Loading...
HomeMy WebLinkAbout24786QUOTATION NO. 630-4296 Page 19 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC ATTACHMENT “A” PRODUCT SPECIFICATON CLARIFICATIONS QUOTATION NO. 630-4296 Page 20 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC The County of Fresno adopts the Los Angeles Department of Public Works Specification for Acrylic Waterborne White Rapid Dry Traffic Paint with the following revisions: 1. I. Definitions. (A.1.) County shall be Fresno County 2. I. Definitions. (A.2.) Department shall be Fresno County Department of Public Works, 2220 Tulare Street, Sixth Floor, Fresno, California 93721. 3. I. Definitions. (A.3.) Engineer shall be the Director of Public Works for Fresno County or his agent. 4. I. Definitions. (A.4.) Purchasing Department shall be County of Fresno, General Services Purchasing, 4525 E. Hamilton Avenue, Fresno, California, 93702. 5. I. Definitions. (A.5.) Purchasing Agent shall be the Purchasing Agent of Fresno County or his deputy. 6. I. Definitions. (A.6) Delete in its entirety. I. Definitions. (A.7) Delete in its entirety. 7. III. General. Delete last paragraph starting with “The composition of paint…” in its entirety. 8. VI. Detailed Requirements. No-Tracking Time Field Test – Change to “The paint shall dry to a no-tracking condition in a maximum of 75 seconds. The no-tracking condition shall be determined by actual application of the pavement at a wet film thickness of 15 mils with white paint covered with glass beads at a rate of 6 to 7 pounds per gallon.” 9. VII. Packaging and Marking. (3) Delete Bulk tank paragraph and following paragraph starting with “The construction…” in their entirety. 10. VIII. Sampling and Inspection. Replace paragraph one with the following: “For all traffic paints, vendors shall supply written certification from the County of Los Angeles, or from an approved independent Materials Testing Laboratory, that candidate products meet or exceed specifications noted herein and shall include all written test results therefore. “Please submit testing laboratory credentials to Robin Quinn for approval (Fax: 559-262-4166).” “In the event any paint does not comply with the specification, the Contractor will be required to replace all remaining paint in the possession of the Department at the Contractor’s own expense within 30 calendar days. This includes all handling and transportation charges. 11. XIX. Delivery. Replace paragraphs one, two and three with the following: “The County will make every effort to make the total order in truckload quantities, however, no minimum order will be specified. Orders will be placed throughout the year on an as-needed basis. Deliveries shall be made within 30 days of order placement.” “The delivery point for all material shall be the County of Fresno Traffic Sign Shop, 4557 E. Hamilton Avenue, Bldg. 409, Fresno, California, 93702.” QUOTATION NO. 630-4296 Page 21 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC The County of Fresno adopts the Los Angeles Department of Public Works Specification for Acrylic Waterborne Yellow Rapid Dry Traffic Paint with the following revisions: 1. I. Definitions. (A.1.) County shall be Fresno County 2. I. Definitions. (A.2.) Department shall be Fresno County Department of Public Works, 2220 Tulare Street, Sixth Floor, Fresno, California 93721. 3. I. Definitions. (A.3.) Engineer shall be the Director of Public Works for Fresno County or his agent. 4. I. Definitions. (A.4.) Purchasing Department shall be County of Fresno, General Services Purchasing, 4525 E. Hamilton Avenue, Fresno, California, 93702 5. I. Definitions. (A.5.) Purchasing Agent shall be the Purchasing Agent of Fresno County or his deputy. 6. I. Definitions. (A.6, 7) Delete in their entirety. 7. III. General. Delete last paragraph starting with “The composition of paint…” in its entirety. 8. VI. Detailed Requirements. No-Tracking Time Field Test – Change to “The paint shall dry to a no-tracking condition in a maximum of 75 seconds. The no-tracking condition shall be determined by actual application of the pavement at a wet film thickness of 15 mils with yellow paint covered with glass beads at a rate of 6 to 7 pounds per gallon.” 9. VII. Packaging and Marking. (3) Delete Bulk tank paragraph and following paragraph starting with “The construction…” in their entirety. 10. VII. Testing (A) Qualifying Test. Amend by adding the following: “For all traffic paints, vendors shall supply written certification from the County of Los Angeles, or from an approved independent Materials Testing Laboratory, that candidate products meet or exceed specifications noted herein and shall include all written test results therefore. “Please submit testing laboratory credentials to Robin Quinn for approval (Fax 559-262- 4166).” 11. VII. Testing (B) Quality Assurance Tests. Replace first paragraph with the following: “All paint ordered from the Contractor shall be subject to testing at any time, at the Engineer’s discretion. The Department reserves the right to accept or reject a specific batch or batches of paint based upon the results of such sample tests.” 