HomeMy WebLinkAbout2102C CCO 02.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER LINCOLN AVENUE COLD PAVEMENT RECYCLING CHANGE ORDER NO. 2 LINCOLN AVENUE FROM SR 145 TO FIG AVENUE APRIL 27, 2022 FEDERAL PROJECT NUBMER: CMLSTBG-5942(300) PAGE 1 OF 1 CONTRACT NO. 21-02-C TO: YARBS GRADING AND PAVING INC: Make the following changes to the plans and specifications or do work not in the plans and specifications for this contract. Because of the change(s), ZERO (0) WORKING DAYS will be added to the contract time. ALLOW FULL ROAD CLOSURE ON LINCOLN AVENUE DURING ROADWAY CONSTRUCTION This change was requested by the contractor. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, allow full roadway closure of Lincoln Avenue between SR 145 and one (1) mile east of SR 145, for a total of 20- working days due to the potential public safety concerns during construction of the proposed improvements in this area. This change is being made at no additional cost to the County. This change did not impact the critical path for the project, so additional contract time was not warranted. NET COST THIS CHANGE ORDER: $0.00 (NO COST) NET TIME EXTENSION THIS CHANGE ORDER: ZERO (0)-WORKING DAYS .2e6a�.tgS�au�uc,F,aei Robert Hendrickson, Resident Engineer APPROVAL RECOMMENDED: YARBS GRADING & PAVING INC. u S Contractor Mandeep S. Sekhon, PE Interim Construction Engineer Tlv� Y Ill-o GI`l By Troy YYrbrough(May 3,20 11:04PDT) APPROVED BY: W 1 1 I h +p Digitally signed by Steve White President Date:2022.05.20 10:09:22 Title -07'00' Steven E. White, Director Public Works and Planning May 3,2022 Accepted Date: Date: Contractor We,the above signed contractor,have considered the change proposed and hereby agree,if this proposal is _Auditor Controller approved,that we will provide all equipment,furnish all materials,except as may otherwise be noted above, _Business office and perform all services necessary for the work above specified,and will accept as full payment therefore the Board of Supervisors _Const.Management prices shown above. RE/Arch. _Design If the Contractor does not sign acceptance of this order,his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified.