Loading...
HomeMy WebLinkAboutCCO 044.pdf o C0U� County of Fresno Department of Public Works and Planning t� f RES�O Development Services&Capital Projects Division Steven E.White,Director PROJECT MANAGEMENT CONSTRUCTION CHANGE ORDER REQUEST This Document is for Fresno County Internal Use Only Project: Fresno County Sheriff Area 2 Substation Contract No.: 19-S-04 Date: 2/1 612 02 2 Contractor: Klassen Corporation Architect: Roger Davidson Change Order No.: CCO#044 Construction Contract Dollar Amount(as awarded on 08/10/20) $11,364,500.00 Change Order Allowance: $568,225.00 Director's Change Order Limit: $210,000.00 Contract Time(Calendar Days): 322 Construction Start Date: 11/09/20 Original Construction Completion Date: 9/26/21 Change Order Scope of Work: Remove sheet rock&demo existing(4)square boxes&rings,purchase&install new TV boxes per request,re-route existing power&data as necessary, public conference RM SS107 install(3)new 1"conduits and mud rings with string line to accessible ceiling,all work will be done on a T&M basis and not to exceed$3009.34 (Sheriff Requested) Attachment(s): CO Coversheet,PCO Proposal and support documents Net Additive Change Order Dollar Amount: $3,352.40 Net Additive Calendar Days: �0 Net Deductive Change Order Dollar Amount: Net Deductive Calendar Days: �0 Total Change Order Dollar Amount To Date $64.25 Adjusted Contract Dollar Amount: $11,364,564.25 Total Adjusted Calendar Days To Date: 30 Director's Change Order Limit Balance: $209,935.75 Adjusted Construction Completion Date: 10/26/21 Reviewed. Davidson <d—d-(F,b16,2 Rogery rdandson(Feb 16,i0i132.00 PST) Architect �_ Reviewed: LaRue Goossen LaRue�Q.Goossen(Feb 16,i0i3II:58 PST) Project Manager Reviewed: Mandeep Sekhon Construction Manager Reviewed: Will Kettler — Division Manager Approved: Steven E. White E Sfaverr whzi!- Fite(-1, OC PST) Director Approved: Brian Pacheco NOTAPPLICABLE Board of Supervisors Chairman Approval Date: Feb 18,2022 Scan and forward Director Approved Copy to: CAO Paul Nerland Sheriffs Office Thomas Trester PWP Business Office Kay Vang StaffAnalyst Linda Guerra Director Steve White co i, County of Fresno 19 Department of Public Works and Planning p� eq6 O Development Services&Capital Projects Division FRVG Steven E.White,Director CONTRACT CHANGE ORDER Project: Fresno County Sheriff Area 2 Substation Contract No.: 19-S-04 Date: 2/16/2022 Contractor: Klassen Corporation 2021 Westwind Drive Bakersfield,California 93301 (661)324-3900 Change Order No.: CCO#044 Construction Contract Dollar Amount(as awarded on 08/10/20): $11,364,500.00 Original Construction Completion Date: 09/26/21 CCO#044 is hereby approved by the County. Scope of Work: Remove sheet rock&demo existing(4)square boxes&rings,purchase&install new TV boxes per request,re-route existing power&data as necessary, public conference RM SS107 install(3)new 1"conduits and mud rings with string line to accessible ceiling,all work will be done on a T&M basis and not to exceed$3009.34 {Sheriff Requested} Attachment: CO Coversheet,PCO Proposal and support documents Net Additive Change Order Dollar Amount: $3,352.40 Net Additive Calendar Days: 10 Net Deductive Change Order Dollar Amount: $0.00 Net Deductive Calendar Days: 10 Total Change Order Dollar Amount To Date: $64.25 Adjusted Contract Dollar Amount: 1 $11,364,564.25 Total Adjusted Calendar Days To Date: 30 Adjusted Construction Completion Date: 1 10/26/21 LaRue Goossen e�.ee=s.zozz.o�4 Ps„ Project Manager Signature Date: Feb 16,2022 By signing acceptance of this Change Order,the Contractor shall agree to the following: 1.Provide all equipment,material,labor and services required to complete the Scope of Work specified in this Change Order. 