Loading...
HomeMy WebLinkAboutAnimal Services CCO 029.pdf co�, County of Fresno Department of Public Works and Planning Development Services&Capital Projects Division FRSS Steven E.White,Director PROJECT MANAGEMENT CONSTRUCTION CHANGE ORDER REQUEST This Document is for Fresno County Internal Use Only Project: Animal Services Contract No.: 20-S-02 Date: 11/18/2021 Contractor: BMY Construction Group,Inc. Architect: Roger Davidson Change Order No.: CCO#029 Construction Contract Dollar Amount(as awarded on 10/30/20) $7,405,000.00 Director's Change Order Limit: $210,000.00 Contract Time(Calendar Days): 298 Construction Start Date: 12/08/20 Original Construction Completion Date: 10/2121 Change Order Scope of Work: Omit the demolition of curb/asphalt by existing pump station Attachment(s): PCO Proposal,Reference Docs,Cover Sheet Net Additive Change Order Dollar Amount: $0.00 Net Additive Calendar Days: �0 Net Deductive Change Order Dollar Amount: -$603.91 Net Deductive Calendar Days: �0 Total Change Order Dollar Amount To Date $262,795.12 Adjusted Contract Dollar Amount: $7,667,795.12 Total Adjusted Calendar Days To Date: 13 Director's Change Order Limit Balance: -$52,795.12 Adjusted Construction Completion Date: 10/15/21 Reviewed: Roger Davidson F0400ON PST, Architect Reviewed: Keith Eckert e Nw�M.`'�"f<s. PST, Project Manager Reviewed: Mandeep Sekhon Construction Manager Reviewed: Will Kettler Division Manager Reviewed: Steven E. White Sleyen C whMo nU(No PST) Director Approved: Jean Rousseau Not Applicable County Administrative Officer,CAD Approved. Steve Brandau Board of Supervisors Chairman Director Approval Date: Nov 23,2021 Scan and forward Director Approved Copy to: CAO Greg Reinke DPH David Luchini PWP Business Office Kay Vang Staff Analyst Linda Guerra Director Steve White `o`''� County of Fresno Department of Public Works and Planning Q�, s Development Services&Capital Projects Division FRES� Steven E.White,Director COUNTY CHANGE ORDER REQUEST Project: Animal Services Contract No.: 20S-02 Date: 11/18/2021 Contractor: BMY Construction Group, Inc. 5485 E.Olive Ave. Fresno,California 93727 (559)243-4200 Change Order No.: CCO#029 Construction Contract Dollar Amount(as awarded on 10/30/20): $7,405,000.00 Original Construction Completion Date: 10/02/21 CCO#029 Is hereby approved by the County. Scope of Work: Omit the demolition of curb/asphalt by existing pump station Attachment: PCO Proposal,Reference Docs,Cover Sheet Net Additive Change Order Dollar Amount: 50.00 Net Additive Calendar Days: Net Deductive Change Order Dollar Amount: -$603.91 Net Deductive Calendar Days: �p Total Change Order Dollar Amount To Date: $262,795.12 Adjusted Contract Dollar Amount: $7,667,795.12 Total Adjusted Calendar Days To Date: 13 Adjusted Construction Completion Date: 10/15/21 Keith Eckert � � Project Manager Date: Nov 19,2021 By signing acceptance of this Change Order,the Contractor shall agree to the following: 1.Provide all equipment,material,labor and services required to complete the Scope of Work specified in this Change Order. 2.The revised adjusted Contract dollar amount and time extension shown in this Change Order as payment in full. In the event the Contractor does not sign acceptance of this Change Order,Provisions under the Agreement 16-S-05, Article VI shall apply. Accepted By: BMY Construction Group,Inc. Authorized S' t Date: it Z When completed by the Contractor, please scan and return Hand Copies and Color PDF copy to: Linda Guerra,StaftAnalyst 1 n d a is_uerr&a fresnocountyca.Eov Fresno County Department of Public Works and Planning,Development Services&Capital Projects Division 2220 Tulare Street,Eighth Floor Fresno,CA. 93721 CHANGE ORDER SUMMARY Project: Animal Services Date Add Credit($) Rejected Pending CCO 001 6/30/2021 -$13,124.00 0 Credit for less over excavation in building areas CCO 002 6/30/2021 -$32,673.00 0 Deletion of Ext.glass mat.gypsum sheathing CCO 003 6/30/2021 $1,992.00 0 Install GFCI on Ext.of BLDG 3 CCO 004 6/30/2021 $1,335.00 0 Additional fixture on pole CCO 005 6/30/2021 $350.00 0 Additional BLDG 1 outlet CCO 006 6/30/2021 $1,216.00 0 Add conduit stubs for gates CCO 007 6/30/2021 $1,457.001 0 Install double acting hinges cCo 008 9/2/2021 $42,091.00 0 Door type changes CCO 009 6/30/2021 -$57,287.00 0 Install insulation at various locations 666-g39 0 Ceiling tile changes 6S9-033 N/A CCO 012 6/30/2021 $683.00 0 Door type changes CCO 013 $129,241.00 Tile base additions CCO 014 $10,238.00 Trail drawing CCO 015 6/30/2021 $2,653.001 0 Add utility sink BLDG 1 CCO 016 7/27/2021 $11,306.00 0 Add trench drains at Ext.kennels CCO 017 7/27/2021 $18,696.00 0 Add plumbing&utilities 669-gab N/A CCO 019 $27,485.00 Sheet metal additions CCO 020 6/30/2021 -$43,716.00 0 Credit for grade CCO 021 6/30/2021 $2,721.00 0 Widen footings CCO 022 6/30/2021 $860.00 0 Extend pop outs CCO 023 6/30/2021 $3,386.001 0 Additional concrete 6S9-024 N/A CCO 025 5/6/2021 $21,084.00 0 Additional trench drains CCO 026 5/19/2021 $2,964.00 0 Added two canopy footings CCO 027 8/12/2021 -$17,735.00 0 Ext.storefront doors changes CCO 028 7/29/2021 -$626.00 0 Parking lot striping w/curb and gutter painting CCO 029 -$603.91 0 Credit for Demo by Pump station CCO 030 7/29/2021 $1,761.48 0 Added support posts in 4'Wall CCO 031 -$20,966.00 Foundation Changes to Each BLDG CCO 032 8/30/2021 -$1,049.56 0 Credit Electrical for Water Heater Elimination CCO 033 7/29/2021 -$17,960.00 0 Reber Credit due to foundation changes CCO 034 -$10,117.00 Guillotine door credit CCO 035 $108,055 00 Install Site Water and Hose Bibs CCO 036 7/29/2021 -$4,697.00 0 Omit Trench Drain in BLDG 1 RM 1 CCO 037 7/29/2021 -$8,002.00 0 Omit One WH-2 in Building-2 CCO 038 7/29/2021 $6,638.53 1 1 0 JPrefabricated Shower Enclosures BLDG 2 Page 1 of 3 CHANGE ORDER SUMMARY Project: Animal Shelter Date Add Credit Rejected Pendir CCO 039 9/2/2021 $5,013.61 0 Added water supply for clothes washer CCO 040 $15,106.23 Install 3 compartment sink RM#9-BLDG 3 CCO 041 7/29/2021 $1,860.70 0 Add hot/mid water supply for added dishwashing CCO 042 $8,369.65 OFCI dog wash tub CCO 043 10/13/2021 $4,578.21 0 Install TD-3 BLDG 3 CCO 044 9/2/2021 $11,279.77 0 Install TD-1 BLDG 3 sallyport CCO 045 $6,356.03 Add L1 Iav in place of OFCI CCO 046 8/30/2021 $8,441.51 0 Extended exterior walls-BLDG 2 CCO 047 8/30/2021 -$122,982.00 0 Credit formica in place of INT.wall paneling CCO 048 7/29/2021 $13,105.44 0 Revised footings for canopy at sally port CCO 049 9/2/2021 $957.00 0 Additional slab concrete BLDG 3 CCO 050 9/2/2021 $4,634.00 0 EXT.kennel pads outside BLDG 2 originally from PCO#31 CCO 051 9/19/2021 $22,144.00 0 Added dryer and DW hood per mec.Drawing CCO 052 8/30/2021 $193,529.00 0 Metal wall paneling in BLDG 1&2 CCO 053 8/30/2021 $5,163.001 0 Standard door frame to alumnatone package CCO 054 $6,707.00 Light kits package CCO 055 7/29/2021 $2,657.00 0 Restaking for concrete drive BLDG 3 CCO 056 8/30/2021 $12,475.00 0 Additional concrete for rolling gates&curb at sally port CCO 057 9/28/2021 -$8,682.00 0 Credit for Transfer Doors at Building 2 Package CCO 058 $131,363.00 Install rolling gates,visions slats,added fencing/gates,etc. CCO 058.1 11/18/2021 $143,904.00 2 Install rolling gates,visions slats,added fencing/gates,etc. CCO 059 8/30/2021 $4,265.78 1 Provide electrical for rolling gates CCO 060 10/22/2021 -$29,050.00 0 Gypsum deduct for installation of metal paneling CCO 061 10/28/2021 $6,989.00 0 Fabrication,Install,Backfill 15'rebar at canopy footings CCO 062 9/28/2021 $1,738.00 1 Added electrical BLDG 3 CCO 063 $14,086.00 Extended performance staff change CCO 063.1 $14,086.00 CCO 064 $14,086.00 Extended GC and time concrete revisions CCO 064.1 $14,086.00 CCO 065 8/30/2021 $2,817.00 3 Extended GC and time due to BLDG 3 mech revisions CCO 066 8/30/2021 $2,817.00 3 Extended GC and Time Due to Guillotine Door Changes CCO 067 10/22/2021 $7,062.00 0 Guillotine door frame material change-BLDG 2 CCO 068 9/21/2021 $1,717.00 0 Ed.light changes-BLDG 1 CCO 069 9/21/2021 $605.00 0 Add.Concrete west side of BLDG 3 CCO 070 9/7/2021 $6,875.00 0 Extended GC and time revisions for Guillotine door changes CCO 071 $7,225.001 0 Install added site hose bibs CCO 072 10/28/2021 $1,041.00 0 Door type alterations from 01:S to 05:S-BLDG 3 CCO 073 9/17/2021 $0.00 0 Date Adjustments CCO 074 10/28/2021 $6,396.00 0 Revised concrete slab detail at Sally&food prep drive CCO 075 10/28/2021 $704.00 0 Additional Outlets BLDG 1 RM 4 CCO 076 10/28/2021 $691.00 0 Re-Frame roll-up door-BLDG 3 Page 2 of 3 CHANGE ORDER SUMMARY Project: Animal Shelter Date Add D. Description CCO 077 10/28/2021 $584.00 0 Additional concrete per ASI&mechanical pad-BLDG 1 CCO 078 10/13/2021 $6,442.00 0 Re-frame Guillotine Door ROs CCO 079 10/13/2021 $61,416.00 0 Add sidewalk&mow strips CCO 079.1 $20,761.00 0 Add sidewalk CCO 080 10/13/2021 $6,561.00 2 Add hat track for kennel backing CCO 081 11/2/2021 -$1,066.44 0 Omit plantsfirrigation-BLDG 1 CCO 082 CCO 083 $3,085 00 1 Paint louvers to match windows CCO 084 11/9/2021 $6,583.00 0 Hose bib relocation due to change in original location-BLDG 3 CCO 085 $10,047 00 0 Add water lines to make-up air units-BLDG 2 CCO 086 CCO 087 CCO 088 CCO 089 CCO 090 CCO 091 CCO 092 CCO 093 CCO 094 CCO 095 CCO 096 CCO 097 CCO 098 CCO 099 CCO 100 CCO 101 CCO 102 CCO 103 CCO 104 CCO 105 CCO 106 CCO 107 CCO 108 CCO 109 CCO 110 CCO 111 CCO 112 CCO 113 Totals $622,049.03 -$359,253.911 $525,801.91 $37,689.00 Totals 13 Page 3 of 3 CONSTRUCTION GROUP INCORPORATED June 16, 2021 County of Fresno Construction Division A ttn: Keith Eckert 2220 Tulare Street,71 Floor Fresno,CA 93721 Re: Animal Control Center BMY JOB NO. 20015 Subject: PCO#29—Credit Demo of Curb/Asphalt Mr. Eckert, BMY Construction Group, Inc. (BMY) is providing the following PCO for the costs and time associated with the changes made to omitting the demolition of existing/asphalt. BMY is requesting the County to issue a Change Order deducting ($603.91) to the contract price, In order to perform the work BMY is requiring a time extension of 0 calendar days, This PCO is valid for 30 days. Due to unprecedent times in our industry, with volatile material pricing and delivery, it is of the utmost importance that this PCO be processed quickly, Our industry is currently having supply issues, The cost of material is on a consistent rise and it is not as readily available, with lead times getting longer. This may directly impact your project, BMY is working diligently to process requested changes quickly, keep material pricing down and get material and products, At this time we need your assistance with timely approvals so we can minimize project impacts. We appreciate your assistance with this matter. if you have any questions or need any further information, please do not hesitate to contact me. Respectfully, Dylan Medeiros Project Engineer Page 1 of 1 5485 East Olive Avenue • Fresno, CA 93727 - Phone (559) 243-4200 - Fax (559) 222-2380 Lic No. 686178 =1 17A 12 PCO #029 CONSTRUCTION GROUP INCORPORATED BMY Construction Group Incorporated Project:20015-Animal Control Center 5485 East Olive Avenue 190 West Dan Ronquillo Drive Fresno,California 93727-2541 Fresno,California 93706 Phone: (559)243-4200 Fax: null Prime Contract Potential Change Order #029: CE #030 - Eliminate Demo of Curb/Asphalt by Existing Pump Station TO: The County of Fresno, Department of Puolic FROM. BMY Construction Group, Inc. Works and Planning 5485 E.Olive Ave 2220 Tulare Street, 8th Floor Fresno, California 93727 Fresno,California 93721 PCO NUMBER/REVISION: 029 1 0 CONTRACT: 20015-Animal Control Center Prime Contract REQUEST RECEIVED FROM: Noel Roger Davidson II(The County of CREATED BY: Dylan Medeiros(BMY Construction Fresno,Department of Public Works and Group, Inc.) Pla) STATUS: Pending-In Review CREATED DATE: 5/18/2021 REFERENCE: PRIME CONTRACT None CHANGE ORDER: FIELD CHANGE: No LOCATION: ACCOUNTING METHOD: Amount Based SCHEDULE IMPACT: PAID IN FULL: No EXECUTED: No SIGNED CHANGE ORDER RECEIVED DATE: TOTAL AMOUNT: ($603.91) POTENTIAL CHANGE ORDER TITLE: CE 4030-Eliminate Demo of Curb/Asphalt by Existing Pump Station CHANGE REASON: Design Development POTENTIAL CHANGE ORDER DESCRIPTION: (The Contract Is Changed As Follows) CE#030-Eliminate Demo of Curb,Asphalt by Existing Pump Station County requested the following: Omit Demolition of existing Curb and Asphalt Paving at Pump House. Omil Demolition and Haul of Concrete Walk from Administration Parking to drive approach on Dan Ronquillo Ave.. ATTACHMENTS: PCO#29-Credit for Demo at Pump Houimpdf Noel Roger Davidson II(The County of The County of Fresno,Department of BMY Construction Group, Inc. Fresno,Department of Public Works and Public Works and Planning Planning) 2220 Tulare Street,8th Floor 2220 Tulare Street,8th Floor 5485 E. Olive Ave Fresno,California 93721 Fresno.California 93721 Fresno, California 93727 SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE BMY Construction Group Incorporated Page 1 of 1 Printed On: 5/18/2021 01:57 PM AS Dczign,Inc.dba: Asphalt Design by Juan Gomez Contractor's License No.821841 4061 W. Belmont Avenue—Fresno,CA 93722 (559)276-0447 Fax (559)276-8029 Date: 5/17/2021 To: BMY Construction Group Change Order Credit—Project: Fresno County Animal Control Center RFQ#2—Demo& Patch Back 1. Eliminate demo of curb/asphalt at existing entrance. Eliminate patch back at same curb area. Credit $603.91 