Loading...
HomeMy WebLinkAboutCCO 033.pdf cot� County of Fresno Department of Public Works and Planning ��t FRESCO Development Services&Capital Projects Division Steven E.White,Director PROJECT MANAGEMENT CONSTRUCTION CHANGE ORDER REQUEST This Document is for Fresno County Internal Use Only Project: Fresno County Sheriff Area 2 Substation Contract No.: 19-S-04 Date: 1/19/2022 Contractor: Klassen Corporation Architect: Roger Davidson Change Order No.: CCO#033 Construction Contract Dollar Amount(as awarded on 08/10/20) $11,364,500.00 Change Order Allowance: $568,225.00 Director's Change Order Limit: $210,000.00 Contract Time(Calendar Days): 322 Construction Start Date: 11/09/20 Original Construction Completion Date: 9/26/21 Change Order Scope of Work: Tower closure strips per ASI-1 2-07-2021-01 Attachment(s): CO Coversheet,PCO Proposal and support documents Net Additive Change Order Dollar Amount: $3,212.39 Net Additive Calendar Days: �0 Net Deductive Change Order Dollar Amount: Net Deductive Calendar Days: �0 Total Change Order Dollar Amount To Date -$3,288.15 Adjusted Contract Dollar Amount: $11,361,211.85 Total Adjusted Calendar Days To Date: 30 Director's Change Order Limit Balance: $213,288.15 Adjusted Construction Completion Date: 10/26/21 Reviewed: Roger Davidson J 2-2 Architect Reviewed: LaRue Goossen Project Manager Reviewed: Mandeep Sekhon Construction Manager Reviewed: Will Kettler Division Manager Approved: Steven E. White s E wln Director Approved: Brian Pacheco NOT APPLICABLE Board of Supervisors Chairman Approval Date: Feb 2,2022 Scan and forward Director Approved Copy to: CAO Paul Nerland Sheriffs Office Thomas Trester PWP Business Office Kay Vang Staff Analyst Linda Guerra Director Steve White cot, County of Fresno 19 Department of Public Works and Planning O� a56 O Development Services&Capital Projects Division FRE`� Steven E.White,Director CONTRACT CHANGE ORDER Project: Fresno County Sheriff Area 2 Substation Contract No.: 19-S-04 Date: 1/19/2022 Contractor: Klassen Corporation 2021 Westwind Drive Bakersfield,California 93301 (661)324-3900 Change Order No.: CCO#033 Construction Contract Dollar Amount(as awarded on 08/10/20): $11,364,500.00 Original Construction Completion Date: 09/26/21 CCO#033 is hereby approved by the County. Scope of Work: Tower closure strips per ASI-12-07-2021-01 Attachment: CO Coversheet,PCO Proposal and support documents Net Additive Change Order Dollar Amount: $3,212.39 Net Additive Calendar Days: �0 Net Deductive Change Order Dollar Amount: Net Deductive Calendar Days: �0 Total Change Order Dollar Amount To Date: -$3,288.15 Adjusted Contract Dollar Amount: $11,361,211.85 Total Adjusted Calendar Days To Date: 30 Adjusted Construction Completion Date: 10/26/21 LaRue Goossen Project Manager Signature Date: Jan 19,2022 By signing acceptance of this Change Order,the Contractor shall agree to the following: 1.Provide all equipment,material,labor and services required to complete the Scope of Work specified in this Change Order. 2.The revised adjusted Contract dollar amount and time extension shown in this Change Order as payment in full. In the event the Contractor does not sign acceptance of this Change Order,Provisions under the Agreement 16-S-05, Article VI shall apply. Accepted 8 : Klassen Corporation Rod�ar�r2 P Y p �Pa,e(-24.2022 1143P3.) Authorized Signature Date: Jan 24,2022 When completed by the Contractor, please scan and return Hard Copies and Color PDF copy to: Linda Guerra,Staff Analyst lindavuerra(i�fresnocountvca.yov Fresno County Department of Public Works and Planning,Development Services&Capital Projects Division 2220 Tulare Street,Eighth Floor Fresno,CA. 93721 CHANGE ORDER SUMMARY Project Sheriff Substation Da ri CCO 001 8/30/2021 $685.00 0 Water board-SMARTS fee CCO 002 - $16,857.00 Revised site grades CCO 003 8/30/2021 $0.00 2 Rain delays CCO 004 8/30/2021 $0.00 2 Rain delays CCO 005 8/30/2021 1 $0.00 13 Rain delays CCO 006 8/30/2021 $6,870.55 5 Storage BLDG drain elevation CCO 007 8/30/2021 $1,745.00 3 Substation floor sink install CCO 008 8/30/2021 $7,614.33 5 Operable partition wall FTG GGO 009 N/A CCO 010 8/30/2021 $89,889.80 0 Block wall for fencing CCO 011 - $572,775.76 Storage Bldg.electric CCO 012 $32,245.91 Substation electrical CCO 013 - $112,372.79 Electrical plan update CCO 014 - $7,444.00 Blockout revised data room CCO 015 - $14,657.00 Additional work in large data room CCO 016 8/30/2021 -$161,500.00 0 Delete Large Canopy CCO 017 - $7,563.80 0 Mechanical hangers CCO 018 9/16/2021 $0.00 0 Date adjustments CCO 019 9/21/2021 $2,884.00 0 Folding Wall Revisions CCO 020 12/14/2021 $2,794.26 0 Fab.&Install metal sill flashing CCO 021 11/16/2021 $3,399.23 0 Install Wedge Anchors at Exterior Wall CCO 022 NOT USED CCO 023 12/14/2021 $3,093.25 0 Plumbing alterations per ASI 2&3 CCO 024 12/14/2021 $795.79 0 Revised Architecturals CCO 025 11/22/2021 $8,355.00 0 Install Overflow pipe minus penetration of gutter CCO 026 $0.00 Metal Building Delay#1 CCO 027 12/29/2021 $4,486.63 0 Fur out West Exterior Wall CCO 028 12/29/2021 $2,097.75 0 Hardware changes from rev.in dwgs.ASI 7 CCO 031 12/29/2021 $10,008.10 0 Ceramic tile alterations CCO 032 12/29/2021 $6,806.50 0 Add.Recessed TV and Databoxes CCO 033 I 1/19/2022 $3,212.39 0 Tower Closure Strips CCO 034 12/29/2021 $3,261.63 0 Provide power&connection to(5)hand dryers CCO 035 12/29/2021 -$5,345.00 0 ASI to omit interior stone veneer and finish gyp board CCO 036 $38,224.99 Alternate Sectional Doors CCO 037 N/A CCO 038 N/A CCO 039 N/A CCO 040 1/18/2022 $5,557.64 0 Lighting for Sheriff Star Totals $163,556.85 -$166,845.00 $731,670.35 $70,470.90 Totals 30 K PCCO #033 Klassen corporation Klassen Corporation Project:05-3-20035-Fresno County Sheriff Sub 2021 Westwind Dr 1129 North Armstrong Avenue Bakersfield,California 93301 Fresno,California 93727 Phone:(661)324-3000 Phone: Fax:(661)324-3900 Fax: Prime Contract Change Order #033: ASI 12-07-2021-01 Tower Closure Strips CONTRACT COMPANY: Fresno Co.Dept of Public Works CONTRACT FOR: 05-3-20035 :Fresno County Sheriff Sub Prime 2220 Tulare Street,8th FI Contract Fresno,California 93721 DATE CREATED: 12/20/2021 CREATED BY: Emma Smith(KLASSEN CORPORATION) CONTRACT STATUS: Pending-In Review REVISION: 0 CHANGE REASON: SCHEDULE IMPACT: 0 days TOTAL AMOUNT: $ 3,212.39 DESCRIPTION: CE#047-ASI 12-07-2021-01 Tower Closure Strips ATTACHMENTS: Sketch A No Cost Change.pdf (ASI 12-07-2021-01)Tower Closure Strips.pdf 20522 KFI-CE-100(ASI-12-07-2021-01 Tower Closure Strips).pdf POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: PCO# I Title Schedule Impact Amount 033 ASI 12-07-2021-01 Tower Closure Strips 0 days 3,212.39 TOTAL: $3,212.39 CHANGE ORDER LINE ITEMS: PCO#033:ASI 12-07-2021-01 Tower Closure Strips # Cost Code Description Type Amount 1 05-120-Structural Steel Subcontractor $2,858.00 Subtotal: $2,858.00 Fee:10.00%Applies to all line item types. 