2.The revised adjusted Contract dollar amount and time extension shown in this Change Order as payment in full. In the event the Contractor does not sign acceptance of this Change Order,Provisions under the Agreement 16-S-05, Article Vl shall apply. Accepted By: Klassen Corporation Roa' � -Pa ePee,s. a 10 z,Pm Authorized Signature Date: Feb 16,2022 When completed by the Contractor, please scan and return Hard Copies and Color PDF copy to: Linda Guerra,Staff Analyst hndaauerra@fresnocountyca.gov Fresno County Department of Public Works and Planning,Development Services&Capital Projects Division 2220 Tulare Street,Eighth Floor Fresno,CA. 93721 CHANGE ORDER SUMMARY Project Sheriff Substation CCO 001 8/30/2021 $685.00 0 Water board-SMARTS fee CCO 002 - $16,857.00 Revised site grades CCO 003 8/30/2021 $0.00 2 Rain delays CCO 004 8/30/2021 $0.00 2 Rain delays CCO 005 8/30/2021 $0.00 13 Rain delays CCO 006 8/30/2021 $6,870.55 5 Storage BLDG drain elevation CCO 007 8/30/2021 $1,745.00 3 Substation floor sink install CCO 008 8/30/2021 $7,614.33 5 Operable partition wall FTG SSA 009 N/A CCO 010 8/30/2021 $89,889.80 0 Block wall for fencing CCO 011 - $572,775.76 Storage Bldg.electric CCO 012 $32,245.91 Substation electrical CCO 013 - $112,372.79 Electrical plan update CCO 014 - $7,444.00 Blockout revised data room CCO 015 - $14,657.00 Additional work in large data room CCO 016 8/30/2021 -$161,500.00 0 Delete Large Canopy CCO 017 - $7,563.80 0 Mechanical hangers CCO 018 9/16/2021 $0.00 0 Date adjustments CCO 019 9/21/2021 $2,884.00 0 Folding Wall Revisions CCO 020 12/14/2021 $2,794.26 0 Fab.&Install metal sill flashing CCO 021 11/16/2021 $3,399.23 0 Install Wedge Anchors at Exterior Wall CCO 022 NOT USED CCO 023 12/14/2021 $3,093.25 0 Plumbing alterations per ASI 2&3 CCO 024 12/14/2021 $795.79 0 Revised Architecturals CCO 025 11/22/2021 $8,355.00 0 Install Overflow pipe minus penetration of gutter CCO 026 $0.00 Metal Building Delay#1 CCO 027 12/29/2021 $4,486.63 0 Fur out West Exterior Wall CCO 028 12/29/2021 $2,097.75 0 Hardware changes from rev.in dwgs.ASI 7 CCO 031 12/29/2021 $10,008.10 0 Ceramic tile alterations CCO 032 12/29/2021 $6,806.50 0 Add.Recessed TV and Databoxes CCO 033 1/19/2022 $3,212.39 0 Tower Closure Strips CCO 034 12/29/2021 $3,261.63 0 Provide power&connection to(5)hand dryers CCO 035 12/29/2021 -$5,345.00 0 ASI to omit interior stone veneer and finish gyp board CCO 036 $38,224.99 Alternate Sectional Doors CCO 037 N/A CCO 038 N/A CCO 039 N/A CCO 040 1/18/2022 $5,557.64 0 Lighting for Sheriff Star CCO 041 $267,768.79 0 Data Rack Revisions CCO 042 N/A CCO 043 N/A CCO 044 2/16/2022 $3,352.40 0 Electrical for Tablets CCO 045 N/A CCO 046 N/A CCO 047 N/A CCO 048 N/A CCO 049 N/A CCO 050 N/A Totals $166,909.25 -$166,845.001 $731,670.351 $338,239.69 Totals 30 K PCCO #044 Klassen corporation Klassen Corporation Project:05-3-20035-Fresno County Sheriff Sub 2021 Westwind Dr 1129 North Armstrong Avenue Bakersfield,California 93301 Fresno,California 93727 Phone:(661)324-3000 Phone: Fax:(661)324-3900 Fax: Prime Contract Change Order #044: Tablets - Substation CONTRACT COMPANY: Fresno Co.Dept of Public Works CONTRACT FOR: 05-3-20035 :Fresno County Sheriff Sub Prime 2220 Tulare Street,8th FI Contract Fresno,California 93721 DATE CREATED: 2/15/2022 CREATED BY: Emma Smith(KLASSEN CORPORATION) CONTRACT STATUS: Pending-In Review REVISION: 0 CHANGE REASON: SCHEDULE IMPACT: TOTAL AMOUNT: $ 3,352.40 DESCRIPTION: CE#064-Tablets-Substation Description: 1. Remove sheet rock and demo existing 4 square boxes and rings. 2. Purchase and install new TV boxes per request. 3. Re-route existing power and data as necessary. 4. Public Conference room SS107 install three new 1"conduits and mud rings with string line to accessible ceiling. 5.All work will be done on a T&M basis and not to exceed$3,009.34. ATTACHMENTS: CO#011 Tablets-substation Rev.2.pdf POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: PCO# I Title Schedule Impact Amount 044 1 CE#064-Tablets-Substation 3,352.40 TOTAL: $3,352.40 CHANGE ORDER LINE ITEMS: PCO#044:CE#064-Tablets-Substation # Cost Code Description Type Amount 1 16-100-Electrical Subcontractor $3,009.34 Subtotal: $3,009.34 Fee:10.00%Applies to all line item types. 300.93 Insurance:1.40%Applies to all line item types. 42.13 Grand Total: $3,352.40 The original(Contract Sum) $ 11,364,500.00 Net change by previously authorized PCCO $ 156,585.07 The contract sum prior to this PCCO was $ 11,521,085.07 The contract sum would be changed by this PCCO in the amount of $ 3,352.40 The new contract sum including this PCCO will be $ 11,524,437.47 The contract time will not be changed by this PCCO Klassen Corporation page 1 of 2 Printed On:2/15/2022 05:23 PM K PCCO #044 Klassen corporation Klassen Corporation Fresno Co.Dept of Public Works 2220 Tulare Street,8th FI Fresno California 93721 SIGNATURE DATE SIGNATURE DATE Klassen Corporation page 2 of 2 Printed On:2/15/2022 05:23 PM Electrical PowerSource ELECTRICAL 5796 S Elm Ave Fresno, CA 93706 559-268-2861 N = LI CENSE N UMBER 696663 Change Order #011 Tablets - Substation BILL TO INVOICE# Klassen Corp. DATE 02.11.2022 2021 Westwind Dr. TERMS Due on receipt Bakersfield, Ca 93301 559-342-3000 DESCRIPTION AMOUNT Labor Cost: 21.34 Hr. $2,112.66 Material Handling: 1 Hr. $35.00 Estimating: 1 Hr. $75.00 Project Management: 1 Hr. $75.00 Total: $2,297.66 Description: 1. Remove sheet rock and demo existing 4 square boxes and rings. 2. Purchase and install new T.V boxes per request. 3. Re-route existing power and data as necessary. 4. Public Conference room SS107 install three new 1" conduits and mud rings with string line to accessible ceiling. 5. All work will be done on a T&M basis and not to exceed $3,009.34. Material: $438.10 - 1/4" EMT and fittings - 1" EMT and fittings - 1" plastic bushings - 4 new T.V boxes - Single gang mud rings Exlusions: - Standard exclusions per original scope letter - Patch back sheet rock - Mud and tape Overhead/Profit 10%: $273.58 Change Order Amount: $3,009.34