Loading...
HomeMy WebLinkAboutCCO 046.pdf o C0U� County of Fresno Department of Public Works and Planning t� f RES�O Development Services&Capital Projects Division Steven E.White,Director PROJECT MANAGEMENT CONSTRUCTION CHANGE ORDER REQUEST This Document is for Fresno County Internal Use Only Project: Fresno County Sheriff Area 2 Substation Contract No.: 19-S-04 Date: 4/25/2022 Contractor: Klassen Corporation Architect: Roger Davidson Change Order No.: CCO#046 Construction Contract Dollar Amount(as awarded on 08/10/20) $11,364,500.00 Change Order Allowance: $568,225.00 Director's Change Order Limit: $210,000.00 Contract Time(Calendar Days): 322 Construction Start Date: 11/09/20 Original Construction Completion Date: 9/26/21 Change Order Scope of Work: Door hardware changes made in approved submittal. Attachment(s): CO Coversheet,PCO Proposal and support documents Net Additive Change Order Dollar Amount: $9,397.07 Net Additive Calendar Days: �0 Net Deductive Change Order Dollar Amount: Net Deductive Calendar Days: �0 Total Change Order Dollar Amount To Date $37,962.17 Adjusted Contract Dollar Amount: $11,402,462.17 Total Adjusted Calendar Days To Date: 30 Director's Change Order Limit Balance: $172,037.83 Adjusted Construction Completion Date: 10/26/21 Reviewed. Roger Davidson rd—d—(May2,202215:5T PDT) Architect-A—Q �^ Reviewed: LaRue Goossen La,,Gpp..Q.(M,y 3,202208:21 PDT) Project Manager Reviewed: Mandeep Sekhon Construction Manager Reviewed: Will Kettler — Division Manager Approved: Steven E. White SfaverLE W� Mte,Ma�, PDT) Director Approved: Brian Pacheco NOTAPPLICABLE Board of Supervisors Chairman Approval Date: May 3,2022 Scan and forward Director Approved Copy to: CAO Paul Nerland Sheriffs Office Thomas Trester PWP Business Office Kay Vang StaffAnalyst Linda Guerra co i, County of Fresno 19 Department of Public Works and Planning p� eq6 O Development Services&Capital Projects Division FRVG Steven E.White,Director CONTRACT CHANGE ORDER Project: Fresno County Sheriff Area 2 Substation Contract No.: 19-S-04 Date: 4/25/2022 Contractor: Klassen Corporation 2021 Westwind Drive Bakersfield,California 93301 (661)324-3900 Change Order No.: CCO#046 Construction Contract Dollar Amount(as awarded on 08/10/20): $11,364,500.00 Original Construction Completion Date: 09/26/21 CCO#046 is hereby approved by the County. Scope of Work: Door hardware changes made in approved submittal. Attachment: CO Coversheet,PCO Proposal and support documents Net Additive Change Order Dollar Amount: $9,397.07 Net Additive Calendar Days: 10 Net Deductive Change Order Dollar Amount: $0.00 Net Deductive Calendar Days: 10 Total Change Order Dollar Amount To Date: $37,962.17 Adjusted Contract Dollar Amount: 1 $11,402,462.17 Total Adjusted Calendar Days To Date: 30 Adjusted Construction Completion Date: pp 10/26/21 23 LIP/e6//�� M, LaRue Goossen LaRue Goossen(Apr 25,2022 11:50 PDT) Project Manager Signature Date: Apr 25,2022 By signing acceptance of this Change Order,the Contractor shall agree to the following: 1.Provide all equipment,material,labor and services required to complete the Scope of Work specified in this Change Order. 