HomeMy WebLinkAbout2102C CCO 04.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER LINCOLN AVENUE COLD PAVEMENT RECYCLING CHANGE ORDER NO. 4 LINCOLN AVENUE FROM SR 145 TO FIG AVENUE AUGUST 23, 2022 FEDERAL PROJECT NUMBER: CMLSTBG-5942(300) PAGE 1 OF 1 CONTRACT NO. 21-02-C TO: YARBS GRADING AND PAVING, INC.: Make the following changes to the plans and specifications or do work not in the plans and specifications for this contract. Because of the change(s), ZERO 0 -WORKING DAYS will be added to the contract time. ADJUST COMPENSATION TO RESOLVE POTENTAIL CLAIM NO. 1 In accordance with Section 9-1.17D(3), "Final Determination of Claims," of the Standard Specifications, adjust compensation as the dispute resolution for Potential Claim No. 1. This potential claim was based on the fact that there was no payment clause included in the Project Specifications nor in the Standard Specifications for Bid Item No. 17, Processing RAP (Cold Central Plant Recycling). The original claim was filed for an amount of$84,789.75; this claim was found to have partial merit. The settlement concludes splitting this amount equally, the County will pay you ($84,789.75i2=$42,394.88) $42,394.88 as the dispute settlement. This amount is considered the full and final payment as the dispute resolution for this claim, no additional compensation or additional contract time will be granted. NET COST THIS CHANGE ORDER: A $42,394.88 INCREASE NET TIME EXTENSION THIS CHANGE ORDER: ZERO (0) -WORKING DAYS Robert Hendrickson, Resident Engineer APPROVAL RECOMMENDED: YARB'S GRADING & PAVING INC. �� - Contractor Mandeep S. Sekhon, PE Construction Engineer Tlvo Yb�oGr By Troy` rbrough(Aug 24,2 209135PDT) APPROVED BY: I+ Digitally signed by Steve W hite Steve h Q Date:2022.08.24 153720 Title President -07'00'Steven E. White, Director Public Works and Planning Accepted Date: Aug 24, 2022 Date: _Contractor We,the above signed contractor, have considered the change proposed and hereby agree, if this proposal is Auditor Controller approved,that we will provide all equipment,furnish all materials,except as may otherwise be noted above, Business Office and perform all services necessary for the work above specified, and will accept as full payment therefore the _Board of Supervisors prices shown above. __Const.Management RE/Arch. _Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified.