HomeMy WebLinkAboutCCO 033.pdf cot� County of Fresno
Department of Public Works and Planning
��t FRESCO Development Services&Capital Projects Division
Steven E.White,Director
PROJECT MANAGEMENT CONSTRUCTION CHANGE ORDER REQUEST
This Document is for Fresno County Internal Use Only
Project: Fresno County Sheriff Area 2 Substation
Contract No.: 19-S-04
Date: 1/19/2022
Contractor: Klassen Corporation
Architect: Roger Davidson
Change Order No.: CCO#033
Construction Contract Dollar Amount(as awarded on 08/10/20) $11,364,500.00
Change Order Allowance: $568,225.00
Director's Change Order Limit: $210,000.00
Contract Time(Calendar Days): 322
Construction Start Date: 11/09/20
Original Construction Completion Date: 9/26/21
Change Order Scope of Work:
Tower closure strips per ASI-1 2-07-2021-01
Attachment(s):
CO Coversheet,PCO Proposal and support documents
Net Additive Change Order Dollar Amount: $3,212.39
Net Additive Calendar Days: �0
Net Deductive Change Order Dollar Amount:
Net Deductive Calendar Days: �0
Total Change Order Dollar Amount To Date -$3,288.15
Adjusted Contract Dollar Amount: $11,361,211.85
Total Adjusted Calendar Days To Date: 30
Director's Change Order Limit Balance: $213,288.15
Adjusted Construction Completion Date: 10/26/21
Reviewed: Roger Davidson J 2-2
Architect
Reviewed: LaRue Goossen
Project Manager
Reviewed: Mandeep Sekhon
Construction Manager
Reviewed: Will Kettler
Division Manager
Approved: Steven E. White s E wln
Director
Approved: Brian Pacheco NOT APPLICABLE
Board of Supervisors Chairman
Approval Date: Feb 2,2022
Scan and forward Director Approved Copy to: CAO Paul Nerland
Sheriffs Office Thomas Trester
PWP Business Office Kay Vang
Staff Analyst Linda Guerra
Director Steve White
cot, County of Fresno
19 Department of Public Works and Planning
O� a56 O Development Services&Capital Projects Division
FRE`� Steven E.White,Director
CONTRACT CHANGE ORDER
Project: Fresno County Sheriff Area 2 Substation
Contract No.: 19-S-04
Date: 1/19/2022
Contractor: Klassen Corporation
2021 Westwind Drive
Bakersfield,California 93301
(661)324-3900
Change Order No.: CCO#033
Construction Contract Dollar Amount(as awarded on 08/10/20): $11,364,500.00
Original Construction Completion Date: 09/26/21
CCO#033 is hereby approved by the County.
Scope of Work:
Tower closure strips per ASI-12-07-2021-01
Attachment:
CO Coversheet,PCO Proposal and support documents
Net Additive Change Order Dollar Amount: $3,212.39
Net Additive Calendar Days: �0
Net Deductive Change Order Dollar Amount:
Net Deductive Calendar Days: �0
Total Change Order Dollar Amount To Date: -$3,288.15
Adjusted Contract Dollar Amount: $11,361,211.85
Total Adjusted Calendar Days To Date: 30
Adjusted Construction Completion Date: 10/26/21
LaRue Goossen
Project Manager Signature
Date: Jan 19,2022
By signing acceptance of this Change Order,the Contractor shall agree to the following:
1.Provide all equipment,material,labor and services required to complete the Scope of Work specified in
this Change Order.
2.The revised adjusted Contract dollar amount and time extension shown in this Change Order as payment in full.
In the event the Contractor does not sign acceptance of this Change Order,Provisions under the Agreement 16-S-05,
Article VI shall apply.
Accepted 8 : Klassen Corporation Rod�ar�r2
P Y p �Pa,e(-24.2022 1143P3.)
Authorized Signature
Date: Jan 24,2022
When completed by the Contractor, please scan and return Hard Copies and Color PDF copy to:
Linda Guerra,Staff Analyst
lindavuerra(i�fresnocountvca.yov
Fresno County Department of Public Works and Planning,Development Services&Capital Projects Division
2220 Tulare Street,Eighth Floor
Fresno,CA. 93721
CHANGE ORDER SUMMARY
Project Sheriff Substation
Da ri
CCO 001 8/30/2021 $685.00 0 Water board-SMARTS fee
CCO 002 - $16,857.00 Revised site grades
CCO 003 8/30/2021 $0.00 2 Rain delays
CCO 004 8/30/2021 $0.00 2 Rain delays
CCO 005 8/30/2021 1 $0.00 13 Rain delays
CCO 006 8/30/2021 $6,870.55 5 Storage BLDG drain elevation
CCO 007 8/30/2021 $1,745.00 3 Substation floor sink install
CCO 008 8/30/2021 $7,614.33 5 Operable partition wall FTG
GGO 009 N/A
CCO 010 8/30/2021 $89,889.80 0 Block wall for fencing
CCO 011 - $572,775.76 Storage Bldg.electric
CCO 012 $32,245.91 Substation electrical
CCO 013 - $112,372.79 Electrical plan update
CCO 014 - $7,444.00 Blockout revised data room
CCO 015 - $14,657.00 Additional work in large data room
CCO 016 8/30/2021 -$161,500.00 0 Delete Large Canopy
CCO 017 - $7,563.80 0 Mechanical hangers
CCO 018 9/16/2021 $0.00 0 Date adjustments
CCO 019 9/21/2021 $2,884.00 0 Folding Wall Revisions
CCO 020 12/14/2021 $2,794.26 0 Fab.&Install metal sill flashing
CCO 021 11/16/2021 $3,399.23 0 Install Wedge Anchors at Exterior Wall
CCO 022 NOT USED
CCO 023 12/14/2021 $3,093.25 0 Plumbing alterations per ASI 2&3
CCO 024 12/14/2021 $795.79 0 Revised Architecturals
CCO 025 11/22/2021 $8,355.00 0 Install Overflow pipe minus penetration of gutter
CCO 026 $0.00 Metal Building Delay#1
CCO 027 12/29/2021 $4,486.63 0 Fur out West Exterior Wall
CCO 028 12/29/2021 $2,097.75 0 Hardware changes from rev.in dwgs.ASI 7
CCO 031 12/29/2021 $10,008.10 0 Ceramic tile alterations
CCO 032 12/29/2021 $6,806.50 0 Add.Recessed TV and Databoxes
CCO 033 I 1/19/2022 $3,212.39 0 Tower Closure Strips
CCO 034 12/29/2021 $3,261.63 0 Provide power&connection to(5)hand dryers
CCO 035 12/29/2021 -$5,345.00 0 ASI to omit interior stone veneer and finish gyp board
CCO 036 $38,224.99 Alternate Sectional Doors
CCO 037 N/A
CCO 038 N/A
CCO 039 N/A
CCO 040 1/18/2022 $5,557.64 0 Lighting for Sheriff Star
Totals $163,556.85 -$166,845.00 $731,670.35 $70,470.90 Totals 30
K PCCO #033
Klassen
corporation
Klassen Corporation Project:05-3-20035-Fresno County Sheriff Sub
2021 Westwind Dr 1129 North Armstrong Avenue
Bakersfield,California 93301 Fresno,California 93727
Phone:(661)324-3000 Phone:
Fax:(661)324-3900 Fax:
Prime Contract Change Order #033: ASI 12-07-2021-01 Tower Closure
Strips
CONTRACT COMPANY: Fresno Co.Dept of Public Works CONTRACT FOR: 05-3-20035 :Fresno County Sheriff Sub Prime
2220 Tulare Street,8th FI Contract
Fresno,California 93721
DATE CREATED: 12/20/2021 CREATED BY: Emma Smith(KLASSEN CORPORATION)
CONTRACT STATUS: Pending-In Review REVISION: 0
CHANGE REASON: SCHEDULE IMPACT: 0 days
TOTAL AMOUNT: $ 3,212.39
DESCRIPTION:
CE#047-ASI 12-07-2021-01 Tower Closure Strips
ATTACHMENTS:
Sketch A No Cost Change.pdf (ASI 12-07-2021-01)Tower Closure Strips.pdf 20522 KFI-CE-100(ASI-12-07-2021-01 Tower Closure Strips).pdf
POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER:
PCO# I Title Schedule Impact Amount
033 ASI 12-07-2021-01 Tower Closure Strips 0 days 3,212.39
TOTAL: $3,212.39
CHANGE ORDER LINE ITEMS:
PCO#033:ASI 12-07-2021-01 Tower Closure Strips
# Cost Code Description Type Amount
1 05-120-Structural Steel Subcontractor $2,858.00
Subtotal: $2,858.00
Fee:10.00%Applies to all line item types. 285.80
Insurance:1.40%Applies to all line item types. 40.01
Bond:1.00%Applies to all line item types. 28.58
Grand Total: $3,212.39
The original(Contract Sum) $ 11,364,500.00
Net change by previously authorized PCCO $ 125,242.21
The contract sum prior to this PCCO was $ 11,489,742.21
The contract sum would be changed by this PCCO in the amount of $ 3,212.39
The new contract sum including this PCCO will be $ 11,492,954.60
The contract time will not be changed by this PCCO by 0 days
Klassen Corporation Fresno Co.Dept of Public Works
2220 Tulare Street,8th FI
Fresno California 93721
SIGNATURE DATE SIGNATURE DATE
Klassen Corporation page 1 of 1 Printed On: 1/6/2022 08:35 AM
,
y
- FRAME 107A AV + i�+ryi"��f
P.P IR
6
4 eth P7 48 56 56 23 YYY
PLAN AT EL.10'-8
E3 'ID THIS
HIS SHEET 1S
B
25-7 NOT AESS.