2.The revised adjusted Contract dollar amount and time extension shown in this Change Order as payment in full. In the event the Contractor does not sign acceptance of this Change Order,Provisions under the Agreement 16-S-05, Article Vl shall apply. Accepted By: Klassen Corporation Rod Paine(May 2,2022 08:50 PDT) Authorized Signature Date: May 2,2022 When completed by the Contractor, please scan and return Hard Copies and Color PDF copy to: Linda Guerra,Staff Analyst hndaauerra@fresnocountyca.gov Fresno County Department of Public Works and Planning,Development Services&Capital Projects Division 2220 Tulare Street,Eighth Floor Fresno,CA. 93721 CHANGE ORDER SUMMARY Project Sheriff Substation P. D. Days Description CCO 001 8/30/2021 $685.00 0 Water board-SMARTS fee CCO 002 - $91,000.00 Revised site grades CCO 003 8/30/2021 $0.00 2 Rain delays CCO 004 8/30/2021 $0.00 2 Rain delays CCO 005 8/30/2021 $0.00 13 Rain delays CCO 006 8/30/2021 $6,870.55 5 Storage BLDG drain elevation CCO 007 8/30/2021 $1,745.00 3 Substation floor sink install CCO 008 8/30/2021 $7,614.33 5 Operable partition wall FTG CGO 009 N/A CCO 010 8/30/2021 $89,889.80 0 Block wall for fencing CCO 011 - $572,775.76 Storage Bldg.electric CCO 012 $32,245.91 Substation electrical CCO 013 $112,372.79 Electrical plan update CCO 014 $7,444.00 Blockout revised data room CCO 015 - $14,657.00 Additional work in large data room CCO 016 8/30/2021 -$161,500.00 0 Delete Large Canopy CCO 017 - $7,563.80 0 Mechanical hangers CCO 018 9/16/2021 $0.00 0 Date adjustments CCO 019 9/21/2021 $2,884.00 0 Folding Wall Revisions CCO 020 12/14/2021 $2,794.26 0 Fab.&Install metal sill flashing CCO 021 11/16/2021 $3,399.23 0 Install Wedge Anchors at Exterior Wall CCO 022 NOT USED CCO 023 12/14/2021 $3,093.25 0 Plumbing alterations per ASI 2&3 CCO 024 12/14/2021 $795.79 0 Revised Architecturals CCO 025 11/22/2021 $8,355.00 0 Install Overflow pipe minus penetration of gutter CCO 026 $0.00 Metal Building Delay#1 CCO 027 12/29/2021 $4,486.63 0 Fur out West Exterior Wall CCO 028 12/29/2021 $2,097.75 0 Hardware changes from rev.in dwgs.ASI 7 CCO 029 $12,487.64 CCO 030 $71,190.79 CCO 031 12/29/2021 $10,008.10 0 Ceramic tile alterations CCO 032 12/29/2021 $6,806.50 0 Add.Recessed TV and Databoxes CCO 033 1/19/2022 $3,212.39 0 Tower Closure Strips CCO 034 12/29/2021 $3,261.63 0 Provide power&connection to(5)hand dryers CCO 034.1 $1,784.20 0 Provide power&connection to(5)hand dryers r2 CCO 035 12/29/2021 -$5,345.00 0 ASI to omit interior stone veneer and finish gyp board CCO 036 $38,224.99 Alternate Sectional Doors CCO 037 N/A CCO 038 N/A CCO 039 N/A CCO 040 1/18/2022 $5,557.64 0 Lighting for Sheriff Star CCO 041 $267,768.79 0 Data Rack Revisions CCO 042 $7,334.25 N/A CCO 043 3/30/2022 $3,633.89 0 Supply and Install'B"metal angle CCO 044 2/16/2022 $3,352.40 0 Electrical for Tablets CCO 045 N/A CCO 046 4/25/2022 $9,397.07 0 Submittal changes-Door hardware CCO 047 3/8/2022 $3,082.34 0 Additional metal studs per new arch drawings CCO 048 N/A CCO 049 $11,371.85 N/A CCO 050 3/30/2022 $14,385.40 0 Tower and Entry Fascia Revision CCO 051 4/8/2022 $4,459.67 0 Added circuits to IDU Units CCO 052 CCO 053 CCO 054 4/20/2022 -$114.65 0 Delete Waste Dispensers&Add Hand Dryers CCO 055 $71,905.65 CCO 056 CCO 057 4/22/2022 $3,054.20 0 Power&Connection to plumbing fixtures TP-1 CCO 058 CCO 059 CCO 060 Totals $204,807.17 -$166,845.00 $968,731.68 $351,395.74 Totals 30 4vi Klassen corporation Klassen Corporation Project:05-3-20035-Fresno County Sheriff Sub 2021 Westwind Dr 1129 North Armstrong Avenue Bakersfield,California 93301 Fresno,California 93727 Phone:(661)324-3000 Phone: Fax:(661)324-3900 Fax: Prime Contract Change Order #046: Submittal Changes - Door Hardware CONTRACT COMPANY: Fresno Co.Dept of Public Works CONTRACT FOR: 05-3-20035:Fresno County Sheriff Sub Prime 2220 Tulare Street,8th FI Contract Fresno,California 93721 DATE CREATED: 2/24/2022 CREATED BY: Emma Smith KLASSEN CORPORATION CONTRACT STATUS: Pending-In Review REVISION: 0 CHANGE REASON: SCHEDULE IMPACT- TOTAL AMOUNT DESCRIPTION: CE#048-Submittal Changes-Door Hardware Hardware changes made in approved submittal. No electrical cost is provided due to no direction given for the power and controls for these unit changes.Once direction is given for power and controls,Klassen will provide a cost for this work. ATTACHMENTS: 2151,COR 62740(1).pdf Submittal#51 Door Hardware-Product Data Review(4-21-2021)(4)adf POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: PCO# Title Schedule Impact Amount 045 1 Submittal Changes-Door Hardware 0 days 9,397.07 TOTAL: $9,397.07 CHANGE ORDER LINE ITEMS: PCO#045:Submittal Changes-Door Hardware # Cost Code Description Type Amount 1 08-100-Metal Doors&Frame(&Hardware I Hardware Changes Subcontractor $8,435.43 Subtotal: $8,435.43 Fee:10.00%Applies to all line Item types. 843.54 Insurance:1.40%Applies to all line Item types. 118.10 Grand Total: $9,397.07 The original(Contract Sum) $ 11,364,500.00 Net change by previously authorized PCCO $ 159,937.47 The contract sum prior to this PCCO was $ 11,524,437.47 The contract sum would be changed by this PCCO in the amount of $9,397.07 The new contract sum including this PCCO will be $ 11,533,834.54 The contract time will not be changed by this PCCO by 0 days Klassen Corporation Fresno Co.Dept of Public Works 2220 Tulare Street,8th FI Fresno California 93721 SIGNATURE DATE SIGNATURE DATE Klassen Corporation page 1 of 1 Printed On:2/24l 2022 08:38 AM T COR ����fl IIF.FINE IIARD�ARI c",13ATII SPECIALISTS Change Order Request ` I4A}?D .AHEi o i <JOMA419RC tI AL-UlCb;I]>NNTIAL Proceed 6053 West Third Street Los Angeles,CA 90036 Tel:(323)930-1330 Fax: (323)930-0459 Attention: >Emma Smith ProjectNante: Fresno