Standard Inclusions: *Asphalt Design Inc.agrees to defend and indemnify contractor or owner by assuming responsibility for claims,suits,or liability for property damage and/or personal injury that arises directly from Asphalt Desigri's work. Intended to be read as type III indemnity only. *This proposal and special provisions are to be attached and made part of any resulting contract. *Proposal is good for 30 days from dated proposal. *,Material costs for asphalt and baserock are those in effect as of'the date of this proposal;Asphalt Design by Juan Gomez shall be reimbursed for any increases in the cost of such materials in effect as of the date of installation. *Our work is under warranty for a period of 1 year after completion or work. Standard Exclusions: *Survey,permits,staking,engineering,testing of any kind, fees,inspection services, *Removal,abandonment,adjustment or relocation of utility lines,such as underground electrical lines,gas lines,wet or dry utilities,wells,irrigations or drainage lines. *Removal of any unforeseen obstructions,buried objects. *Any demolition or off-haul of any kind other than what is specifically included in the proposal. *Any reasonable search to locate disturbed soil or undocumented fill soils. *Verification,certification or survey of over excavation depths. *Winterization,dewatering,erosion control including grading,construction entrances,swppp&reports. *Removal of trees,tree roots,footings,septic tanks,wells,slabs and basements. *Adjustment or patch back of manholes,trenches,sewer or water meters. *Off haul of dirt generated from other trades. *Any import of dirt. *Any excavation or backfill of wall footings. *Rccompaction nr backfill due to existing underground conditions. *Lime treatment,geo fabric,petromat,prime coat,traffic control, crack filling,fog seal,slurry seal, truncated domes. *Baserock underneath buildings,pads, footings,curbs,gutters,sidewalks, approaches,trash enclosures or any other areas besides the asphalt paving unless specifically noted. *Prevailing wages&any insurance coverage not currently provided by our current insurance policy. *Anything that is not specifically included is excluded. D7R# 1000010136 TO ACCEPT,sign here&return x (print name) (date) BY signing this you are authorising an agreement per the terms in the bid proposal. 1 A S Dezign, Inc. dba Asphalt Design By Juan Gomez 4061 W. Belmont Avenue - Fresno, CA 93722 (559) 276-0447 Fax (559) 276-8029 May 17, 2021 To: BMY Construction Group Project: Fresno County Animal Control Change Order Work: RFQ#2 - Elimination of Demo & Patch Back Labor: Qt Hrs Rate Total Operator 1 2 $82.04 $164.08 Laborer 1 1 $58 29 S58 29 Laborer 2 1 S58.29 $116.58 Travel time $35.00 $0.00 Subtotal $338.95 Equipment: Qty Hrs Rate Total Tractor 1 1 $35.00 $35.00 Bobcat 1 1 $35.00 $35.00 Mini excavator $35.00 $0.00 Roller 535.00 $0.00 Paver Scraper $185.00 $0.00 $85.00 50.00 623 Scraper $175.00 $0.00 Blade $85.00 $0.00 Pactor $85.00 Excavator $0.00 $150.00 $0.00 Grinder 5450.00 $0.00 Service truck Water truck $$35.00 $35.00 $0.00 0.00 Trucking/mobilization $120.00 $0.00 Subtotal $70.00 Material: Qt Rate Tax Total Asphalt 1 53 1.08 $57.24 Baserock 1.08 $0.00 Delivery: # of loads Rate Total As halt S0.00 Baserock $0.00 Subtotal $57.24 Grand subtotal $466.19 Mark up 15% $69.93 Burden 20.00% $67.79 GRAND TOTAL $603.91