Loading...
HomeMy WebLinkAbout2001C CCO 05.pdf COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER SAND CREEK BRIDGE REPLACEMENT ON ENNIS ROAD CHANGE ORDER NO. 5 BRIDGE NO. 42CO697 AUGUST 16, 2022 FEDERAL PROJECT NUMBER: BRLO-5942(238) PAGE 1 OF 1 CONTRACT NO. 20-01-C TO: AGEE CONSTRUCTION CORPORATION: Make the following changes to the plans and specifications or do work not in the plans and specifications for this contract. Because of the change(s), ZERO (0) -WORKING DAYS will be added to the contract time. INCLUDE FORM FHWA-1273 AND THE FEDERAL MINIMUM WAGE RATES IN THE SIGNED "AGREEMENT" This change was requested by the engineer. In accordance with Section 4-1.05, "Changes and Extra Work," of the Standard Specifications, include the attached form FHWA-1273 and the Federal Minimum Wage Rates to the singed "Agreement' of the contract documents. No compensation will be made for this change. This change does not impact the project schedule; therefore, no additional time will be granted. NET COST THIS CHANGE ORDER: $0.00 (NO COST) NET TIME EXTENSION THIS CHANGE ORDER: ZERO (0) -WORKING DAYS JAMES DREWS, Resident Engineer APPROVAL RECOMMENDED: AGEE CONSTRUCTION CORPORATION 0 *5 "L nn pp N MANDEEP S. SEKHON, Construction Engineer By: Alan Dir'lam(Aug 17,2022 11:04 PDT) APPROVED BY: Chief Estimator Digitally signed by Steve White Title: Steve White Date:2022.08.1815:49:37 -07'00' Aug 17 2022 STEVEN E. WHITE, Director of Public Works Accepted Date: and Planning Date: _Contractor We,the above signed contractor, have given careful consideration to the change proposed and hereby agree, if _Auditor Controller this proposal is approved,that we will provide all equipment, furnish all materials,except as may otherwise be _Business office Board of Superviso noted above, and perform all services necessary for the work above specified,and will accept as full payment _ _Const.Managementrs therefore the prices shown above. RE/Arch. _Design If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. LETTER OF TRANSMITTAL - C.C.O. NO. 5 AUGUST 16, 2022 TO: STEVEN E. WHITE, DIRECTOR SAND CREEK BRIDGE REPLACEMENT PUBLIC WORKS AND PLANNING ON ENNIS ROAD BRIDGE NO. 42C0697 FEDERAL PROJECT NO: BRLO-5942(238) CONTRACT NO. 20-01-C ATTN: MANDEEP S. SEKHON CONSTRUCTION ENGINEER FROM: JAMES DREWS, Resident Engineer STATUS OF FUNDS: Contract Items $ 2,697,777.00 Original Allotment $ 2,845,165.85 Dept. Furnished Materials $ 0.00 Supplemental Allotment $ 0.00 Previous CCO's $ 96,314.87 Total Allotment $ 2,845,165.85 This CCO $ 0.00 Obligated Funds $ 2,794,091.87 Total Obligated Funds $ 2,794,091.87 Unobligated Balance $ 51,073.98 DIRECTOR'S LIMIT to sign change orders is: $ 147,388.85 DESCRIPTION: Include form FHWA-1273 and the Federal Minimum Wage Rates in the signed "Agreement." WHY: The form FHWA-1273 and the Federal Minimum Wage Rates were included in the Project Specifications, but not in the signed "Agreement." Upon project review by Caltrans, it became apparent that these documents need to be included in the signed "Agreement." Therefore, it was necessary to add these two documents to the signed "Agreement." HOW: The contractor is being directed to include the form FHWA-1273 and the Federal Minimum Wage Rates to the signed "Agreement," according to Section 4-1.05, "Changes and Extra Work," of the Standard Specifications. This change is being made at no additional cost. COST: $0.00 (No Cost) NET COST THIS CHANGE ORDER: $0.00 (NO COST) NET TIME EXTENSION THIS CHANGE ORDER: ZERO (0) -WORKING DAYS