285.80 Insurance:1.40%Applies to all line item types. 40.01 Bond:1.00%Applies to all line item types. 28.58 Grand Total: $3,212.39 The original(Contract Sum) $ 11,364,500.00 Net change by previously authorized PCCO $ 125,242.21 The contract sum prior to this PCCO was $ 11,489,742.21 The contract sum would be changed by this PCCO in the amount of $ 3,212.39 The new contract sum including this PCCO will be $ 11,492,954.60 The contract time will not be changed by this PCCO by 0 days Klassen Corporation Fresno Co.Dept of Public Works 2220 Tulare Street,8th FI Fresno California 93721 SIGNATURE DATE SIGNATURE DATE Klassen Corporation page 1 of 1 Printed On: 1/6/2022 08:35 AM , y - FRAME 107A AV + i�+ryi"��f P.P IR 6 4 eth P7 48 56 56 23 YYY PLAN AT EL.10'-8 E3 'ID THIS HIS SHEET 1S B 25-7 NOT AESS. 13'-31h 13'-3111 SPLICE s A `p O (lE2 *tih E2 n TYP.EA.SIDE W 4 V6 Ge s I TVP. KTYP. \-M5 O• GR" Co TEMPLATE �_ M5 } o M5 PL3A-Xlh LIJ TYP.OF S Q ¢ N oELI w Q L4X4XIk 6 DD—DD y P ATE m+ 1�+ 3��0�h TEM G ^� t/44 TYP. �i• 3,U1 ,t°9 E3 E3 GENERAL NOTE FOR APP Aoexya by to 1—cW Nn u_ cexm<e..pixmw.N ona N d"—ev tn.o.w w sort meae<fNn 3 SIDES a uws.itwe arn�',N AApq�wm awiMn ti bpkvN�r a w n E3 h P.P. 6 -F - TYP. au.�o..nx m.o•^•w r4-en a>'o<tA a a m+.xoNa �6 7(y UnNas<pveNkully tletea-te lM1!<Mvay,eM oE6lbnf M<naryAi Na[ �ycJ6 nl ov ovtnvriiolions py IM o•n<r t0 raNefa N<aaQ4ovs.aNNbm a ' SPLICE E2 American Institute of Steel Construction,Inc. A Ap<bva<a a ax vxY^roW x umW to vt.N�M x pe x M M u»o.M.orw/o<me, a<oa<aar oea•a e.:Kox<ra<e Na . an mN aen rxst a s��tr aanrraa a.Revon«a w.a a mrtuwn 13'•3t 13'-31 PLAN AT EL.3l'-2 v � ��FoTG) ift"k CHANGE ORDER DATE: December 17, 2021 C.E.#: 100 JOB NAME: Fresno Co. Sheriff Substation JOB#: 20522 CONTRACTOR: Klassen Corp. JOB TYPE: Installed DESCRIPTION: Additional cost incurred pursuant to ASI-12-07-2021-01 Tower Closure Strips(attached) received on 12/14/2021 for Material and Labor. QUALIFICATIONS/EXLUSIONS: Please sign below to indicate your acceptance of this change and its related cost and schedule impact subject to the terms of our original agreement and additional terms specified. Receipt of this signed change order represents full authorization to proceed with the above described changes. COST BREAKDOWN: ITEM UNIT RATE COST Material 392.50 Sales Tax 8.350% 32.77 Freight 125.00 Detailing/Admin 120.00 Shop Labor (3 days) 1.5 85.00 128.00 Field Labor (see attached Name of Erector here)(2 days) 1,800.00 Subtotal: 2,598.27 Mark-up @ 10% 260.00 TOTAL COST 2,858.00 TIME EXTENSION: 5 working days MATERIALS: ITEM UNIT RATE COST Materials 392.5 392.50 TOTAL MATERIALS 392.50 Submitted by Kim for Kasco Fab, Inc. Approved by for Klassen Corp. This change estimate cost is valid for thirty(30)days from the date of the change estimate. NOTE: STEEL CLOSURE STRIPS SHALL BE TACK WELDED INTO PLATE WITH WELDS &ROUND SMOOTH. JOINTS AT CLOSURE STRIPS SHALL BE CAULKED SMOOTH AND PAINTED TO MATCH TOWER COLUMNS. 1/4" plates using a 3/16" x 1 1/2" 5/16" WELDED PLATE fillet weld spaced at 12" centers FROM staggered each edge FINISH FLOOR TO +8'-O" (TYPIGAL) TUBE STEEL COLUMNS (TYP I GAL) Sheriff Substation Tower Frame Closure Strips Plan NOT TO 5GALE REFERENCE: AS 112-07-2021-01