County Sheriff Substation COR 62740 Contrator: Klassen Corp. Project 2151 Address: 1129 N Armstrong Ave Date 11/9/2021 Fresno, CA 93727 Tel. Project Manager: Cody Goodsell Fax: Directive: PROCEED-We are proceeding with the changes requested. Reference. Submittal changes. Scope of Work: Hardware changes made in approved submittal. ❑ Drawings Description: See attached proposal for details. Total.......................................8435.43 Thank You, AI Riss Attached ❑ 0 Page(s) CC: Proceed Project: 2151 COR: 62740 Printed on Tuesday,November 9,2021 Page I of I THE FINE II11RDWARE & 13ATH SPECIALISTS D S I G HARDWARE Date: 11/9/2021 DH Project#: 2151 Project: Fresno County Area 2 Sheriff Substation Contractor: Klassen Corporation Jobsite Address: 1129 North Armstrong Ave Fresno, CA 93727 Attention: Emma Smith Contact info. Emmas@klassencorp.com Reference: Changes to hardware schedule made in approved submittals Description: Added EL Hardware, Deleted hardware and added opening 103B. Material: 6,625.41 Tax: Fresn 7.98% 528.71 Freight: 250.00 Installation/labor/Engineering Mark up 15% $ 1,031.31 Total: $8,435.43 Please sign and return to cgoodsell@designhardware to proceed with this change. Design Hardware will follow this form up with a change order with a Change order Number. This form is to Proceed only with Change order Authorized Signature Project: 21511300170 - Fresno County Area 2 Sheriff Substation Change Order Submittals -1 Single Door#SS103 Livescan from Secure Reception 90 RHR 1 Single Door#SS103 Livescan from Secure Reception 90 RHR -1 Hinges 513131 4 1/2 x 4 1/2 NRP 652 IV (3.70) 1 Hinges 513131 4 1/2 x 4 1/2 NRP TW4 652 IV 108.90 1 Electrified Lockset ND80 EU P RHO 50-210-GMK 626 SC 414.12 -1 Lockset ND50P RHO 626 SC (176.54) Opening Total 342.78 -1 Pair Doors#SS105 Public Area Secured from Public Conf Room 90 RHRA 1 Pair Doors#SS105 Public Area Secured from Public Conf Room 90 RHRA -1 Hinges 5BB1 4 1/2 x 4 1/2 NRP 652 IV (3.70) 1 Hinges 5BB1 4 1/2 x 4 1/2 NRP TW4 652 IV 108.90 -1 Exit Device 99L x 996L-R&V 17 RHR US26D VO (654.72) 1 Exit Device 99L x M996L-M 06 24VDC RHR US26D VO 1,289.28 Opening Total 739.76 -1 Single Door#SS110 Public Waiting Area from Work Station A 90 RHR 1 Single Door#SS110 Public Waiting Area from Work Station A 90 RHR -1 Hinges 5BB1 4 1/2 x 4 1/2 NRP 652 IV (3.70) 1 Hinges 513131 4 1/2 x 4 1/2 NRP TW4 652 IV 108.90 1 Electrified Lockset ND80 EU P RHO 50-210-GMK 626 SC 414.12 -1 Lockset ND50P RHO 626 SC (176.54) Opening Total 342.78 -1 Pair Doors#SS113B Work Station A to Data Racks 90 LHA 1 Pair Doors#SS113B Work Station A to Data Racks 90 LHA -1 Hinges 513131 4 1/2 x 4 1/2 NRP 652 IV (3.70) 1 Hinges 5BB1 4 1/2 x 4 1/2 NRP TW4 652 IV 108.90 1 Electrified Lockset ND80 EU P RHO 50-210-GMK 626 SC 414.12 -1 Lockset ND80P RHO 626 SC (176.54) Opening Total 342.78 -1 Single Door#SS114A Corridor A to Specialty Unit 1 office 90 LH 1 Single Door#SS114A Corridor A to Specialty Unit 1 office 