12. IX. Vendor Support. Replace first sentence with the following: “Upon the Engineer’s request , the Contractor shall be available to provide a minimum of two days technical support to the Department, at no additional cost.” 13. X. Delivery. Replace the first paragraph with the following: “The County will make every effort to make the total order in truckload quantities; however, no minimum order will be specified. Orders will be placed throughout the year on an as-needed basis. Deliveries shall be made within 30 days of order placement.” QUOTATION NO. 630-4296 Page 22 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC 14. X. Delivery. Replace the last sentence dealing with the delivery point with the following: “The delivery point for all material shall be the County of Fresno Traffic Sign Shop, 4557 E. Hamilton Avenue, Bldg. 409, Fresno, California, 93702.” The County of Fresno adopts the Los Angeles Department of Public Works Specification for Red Lead-Free Rapid Dry Curb Marking Paint with the following revisions: 1. Delivery. Replace the last sentence dealing with the delivery point with the following: “The delivery point for all material shall be the County of Fresno Traffic Sign Shop, 4557 E. Hamilton Avenue, Bldg. 409, Fresno, California, 93702.” The County of Fresno adopts the Los Angeles Department of Public Works Specification for Green, Blue, and Black Type II Curb Marking Paint with the following revisions: 1. I. Definitions. (A.1.) County shall be Fresno County. 2. I. Definitions. (A.2.) Department shall be Fresno County Department of Public Works, 2220 Tulare Street, Sixth Floor, Fresno, California 93721. 3. I. Definitions. (A.3.) Engineer shall be the Director of Public Works for Fresno County or his agent. 4. I. Definitions. (A.4.) Purchasing Department shall be County of Fresno Purchasing, General Services-Purchasing Unit, 4525 E. Hamilton Avenue, Fresno, California, 93702. 5. I. Definitions. (A.5.) Purchasing Agent shall be the Purchasing Agent of Fresno County or his deputy. 6. I. Definitions. (A.6, 7) Delete in their entirety. 7. III. General (A) Delete in its entirety. 8. IV. Drying Time (B.1) Add paragraph 2 as follows: “Black paint shall dry to a no-tracking condition in a maximum of 75 seconds. The no-tracking condition shall be determined by actual application of the pavement at a wet film thickness of 15 mils. 9. VII. Basis of Payment (A) replace last sentence with “Black Paint Only, may also be ordered in 50 gallon containers and 250 gallon totes”. 10. VII. Basis of Payment (A) Delete “1-gallon and” 11. VII. Basis of Payment (B) Delete “1-gallon,” 12. VIII. Packaging and Marking (B.1) Delete in its entirety. 13. IX. Delivery (C) Replace with the following: “The delivery point for all material shall be the County of Fresno Traffic Sign Shop, 4557 E. Hamilton Avenue, Bldg. 409, Fresno, California, 93702.” QUOTATION NO. 630-4296 Page 23 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC ATTACHMENT “B” LOS ANGELES COUNTY DEPARTMENT OF PUBLIC WORKS TRAFFIC PAINT SPECIFICATONS Note: Bidders are not to respond on these forms. Bidders are to respond on the Quotation Page 18 provided by the County of Fresno QUOTATION NO. 630-4296 Page 24 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC QUOTATION NO. 630-4296 Page 25 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC QUOTATION NO. 630-4296 Page 26 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC QUOTATION NO. 630-4296 Page 27 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC QUOTATION NO. 630-4296 Page 28 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC QUOTATION NO. 630-4296 Page 29 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC QUOTATION NO. 630-4296 Page 30 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC QUOTATION NO. 630-4296 Page 31 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC QUOTATION NO. 630-4296 Page 32 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC QUOTATION NO. 630-4296 Page 33 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC QUOTATION NO. 630-4296 Page 34 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC QUOTATION NO. 630-4296 Page 35 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC QUOTATION NO. 630-4296 Page 36 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC QUOTATION NO. 630-4296 Page 37 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC QUOTATION NO. 630-4296 Page 38 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC QUOTATION NO. 630-4296 Page 39 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC QUOTATION NO. 630-4296 Page 40 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC QUOTATION NO. 630-4296 Page 41 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC QUOTATION NO. 630-4296 Page 42 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC QUOTATION NO. 630-4296 Page 43 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC QUOTATION NO. 630-4296 Page 44 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC QUOTATION NO. 630-4296 Page 45 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC QUOTATION NO. 630-4296 Page 46 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC QUOTATION NO. 630-4296 Page 47 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC QUOTATION NO. 630-4296 Page 48 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC QUOTATION NO. 630-4296 Page 49 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC QUOTATION NO. 630-4296 Page 50 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC QUOTATION NO. 630-4296 Page 51 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC QUOTATION NO. 630-4296 Page 52 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC QUOTATION NO. 630-4296 Page 53 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC QUOTATION NO. 630-4296 Page 54 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC QUOTATION NO. 630-4296 Page 55 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC QUOTATION NO. 630-4296 Page 56 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC QUOTATION NO. 630-4296 Page 57 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC QUOTATION NO. 630-4296 Page 58 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC QUOTATION NO. 630-4296 Page 59 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC QUOTATION NO. 630-4296 Page 60 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC QUOTATION NO. 630-4296 Page 61 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC QUOTATION NO. 630-4296 Page 62 G:\RFQ\630-4296 TRAFFIC STRIPING PAINT.DOC