section 9-1.03," Payment Scope," of the Special
Provisions. This price includes compensation of all labor, materials, equipment, overhead costs, markups,
profits, and incidentals for performing the work.
A total of 20 working days will be added to the contract time for this work.
NET COSTS THIS CHANGE ORDER: A $247,307.50 INCREASE
NET TIME EXTENSION THIS CCO: 20 WORKING DAYS
_Contractor-White We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if
Auditor-Canary this proposal is approved,that we will provide all equipment, furnish all materials,except as may otherwise be
Bus.office-Green noted above,and perform all services necessary for the work above specified,and will accept as full payment
_Board-Pink
_Const.Mgmt-Blue therefor the prices shown above.
_RE/Arch.-Blue
_Proj.rev.-Goldenrod If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the
_Contractor before specifications as to proceeding with the ordered work and filing a written protest within the time therein
Approval-White specified.
COUNTY OF FRESNO
CONSTRUCTION MANAGEMENT
CONTRACT CHANGE ORDER
AMERICAN AVENUE AND GOLDEN STATE BLVD CHANGE ORDER NO. 2
INTERSECTION IMPROVEMENTS NOVEMBER 9, 2021
CONTRACT NO. 20-20-C PAGE 2 OF 2
�Obelt �`fG��l4��/G�fJOl7
Robert Hendrickson(Nov 9,202112:42 PST)
ROBERT HENDRICKSON, Resident Engineer
APPROVAL RECOMMENDED:
A.J. EXCAVATION, INC.,
Contractor
MANDEEP SEKHON, Construction Engineer
Aaka,E�
By: Alisa Emmett(Nov 9,2021 16:41 PST)
Steven C white
Steven E White(Nov 10,2021 05:39 PST)
president STEVEN E. WHITE, Director of Public Works
Title: and Planning
Accepted Date: Nov 9, 2021 Date: Nov 10, 2021
Steve ra n d a u Digitally signed by Steve Brandau
Date:2021.12.07 14:57:59-08'00'
STEVE BRANDAU, Chairman
Board of Supervisors
Date:
Contractor-White We,the above signed contractor, have given careful consideration to the change proposed and hereby agree,if
_Auditor-Canary this proposal is approved,that we will provide all equipment,furnish all materials,except as may otherwise be
Bus.office-Green noted above,and perform all services necessary for the work above specified,and will accept as full payment
Board-Pink therefor the prices shown above.
_Const.Mgmt-Blue
_RE/Arch.-Blue
_Proj.Dev.-Goldenrod If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the
_Contractor before specifications as to proceeding with the ordered work and filing a written protest within the time therein
Approval-White specified.