13'-31h 13'-3111
SPLICE
s
A
`p O
(lE2 *tih E2 n TYP.EA.SIDE
W 4 V6 Ge
s I
TVP. KTYP. \-M5
O•
GR"
Co TEMPLATE �_ M5
} o M5 PL3A-Xlh
LIJ TYP.OF S
Q ¢ N
oELI
w
Q L4X4XIk 6 DD—DD
y P ATE m+
1�+ 3��0�h TEM
G ^�
t/44 TYP. �i• 3,U1 ,t°9
E3 E3 GENERAL NOTE FOR APP
Aoexya by to 1—cW Nn
u_ cexm<e..pixmw.N ona N d"—ev tn.o.w w sort meae<fNn
3 SIDES a uws.itwe arn�',N AApq�wm awiMn ti bpkvN�r a w n
E3 h P.P. 6
-F - TYP. au.�o..nx m.o•^•w r4-en a>'o<tA a a m+.xoNa
�6 7(y UnNas<pveNkully tletea-te lM1!<Mvay,eM oE6lbnf M<naryAi Na[
�ycJ6 nl ov ovtnvriiolions py IM o•n<r t0 raNefa N<aaQ4ovs.aNNbm a '
SPLICE E2 American Institute of Steel Construction,Inc.
A Ap<bva<a a ax vxY^roW x umW to vt.N�M x pe x M
M u»o.M.orw/o<me, a<oa<aar oea•a e.:Kox<ra<e Na
. an mN aen rxst a s��tr aanrraa a.Revon«a w.a a mrtuwn
13'•3t 13'-31
PLAN AT EL.3l'-2
v �
��FoTG)
ift"k
CHANGE ORDER
DATE: December 17, 2021 C.E.#: 100
JOB NAME: Fresno Co. Sheriff Substation JOB#: 20522
CONTRACTOR: Klassen Corp. JOB TYPE: Installed
DESCRIPTION:
Additional cost incurred pursuant to ASI-12-07-2021-01 Tower Closure Strips(attached) received
on 12/14/2021 for Material and Labor.
QUALIFICATIONS/EXLUSIONS:
Please sign below to indicate your acceptance of this change and its related cost and schedule impact subject to the terms
of our original agreement and additional terms specified. Receipt of this signed change order represents full authorization
to proceed with the above described changes.
COST BREAKDOWN:
ITEM UNIT RATE COST
Material 392.50
Sales Tax 8.350% 32.77
Freight 125.00
Detailing/Admin 120.00
Shop Labor (3 days) 1.5 85.00 128.00
Field Labor (see attached Name of Erector here)(2 days) 1,800.00
Subtotal: 2,598.27
Mark-up @ 10% 260.00
TOTAL COST 2,858.00
TIME EXTENSION: 5 working days
MATERIALS:
ITEM UNIT RATE COST
Materials 392.5 392.50
TOTAL MATERIALS 392.50
Submitted by Kim for Kasco Fab, Inc.
Approved by for Klassen Corp.
This change estimate cost is valid for thirty(30)days from the date of the change estimate.
NOTE:
STEEL CLOSURE STRIPS SHALL BE
TACK WELDED INTO PLATE WITH WELDS
&ROUND SMOOTH.
JOINTS AT CLOSURE STRIPS SHALL BE
CAULKED SMOOTH AND PAINTED
TO MATCH TOWER COLUMNS.
1/4" plates using a 3/16" x 1 1/2"
5/16" WELDED PLATE fillet weld spaced at 12" centers
FROM staggered each edge
FINISH FLOOR TO
+8'-O" (TYPIGAL)
TUBE STEEL
COLUMNS
(TYP I GAL)
Sheriff Substation
Tower Frame Closure Strips Plan
NOT TO 5GALE REFERENCE:
AS 112-07-2021-01