Loading...
HomeMy WebLinkAbout2102C CCO 03.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER LINCOLN AVENUE COLD PAVEMENT RECYCLING CHANGE ORDER NO. 3 LINCOLN AVENUE FROM SR 145 TO FIG AVENUE JUNE 6, 2022 FEDERAL PROJECT NUBMER: CMLSTBG-5942(300) PAGE 1 OF 2 CONTRACT NO. 21-02-C TO: YARBS GRADING AND PAVING, INC: Make the following changes to the plans and specifications or do work not in the plans and specifications for this contract. Because of the change(s), ZERO(0) -WORKING DAYS will be added to the contract time. INCREASE BID ITEM NO. 1 This change was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work,"of the Standard Specifications, increase Bid Item No. 1, Supplemental Work(Payment Adjustment for Price Index Fluctuations) by$346,418. This increase resulted due to the California Statewide Crude Oil Index increased approximately by 50 percent from the bid opening month. The index for bid opening month,August 2021,was 403.9; and the index was 622.0 for the month of April 2022 and 596.7 for the month of May 2022,which applies to the pay estimates for the quantity of oil (asphalt)being compensated for these months. This additional amount was approved by the Board of Supervisors on May 17, 2022. Increased Items: Item Total No. Description Unit Quantity Price Amount NO 1 Supplemental Work(Payment $ 346,418.00 $1.00 $346,418.00 266.48 Adjustment for Price Index Fluctuations) This change did not impact the critical path for the project, so additional contract time was not warranted. —Contractor We,the above signed contractor,have considered the change proposed and hereby agree,If this proposal Is —Auditor Controller approved,that we will provide all equipment,fumish all materials,except as may otherwise be noted above, —Business Orfice and perform all services necessary for the work above specified,and will accept as full payment therefore the —Board of Supervisors prices shown above. _Const.Management —RE/Arch. —Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER LINCOLN AVENUE COLD PAVEMENT RECYCLING CHANGE ORDER NO. 3 LINCOLN AVENUE FROM SR 145 TO FIG AVENUE JUNE 6, 2022 FEDERAL PROJECT NUBMER: CMLSTBG-5942(300) PAGE 2 OF 2 CONTRACT NO. 21-02-C TOTAL COST THIS CHANGE ORDER: A$346,418.00 INCREASE TOTAL TIME EXTENSION THIS CHANGE ORDER: ZERO(0) -WORKING DAYS ,P.dut-yS/urd�c.�ew Robert Hendrickson, Resident Engineer APPROVAL RECOMMENDED: YARBS GRADING 8t PAVING INC. ��,•S - Contractor Mandeep S. Sekhon, PE Construction Engineer B Jim Leppo � y APPROVED BY: Steve White Digitally signed by Steve White PM Date:2022.06.14 13:06:31 Title -07'00 Steven E. White, Director Public Works and Planning Accepted Date: 6/14/22 _-;o Date: BRIAN PACHECO, Chairman Board of Supervisors Date: U-3U-),a contractor We,the above signed contractor,have considered the change proposed and hereby agree,If this proposal is _Auditor Controller approved,that we will provide all equipment,furnish all materials,except as may otherwise be noted above, _Business Cf ke and perform all services necessary for the work above specified,and will accept as full payment therefore the _Board of Supervisors Cont.Management prices shown above. _ _RWlrrh. _Design If the Contractor does not sign acceptance of this order,his attention Is directed to the requirements of the spedfications as to proceeding with the ordered work and filing a written protest within the time therein spedfied.