Loading...
HomeMy WebLinkAbout2005C CCO 02.pdfCOUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER LATON PEDESTRIAN AND DRAINAGE IMPROV EMENTS CHANGE ORDER NO. 2 FEDERAL PROJECT NUMBER: ATPL -5942(275) JANUARY 19, 2021 CONTRACT NO. 20-05-C PAGE 1 OF 2 __ Contractor __ Auditor Controller __ Business Office __ Board __ Const. Management __ RE/Arch. __ Design We, the above signed contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefor the prices shown above. If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. TO: EMMETT’S EXCAVATION, INC: Make the following changes to the plans and specifications or do the following work not included in the plans and specifications for this contract. Because of the change(s), TWO WORKING DAYS will be added to the contract time. The revised date of completion is June 23, 2021. PART I: DEMO ADDITIONAL CONCRETE IN THE DECK, INVERT, AND WALL SLABS OF THE GRANT CANAL BOX CULVERT Drill to a 9-inch depth to bond to the longitudinal (in the direction of the canal) reinforcement with an approved chemical adhesive to match the existing longitudinal reinforcement within the culvert invert and wall slabs. The deck slab reinforcement shall be installed using one of the following options: Option 1 – Remove the existing concrete to a clean saw cut line to allow the lap of undamaged existing reinforcing with new longitudinal reinforcement according to Standard Plan D82, Detail A. Perform lap splicing (minimum length) per Section 52-6.03B, “Lap Splicing,” of the Standard Specifications. Option 2 – Remove an additional 6 to 8 inches of concrete to a clean saw cut line exposing between 12 and20 inches of undamaged existing reinforcement. Drill to a 9-inch depth and bond the longitudinal reinforcement with an approved chemical adhesive to match the existing longitudinal reinforcement. Provide dowel bars of sufficient length for lap splices according to the requirements of Section 52-6.03B, “Lap Splicing,” of the Standard Specifications. All new transverse reinforcement shall be lap splice d with existing transverse reinforcement according to Section 52-6.03B, “Lap Splicing,” of the Standard Specifications. TOTAL COST PART I: NO COST TOTAL TIME EXTENSION PART I: ZERO WORKING DAYS PART II: GRANT A TIME EXTENSION Grant a time extension of two working days for additional holidays granted by the Department to contractors currently working according to Section 8-1.07B, “Time Adjustments,” of the Special Provisions. COUNTY OF FRESNO CONSTRUCTION MANAGEMENT CONTRACT CHANGE ORDER LATON PEDESTRIAN AND DRAINAGE IMPROV EMENTS CHANGE ORDER NO. 2 FEDERAL PROJECT NUMBER: ATPL -5942(275) JANUARY 19, 2021 CONTRACT NO. 20-05-C PAGE 2 OF 2 __ Contractor __ Auditor Controller __ Business Office __ Board __ Const. Management __ RE/Arch. __ Design We, the above signed contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, except as may otherwise be noted above, and perform all services necessary for the work above specified, and will accept as full payment therefor the prices shown above. If the Contractor does not sign acceptance of this order, his attention is directed to the requirements of the specifications as to proceeding with the ordered work and filing a written protest within the time therein specified. Working Day Extension Summary Working Days December 24, 2020 1 Working Day December 31, 2020 1 Working Day Total Working Days 2 Working Days TOTAL COST PART II: NO COST TOTAL TIME EXTENSION PART II: 2 WORKING DAYS NET COST THIS CHANGE ORDER: $0.00 (NO COST) NET TIME EXTENSION THIS CHANGE ORDER: 2 WORKING DAYS JAMES DREWS, Resident Engineer APPROVAL RECOMMENDED: EMMETT’S EXCAVATION, INC. Contractor STEVE DEIS, Construction Engineer By: STEVEN E. WHITE, Director of Public Works Title: and Planning Accepted Date: Date: Jan 21, 2021 Project Manager Steven E White (Jan 21, 2021 07:57 PST) Steven E White Jan 21, 2021