90 LH -1 Hinges 513131 4 1/2 x 4 1/2 NRP 652 IV (3.70) 1 Hinges 513131 4 1/2 x 4 1/2 NRP TW4 652 IV 108.90 1 Electrified Lockset ND80 EU P RHO 50-210-GMK 626 SC 414.12 -1 Lockset ND50P RHO 626 SC (176.54) Opening Total 342.78 -1 Pair Doors#SS117AB Corridor B from Training Room A 90 LHRA 1 Pair Doors#SS117AB Corridor B from Training Room A 90 LHRA -1 Steel Mullion 4954 8'2" SP28 VO (212.48) -1 Exit Device 99EO US26D VO (460.48) -1 Exit Device 99L x 996L-R&V 17 LHR US26D VO (654.72) -i Cylinder 20-057 626 SC (42.91) 2 Pull Plate 8302-0 4 x 16 US32D IV 52.92 2 Push Plate 8200 4 x 16 US32D IV 14.12 Opening Total (1,303.55) -1 Pair Doors#SS117B Corridor B from Training Room B 90 LHRA 1 Pair Doors#SS117B Corridor B from Training Room B 90 LHRA November 09,2021 8:47 am Page-1 of 1 Project: 2151/300170 - Fresno County Area 2 Sheriff Substation Change Order Submittals -1 Steel Mullion 4954 8'2" SP28 VO (212.48) -1 Exit Device 99EO US26D VO (460.48) -1 Exit Device 99L x 996L-R&V 17 LHR US26D VO (654.72) -1 Cylinder 20-057 626 SC (42.91) 2 Pull Plate 8302-0 4 x 16 US32D IV 52.92 2 Push Plate 8200 4 x 16 US32D IV 14.12 Opening Total (1,303.55) -1 Single Door#SS128 Corridor F from Corridor E 90 RHR 1 Single Door#SS128 Corridor F from Corridor E 90 RHR -1 Hinges 513131 4 1/2 x 4 1/2 NRP 652 IV (3.70) 1 Hinges 513131 4 1/2 x 4 1/2 NRP TW4 652 IV 108.90 -1 Exit Device 99L x 996L-R&V 17 RHR US26D VO (654.72) 1 Exit Device 99L x M996L-M 06 24VDC RHR US26D VO 1,289.28 Opening Total 739.76 -1 Pair Doors#SS129 Corridor B from Secure Training Room 90 LHRA 1 Pair Doors#SS129 Corridor B from Secure Training Room 90 LHRA -1 Steel Mullion 4954 8'2" SP28 VO (212.48) -1 Exit Device 99EO US26D VO (460.48) -1 Exit Device 99L x 996L-R&V 17 LHR US26D VO (654.72) -1 Cylinder 20-057 626 SC (42.91) 2 Pull Plate 8302-0 4 x 16 US32D IV 52.92 2 Push Plate 8200 4 x 16 US32D IV 14.12 Opening Total (1,303.55) -1 Single Door#SS130 A Secure Training Room to Secure Training Records 90 RH 1 Single Door#SS130 A Secure Training Room to Secure Training Records 90 RH -1 Hinges 513131 4 1/2 x 4 1/2 NRP 652 IV (3.70) 1 Hinges 513131 4 1/2 x 4 1/2 NRP TW4 652 IV 108.90 1 Electrified Lockset ND80 EU P RHO 50-210-GMK 626 SC 414.12 -1 Lockset ND80P RHO 626 SC (176.54) Opening Total 342.78 -1 Single Door#SS130 B Secure Training Supply Storage to Secure 90 LH Training Records 1 Single Door#SS130 B Secure Training Supply Storage to Secure 90 LH Training Records -1 Hinges 5BB1 4 1/2 x 4 1/2 NRP 652 IV (3.70) 1 Hinges 513131 4 1/2 x 4 1/2 NRP TW4 652 IV 108.90 1 Electrified Lockset ND80 EU P RHO 50-210-GMK 626 SC 414.12 -1 Lockset ND80P RHO 626 SC (176.54) Opening Total 342.78 -1 Single Door#SS131 Work Station C to Admin Supply Storage 90 LH 1 Single Door#SS131 Work Station C to Admin Supply Storage 90 LH -1 Hinges 5131314 1/2 x 4 1/2 NRP 652 IV (3.70) 1 Hinges 513131 4 1/2 x 4 1/2 NRP TW4 652 IV 108.90 1 Electrified Lockset ND80 EU P RHO 50-210-GMK 626 SC 414.12 -1 Lockset ND80P RHO 626 SC (176.54) Opening Total 342.78 November 09,2021 8:47 am Page-1 of 1 Project: 2151/300170 - Fresno County Area 2 Sheriff Substation Change Order Submittals -1 Single Door#SS133 Work Station C to USA Supply Storage 90 RH 1 Single Door#SS133 Work Station C to USA Supply Storage 90 RH -1 Hinges 513131 4 1/2 x 4 1/2 NRP 652 IV (3.70) 1 Hinges 513131 4 1/2 x 4 1/2 NRP TW4 652 IV 108.90 1 Electrified Lockset ND80 EU P RHO 50-210-GMK 626 Sc 414.12 -1 Lockset ND80P RHO 626 SC (176.54) Opening Total 342.78 -1 Single Door#SS135 Corridor E to Inv Staff Supply Storage 90 RH 1 Single Door#SS135 Corridor E to Inv Staff Supply Storage 90 RH -1 Hinges 513131 4 1/2 x 4 1/2 NRP 652 IV (3.70) 1 Hinges 513131 4 1/2 x 4 1/2 NRP TW4 652 IV 108.90 1 Electrified Lockset ND80 EU P RHO 50-210-GMK 626 SC 414.12 -1 Lockset ND80P RHO 626 SC (176.54) Opening Total 342.78 -1 Single Door#SS137 Corridor E to Inv Staff Property 90 LH 1 Single Door#SS137 Corridor E to Inv Staff Property 90 LH -1 Hinges 513131 4 1/2 x 4 1/2 NRP 652 IV (3.70) 1 Hinges 513131 4 1/2 x 4 1/2 NRP TW4 652 IV 108.90 1 Electrified Lockset ND80 EU P RHO 50-210-GMK 626 SC 414.12 -1 Lockset ND80P RHO 626 SC (176.54) Opening Total 342.78 -1 Single Door#SS152 Work Station B to Evidence Prep 90 RH 1 Single Door#SS152 Work Station B to Evidence Prep 90 RH -1 Hinges 513131 4 1/2 x 4 1/2 NRP 652 IV (3.70) 1 Hinges 513131 4 1/2 x 4 1/2 NRP TW4 652 IV 108.90 1 Electrified Lockset ND80 EU P RHO 50-210-GMK 626 Sc 414.12 -i Lockset ND50P RHO 626 SC (176.54) Opening Total 342.78 i Single Door#SS103B Public Waiting Area from Work Station A 90 RHR 1 WD 3080 1 3/4 F LSL HPDL F58 DCL RHR 578.62 1 3080 SGL AL A-304-2 2"LH 460.00 3 Hinges 513131 4 1/2 x 4 1/2 NRP 652 IV 16.62 1 Hinges 513131 4 1/2 x 4 1/2 NRP TW4 652 IV 108.90 1 Electrified Lockset ND80 EU P RHO 50-210-GMK 626 SC 414.12 1 Closer 4040XP H AL LC 278.40 1 Wall Stop WS406/407CCV US32D IV 1.51 Opening Total 1,658.17 -1 Single Door#SS155 Work Station B to Secure Training Supply Storage 90 LH 1 Single Door#SS155 Work Station B to Secure Training Supply Storage 90 LH -1 Hinges 513131 4 1/2 x 4 1/2 NRP 652 IV (3.70) 1 Hinges 513131 4 1/2 x 4 1/2 NRP TW4 652 IV 108.90 1 Electrified Lockset ND80 EU P RHO 50-210-GMK 626 Sc 414.12 -1 Lockset ND80P RHO 626 SC (176.54) Opening Total 342.78 -1 Single Door#ST101 Exterior from Collateral Vehicle Storage 90 RHR 1 Single Door#ST101 Exterior from Collateral Vehicle Storage 90 RHR November 09,2021 8:47 am Page-1 of 1 Project: 21511300170 - Fresno County Area 2 Sheriff Substation Change Order Submittals -1 Hinges 5131314 1/2 x 4 1/2 NRP f 652 IV (3.70) 1 Hinges 513131 4 1/2 x 4 1/2 NRP TW4 652 IV 108.90 -1 Lockset ND50P SPA 626 SC (176.54) 1 Electrified Lockset ND80 EU P RHO 50-210-GMK 626 SC 414.12 Opening Total 342.78 -1 Single Door#ST102 West Yard Parking from Evidence Storage 90 LHR 1 Single Door#ST102 West Yard Parking from Evidence Storage 90 LHR -1 Hinges 5131314 1/2 x 4 1/2 NRP 652 IV (3.70) 1 Hinges 5131314 1/2 x 4 1/2 NRP TW4 652 IV 108.90 -i Lockset ND50P SPA 626 SC (176.54) 1 Electrified Lockset ND80 EU P RHO 50-210-GMK 626 SC 414.12 Opening Total 342.78 -1 Single Door#ST105 West Yard Parking from Evidence Storage 90 RHR 1 Single Door#ST105 West Yard Parking from Evidence Storage 90 RHR -1 Hinges 5131314 1/2 x 4 1/2 NRP 652 IV (3.70) 1 Hinges 5131314 1/2 x 4 1/2 NRP TW4 652 IV 108.90 -1 Lockset ND50P SPA 626 SC (176.54) i Electrified Lockset ND80 EU P RHO 50-210-GMK 626 SC 414.12 Opening Total 342.78 -1 Single Door#ST106 West Yard Parking from Evidence Storage 90 RHR 1 Single Door#ST106 West Yard Parking from Evidence Storage 90 RHR -1 Hinges 51313 1 4 1/2 x 4 1/2 NRP 652 IV (3.70) 1 Hinges 51313 1 4 1/2 x 4 1/2 NRP TW4 652 IV 108.90 -1 Lockset ND50P SPA 626 SC (176.54) i Electrified Lockset ND80 EU P RHO 50-210-GMK 626 SC 414.12 Opening Total 342.78 -1 Single Door#ST109 Exterior from Evidence Storage 90 LHR 1 Single Door#ST109 Exterior from Evidence Storage 90 LHR -1 Hinges 51313 1 4 1/2 x 41/2 NRP 652 IV (3.70) 1 Hinges 51313 1 4 1/2 x 4 1/2 NRP TW4 652 IV 108.90 -1 Lockset ND50P SPA 626 SC (176.54) i Electrified Lockset ND80 EU P RHO 50-210-GMK 626 SC 414.12 Opening Total 342.78 -1 Single Door#ST110 Exterior from Collateral Vehicle Storage 90 LHR i Single Door#ST110 Exterior from Collateral Vehicle Storage 90 LHR -1 Hinges 51313 1 4 1/2 x 4 1/2 NRP 652 IV (3.70) 1 Hinges 5131314 1/2 x 4 1/2 NRP TW4 652 IV 108.90 -1 Lockset ND50P SPA 626 SC (176.54) 1 Electrified Lockset ND80 EU P RHO 50-210-GMK 626 SC 414.12 Opening Total 342.78 -1 Single Door#ST112 Exterior from Collateral Vehicle Storage 90 LHR 1 Single Door#ST112 Exterior from Collateral Vehicle Storage 90 LHR -1 Hinges 51313 1 4 1/2 x 4 1/2 NRP 652 IV (3.70) 1 Hinges 5131314 1/2 x 4 1/2 NRP TW4 652 IV 108.90 -1 Lockset ND50P SPA 626 SC (176.54) November 09,2021 8:47 am Page-1 of 1 Project: 2151/300170 - Fresno County Area 2 Sheriff Substation Change Order Submittals 1 Electrified Lockset ND80 EU P RHO 50-210-GMK 626 SC 414.12 Opening Total 342.78 -1 Pair Doors#ST114 Exterior from Electrical 90 RHRA 1 Pair Doors#ST114 Exterior from Electrical 90 RHRA -1 Hinges 5131314 1/2 x 4 1/2 NRP 652 IV (3.70) 1 Hinges 5131314 1/2 x 4 1/2 NRP TW4 652 IV 108.90 1 Electrified Lockset ND80 EU P RHO 50-210-GMK 626 SC 414.12 -1 Lockset ND80P RHO 626 SC (176.54) Opening Total 342.78 -1 Pair Doors#ST115 Exterior from Collateral Vehicle Storage 90 RHRA 1 Pair Doors#ST115 Exterior from Collateral Vehicle Storage 90 RHRA -1 Hinges 5131314 1/2 x 4 1/2 NRP 652 IV (3.70) 6 Hinges 51313 1 4 1/2 x 4 1/2 NRP TW4 652 IV 108.90 1 Electrified Lockset ND80 EU P RHO 50-210-GMK 626 SC 414.12 -1 Lockset ND80P RHO 626 SC (176.54) Opening Total 342.78 Section Totals Alternate#01 - Finish Hardware 7,002.49 interior Aluminum 460.00 Wood Doors 578.62 Pre-Tax Total 6625.41 Taxes FRESN-7.98% 528.71 Tax Total 528.71 Grand Total 7154.12 November 09,2021 8:47 am Page-1 of 1